Federal Register/Vol. 86, No. 59/Tuesday, March 30, 2021/Notices

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register/Vol. 86, No. 59/Tuesday, March 30, 2021/Notices Federal Register / Vol. 86, No. 59 / Tuesday, March 30, 2021 / Notices 16639 provide drainage service to lands within water annually with the Agency for Recreation Act of March 12, 2019 (Pub. the San Luis Unit of the CVP including storage and conveyance in Folsom L. 116–9). the Westlands WD service area. Reservoir, and a contract with the 42. Shasta County Water Agency, 20. San Luis WD, Meyers Farms District for conveyance of non-project CVP, California: Proposed partial Family Trust, and Reclamation; CVP; water through Folsom South Canal. assignment of 50 acre-feet of the Shasta California: Revision of an existing 31. Gray Lodge Wildlife Area, CVP, County Water Agency’s CVP water contract among San Luis WD, Meyers California: Reimbursement agreement supply to the City of Shasta Lake for Farms Family Trust, and Reclamation between the California Department of M&I use. providing for an increase in the Fish and Wildlife and Reclamation for 43. Friant Water Authority, CVP, exchange of water from 6,316 to 10,526 groundwater pumping costs. California: Negotiation and execution of acre-feet annually and an increase in the Groundwater will provide a portion of a repayment contract for Friant Kern storage capacity of the bank to 60,000 Gray Lodge Wildlife Area’s Central Canal Middle Reach Capacity Correction acre-feet. Valley Improvement Act Level 4 water Project. 21. Contra Costa WD, CVP, California: supplies. This action is taken pursuant Amendment to an existing O&M to Public Law 102–575, Title 34, Section Completed Contract Actions agreement to transfer O&M of the Contra 3406(d)(1, 2 and 5), to meet full Level 1. (9) Madera-Chowchilla Water and Costa Rock Slough Fish Screen to the 4 water needs of the Gray Lodge Power Authority, CVP, California: Contra Costa WD. Initial construction Wildlife Area. Agreement to transfer the OM&R and funding provided through ARRA. 32. State of Nevada, Newlands certain financial and administrative 22. Irrigation water districts, Project, Nevada: Title transfer of lands activities related to the Madera Canal individual irrigators and M&I water and features of Carson Lake and Pasture. and associated works. Contract executed users, CVP, California: Temporary water 33. Washoe County Water on January 22, 2021. service contracts for terms not to exceed Conservation District, Truckee Storage 2. (29) Santa Clara Valley WD (now 1 year for up to 100,000 acre-feet of Project, Nevada: Repayment contract for called Valley Water), CVP, California: surplus supplies of CVP water resulting costs associated with SOD work on Boca Second amendment to Santa Clara from an unusually large water supply, Dam. Valley WD’s water service contract to not otherwise storable for project 34. Santa Barbara County Water add CVP-wide form of contract language purposes, or from infrequent and Agency, Cachuma Project, California: providing for mutually agreed upon otherwise unmanaged flood flows of Negotiation and execution of a long- point or points of delivery. Contract short duration. term water service contract. executed on December 14, 2020. 23. City of Redding, CVP, California: 35. Cachuma Operations and 3. (32) Fresno County Waterworks No. Proposed partial assignment of 30 acre- Maintenance Board, Cachuma Project, 18; Friant Division, CVP; California: feet of the City of Redding’s CVP water California: Negotiation and execution of Execution of an agreement to provide supply to the City of Shasta Lake for an O&M contract. for the O&M of select Federal facilities M&I use. 36. State of California, Department of by Fresno County Waterworks No. 18. 24. Sacramento River Division, CVP, Water Resources; CVP; California: Contract executed on September 11, California: Administrative assignments Negotiation of a multi-year wheeling 2018. of various Sacramento River Settlement agreement with the State of California, 5. (50) Friant Water Authority, Friant Contracts. Department of Water Resources Division, CVP, California: Renewal of 25. California Department of Fish and providing for the conveyance and OM&R contract. Contract executed on Game, CVP, California: To extend the delivery of CVP water through the State October 5, 2020. term of and amend the existing water of California’s water project facilities to service contract for the Department’s Byron-Bethany ID (Musco Family Olive Christopher Beardsley, San Joaquin Fish Hatchery to allow an Company), Del Puerto WD, and the San Director, Policy and Programs. increase from 35 to 60 cubic feet per Joaquin Valley National Cemetery. [FR Doc. 2021–06512 Filed 3–29–21; 8:45 am] second of continuous 37. Water user entities responsible for BILLING CODE 4332–90–P 26. PacifiCorp, Klamath Project, repayment of reimbursable project Oregon and California: Transfer of O&M construction costs in California, Nevada, of Link River Dam and associated and Oregon: Contracts for conversion or DEPARTMENT OF THE INTERIOR facilities. Contract will allow for the prepayment executed pursuant to the continued O&M by PacifiCorp. Water Infrastructure Improvements for Office of Surface Mining Reclamation 27. Tulelake ID, Klamath Project, the Nation Act, Public Law 114–322, and Enforcement Oregon and California: Transfer of O&M Sec. 4011 (a–d). of 38. Contra Costa Water District, CVP, [S1D1S SS08011000 SX064A000 28. U.S. Fish and Wildlife Service and California: Title transfer of lands and 211S180110; S2D2S SS08011000 Tulelake ID; Klamath Project; Oregon features of the Contra Costa Canal SX064A000 21XS501520; OMB Control Number 1029–0129] and California: Water service contract System of the CVP. for deliveries to Lower Klamath 39. Truckee-Carson ID, Newlands Agency Information Collection National Wildlife Refuge, including Project, Nevada: Negotiation and Activities; Reclamation Awards transfer of O&M responsibilities for the execution of an OM&R transfer P Canal system. agreement. AGENCY: Office of Surface Mining 29. Tulelake ID, Klamath Project, 40. Tehama-Colusa Canal Authority, Reclamation and Enforcement, Interior. Oregon and California: Amendment of CVP, California: Renewal of OM&R ACTION: Notice of information collection; repayment contract to eliminate contract. request for comment. reimbursement for P Canal O&M costs. 41. Title transfer agreements; 30. Placer County Water Agency and California, Nevada, and Oregon: SUMMARY: In accordance with the East Bay Municipal Utility District, Potential title transfers agreements Paperwork Reduction Act of 1995, we, CVP, California: Long-term Warren Act pursuant to the John D. Dingell, Jr. the Office of Surface Mining contracts for up to 47,000 acre-feet of Conservation, Management, and Reclamation and Enforcement (OSMRE), VerDate Sep<11>2014 17:59 Mar 29, 2021 Jkt 253001 PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 E:\FR\FM\30MRN1.SGM 30MRN1 jbell on DSKJLSW7X2PROD with NOTICES 16640 Federal Register / Vol. 86, No. 59 / Tuesday, March 30, 2021 / Notices are proposing to renew an information Abstract: Since 1986, OSMRE has review an initial determination (‘‘ID’’) collection. presented awards to coal mine operators (Order No. 8) of the presiding DATES: Interested persons are invited to who completed exemplary active administrative law judge (‘‘ALJ’’) submit comments on or before June 1, reclamation. A parallel award program granting the complainant’s motion for 2021. for abandoned mine land reclamation leave to amend the complaint and ADDRESSES: Send your comments on began in 1992. The objective is to give notice of investigation. this information collection request (ICR) public recognition to those responsible FOR FURTHER INFORMATION CONTACT: by mail to Mark Gehlhar, Office of for the nation’s most outstanding Lynde Herzbach, Office of the General Surface Mining Reclamation and achievements in environmentally sound Counsel, U.S. International Trade Enforcement, 1849 C Street NW, Room surface coal mining and reclamation Commission, 500 E Street SW, 4556–MIB, Washington, DC 20240, or by and to encourage the exchange and Washington, DC 20436, telephone (202) email to [email protected]. Please transfer of successful reclamation 205–3228. Copies of non-confidential reference OMB Control Number 1029– technology. documents filed in connection with this 0129 in the subject line of your Title of Collection: Reclamation investigation may be viewed on the comments. Awards. Commission’s electronic docket (EDIS) OMB Control Number: 1029–0129. FOR FURTHER INFORMATION CONTACT: To at https://edis.usitc.gov. For help Form Number: None. request additional information about accessing EDIS, please email Type of Review: Extension of a this ICR, contact Mark Gehlhar by email [email protected]. General currently approved collection. at [email protected], or by telephone information concerning the Commission Respondents/Affected Public: at 202–208–2716. may also be obtained by accessing its Businesses and individuals. SUPPLEMENTARY INFORMATION: In internet server at https://www.usitc.gov. Total Estimated Number of Annual Hearing-impaired persons are advised accordance with the Paperwork Respondents: 65. Reduction Act of 1995 (44 U.S.C. 3501 that information on this matter can be Total Estimated Number of Annual obtained by contacting the et seq.) and 5 CFR 1320.8(d)(1), we Responses: 65. provide the general public and other Commission’s TDD terminal on (202) Estimated Completion Time per 205–1810. Federal agencies with an opportunity to Response: Varies from two hours to 65 SUPPLEMENTARY INFORMATION: On comment on new, proposed, revised, hours, depending on activity. January 25, 2021, the Commission and continuing collections of Total Estimated Number of Annual instituted this investigation under information. This helps us assess the Burden Hours: 1,211. section 337 of the Tariff Act of 1930, as impact of our information collection Respondent’s Obligation: Voluntary. amended, 19 U.S.C. 1337 (‘‘section requirements and minimize the public’s Frequency of Collection: One time. reporting burden. It also helps the Total Estimated Annual Nonhour 337’’), based on a complaint filed by public understand our information Burden Cost: $2,500. ARK Diagnostics, Inc. of Fremont, collection requirements and provide the An agency may not conduct or California (‘‘Complainant’’).
Recommended publications
  • Shasta Lake Unit
    Fishing The waters of Shasta Lake provide often congested on summer weekends. Packers Bay, Coee Creek excellent shing opportunities. Popular spots Antlers, and Hirz Bay are recommended alternatives during United States Department of Vicinity Map are located where the major rivers and periods of heavy use. Low water ramps are located at Agriculture Whiskeytown-Shasta-Trinity National Recreation Area streams empty into the lake. Fishing is Jones Valley, Sugarloaf, and Centimudi. Additional prohibited at boat ramps. launching facilities may be available at commercial Trinity Center marinas. Fees are required at all boat launching facilities. Scale: in miles Shasta Unit 0 5 10 Campground and Camping 3 Shasta Caverns Tour The caverns began forming over 250 8GO Information Whiskeytown-Shasta-Trinity 12 million years ago in the massive limestone of the Gray Rocks Trinity Unit There is a broad spectrum of camping facilities, ranging Trinity Gilman Road visible from Interstate 5. Shasta Caverns are located o the National Recreation Area Lake Lakehead Fenders from the primitive to the luxurious. At the upper end of Ferry Road Shasta Caverns / O’Brien exit #695. The caverns are privately the scale, there are 9 marinas and a number of resorts owned and tours are oered year round. For schedules and oering rental cabins, motel accommodations, and RV Shasta Unit information call (530) 238-2341. I-5 parks and campgrounds with electric hook-ups, swimming 106 pools, and showers. Additional information on Forest 105 O Highway Vehicles The Chappie-Shasta O Highway Vehicle Area is located just below the west side of Shasta Dam and is Service facilities and services oered at private resorts is Shasta Lake available at the Shasta Lake Ranger Station or on the web managed by the Bureau of Land Management.
    [Show full text]
  • Chapter 18 Recreation and Public Access
    Chapter 18 Recreation and Public Access 1 Chapter 18 2 Recreation and Public Access 3 18.1 Affected Environment 4 This section describes recreational facilities and opportunities and public access 5 in the primary and extended study areas. 6 18.1.1 Recreation 7 Shasta Lake and Vicinity 8 Shasta Lake is the centerpiece of the Shasta Unit of the Whiskeytown-Shasta- 9 Trinity National Recreation Area (NRA). The Shasta Unit has a total area of 10 approximately 125,500 acres, of which 29,500 acres are currently inundated by 11 Shasta Lake at full pool, leaving approximately 96,000 acres of land area (USFS 12 1996). Figure 18-1 shows the recreation facilities in the Shasta Unit of the 13 NRA. 14 Recreation Setting and Activities The USFS, headquartered in Redding, 15 manages the Shasta Unit of the NRA to be a showcase recreational area. 16 Environmental factors such as a hot summer season, steep terrain, and sparse 17 forest cover in some areas favor water-oriented recreation as the main attraction. 18 The focal point of recreation in the Shasta Unit is Shasta Lake itself, with its 19 large surface area and 370 miles of shoreline (USFS 1996). The lake has four 20 major arms; three of the arms are more than 12 miles long at full pool, and all 21 are a mile or more wide at their downstream ends. The main basin of the lake 22 near the dam is about 2 miles across. 23 Because boating is the predominant recreation activity at Shasta Lake, the lake 24 attracts all types and sizes of powerboats, including personal watercraft (jet 25 skis); runabouts, ski boats, and fishing boats; and larger cabin cruisers, pontoon 26 boats, deck boats, and houseboats (Graefe et al.
    [Show full text]
  • Figure 6-3. California's Water Infrastructure Network
    DA 17 DA 67 DA 68 DA 22 DA 29 DA 39 DA 40 DA 41 DA 46 N. FORK N. & M. TUOLOMNE YUBA RIVER FORKS CHERRY CREEK, RIVER Figure 6-3. California's Water Infrastructure ELEANOR CREEK AMERICAN M & S FORK RIVER YUBA RIVER New Bullards Hetch Hetchy Res Bar Reservoir GREENHORN O'Shaughnessy Dam Network Configuration for CALVIN (1 of 2) SR- S. FORK NBB CREEK & BEAR DA 32 SR- D17 AMERICAN RIVER HHR DA 42 DA 43 DA 44 RIVER STANISLAUS SR- LL- C27 RIVER & 45 Camp Far West Reservoir DRAFT Folsom Englebright C31 Lake DA 25 DA 27 Canyon Tunnel FEATHER Lake 7 SR- CALAVERAS New RIVER SR-EL CFW SR-8 RIVER Melones Lower Cherry Creek MERCED MOKELUMNE Reservoir SR-10 Aqueduct ACCRETION CAMP C44 RIVER FAR WEST TO DEER CREEK C28 FRENCH DRY RIVER CREEK WHEATLAND GAGE FRESNO New Hogan Lake Oroville DA 70 D67 SAN COSUMNES Lake RIVER SR- 0 SR-6 C308 SR- JOAQUIN Accretion: NHL C29 RIVER 81 CHOWCHILLA American River RIVER New Don Lake McClure Folsom to Fair D9 DRY Pardee Pedro SR- New Exchequer RIVER Oaks Reservoir 20 CREEK Reservoir Dam SR- Hensley Lake DA 14 Tulloch Reservoir SR- C33 Lake Natoma PR Hidden Dam Nimbus Dam TR Millerton Lake SR-52 Friant Dam C23 KELLY RIDGE Accretion: Eastside Eastman Lake Bypass Accretion: Accretion: Buchanan Dam C24 Yuba Urban DA 59 Camanche Melones to D16 Upper Merced D64 SR- C37 Reservoir C40 2 SR-18 Goodwin River 53 D62 SR- La Grange Dam 2 CR Goodwin Reservoir D66 Folsom South Canal Mokelumne River Aqueduct Accretion: 2 D64 depletion: Upper C17 D65 Losses D85 C39 Goodwin to 3 Merced River 3 3a D63 DEPLETION mouth C31 2 C25 C31 D37
    [Show full text]
  • 2230 Pine St. Redding
    We know why high quality care means so very much. Since 1944, Mercy Medical Center Redding has been privileged to serve area physicians and their patients. We dedicate our work to continuing the healing ministry of Jesus in far Northern California by offering services that meet the needs of the community. We do this while adhering to the highest standards of patient safety, clinical quality and gracious service. Together with our more than 1700 employees and almost 500 volunteers, we offer advanced care and technology in a beautiful setting overlooking the City. Mercy Medical Center Redding is recognized for offering high quality patient care, locally. Designation as Blue Distinction Centers means these facilities’ overall experience and aggregate data met objective criteria established in collaboration with expert clinicians’ and leading professional organizations’ recommendations. Individual outcomes may vary. To find out which services are covered under your policy at any facilities, please contact your health plan. Mercy Heart Center | Mercy Regional Cancer Center | Center for Hip & Knee Replacement Mercy Wound Healing & Hyperbaric Medicine Center | Area’s designated Trauma Center | Family Health Center | Maternity Services/Center Neonatal Intensive Care Unit | Shasta Senior Nutrition Programs | Golden Umbrella | Home Health and Hospice | Patient Services Centers (Lab Draw Stations) 2175 Rosaline Ave. Redding, CA 96001 | 530.225.6000 | www.mercy.org Mercy is part of the Catholic Healthcare West North State ministry. Sister facilities in the North State are St. Elizabeth Community Hospital in Red Bluff and Mercy Medical Center Mt. Shasta in Mt. Shasta Welcome to the www.packersbay.com Shasta Lake area Clear, crisp air, superb fi shing, friendly people, beautiful scenery – these are just a few of the words used to describe the Shasta Lake area.
    [Show full text]
  • Water Allocation in the Klamath Reclamation Project (Oregon State
    Oregon State University Extension Service Special Report 1037 December 2002 Water Allocation in the Klamath Reclamation Project, 2001: An Assessment of Natural Resource, Economic, Social, and Institutional Issues with a Focus on the Upper Klamath Basin William S. Braunworth, Jr. Assistant Extension Agriculture Program Leader Oregon State University Teresa Welch Publications Editor Oregon State University Ron Hathaway Extension agriculture faculty, Klamath County Oregon State University Authors William Boggess, department head, Department of William K. Jaeger, associate professor of agricul- Agricultural and Resource Economics, Oregon tural and resource economics and Extension State University agricultural and resource policy specialist, Oregon State University William S. Braunworth, Jr., assistant Extension agricultural program leader, Oregon State Robert L. Jarvis, professor of fisheries and University wildlife, Oregon State University Susan Burke, researcher, Department of Agricul- Denise Lach, codirector, Center for Water and tural and Resource Economics, Oregon State Environmental Sustainability, Oregon State University University Harry L. Carlson, superintendent/farm advisor, Kerry Locke, Extension agriculture faculty, University of California Intermountain Research Klamath County, Oregon State University and Extension Center Jeff Manning, graduate student, Department of Patty Case, Extension family and community Fisheries and Wildlife, Oregon State University development faculty, Klamath County, Oregon Reed Marbut, Oregon Water Resources
    [Show full text]
  • Dispersal of Larval Suckers at the Williamson River Delta, Upper Klamath Lake, Oregon, 2006–09
    Prepared in cooperation with the Bureau of Reclamation Dispersal of Larval Suckers at the Williamson River Delta, Upper Klamath Lake, Oregon, 2006–09 Scientific Investigations Report 2012–5016 U.S. Department of the Interior U.S. Geological Survey Cover: Inset: Larval sucker from Upper Klamath Lake, Oregon. (Photograph taken by Allison Estergard, Student, Oregon State University, Corvallis, Oregon, 2011.) Top: Photograph taken from the air of the flooded Williamson River Delta, Upper Klamath Lake, Oregon. (Photograph taken by Charles Erdman, Fisheries Technician, Williamson River Delta Preserve, Klamath Falls, Oregon, 2008.) Bottom left: Photograph of a pop net used by The Nature Conservancy to collect larval suckers in Upper Klamath Lake and the Williamson River Delta, Oregon. (Photograph taken by Heather Hendrixson, Director, Williamson River Delta Preserve, Klamath Falls, Oregon, 2006.) Bottom middle: Photograph of a larval trawl used by Oregon State University to collect larval suckers in Upper Klamath Lake and the Williamson River Delta, Oregon. (Photograph taken by David Simon, Senior Faculty Research Assistant, Oregon State University, Corvallis, Oregon, 2010.) Bottom right: Photograph of a plankton net used by the U.S. Geological Survey to collect larval suckers in Upper Klamath Lake and the Williamson River Delta, Oregon. (Photographer unknown, Klamath Falls, Oregon, 2009.) Dispersal of Larval Suckers at the Williamson River Delta, Upper Klamath Lake, Oregon, 2006–09 By Tamara M. Wood, U.S. Geological Survey, Heather A. Hendrixson, The Nature Conservancy, Douglas F. Markle, Oregon State University, Charles S. Erdman, The Nature Conservancy, Summer M. Burdick, U.S. Geological Survey, Craig M. Ellsworth, U.S. Geological Survey, and Norman L.
    [Show full text]
  • KLAMATH HYDROELECTRIC PROJECT [FERC No
    KLAMATH HYDROELECTRIC PROJECT [FERC No. 2082] REQUEST FOR DETERMINATION OF ELIGIBILITY Copco No. 1, c1915 PacifiCorp Archives Photo for PacifiCorp, Portland, OR Prepared by George Kramer, M.S., HP Preservation Specialist Under contract to CH2M-Hill Corvallis, OR October 2003 App E-6E DOE 1_Cover.doc DETERMINATION OF ELIGIBILITY FOR THE NATIONAL REGISTER Property Name: KLAMATH HYDROELECTRIC PROJECT Date of Construction: 1903-1958 Address: N/A County: Klamath, Oregon Siskiyou, California Original Use: Hydroelectric Generation Current Use: Hydroelectric Generation Style: Utilitarian/Industrial Theme: Commerce/Industrial _____________________________________________________________________________________ PRIMARY SIGNIFICANCE: The resources of the Klamath Hydroelectric Project were built between 1903 and 1958 by the California Oregon Power Company and its various pioneer predecessors and are now owned and operated by PacifiCorp under Federal Energy Regulatory License No. 2082. The resources of the project are strongly associated with the early development of electricity in the southern Oregon and northern California region and played a significant role in the area’s economy both directly, as a part of a regionally-significant, locally-owned and operated, private utility, and indirectly, through the role that increased electrical capacity played in the expansion of the timber, agriculture, and recreation industries during the first six decades of the 20th century. The Klamath Hydroelectric Project is considered regionally significant and eligible for listing in the National Register of Historic Places under Criterion “A” for its association with the industrial and economic development of southern Oregon and northern California. [See Statement of Significance, Page 19] Copco No. 1, Dam and Gatehouse, 2002 In my opinion, the property ___ meets ___ does not meet the criteria for listing in the National Register of Historic Places.
    [Show full text]
  • Yurok Final Brief
    Case 3:16-cv-06863-WHO Document 107 Filed 03/23/18 Page 1 of 22 JEFFREY H. WOOD, Acting Assistant Attorney General 1 Environment & Natural Resources Division 2 SETH M. BARSKY, Chief S. JAY GOVINDAN, Assistant Chief 3 ROBERT P. WILLIAMS, Sr. Trial Attorney KAITLYN POIRIER, Trial Attorney 4 U.S. Department of Justice 5 Environment & Natural Resources Division Wildlife & Marine Resources Section 6 Ben Franklin Station, P.O. Box 7611 7 Washington, D.C. 20044-7611 Tel: 202-307-6623; Fax: 202-305-0275 8 Email: [email protected] Email: [email protected] 9 10 Attorneys for Federal Defendants 11 UNITED STATES DISTRICT COURT 12 FOR THE NORTHERN DISTRICT OF CALIFORNIA 13 SAN FRANCISCO DIVISION 14 YUROK TRIBE, et al., ) 15 Case No. 3:16-cv-06863-WHO ) 16 Plaintiff, ) ) 17 FEDERAL DEFENDANTS’ RESPONSE v. ) TO DEFENDANT-INTERVENORS’ 18 ) MOTION FOR RELIEF FROM U.S. BUREAU OF RECLAMATION, et al., ) JUDGMENT AND/OR STAY OF 19 ) ENFORCEMENT (ECF No. 101) Defendants, ) 20 ) 21 and ) ) 22 KLAMATH WATER USERS ) ASSOCIATION, et al., ) 23 ) 24 Defendant-Intervenors. ) 25 26 27 28 1 Federal Defendants’ Response to Intervenors’ Motion for Relief 3:16-cv-6863-WHO Case 3:16-cv-06863-WHO Document 107 Filed 03/23/18 Page 2 of 22 1 TABLE OF CONTENTS 2 I. INTRODUCTION 3 3 II. FACTUAL BACKGROUND 5 4 A. Hydrologic Conditions In Water Year 2018 5 5 B. 2013 Biological Opinion Requirements for Suckers 5 6 III. DISCUSSION 7 7 A. Given Hydrologic Conditions, Guidance Measures 1 8 and 4 Cannot Both Be Implemented As They Were Designed Without Impermissibly Interfering With 9 Conditions Necessary to Protect Endangered Suckers 7 10 1.
    [Show full text]
  • Water Temperature Monitoring of the Klamath River Mainstem
    L . Water Temperature Monitoring of the Klamath River Mainstem Progress Report #3 Prepared by Robert Rohde and Leaf Hillman with assistance provided by Susan Smith and William Tripp Karuk Tribe of California Department of Natural Resources P.O. Box 282 Orleans, California 95556 PROGRESS REPORT #3 WATER TEMPERATURE MONITORING OF THE KLAMATH RIVER MAINSTEM BACKGROUND This is the third progress report to the United States Fish and Wildlife Service (USFWS) concerning activities conducted under the terms of Cooperative Agreement Number 14-48-0001-92663, and covers the period of October 1, 1993 to September 30, 1994. This report describes the activities that have been initiated and/or completed on the Water Temperature Monitoring of the Klamath River Mainstem Project. As described in our original proposal, seven water temperature monitoring sites were established in the Klamath River mainstem from Link River Dam in Oregon to the mouth of the Klamath River near the Pacific Ocean. During preparation for water temperature gage deployment in spring of 1993, Pacific Power and Light (PP&L) and the California Department of Fish and Game offered to share water temperature data from Ryan temperature gages located at two of this project’s proposed locations (below Link River Dam and below Iron Gate Dam). PP&L also agreed to retrieve the data below Keno Dam along with the Link River site and two other gages they had located below Boyle and Copco Dams. At the same time, additional water temperature monitoring sites were established approximately three to five miles below the Shasta, Scott and Salmon Rivers to allow for water temperature mixing.The installation of these water temperature instruments was made possible with the help of the Oak Knoll and Salmon River Ranger Districts, Klamath National Forest.
    [Show full text]
  • Chapter 2. Project Update/Activities U.S
    Chapter 2 Project Update/Activities since Publication of the Draft EIR/EIS Chapter 2 Project Update/Activities since Publication of the Draft EIR/EIS This chapter is intended to provide an update on various aspects of the project that have changed since issuance of the draft EIR/EIS on August 8, 2003. Many of these changes are a result of comments received on the draft EIR/EIS during the comment period, which ended December 15, 2003. Changes to the project are presented in the list below, followed by a more detailed description of each. 1. Modifications to the layout and configuration of the intake facilities 2. Site identification for Zone 40 water treatment plant 3. Revised modeling and coordinated operation agreement assumptions 4. Water contract settlement agreements None of these changes results in new impacts. In some cases they result in a reduction of severity of impacts identified in the draft EIR/EIS. A revised summary of impacts and mitigation measures is provided at the end of this chapter in Tables S-1, S-2, and S-3. Table S-1 summarizes the significant environmental impacts and Table S-2 summarizes the less-than-significant environmental impacts of the FRWP alternatives. Table S-3 summarizes significant cumulative impacts. The tables are organized to present impacts by environmental topic area and to indicate the significance of each impact, available mitigation measures, and the significance of each impact if mitigation is implemented. Responsibility for Project Implementation As noted in Chapter 1 of the draft EIR/EIS, FRWA is a joint powers agency formed by the Sacramento County Water Agency and East Bay Municipal Utility District.
    [Show full text]
  • State of the River Report
    Lower American River State of the River Report Water Forum 660 J Street, Suite 260 Sacramento, CA 95814 1 April 2005 Lower American River The Water Forum is a diverse group of business and agricultural leaders, citizens groups, environmentalists, water managers, and local governments in the Sacramento Region that have joined to fulfill two co-equal objectives: • Provide a reliable and safe water supply for the region’s economic health and planned development to the year 2030; and • Preserve the fishery, wildlife, recreational, and aesthetic values of the lower American River. In 2000, Water Forum members approved a comprehensive Water Forum Agreement, consisting of integrated actions necessary to provide a regional solution to potential water shortages, environmental degradation, groundwater contamination, threats to groundwater reliability, and limits to economic prosperity. The Water Forum Agreement allows the region to meet its needs in a balanced way through implementation of seven elements. The seven elements of the Water Forum Agreement are: 1) increased surface water diversions, 2) actions to meet customers’ needs while reducing diversion impacts in drier years, 3) an improved pattern of fishery flow releases from Folsom Reservoir, 4) lower American River Habitat Management Element, 5) water conservation, 6) groundwater management, and 7) the Water Forum Successor Effort (WFSE). The WFSE was created to implement the seven elements of the Water Forum Agreement over the next 30 years. Additional information can be found on the Water Forum’s web site at: www.waterforum.org. Water Forum 660 J Street, Suite 260 Sacramento, CA 95814 April 2005 2 Lower American River State of the River Report 3 Letter to Readers Dear Reader, This is the first lower American River State of the River Report.
    [Show full text]
  • Calif. Regional Water Quality Control Board
    North Coast Regional Water Quality Control Board 5550 Skylane Boulevard, Suite A, Santa Rosa, CA 95403 http://www.waterboards.ca.gov/northcoast State Warns Against Blue-Green Algae in Klamath River Contact with blue-green algae can cause eye irritation, skin rash Caution urged when recreating and consuming fish FOR IMMEDIATE RELEASE Contact: Clayton Creager September 13, 2012 Phone: (707) 576-2666 Sacramento – Due to its potential health risks, federal, state, and tribal agencies are urging swimmers, boaters and recreational users to avoid contact with blue-green algae (cyanobacteria) now blooming in the Klamath River, downstream of Iron Gate Dam, in Northern California. Water in the Klamath River downstream of the dam to just below the Interstate 5 Bridge has exceeded public health criteria; these areas have been posted with health advisories warning against human and animal contact with the water. ADDED INFORMATION: Blue-green algae (cyanobacteria) now blooming in the Klamath River, downstream of Iron Gate Dam, to Turwar in Humboldt County has exceeded public health criteria; these areas have been posted with health advisories warning against human and animal contact with the water. Recent monitoring indicates that levels of cyanobacteria downstream of Turwar are also increasing (but are currently below the state’s action levels); water users are encouraged to use caution, and check most recent sampling results on the Klamath Recent monitoring indicates that levels of cyanobacteria downstream of the I-5 bridge are also increasing (but are currently below the state’s action levels);water users are encouraged to use caution, and check most recent sampling results on the Klamath Blue-Green algae Tracker (see link below).
    [Show full text]