PDF | 327.4 KB | International Humanitarian

Total Page:16

File Type:pdf, Size:1020Kb

PDF | 327.4 KB | International Humanitarian United Nations / Ujedinjene nacije / Уједињене нације Office of the Resident Coordinator / Ured rezidentnog koordinatora / Уред резидентног координатора Bosnia and Herzegovina / Bosna i Hercegovina / Босна и Херцеговина International Humanitarian Assistance to BiH 15th June 2014 NOTE: This document represents compilation of data provided by listed embassies/organizations/institutions. The author is not responsible for accuracy of information received from outside sources. ORGANIZATION WHAT WHEN WHERE CATEGORY ADRA Current budget of 100,000 USD with possibility of additional funding. 20/05/2014 Humanitarian aid, Full time local team to be employed. WASH Early recovery Hundreds of volunteers engaged in preparation and delivery of Doboj, Zavidovici, packages of food, water, hygiene items, clothes, infants’ utensils and Vozuca, Banja Luka, medicines for population of affected areas. Bijeljina, Samac and Orasje. Planed activities: Psychosocial support; Room dryers and 260dehumidifiers, expected to be here 26/05/2014. An engineer from Germany for one month; REDO water purification unit (3,000l per hour) will be shipped Doboj 26/05/2014; Debris Cleaning – Use of Effective Microorganisms (EM) to clean oil spills and other contaminations in and around houses, as well as rehabilitating agricultural land. Possible deployment of EM Expert Cleaning-up activities; Distribution of Relief Items; Technician for the Water distribution system and dryers 21/05/2014 Austria Disaster relief unit of the Austrian Armed Forces deployed – 76 02/06/2014 Based in Orasje WASH solders (consisting of command and logistic cell, detection elements, decontamination elements, a medical element and three water purification elements as well as specialists on chemical and biological hazards). This unit is capable of producing 240.000 l potable water per day which is sufficient to serve 50.000 persons. Unit will also transport the purified water to central distribution sites. HWA will make distribution of following aid: 01/06/2014 Topcic polje WASH - sets of tools for cleaning of debris and sediment for 12 of the most vulnerable families. Each set contains a construction trolley, rubber boots, shovel, pick, protective mask with filter and work gloves Zmaja od Bosne bb, Sarajevo 71000, Bosnia and Herzegovina Tel: (387-33) 293 428 / Fax: (387-33) 552 330 / www.un.ba - 27 sets of disinfection facilities will be delivered. Each set contains a Maglaj, Doboj and WASH hand-sprayer of 20 litters capacity, two pairs of rubber gloves, a mask Zavidovic with filter and disinfectant - 7 motor sprayers for disinfection and disinfectants to be donated to Tuzla, Bijeljina and WASH professional services, that will immediately go in the field and start Brcko disinfecting the affected areas; Since the beginning of the floods Austrian Humanitarian 28/05/2014 BIH Humanitarian aid Organizations and private donors are continuously sending humanitarian aid to Bosnia and Herzegovina. HCP teams and the water purification unit active in affected areas. 28/05/2014 Affected areas WASH Hilfswerk Austria International (HWA) allocate through two EU 23/05/2014 Bijeljina, Vukosavlje, Early recovery funded projects 45.000 EUR for support to the Roma communities Tuzla and Kakanj (distribution of food, potable water, hygiene, tools, disinfection items); At least 12 families that are flood or landslides victims are going to be Bijeljina, Brčko and Early recovery beneficiaries of the Social housing project; Tuzla HWA offered assistance for Recovery Needs Assessment. Deployed 46 people from the Firefighters Association and Water 18/05/2014 Orasje Life saving Rescue Department, 8 aluminum boats, 13 trucks and 7 trailers Arbeiter - 500 food/water/hygiene parcels (in total 6 tons of food and hygiene 28/05/2014 Sanski Most and Kljuc WASH Samariter-Bund and 5.000 liters of water € 17.000) and Janja e.V Deutschland 3 Water Treatment Plant (WTP) Samac WASH 29/05/2014 start distributing: 1. 475 food/water parcels, 2. 475 Maglaj, Doboj, Samac, WASH House cleaning kits, 3. 475 Personal/Home hygiene kits and 4. 475 Vukosavlje , Odzak, Humanitarian aid Bed sets (with German Government funds of € 110.000) Brcko District and Domaljevac 4 chain saws, 2 water pumps and 2 generators Maglaj, Doboj, Humanitarian aid Zavidovici, Samac, Early recovery Vukosavlje, Odzak, Brcko District, Orasje, Zenica and Zepce Azerbaijan 25t of humanitarian aid: boats with engines, tents, beds, generators, 20/05/2014 Delivered to Rajlovac Humanitarian aid, water cans, water pumps, protective suits, gas bottles, water hose with and divided to AFBIH, WASH associated extensions, suction hoses, helmets, hand lamps, winches CPs FBIH and RS 3.5 capacity Belgium Team of 27 personnel and equipment arrived and active in the field 23/05/2014 Orasje WASH, Early recovery from 21/05/2014 Trucks with 27 military personnel equipped with high capacity pumps 20/05/2014 Maglaj unless there is WASH, and water purification material left Belgium – arriving on 21 or more pressing priority Early recovery 22/05/2014 on another location The inventory and packing list sent to the BiH Emergency Coordination Centre in Banja Luka. Bulgaria Humanitarian aid (blankets, bed linens, bed linen for children, pillows, 26/05/2014 Red Cross of FBiH and Humanitarian aid rubber boots, socks, folding beds with mattresses and 21 t of mineral to the Red Cross of RS water) Tents and blankets 18/05/2014 Brcko Humanitarian aid Canada Support in 200 000 USD to the Red Cross Society of Bosnia and 13/06/2014 Humanitarian aid, Early Herzegovina which will assist 10,000 flood-affected families; recovery Save the Children Canada will provide assistance to 12,400 flood- Zenica-Doboj Canton affected families in Zenica-Doboj Canton with 400 000 USD CARE Long-term presence in country working within two programme 23/05/2014 Tuzla Canton and Humanitarian aid International clusters: socio-economic inclusion and gender equality. Bijeljina Early recovery Rapid needs assessments - completed Emergency and Relief Phase: food, NFI, hygiene kits, disinfectants, water pumps, dehumidifiers, essential household items . Protection activities that include Roma and vulnerable women. Recovery Phase - livelihoods assistance such as seeds, tools, fodder, livestock etc. Caritas Channelled the contribution of Swiss Government (100.000 CHF) over 01/06/2014 18 Municipalities in Humanitarian aid, Early Switzerland Caritas Europe joint fund (total 600.000 Euro) for the emergency BiH - Distribution recovery relief for 8.000 families in food, hygienic goods and water. through local Caritas network. Support from retail companies Manor and Aldi in food, hygienic goods and clothes (value approx. 100.000 EUR) In cooperation with Habitat for Humanity and other donors preparing the project for rehabilitation phase in the value of 2.000.000 EUR (construction and reconstruction of housing units). The focus will be given to Roma and other extremely vulnerable families. Catholic Relief Commitment of US$500,000 to the urgent flood relief and recovery 23/05/2014 Early recovery Services efforts across BiH and Serbia; 8 field “assessment” teams visiting affected regions to evaluate the greatest needs for support. Croatia 2 helicopters with 15 people 19/05/2014 Doboj, Maglaj, Life saving Zavidovići, Modriča, State Emergency Fire-fighting brigade with 11 firefighters, 3 vehicles Orašje, Odžak, carrying pumps, aggregates and rescue equipment, Bosanski Šamac, State emergency civilian protection brigade with 8 people, 4 vehicles, Zenica, Brčko, Bijeljina, 3 tin boats with motors and other equipment; Orašje and Tuzla A Public Fire-fighting brigade with 6 people and 2 vehicles; The Government decided to extend their deployment until 21 May or 23 May at the latest. Croatian Red Cross has set up bank accounts for the collection of donations for the distressed in Bosnia and Herzegovina. 13 people, 4 boats 16/05/2014 Vukosavlje 5 people, 2 boats Odzak 2 helicopters evacuation and transport as needed Czech Republic Two trucks with humanitarian aid (hygienic items, clothes, drinking 26/05/2014 Through the Red Cross Humanitarian aid water and boots) distributed through the Red Cross; Firemen and two water pumps; 20/05/2014 Orašje WASH Humanitarian aid kits 1,120 pcs delivered; Brčko Humanitarian aid, 182,000 EUR for Bosnia and Serbia for reconstruction and equipment 18/05/2014 Maglaj and Doboj Early recovery of laboratories within Local Ambulances. Denmark Water purification team consisting of 8 persons and a high capacity 04/06/2014 Various locations WASH pumping team (capable of moving 3,4 million liters of water per hour) consisting of 26 persons deployed on 25/05/2014. Support coordinated with other contributions from EU Member States by EUCP EU ECHO Post disaster needs assessment experts; 19/05/2014 Early recovery Help through Member States. 16/05/2014 EUFOR Providing trucks and manpower for distribution of humanitarian aid 25/05/2014 BiH Humanitarian aid, Early throughout affected areas. The total number of rescued people by recovery EUCP teams stands now at 1578. 4 helicopters and 12 trucks 16/05/2014 Evacuation and Life saving transport as needed Finland ICT and logistics expert deployed as a part of EU's Civil Protection 01/06/2014 Early recovery Group. France Mine expert deployed for development of assessment and will stay in 26/05/2014 Early recovery BiH until 30/05/2014; 23 tents (25 m2) delivered. Additional 50 family tents to be delivered Tuzla region in following days through the Red Cross. Additional team (3 experts) with equipment for water purification 23/05/2014 WASH (4m3/h) deployed until 31/05/2014 Additional WASH Unit (4 persons) with an equipment for water 21/05/2014 Maglaj WASH purification (4m3/h) deployed until 27/05/2014 2 firefighters, 1 doctor and 1 water purification expert as well as 20/05/2014 Tuzla WASH water purification equipment, mobile ambulance (tent 54m2) and other materials (boots, clothes etc.) – will be present in affected areas until 26/05/2014. FYROM 30 people 6 boats 18/05/2014 Brcko Life saving Germany 1,361 Mio US-Dollar (= 1 Mio.
Recommended publications
  • National Reviews 1998 Bosnia and Herzegovina Executive
    DANUBE POLLUTION REDUCTION PROGRAMME NATIONAL REVIEWS 1998 BOSNIA AND HERZEGOVINA EXECUTIVE SUMMARY Ministry of Agriculture, Water Management and Forestry in cooperation with the Programme Coordination Unit UNDP/GEF Assistance DANUBE POLLUTION REDUCTION PROGRAMME NATIONAL REVIEWS 1998 BOSNIA AND HERZEGOVINA EXECUTIVE SUMMARY Ministry of Agriculture, Water Management and Forestry in cooperation with the Programme Coordination Unit UNDP/GEF Assistance Preface The National Reviews were designed to produce basic data and information for the elaboration of the Pollution Reduction Programme (PRP), the Transboundary Analysis and the revision of the Strategic Action Plan of the International Commission for the Protection of the Danube River (ICPDR). Particular attention was also given to collect data and information for specific purposes concerning the development of the Danube Water Quality Model, the identification and evaluation of hot spots, the analysis of social and economic factors, the preparation of an investment portfolio and the development of financing mechanisms for the implementation of the ICPDR Action Plan. For the elaboration of the National Reviews, a team of national experts was recruited in each of the participating countries for a period of one to four months covering the following positions: Socio-economist with knowledge in population studies, Financial expert (preferably from the Ministry of Finance), Water Quality Data expert/information specialist, Water Engineering expert with knowledge in project development. Each of the experts had to organize his or her work under the supervision of the respective Country Programme Coordinator and with the guidance of a team of International Consultants. The tasks were laid out in specific Terms of Reference. At a Regional Workshop in Budapest from 27 to 29 January 1998, the national teams and the group of international consultants discussed in detail the methodological approach and the content of the National Reviews to assure coherence of results.
    [Show full text]
  • Bosnian Genocide) from 1992 Until 1995 Was the Worst Massacre Occurred Since the Holocaust in the World War II
    CHAPTER I INTRODUCTION 1.1 Research Background Bosnian War (Bosnian Genocide) from 1992 until 1995 was the worst massacre occurred since the Holocaust in the World War II. In 1992, Serbia set out to “ethnically cleanse” Bosnian territory by regularly eliminated all Bosnian Muslims (Bosniaks). Serbian together with Bosnian Serbs ethnic attacked Bosniaks with former Yugoslavian military equipment, and then surrounded Sarajevo as the capital city of BiH. In consequence, many Bosniaks were driven into concentration camps, where Bosniaks women and girls were raped and other civilians were tortured, starved and murdered (Lampe, 2019). This conquest made 70% of the territories in Bosnia-Herzegovina (BiH), wherein the closest Republic from Serbia, was ethnically cleansed from Bosniaks and Croats civilians (Flögel, Lauc, and Goreta, 2010). The Serbian army first traced of the boundary along the valley of Drina, whereabouts plenty of towns with Muslim majority. In the first weeks of April, Serb military force that was backed up by regular units of the JNA (Yugoslav People's Army) struck into districts such as Zvornik, Višegrad, Bratunac, Srebrenica, and Foca, and then attacked, exiled, murdered, terrorized, and expelled the poor defenses of the Muslim populations. Subsequently, millions of Bosnian Muslims were displaced and forced in immigrating to other safer country as refugee (Nation, 2003, p. 160, 189, 203). In fact, one of the safest powerful countries that Bosniak refugees chose to settle in was United States. In 1992, after 1 2 the Bosnian War started, there was a wave of Bosnian refugees to United States that had primarily been Muslim. From the year of 1991 to 1994, around 11,500 Bosnian immigrated, and within the U.S.
    [Show full text]
  • Rotary Foundation Matching Grants Project Fight Youth Poverty in Bosnia-Herzegovina Part 2 April 2013 - June 2014 (15 Months) Update, December 19Th, 2012 Dr
    Rotary Foundation Matching Grants project Fight Youth Poverty in Bosnia-Herzegovina part 2 April 2013 - June 2014 (15 months) Update, December 19th, 2012 Dr. Hans Philipp, Rotary Club Kitzbühel, project coordinator The project is linked with the ADC financed tour.reg project (implemented in Bosnia- Herzegovina by KulturKontakt Austria from 2007-2012) and the Rotary Foundation Matching Grants project #76732 “Fight Youth Poverty in Bosnia-Herzegovina, 2013 – 2014 (FYP)” (submitted for financing at BMZ Germany). Goal of the project is to improve the initial vocational education of the youth at 12 secondary colleges for tourism in Bosnia-Herzegovina: 9 schools that had previously participated in the tour.reg project: schools from Brcko-District, Pale, Lukavac, Sarajevo, Cazin, Bihac, Zenica, Tuzla, Prijedor and 3 new schools choosen with the help of the local ministries: Jablanica, Teslic, Kupres (3 out of the total of 9 schools which will be partners in the FYP project), The project will follow up the results from the tour.reg project and be aimed at implementation of the quality criteria for practical teaching and learning at the chosen schools, using the results of the tour.reg project specified in the guidelines “Leitfaden für inner- und außerschulischen Praxisunterricht” (guidelines define and describe the quality criteria for the practical teaching and learning within and outside the schools), specifically: Promote the development of related practical key qualifications of teachers and students in school environment through four three-day
    [Show full text]
  • Execution of Demining (Dem) and Technical Survey (Ts) Works
    Based on the donations earmarked for the projects of Demining (DEM) and Technical Survey (TS) in Bosnia and Herzegovina, donated by German Federal Foreign Office through ITF Enhancing Human Security (ITF), ITF would like to announce the following: WORKS PROCUREMENT NOTICE FOR EXECUTION OF DEMINING (DEM) AND TECHNICAL SURVEY (TS) WORKS 1. Publication reference: ITF-01-05/13-DEM/TS-BH-GER 2. Procedure: Open Tender Procedure for Commercial Companies and Non-governmental Organizations 3. Contracting Authority: ITF Enhancing Human Security (ITF) 4. Description of the contracts: Execution of Demining and Technical Survey works on following contracts/lots: CONTRACT MACROLOCATION MICROLOCATION MAC ENTITY SURFACE TENDER SURVEY GUARANTEE NUMBER VALUE Lot 1 ITF-01/13-DEM-BH-GER Trasa puta Hrastova ITF-01A/13-DEM-BH-GER Doboj kosa - Stanovi 50767 RS 9.369 ITF-01B/13-DEM-BH-GER Doboj Stanovi 9 - TAP 51392 RS 33.098 42.467 1.500,00 EUR Lot 2 ITF-02/13-DEM-BH-GER ITF-02A/13-DEM-BH-GER Olovo Pridvornica 9386 FBiH 53.831 ITF-02B/13-DEM-BH-GER Olovo Pridvornica 5 9393 FBiH 47.470 101.301 4.000,00 EUR Lot 3 ITF-03/13-DEM-BH-GER Gornji Vakuf- ITF-03A/13-DEM-BH-GER Uskoplje Zdrimci 1 6673 FBiH 2.542 ITF-03B/13-DEM-BH-GER Travnik Vodovod Seferi 8538 FBiH 1.186 Grabalji-Sadavace- ITF-03C/13-DEM-BH-GER Vitez Zabilje 4582 FBiH 7.408 ITF-03D/13-DEM-BH-GER Vitez Šehov gaj – Lazine 2 6702 FBiH 28.846 ITF-03E/13-DEM-BH-GER Vitez Šehov gaj – Lazine 3 6703 FBiH 20.355 ITF-03F/13-DEM-BH-GER Vitez Šehov gaj – Lazine 4 6704 FBiH 18.826 79.163 3.000,00 EUR Lot 4 ITF-04/13-DEM/TS-BH-GER
    [Show full text]
  • Air Pollution in Tuzla and Lukavac CITY FACTSHEET
    Air Pollution in Tuzla and Lukavac CITY FACTSHEET The Problem For years, the air quality in Tuzla and Lukavac has Europe. With regards to industrial pollution, the been poor and has not improved. One of the major two urban units of Tuzla and Lukavac need to be threats to the health of citizens in this area comes considered a pair as they are located in the same from the high concentration of fine particulate basin, while centres of Tuzla and Lukavac share the matter (the so-called PM2.5). PM2.5 are particles same distance from Tuzla Thermal Power Plant. formed by the combustion of materials; PM 2.5 is the pollutant with the highest concern for health protection. In addition to industry that harms citizens’ health, old cars and domestic furnaces Fine particulate matter (PM2.5) in the air fuelled by fossil fuels are also main that we breathe can enter into the contributors to air pollution in this region. bloodstream and harm our health in many ways. As in many other cities of Bosnia and Herzegovina, Scientific studies show that air pollution causes the streets of Tuzla and Lukavac are dominated by premature death, heart and lung disease, as well as old exhausted diesel vehicles which worsen the stroke, and a range of other health impacts. quality of air and are extremely harmful to health. In the Tuzla region, the main sources of PM2.5 are The World Health Organization (WHO) has the Tuzla Thermal Power Plant which burns over declared that Bosnia and Herzegovina has the 3.3 million tons of coal per year, and other old second highest mortality rate (per 100.000 coal-fired industrial plants.
    [Show full text]
  • Report on the Quality of Life in Tuzla Canton 2019 Introduction
    Report on the quality of life in Tuzla Canton 2019 Introduction Publisher: The Vital Signs is a methodology providing periodical research of the In addition to official, statistical data, an important component of Jasna Jašarević, Executive Director general community vitality through monitoring of the situation, needs the survey is the subjective sense of citizens about the vitality of the and opportunities to act in the areas influencing the quality of living of community, where citizens were consulted about the state of the Preparation of texts and editing: citizens. In 2019, the Foundation has implemented a research, using community through civic forums and an online questionnaire “Assess Melika Mulaosmanović, Project Coordinator a licensed research methodology “Vital Signs” which was provided by the vitality of their community”. The report also included some of Community Foundations of Canada, adjusted to the needs of many the citizens’ comments, that is, their personal contribution to the Research Consultants: organizations. Today, this research is being carried out by many local community. Ph.D. Meldina Kokorović Jukan, Dean at the Faculty of development foundations, not only in Canada, but also in the UK, Economics, UNTZ Brazil, Germany, Romania, and other countries. We would like to emphasize that, as of 2015, most countries have Ph.D. Jasmina Okičić, Associate Professor at the Faculty started to align their national datasets with the UN Sustainable of Economics, UNTZ By collecting information about the local community and monitoring Development Goals (SDGs) as an Agenda that would implement for the years: 2015, 2016, 2017 and 2018, we are deepening our the 2030 targets.
    [Show full text]
  • Factory Construction for the Production of Ferrosilicium in Gornji Vakuf - Uskoplje
    FACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON Travnik, september 2013 Ministry of economy, Central Bosnian Canton Construction of the facility for ferrosilicium production CONTENTS Introduction …………………………………………………….. 5 Location ………………………………...........………………… 7 Information about the project ………..……………... 11 Number of employees ……………………………………. 13 Products and services ……………………....……….…... 13 Material inputs …………………………….…................. 15 Capacity ……………………………………………............... 17 Market analysis ………………………………….........…… 18 Dynamics of realisation ………………………….......…. 18 Economic and financial analysis ………................. 19 Conclusions …………………………………………........….. 20 Page 3 Ministry of economy, Central Bosnian Canton Construction of the facility for ferrosilicium production INTRODUCTION The construction project of manufacturing plant and production of alloys (ferrosilicon, ferositiromagnesium and silicon-metal) on the location of '' Batuški lug'' in the municipality of Gornji Vakuf - Uskoplje, whose site location would consist of two electric-arc furnaces, which have a designed power of a total of 48 MVA (2 X 24 MVA) and associated infrastructure (storage of raw materials, facilities for washing and crushing quartz, quartz plant for transport to the dispenser, plant transport coke plant, a freight timber, a facility for the delivery of raw materials for the production feromagnesium, softening plant for process water, warehouse finished products, etc.), and the wardrobe and the bathroom for employees, restaurant facility and management facility. Plant and equipment for the production of alloys (ferrosilicon, feromagnesium and silicon- metal) is planned to be built on the site of the industrial zone "Batuški lug" in the municipality of Gornji Vakuf - Uskoplje. Industrial-commercial zone "Batuški lug" extends to 48.1 hectares. In the need to extend the area of the plant, free plots are available and they extend over the area of over 50 hectares.
    [Show full text]
  • Minutes of the Meeting Local Project Appraisal
    mm mm Emp<JWf!ff!d lives. Resilient nations. MINUTES OF THE MEETING LOCAL PROJECT APPRAISAL COMMITTEE Project: Increasing resilience of Livno, Mrkonjić Grad and Maglaj Project ID: BHl0/00110813 Summary of the meeting Introduction Mr. Avdić, UNDP BiH Sector Leader for Energy and Environment initiated the meeting by informing all participants of the Local Programme Advisory Committee (LPAC) that Project "Increasing resilience of Livno, Mrkonjić Grad and Maglaj" received Endorsement of the Czech Government. Expected start of the Project is 15 August 2018. Mr. Avdic stressed out that presenting the project activities, methodology and implementation modalities to LPAC, is a formal precondition and underlined the importance of local partners role within this project. Presentation of the Project Document Project budget is EUR 100,000 and anticipated duration is 12 months starting from 15 August 2018 and ending on 14 August 2019. The project would use the Direct Implementation Modality (DIM). The Project Board will be comprised of the following institutions: Ministry of Security of BiH, Civil Protection Directorate/Administration of FBIH, Civil Protection Directorate/Administration of RS, the Czech Republic Humanitarian Aid and UNDP. Project would lean and build on vast and successful UNDP ORR efforts in the local communities. In particular, the project will be closely interlinked with all relevant on-going and planned ORR related projects to secure alignment of results, efficiency, avoid duplication of efforts and ensure contribution to overall strategic direction. Overall objective of the project is to strengthen disaster risk reduction (ORR) capacities at all government levels in BiH and citizens, with focus on vulnerable categories.
    [Show full text]
  • Industriall Global Union's Letter to Tuzla Prime Minister Regarding
    Geneva, 6 July 2017 Mr. Bego Gutić Tuzla Canton Prime Minister Bosnia and Herzegovina Sent by email: [email protected] IndustriALL Global Union calls on Tuzla Canton Government to intervene at GIKIL Lukavac and ensure national and international labour standards are upheld Dear Honourable Prime Minister Gutić, I write to you on behalf of IndustriALL Global Union, which represents more than fifty million workers in mining, energy and manufacturing industries in 140 countries worldwide, including in Bosnia and Herzegovina, to call on your administration to intervene at GIKIL, Lukavac, to guarantee the full respect of workers’ rights at the site. Please note that the Independent Trade Union of Chemistry and Non-metal Workers in the Federation of Bosnia and Herzegovina is affiliated to IndustriALL Global Union, and this union represents the GIKIL workers here, via the Samostalni sindikat hemije i nemetala u Federaciji Bosne i Hercegovine. We strongly condemn the mistreatment of the 1,000 workers at the company, which left the workers no other choice but to strike and demonstrate. Non-payment of wages is an unacceptable breach of international workers’ rights, as well as of the national legislation of Bosnia and Herzegovina. The union was forced to make an agreement with the employer to simply follow the law and pay wages that were outstanding. The employer did then not respect even this agreement as salaries were again being paid late. The core conventions of the International Labour Organization 87 and 98 have both been ratified by Bosnia and Herzegovina since 1993. These international standards bind your administration to ensure basic trade union rights at GIKIL.
    [Show full text]
  • Olm, Proteus Anguinus
    Olm, Proteus anguinus Compiler: Jelić, D. Contributors: Jelić, D.; Jalžić, B.; Kletečki, E.; Koller, K.; Jalžić, V.; Kovač-Konrad, P. Suggested citation: Jelić, D. (2014): A survival blueprint for the olm, Proteus anguinus. Croatian Institute for Biodiversity, Croatian Herpetological Society, Zagreb, Croatia. 1. STATUS REVIEW 1.1 Taxonomy: Chordata > Amphibia > Caudata > Proteidae > Proteus > anguinus Most populations are assigned to the subterranean subspecies Proteus anguinus anguinus. Unlike the nominate form, the genetically similar subspecies P.a. parkelj from Bela Krajina in Slovenia is pigmented and might represent a distinct species, although a recent genetic study suggests that the two subspecies are poorly differentiated at the molecular level and may not even warrant subspecies status (Goricki and Trontelj 2006). Isolated populations from Istria peninsula in Croatia are genetically and morphologically differentiated as separate unnamed taxon (Goricki and Trontelj 2006). Croatian: Čovječja ribica English: Olm, Proteus, Cave salamander French: Protee Slovenian: Čovješka ribica, močeril German: Grottenolm 1.2 Distribution and population status: 1.2.1 Global distribution: Country Population Distribution Population trend Notes estimate (plus references) (plus references) Croatia 68 localities (Jelić 3 separate Decline has been et al. 2012) subpopulations: observed through Istria, Gorski devastation of kotar and several cave Dalmatia systems in all regions (Jelić et al. 2012) Italy 29 localities (Sket Just the A decline has been 1997) easternmost observed in the region around population of Trieste, Gradisce Goriza (Italy) (Gasc and Monfalcone et al. 1997). Slovenia 158 localities 4 populations A decline has been (Sket 1997) distributed from observed in the Vipava river in the population in west (border with Postojna (Slovenia) Italy) to Kupa (Gasc et al.
    [Show full text]
  • Procedural Aspects So Far, Only Questions of Substance In
    Articles / Chronicle 3. The law: procedural aspects (use of force only in self-defence) announcement, made at a joint Moscow news So far, only questions of substance in seem to have been 'stretched' to the ut- conference with Russian Foreign Minister testing the NATO ultimatums against most. Now, resolution 836 is arranged Andrei Kozyrev was, however, greeted with mixed feelings both from the Bosnian Muslims the background of Security Council in such a way that UNPROFOR may and the UN, due to the fact that the agreement resolution 836 have been dealt with. be supported in the performance of its was negotiated without participation of the UN. There remains a question of procedure task by air power. This implies the pos- The commitment was widely regarded as a to be answered. Resolution 836 says in sibility of supporting peacekeeping. major success of Russia's diplomatic efforts to mediate peace in Bosnia. To the surprise of its paragraph 10 that 'the necessary From a theoretical, doctrinal point of Radovan Karadzic, Russian Foreign Minister measures' may be taken 'under the view then the question whether the air Andrei Kozyrev showed support for the UN air authority of the Security Council and support itself would remain within the strikes during the talks and expressed concerns subject to close coordination with the limits of peacekeeping or should be about the breach of the no-flight zone by Secretary-General and UNPROFOR'. considered enforcement action is Bosnian Serbs (SZ 2 Mar, p. 4; WP 2 Mar, p. A20). And in paragraph 11 the member indeed interesting.
    [Show full text]
  • United Nations / Ujedinjene Nacije / Уједињене Нације International
    United Nations / Ujedinjene nacije / Уједињене нације Office of the Resident Coordinator / Ured rezidentnog koordinatora / Уред резидентног координатора Bosnia and Herzegovina / Bosna i Hercegovina / Босна и Херцеговина International Humanitarian Assistance to BiH 29th May 2014 NOTE: This document represents compilation of data provided by listed embassies/organizations/institutions. The author is not responsible for accuracy of information received from outside sources. ORGANIZATION WHAT WHEN WHERE CATEGORY ADRA Current budget of 100,000 USD with Possibility of additional funding. 20/05/2014 Humanitarian aid, Full time local team to be emPloyed. WASH Early recovery Hundreds of volunteers engaged in PreParation and delivery of Doboj, Zavidovici, Vozuca, packages of food, water, hygiene items, clothes, infants’ utensils and Banja Luka, Bijeljina, medicines for PoPulation of affected areas. Samac and Orasje. Planed activities: Psychosocial support; Room dryers and 260dehumidifiers, expected to be here 26/05/2014. An engineer from Germany for one month; REDO water Purification unit (3,000l Per hour) will be shiPPed Doboj 26/05/2014; Debris Cleaning – Use of Effective Microorganisms (EM) to clean oil spills and other contaminations in and around houses, as well as rehabilitating agricultural land. Possible dePloyment of EM Expert Cleaning-up activities; Distribution of Relief Items; Technician for the Water distribution system and dryers 21/05/2014 Austria Since the beginning of the floods Austrian Humanitarian 28/05/2014 BIH Humanitarian
    [Show full text]