Balwada Micro Irrigation Scheme Indicative Salient Features
Total Page:16
File Type:pdf, Size:1020Kb
SALIENT FEATURE (As proposed in DPR) Balwada Micro Irrigation Scheme Indicative Salient features 1. Name of the Project : Balwada Micro Irrigation Scheme 2. Type of Project : Irrigation Projectb (Irrigation or Multipurpose) 3. Location : Khargone District i) Supply Source : B.P.T-1 Of N.K.S.L ii) Lifting Point ; : Near village Gawalu Khargone District iii) Command In Khargone District 3.1 River Basin a) Name i) Flow : Narmada Basin ii) Command Village of Barwaha tehsil b) Located in : Madhya Pradesh 3.2 River / Tributaries : Narmada/choral 3.3 State(s) / District(s) or Tehsils in which following are located. State District Tehsil (a) (Supply Source) : M.P Khargone Barwaha (b) Lifting Point / Rising Main : (c) Command Area : District Teshil Khargone Barwaha 3.4 Name of Village near the Head-works (i) Starting Point : Gawalu of Barwaha tehsil Khargone District 3.5 Location of Head-Works : (i) Distribution Point : B.P.T-1 OF N.K.S.L PROJECT (ii) Delivery Point : Distribution chamber near Balwada . 3.6 Project area reference : as detailed below Canal & Project Area Distribution : Command Reference Chamber Area Topo sheet 46 N/15 46 B/3 No. Index Plan : Attached 3.7. Access to the Project. a) Nearest Airport : a) Devi Ahilya Airport Indore (M.P.) b) Nearest Rail Head : b) Balwada, i) 60 kms from Distribution point ii) 02kms. Distribution 4. Interstate aspects of the project Not applicable 5. Proposed annual utilization by the project : 31.846 MCM (i) G.C.A. : 7000 Hectare (ii) Irrigation C.C.A. : 5000 Hectare (iii) Annual irrigation on intensity of : 9650 Hectare irrigation @ 157% - Kharif : 72% (3600Ha.) - Rabi : 108% (5450 Ha.) - Perennial : 12% (5450 Ha.) Total - : 193 %(9650 Hact) 5.1 Discharge : 1.25 Cumec 6. Estimated life of the project (years) : 50 Year 7. Head Regulator(s) : Junction Structure shall be constructed near Balwada village 8. Canal System 8.1 Canal system (Piped) : Fully Piped disnet system and main canal . 8.1.1 Purpose of Canal : Irrigation 8.1.2 Type : Pipe Canal (Main) (M.S. Pipe) Disnet will be of MS/DI/HDPE/PSC pipe (a) Flow/ : Piped system 10. Cropping Pattern Existing Proposed 100% 193% 10.1 Name of crop (season-wise) : As given below KHARIF RABI JUNE JULY OCTOBER NOVEMBER (a) Rice (a) Soyabeen (a) Wheat local (a) Wheat local (b) Jowar (b) Jowar (b) Wheat HYV-1 (b) Wheat HYV-II (c) Maize (c) Potato (d) Vegetable / Chilies (d) Gram Early (e) Peddy (e) Fodder (f) Groundnut (f) Vegetable (g) Cotton (h) Pulses PERENNIAL (a) Banana (b) Orchard 11 Cost : 51.468 crores 11.1. Cost of the project (Rs.Crore) total : 52.78 Crores 11.2 Allocation cost (Rs.lakhs) Unit 1 : Nil Unit 2 : 52.78 \\ Total : 52.78 Crores 12. B.C. Ratio. : - 13. Cost per Ha. (i) On C.C.A. : 1.06 Lacs per Ha. (ii) On A.I. : 0.547 Lacs per Ha. .