Tender Notice

Total Page:16

File Type:pdf, Size:1020Kb

Tender Notice GOVERNMENT OF SIKKIM OFFICE OF THE CONSERVATOR OF FOREST (TERRITORIAL) FORESTS, ENVIRONMENT& WILDLIFE MANAGEMENT DEPARTMENT DEORALI 737102, GANGTOK. TENDER NOTICE Sealed tenders are invited by the Forest Environment and Wildlife Management Department to grant license for temporary collection of loose boulders, sand and stone from the following sites during the year 2015-16 (1st July, 2015 to 31st December, 2016) i.e. for a period of 18 months. Interested parties may collect the tender forms from 11th June, 2015 to 25th June, 2015 in the concerned Divisional Forest Office (Territorial) and last date of submission of the form is 25th June, 2015 before 12:00 pm to the concerned Divisional Forest Officer (Territorial) in their respective district offices at Gangtok/Mangan/Namchi and Gyalshing. Tender shall opened at 01:00 pm on 26th June, 2015 by the Committee constituted for the purpose in the office of the DFO (Territorial) at Gangtok/Mangan/Namchi and Gyalshing, respectively. NORTH (17) Earnest Type of Money to Offset Sl. Range Location Area Unit Produce be Price for No. available deposited Tender by TDR 1 Lachen Chhuba Khola 5000 sq ft Sand/Stone 1,500 15,000 2 Lachen Zema Chhu(above bridge) 10000 sq ft Sand/Stone 3,000 30,000 3 Lachen Zema Chuu(below bridge) 24000 sq ft Sand/Stone 7,200 72,000 4 Mangan Sangkalang River bed 100000 sq ft Sand/Stone 30,000 300,000 5 Mangan Rangrang river bed 4000 sq ft Sand/Stone 1,200 12,000 6 Mangan Lower Tingchim 45000 sq ft Sand/Stone 13,500 135,000 7 Tsungthang Munsithang let bank(A) 5000 sq ft Sand/Stone 1,500 15,000 8 Tsungthang Munsithang left bank(B) 5000 sq ft Sand/Stone 1,500 15,000 9 Tsungthang Uttish Ghari 90000 sq ft Sand/Stone 27,000 270,000 10 Tsungthang Phimchhu 5000 sq ft Sand/Stone 1,500 15,000 Rangma (below first 11 Tsungthang 5000 sq ft Sand/Stone 1,500 15,000 bridge) 12 Lachung Zyakuphyak Chuu 5000 sq ft Sand/Stone 1,500 15,000 13 Lachung Farey Lachung Chhu 10000 sq ft Sand/Stone 3,000 30,000 14 Lachung Sebo Chhu 20000 sq ft Sand/Stone 6,000 60,000 15 Lachung Sewkin 20000 sq ft Sand/Stone 6,000 60,000 16 Dzongu Maindang(Passingdang) 25000 sq ft Sand/Stone 7,500 75,000 17 Dzongu Phidang Lower Dzongu 12500 sq ft Sand/Stone 3,750 37,500 South (39) Earnest Type of Money to Sl. Offset Price Range Location Area Unit Produce be No. for Tender available deposited by TDR 1 Melli Akkar, Rangit River Bed 9000 sqft sand/stone 2,700 27,000 2 Melli Bijanbari,Rangeet River Bed 8000 sqft sand/stone 2,400 24,000 3 Melli Majhitar, Rangeet River Bed 64000 sqft sand/stone 19,200 192,000 4 Melli Manpur,Rangeet River Bed-I 60000 sqft sand/stone 18,000 180,000 5 Melli Manpur,Rangeet River Bed-II 60000 sqft sand/stone 18,000 180,000 6 Melli Manpur,Rangeet River Bed 28000 sqft sand/stone 8,400 84,000 7 Melli Rolu,Rangeet River Bed 22500 sqft sand/stone 6,750 67,500 8 Melli Champa,Rangeet River Bed 10500 sqft sand/stone 3,150 31,500 9 Melli Ravikhola,River Bed 8500 sqft sand/stone 2,550 25,500 10 Namthang Kopchey(A)Teesta River Bed 40000 sqft sand/stone 12,000 120,000 11 Namthang Kopchey(B)Teesta River Bed 40000 sqft sand/stone 12,000 120,000 12 Namthang Kopchey©Teesta River Bed 40000 sqft sand/stone 12,000 120,000 13 Namthang Kharpani,Teesta River Bed 25000 sqft sand/stone 7,500 75,000 Lower Maneydara(A) 14 Namthang 25000 sqft sand/stone 7,500 75,000 Opp.SMIT,Teesta River Bed Lower Maneydara(B) 15 Namthang 25000 sqft sand/stone 7,500 75,000 Opp.SMIT,Teesta River Bed. 16 Namthang Jholungey(A)Teesta River Bed 50000 sqft sand/stone 15,000 150,000 17 Namthang Jholungey(B) Teesta River Bed 50000 sqft sand/stone 15,000 150,000 18 Namthang Samardong,Teesta River Bed 50000 sqft sand/stone 15,000 150,000 Lower Samardong,near muck 19 Namthang 40000 sqft sand/stone 12,000 120,000 dumping area, Teesta River be 20 Namthang Kalajkhola 30000 sqft sand/stone 9,000 90,000 21 Namthang Setikhola,Teesta River Bed 20000 sqft sand/stone 6,000 60,000 22 Lingmoo Lower Kolthang 12000 sqft sand/stone 3,600 36,000 23 Lingmoo Agingeray 13000 sqft sand/stone 3,900 39,000 24 Lingmoo Payoung 15000 sqft sand/stone 4,500 45,000 25 Lingmoo Sisney,Teesta River Bed 23000 sqft sand/stone 6,900 69,000 26 Namchi Kitchudumra,Rangeet River Bed 57000 sqft sand/stone 17,100 171,000 27 Namchi Pabongkhola-I 140000 sqft sand/stone 42,000 420,000 28 Namchi Pabongkhola- II 120000 sqft sand/stone 36,000 360,000 29 Namchi Pabongkhola-III 180000 sqft sand/stone 54,000 540,000 30 Namchi Sipsookhola-Simchuthang - I 20000 sqft sand/stone 6,000 60,000 Opposite to NHPCstage –V 31 Namchi 60000 sqft sand/stone 18,000 180,000 Power House 32 Namchi Orarey 60000 sqft sand/stone 18,000 180,000 33 Namchi Gantey 4250 sqft sand/stone 1,275 12,750 34 Namchi Tokal, Simaley 4000 sqft sand/stone 1,200 12,000 35 Namchi Sikkip 20000 sqft sand/stone 6,000 60,000 Simballay (Near NHPC DAM) 36 Ravongla 30000 sqft sand/stone 9,000 90,000 Rengeet River Bed 37 Ravongla Below Legship Bridge 9000 sqft sand/stone 2,700 27,000 38 Ravongla Sagbari Rangeet River Bed 13800 sqft sand/stone 4,140 41,400 39 Ravongla College Khola Rangeet River Bed 32000 sqft sand/stone 9,600 96,000 East (85) Earnest Type of Money Offset Sl. Range Location Area Unit Produce to be Price for No. available deposite Tender d by TDR 1 Gangtok Bechu Khola 10000 sqft Sand & Stone 3,000 30,000 Roruchu below Bhusuk 2 Gangtok 36000 sqft Sand & Stone 10,800 108,000 Bridge 3 Gangtok Roruchu above Power Bridge 12500 sqft Sand & Stone 3,750 37,500 4 Gangtok Roruchu below Power Bridge 10000 sqft Sand & Stone 3,000 30,000 Roruchu above Bhusuk 5 Gangtok 10000 sqft Sand & Stone 3,000 30,000 Bridge Roruchu above Power Bridge 6 Gangtok 10000 sqft Sand & Stone 3,000 30,000 2nd 7 Gangtok Roruchu (I) 15000 sqft Sand & Stone 4,500 45,000 8 Gangtok Roruchu (II) 25000 sqft Sand & Stone 7,500 75,000 9 Gangtok Yali Chu 7500 sqft Sand & Stone 2,250 22,500 10 Gangtok Rangchang Dovan 16000 sqft Sand & Stone 4,800 48,000 11 Gangtok Dikchu Khola 1600 sqft Sand & Stone 480 4,800 12 Gangtok Lower Raley 24000 sqft Sand & Stone 7,200 72,000 13 Gangtok Ranikhola 30000 sqft Sand & Stone 9,000 90,000 Lower Samdong Teesta River 14 Gangtok 6000 sqft Sand & Stone 1,800 18,000 Reserve 15 Gangtok Reshithang 5000 sqft Sand & Stone 1,500 15,000 Lower Samdong Teesta River 16 Gangtok 3000 sqft Sand & Stone 900 9,000 Reserve 17 Ranipool 14th Mile Takchamchu - I 7,500 sqft Sand & Stone 2,250 22,500 18 Ranipool 14th Mile Takchamchu - II 7,500 sqft Sand & Stone 2,250 22,500 19 Ranipool 8th Mile 4,500 sqft Sand & Stone 1,350 13,500 20 Ranipool Dhakal Gaon Lower Syari 7,500 sqft Sand & Stone 2,250 22,500 Dhakal Gaon below 21 Ranipool 4,500 sqft Sand & Stone 1,350 13,500 Suspension Bridge Roruchu above Jalipool 22 Ranipool 9,000 sqft Sand & Stone 2,700 27,000 Bridge 23 Ranipool Below Jalipool Bridge (New) 8,000 sqft Sand & Stone 2,400 24,000 Ranikhola, Setikhola 24 Ranipool 2,000 sqft Sand & Stone 600 6,000 confluence 25 Ranipool Opposite Science City 6,000 sqft Sand & Stone 1,800 18,000 26 Ranipool Jalipool Ranikhola below STP 8,000 sqft Sand & Stone 2,400 24,000 Jalipool below SNT 27 Ranipool 10,000 sqft Sand & Stone 3,000 30,000 Workshop 28 Ranipool Ray Sivik Khola - I 3,000 sqft Sand & Stone 900 9,000 29 Ranipool Ray Sivik Khola - II 6,000 sqft Sand & Stone 1,800 18,000 30 Ranipool Ray Sivik Khola - III 5,000 sqft Sand & Stone 1,500 15,000 31 Ranipool Opposite Sun-Pharma 6,000 sqft Sand & Stone 1,800 18,000 32 Singtam Teesta River Bed (Golitar-I) 30,000 sqft Sand & Stone 9,000 90,000 33 Singtam Teesta River Bed (Golitar-II) 30,000 sqft Sand & Stone 9,000 90,000 Teesta River Bed (19th Mile) 34 Singtam 30,000 sqft Sand & Stone 9,000 90,000 Site reserved for GREF (BRO) Teesta River Bed (19th Mile) 35 Singtam 40,000 sqft Sand & Stone 12,000 120,000 Site reserved for GREF (BRO) 36 Singtam Teesta River Bed (20th Mile) 10,000 sqft Sand & Stone 3,000 30,000 37 Singtam Teesta River Bed (20th Mile) 35,000 sqft Sand & Stone 10,500 105,000 Teesta River Bed (Bagey 38 Singtam 90,000 sqft Sand & Stone 27,000 270,000 Khola I) Teesta River Bed (Bagey 39 Singtam 70,000 sqft Sand & Stone 21,000 210,000 Khola II) 40 Singtam Teesta River Bed (Mining-I) 20,000 sqft Sand & Stone 6,000 60,000 41 Singtam Teesta River Bed (Mining-II) 20,000 sqft Sand & Stone 6,000 60,000 42 Singtam Teesta River Bed (Mining-III) 20,000 sqft Sand & Stone 6,000 60,000 43 Singtam Teesta River Bed (Mining-IV) 10,000 sqft Sand & Stone 3,000 30,000 44 Singtam Teesta River Bed (Mining-V) 10,000 sqft Sand & Stone 3,000 30,000 45 Singtam Rangpo River Bed-I 20,000 sqft Sand & Stone 6,000 60,000 46 Singtam Rangpo River Bed-II 20,000 sqft Sand & Stone 6,000 60,000 47 Singtam Rangpo River Bed-III 20,000 sqft Sand & Stone 6,000 60,000 48 Singtam Rangpo River Bed-IV 20,000 sqft Sand & Stone 6,000 60,000 49 Singtam Rangpo River Bed-V 20,000 sqft Sand & Stone 6,000 60,000 50 Singtam Rangpo River Bed-VI 20,000 sqft Sand & Stone 6,000 60,000 51 Singtam Rangpo River Bed-VII 20,000 sqft Sand & Stone 6,000 60,000 52 Singtam Rangpo River Bed-VIII 20,000 sqft Sand & Stone 6,000 60,000 Confluence of Rangpo Teesta 53 Singtam 15,000 sqft Sand & Stone 4,500 45,000 River I Confluence of Rangpo Teesta 54 Singtam 15,000 sqft Sand & Stone 4,500 45,000 River II Confluence of Rangpo Teesta 55 Singtam 15,000 sqft Sand & Stone 4,500 45,000 River III 56 Singtam Lower Martam Hajam Khola 5,000 sqft Sand & Stone 1,500 15,000 Lower Martam Rongnichu 57 Singtam 12,500 sqft Sand & Stone 3,750 37,500 River bed Lower Martam Rongnichu 58 Singtam 12,500 sqft Sand & Stone 3,750 37,500 River bed below GREF Camp Rangchang Dovan (Tungtar-I) 59 Singtam 18,000 sqft Sand & Stone 5,400 54,000 Teesta River bed.
Recommended publications
  • Rapid Climate Vulnerability Assessment of Gangtok, Sikkim
    February, 2018 RAPID CLIMATE VULNERABILITY ASSESSMENT OF GANGTOK, SIKKIM Developing Disaster Resilience Action Plan Through GIS & Prioritising Actions for Natural Disaster Risk Reduction in Urban Agglomerations of Shillong & Gangtok Gangtok City, Sikkim Gangtok, the capital city of Sikkim, is located in the eastern Himalayan range. The city is flanked on east and west by two streams, namely Roro Chu and Ranikhola, respectively, comprising 17 municipal wards. These two rivers divide the natural drainage into two parts, the eastern and western parts. Fig 1: Gangtok City map Gangtok City Characteristics Indicators Characteristics Classification of the city Hill Location 27°20’N 88°37’E Area 19.016 sq.km Climate Type Subtropical highland climate Temperature Average Annual Maximum Temperature - 27°C Average Annual Minimum Temperature - 19°C Rainfall Average annual : 3494 mm Height above Mean Sea Level 1,676 m above MSL Fig2: The main road connecting Gangtok to other cities Fig3: Gangtok M G Marg and towns Steep slopes, vulnerability to landslides, large forest cover and inadequate access to most areas characterize Gangtok. Unplanned urbanization and rapid construction on the hill slopes has increased the risk of environmental degradation in Gangtok. Hazard Exposure Sl. No Hazard Type Exposure 1 Flash Flood Y 2 Drought/ Heat Wave N 3 Earthquakes Y 4 Landslides Y 5 Forest Fires Y 6 Heavy Rainfall Y 7 Hailstorms/thundering Y Hazard Timeline Index Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Landslides Flash Flood Hailstorm/thundering Forest
    [Show full text]
  • “Identification of Drought and Flood Induced Critical Moments and Coping Strategies in Hazard Prone Lower Teesta River Basin”
    MS “Identification of Drought and Flood Induced Critical Moments Thesis and Coping Strategies in Hazard Prone Lower Teesta River Basin” “ Identification of Drought and Flood Induced Critical Moments and Coping and Induced Critical Moments Flood and of Drought Identification Strategies in Hazard Prone Lower Teesta River Basin River Lower Teesta Prone Hazard Strategies in This thesis paper is submitted to the department of Geography & Environmental Studies, University of Rajshahi, as a partial fulfillment of the requirements for the degree of MS - 2015. SUBMITTED BY Roll No. 10116087 Registration No. 2850 Session: 2014 - 15 MS Exam: 2015 ” April, 2017 Department of Geography and Sk. Junnun Sk. Al Third Science Building Environmental Studies, Faculty of Life and Earth Science - Hussain Rajshahi University Rajshahi - 6205 April, 2017 “Identification of Drought and Flood Induced Critical Moments and Coping Strategies in Hazard Prone Lower Teesta River Basin” This thesis paper is submitted to the department of Geography & Environmental Studies, University of Rajshahi, as a partial fulfillment of the requirements for the degree of Master of Science - 2015. SUBMITTED BY Roll No. 10116087 Registration No. 2850 Session: 2014 - 15 MS Exam: 2015 April, 2017 Department of Geography and Third Science Building Environmental Studies, Faculty of Life and Earth Science Rajshahi University Rajshahi - 6205 Dedicated To My Family i Declaration The author does hereby declare that the research entitled “Identification of Drought and Flood Induced Critical Moments and Coping Strategies in Hazard Prone Lower Teesta River Basin” submitted to the Department of Geography and Environmental Studies, University of Rajshahi for the Degree of Master of Science is exclusively his own, authentic and original study.
    [Show full text]
  • Facilities of White Water Rafting in West Bengal IJPESH 2020; 7(6): 01-03 © 2020 IJPESH Kousik Biswas and Dr
    International Journal of Physical Education, Sports and Health 2020; 7(6): 01-03 P-ISSN: 2394-1685 E-ISSN: 2394-1693 Impact Factor (ISRA): 5.38 Facilities of white water rafting in West Bengal IJPESH 2020; 7(6): 01-03 © 2020 IJPESH www.kheljournal.com Kousik Biswas and Dr. Susanta Sarkar Received: 01-09-2020 Accepted: 02-10-2020 Abstract Kousik Biswas The objective of the study was to focus on the existing facilities and scope for White Water Rafting, and Research Scholar, Department of the level of facilities available of standard equipment and training in West Bengal. Checklist interview Physical Education, University and valid official data was analysed during the survey study. Result was found that few Non-Government of Kalyani, Kalyani, Nadia, agencies conducted white water rafting for commercial purpose only. They used both Indian and West Bengal, India international rafting gears but amount of equipment was insufficient, no such Government or Non- Government Institution for White water Rafting training. West Bengal Government do not have any Dr. Susanta Sarkar equipment for White Water Rafting. This study may raise the relevant points which are to be addressed Associate Professor, Department by the appropriate authority to elevate the prospect of White Water Rafting in the state of West Bengal. of Physical Education, University of Kalyani, Kalyani, Keywords: White water rafting, equipment, facilities, West Bengal. Nadia, West Bengal, India Introduction Adventure is an exciting experience that is typically a bold, sometimes risky, undertaking. Adventures may be activities with some potential for physical danger. Engaging ourselves in an unusual and exciting, typically hazardous, experience or activity.
    [Show full text]
  • Rivers of Peace: Restructuring India Bangladesh Relations
    C-306 Montana, Lokhandwala Complex, Andheri West Mumbai 400053, India E-mail: [email protected] Project Leaders: Sundeep Waslekar, Ilmas Futehally Project Coordinator: Anumita Raj Research Team: Sahiba Trivedi, Aneesha Kumar, Diana Philip, Esha Singh Creative Head: Preeti Rathi Motwani All rights are reserved. No part of this book may be reproduced or utilised in any form or by any means, electronic or mechanical, without prior permission from the publisher. Copyright © Strategic Foresight Group 2013 ISBN 978-81-88262-19-9 Design and production by MadderRed Printed at Mail Order Solutions India Pvt. Ltd., Mumbai, India PREFACE At the superficial level, relations between India and Bangladesh seem to be sailing through troubled waters. The failure to sign the Teesta River Agreement is apparently the most visible example of the failure of reason in the relations between the two countries. What is apparent is often not real. Behind the cacophony of critics, the Governments of the two countries have been working diligently to establish sound foundation for constructive relationship between the two countries. There is a positive momentum. There are also difficulties, but they are surmountable. The reason why the Teesta River Agreement has not been signed is that seasonal variations reduce the flow of the river to less than 1 BCM per month during the lean season. This creates difficulties for the mainly agrarian and poor population of the northern districts of West Bengal province in India and the north-western districts of Bangladesh. There is temptation to argue for maximum allocation of the water flow to secure access to water in the lean season.
    [Show full text]
  • “Sikkim Is Doing Very Well”
    ON Tuesday, 05 April, 2005 Vol. 3 No. 291 Gangtok Rs. 3 05 April, 2005; NOW! 1 pg 2 SBI press CREDIT POPE SBI announces Xpress XCredit.XX Personal Loans for JOHN XXX PAUL II net monthly incomes of Rs. 2,500 onwards; 18-times the salary; at The Great 10.25% interest! contact PT Bhutia 9434357921, Unifier Chettri 94340 12824 or P Darnal 9434151288 “SIKKIM IS DOING VERY WELL” UNION HOME MINISTER RETURNS IMPRESSED WITH SIKKIM SUBASH RAI GANGTOK, 04 April: The Union Home Minister, Shivraj Patil, today expressed praise for the Army jawans posted in the frozen heights of Nathula at 14,000 ft. guarding the Indo- China border. “I feel relaxed by the thought that we have such brave and diligent soldiers keeping a watch for us,” he said while speaking to reporters at Nathula today. On the last day of his three- day visit to Sikkim, Mr. Patil, accompanied by his family and the Minister of State for Home, Manik Rao Ganit, was es- corted to the Indo-China bor- der Chief Minister Pawan Chamling and shown around by the GOC 17 Mountain Di- vision, Avadesh Prakash. Leaving early, the Union Home Minister’s entourage trav- elled by road to Nathula this morning. The entire stretch, from 3rd Mile onwards was swathed in fresh snow and reached The Union Home Minister, Shivraj Patil, takes a pony ride with his grand-daughter, from the road-head to Nathula pass on Monday Nathula at around 10 AM. While briefing the media working so efficiently here.” situation, he would deliver the issues like infrastructural devel- perience will certainly help in persons at Nathula, the Home On the opening of Indo- right information to the Prime opment,” he said.
    [Show full text]
  • Chapter II: River System and Drainage
    Chapter II: River System and Drainage 2.11ntroduction The sub-Himalayan Jalpaiguri district is endowed with intricate river systems originating from the Sikkim, Darjeeling, Bhutan and Tibetan Himalayas draining across the Himalayas (figure 2.1 ). The piedmont zone is dissected by mountain streams of various sizes. The proportion of river length and catchment area between zone of erosion and deposition in various types differ considerably (Starkel, L & Sarkar, S, 2002). The river systems of sub­ Himalayan Jalpaiguri district have been genetically classified in following 7 types by Starkel et.al, in 2008. (i) Large transit river originated in high Himalaya. This group is represented by three rivers Tista. Torsa and Sankosh, with perennial discharge, feed both by rain and melt waters. Deep canyons in marginal part and mega-fans in the foreland indicate very high water discharge and high sediment load. Great alluvial fans and braided channels with frequent avulsions extend far up to the river Brahmaputra. (ii Rivers dissecting Lesser Hm1alaya. Only river .laldhaka under this group dwin·, catchment. Jeeply mctsed also in the Duars. \Vhere it is draining the active rismg blocks. As a result. its tan surface is developing farther dcnvnstream. Other nvers dissecting southern part of Lesser Himalaya with catchments between 50-l 00 km) are located in the belt of higher precipitation (Clish. CheL DaimL Chmnurchi. Ret!.. \. ;abur Basra. Jainti etc. land form targe allm1al lims. :\ggradations tollow upstream mto the hills and farther downstream braided channels change to the meandering ones. (iii) Seasonal or episodic rivers draining only frontal zone of the Himalaya with highly 2 dissected catchments with an area between 10-30 km .
    [Show full text]
  • ANSWERED ON:07.12.2004 DEVELOPMENT of NORTH EASTERN REGION Pradhan Shri Dharmendra
    GOVERNMENT OF INDIA DEVELOPMENT OF NORTH EASTERN REGION LOK SABHA UNSTARRED QUESTION NO:1004 ANSWERED ON:07.12.2004 DEVELOPMENT OF NORTH EASTERN REGION Pradhan Shri Dharmendra Will the Minister of DEVELOPMENT OF NORTH EASTERN REGION be pleased to state: (a) the details of schemes formulated in the previous three years for the Development of North Eastern States; (b) the details of funds allocated to each State for these schemes; (c) whether the funds allocated for these schemes have been fully utilized; (d) if not, the reasons therefor; (e) whether the targets set in these schemes have been achieved; (f) if not, the reasons therefor; and (g) the steps taken by the Government in this regard? Answer MINISTER IN THE MINISTRY OF DEVELOPMENT OF NORTH EASTERN REGION (SHRI P.R. KYNDIAH) (a) & (b): The Ministry of Development of North Eastern Region and the North Eastern Council (NEC) sanction and fund projects for the development of North Eastern Region. The State-wise details of projects sanctioned by the Ministry of Development of North Eastern Region under Non Lapsable Central Pool of Resources (NLCPR) and the sector-wise projects sanctioned by NEC during the previous three years are annexed at Annexure-I. (c) (d) (e) & (f): The position of utilization of funds and the progress of implementation is at Annexure-I. The main reasons for underutilization of funds and underachievement of implementation targets are as follows: i) Generally, the State Governments take long time to transfer funds released by Government of India to the implementing/executing agency ii) Due to long rainy season the working season in the North East is limited as compared to the rest of the country.
    [Show full text]
  • 1. List of Fair Price Shops Under Gangtok Food Godown, East District SL
    1. List of Fair Price Shops under Gangtok Food Godown, East District SL. Registartion No Name of FPS Address 1 01/E/GFPS-01 M/s Mingma Lhamu Tathengchen 2 01/E/GFPS-02 M/s M.P.C.S Ltd Upper Tathengchen 3 01/E/GFPS-03 M/s Passangkit Bhutia Upper Tathengchen 4 01/E/GFPS-04 M/s Tshering Doma Lower Tathengchen 5 01/E/GFPS-05 M/s Harish Chandra Gupta Chandmari 6 01/E/GFPS-06 M/s Karma Tenzing Bhutia Chandmari 7 01/E/GFPS-07 M/s Katuk Bhutia Upper Chandmari 8 01/E/GFPS-08 M/s Nima Doma Bhutia Chandmari 9 01/E/GFPS-09 M/s Hira Prasad Chandmari 10 01/E/GFPS-010 M/s Kaushila Lepcha Upper Chandmari 11 01/E/GFPS-011 M/s Om Prakash Mittal Chandmari 12 01/E/GFPS-012 M/s Bhagawati Pradhan Rongek 13 01/E/GFPS-013 M/s C.C.S Ltd. Yalley Bhusuk 14 01/E/GFPS-014 M/s Akkee Bhutia Bhusuk 15 01/E/GFPS-015 M/s Harka Maya Rai Bhusuk 10th Mile 16 01/E/GFPS-016 M/s Chenpa Doma Bhutia Pabik Naitam 17 01/E/GFPS-017 M/s Krishna Kri. Rai Naitam Nandok 18 01/E/GFPS-018 M/s Jasmati Rai Naitam Block 19 01/E/GFPS-019 M/s M.P.C.S Ltd Assam Linzey 20 01/E/GFPS-020 M/s Sudhama Pandit Kazi Road 21 01/E/GFPS-021 M/s Lobsang Choden Kazi Road 22 01/E/GFPS-022 M/s Kessang Bhutia Nam Nang 23 01/E/GFPS-023 M/s T.
    [Show full text]
  • District Survey Report of Kalimpong District
    DISTRICT SURVEY REPORT OF KALIMPONG DISTRICT (For mining of minor minerals) As per Notification No. S.O.3611 (E) New Delhi Dated 25th of July 2018 and Enforcement & Monitoring Guidelines for Sand Mining (EMGSM) January 2020, Issued by Ministry of Environment, Forest and Climate Change (MoEF & CC) Government of West Bengal (WORK ORDER No: MDTC/PM-5/160/66, dated 20.01.2020) July, 2021 CONSULTANT District Survey Report Kalimpong District, West Bengal Table of Content Chapter No Subject Page No 1 Preface 1-2 2 Introduction 3-15 3 General Profile of The District 16-36 a. General Information 16-17 b. Climate Condition 18 c. Rainfall and humidity 18-20 d. Topography & Terrain 20 e. Water courses and Hydrology 21-22 f. Ground water Development 23 g. Drainage System 23-25 h. Demography 25-27 i. Cropping pattern 27 j. Land Form and Seismicity 27-31 k. Flora 31-34 l. Fauna 34-36 4 Physiography of the District 37-41 4.1 General Landforms 37-38 4.2 Soil and rock pattern 38-40 4.3 Different geomorphology units 40-41 5 Land Use Pattern of The District 42-51 5.1 Forest 44-46 5.2 Agriculture and Irrigation 46-50 Work order No. MDTC/PM-5/160/66; dt. 20.1.2020 District Survey Report Kalimpong District, West Bengal 5.3 Horticulture 50-51 5.4 Mining 51 6 Geology 52-54 Regional and local geology with geological succession 52-54 7 Mineral Wealth 55-79 7.1 Overview of mineral resources 55 7.2 Details of Resources 55-77 7.2.1 Sand and other riverbed minerals 55-73 I.
    [Show full text]
  • District Census Handbook, North, East, South & West,Part-XIII-A & B, Series-19, Sikkim
    CENSUS OF INDIA 1981 SE~rES 19 SIKKIM DISTRICT CENSUS HANDBOOK PARTS XIII - A & B VILLAGE AND TOVVN DIRECTORY VILLAGE AND TO\NNVVISE PRIMARY CENSUS ABSTRACT Nor1:h, East, South & VVest Districts .l. K. T'HAPA of the Indian Administrative Service Director of Census Operations Sikkil17 Motif on the Cover-page: Sikkim may be called as the land of Monasteries. One of the important features of Sikkim is that excepting the temples, churches, mosques, etc. there are about 67 monasteries - some of them have old historical importance. In addition. there are 132 Manilhakhang (place of worship for ladies and some of them are run by ladies) and 22 Lhakhang & Tsamkhang (hermitage or place of meditation) in the state. The above Monastery is called Gor Gompa, a small Gompa on a solitary spot commanding a picturesque view and situated at Gor above Hee Gyathang in Dzongri area (13,000 ft.) of North Sikkim. o CONTENTS Page Foreword Preface Important Statistics ix-xli 1. Analytical Note (i) Census concepts 1 (ii) Brief History of the State and the District Census Handbook 5 (iii) Scope of Village Directory, Town Directory Statements and Primary Census Abstract 7 (iv) Physical Aspects 9 (v) Major Characteristics of the State 10 (vi) Places of religious, historical or archaeological importance with an introduction of tourist interest 23 (vii) Major Events and Activities during the decade 27 (viii) Analysis of data 30 Table 1 Population, NumQer of revenue blocks and towns 1981 30 Table 2 Decadal change in distribution of population 31 Table 3 Distribution of
    [Show full text]
  • ENVIS Sikkim
    ACTION PLAN FOR REJUVENATION OF FOUR IDENTIFIED POLLUTED RIVER STRETCHES OF SIKKIM SUBMITTED BY: RIVER REJUVENATION COMMITTEE -SIKKIM CONSTITUTED VIDE NOTIFICATION NO. GOS/FEWMD/PR.SEC-PCCF/161 DATED 23.01.2019 CONTENTS 1. Chapter 1 1 Introduction 2. Chapter 2 4 2.1 Identification of Polluted River Stretches 2.2. Criteria for priority five 4 3. Chapter 3 6 Components of Action Plan 4. Chapter 4 7 The Maney Khola (Adampool to Burtuk stretch) rejuvenation Action Plan. 5. Chapter 5 13 The Rangit Revjuvenation Plan (Dam site NHPC to Triveni Stretch). 6. Chapter 6 18 The Rani-Chu (Namli to Singtam Stretch) rejuvenation plan. 7. Chapter 7 25 The Teesta River (Melli to Chungthang Stretch) Rejuvenation Plan. LIST OF FIGURES 1. Map of Sikkim 2 2. Map showing the rivers of Sikkim 3 3. Map showing the river stretch between Adampool and Burtuk. 9 4. Map showing the river stretch between Rangit NHPC Dam site 14 and Triveni. 5. Map showing the river stretch between Namli and Singtam. 20 6. Map showing river stretch between Chungthang and Melli. 27 LIST OF TABLES 1. NWMP Stations 5 2. List of Hospitals in Gangtok 8 3. Action Plan for Maney Khola 10 4. List of water based industries along Rangit river 13 5. Action Plan for Rangit River 15 6. List of water based industries along Rani Chu 18 7. Action Plan for Rani Chu river 21 8. List of water based industries along Teesta river 25 9. Action Plan for Teesta River 28 River Rejuvenation Action Plan -Sikkim ACTION PLAN FOR REJUVENATION OF FOUR (04) IDENTIFIED POLLUTED RIVER STRETCHES OF SIKKIM CHAPTER 1 1.
    [Show full text]
  • INCOGNITO SIKKIM 8 NIGHTS 9 DAYS; April 12-20, 2014
    INCOGNITO SIKKIM 8 NIGHTS 9 DAYS; April 12-20, 2014 This is a truly off-beat trip that focuses only on little explored, emerging destinations across the western, southern & northern parts of Sikkim. Pristine breathtakingly beautiful scenery, awe inspiring views of snow covered peaks including Kanchenjunga, and interactions with the warm & hospitable indigenous hill tribes during a homestay in North Sikkim; all combine to give you a unique & matchless holiday experience in the Sikkim Himalayas. What’s more you not only cover incognito places but also go incognito far away from the maddening crowds that throng elsewhere in this remarkable Himalayan state. Trip dates: April 12-20, 2014 Start from: Bagdogra Airport/NJP Rly. Stn End at: Bagdogra Airport/NJP Rly. Stn Meals: Dinner in Kaluk on Day 1 to breakfast in Rumtek on Day 8 Total distance covered: 900 kms Maximum altitude reached: Pelling (2150M) Group size: 8-20 Permits required Yes (Changoo lake). We procure these for you. Document required: Photocopies of valid nationality proof Photo-IDs (Passport, Driving License, Voters ID, PAN card Booking deadline: March 12, 2014 ITINERARY Day 01: NJP / Bagdogra – Kaluk 110 km / 4 hrs Arrive at Bagdogra Airport / New Jalpaiguri Rly Stn. Set off on a picturesque drive to reach the village of Kaluk in West Sikkim. Kaluk- Rinchenpong is the forest and buffer zone area of Varshey Rhododendron sanctuary. The area is gifted with abundant natural resources and is a paradise for the nature lovers, conservationists, botanists, zoologists and environmentalists. Spend the rest of the day relaxing in the resorts landscape garden with a book or stroll around the resort's own forest area on a bird watching tour.
    [Show full text]