Balwada Micro Irrigation Scheme Indicative Salient Features

Balwada Micro Irrigation Scheme Indicative Salient Features

SALIENT FEATURE (As proposed in DPR) Balwada Micro Irrigation Scheme Indicative Salient features 1. Name of the Project : Balwada Micro Irrigation Scheme 2. Type of Project : Irrigation Projectb (Irrigation or Multipurpose) 3. Location : Khargone District i) Supply Source : B.P.T-1 Of N.K.S.L ii) Lifting Point ; : Near village Gawalu Khargone District iii) Command In Khargone District 3.1 River Basin a) Name i) Flow : Narmada Basin ii) Command Village of Barwaha tehsil b) Located in : Madhya Pradesh 3.2 River / Tributaries : Narmada/choral 3.3 State(s) / District(s) or Tehsils in which following are located. State District Tehsil (a) (Supply Source) : M.P Khargone Barwaha (b) Lifting Point / Rising Main : (c) Command Area : District Teshil Khargone Barwaha 3.4 Name of Village near the Head-works (i) Starting Point : Gawalu of Barwaha tehsil Khargone District 3.5 Location of Head-Works : (i) Distribution Point : B.P.T-1 OF N.K.S.L PROJECT (ii) Delivery Point : Distribution chamber near Balwada . 3.6 Project area reference : as detailed below Canal & Project Area Distribution : Command Reference Chamber Area Topo sheet 46 N/15 46 B/3 No. Index Plan : Attached 3.7. Access to the Project. a) Nearest Airport : a) Devi Ahilya Airport Indore (M.P.) b) Nearest Rail Head : b) Balwada, i) 60 kms from Distribution point ii) 02kms. Distribution 4. Interstate aspects of the project Not applicable 5. Proposed annual utilization by the project : 31.846 MCM (i) G.C.A. : 7000 Hectare (ii) Irrigation C.C.A. : 5000 Hectare (iii) Annual irrigation on intensity of : 9650 Hectare irrigation @ 157% - Kharif : 72% (3600Ha.) - Rabi : 108% (5450 Ha.) - Perennial : 12% (5450 Ha.) Total - : 193 %(9650 Hact) 5.1 Discharge : 1.25 Cumec 6. Estimated life of the project (years) : 50 Year 7. Head Regulator(s) : Junction Structure shall be constructed near Balwada village 8. Canal System 8.1 Canal system (Piped) : Fully Piped disnet system and main canal . 8.1.1 Purpose of Canal : Irrigation 8.1.2 Type : Pipe Canal (Main) (M.S. Pipe) Disnet will be of MS/DI/HDPE/PSC pipe (a) Flow/ : Piped system 10. Cropping Pattern Existing Proposed 100% 193% 10.1 Name of crop (season-wise) : As given below KHARIF RABI JUNE JULY OCTOBER NOVEMBER (a) Rice (a) Soyabeen (a) Wheat local (a) Wheat local (b) Jowar (b) Jowar (b) Wheat HYV-1 (b) Wheat HYV-II (c) Maize (c) Potato (d) Vegetable / Chilies (d) Gram Early (e) Peddy (e) Fodder (f) Groundnut (f) Vegetable (g) Cotton (h) Pulses PERENNIAL (a) Banana (b) Orchard 11 Cost : 51.468 crores 11.1. Cost of the project (Rs.Crore) total : 52.78 Crores 11.2 Allocation cost (Rs.lakhs) Unit 1 : Nil Unit 2 : 52.78 \\ Total : 52.78 Crores 12. B.C. Ratio. : - 13. Cost per Ha. (i) On C.C.A. : 1.06 Lacs per Ha. (ii) On A.I. : 0.547 Lacs per Ha. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us