World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Project name: Project for Strenghtening National Rural Transport Program New Activities Loan: IDA-5336 & H8990 Modified Activities Procurement Plan Version: 2016-2 Canceled Activities Status: Approved Activities without Modification Date of Last Change of Status: 04/11/2015 Public Disclosure Authorized Category Works: Activities ShowHide Total days of End of No Objection Publication / No Objection to Contract (between Bid Contract Description Reference # Province/State Documents Invitation Bid Opening Evaluation of Bids Evaluation Report Signature Date Opening and (Completed) P.P. - Executing Agency: 2016-2-DOLIDAR - Method: NCB (National Competitive 5.Construction of Sandhikhark-Dharapani- SNRTP-22-NCB-O-SNRTP-ARG-W-NCB-1.05- Lumbini Zone N/A 01/02/14 03/03/14 18/03/14 N/A 10/05/14 68 11/05/15 Maidan Rd. (08 Km) UG-070-71 DTO Arghakhanchi Contract under execution Post Review N/A 15/03/14 14/04/14 15/05/14 N/A 11/07/14 88 Public Disclosure Authorized 6. Construction of Sandhikhark-Nuwakot- SNRTP-23-NCB-O-SNRTP-ARG-W-NCB-1.06- Lumbini Zone N/A 01/02/14 03/03/14 18/03/14 N/A 10/05/14 68 11/05/15 Asurkot-Pyuthan Rd. (07 Km): UG-070-71 DTO Arghakhanchi Contract under execution Post Review N/A 15/03/14 15/04/14 14/05/14 N/A 15/07/14 91 3. Construction of Mandredhunga – SNRTP-80-NCB-O-SNRTP-NUW-W-NCB-16.03-Bagmati Zone N/A 17/01/14 16/02/14 03/03/14 N/A 02/05/14 75 10/12/15 Khargabhanjyang-Gorsyang –Dangsing Road UG-070-71 (12.00 km) DTO Nuwakot Contract under execution Post Review N/A 04/03/14 06/04/14 14/05/14 N/A 30/05/14 54 1. Construction of Badhkhola-Taksar- SNRTP-119-NCB-O-SNRTP-SYA-W-NCB-28.01- Gandaki Zone N/A 25/01/14 24/02/14 03/03/14 N/A 02/05/14 67 25/11/15 Dadegaunda Road (10 Km) UG-070-71 Public Disclosure Authorized DTO Syanja Contract under execution Post Review N/A 27/01/14 26/02/14 01/05/14 N/A 26/05/14 89 2. Construction of Whalighuwas-Rampurr SNRTP-120-NCB-O-SNRTP-SYA-W-NCB-28.02- Gandaki Zone N/A 25/01/14 24/02/14 03/03/14 N/A 02/05/14 67 25/11/15 Road (7.50 Km) UG-070-71 DTO Syanja Contract under execution Post Review N/A 27/01/14 26/02/14 28/03/14 N/A 26/05/14 89 3. Construction of Rangkhola-Biruwa Road. SNRTP-121-NCB-O-SNRTP-SYA-W-NCB-28.03- Gandaki Zone N/A 25/01/14 24/02/14 03/03/14 N/A 02/05/14 67 25/11/15 (7.50 Km) UG-070-71 DTO Syanja Contract under execution Post Review N/A 27/01/14 26/02/14 30/03/14 N/A 26/05/14 89 1. Construction of Sandhikharka-Dharapani- SNRTP-169-NCB-O-SNRTP-ARG-W-NCB-1.01- Lumbini Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/04/16 Chujathi Road (7 Km): UG-070-71 Public Disclosure Authorized DTO Arghakhanchi Expected Post Review 2. Construction of Sandhikharka-Dharapani- SNRTP-170-NCB-O-SNRTP-ARG-W-NCB-1.02- Lumbini Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 11/10/16 Chujathi Road (12.50 Km): UG-070-71 DTO Arghakhanchi Expected Post Review 3.Construction of Sandhikharka-Balkot- SNRTP-171-NCB-O-SNRTP-ARG-W-NCB-1.03- Lumbini Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 09/10/16 Tamghash Rd (25.50 Km) UG-070-71 DTO Arghakhanchi Expected Post Review 1. Construction of Chama-Samjhanachowk- SNRTP-175-NCB-O-SNRTP-BAN-W-NCB-2.01- Bheri Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/10/16 Khajura-Radhapur Road (11 Km): UG-070-71 DTO Banke Expected Post Review 2. Construction of RRM-Mahendranagar- SNRTP-176-NCB-O-:SNRTP-BAN-W-NCB-2.02- Bheri Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/04/16 Hirminiya-Holyia Road.(06 km) UG-070-71 DTO Banke Expected Post Review 3.Construction of MRM-Titirihiya-Sohanpur- SNRTP-177-NCB-O-SNRTP-BAN-W-NCB-2.03- Bheri Zone N/A 10/01/15 10/01/15 10/01/15 N/A 10/01/15 0 08/07/16 Udrahapur Road (18.50 Km) UG-070-71 DTO Banke Expected Bheri Zone Post Review 4. Construction of Paraspur- Gaughat Road. SNRTP-178-NCB-O-SNRTP-BAN-W-NCB-2.04- Bheri Zone N/A 26/01/15 25/02/15 27/03/15 N/A 26/04/15 60 25/04/16 (12.75 Km) PM-070-71 DTO Banke Expected Post Review 1.Construction of Bahuwari-Simraungadh- SNRTP-179-NCB-O-SNRTP-BAR-W-NCB-3.01- Narayani Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/04/16 Aruwa Nadi Road. (10 Km) UG-070-71 DTO Bara Expected Post Review 2. Construction of Kabahigoth- SNRTP-180-NCB-O-SNRTP-BAR-W-NCB-3.02- Narayani Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 11/04/16 BariyarpurRoad (10.75 Km) UG-070-71 DTO Bara Expected Post Review 3. Construction of Bahuwari-Simraungadh- SNRTP-181-NCB-O-SNRTP-BAR-W-NCB-3.03- Narayani Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 11/01/16 Aruwa Nadi Road. (5.50 Km) UG-070-71 DTO Bara Expected Post Review 4. Construction of Kabahigoth-Bariyarpur SNRTP-182-NCB-O-SNRTP-BAR-W-NCB-3.04- Narayani Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 11/01/16 Road (5.5 Km) UG-070-71 DTO Bara Expected Post Review 1. Construction of MRM-Basgadhi- SNRTP-183-NCB-O-SNRTP-BRD-W-NCB-4.01- Bheri Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/04/16 Mainapokhar Road,Bardiya Road. (8.25 Km) UG-070-71 DTO Bardia Expected Post Review 2. Construction of Pushap Lal Marg Road SNRTP-184-NCB-O-SNRTP-BRD-W-NCB-4.02- Bheri Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/10/16 (16.60 Km) UG-070-71 DTO Bardia Expected Post Review 3. Construction of Laxmana-Gauripara- SNRTP-185-NCB-O-SNRTP-BRD-W-NCB-4.03- Bheri Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/10/16 Ganeshpur Road (13.65km) UG-070-71 DTO Bardia Expected Post Review 4.Construction of Rajapur Ring Rd. (47.25 SNRTP-186-NCB-O-SNRTP-BRD-W-NCB-4.04- Bheri Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/10/16 Km) UG-070-71 DTO Bardia Expected Post Review 1.Construction of Kalakate-Gadhawa SNRTP-187-NCB-O-SNRTP-DAN-W-NCB-5.01- Rapti Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/10/16 Road(35 Km) UG-070-71 DTO Dang Expected Post Review 2. Construction of Pawan Nagar-Purandhara SNRTP-188-NCB-O-SNRTP-DAN-W-NCB-5.02- Rapti Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 11/01/16 Road(5.75 Km) UG-070-71 DTO Dang Expected Post Review 1. Construction of Bhimdhunga-Lamidanda- SNRTP-189-NCB-O-SNRTP-DHA-W-NCB-6.01- Bagmati Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 11/01/16 Galchi Road (27.75 Km): UG-070-71 DTO Dharding Expected Post Review 2.Construction of Dhadingbesi-Salyantar SNRTP-190-NCB-O-SNRTP-DHA-W-NCB-6.02- Bagmati Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/10/16 Road (18.50 Km) UG-070-71 DTO Dharding Expected Post Review 3. Construction of Dhadingbesi-Salayantar SNRTP-191-NCB-O-SNRTP-DHA-W-NCB-6.03- Bagmati Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 11/04/16 Road (23.15 Km) UG-070-71 DTO Dharding Expected Post Review 4. Construction of Bhimdhunga-Lamidanda- SNRTP-192-NCB-O-SNRTP-DHA-W-NCB-6.04- Bagmati Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/04/16 Galchi Road (18.50 Km) UG-070-71 DTO Dharding Expected Bagmati Zone Post Review 1. Construction of Devpura-Ghodghas- SNRTP-193-NCB-O-SNRTP-DHAN-W-NCB- Janakpur Zone N/A 11/01/15 10/02/15 12/03/15 N/A 11/04/15 60 10/04/16 Fulgama-Tulshiyahi Road (13.20 Km) 7.01-UG-070-71 DTO Dhanusha Expected Post Review 2.
Recommended publications
  • CEDAW Shadow Report Writing Process Consultation Meeting on CEDAW Shadow • Take Away on CEDAW Shadow Report Report Writing Process
    FWLD’S QUARTERLY ONLINE BulletinVol. 8 Year 3 Jan-Mar, 2019 CEDAW SHADOW REPORT WRITING Working for non-discrimination PROCESS and equality Formation of Shadow Report Preparation Inside Committee (SRPC) • CEDAW Shadow Report Writing Process Consultation Meeting on CEDAW Shadow • Take away on CEDAW Shadow Report Report Writing Process • Take away on Citizenship/Legal Aid Provincial Consultation on draft of CEDAW • Take away on Inclusive Transitional Justice Shadow Report • Take away on Reproductive Health Rights • Take away on Violence against Women Discussion on List of Issues (LOI) • Take away on Status of Implementation of Constitution and International Instruments National Consultation of the CEDAW Shadow • Media Coverage on the different issues initiated by FWLD Report Finalization of CEDAW Shadow Report Participated in the Reveiw of 6th Periodic Report of Nepal on CEDAW Concluding Observations on Sixth Periodic Report of Nepal on CEDAW Take away on CEDAW SHADOW REPORT A productive two days consultative meeting on CEDAW obligations on 2nd and 3rd October 2018. Submission of CEDAW Press meet on CEDAW Shadow Report CEDAW Shadow Report Preparation Committee coordinated by FWLD has submitted the CEDAW Shadow Report and the A press meet was organized on 11th Oct. 2018 to report has been inform media about reporting process of Shadow uploaded in Report on Sixth Periodic Report of Nepal on CEDAW. The timeline of review of the report and its OHCHR’s website on outcome was also discussed. October 1st 2018. NGO Briefs and Informal Country meeting on the Lunch Meeting role of civil society in the 71st Session of CEDAW A country meeting was organized to discuss about the role of civil society in the 71st Session of CEDAW on 11th Oct, 2018.
    [Show full text]
  • Unicef Nepal
    -.;*• la 8 2 2 N P 7 5 '\ gà| UNICEF NEPAL WATER RESOURCE AVAILABILITY By S. Radojicic •••-• <*, 1975 LIB RA a Y !»<; • ¿I Roiere'iee Centre for GuiiiiM unity VVaier Supply WATER SUPPLY MD SANITATION SECTOR STUDY - NEPAL NP I'S WATER RESOURCE AVAILABILITY by S. RODOJICIC UNICEF Hy&rodeologist 1975 Li;:-- •' tnj -: • ••.•..V¡..*¡ t , ; :• . ,¡w »'.;•<;f- supply CONTENTS SUMMARY 1 - V RECOMMENDATIONS VI - IX INTRODUCTION ...,..,,, 1 1. SURFACE WATER OCCURRENCES „(liijàt ! 2. GROUND WATER OCCURRENCES ,..***,*. 5 2.1. Mountain complex ..............,..,........*.****,»*«** 5 2.1.1. High Himalayas *..*..*.. 6 2.1.2. Midland Zone 7 2.1.3. Mahabharat Range 13 2.1.4. Churia Hills „,., 14 2.2. Terai Region 15 2.2.1. Eastern Terai 17 2.2.2. Central Terai 18 2.3-2. Western Terai 19 2.2.3.1. Lumbini Zone 19 2.2.3.2. .Bkeri Zone 22 2.2.3.3. Seti-Mahakali Zone 24 3. FEASIBILITY OF TAPPING GROUND WATER IN THE TJ3RAI BY SHlJjLOW TUBE WELLS 24 3.1. Hydrogeological Conditions 26 3.2. Drilling Method and Equipment Required 29 3.3. Well Design, Construction and Cost .....30 4. GOVERNMENT AGENCIES INVOLVED IN THE WATER RESOURCES EXPLORATION AND EXPLOITATION . .*, 35 4.1. Water Supply and Sewerage Board ,.35 4.2. Water Supply and Sewerage Department 36 4.3. Remote Area and Local Development Department 39 4.4. Ground Water Section 40 4.5. Nepal Resettlement Co ,42 4.6 Constractors Service Available in Nepal ...4...42 REFERENCES SUMMARY x I. In Nepal there are real feasibilities the water supply of people to be settled by developing two water resources: surface and ground waters.
    [Show full text]
  • Logistics Capacity Assessment Nepal
    IA LCA – Nepal 2009 Version 1.05 Logistics Capacity Assessment Nepal Country Name Nepal Official Name Federal Democratic Republic of Nepal Regional Bureau Bangkok, Thailand Assessment Assessment Date: From 16 October 2009 To: 6 November 2009 Name of the assessors Rich Moseanko – World Vision International John Jung – World Vision International Rajendra Kumar Lal – World Food Programme, Nepal Country Office Title/position Email contact At HQ: [email protected] 1/105 IA LCA – Nepal 2009 Version 1.05 TABLE OF CONTENTS 1. Country Profile....................................................................................................................................................................3 1.1. Introduction / Background.........................................................................................................................................5 1.2. Humanitarian Background ........................................................................................................................................6 1.3. National Regulatory Departments/Bureau and Quality Control/Relevant Laboratories ......................................16 1.4. Customs Information...............................................................................................................................................18 2. Logistics Infrastructure .....................................................................................................................................................33 2.1. Port Assessment .....................................................................................................................................................33
    [Show full text]
  • Variations in Surface Ozone and Carbon Monoxide in the Kathmandu Valley and Surrounding
    Atmos. Chem. Phys. Discuss., https://doi.org/10.5194/acp-2017-306 Manuscript under review for journal Atmos. Chem. Phys. Discussion started: 17 July 2017 c Author(s) 2017. CC BY 3.0 License. Variations in surface ozone and carbon monoxide in the Kathmandu Valley and surrounding broader regions during SusKat‐ABC field campaign: Role of local and regional sources Piyush Bhardwaj1,2,*, Manish Naja1, Maheswar Rupakheti3, Arnico K. Panday4, Rajesh Kumar5, Khadak Mahata3, Shyam Lal6, Harish C. Chandola2, Mark G. Lawrence3 1Aryabhatta Research Institute of Observational Sciences (ARIES), Nainital, 263002, India 2Dev Singh Bisht Campus, Kumaun University, Nainital, 263001, India *Now at Gwangju Institute of Science and Technology (GIST), Gwangju, 61005, Republic of Korea 3Institute for Advanced Sustainability Studies (IASS), Potsdam, 14467, Germany 4International Centre for Integrated Mountain Development (ICIMOD), Kathmandu, 44700, Nepal 5National Center for Atmospheric Research (NCAR) Boulder, 80301, USA 6Physical Research Laboratory (PRL), Ahmadabad, 380009, India Key words: Kathmandu, Himalayas, Air Pollution, Ozone, CO, Long Range Transport Correspondence to: Manish Naja ([email protected]) 1 Atmos. Chem. Phys. Discuss., https://doi.org/10.5194/acp-2017-306 Manuscript under review for journal Atmos. Chem. Phys. Discussion started: 17 July 2017 c Author(s) 2017. CC BY 3.0 License. Highlights of the study: A comparative study on trace gases among sites in the Kathmandu Valley and India. 5 An important contribution of regional transport to the springtime ozone enhancement in the Kathmandu Valley. 10 The winter time higher ozone levels in the Kathmandu Valley are largely due to local sources. 15 O3, CO and light NMHCs levels are higher in the Kathmandu Valley than the site in IGP.
    [Show full text]
  • EDUCATION, AWARENESS and FACING DEVELOPMENT in RASUWA Ariel Murray SIT Study Abroad
    SIT Graduate Institute/SIT Study Abroad SIT Digital Collections Independent Study Project (ISP) Collection SIT Study Abroad Spring 2018 MONEY SPEAKS: EDUCATION, AWARENESS AND FACING DEVELOPMENT IN RASUWA Ariel Murray SIT Study Abroad Follow this and additional works at: https://digitalcollections.sit.edu/isp_collection Part of the Asian Studies Commons, Educational Sociology Commons, Family, Life Course, and Society Commons, Place and Environment Commons, Tourism Commons, and the Work, Economy and Organizations Commons Recommended Citation Murray, Ariel, "MONEY SPEAKS: EDUCATION, AWARENESS AND FACING DEVELOPMENT IN RASUWA" (2018). Independent Study Project (ISP) Collection. 2860. https://digitalcollections.sit.edu/isp_collection/2860 This Unpublished Paper is brought to you for free and open access by the SIT Study Abroad at SIT Digital Collections. It has been accepted for inclusion in Independent Study Project (ISP) Collection by an authorized administrator of SIT Digital Collections. For more information, please contact [email protected]. MONEY SPEAKS: EDUCATION, AWARENESS AND FACING DEVELOPMENT IN RASUWA By Ariel Murray (Fig. 1: three of the six hotels in Nagathali, Thuman Ward 6, Rasuwa) Academic Director: Onians, Isabelle Project Advisor: Dixit, Kunda Sending School: Smith College Major: Government Studies; French Studies Primary Research Location(s): Asia, Nepal, Rasuwa, Thuman, Nagathali, Brenthang Submitted in partial fulfillment of the requirements for Nepal: Tibetan and Himalayan Peoples, SIT Study Abroad, Spring 2018 Abstract In the Rasuwa district of Nepal, an area affected profoundly by the 2015 earthquake, development and infrastructure have been fast growing both since the natural disaster and the opening of Rasuwa Gadhi as the more formal trade route to and from China.
    [Show full text]
  • Final Evaluation Combating Exploitive Child Labor Through Education in Nepal: Naya Bato Naya Paila Project -New Path New Steps
    FINAL (AFTER COMMENTS) Independent Final Evaluation Combating Exploitive Child Labor through Education in Nepal: Naya Bato Naya Paila Project -New Path New Steps- USDOL Cooperative Agreement No: IL-19513-09-75-K Report prepared by: Dr. Martina Nicolls April 2013 Table of Contents ACKNOWLEDGMENTS ............................................................................................................ v LIST OF ACRONYMS ............................................................................................................... vi EXECUTIVE SUMMARY ........................................................................................................... 1 Country Context ................................................................................................................................................... 1 Relevance: Shifting Project Priorities ................................................................................................................... 1 Effectiveness ........................................................................................................................................................ 2 Efficiency .............................................................................................................................................................. 3 Impact .................................................................................................................................................................. 3 Sustainability .......................................................................................................................................................
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Team 53: Homestay on Annapurna Circuit
    HOMESTAY ON ANNAPURNA CIRCUIT Global Enterprise Experience 2013 Team 53 Marc Schoppman - New Zealand, non-native English speaker (group leader) Avuyile Andisiwe - South Africa, non-native English speaker Cao Jia Qi - Macau, non-native English speaker Dora Cecilia Balint - Hungary, non-native English speaker Gaetan Ndahimana -Rwanda, non-native English speaker Júlia Anna Balint - Hungary, non-native English speaker Julio César Arias Castaño - Colombia, non-native English speaker Sujan Adhikari - Nepal, non-native English speaker Table of Contents Executive Summary..........................................................................................................................................1 1. Introduction 1.1 Targeted Region.....................................................................................................................................1 1.2 Targeted Social and Economic Issues....................................................................................................1 2. Business Overview 2.1 The Business Model..............................................................................................................................2 2.2 Competitors in the Market.....................................................................................................................2 2.3 Marketing/Promotion.............................................................................................................................2 3. Value Creation 3.1 How Millenium Goals are Addressed....................................................................................................3
    [Show full text]
  • World Bank Document
    NEPAL ELECTRICITY AUTHORITY Kali Gandaki ‘A’ Hydropower Plant Rehabilitation Project Environmental Assessment (EA) (Final Draft) Public Disclosure Authorized Public Disclosure Authorized Submitted to: Large Hydropower Operation and Maintenance Department Public Disclosure Authorized Nepal Electricity Authority Kathmandu, Nepal Submitted by: Environmental and Social Studies Department NEA Training Center, Kharipati, Bhaktapur, Nepal P.O. Box #: 21729 Kathmandu Phone No.: 977 1 66 11 580 Fax No.: 977 1 66 11 590 Public Disclosure Authorized January 28, 2013 Table of Contents Table of Contents ................................................................................................................................. ii Abbreviations and Acronyms............................................................................................................... iv Executive Summary ............................................................................................................................. 1 CHAPTER ONE: INTRODUCTION ................................................................................................... 6 1.1 Background ................................................................................................................................... 6 1.2 Need for Rehabilitation Works ..................................................................................................... 6 1.4 Environmental Assessment of the Proposed Rehabilitation Project ............................................. 7 1.5 Proponent
    [Show full text]
  • 49215-001: Earthquake Emergency Assistance Project
    Environmental Assessment Document Initial Environmental Examination Loan: 3260 July 2017 Earthquake Emergency Assistance Project: Panchkhal-Melamchi Road Project Main report-I Prepared by the Government of Nepal The Environmental Assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Government of Nepal Ministry of Physical Infrastructure and Transport Department of Roads Project Directorate (ADB) Earthquake Emergency Assistance Project (EEAP) (ADB LOAN No. 3260-NEP) INITIAL ENVIRONMENTAL EXAMINATION OF PANCHKHAL - MELAMCHI ROAD JUNE 2017 Prepared by MMM Group Limited Canada in association with ITECO Nepal (P) Ltd, Total Management Services Nepal and Material Test Pvt Ltd. for Department of Roads, Ministry of Physical Infrastructure and Transport for the Asian Development Bank. Earthquake Emergency Assistance Project (EEAP) ABBREVIATIONS AADT Average Annual Daily Traffic AC Asphalt Concrete ADB Asian Development Bank ADT Average Daily Traffic AP Affected People BOD Biological Oxygen Demand CBOs Community Based Organization CBS Central Bureau of Statistics CFUG Community Forest User Group CITIES Convention on International Trade in Endangered Species CO Carbon Monoxide COI Corridor of Impact DBST Double Bituminous Surface Treatment DDC District Development Committee DFID Department for International Development, UK DG Diesel Generating DHM Department of Hydrology and Metrology DNPWC Department of National
    [Show full text]
  • Government of Nepal Ministry of Forests and Environment Nepal
    Government of Nepal Ministry of Forests and Environment Nepal Forests for Prosperity Project Environmental and Social Management Framework (ESMF) March 8, 2020 Executive Summary 1. This Environment and Social Management Framework (ESMF) has been prepared for the Forests for Prosperity (FFP) Project. The Project is implemented by the Ministry of Forest and Environment and funded by the World Bank as part of the Nepal’s Forest Investment Plan under the Forest Investment Program. The purpose of the Environmental and Social Management Framework is to provide guidance and procedures for screening and identification of expected environmental and social risks and impacts, developing management and monitoring plans to address the risks and to formulate institutional arrangements for managing these environmental and social risks under the project. 2. The Project Development Objective (PDO) is to improve sustainable forest management1; increase benefits from forests and contribute to net Greenhouse Gas Emission (GHG) reductions in selected municipalities in provinces 2 and 5 in Nepal. The short-to medium-term outcomes are expected to increase overall forest productivity and the forest sector’s contribution to Nepal’s economic growth and sustainable development including improved incomes and job creation in rural areas and lead to reduced Greenhouse Gas (GHG) emissions and increased climate resilience. This will directly benefit the communities, including women and disadvantaged groups participating in Community Based Forest Management (CBFM) as well and small and medium sized entrepreneurs (and their employees) involved in forest product harvesting, sale, transport and processing. Indirect benefits are improved forest cover, environmental services and carbon capture and storage 3. The FFP Project will increase the forest area under sustainable, community-based and productive forest management and under private smallholder plantations (mainly in the Terai), resulting in increased production of wood and non-wood forest products.
    [Show full text]
  • Japan International Cooperation Agency (JICA)
    Chapter 3 Project Evaluation and Recommendations 3-1 Project Effect It is appropriate to implement the Project under Japan's Grant Aid Assistance, because the Project will have the following effects: (1) Direct Effects 1) Improvement of Educational Environment By replacing deteriorated classrooms, which are danger in structure, with rainwater leakage, and/or insufficient natural lighting and ventilation, with new ones of better quality, the Project will contribute to improving the education environment, which will be effective for improving internal efficiency. Furthermore, provision of toilets and water-supply facilities will greatly encourage the attendance of female teachers and students. Present(※) After Project Completion Usable classrooms in Target Districts 19,177 classrooms 21,707 classrooms Number of Students accommodated in the 709,410 students 835,820 students usable classrooms ※ Including the classrooms to be constructed under BPEP-II by July 2004 2) Improvement of Teacher Training Environment By constructing exclusive facilities for Resource Centres, the Project will contribute to activating teacher training and information-sharing, which will lead to improved quality of education. (2) Indirect Effects 1) Enhancement of Community Participation to Education Community participation in overall primary school management activities will be enhanced through participation in this construction project and by receiving guidance on various educational matters from the government. 91 3-2 Recommendations For the effective implementation of the project, it is recommended that HMG of Nepal take the following actions: 1) Coordination with other donors As and when necessary for the effective implementation of the Project, the DOE should ensure effective coordination with the CIP donors in terms of the CIP components including the allocation of target districts.
    [Show full text]