Endorsement City & Southwest

Total Page:16

File Type:pdf, Size:1020Kb

Endorsement City & Southwest ENDORSEMENT CITY & SOUTHWEST ACOUSTIC ADVISOR Review of Construction Noise and Document Construction Noise and Vibration Impact Vibration Impact Statement for reference: Statement Portion 3 – Martin Place and Pitt Line-Wide works Portion 3 Street Stations Martin Place and Pitt Street Prepared by Renzo Tonin and Associates for Stations Systems Connect. Prepared Larry Clark, Alternate Acoustics by: Advisor TK685-03-14F01 CNVIS C2S_P3 MPL_PIT Date of 9 March 2021 (r5) issue: Dated 22 February 2021 As approved Alternate Acoustics Advisor for tHe Sydney Metro City & SoutHwest project, I Have reviewed the Construction Noise and Vibration Impact Statement (CNVIS) for Line-Wide works Portion 3 – Martin Place and Pitt Street Stations, as reQuired under A27 (d) of tHe project approval conditions (SSI 15-7400). I reviewed and provided comment on revisions of the CNVIS. Revision 5 of tHe document Has been updated since tHe last endorsed version of tHe CNVIS (r3) to address EPA Notice of Variation reQuirements. I am satisfied tHat revision 5 of the CNVIS is technically valid, and includes appropriate noise and vibration mitigation and management. On tHis basis I endorse revision 5 of the CNVIS for Line-Wide works in respect of the Martin Place and Pitt Street Station works. Larry Clark, City & SoutHwest Alternate Acoustics Advisor Acoustic Studio: 20210309 LW CNVIS Martin Place and Pitt Street Stations (r5) AltAA endorsement.docx - 1 - Acoustics Vibration Structural Dynamics SYDNEY METRO CITY AND SOUTH WEST - LINE-WIDE WORKS Construction Noise and Vibration Impact Statement Portion 3 - Martin Place and Pitt Street Stations 22 February 2021 Systems Connect TK685-03-14F01 CNVIS C2S_P3 MPL_PIT (r5) Sydney Melbourne Brisbane Gold Coast Kuwait Singapore Renzo Tonin & Associates ABN 29 117 462 861 Level 1/418A Elizabeth St SURRY HILLS NSW 2010 | PO Box 877 STRAWBERRY HILLS NSW 2012 P (02) 8218 0500 F (02) 8218 0501 [email protected] www.renzotonin.com.au RENZO TONIN & ASSOCIATES 4 MARCH 2021 Document details Detail Reference Doc reference: TK685-03-14F01 CNVIS C2S_P3 MPL_PIT (r5) Prepared for: Systems Connect Address: Level 3, 116 Miller Street NORTH SYDNEY NSW 2060 Attention: Mathew Billings Document control Non-issued Issued Reviewed / Date Revision history Prepared Instructed revision revision Authorised 20.10.2020 Initial report 0 1 T. Gowen - M. Tabacchi 19.11.2020 Respond to AA/ER comments - 2 T. Gowen - M. Tabacchi 25.11.2020 Respond to AA comments - 3 T. Gowen - M. Tabacchi 02.02.2021 Address EPA’s EPL Variation - 4 T. Gowen - M. Tabacchi Notice 04.03.2021 Address AA comments - 5 T. Gowen - M. Tabacchi File Path: R:\AssocSydProjects\TK651-TK700\TK685 PK SMCSW Linewide Works (CPB UGL)\1 Docs\100 CONSTRUCTION\3-14 CNVIS C2S_P3 MPL_PIT\TK685-03-14F01 CNVIS C2S_P3 MPL_PIT (r5).docx Important Disclaimers: The work presented in this document was carried out in accordance with the Renzo Tonin & Associates Quality Assurance System, which is based on Australian/New Zealand Standard AS/NZS ISO 9001. This document is issued subject to review and authorisation by the suitably qualified and experienced person named in the last column above. If no name appears, this document shall be considered as preliminary or draft only and no reliance shall be placed upon it other than for information to be verified later. This document is prepared for the particular requirements of our Client referred to above in the ‘Document details’ which are based on a specific brief with limitations as agreed to with the Client. It is not intended for and should not be relied upon by a third party and no responsibility is undertaken to any third party without prior consent provided by Renzo Tonin & Associates. The information herein should not be reproduced, presented or reviewed except in full. Prior to passing on to a third party, the Client is to fully inform the third party of the specific brief and limitations associated with the commission. In preparing this report, we have relied upon, and presumed accurate, any information (or confirmation of the absence thereof) provided by the Client and/or from other sources. Except as otherwise stated in the report, we have not attempted to verify the accuracy or completeness of any such information. If the information is subsequently determined to be false, inaccurate or incomplete then it is possible that our observations and conclusions as expressed in this report may change. We have derived data in this report from information sourced from the Client (if any) and/or available in the public domain at the time or times outlined in this report. The passage of time, manifestation of latent conditions or impacts of future events may require further examination and re-evaluation of the data, findings, observations and conclusions expressed in this report. We have prepared this report in accordance with the usual care and thoroughness of the consulting profession, for the sole purpose described above and by reference to applicable standards, guidelines, procedures and practices at the date of issue of this report. For the reasons outlined above, however, no other warranty or guarantee, whether expressed or implied, is made as to the data, observations and findings expressed in this report, to the extent permitted by law. The information contained herein is for the purpose of acoustics only. No claims are made and no liability is accepted in respect of design and construction issues falling outside of the specialist field of acoustics engineering including and not limited to structural integrity, fire rating, architectural buildability and fit-for-purpose, waterproofing and the like. Supplementary professional advice should be sought in respect of these issues. External cladding disclaimer: No claims are made and no liability is accepted in respect of any external wall and/or roof systems (eg facade / cladding materials, insulation etc) that are: (a) not compliant with or do not conform to any relevant non-acoustic legislation, regulation, standard, instructions or Building Codes; or (b) installed, applied, specified or utilised in such a manner that is not compliant with or does not conform to any relevant non-acoustic legislation, regulation, standard, instructions or Building Codes. SYSTEMS CONNECT SYDNEY METRO CITY AND SOUTH WEST - LINE-WIDE WORKS TK685-03-14F01 CNVIS C2S_P3 MPL_PIT (R5) CONSTRUCTION NOISE AND VIBRATION IMPACT STATEMENT ii PORTION 3 - MARTIN PLACE AND PITT STREET STATIONS RENZO TONIN & ASSOCIATES 4 MARCH 2021 Contents 1 Introduction 6 1.1 Relevant requirements and purpose of this CNVIS 6 1.2 Structure of this CNVIS 6 1.3 Quality assurance 7 2 Description of construction works and hours 8 2.1 Summary of works addressed in this CNVIS 8 2.1.1 Construction activities 8 2.1.2 Construction traffic 9 2.1.3 Cumulative construction impacts 9 2.2 Construction hours 9 2.2.1 Standard construction hours 9 2.2.2 Out of hours work periods 10 2.2.3 Justification for OOHW 11 2.2.4 COVID-19 extended construction hours 12 3 Nearest sensitive receivers 13 3.1 Residential receivers 13 3.2 Other sensitive receivers (PPA Condition E34) 13 3.3 Commercial and industrial premises 13 3.4 Heritage receivers 13 4 Construction noise and vibration objectives 15 4.1 Noise goals 15 4.1.1 Noise management levels (NMLs) 15 4.1.2 Sensitive receiver NMLs and respite for high noise impact works (CSSI-7400 Conditions E37 and E38) 16 4.1.3 Residential receiver NMLs – 8pm to 7am (CSSI-7400 Conditions E41 and E42) 16 4.1.4 Sleep disturbance 18 4.1.5 National Standard for exposure to noise 18 4.1.6 Construction related road traffic noise objectives 18 4.2 Construction vibration goals 19 4.2.1 Disturbance to building occupants (human annoyance) 19 4.2.2 Structural damage to buildings 20 4.2.3 Heritage 20 4.2.4 Sensitive scientific and medical equipment 20 4.2.5 Utilities and other vibration sensitive structures 20 5 Construction noise assessment 21 5.1 Noise prediction methodology 21 5.1.1 Detailed design outcomes 21 SYSTEMS CONNECT SYDNEY METRO CITY AND SOUTH WEST - LINE-WIDE WORKS TK685-03-14F01 CNVIS C2S_P3 MPL_PIT (R5) CONSTRUCTION NOISE AND VIBRATION IMPACT STATEMENT iii PORTION 3 - MARTIN PLACE AND PITT STREET STATIONS RENZO TONIN & ASSOCIATES 4 MARCH 2021 5.1.2 Construction activities 22 5.2 Predicted noise levels 22 5.2.1 ICNG NMLs 23 5.2.1.1 ICNG Standard construction hours 23 5.2.1.2 ICNG OOHW 24 5.2.2 CSSI-7400 Conditions E37 and E38 25 5.2.3 PPA Conditions E41/42 26 5.2.4 Sleep disturbance 26 5.3 Noise mitigation and management 28 5.3.1 Consultation with affected receivers (CSSI-7400 Condition E33) 28 5.3.2 Site noise control measures 28 5.3.3 Additional noise mitigation measures 29 5.3.4 Attended noise monitoring 30 5.3.5 Complaints Handling 30 6 Construction vibration impacts 31 6.1 Minimum working distances for vibration intensive plant 31 7 Ground-borne noise assessment 32 7.1 Ground-borne noise prediction methodology 32 8 Traffic noise assessment 33 8.1 Traffic sources 33 8.2 Predicted construction traffic noise 33 8.3 Sleep disturbance 34 8.4 Traffic noise mitigation and management 35 9 Cumulative impacts 36 10 Conclusion 37 References 38 APPENDIX A Glossary of terminology I APPENDIX B Nearest sensitive receivers and noise management levels III APPENDIX C Construction details V C.1 Construction timetable/ activities/ management VI APPENDIX D Detailed predicted noise levels VII APPENDIX E Consultation required under conditions E37/E38 VIII List of tables Table 2-1: Standard construction hours 9 Table 2-2: Construction hours
Recommended publications
  • The Croydon Record No
    The Croydon Record No. 1. CROYDON, JANUARY, 1925 Vol. LETTERS OF A PRIEST TO HIS THE CATHOLIC DEPOT PEOPLE. My Dear People, PELLEGRINI & CO. Our Parish is just One Year old ; and we look back upon the Past with feelings of great CHURCH FURNISHERS AND comfort and joy. If the future be a reflex of CATHOLIC BOO KSELLERS the past, a long line of successes is assured to us. Temporally and spiritually, you have done 543 GEORGE STREET, SYDNEY magnificently well. Where nought existed (Between Liverpool and Bathurst Sts.) Douglas before, we have now a Presbytery, Church, The World's Finest Motorcycle and ground. Where Catholics were formerly —also at- ' As supplied to the Parish Priest merely scattered families, they have now be- 244 Elizabeth Street, Melbourne. come one large family knitted together by £65/-/- cash, or £25/-/- down and threads of religion, friendship, and enthus- 370 Queen Street, Brisbane. £1/-/- weekly. iasm. This achievement is due chiefly to your own loyalty and to your deep religious faith. WILLIAMS BROS., LTD. And in the Church itself our Societies have 255-259 Elizabeth Street, Sydney. been formed with no abatenlent of interest and WOOD COFFILL LTD, devotion. The Mission has been carried out with pronounced success. In matters religious FUNERAL DIRECTORS LOUIS GILLE & CO. and material, we have been eminently blessed ,,Catholic Church Furnishers and suppliers of by God. In finance, we have established records SYDNEY and SUBURBS all Devotional and Religious Articles which have surprised even the most confident. and Requisites. Local Branch : ,Large stooks of all branches of Cathollc As we commence the year we offer you from •Literature, Educational, Spiritual, Fiction, —etc.— our hearts our desire for your happiness and Railway Parade, Burwood.
    [Show full text]
  • Sydney Metro Martin Place Integrated Station Development South Tower Stage 2 DA Architectural Design Report
    Sydney Metro Martin Place Integrated Station Development South Tower Stage 2 DA Architectural Design Report CSWSMP-MAC-SMA-AT-DRE-000110 [F] Prepared for Macquarie Corporate Holdings Pty Limited September 2018 2 View looking west along Martin Place. The proposed 39 Martin Place is on the left. Street trees, furniture and other public domain elements within the precinct are indicative only and are subject to relevant approvals and detailed coordination with new and existing underground utilities and infrastructure. Table of Contents 3 Contents Part 01 Project Overview 5 Part 02 Site Context 13 Part 03 Design Principles Summary 31 Part 04 Urban Design and Architecture 35 Part 05 Public Domain & Ground Plane 67 Part 06 Tower Functionality 73 Part 07 Appendices 79 Appendix A Architectural Drawings Appendix B Demarcation Drawings Appendix C Gross Floor Area Schedule Appendix D Consolidated Design Guidelines Project Overview 01 6 Project Overview South Site Introduction This report supports a State Significant Development (SSD) Development Application (DA) (SSD DA) submitted to the Minister for Planning (Minister) pursuant to Part 4 of the Environmental Planning and Assessment Act 1979 (EP&A Act) on behalf of Macquarie Corporate Holdings Pty Limited (Macquarie), who is seeking to create a world class transport and employment precinct at Martin Place, Sydney. The SSD DA seeks approval for the detailed design and construction of the South Site Over Station Development (OSD), located above and integrated with Metro Martin Place station (part of the NSW Government’s approved Sydney Metro project). The southern entrance to Metro Martin Place station and the South Site OSD above are located at 39-49 Martin Place.
    [Show full text]
  • Construction Work on Castlereagh Street, Sydney from Sunday 18
    Construction of bus and cycleway infrastructure JANUARY 2015 Construction work on Castlereagh Street, Sydney from Sunday 18 January The NSW Government is funding new and essential bus and cycleway infrastructure as part of the Sydney City Centre Access Strategy. Roads and Maritime Services will deliver this work on Castlereagh Street, between Hay Street and Liverpool Street, from Sunday 18 January to Saturday 14 March, weather permitting. Bus infrastructure New bus infrastructure will be built on the eastern side of Castlereagh Street between Hay and Campbell streets from Sunday 18 January to Saturday 14 February. The work includes: • Adjusting roads and pavements, including modifications to existing kerb lines and footpaths, lane markings and reconstruction of median kerbs • Removing and relocating loading zones and parking spaces where bus zones, bus lanes and bus layovers are proposed • Installing or removing signage. Cycleway infrastructure New cycleway infrastructure will be built on the western side of Castlereagh Street between Goulburn and Liverpool streets from Sunday 18 January to Saturday 14 March. The work includes: • Installing median for the new two-way separated cycleway • Modifying kerbs and footpaths • Removing and relocating some loading zones and parking spaces • Removing 13 Liquidambar trees and installing planters for nine new trees (species to be nominated and planted by the City of Sydney at a later date) • Adjusting services • Resurfacing and line marking. For further enquiries: Stakeholder Manager, Gina Kelly T 1800 822 486 I E [email protected] For information on scheduled road work, visit www.livetraffic.com or outside business hours call the Transport Management Centre on 132 701 Work schedule This work will be carried out Monday to Friday 7am to 6pm and Saturdays 8am to 1pm.
    [Show full text]
  • Proceedings of the Society of Architectural Historians Australia and New Zealand Vol. 32
    Proceedings of the Society of Architectural Historians Australia and New Zealand Vol. 32 Edited by Paul Hogben and Judith O’Callaghan Published in Sydney, Australia, by SAHANZ, 2015 ISBN: 978 0 646 94298 8 The bibliographic citation for this paper is: Margalit, Harry, and Paola Favaro. “From Social Role to Urban Significance: The Changing Presence of the MLC Company in Martin Place.” In Proceedings of the Society of Architectural Historians, Australia and New Zealand: 32, Architecture, Institutions and Change, edited by Paul Hogben and Judith O’Callaghan, 378- 389. Sydney: SAHANZ, 2015. All efforts have been undertaken to ensure that authors have secured appropriate permissions to reproduce the images illustrating individual contributions. Interested parties may contact the editors. Harry Margalit and Paola Favaro, UNSW Australia From Social Role to Urban Significance: The Changing Presence of the MLC Company in Martin Place The intersection of Martin Place and Castlereagh Street in Sydney is dominated by a single institution – the MLC (Mutual Life and Citizens’ Assurance Company). To the south is the MLC Centre (1971-77), and on the northern corner stands the interwar MLC building of 1938. The company has a long association with the area, with the Citizens’ Life Assurance Company established in 1886 and headquartered at 21-25 Castlereagh Street. The MLC Company came into being in 1908 with the amalgamation of the Citizens’ Life Assurance Co. Limited and the Mutual Life Assurance Association of Australia. This paper examines the history of the 1938 and 1977 buildings as a means to understanding and elucidating not only the development of the company, but also changing attitudes to how it represented itself through specific buildings, and how the function and public presence of each building chart a shift in urban design attitudes and the use of public space.
    [Show full text]
  • Agentname Contactperson Email Address Wise Vision Aiden Parker [email protected]
    AgentName ContactPerson Email Address Wise Vision Aiden Parker [email protected]. Suite 610,368 Sussex street, Sydney, NSW, Australia 2000 au 2 Easy Travel Carolina [email protected] 200 Mary street, BRISBANE ADELAIDE STREET, QLD, Australia 4000 Maffezzolli m 360 Degree Agency Mara Marquez [email protected] 133 Castlereagh St, Sydney, NSW, Australia 2000 cy 4 U Australia Lobsang Caviedes Contact@4uaustralia. unit 25/6 White Ibis drive, GRIFFIN, QLD, Australia 4503 com 51 Visas Pty Ltd Terry [email protected] Level 24, 300 Barangoo Ave, SYDNEY, NSW, Australia 2000 om A Block Company Barhodirova [email protected] 1/2 Labzar str, Tashzent, Tashzent, Uzbekistan 00000 Dilrabo ABC International Services Andrea Juarez [email protected] Level 9, office 46, 88 Pitt Street, SYDNEY, NSW, Australia 2000 PTY LTD m.br ABC Student Center Arthur Harris [email protected] Suite 303 / 468 George st, Sydney, NSW, Australia 2000 .au ABK Consultancy Bhawani Poudel bhawani.poudel@abkl Suite 33, Level 3, 110 Sussex Street, SYDNEY, NSW, Australia 2000 awyers.com.au Abroad Australia Leidy Patino admin@abroadaustral 20-22 princes highway, WOLLI CREEK, NSW, Australia 2205 ia.com Active Migration Education James McNess amelia@activemigrati 2/32 Buckingham Drive, Wanggara, WA, Australia 6065 oneducation.com.au AECC Global Missy Matsuda clientrelations@aeccgl Ground Floor, 20 Queen Street, MELBOURNE, VIC, Australia 3000 obal.com Agape Student Service Stefannie Costa scosta@agapestudent Suite 2, level 14 309 Kent street, Sydney, NSW, Australia 2000 .com.au
    [Show full text]
  • Interchange Access Plan – Central Station October 2020 Version 22 Issue Purpose: Sydney Metro Website – CSSI Coa E92 Approved Version Contents
    Interchange Access Plan – Central Station October 2020 Version 22 Issue Purpose: Sydney Metro Website – CSSI CoA E92 Approved Version Contents 1.0 Introduction .................................................1 7.0 Central Station - interchange and 1.1 Sydney Metro .........................................................................1 transfer requirements overview ................ 20 1.2 Sydney Metro City & Southwest objectives ..............1 7.1 Walking interchange and transfer requirements ...21 1.3 Interchange Access Plan ..................................................1 7.2 Cycling interchange and transfer requirements ..28 1.4 Purpose of Plan ...................................................................1 7.3 Train interchange and transfer requirements ...... 29 7.4 Light rail interchange and transfer 2.0 Interchange and transfer planning .......2 requirements ........................................................................... 34 2.1 Customer-centred design ............................................... 2 7.5 Bus interchange and transfer requirements ........ 36 2.2 Sydney Metro customer principles............................. 2 7.6 Coach interchange and transfer requirements ... 38 2.3 An integrated customer journey .................................3 7.7 Vehicle drop-off interchange and 2.4 Interchange functionality and role .............................3 transfer requirements ..........................................................40 2.5 Modal hierarchy .................................................................4
    [Show full text]
  • Space For: Five-Star Reviews
    Space for: five-star reviews CAMPUS BUSINESS PARK 350 PARRAMATTA ROAD, HOMEBUSH, NSW OVERVIEW 2 Opportunity Campus Business Park is one of the Inner West’s premier industrial estates, ideally suited to the corporate minded user. Home to companies such as Nissan, Acer and DHL, the estate benefits from excellent corporate exposure and direct access to Sydney’s major road networks. Sydney Markets are also located within close proximity. Opportunity to lease 765 sqm of modern office space. VIEW FROM ABOVE 3 Sydney CBD Homebush Bay Drive M4 Motorway Sydney Olympic Park Sydney Markets Campus Business Park Centenary Drive Parramatta Road LOCATION 4 Direct Private vehicle access Campus Business Park is situated on Parramatta Road in Homebush, providing direct access to the M4 Motorway, Homebush Bay Drive and Centenary Drive. Users will also benefit from the WestConnex road upgrades, providing reduced travel times between the estate and the CBD, M5 Motorway, Sydney Airport and Port Botany. Buses and trains Bus and train services are located within walking distance from the estate. CENTR ALLY CONNECTED 750M 1.3KM 14KM to Sydney to Homebush/ to Sydney Markets Lidcombe CBD CAFÉ 1KM station 2.2KM on-site to Sydney to M4 Olympic Park Motorway WESTCONNEX 5 M4 Homebush STAGE 1 M4 widening Rozelle M4 tunnels Complete Strathfield Haberfield Burwood Sydney CBD Future proofing Sydney STAGE 3 M4-M5 Link Westconnex is the largest transport and Leichhardt Opening 2023 urban renewal project in Australia, bringing major improvements to road infrastructure Camperdown and public transport to keep Sydney moving. Benefits: + Easing road congestion + Bypass 42 sets of traffic lights from airport to Parramatta Alexandria + Double the capacity of the M5 corridor Campsie St Peters Interchange + Better connections along the M4 and M5 Motorways + Quicker and more reliable trips between STAGE 2 west and south west Sydney.
    [Show full text]
  • Pitt Street North Over Station Development
    City & Southwest Pitt Street north over station development Planning Information Booklet JULY 2020 Images are artist’s impressions, subject to change. Contents Pitt Street Station - Sydney CBD’s new connection hub 4 Pitt Street north over station development 6 The planning process 8 A premium commercial office building for Sydney’s CBD 10 What is in the Environmental Impact Statement? 12 What plans are being lodged and who approves them? 14 How to have your say on the applications 16 In July 2020, a State Significant Development Application (SSDA) for the Pitt Street north over station development (Stage 2 detailed design) and a modification to the Stage 1 Concept Approval was submitted to the Department of Planning, Industry and Environment (DPIE). This booklet outlines the consultation, design and planning process associated with these applications. It also explains how these applications fit within the framework of the Pitt Street integrated station development. 2 Artist’s impression, subject to change. Artist’s impression, subject to change. 3 Pitt Street Station – Sydney CBD’s new connection hub Sydney Metro is Australia’s biggest public transport project. In 2024, Sydney will have 31 metro railway stations and a 66-kilometre standalone metro railway system. There will be ultimate capacity for a metro train every two minutes in each direction under the Sydney city centre. As part of Sydney Metro, an underground station will be constructed at Pitt Street in the Sydney CBD. Pitt Street Station will offer a multi-modal transport choice in this precinct. The Pitt Street over station development will be a confident addition to the city skyline.
    [Show full text]
  • Property Portfolio 2009 31 DECEMBER 2009 Property Portfolio 2009
    2009 Property Portfolio 2009 31 DECEMBER 2009 Property Portfolio 2009 about stockland We have a long and proud history of creating places that Ervin Graf, 1952 meet the needs of our customers and communities OUR ProperTY PorTFOLIO OUR STorY This portfolio identifies all of our Ervin Graf founded Stockland in 1952 with a vision We recognise our responsibilities to the environment and are properties and projects across to “not merely achieve growth and profits but to striving to become a leader in sustainable business practices. Australia and the United Kingdom. make a worthwhile contribution to the development Our positive and adaptable team shares Graf’s vision of making a worthwhile contribution to our community. Stockland is one of Australia’s of our cities and great country”. leading diversified property groups. We work hard, we expect a lot of one another, and we seek Pursuing that vision has seen Stockland grow to become We’re active in retail, office and true work-life balance. For over half a century, we’ve worked one of Australia’s leading diversified property groups – industrial property, as well as hard to grow our diverse portfolio of assets and projects while developing and managing a large portfolio of residential residential communities, maintaining a conservative balance sheet. It’s proven to be a community, apartment, retirement living, retail, office and apartments and retirement living. sound approach and we’re now Australia’s largest diversified industrial assets. property group and a top 50 ASX listed company. More information on Stockland’s activities is available at With the benefit of our diverse property skills, we connect www.stockland.com together property styles in shared locations, to create communities of uncommon diversity and connectedness; places that inspire people to gather, to share and to live life.
    [Show full text]
  • Campus Business Park 350 Parramatta Road, Homebush Nsw Overview 2
    HIGH PROFILE+ LOCATION CAMPUS BUSINESS PARK 350 PARRAMATTA ROAD, HOMEBUSH NSW OVERVIEW 2 Opportunity “ MODERN SHOWROOM Ideally located on Parramatta Road in AND OFFICE Homebush, Campus Business Park is one of the inner west’s premier business estates. SPACES WITH The property benefits from excellent corporate EXCELLENT exposure and easy access to Sydney’s major arterial roads and public transport. EXPOSURE” A number of outstanding leasing opportunities are currently available with high quality showroom and office spaces from 261–2,146 sqm. Now is the time to join businesses including Nissan, DHL and Barbeques Galore at Campus Business Park. VIEW FROM ABOVE 3 Sydney CBD Homebush Bay Drive M4 Motorway Sydney Olympic Park Sydney Markets Campus Business Park Centenary Drive Parramatta Road LOCATION 4 Direct access Campus Business Park is situated on Parramatta Road in Homebush, providing direct access to the M4 Motorway, Homebush Bay Drive and Centenary Drive. Bus and train services are located only a short walk from the estate. Users will also benefit from the WestConnex road upgrades currently underway, providing reduced travel times between the estate and the CBD, M5 Motorway, Sydney Airport and Port Botany. CENTRALLY CONNECTED 2.2KM 14KM to M4 to Sydney 1KM Motorway 1.3KM CBD CAFÉ to Sydney to Homebush/ on-site Olympic Park Lidcombe station AMENITY 5 “ THE ESTATE PROVIDES USERS WITH EASILY ACCESSIBLE FACILITIES AND SERVICES” Facilities Sydney Olympic Park is an outstanding example of best practice sustainable urban development. With 425 hectares of urban parkland and a unique array of recreational and sporting facilities within close proximity, Campus Business Park offers an enviable combination of work and lifestyle balance.
    [Show full text]
  • Pitt Street Metro Draft SDPP Visual
    SYDNEY METRO PITT STREET STATION DESIGN AND PRECINCT PLAN - VISUAL ASSESSMENT Prepared for CPB 7 September 2020 URBIS STAFF RESPONSIBLE FOR THIS REPORT WERE: Director Jacqueline Parker Associate Director Jane Maze-Riley Project Code P0022802 Report Number Final All information supplied to Urbis in order to conduct this research has been treated in the strictest confidence. It shall only be used in this context and shall not be made available to third parties without client authorisation. Confidential information has been stored securely and data provided by respondents, as well as their identity, has been treated in the strictest confidence and all assurance given to respondents have been and shall be fulfilled. © Urbis Pty Ltd 50 105 256 228 All Rights Reserved. No material may be reproduced without prior permission. You must read the important disclaimer appearing within the body of this report. urbis.com.au CONTENTS Introduction ....................................................................................................................................................... 1 1. Method ................................................................................................................................................ 2 Sensitivity ............................................................................................................................. 2 Visual Modification Levels ................................................................................................... 3 Assessment of Impacts .......................................................................................................
    [Show full text]
  • Presenza Italiana in Australia
    Presenza italiana in Australia La “Presenza italiana in Australia” elenca, in ordine alfabetico, le aziende italiane con una presenza stabile e diretta in Australia (174 presenze) : consociata, joint venture, filiale o ufficio di rappresentanza. Per ogni azienda viene indicato, oltre all’anagrafica, il settore di riferimento. Questo elenco intende rappresentare un utile strumento di analisi degli interessi economici italiani nel paese e offrire visibilità alle aziende italiane rilevate. Non intende in alcun modo rappresentare in maniera esaustiva la presenza italiana in Australia. Ultimo aggiornamento: MAGGIO 2019 SETTORE AZIENDA AUSTRALIANA AZIENDA ITALIANA CONTATTI IN AUSTRALIA CONTATTI IN ITALIA FARMACEUTICO A. MENARINI AUSTRALIA Pty A. MENARINI INDUSTRIE Tel: +61 02 9080 7200 Tel. +39 055 56801 Level 8, 67 Albert Avenue FARMACEUTICHE RIUNITE Fax: +61 02 9080 7201 Fax. +39 055 582771 Chatswood, NSW 2067 Via Sette Santi, 1 www.menarini.com.au www.menarini.it 50131 Firenze www.menarini.com EDILIZIA ABET PTY LTD ABET LAMINATI SPA Tel: +61 02 9672 7300 Tel: +39 0172/419111 ED INTERIOR DESIGN 11- 13 Smoothy Pl Viale Industria 21, Fax: +61 02 9672 7303 Fax: +39 0172/431571 Arndell Park, NSW 2148 Casella Postale 47 [email protected] [email protected] 12042 Bra (CN) www.abet.com.au www.abetlaminati.com DIFESA AGUSTAWESTLAND AUSTRALIA GRUPPO LEONARDO Tel: +61 3 9227 3700 Tel: +39 06 324731 Hangar, 19 Larkin Ct, Piazza Monte Grappa n. 4 www.leonardocompany.com Fax: +39 06 3208621 Essendon Fields VIC 3041 00195 Roma www.leonardocompany.com
    [Show full text]