John Murray Plots His Course for Port Canaveral
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
2.0 Current Freight Rail System and Services in Florida
Investment Element of the 2010 Florida Rail System Plan 2.0 Current Freight Rail System and Services in Florida 2.1 Overview The Florida rail system is comprised of 2,786 miles of mainline track, which are owned by 15 operating line-haul railroads and terminal or switching companies, as well as 81 miles owned by the State of Florida. Florida’s rail system includes 2 Class I Railroads (CSX Transportation and Norfolk Southern Corporation), 1 Class II (Florida East Coast Railway), 11 Class III (Alabama and Gulf Coast Railway AN Railway, Bay Line Railroad, First Coast Railroad, Florida West Coast Railroad, Florida Central Railroad, Florida Midland Railroad, Florida Northern Railroad, Georgia and Florida Railway, Seminole Gulf Railway, and South Central Florida Express) and 1 railroad specializing in switching and terminals (Talleyrand Terminal).9 The largest operator in the State is CSX Transportation, which owns more than 53 percent of the statewide track mileage. In 2008, Florida’s railroads carried nearly 1.6 million carloads – 19 percent less than in 2006 – and approximately 83 million tons of freight, representing a 25 million ton (23 percent) decrease from 2006.10 During that year, railroads handled freight equivalent to roughly 5.0 million heavy trucks.11 Nonetheless, railroads continue to support thousands of jobs throughout the State and assist Florida’s industries to remain competitive with international and domestic markets for fertilizer, construction rock, consumer goods, paper products, processed 9 U.S. Class I Railroads are line-haul freight railroads with 2007 operating revenue in excess of $359.6 million (2006 operating revenues exceeding $346.7 million). -
2004 Freight Rail Component of the Florida Rail Plan
final report 2004 Freight Rail Component of the Florida Rail Plan prepared for Florida Department of Transportation prepared by Cambridge Systematics, Inc. 4445 Willard Avenue, Suite 300 Chevy Chase, Maryland 20815 with Charles River Associates June 2005 final report 2004 Freight Rail Component of the Florida Rail Plan prepared for Florida Department of Transportation prepared by Cambridge Systematics, Inc. 4445 Willard Avenue, Suite 300 Chevy Chase, Maryland 20815 with Charles River Associates Inc. June 2005 2004 Freight Rail Component of the Florida Rail Plan Table of Contents Executive Summary .............................................................................................................. ES-1 Purpose........................................................................................................................... ES-1 Florida’s Rail System.................................................................................................... ES-2 Freight Rail and the Florida Economy ....................................................................... ES-7 Trends and Issues.......................................................................................................... ES-15 Future Rail Investment Needs .................................................................................... ES-17 Strategies and Funding Opportunities ...................................................................... ES-19 Recommendations........................................................................................................ -
Florida Ports Financing Commission
FLORIDA PORTS FINANCING COMMISSION Canaveral Port Authority ∙ Port Everglades ∙ Port of Fort Pierce ∙ Jacksonville Port Authority ∙ Manatee County Port Authority ∙ PortMiami ∙ Port of Palm Beach ∙ Panama City Port Authority ∙ Port of Pensacola ∙ Tampa Port Authority September 24, 2019 10:00 A.M. Teleconference Call-in Number: +1 646 558 8656 Meeting ID: 463 888 1996 502 East Jefferson Street, Tallahassee, Florida 32301 Phone: (850) 222-8028 ∙ Fax: (850) 222-7552 Email: [email protected] FLORIDA PORTS FINANCING COMMISSION Canaveral Port Authority ∙ Port Everglades ∙ Port of Fort Pierce ∙ Jacksonville Port Authority ∙ Manatee County Port Authority ∙ PortMiami ∙ Port of Palm Beach ∙ Panama City Port Authority ∙ Port of Pensacola ∙ Tampa Port Authority September 24, 2019 10:00 A.M. Teleconference Call-in Number: +1 646 558 8656 Meeting ID: 463 888 1996 AGENDA 1. Call to Order 2. Roll Call 3. Approval of June 27, 2019 Florida Ports Financing Commission (FPFC) Meeting Summary 4. Administrative Report 5. Approval of FPFC FY 2019 Budget 6. Election of Officers Recommended by the Nominating Committee 7. Other Issues 8. Adjournment 502 East Jefferson Street, Tallahassee, Florida 32301 Phone: (850) 222-8028 ∙ Fax: (850) 222-7552 Email: [email protected] TAB 1 Call to Order TAB 2 Roll Call FLORIDA PORTS FINANCING COMMISSION ROLL CALL MEMBER PORT REPRESENTATIVE PORT CANAVERAL Mike Poole Pat Poston PORT EVERGLADES David Anderton PORT OF FT. PIERCE Kevin Lindgren PORT OF JACKSONVILLE Mike McClung PORT MANATEE Denise Stufflebeam PORTMIAMI Becky Hope PORT OF PALM BEACH Manuel Almira PORT PANAMA CITY John Miller PORT OF PENSACOLA Amy Miller PORT TAMPA BAY Ram Kancharla PORT OF FERNANDINA Laura DiBella 2019 TAB 3 Approval of June 27, 2019 Florida Ports Financing Commission (FPFC) Meeting Summary FLORIDA PORTS FINANCING COMMISSION Canaveral Port Authority ∙ Port Everglades ∙ Port of Fort Pierce ∙ Jacksonville Port Authority ∙ Manatee County Port Authority ∙ PortMiami ∙ Port of Palm Beach ∙ Panama City Port Authority ∙ Port of Pensacola ∙ Tampa Port Authority June 27, 2019 10:00 A.M. -
I N V E S T I N G
INVESTING IN Program Highlights | 2016 1 INVESTING IN The SIS n 2003, the Florida Legislature and Governor established the Strategic Intermodal System (SIS) to enhance Florida’s transportation mobility and Ieconomic competitiveness. The SIS is a statewide network of high-priority transportation facilities, including the State’s largest and most significant WHAT IS THE airports, spaceports, deep-water seaports, freight rail terminals, passenger rail and intercity bus terminals, rail corridors, waterways and highways. These facilities represent the state’s primary means for moving people and freight between Florida’s diverse regions, as well as between Florida and other states STRATEGIC and nations. SIS Facilities are designated through the use of objective criteria and thresholds based on quantitative measures of transportation and economic activity. These facilities meet high levels of people and goods movement and INTERMODAL generally support major flows of interregional, interstate, and international travel and commerce. Facilities that do not yet meet the established criteria and thresholds for SIS designation, but are expected to in the future are referred to as Emerging SIS. These facilities experience lower levels of people SYSTEM? and goods movement but demonstrate strong potential for future growth and development. The designated SIS and Emerging SIS includes 17 commercial service airports, two spaceports, 12 public seaports, over 2,300 miles of rail corridors, over 2,200 miles of waterways, 34 passenger terminals, seven rail freight terminals, and over 4,600 miles of highways. These hubs, corridors and connectors are the fundamental structure which satisfies the transportation needs of travelers and visitors, supports the movement of freight, and provides transportation links to external markets. -
U.S. Coast Guard Units in FLORIDA
U.S. Coast Guard Units in the State of Florida Seventh Coast Guard District Headquarters Office Tel: (305) 415-6670 909 S.E. First Avenue, Suite 944 Miami, FL Coast Guard Air Station Miami Tel: (305) 953-2100 14750 N.W. 44th Court Opa Locka Airport Opa Locka, FL 33054 Coast Guard Air Station Clearwater Tel: (727) 535-1437 15100 Rescue Way Clearwater, FL 33762-1437 Coast Guard Marine Safety Office / Marine Safety Unit Tampa Tel: (813) 228-2191 155 Columbia Drive Tampa, FL 33606-3598 Coast Guard Civil Engineering Unit Miami Tel: (305) 278-6700 15608 S.W. 117th Avenue Miami, FL 33177-1630 Coast Guard Helicopter Interdiction Tactical Squadron (HITRON) Jacksonville Tel: (904) 594-6800 6213 Aviation Avenue, Bldg. 1846 Jacksonville, FL 32221-8120 Coast Guard Station St. Petersburg Tel: (727) 824-7670 600 8th Avenue SE St. Petersburg, FL 33701-5099 Coast Guard Station Ft. Myers Beach Tel: (941) 463-5754 719 San Carlos Drive Fort Myers Beach, FL 33931-2221 1 S Coast Guard tation Ft. Pierce Tel: (561) 464-6100 900 Seaway Drive Fort Pierce, FL 34949-3039 Coast Guard Station Islamorada Tel: (305) 664-4404 183 Palermo Drive Islamorada, FL 33036-3317 Coast Guard Station Lake Worth Inlet Tel: (561) 840-8503 3300 Lakeshore Drive Riviera Beach, FL 33404-2406 Coast Guard Station Marathon Tel: (305) 743-1945 1800 Overseas Highway Marathon, FL 33050-2199 Coast Guard Station Ft. Lauderdale Tel: (954) 927-1611 P.O. BOX 537 Broward County Park 7000 N. Ocean Drive Dania, FL 33004-3079 Coast Guard Station Ponce De Leon Inlet Tel: (386) 428-9085 2999 North Peninsula Avenue New Smyrna Beach, FL 32169-2041 Coast Guard Station Port Canaveral Tel: (321) 853-7601 9235 Grouper Road Cape Canaveral, FL 32920-4402 Coast Guard Station Sand Key Tel: (727) 596-8540 1375 Gulf Boulevard Clearwater, FL 33767-2899 Coast Guard Station Key West Tel: (305) 292-8862 Building 101, Trumbo Point Key West, FL 33040-6695 2 Coast Guard Station Yankeetown Tel: (352) 447-6900 P.O. -
Florida Department of Transportation RICK SCOTT 2198 Edison Avenue ANANTH PRASAD, P.E
Florida Department of Transportation RICK SCOTT 2198 Edison Avenue ANANTH PRASAD, P.E. GOVERNOR Jacksonville, FL 32204 SECRETARY Transmitted Electronically July 23, 2014 RE: FDOT Courtesy Review - Draft Ocean Highway and Port Authority and Port of Fernandina Master Plan Update Introduction The Florida Department of Transportation received the Draft Ocean Highway and Port Authority and Port of Fernandina Master Plan Update June 23, 2014. The following are the FDOT Courtesy Review comments. We look forward to reviewing the final Master Plan in the future. The comments offered are suggested revisions and recommendations that are to be included before an adoption into the City of Fernandina Comprehensive Plan. Previously we provided the Master Plan Consultant comments related to grammar and wording in the document. These editorial comments are not included in this courtesy review letter as they are not substantive changes. Overall, the Draft Master Plan addresses the requirements set forth for port strategic plans under F.S. 311.14 (2). FDOT Comments Tables • Page ES-12 shows the Phase 3 Site Layout. The narrative to explain Phase 3 is lacking or needs clarification. • Table 6.1-3 (page 6-13) PM Peak hour Roadway Level of Service Conditions): o Segment Column: Roadway segments should match FDOT LOS report or where there are significant changes in volume or changes in the number of thru lanes. o 2023 Peak Volume Column: The standardized “K” factor should be used when converting AADT to peak hour. What “K’ factor was used to convert AADT to peak hour? In addition, traffic volumes should be averaged when there are more than one count stations within a segment. -
The Florida Rail System Plan: Investment Element
The Florida Rail System Plan: Investment Element prepared for the Florida Department of Transportation prepared by Cambridge Systematics, Inc. With support from Planning Innovations, Inc Quandel Consultants December 2010 Florida Department of Transportation CHARLIE CRIST " STEPHANIE C. KOPELOUSOS 605 Suwannee Street GOVERNOR Tallahassee, FL 32399-0450 SECRETARY December 14, 2010 Citizens of Florida: I am pleased to submit to you the Investment Element of the 2010 Florida Rail System Plan. Unlike in past years, where the Florida Rail System Plan was more descriptive of the separate freight and passenger rail systems, this plan is more visionary, strategic, and policy-driven. The plan was guided by a broad base of stakeholders, including the Rail Stakeholder Advisory Committee, members of the public and private sectors, modes of transportation, economic development and environmental interests, and citizen representatives. The Committee and others worked throughout the summer and fall of 2009 to develop an inventory of Florida's rail system needs and recommend priority investments that support the strategic goals, objectives, and policies of the Florida Rail System Plan. The Florida Rail System Plan is comprised of a Policy Element and this document, the Investment Element. The Policy Element provides a broad policy framework for the investment of limited state resources in Florida's rail system. The Investment Element builds upon the framework of the Policy Element by identifying the needs of Florida's rail system, establishing priorities for the investment of state funds, and setting forth future action steps necessary to implement the plan. Florida in the year 2030 will be shaped by the actions, decisions, and policy choices made today. -
2018 Update of Tables and Figures
2018 Update of Tables and Figures August 2019 INTRODUCTION This document provides an update to the majority of data tables and figures provided in the Florida Department of Transportation’s (FDOT) 2015 Florida Seaport System Plan. The annual updating of seaport system plan data allows FDOT to: implement the plan using the latest industry metrics; provide analysis of long-term trends; and, provide a foundation for future five-year plan updates. The information collected for this update are the 2018 seaport metrics including the number of containers in twenty-foot equivalent units (TEUs), cargo tonnages, total number of revenue cruise passengers, and several other items. The primary source of the data is the individual Florida Seaports and the Florida Seaport Five-Year Mission Plans. In addition, some of the data comes from official government sources. Maintaining this data on an annual basis will lay the foundation of information necessary for the 2020 Florida Seaport Plan to build upon. The purpose statement and vision of the 2015 plan are restated below. The updated Figures and Tables follow. It should be noted, not all tables and figures in the 2015 plan were updated as: some data sources are not updated annually; some source data has not been updated; or, the 2015 data is still up to date. STATEMENT OF PURPOSE This 2015 Florida Seaport System Plan was prepared in accordance with the statutory requirements of Section 311.14(1), Florida Statutes (F.S.). The development of this plan, along with other modal plans developed under the Freight, Logistics, and Passenger Operations (FLP) Office at the Florida Department of Transportation (FDOT), provides the Department with a cohesive planning process for all the modal offices. -
Port Canaveral 2018 Economic Impact Analysis
The Economic Contribution of Port Canaveral to Florida in 2018 Prepared for: Canaveral Port Authority September 2019 Business Research & Economic Advisors Page | 1 Table of Contents I. Executive Summary 3 II. Introduction 15 III. Business Line Analysis 19 i. Cruise Segment 19 ii. Cargo Segment 29 a. Final Demand Impacts 34 iii. Real Estate Segment 35 iv. Recreation Segment 38 v. Government Segment 41 IV. Appendix 44 A. Passenger & Crew Surveys 45 B. Jetty Park Survey 51 C. CPA’s Operational Expenses 52 Business Research & Economic Advisors Page | 2 2018 Economic Contribution of Port Canaveral I. Executive Summary Introduction Business Research and Economic Advisors (BREA) was engaged by the Canaveral Port Authority (CPA) to conduct an analysis of the economic contribution of Port Canaveral to the state of Florida during 2018. The objective of the study was to quantify employ- ment, wages, expenditures and taxes that were directly and indirectly related to the movement of cruise passengers and cargo through Port Canaveral, the operational activ- ity of tenants who conduct their business on property owned and maintained by CPA, and patrons of CPA parks, recreational facilities and attractions. The major findings of this analysis included: • Port Canaveral welcomed 2.1 million embarking, multi-day cruise passengers in 2018. This was the second-most passenger embarks from a U.S. cruise port and accounted for approximately 16% of total U.S. embarkations. Port Canav- eral also welcomed 355,000 port-of-call passengers and 273,000 single-day cruise passengers who boarded the Victory Casino ships that homeport at Port Canaveral. -
Canaveral Port Authority Master Cruise Ship Schedule -- FY 2019
Canaveral Port Authority Master Cruise Ship Schedule -- FY 2019 Fiscal Year 2019 (Oct 1, 2018 - Sept 30, 2019) Arrival Departure PAX Date Day Terminal Ship Time Time Cruise Line Agent Capacity Comments MISC. Oct 01, 2018 Mon CT10 Oct 01, 2018 Mon CT8 Disney Dream 0530 1700 Disney MCC 4,000 Oct 01, 2018 Mon CT6 Oct 01, 2018 Mon CT5 Oct 01, 2018 Mon CT1 Enchantment of the Seas 0700 1600 Royal Caribbean MLSBC 2,730 Oct 01, 2018 Mon CT3 NCB5 Oct 02, 2018 Tue CT10 Oct 02, 2018 Tue CT8 Oct 02, 2018 Tue CT6 Oct 02, 2018 Tue CT5 Oct 02, 2018 Tue CT1 Oct 02, 2018 Tue CT3 NCB5 Oct 03, 2018 Wed CT10 Oct 03, 2018 Wed CT8 Oct 03, 2018 Wed CT6 Oct 03, 2018 Wed CT5 Oct 03, 2018 Wed CT1 Oct 03, 2018 Wed CT3 NCB5 Oct 04, 2018 Thu CT10 Oct 04, 2018 Thu CT8 Oct 04, 2018 Thu CT6 Oct 04, 2018 Thu CT5 Carnival Liberty 0700 1600 Carnival Fillette 2,980 Oct 04, 2018 Thu CT1 Oct 04, 2018 Thu CT3 NCB5 Oct 05, 2018 Fri CT10 Oct 05, 2018 Fri CT8 Disney Dream 0530 1700 Disney MCC 4,000 Oct 05, 2018 Fri CT6 Oct 05, 2018 Fri CT5 Oct 05, 2018 Fri CT1 Enchantment of the Seas 0700 1600 Royal Caribbean MLSBC 2,730 Oct 05, 2018 Fri CT3 NCB5 Oct 06, 2018 Sat CT10 Oct 06, 2018 Sat CT8 Disney Fantasy 0545 1700 Disney MCC 4,000 Oct 06, 2018 Sat CT6 Carnival Breeze 630 1600 Carnival Fillette 3,690 Oct 06, 2018 Sat CT5 Oct 06, 2018 Sat CT1 Oct 06, 2018 Sat CT3 NCB5 Oct 07, 2018 Sun CT10 Oct 07, 2018 Sun CT8 Oct 07, 2018 Sun CT6 Carnival Sunshine 700 1600 Carnival Fillette 3,006 Oct 07, 2018 Sun CT5 Carnival Liberty 0700 1600 Carnival Fillette 2,980 Oct 07, 2018 Sun CT1 Oasis -
Processing the Shuttle for Flight
Processing When taking a road trip, it is important to plan ahead by making sure your vehicle is prepared for the journey. A typical road trip on Earth can be the Shuttle for routine and simple. The roadways are already properly paved, service Flight stations are available if vehicle repairs are needed, and food, lodging, and stores for other supplies can also be found. The same, however, could not be said for a Space Shuttle trip into space. The difficulties associated with Steven Sullivan space travel are complex compared with those we face when traveling here. Preparing the Shuttle for Flight Food, lodging, supplies, and repair equipment must be provided for within Ground Processing the space vehicle. Jennifer Hall Peter Nickolenko Vehicle preparation required a large amount of effort to restore the shuttle Jorge Rivera to nearly new condition each time it flew. Since it was a reusable vehicle Edith Stull Steven Sullivan with high technical performance requirements, processing involved a Space Operations Weather tremendous amount of “hands-on” labor; no simple tune-up here. Not only Francis Merceret was the shuttle’s exterior checked and repaired for its next flight, all Robert Scully components and systems within the vehicle were individually inspected and Terri Herst verified to be functioning correctly. This much detail work was necessary Steven Sullivan because a successful flight was dependent on proper vehicle assembly. Robert Youngquist During a launch attempt, decisions were made within milliseconds by equipment and systems that had to perform accurately the first time—there was no room for hesitation or error. -
Strategic Intermodal System
FLORIDAF L O R I D A’S STRATEGIC INTERMODAL SYSTEM HIGHWAY RAIL AVIATION TRANSIT SEAPORT SPACEPORT OCTOBER 2011 Letter from the Secretary Today, as Florida emerges from the most severe economic recession in decades, the role of transportation in shaping Florida’s economic future is more significant than ever. The Florida Department of Transportation (FDOT) and its partners have collaborated to identify the future transportation needs of the state on the Strategic Intermodal System (SIS). The FDOT’s 2040 SIS Multi-Modal Unfunded Needs Plan is an update of the first ever SIS Multi-Modal Unfunded Needs Plan, approved in May 2006. With a statewide total of $131.2 Billion, the 2040 Unfunded Needs Plan includes needs from Aviation, Highway, Rail, Seaport, Spaceport, and Transit. Ananth Prasad Comprised of the state’s largest and most strategic transportation facilities, the SIS is the FDOT Secretary state’s primary means for moving people and freight between Florida’s diverse regions, as well as between Florida and other states and nations. Planning for future improvements to the SIS is critical to Florida’s future. Sincerely, FDOT Secretary Ananth Prasad Table of Contents Goals, Objectives & Process 2 Current Conditions 4 What Has Changed 6 SIS Unfunded Needs 8 Aviation 10 Highway 11 Rail 12 Seaport 13 Spaceport 14 Transit 15 1 What are the FTP Goals? The SIS is a large and complex system, but ultimately its purpose is simple. The SIS is intended GOALS, to enhance Florida’s economic competitiveness and quality of life by ensuring mobility for both people and freight between Florida’s regions and between Florida and other states and nations.