Agenda of 327th SEAC Meeting dated:07/09/2018 Reporting Time 10.30 AM 1. Case No. - 5550/2017 Executive Engineer, 1287 date Prior Environment Clearance for Choundi Jamunia Lift Irrination Scheme at village Narmada Development Canal Division, , 16/08/18 rec. date Bhikangoan, Tehsil - , Distt. - Khargone, (MP) Cat. 1(c) River Valley and Distt. - Khargone, (M.P.) 23/08/18. Hydroelectric Projects. (EIA) SIA/MP/RVP/19179/2017. 2. Case No. - 5562/2017 Executive Engineer, 1289 date Prior Environment Clearance for Simrol - Ambachandan Micro Lift Irrination Scheme in O.S.P Canal Division, , 16/08/18 rec. date Dist. , (M.P.) Cat. 1(c) River Valley and Hydroelectric Projects. (EIA) SIA/MP/RVP/19367/2017. 23/08/18.

3. Case No. - 5742/2018 The Executive 1338 date Prior Environment Clearance for Narmada - - Lift Engineer, Narmada Development Division No. 30, 31/08/18 rec. date Irrigation Scheme. To cater irrigation water to about 57422 ha.of CCA in Jhabua and Road - , Distt. - Dhar, (M.P.) – /09/18. Dhar Distt. In region along with water for drinking and irrigation purposes. Total 454446. SIA/MP/RIV/28337/2018. 202 Villages of Dhar and (Jhabua 73, Petlawad 27, Thandla 32, 18 Sardarpur 55 Dhar District) will be benefited by this Scheme. (i) Supply Source: Lift Irrigation Scheme at Lifting Point: Malwada, Tehsil – Submergence of Sardar Sarowar.Village- Malwada (Nisarpur) Tehsil - Kukshi Distt. – Dhar. (iI) Distribution Point: Near Village- Ukala, Tehsil- Sardarpur, Distt.- Dhar (M.P.) Cat. - 1(c) River Valley and Hydroelectric Projects . (TOR) 4. Case No. - 5734/2018 The Executive 1323 date Prior Environment Clearance for Micro Irrigation Scheme, Lifting Point: ISP Main Canal Engineer, Narmada Development Division No. 25, 25/08/18 rec. date at Command Area- 3660 ha. In 13 Villages of District in M.P. by lifting 13.47 , Distt. - Khandwa, (M.P.) – 450119. 28/08/18. MCM water from ISP Main Canal at RD 13.00 KM ha. at Kodwar, Tehsil - Punasa, SIA/MP/RIV/21425/2017 Dist. Khandwa, (M.P.) Cat. - 1(c) River Valley and Hydroelectric Projects. (TOR) 5. Case No. - 5735/2018 The Executive 1325 date Prior Environment Clearance for Micro Lift Irrigation Scheme at Killod, Tehsil - , Engineer, Narmada Development Division No. 25, 25/08/18 rec. date Dist. - Khandwa, (M.P.) Lifting Point Indira Sagar Reservoir at 247 m RL, Command Narmada Nagar, Distt. - Khandwa, (M.P.) – 450119. 28/08/18. Area- 10000 ha. In 29 Villages of in M.P. by lifting 36.91 MCM water SIA/MP/RIV/21424/2017 from ISP Reservoir ha. Cat. - 1(c) River Valley and Hydroelectric Projects. (TOR) 6. Case No. - 5733/2018 M/s Cipla Limited, Plot 1321 date Prior Environment Clearance for Manufacturing of Active Pharmaceutical Ingredient at No. M12 & M12, Misc. Zone Phase II, Sector III, 25/08/18 rec. date Plot No. M12 & M12, Misc. Zone Phase II, Sector III, Indore SEZ, , Distt. - Indore SEZ, Pithampur, Dist. - Dhar (M.P.)- 454775. 28/08/18. Dhar, (M.P.) Capacity – 10 Tones/66958 square meter ha., Cat. - 5(f) Project Synthetic Reference No. for online tracking of project Details Organic Chemicals Industry (dyes & dye intermediates; bulk drug). (TOR) SIA/MP/IND2/28439/2018 7. Case No. - 5737/2018 Panchsheel Organic 1340 dtd. 1/9/18 Prior Environment Clearance for Manufacturing of Bulk Durg & Intermediate at Plot No. Limited, B-6-B7, Sector C Industrial Estate 87 & 88 Village Sagor, Pithampur Distt. Dhar (M.P.) Land area 6000 Sqm, Proposed Road, Indore M.P.) SIA/MP/IND2/28393/2018 Capacity 10000 Kg/Month or 120 MTPA with by product of 14.65 Kg/Day (TOR) 8. Case No. 5740/2018 Residential Construction Online application Prior Environment Clearance for Residential Construction Project Group Center, Central Reserve Project Group Center, Central Reserve Police Force forwarded by Police Force (CRPF) Neemuch, 37609.0 sq.m built up area ha. New Construction Projects and Industrial Estates (CRPF) Neemuch, CENTRAL PUBLIC WORKS SEIAA. DEPARTMENT. New Construction Projects and Industrial Estates. SIA/MP/NCP/25612/2018 9. Case No. - 5586/2017 General Manager, M/s 874 Dated 29/05/18 rec dt. 31/05/18. Indian Oil Corporation Ltd (MD), Storage Expansion at Prior Environment Clearance for Storage Capacity Expansion at Ratlam POL Terminal, Bangrod, Ratlam, (M.P.) – 457111 . Bangrod, Ratlam, (M.P.) – 457111 Cat. - 6(b) Isolated Storage & handling of Hazardous (SIA/(M.P.)/IND2/19961/2017) Chemicals. (Query reply presentation) 10. Case No. 5738/2018 Construction of Proposed Online application Construction of Proposed Residential Development on Part of Khasra No. 69 situated at Residential Development on Part of Khasra No. 69 forwarded by Danish Hills View Colony Village Damkheda Kolar Road Tehsil Huzur, District , situated at Danish Hills View Colony Village Damkheda SEIAA. , . DANISH HOUSING COOPERATIVE SOCIETY LIMITED Kolar Road Tehsil Huzur, District Bhopal, Madhya New Construction Projects and Industrial Estates (TOR) Pradesh, India. SIA/MP/NCP/22838/2018 11. Case No. – 5714/2018 Sarpanch, Gram 1065-66/ 18 Prior Environment Clearance for Sand mine in an area of 5.520 Ha. (10,300 cum per Panchayat, Village - Barchi, Tehsil - Aamla, Dist. dated 03-07-18. annum) (Khasra no. 434, 308) at Village - Barchi, Tehsil - Aamla, Dist. Betul (M.P.) Betul, (M.P) – 460001 (absent in 320 & (SIA/(M.P.)/MIN/73782/2018). 324 meeting) Last Chance 12. Case No. – 5715/2018 Sarpanch, Gram 1067-68/ 18 Prior Environment Clearance for Sand mine in an area of 5.590 Ha. (44,000 cum per Panchayat, Village - Harnya, Tehsil - Chicholi, Dist. dated 03-07-18. annum) (Khasra no. 1, 9) at Village - Harnya, Tehsil - Chicholi, Dist. Betul (M.P.) Betul, (M.P.) – 460001 (absent in 320 & (SIA/(M.P.)/MIN/73780/2018). 324 meeting) Last Chance 13. Case No. – 5713/2018 Sarpanch, Gram 1063-64/ 18 Prior Environment Clearance for Sand mine in an area of 9.330 Ha. (9000 cum per Panchayat, Village - Sontalai, Tehsil - Aamla, Dist. dated 03-07-18. annum) (Khasra no. 1) at Village - Sontalai, Tehsil - Aamla, Dist. Betul (M.P.) Betul, (M.P.) – 460001 (absent in 320 & (SIA/(M.P.)/MIN/73791/2018). 324 meeting) Last Chance INSTRUCTIONS FOR THE PP’s

A. All the PP’s who have applied for issuance of TOR by online registration of the proposals can take-up the EIA studies as per the Standard TOR developed by the Minister of Environment, Forest & Climate Change, New Delhi. The SEAC will have the right and the responsibility of stipulating additional TOR in specific Projects considering its project features.

B. The State Expert Appraisal Committee will consider the project proposals for prior EC, in its meeting to be held on 7/09/18 at 10.30 A.M. at M.P. Pollution Control Board, E-5, Arera Colony, Bhopal. The Project proponents are requested to attend the meeting in person or depute a competent person having proper & full background of the proposed project with proper authorization in writing Capacity-Authority Letter), who can explain the project and also respond to the queries & offer his views on suggestions made by the committee. Such person would be required to make a presentation on the salient features of the project, the related environmental issues, risk assessment and proposed Environmental Management Plan. His commitment before the committee will be treated as your commitment.

C. SEIAA OM No. 10237 dated 05/01/20126 ds ifjikyukFkZ ^^ vkosnd }kjk SEAC ds le{k izdj.k ds izLrqrhdj.k ds nkSjku ,sls leLr nLrkostksa dh ewy izfr tks izdj.k ds rduhdh vkWdyu ds fy, vko’;d gS ¼Original Copy ½ SEAC ds le{k izLrqr dh tk;sxh A ;fn dksbZ vkosnd vius ewy nLrkost SEAC ds le{k izLrqr ugha djrk gS rks mlds vkosnu ij SEAC }kjk fopkj ugha fd;k tkosxk**A

D. As per the OM No. 11114 dated 08/02/20126 of SEIAA Project Proponent should submit an affidavit to be executed on appropriate non- judicial stamp paper of minimum value and attested by public notary along with online application for environmental clearance and at the time of submission of hard copy with declaration read as under:

“I hereby give an undertaking that the data and information given in the application and enclosures for environmental clearance are true to the best of my knowledge and belief without concealing any fact and I am aware that if any part of data and information submitted is found to be false or misleading at any stage the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.” The PP’s who have not submitted above declaration at the time of online submission/with hard copy, should bring above affidavit at the time of presentation.

E. Kindly send a brief write up of project/executive summary of the project (maximum three page, in word format) and the name of the consultant with the Sl. No. in the QCI/NABET list in a week’s time by e-mail to the following addresses: [email protected] & [email protected] atleast 03 days prior to the SEAC meeting mentioning case number and agenda meeting number with date. F. In accordance with the circular no. J-11011/618/2010-IA.II (I) dated 30.5.2012, in case of expansion project and or renewal of mine lease for which environment clearance was issued earlier, the project proponent shall submit a certified report of the status of compliance of the conditions stipulated in the environment clearance for the on-going / existing operations of the project by the Regional Offices of Ministry of Environment, Forest and Climate Change. The status of compliance of the conditions stipulated in the EC as highlighted in the report(s) will be discussed by the EAC during appraisal of the project. G. For all other projects (except building/construction projects, item 08 of schedule and mining projects of minor minerals up to 05 hectares under category- “B2”) information shall be provided in the prescribed Form-2 enclosed with OM issued by MoEF&CC vide circular no. F.No. 22-8/2018-IA.III dated 20th April, 2018 along with the copy of EIA/EMP report as per the generic structure given at Appendix-III of the EIA Notification, 2006, Summary of the Environmental Impact Assessment given in Appendix-IIIA. Risk Assessment Report. Copy of Feasibility Report or Detailed Project Report of Detailed Engineering Report, certification of compliance of earlier environmental clearance conditions in case of expansion proposals and final layout plant, as the case may be and as per the requirement contained in the EIA Notification, 2006 and/or the Form-2. H. The projects proposals which are scheduled for the EIA presentation in this meeting, the information shall be provided in the prescribed Form-2 enclosed with OM issued by MoEF&CC vide circular no. F.No. 22-8/2018-IA.III dated 20th April, 2018. I. The mining project proponents involving violations of the EIA Notification, 2006 under the provisions of S.O. 804 (E) dated 14/03/2017 and subsequent amendments for TOR/EC shall give an undertaking by way of affidavit to comply with all the statutory requirements and judgment of Hon;ble Supreme Court dated the 2nd August 2017 in Writ Petition (Civil) No. 114 of 2014 in the matter of Common Cause versus Union of India and Ors. Before grant of TOR/EC the undertaking inter-alia include commitment of the PP not to repeat any such violation of future. In case of violation of above undertaking, the TOR/Environmental Clearance shall be liable to be terminated forthwith. J. All Certificates’ should be addressed to the Ministry on letter head with letter number & dispatch number. K. The Consultants are requested to carry a valid proof in respect of their accreditation status from NABET.