Athena Launch Vehicle Family

Total Page:16

File Type:pdf, Size:1020Kb

Athena Launch Vehicle Family TM APPROVED FOR PUBLIC RELEASE Copyright © 2014 by Lockheed Martin Corporation, All Rights Reserved. 1 Athena Launch Vehicle Family The Athena Program consists of a modular family of launch vehicles based on solid rocket motor (SRM) main propulsion. The Athena family is commercially developed by LM , ATK (Athena teammate) & subcontractors Athena has flown 7 times with 5 successes, from 3 different launch locations: • Kodiak Launch Complex, AK: Highly Inclined orbits (1 launch) – (active) • Vandenberg Air Force Base, CA: Highly Inclined orbits (4 launches) – (retired) • Cape Canaveral Air Force Station, FL: Low Inclined orbits (2 launches) – (active) Athena launches are performed from commercially leased facilities under fixed price contracts – the Athena Program does not own or maintain the launch complexes – however, they are rarely used by other launch vehicles. The Athena Program consists 4 basic configurations, of which 2 have flown: • Athena Ic: Very Small Payloads ~300kg to SSO (4 flights) • Athena IIc: Small Payloads ~1000kg to SSO (3 flights) • Athena IIS: Medium Lite Payloads ~1400kg - 3000kg to SSO (Development Required) • Athena III: Medium Payloads ~4300kg to SSO (Development Required) 2 Expanded Athena Launch Vehicle Family Athena III Athena IIS-2/4/6 Athena IIc Athena Athena Ic Model 165 PLF Common Model 120 PLF (4.2m) Model 92 PLF (3.1m) Core (2.3m) OAM Castor 30 UIS Castor 120 LIS LIS CLIS Castor 120 Castor 120 Castor 900 PLF – Payload Fairing OAM – Orbit Adjust Module DM – Dual Mode (Bi-Propellant) Orion 50SXLG UIS – Upper Interstage LIS – Lower Interstage CLIS – Conical Lower Interstage Performance (kg) Athena Ic Athena IIc Athena IIcS-2/4/6 Athena III 500 km; 28.5o (CCAFS LC-46) 615 1640 2080 / 2630 / 3270 5170 w/ DM OAM 760 1885 2700 / 3500 / 4150 5510 700 km; SSO (KLC LP-1) 285 1085 1430 / 1800 / 2190 3730 w/ DM OAM 470 1295 1870 / 2490 / 3010 4300 3 Athena Launch Vehicles & Components 120” PAYLOAD FAIRING 92” PAYLOAD FAIRING 141” PAYLOAD FAIRING Structure 165” PAYLOAD FAIRING Separation System Structure Instrumentation Separation System PAYLOAD ADAPTER Instrumentation Structure Separation System CONICAL LOWER INTERSTAGE Instrumentation ORBIT ADJUST MODULE Structures Attitude control system (ACS) Separation System Avionics Equipment Section Structure DUAL MODE OAM Separation System Structures, Avionics, Sep System CASTOR 30* Bi-Prop ACS 28,500 lbm HTPB Propellant Carbon Fiber Epoxy Case CASTOR 900*** Carbon Phenolic Exit Cone 843,300 lbm of PBAN Propellant Submerged Flex Bearing Steel Case Common Core Elements (Flight Proven) (Flight Elements Core Common Electromechanical TVC D6AC Steel Exit Cone IIc UPPER/LOWER INTERSTAGE Submerged Flex Bearing & Structures Electromechanical TVC Ic Separation System CASTOR 120 ORION 50S XLG (2/4/6)** Athena Athena 107,400 lbm of HTPB Propellant 33,100 lbm of HTPB Propellant Carbon Fiber Epoxy Case Carbon Fiber Epoxy Case Carbon Phenolic Exit Cone Aluminum Exit Cone (KLC) required complex launch Inclination High New • Submerged Flex Bearing Submerged Flex Bearing Required) (Development Elements Growth Performance III Athena Athena IIS Performance Growth Elements (Development Required) (Development Elements Growth Performance IIS Athena Cold gas pressurized Thrust Vector Cold gas pressurized Thrust Vector Flight Heritage Actuation (TVA) Actuation (TVA) * Anteres LV ** Taurus LV ** GMD GBI *** Space Shuttle Derived 4 Athena IIS Launch Vehicle Family SSO Performance KLC, LP-1: Sun-Synchronous Orbit Inclinations 4500 AIIC Dual Mode OAM AIIC Mono-Prop OAM AIIS-2 Dual Mode OAM AIIS-2 Mono-Prop OAM 4000 AIIS-4 Dual Mode OAM AIIS-4 Mono-Prop OAM AIIS-6 Dual Mode OAM AIIS-6 Mono-Prop OAM 3500 3000 D-II 7920 2500 2000 D-II 7420 1500 D-II 7320 Separable Payload Mass (kg) Mass Payload Separable 1000 500 0 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 Circular Altitude (km) 5 Athena IIS Launch Vehicle Family ETR Performance 6 Athena IIS Family- Launch Vehicle Specs 120” Ø Fairing 92” Ø Body 100” Rad 74.25” Rad to centerline 40° 146” 1,249” 1,085” 909” 15° Nose Cones 433.5” 354.5” 50” Ø Motors Mass (lbm), Force (lbmf) Athena IIS-2/4/6 Max Expected GLOW 349,000 / 424,000 / 499,000 Nominal Sea Level Thrust @ 1 Sec 465,000 / 630,000 / 795,000 10.5” 7 Simple Modular Design LV Payload Fairings: M92, M120 Std (shown), Long, M141 Std, L, XL CASTOR 30: Common to all Configurations CASTOR 120: Common to all Configurations CASTOR 120: Athena II Athena IIS Orbit Adjust Module: Mono Propellant (shown), Bi-Propellant / Dual-Mode Upper Interstage: Common to all Configurations Lower Interstage: Athena II Athena IIS ORION 50S XLG: Athena IIS, 2/4/6 Non-Separating 8 Athena IIS Payload Fairing Options 15° Nose 45” Cone 36” 45” 15° Nose 141” Ø Cone Fairing 15° Nose Cone 120” Ø Fairing 1,285” 1,334” 1,145” 92” Ø Fairing 1,121” 1,180” 1,009” 909” 909” 909” M92 Fairing M120 Fairing M141 Fairing Standard and Standard, Long, Long (shown) and XL (shown) Development Required Development Required 9 PLF Static Volume Comparison Athena PLF Volumes 125” Ø Comparison PLF Volumes 70” Ø Vega Delta II 108” Ø 94” Ø 108” Ø 49” Ø 19” Ø 81” Ø 42” Ø 38” Ø 119” 100” 113” 78” 165” 78” 196” 166” 126” 102” 66” 17” 87” Ø 85” Ø M92 M120 Std. M141 Std. 10 Potential RideShare Opportunities Commercial Mission: 2016 (Q3-Q4), KLC (65-85 deg), 500 – 700 km • Athena IIc w/Std OAM • Multiple Secondary configurations may be available Single Payload: Two Payloads: Three Payloads: Four Payloads: 250 – 350 kg 125 – 175 kg (ea) 80 – 115 kg 60 – 80 kg MU PLA / SS MU PLA / SS MU PLA / SS MU PLA / SS Axial Axial Axial Lateral – 15 deg canting 38.5”Ø 154” 75.5” 81”Ø 11 Potential RideShare Opportunities ORS-5 Mission: – 2017, CCAFS/Meck (28.5, 9.2 deg), 500 – 700 km • Athena Ic / Athena IIc, Std OAM / DM OAM • Multiple Secondary configurations may be available Two Payloads: Two Payloads: Two Payloads: Six Payloads: ~50 kg (ea) ~50 kg (ea) ~75 kg (ea) ~50 kg (ea) 28.5 deg / ~600km 9.2 deg / ~600km 9.2 deg / ~600km 28.5 deg / ~600km Lateral Lateral Lateral Lateral Athena IIc Athena IIc DM OAM Athena Ic Athena IIc DM OAM 12 Athena Point of Contact For more information on availability, manifest scheduling, performance, flight environments, interface options and pricing please contact: Mission Management Gregory Kehrl (303) 514-9548 [email protected] 13 ! ! GO ATHENA ! ! 14 .
Recommended publications
  • Launch and Deployment Analysis for a Small, MEO, Technology Demonstration Satellite
    46th AIAA Aerospace Sciences Meeting and Exhibit AIAA 2008-1131 7 – 10 January 20006, Reno, Nevada Launch and Deployment Analysis for a Small, MEO, Technology Demonstration Satellite Stephen A. Whitmore* and Tyson K. Smith† Utah State University, Logan, UT, 84322-4130 A trade study investigating the economics, mass budget, and concept of operations for delivery of a small technology-demonstration satellite to a medium-altitude earth orbit is presented. The mission requires payload deployment at a 19,000 km orbit altitude and an inclination of 55o. Because the payload is a technology demonstrator and not part of an operational mission, launch and deployment costs are a paramount consideration. The payload includes classified technologies; consequently a USA licensed launch system is mandated. A preliminary trade analysis is performed where all available options for FAA-licensed US launch systems are considered. The preliminary trade study selects the Orbital Sciences Minotaur V launch vehicle, derived from the decommissioned Peacekeeper missile system, as the most favorable option for payload delivery. To meet mission objectives the Minotaur V configuration is modified, replacing the baseline 5th stage ATK-37FM motor with the significantly smaller ATK Star 27. The proposed design change enables payload delivery to the required orbit without using a 6th stage kick motor. End-to-end mass budgets are calculated, and a concept of operations is presented. Monte-Carlo simulations are used to characterize the expected accuracy of the final orbit.
    [Show full text]
  • L AUNCH SYSTEMS Databk7 Collected.Book Page 18 Monday, September 14, 2009 2:53 PM Databk7 Collected.Book Page 19 Monday, September 14, 2009 2:53 PM
    databk7_collected.book Page 17 Monday, September 14, 2009 2:53 PM CHAPTER TWO L AUNCH SYSTEMS databk7_collected.book Page 18 Monday, September 14, 2009 2:53 PM databk7_collected.book Page 19 Monday, September 14, 2009 2:53 PM CHAPTER TWO L AUNCH SYSTEMS Introduction Launch systems provide access to space, necessary for the majority of NASA’s activities. During the decade from 1989–1998, NASA used two types of launch systems, one consisting of several families of expendable launch vehicles (ELV) and the second consisting of the world’s only partially reusable launch system—the Space Shuttle. A significant challenge NASA faced during the decade was the development of technologies needed to design and implement a new reusable launch system that would prove less expensive than the Shuttle. Although some attempts seemed promising, none succeeded. This chapter addresses most subjects relating to access to space and space transportation. It discusses and describes ELVs, the Space Shuttle in its launch vehicle function, and NASA’s attempts to develop new launch systems. Tables relating to each launch vehicle’s characteristics are included. The other functions of the Space Shuttle—as a scientific laboratory, staging area for repair missions, and a prime element of the Space Station program—are discussed in the next chapter, Human Spaceflight. This chapter also provides a brief review of launch systems in the past decade, an overview of policy relating to launch systems, a summary of the management of NASA’s launch systems programs, and tables of funding data. The Last Decade Reviewed (1979–1988) From 1979 through 1988, NASA used families of ELVs that had seen service during the previous decade.
    [Show full text]
  • The Annual Compendium of Commercial Space Transportation: 2012
    Federal Aviation Administration The Annual Compendium of Commercial Space Transportation: 2012 February 2013 About FAA About the FAA Office of Commercial Space Transportation The Federal Aviation Administration’s Office of Commercial Space Transportation (FAA AST) licenses and regulates U.S. commercial space launch and reentry activity, as well as the operation of non-federal launch and reentry sites, as authorized by Executive Order 12465 and Title 51 United States Code, Subtitle V, Chapter 509 (formerly the Commercial Space Launch Act). FAA AST’s mission is to ensure public health and safety and the safety of property while protecting the national security and foreign policy interests of the United States during commercial launch and reentry operations. In addition, FAA AST is directed to encourage, facilitate, and promote commercial space launches and reentries. Additional information concerning commercial space transportation can be found on FAA AST’s website: http://www.faa.gov/go/ast Cover art: Phil Smith, The Tauri Group (2013) NOTICE Use of trade names or names of manufacturers in this document does not constitute an official endorsement of such products or manufacturers, either expressed or implied, by the Federal Aviation Administration. • i • Federal Aviation Administration’s Office of Commercial Space Transportation Dear Colleague, 2012 was a very active year for the entire commercial space industry. In addition to all of the dramatic space transportation events, including the first-ever commercial mission flown to and from the International Space Station, the year was also a very busy one from the government’s perspective. It is clear that the level and pace of activity is beginning to increase significantly.
    [Show full text]
  • Space Almanac 2007
    2007 Space Almanac The US military space operation in facts and figures. Compiled by Tamar A. Mehuron, Associate Editor, and the staff of Air Force Magazine 74 AIR FORCE Magazine / August 2007 Space 0.05g 60,000 miles Geosynchronous Earth Orbit 22,300 miles Hard vacuum 1,000 miles Medium Earth Orbit begins 300 miles 0.95g 100 miles Low Earth Orbit begins 60 miles Astronaut wings awarded 50 miles Limit for ramjet engines 28 miles Limit for turbojet engines 20 miles Stratosphere begins 10 miles Illustration not to scale Artist’s conception by Erik Simonsen AIR FORCE Magazine / August 2007 75 US Military Missions in Space Space Support Space Force Enhancement Space Control Space Force Application Launch of satellites and other Provide satellite communica- Ensure freedom of action in space Provide capabilities for the ap- high-value payloads into space tions, navigation, weather infor- for the US and its allies and, plication of combat operations and operation of those satellites mation, missile warning, com- when directed, deny an adversary in, through, and from space to through a worldwide network of mand and control, and intel- freedom of action in space. influence the course and outcome ground stations. ligence to the warfighter. of conflict. US Space Funding Millions of constant Fiscal 2007 dollars 60,000 50,000 40,000 30,000 20,000 10,000 0 Fiscal Year 59 62 65 68 71 74 77 80 83 86 89 92 95 98 01 04 Fiscal Year NASA DOD Other Total Fiscal Year NASA DOD Other Total 1959 1,841 3,457 240 5,538 1983 13,051 18,601 675 32,327 1960 3,205 3,892
    [Show full text]
  • The Evolving Launch Vehicle Market Supply and the Effect on Future NASA Missions
    Presented at the 2007 ISPA/SCEA Joint Annual International Conference and Workshop - www.iceaaonline.com The Evolving Launch Vehicle Market Supply and the Effect on Future NASA Missions Presented at the 2007 ISPA/SCEA Joint International Conference & Workshop June 12-15, New Orleans, LA Bob Bitten, Debra Emmons, Claude Freaner 1 Presented at the 2007 ISPA/SCEA Joint Annual International Conference and Workshop - www.iceaaonline.com Abstract • The upcoming retirement of the Delta II family of launch vehicles leaves a performance gap between small expendable launch vehicles, such as the Pegasus and Taurus, and large vehicles, such as the Delta IV and Atlas V families • This performance gap may lead to a variety of progressions including – large satellites that utilize the full capability of the larger launch vehicles, – medium size satellites that would require dual manifesting on the larger vehicles or – smaller satellites missions that would require a large number of smaller launch vehicles • This paper offers some comparative costs of co-manifesting single- instrument missions on a Delta IV/Atlas V, versus placing several instruments on a larger bus and using a Delta IV/Atlas V, as well as considering smaller, single instrument missions launched on a Minotaur or Taurus • This paper presents the results of a parametric study investigating the cost- effectiveness of different alternatives and their effect on future NASA missions that fall into the Small Explorer (SMEX), Medium Explorer (MIDEX), Earth System Science Pathfinder (ESSP), Discovery,
    [Show full text]
  • 1.1 a Survey of the Lightning Launch Commit Criteria
    1.1 A Survey Of The Lightning Launch Commit Criteria William P. Roeder and Todd M. McNamara 45th Weather Squadron, Patrick AFB, FL 1. 45 WS MISSION The 45th Weather Squadron (45 WS) provides comprehensive weather services to America’s space program at Cape Canaveral Air Force Station (CCAFS) and NASA’s Kennedy Space Center (KSC) (Harms et al., 1999). These services include weather support for pre-launch, launch, post-launch, routine weather forecast, 24/7 watches/warnings, flight briefings, and special missions. A major part of the 45 WS support to launch is evaluating and forecasting the Lightning Launch Commit Criteria (LLCC) (Roeder et al., 1999) and User Launch Commit Criteria (Boyd et al., 1995). The LLCC protect against natural and rocket triggered lightning strikes to the in-flight rocket. The User Launch Commit Criteria include low level winds so the rocket doesn’t Figure 1. Average cloud-to-ground lighting flash density topple or get blown back into the launch pad 2 during launch, and ceiling and visibility so the (flashes/km •year) for the CONUS (1989–1993), corrected for detection efficiency. Data are from the ascending rocket can be tracked by camera to National Lightning Detection Network. Figure provided ensure it is on the correct trajectory. Launch by Dr. Richard Orville, Texas A&M University. customers include the DoD, NASA, and commercial customers for approximately 30 launches per year. The launch vehicles supported 2. INTRODUCTION TO THE LIGHTNING recently include Titan, Atlas, Delta, Athena, LAUNCH COMMIT CRITERIA Pegasus, and Space Shuttle space launch vehicles, and Trident ballistic missiles.
    [Show full text]
  • N AS a Facts
    National Aeronautics and Space Administration NASA’s Launch Services Program he Launch Services Program (LSP) manufacturing, launch operations and rockets for launching Earth-orbit and Twas established at Kennedy Space countdown management, and providing interplanetary missions. Center for NASA’s acquisition and added quality and mission assurance in In September 2010, NASA’s Launch program management of expendable lieu of the requirement for the launch Services (NLS) contract was extended launch vehicle (ELV) missions. A skillful service provider to obtain a commercial by the agency for 10 years, through NASA/contractor team is in place to launch license. 2020, with the award of four indefinite meet the mission of the Launch Ser- Primary launch sites are Cape Canav- delivery/indefinite quantity contracts. The vices Program, which exists to provide eral Air Force Station (CCAFS) in Florida, expendable launch vehicles that NASA leadership, expertise and cost-effective and Vandenberg Air Force Base (VAFB) has available for its science, Earth-orbit services in the commercial arena to in California. and interplanetary missions are United satisfy agencywide space transporta- Other launch locations are NASA’s Launch Alliance’s (ULA) Atlas V and tion requirements and maximize the Wallops Flight Facility in Virginia, the Delta II, Space X’s Falcon 1 and 9, opportunity for mission success. Kwajalein Atoll in the South Pacific’s Orbital Sciences Corp.’s Pegasus and facts The principal objectives of the LSP Republic of the Marshall Islands, and Taurus XL, and Lockheed Martin Space are to provide safe, reliable, cost-effec- Kodiak Island in Alaska. Systems Co.’s Athena I and II.
    [Show full text]
  • Launch and Deployment Analysis for a Small, MEO, Technology
    Launch and Deployment Analysis for a Isp = specific impulse, sec Small, MEO, Technology Demonstration k = spring constant, Nt/mm KLC = Kodiak Island Launch Complex Satellite MTO = medium transfer orbit transfer orbit 1 LEO = low earth orbit Tyson Karl Smith 2 LMA = Lockheed Martin Aerospace Stephen Anthony Whitmore M = final mass after insertion burn, kg Utah State University, Logan, UT, 84322-4130 final Mpayload = mass of payload after kick motor jettison, kg A trade study investigation the possibilities of delivering M = propellant mass consumed during a small technology-demonstration satellite to a medium prop earth orbit are presented. The satellite is to be deployed insertion burn, kg in a 19,000 km orbit with an inclination of 55°. This Mstage = mass of expended stage after jettison, payload is a technology demonstrator and thus launch kg and deployment costs are a paramount consideration. NRE = non-recurrent engineering, kg Also the payload includes classified technology, thus a Nspring = number of springs in Lightband® USA licensed launch system is mandated. All FAA- separation system licensed US launch systems are considered during a MTO = MEO transfer orbit preliminary trade analysis. This preliminary trade OSC = Orbital Sciences Corporation analysis selects Orbital Sciences Minotaur V launch R = apogee radius, km vehicle. To meet mission objective the Minotaur V 5th a stage ATK-Star 37FM motor is replaced with the Rp = perigee radius, km smaller ATK- Star 27. This new configuration allows R⊕ = local earth radius, km for payload delivery without adding an additional 6th SDL = Space Dynamics Laboratory stage kick motor. End-to-end mass budgets are SLV = space launch vehicle calculated, and a concept of operations is presented.
    [Show full text]
  • Orbital Rendezvous Using an Augmented Lambert Guidance Scheme By
    Orbital Rendezvous Using an Augmented Lambert Guidance Scheme by Sara Jean MacLellan B.S. Aerospace Engineering Embry-Riddle Aeronautical University, 2003 SUBMITTED TO THE DEPARTMENT OF AERONAUTICS AND ASTRONAUTICS IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF SCIENCE IN AERONAUTICS AND ASTRONAUTICS AT THE MASSACHUSETTS INSTITUTE OF TECHNOLOGY JUNE 2005 @ 2005 Sara Jean MacLellan. All rights reserved. The author hereby grants to MIT permission to reproduce and distribute publicly paper and electronic copies of this thesis document in whole or in part. Signature of Author: Department of Aeronautics and Astronautics May 06, 2005 Certified by: V Andrew Staugler Senior Member of the Technical Staff The Charles Stark Draper Laboratory, Inc. Technical Advisor Accepted by: Richard H. Battin, Ph.D. Senior Lecturer of Aeronautics and Astronautics Thesis Supervisor Accepted bv Jaime Peraire, Ph.D. MASSACHUSS INS E Professor of Aeronautics and Astronautics OF TECHNOLOGY Chair, Committee on Graduate Students DEC 1E2005 LIBRARIES AERO I [This page intentionally left blank.] 40600 Orbital Rendezvous Using an Augmented Lambert Guidance Scheme by Sara Jean MacLellan Submitted to the Department of Aeronautics and Astronautics on May 06, 2005, in partial fulfillment of the requirements for the degree of Master of Science in Aeronautics and Astronautics Abstract The development of an Augmented Lambert Guidance Algorithm that matches the po- sition and velocity of an orbiting target spacecraft is presented in this thesis. The Aug- mented Lambert Guidance Algorithm manipulates the inputs given to a preexisting Lam- bert guidance algorithm to control the boost of a launch vehicle, or chaser, from the surface of the Earth to a transfer trajectory enroute to the aim point.
    [Show full text]
  • Appendix 15B. Tables of Operational Military Satellites TED MOLCZAN and JOHN PIKE*
    Appendix 15B. Tables of operational military satellites TED MOLCZAN and JOHN PIKE* Table 15B.1. US operational military satellites, as of 31 December 2002a Common Official Intl NORAD Launched Launch Perigee Apogee Incl. Period name name name design. (date) Launcher site (km) (km) (deg.) (min.) Comments Navigation satellites in medium earth orbit GPS 2-02 SVN 13/USA 38 1989-044A 20061 10 June 89 Delta 6925 CCAFS 19 594 20 787 53.4 718.0 GPS 2-04b SVN 19/USA 47 1989-085A 20302 21 Oct 89 Delta 6925 CCAFS 21 204 21 238 53.4 760.2 (Retired, not in SEM Almanac) GPS 2-05 SVN 17/USA 49 1989-097A 20361 11 Dec 89 Delta 6925 CCAFS 19 795 20 583 55.9 718.0 GPS 2-08b SVN 21/USA 63 1990-068A 20724 2 Aug 90 Delta 6925 CCAFS 19 716 20 705 56.2 718.8 (Decommissioned Jan. 2003) GPS 2-09 SVN 15/USA 64 1990-088A 20830 1 Oct 90 Delta 6925 CCAFS 19 978 20 404 55.8 718.0 GPS 2A-01 SVN 23/USA 66 1990-103A 20959 26 Nov 90 Delta 6925 CCAFS 19 764 20 637 56.4 718.4 GPS 2A-02 SVN 24/USA 71 1991-047A 21552 4 July 91 Delta 7925 CCAFS 19 927 20 450 56.0 717.9 GPS 2A-03 SVN 25/USA 79 1992-009A 21890 23 Feb 92 Delta 7925 CCAFS 19 913 20 464 53.9 717.9 GPS 2A-04b SVN 28/USA 80 1992-019A 21930 10 Apr 92 Delta 7925 CCAFS 20 088 20 284 54.5 717.8 (Decommissioned May 1997) GPS 2A-05 SVN 26/USA 83 1992-039A 22014 7 July 92 Delta 7925 CCAFS 19 822 20 558 55.9 718.0 GPS 2A-06 SVN 27/USA 84 1992-058A 22108 9 Sep 92 Delta 7925 CCAFS 19 742 20 638 54.1 718.0 GPS 2A-07 SVN 32/USA 85 1992-079A 22231 22 Nov 92 Delta 7925 CCAFS 20 042 20 339 55.7 718.0 GPS 2A-08 SVN 29/USA 87 1992-089A
    [Show full text]
  • Information Summary Assurance in Lieu of the Requirement for the Launch Service Provider Apollo Spacecraft to the Moon
    National Aeronautics and Space Administration NASA’s Launch Services Program he Launch Services Program was established for mission success. at Kennedy Space Center for NASA’s acquisi- The principal objectives are to provide safe, reli- tion and program management of Expendable able, cost-effective and on-schedule processing, mission TLaunch Vehicle (ELV) missions. A skillful NASA/ analysis, and spacecraft integration and launch services contractor team is in place to meet the mission of the for NASA and NASA-sponsored payloads needing a Launch Services Program, which exists to provide mission on ELVs. leadership, expertise and cost-effective services in the The Launch Services Program is responsible for commercial arena to satisfy Agencywide space trans- NASA oversight of launch operations and countdown portation requirements and maximize the opportunity management, providing added quality and mission information summary assurance in lieu of the requirement for the launch service provider Apollo spacecraft to the Moon. to obtain a commercial launch license. The powerful Titan/Centaur combination carried large and Primary launch sites are Cape Canaveral Air Force Station complex robotic scientific explorers, such as the Vikings and Voyag- (CCAFS) in Florida, and Vandenberg Air Force Base (VAFB) in ers, to examine other planets in the 1970s. Among other missions, California. the Atlas/Agena vehicle sent several spacecraft to photograph and Other launch locations are NASA’s Wallops Island flight facil- then impact the Moon. Atlas/Centaur vehicles launched many of ity in Virginia, the North Pacific’s Kwajalein Atoll in the Republic of the larger spacecraft into Earth orbit and beyond. the Marshall Islands, and Kodiak Island in Alaska.
    [Show full text]
  • Space Launch Vehicles: Government Activities, Commercial Competition, and Satellite Exports
    Order Code IB93062 CRS Issue Brief for Congress Received through the CRS Web Space Launch Vehicles: Government Activities, Commercial Competition, and Satellite Exports Updated October 6, 2003 Marcia S. Smith Resources, Science, and Industry Division Congressional Research Service ˜ The Library of Congress CONTENTS SUMMARY MOST RECENT DEVELOPMENTS BACKGROUND AND ANALYSIS U.S. Launch Vehicle Policy From “Shuttle-Only” to “Mixed Fleet” Clinton Administration Policy George W. Bush Administration Activity U.S. Launch Vehicle Programs and Issues NASA’s Space Shuttle Program New U.S. Expendable and Reusable Launch Vehicles NASA’s Efforts to Develop New Reusable Launch Vehicles (RLVs) Private Sector RLV Development Efforts DOD’s Evolved Expendable Launch Vehicle (EELV) Program U.S. Commercial Launch Services Industry Congressional Interest Foreign Launch Competition (Including Satellite Export Issues) Europe China Russia Ukraine India Japan Satellite Exports: Agency Jurisdiction and Other Continuing Issues LEGISLATION For more information on the space shuttle program, see: CRS Report RS21408, NASA’s Space Shuttle Columbia: Quick Facts and Issues for Congress CRS Report RS21606, NASA’s Space Shuttle Columbia: Synopsis of the Report of the Columbia Accident Investigation Board CRS Report RS21411, NASA’s Space Shuttle Program: Space Shuttle Appropriations FY1992-FY2002 CRS Report RS21419, NASA’s Space Shuttle Program: Excerpts from Recent Reports and Hearings Regarding Shuttle Safety For information on the Orbital Space Plane, which is not a launch vehicle, but a spacecraft, see CRS Issue Brief IB93017, Space Stations. IB93062 10-06-03 Space Launch Vehicles: Government Activities, Commercial Competition, and Satellite Exports SUMMARY Launching satellites into orbit, once the plans to refocus its latest RLV development exclusive domain of the U.S.
    [Show full text]