Environmental Monitoring Report

Semestral Report Project Number: 44019-013 June 2020

PRC: Urban Pollution Control and Environmental Management Project

Prepared by SGS-CSTC Standards Technical Services Co., Ltd. & SGS Co., Ltd. for the Huangshi Municipal Government and the Asian Development Bank

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Director, Management or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

External Environment Monitor

Project Number:44019 Consulting Services Contract No: Loan 2940 P-CB03 Jun 2020

PRC: Hubei Huangshi Urban Pollution Control and Environmental Management Project

Semi-Annual External Environmental Monitoring Report (Mar 2020 - June 2020)

Submitted to: Asian Development Bank Huangshi Asian Development Bank Project Management Office

Prepared by: SGS-CSTC Standards Technical Services Co., Ltd. SGS China Co., Ltd. ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June)

TABLE OF CONTENT

1. INTRODUCTION ...... 1

1.1 REPORT OBJECTIVES ...... 1

1.2 PROJECT BACKGROUND AND GOALS ...... 2

1.3 SUBPROJECT INTRODUCTION ...... 4

1.4 PROJECT IMPLEMENTATION PROGRESS ...... 9 2. EMP IMPLEMENTATION AGENCY ESTABLISHMENT AND RESPONSIBILITIES ...... 15

2.1 RESPONSIBILITIES OF ENVIRONMENTAL MANAGEMENT AGENCIES ...... 15

2.2 ENVIRONMENTAL MONITORING ...... 21

2.3 INSTITUTIONAL STRENGTHENING ...... 21

2.4 ENVIRONMENTAL REQUIREMENTS IN CONTRACTS ...... 21 3. COMPLIANCE WITH ENVIRONMENTAL RELATED PROJECT COVENANTS 23 4. IMPLEMENTATION OF ENVIRONMENTAL IMPACT MITIGATION MEASURES 24 5. ENVIRONMENTAL MONITORING PLANS AND RESPONSIBILITIES ...... 41

5.1 ENVIRONMENTAL MONITORING RESPONSIBILITIES ...... 41

5.2 TARGET OF ENVIRONMENTAL QULIATY AND METHODS FOR SAMPLING AND ANALYSIS .... 41

5.3 ARRANGEMENT FOR ENVIRONMENTAL MONITORING ...... 43

5.4 CONTENTS OF MONITORING ...... 43

5.5 RESULTS OF MONITORING ...... 49 6. PUBLIC CONSULTATION AND COMPLAINTS ...... 84 7. INSTITUTIONAL STRENGTHENING AND TRAINING ...... 86 8. KEY ENVIRONMENTAL ISSUES ...... 90

8.1 KEY ENVIORNMENTAL ISSUES AND PROPOSED CORRECTIVE ACTIONS ...... 90 9. CONCLUSION ...... 108

LIST OF TABLES

Table 1.1 Detailed Project Scope of Each Subproject 5 Table 1.2 Implementation Progress of all contracts under this Project (Up to June 2020) 10 Table 1.3 Fact Sheet of the 4 works contracts that have been procured (Till June 2020) 11 Table 2.1 Information of dedicated environmental management correspondents (Till March 2020) 16

i Mar 2020

ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June)

Table 3.1 Environmental Related Project Covenants Compliance Status 23 Table 4.1 Potential Environmental Impacts and Mitigation Measures at Design and Preconstruction Phase 24 Table 4.2 Potential Environmental Impact and Mitigation Measures (at Construction Stage) 27 Compared with the requirements in the EMP, the implementation of the mitigation measures during the operation phase of the project is shown in Table 4.3 below; 36 Table 4.3 Potential Environmental Impact and Mitigation Measures (at Operational phase of the project) 36 Table 4.4 Municipal solid waste collection and transportation system, potential environmental impacts and mitigation measures (At Project operational phase) 38 Table 5.1 Environmental standards that applicable to this project 42 Table 5.2 The summarized completed contents of the environmental monitoring- project construction monitoring 43 Table 5.3 The monitoring results summarized 50 Table 6.1 Public Consultation Plan 84 Table 7.1 Institutional Strengthening and Training Program 86 Table 7.2 List of Upcoming Training Plans 88 Table 8.1 Main environmental issues and rectification suggestions for each subproject 90

ii Mar 2020

ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June)

ABBREVIATION ADB = Asian Development Bank AFS = Audited Financial Statements DMF = Design and Monitoring Framework EIA = Environmental Impact Assessment EMP = Environmental Management Plan EPB = Environmental protection bureau FMA = Financial management assessment GACAP = Governance and Anticorruption Action Plan GAP = Gender Action Plan GIS = Geographic Information System HMG = Huangshi Municipal Government HPG = Hubei Provincial Government HPFD = Huangshi Provincial Finance Bureau HPMO = Huangshi Project Management Office HUCIDC = Huangshi Urban Construction Investment and Development Company Ltd. IARS = Imprest Account Reconciliation Statement ICB = International Competitive Bidding ICS = Individual Consultant Selection LAR = Land Acquisition and Resettlement LIBOR = London Interbank Offered Rate NCB = National Competitive Bidding NGOs = Nongovernment Organizations PAI = Project Administration Instructions PAM = Project Administration Manual PCA = Procurement Capacity Assessment PIU = Project Implementation Unit PMO = Project Management Office PPMS = Project Performance Management System PRC = People’s Republic of China PSA = Poverty and Social Assessment QBS = Quality Based Selection QCBS = Quality-and-Cost Based Selection RRP = Report and Recommendation of the President to the Board SBD = Standard Bidding Documents SDAP = Social Development Action Plan SOE = Statement of Expenditure SPS = Safeguard Policy Statement SPRSS = Summary Poverty Reduction and Social Strategy TOR = Terms of Reference WWTP = Wastewater Treatment Plant

iii Mar 2020

ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

1. INTRODUCTION

1.1 REPORT OBJECTIVES

The key objectives of this Assignment are to ensure the Project’s compliance with (i) all applicable local regulations and stations pertaining to environment, health and safety; (ii) ADB’s Safeguard Policy Statement (2009); and (3) all mitigation measures and recommendations specified in the Environmental Impact Assessment (EIA) report and Environmental Management Plan (EMP) are implemented throughout the entire project implementation period that covers design, construction and operation phase. The Assignment will review and verify all environmental monitoring information from Huangshi Environmental Monitoring Station (HEMS), conduct independent field inspection, and to evaluate the implementation of EMP and identify any environment-related issues and necessary corrective actions.

The 13th Semi-Annual External Environmental Monitoring (EEM) Report (hereafter referred to as “the Report”) is prepared by the consortium of SGS-CSTC Standards Technical Services Co., Ltd. and SGS China Co., Ltd. (hereinafter referred to as “SGS”). Due to the impact of the COVID epidemic, SGS performed the twelfth external environmental monitoring site inspection mission based on the communication with the Huangshi project office and representatives of various construction projects, as well as the project site pictures and third-party test report data to evaluate the implementation status of EMP requirements during this period.

This report records the environmental management activities undertaken during the period of 2019.Mar-2020.June, covering from design and pre-construction stage of the subprojects and verify the environmental impacts and implementation status of mitigation measures, reduce negative environmental impacts and propose environmental improvement schemes. In accordance with all the relevant specifications and standards of the PRC, as well as the policies of the Asian Development Bank (ADB), this report will focus on (i) EMP implementation progress; (ii) implementation of mitigation measures, (iii) environmental related project covenants compliance, (iv) environmental monitoring and compliance, (v) institutional strengthening and training, (iv) Public consultation and (vii) problems that have occurred and corrective actions taken.

Since the impact of the new global epidemic outbreak at the end of 2019, each sub-project has resumed work in March 2020, and according to the National Health and Health Commission website in the early morning of January 28, it released a new coronavirus infection pneumonia diagnosis and treatment plan (trial fourth version) To comply with the requirements of the Comprehensive Water Pollution Control and Utilization of the Asian Development Bank Loan Project Management Office and local construction administrative departments in Huangshi City, combined with the actual situation, do a good job in the prevention and treatment of new coronavirus pneumonia epidemics, and at the same time do a good job in manpower, materials and technical preparation, In case of emergencies such as suspected cases of new coronavirus

1 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

pneumonia in the project, the emergency plan can be taken in time to control the accident risk level. Prepared a new coronary pneumonia prevention and emergency plan for the project construction site management, personnel return management and epidemic situation monitoring and disposal, and established a protection and emergency leadership group to strictly monitor the entire resumption process to ensure the normal production of the project and the order of life of employees .

1.2 PROJECT BACKGROUND AND GOALS

Huangshi Municipal Government (HMG) has requested a sum of USD 100 million loan from Asian Development Bank (ADB) with the purpose to promote environmental sustainable and socioeconomically inclusive urban development in Huangshi, Hubei Province, by upgrading the city’s urban environmental infrastructure and services. The loan project is named “Hubei Huangshi Urban Pollution Control and Environmental Management Project” (hereinafter referred to as “the Project”), and the loan was approved by ADB in February 2013.

In accordance with ADB’s Guidelines on the Use of Consultants, the Huangshi Project Management Office (hereinafter referred to as “the Client” or “PMO”) has appointed the association between SGS-CSTC Standards Technical Services Co., Ltd. and SGS China Co., Ltd. (hereinafter referred to as “SGS”) to undertake the External Environment Monitor service (Consulting Services Contract #: P-CB03) for the Project (hereinafter referred to as “the Assignment”), in order to evaluate the overall environmental performance of the Project and ensure proper implementation of the EMP.

The Project is set in Huangshi, southeastern Hubei Province, 80 kilometers southeast of , the provincial capital1. The city is spread over floodplain on the south bank of the River, having developed around three lakes: Ci, Qingshan, and Qinggang. In 2010, the population of the municipality was 2.43 million, with 765,000 living in the urban area2. Huangshi's initial development was based on mining, and its associated secondary industries have driven the city's economic development. Resource depletion and the need for more balanced and sustainable development prompted the Huangshi municipal government to renew the city by upgrading its industry, relocating polluting industries outside of the central urban area, and developing tertiary industries and an enabling investment environment. This will help Huangshi strengthen its development potential as a core secondary city in Hubei Province, supporting balanced regional development in the province. Huangshi is a part of the "Wuhan+8 megacity cluster," which the government promotes as a pilot administrative zone for balanced, environment-friendly economic development within the cluster.

Huangshi faces environmental and urban development challenges reflecting its historical reliance on heavy industry and inadequate investment in urban infrastructure. General neglect of urban pollution allowed untreated industrial and domestic wastewater to flow into urban lakes. The city's solid waste management is inadequate and the sludge from wastewater

1 Huangshi is the 11th largest municipality in Hubei Province by population and 9th by . 2 Huangshi municipality has five urban districts (Huangshigang, Tieshan, Xialu, Xisaishan, and a development zone), one country-level city (), and one county (Yangxin).

2 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

treatment plants is untreated. Urban channels and lakes are blocked by polluted sediments and accumulated solid waste. The three lakes in the city became polluted and degraded, endangering public health and safety, particularly for the poor who often live near polluted inland waterways and in areas with deficient urban services. Inadequate urban infrastructure constrains sustainable urban development and limits Huangshi's ability to promote investment and support balanced regional development in Hubei. The current environmental challenges ahead of Huangshi’s development roadmap can be divided into the following main categories:

Wastewater – An estimated 131,000 cubic meters of untreated urban wastewater is discharged daily into the city’s three lakes and the Yangtze River3. The project will support the rehabilitation and extension of the existing wastewater network system to remove misconnections and intercept urban wastewater more effectively, thereby improving collection efficiency and mitigating pollution loads into water bodies downstream. The Project will also support the construction of a new wastewater collection and treatment system to serve the newly developed urban area of Hexi.

Lake – Water quality in Huangshi’s three lakes is severely polluted, to class V or worse4. The lakes are affected by organic pollution, nutrients, and heavy metals. Sediments are highly contaminated with heavy metals, particularly near discharge points into lakes. The Project will support an integrated multifunctional approach to lake improvement that removes contaminated sediments, constructs engineered wetlands and lake embankments, and interconnects urban water bodies. These interventions are designed to (i) improve water quality, (ii) restore lake ecology and healthy hydraulic circulation, (iii) improve the lakes’ retention capacity and resilience under climate change, and (iv) enhance public amenity.

Sludge – The Project will tackle the emerging environmental challenge of handling the sludge generated in greater quantities as wastewater collection and treatment expands5. At present, untreated sludge is dumped directly to the municipal landfill. While supporting the treatment system for contaminated sludge in the short term, the Project will help the HMG develop a mid- and long-term strategic plan to reduce sludge production, stabilize its content, and find beneficial uses for it6.

Solid waste – Challenges facing solid waste management in Huangshi are (i) inefficient collection and transfer facilities, (ii) excessive waste generated without sorting or recycling, and (iii) inadequate disposal capacity for the volume. While the HMG will expand the capacity of disposal facilities to meet future demand, the Project will upgrade the existing collection and transfer system to enhance collection efficiency to comply with environmental standards,

3 The reported coverage rate of wastewater collection and treatment differs depending on the data source and calculation method. It is 71% based on the ratio of wastewater flowing into existing wastewater treatment plants (167,000 m3 per day) to total wastewater generation in the catchment (234,000 m3 per day). However, this does not indicate actual connectivity and collection in Huangshi, where many sewer networks are combined with storm water and misconnection and infiltration are common. A more representative method based on the pollution loads indicates a collection rate of 44%. 4 Two sampling tests during project preparation found sewage sludge contaminated with high concentrations of heavy metals and oil sands from industry, which limits its disposal and reuse. 5 In the first half of 2015 the Lake Circulation project was determined not to carry out, while in the second half of 2015 the Lake Circulation project was determined to continue carry out and not changed.

3 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

build new collection and transfer stations to serve an expanded urban area, and pilot a sorting and recycling scheme with community participation to reduce, reuse, and recycle waste.

1.3 SUBPROJECT INTRODUCTION

The primary purpose of this Project is to promote environmentally sustainable and socioeconomically inclusive urban development in Huangshi by upgrading urban environmental infrastructure and services. The Project will support wastewater management, lake rehabilitation, sludge treatment, solid waste management and related environmental services such as institutional strengthening and capacity building. The Project outputs will include the following:

(i) Wastewater collection and treatment – It will (a) comprehensively survey the urban wastewater network and develop a geographic information system database and online monitoring system for asset management, (b) rehabilitate or construct 33 km of sewer network in the existing urban area, and (c) construct a wastewater treatment plant with a capacity of 30,000 m3 per day, 27 km of sewer network, and two associated pumping stations in the expanded urban area.

(ii) Lake rehabilitation and hydraulic circulation restoration - It will (a) remove 1.55 million m3 of contaminated sediments from the lakes Ci, Qingshan, and Qinggang; (b) construct two engineered wetlands measuring 20 hectares (ha) each in Ci Lake; (c) construct 15 km of ecological embankments with 26.3 ha of vegetated buffer strips, 4.5 ha of wetlands, and 63.5 ha of aquatic vegetation; and (d) construct two pumping stations and 7.5 km of channels connecting the three lakes and the Yangtze River.

(iii) Sludge treatment – it will construct sludge treatment facilities with a capacity of 150 tons per day.

(iv) Solid waste management – it will (a) upgrade three existing collection stations and construct 21 new collection and transfer stations; (b) purchase vehicles to collect, transport, and compact waste, as well as rubbish bins; and (c) pilot a sorting and recycling scheme with community participation.

(v) Capacity development and institutional strengthening – it will provide (a) support to executing and implementing agencies toward project implementation in line with ADB procedures and guidelines; (b) institutional strengthening in the HMG or urban environmental management services and public awareness campaigns on lake ecosystems, environmental protection, public health, and solid waste sorting and recycling; and (c) technical support to executing and implementing agencies for external resettlement and environmental monitoring.

In Jun 2017, Asian Development Bank has approved the alterations on PRC: Hubei Huangshi Urban Pollution Control and Environmental Management Project, on which the changes are described below:

4 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

(i) Wastewater collection and treatment – Cancelled Content: the section of pipeline network construction has been reduced, of which those for Ci Lake has been deducted for 12 km, for

Qingshanhu and Qingganghu, 8 km respectively. Added Content: Tieshan area network has been added with a length of 24.31 km, Old Xialu area network 10.26km and Tuanchengshan area network 14.5km. Additionally, specific dredging and drainage equipment shall be added in those projects.

(ii) Lake rehabilitation and hydraulic circulation restoration – Cancelled Content: hydraulic circulation has been phased out as a whole. The implementation sector of Qingganghu ecological restoration has been cancelled as well. Added Content: the new scale of the artificial wetlands has been added up to 80,000 ton/day, the total area of which has been modified to 92.3 ha. The 2nd stage of Qingganghu ecological restoration project is schedule to begin.

(iii) Solid waste management – Added Content: the equipment procurement for old transfer stations as well as sanitation vehicles and leachate treatment facilities in sets has been introduced into the project.

Detailed description of each sub-project is given in Table 1.1 below; the adjustments of each sub-project are described in Table 1.1.2.

Table 1.1 Detailed Project Scope of Each Subproject

Subproject Description C1: Wastewater Components Wastewater collection and treatment:(a) conducting a comprehensive survey of existing urban wastewater network in the urban area and developing a geographic information system database for asset management, (b) rehabilitating 7.4 km of existing sewer network and constructing 14.9 km of new sewer network in the existing urban area, reforming 10.5 km of existing combined network to separate network and (c) constructing 30,000m3/d wastewater treatment plant, constructing 24.4km new sewer network, separating 2.7km existing network, and 2 associated pumping stations in new urban area of Hexi.

Storm Water system survey: storm water and combine pipelines with quantity of 450 km; 10 drainage pumping stations

1 Network survey & GIS Wastewater system survey: wastewater pipeline with quantity of 250 km; 6 wastewater pump station; 5 WWTPs; 3 Enterprise wastewater treatment station GIS system development Sewerage system online monitoring (i) Online monitoring control center, (ii) lab, (iii) on site 2 system monitoring instruments, (iv) on site monitoring stations,

1) new sewage network; 2)reforming existing combined sewage system to separate system; 3)existing sewage system rehabilitation 3 Wastewater Interception works Separate Unit: m New Network Rehabilitation Network

5 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Subproject Description Ci lake 1,417 1,955 2,700 catchment Tuanchengshan 6,381 7,452 2,100 Catchment Qingshanhu 1,146 600 catchment Qinggang lake 7,097 2,000 Catchment Hexi catchment 24,439 2,720

Total 39,334 13,273 7,400

4 Hexi WWTP Capacity 30,000 ton/day

25,000 ton/day for Yegang 5 Pump Stations capacity 45,000 ton/day for Fengbogang C2: Lake Circulation & Ecological Restoration Components: Lake restoration and water recycling restoration:(a) removing 1.55 million m3 of contaminated sedimentary deposits from the Ci, Qingshan, and Qinggang lakes, (b) constructing 20 ha engineered wetland to treat effluent from Tuanchengshan WWTP and 20 ha engineered wetland ,0.85 km tunnel and 6.55 km channels/culvert to treat the initial rainwater fllowing into Ci lake, (c) constructing 15 km ecological embankment, 4.5 ha wetlands along the embankment and restoring 63.5 ha aquatic vegetation,(d) Bulid 2 pumping stations to connect the three lakes and the Yangtze River.

C2-1: Lake sediment Dredging 1 Ci lake dredging Quantity 986,000 m3 2 Qingshanhu dredging Quantity 262,700 m3 3 Qinggang lake dredging Quantity 251,700 m3 4 Yaer pond earthwork Quantity 48,300 m3 5 Yaer pond sediment treatment and disposal plant 6 Water body stabilization and pollution control C2-2: Lake Circulation between Ci Lake, Qingshanhu, Qinggang Lake & Yangze River 8 m3/s for Qingshan PS 1 Pump Stations Capacity 4 m3/s for Qinggang PS 2 Presure culvert under Qingshanhu length 2.32 km 3 Panlongshan tunnel length 0.85 km 4 Wangjiaqiao canal length 0.93 km 5 Qinggang lake ecological channel length 0.235 km 6 Daquan road culvert length 2.74 km 7 Ci Lake ecological channel length 0.55 km 8 Huangshi Road rehabilitation and 4 bridges in Qingshanhu #2 9 Monitoring equipment C2-3: Lake embankment and ecological restoration Ecological Aquatic Vegetated buffer Constructed embankment vegetation strips (m2) wetland (m2) (m) (m2)

6 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Subproject Description Ci lake embankment and ecological 1 250,000 10,380 495,900 44,000 restoration Qingshanhu embankment and 2 7,200 4,190 129,000 ecological restoration Qinggang Lake embankment and 3 5,720 450 10,000 1,000 ecological restoration Total 262,920 15,020 634,900 45,000 C2-4: Engineered Wetland 1 Downstream Wetland for Tuanchengshan WWTP outlet treatment Area 20 ha 2 Upstream wetland for Non-point source treatment Area 20 ha C3: Solid waste Management component Solid waste Management component:(a) upgrading 3 existing transfer stations and constructing 9 new collection stations and 12 transfer stations, (b) purchasing vehicles for collection, transportation,

compaction, water sprinkling and road cleanning, and rubbish bins, (c) and piloting sorting and recycling scheme involving community participation; 2 SW collection station in dongfeng road and sanitary bureau, 3 Construction of solid waste SW transfer statons in Yujiashan, Sike and Wangtai, 2 sanitary 1 management facilities in batch 1 station in Yujiashan and Sike; 2000 litterbins; 1000 waste tanks; 12 environmental sanitary rest station and 10 drinking sites. 4 new collection stations in Tianshun,Yinhuyuese, Guangchangbian and Xiqu; 6 new/rebuild transfer stations in Construction of solid waste Guihuawan, Damatou, Tonghuashanzhuang(rebuilt), Fenglieshan, 2 management facilities in batch 2 Hekou and Xisai; 3 sanitary station in Xisai, Damatou and Shiji; 2000 litterbins; 1000 waste tanks; 13 environmental sanitary rest station and 10 drinking sites. 3 new collection stations in Tiehe road, Tonghui community and Mining Bureau; 6 new/rebuild transfer stations in Jiangbei, Hujiapeng, Qizhong (rebuild), 15th metallurgy construction Construction of solid waste 3 material plant (rebuild), Youse hospital and Wangren; 2 sanitary management facilities in batch 3 station in Jiangbei and Youse; 1 parking lots in Huangshigang; 1000 litterbins; 1000 waste tanks; 13 environmental sanitary rest station and 10 drinking sites; 4 Vehicles for collections, transportation, compaction, water sprinkling and road cleaning by 3 batch 5 Waste sorting and recycling scheme; C4: Sludge treatment and disposal component General scale of project planning is 300 tons/d and of which the recent construction scale is 100 tons/d. 1 sludge treatment plant capacity 150 tons/day C5: Capacity Development and Implementation Support component

Capacity development and implementation support component (a) project management support to the executing agency, implementing agency, and the project management office (PMO) to ensure that project implementation complies with ADB requirements, (b)support the institutional strengthening for pollution source control, integrated water resources management, cumulative impact model upgrading, wastewater planning and asset management, and sludge treatment and disposal master strategic planning, (c) public awareness campaign on lake ecosystem, environmental protection, public health, and solid waste sorting and recycling, and (d) technical support for external resettlement and environmental monitoring.

7 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Table 1.1.2 Adjustment description of each subproject

Construction Projects after Previous Content of Subprojects Alterations Adjustments Wastewater collection and Cancelled Content: the section of Downstream wetlands treatment: including buildup of pipeline network construction has construction: census of pollution sources, been reduced, of which those for Ci The wetlands to be built is about geological information system, Lake has been deducted for 12 km, 300,000 m2, designed for treating monitoring system of drainage for Qingshanhu and Qingganghu, 8 the discharged treated wastewater facilities, the 60km pipeline km respectively. Added Content: from Tuanchengshan wastewater construction of Ci lake, Tieshan area network has been treatment plant. This project also Qingshanhu, Qingganghu and added with a length of 24.31 km, includes the construction of a Hexi catchments, Hexi wastewater Old Xialu area network 10.26km and 3000-m2 themed education venue treatment plant etc. Tuanchengshan area network and its associated facilities. 14.5km. Additionally, specific dredging and drainage equipment shall be added in those projects. Lake rehabilitation & hydraulic Cancelled Content: Tieshan area network & Xialu circulation restoration: including hydraulic circulation has been area network: the newly to-be- dredging, sludge disposal & phased out as a whole. The built pipeline network for Tieshan treatment, lake-bank ecological implementation sector of area is 24.31 km, for Xialu restoration, artificial wetlands as Qingganghu ecological restoration 10.26km and for Tuanchengshan well as the hydraulic circulation has been cancelled as well. Added 14.50km. projects for the 3 lakes (Ci la, Content: the new treatment scale of Qingganghu & Qingshanhu). the artificial wetlands has been added up to 80,000 ton/day, the total area of which has been modified to 92.3 ha. The 2nd stage of Qingganghu ecological restoration project is scheduled to begin. Sludge treatment: Unaltered The second stage ecological Including the construction of a restoration project for centralized sludge treatment plant Qingshanhu: Mainly including for sludge from Ci lake, ecological construction, Tuanchengshan, Huangjinshan Suoqiangang reconstruction, and Hexi wastewater treatment Qingshanhu channel connection plant to facilitate in-depth sludge etc. treatment. Solid waste management: Added Content: Facilities and sanitary vehicle Including building of a municipal The equipment procurement for old procurement for transfer waste collection and transfer transfer stations as well as sanitation stations: Mainly including system, several garbage transfer vehicles and leachate treatment procurement of new equipment for stations, procurement and facilities in sets has been introduced transfer stations, specific sanitary

8 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

distribution of sanitary vehicles into the project. vehicles, road sweeper vehicles, and other related public facilities. water surface garbage cleaning facilities and leachate treatment equipment etc. Capacity development and Unaltered Specialized for Drainage and institutional strengthening: dredging emergency facilities: to Including research on the ability newly purchase professional of subproject feasibility so as to automatic dredging facilities and facilitate the processing of each emergency drainage equipment. subproject.

The intended project outcome is improved urban environmental infrastructure and management services in Huangshi. Meanwhile, the Project will as well help Huangshi (i) promote environmentally sustainable urban development; (ii) improving living standards by providing better urban services and a cleaner environment to urban residents, including the poor; and (iii) enhance inclusive socioeconomic growth with expanded tertiary industries, an attractive investment environment, and more employment.

In addition, the Project will also (i) demonstrate an integrated approach to urban pollution control and environmental management that combines reducing upstream pollution loads by rehabilitating and extending wastewater and solid waste systems with improving downstream water quality by rehabilitating lake ecology and hydraulic circulation, which will significantly improve water quality in the three lakes; (ii) analyze the cumulative impact of pollution loads and modeling of surface water circulation to support the design of the Project; and (iii) pilot a scheme for solid waste sorting and recycling with community participation that will show, albeit on small scale, the reduce-reuse-recycle approach. The pilot scheme will be replicated in other communities in Huangshi. The project also has great potential to polluted and blocked urban lakes in other small and medium-sized cities along the Yangtze and elsewhere in PRC.

1.4 PROJECT IMPLEMENTATION PROGRESS

Based on the latest Project Progress Report and the project update received from HSPMO, the Project has 38 service contracts in which 23 are civil works contracts, 7 are goods contracts and 8 are consulting service contracts. During this reporting period, 5 civil works contracts, 2 goods contracts and all 8 consulting service contracts were procured. Table 1.2 below summarizes the overall implementation progress of all service contracts under this Project until Juneh 2020:

9 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Table 1.2 Implementation Progress of all contracts under this Project (Up to June 2020) Contract Contract Name Status Description No. 1- Works 1: Wastewater Collection and Treatment Started in May 2017 WW-C01 Ci lake area network 22.005 km Completed Completed in Jul, 2018 Construction started in Qingshan & Qinggang lake area network WW-C02 Completed Oct.2015 10.843 km Completed in Mar 2017 Construction started in August 2014; Hexi WWTP and 2 pump stations civil WW-C03 Completed Due to the operation of the works contract was not signed, final acceptance was not taken. Construction started in Feb 2015 WW-C04 Hexi area network 27.159 km Completed Accomplished in Apr 2017 WW-C05-1 Tieshan network Completed Started in Aug 2017 WW-C05-2 Xialu district network Completed Started in Sep 2017 2: Lake Rehabilitation Started in June 2016 LR-C01-1 Ci Lake dredging part 1 Completed Completed in May 2018 Started in June 2016 LR-C01-2 Ci Lake dredging part 2 Completed Completed Started in Dec 2014 LR-C01-3 Qingshanhu dredging Completed Construction Completed Started in May 2016 LR-C01-4 Qingganghu dredging Completed Construction Completed Ci Lake water body restoration after LR-C01-5 Ongoing Construction Completed dredging South Ci Lake ecological restoration section Started in Nov 2018 LR-C03-1 Completed 1 Construction Completed Started in June 2019, The original plan was basically South Ci Lake ecological restoration section completed by the end of June, but LR-C03-2 Ongoing 2 due to the epidemic, the completion plan was postponed to the end of September Qingshan & Qinggang ecological Construction started in Nov 2015 LR-C03-3 Completed restoration Completed. Construction started in Oct 2018 Due to land acquisition and Qingshan & Qinggang ecological LR-C03-4 Ongoing demolition, some construction restoration section 2 sites cannot be constructed. The project is at a standstill Downstream wetland for Tuanchengshan LR-C04-1-1 Ongoing Started in Dec 2017 WWTP outflow, Bid I Downstream wetland for Tuanchengshan LR-C04-1-1 Ongoing Started in Mar 2018 WWTP outflow, Bid II Downstream wetland for Tuanchengshan LR-C04-1-3 Ongoing Started in Aug 2018 WWTP outflow, Bid III Construction started in Mar 2015, LR-C04-2 Upstream wetland for storm water Completed completed & final acceptance done. 3:Sludge Treatment Enter the site in May 2017, SL-C01 Sludge treatment in Hexi Completed Acceptance done

10 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Contract Contract Name Status Description No. 4:Solid Waste Management Construction started in Mar 2015, SW-C01 Transfer station batch 1 Completed pending completion of acceptance. Started in Apr 2017 Completed in June 2018 SW-C02 Transfer station batch 2 Ongoing pending completion of acceptance. Started in Jul 2018 SW-C03 Transfer station batch 3 Ongoing Under construction.. 2-Goods 1:Wastewater Collection and Treatment Construction Unorganized completion WW-E01 Online monitoring system acceptance Construction started in Jul 2015, WW-E02 Hexi WWTP and 2 Pump stations equipment Ending stage now debugging, pending completion of acceptance Construction is in progress and Emergency pipe network dredging WW-E03 Completed commissioning is planned to start equipment in August 2:Inner Lake Ecological Restoration LR-E03 Wetland Science Museum Ongoing Gradual resumption 4:Solid Waste Management SW-E01 Transfer station vehicles Completed - SW-E02 Sweeping vehicles Completed - Equipment update of garbage transfer SW-E03 station and bulk purchase of sanitation Ongoing vehicles 3-Consulting Service WW-CB01 Sewer network survey and GIS Completed Completed in Dec 2014 SW-CB01 Yaguang community pilot scheme Ongoing Construction started in Oct 2014 P-CB01 Project management support Ongoing Construction started in Jun 2014 P-CB02 Institutional strengthening support Ongoing Construction started in Jun 2014 P-CB03 External environmental monitoring Ongoing Construction started in Dec 2013 P-CB04 External resettlement and social monitoring Ongoing Construction started in Dec 2013 P-CB05 Sewer network survey and GIS Completed Completed in Oct 2013 P-CB06 Yaguang community pilot scheme Completed Completed in Jun 2013

As of the end of June 2020, a detailed fact sheet of the construction contracts that have been stared are summarized in Table 1.3 below:

Table 1.3 Fact Sheet of the 4 works contracts that have been procured (Till June 2020) Contract Construction Start Contract Name Contractor Status No. Supervision Date 1: Wastewater Collection and Treatment

Huangshi Municipal Ci Lake Hubei Dongtai Infrastructure WW-C01 catchment pipe Construction May 2017 Completed Engineering Co., network Consulting Co., Ltd Ltd.

11 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Contract Construction Start Contract Name Contractor Status No. Supervision Date Qingshanhu and Hubei Huatai Hubei Xing Tian Qinggang lake Construction WW-C02 Rui Engineering Oct 2015 Completed area network Supervision Co., Co., Ltd. 10.843 km Ltd.

Huangshi Municipal Hubei Huatai Hexi WWTP and Infrastructure Construction WW-C03 2 pump stations Aug 2014 Completed Engineering Co., Supervision Co., civil works Ltd. Ltd.

Huangshi Municipal Hubei Huatai Completed, final Hexi area network Infrastructure Construction WW-C04 Feb 2015 acceptance not 27.159 km Engineering Co., Supervision Co., taken Ltd. Ltd. Wuhan Construction Tian’en Completed, final WW-C05- Engineering Construction Group Aug 2017 acceptance not 1 network Management & Co., Ltd taken Consultancy Co., Ltd. Wuhan Jiagnxi Construction Completed, final WW-C05- Xialu district Construction Engineering Sep 2017 acceptance not 2 network Engineering First Supervision Co., taken LLC Ltd 2: Lake Circulation and Ecological Rehabilitation Hydropower Hubei HuaAo Completed, final Ci Lake dredging LR-C01-1 Construction Hydropower April 2016 acceptance not part 1 Engineering Co., Consulting Co., Ltd taken Ltd The combo of Polytron Technologies Inc Hubei HuaAo Completed, final Ci Lake dredging and Hubei water LR-C01-2 Hydropower April 2016 acceptance not part 2 conservancy and Consulting Co., Ltd taken hydropower construction Limited by Share Ltd Hubei HuaYa Hubei HuaAo Qingshanhu Construction LR-C01-3 Hydropower Dec 2014 Completed dredging Engineering Co., Consulting Co., Ltd. Ltd. The combo of Gezhouba Dam Polytron Technologies Inc Hubei HuaAo Completed, final Qinggang Lake and Hubei water LR-C01-4 Hydropower May 2016 acceptance not dredging conservancy and Consulting Co., Ltd taken hydropower construction Limited by Share Ltd

12 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Contract Construction Start Contract Name Contractor Status No. Supervision Date Hubei HuaAo Water recovery Wuhan Bio-an LR-C01-5 Hydropower Aug 2016 Completed after dredging Biotech Co., Ltd. Consulting Co., Ltd. Xingye Downstream Environmental Wuhan Hongyu wetland for Group Co., Ltd. and LR-C04- Construction Tuanchengshan Dec 2017 Ongoing 1-1 Engineering WWTP outflow, Zhujiang Landscape Consulting Co., Ltd Bid I Construction Co., Ltd. Downstream Wuhan Hongyu wetland for LR-C04- Tengwangge Construction Tuanchengshan Mar 2018 Ongoing 1-2 Construction Group Engineering WWTP outflow, Consulting Co., Ltd Bid II Downstream Wuhan Hongyu wetland for China Railway LR-C04- Construction Tuanchengshan NO.3 GROUP Aug 2018 Ongoing 1-3 Engineering WWTP outflow, Co.,LTD Consulting Co., Ltd Bid III Eastern Wuhan HuaTian HuaTai Upstream LR-C04-2 International Art Construction Mar 2015 Completed Wetland Co., Ltd. Supervision Co., Ltd. Phase I of Hubei Huatai Green Giant Ecological Construction Ecological LR-C03-1 Restoration on the Supervision May 2018 Completed Environment Co., South Shore of Ci Engineering Co., Ltd. Lake Ltd. Phase II of Hubei Huatai Ecological Changhong Construction LR-C03-2 Restoration on the Construction Group Supervision June 2019 Ongoing South Shore of Ci Co., Ltd. Engineering Co., Lake Ltd. Hubei Huatai Ecological landscape Construction remediation of LR-C03-3 architecture Co., Supervision Nov 2015 Completed Qingshanhu and Ltd. Engineering Co., Qinggang lake Ltd. Planning adjustment, the demolition Ecological Honggu Beach Wuhan Municipal problem has not remediation of Landscaping Engineering Design been completely LR-C03-4 Qingshanhu and Oct 2018 Construction Co., & Research Institute solved, and the Qinggang lake, Ltd. Co., Ltd. application for Phase II small-scale resumption is in progress 3:Sludge Treatment

Jiangsu Tianyu Wastewater Hubei Huatai environmental treatment and Construction SL-C01 protection group May 2017 Completed disposal project of Supervision Municipal Hexi Engineering Co., Ltd. Engineering Co., Ltd.

13 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Contract Construction Start Contract Name Contractor Status No. Supervision Date 4:Solid Waste Management

Guangdong Jiangxi TianHeng Construction Construction Transfer station Engineering completed, SW-C01 Engineering Group Mar 2015 batch 1 Consulting waiting for No.1 Construction Supervision Co., acceptance Co., Ltd. Ltd.

Guangdong TianHeng Chidong Transfer station Engineering Construction SW-C02 Construction Group Apr 2017 batch 2 Consulting completed Co., Ltd Supervision Co., Ltd. 1. The real stone paint and latex paint on the exterior wall of the transfer station of Development Guangdong Avenue are TianHeng completed, and Chidong Transfer station Engineering the roof SW-C03 Construction Group Jul 2018 batch 3 Consulting waterproofing is Co., Ltd Supervision Co., completed; Ltd. 2. The latex paint of the Seven Middle Sanitation Base is completed, and the roof waterproofing is completed

14 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

2. EMP IMPLEMENTATION AGENCY ESTABLISHMENT AND RESPONSIBILITIES

2.1 RESPONSIBILITIES OF ENVIRONMENTAL MANAGEMENT AGENCIES

The Environmental Management Plan (EMP) covers the entire cycle of the project, including project preparation stage, design, construction, trial operation and operation phases, in order to ensure that the Project is implemented in an environmentally-acceptable manner. The EMP contains detail description on environmental mitigation measures for each stage of the Project implementation, and also a specific environmental monitoring plan, organization structure and distribution of responsibilities. Furthermore, it also lays out the grievances redress mechanism in case of complaints or conflicts.

All budgets for implementing mitigation measures during construction stage shall be clearly listed out in the bidding document and works contracts, which will be bear by the Contractors. Cost for implementing mitigation measures in the operation stage will be bear by the facility operator.

The EMP also defines the environmental management structure and responsibilities for the entire Project, as graphically depicted in Figure 2.1 below:

Figure 2.1 Organization of Environmental Management during Project Implementation

Environmental and Social Management Unit (ESMU): In general, the ESMU is responsible for coordinating environmental and social monitoring efforts of Government Agencies, and for communicating with HPMO management and Government Agencies on the status of Contractors' environmental performance. The ESD will be responsible also for

15 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

reporting through the HPMO ADB the progress of EMP implementation. Currently ESMU is the sub-unit of PMU and the coordinator has been changed from Mr. LIU Chunchun, Mr. Wenqiang to Mr. Xiong Yongqin.

Loan Implementation Environment Consultants (LIEC): LIEC will oversee supervising environmental issues related to construction activities and of coordinating the EFI activities. The LIEC will act as external environment monitor, and will coordinate with agencies in charge of EMP supervision and monitoring to ensure these activities are carried out in compliance with the project schedule and that no risk of delaying the construction may result from these activities. Currently environmental expert Mr. YU Jialiang from project management consulting firm ESD is the LIEC of the Project.

Environmental Field Inspectors (EFI): EFI will have the principal responsibility for observing contractor construction activities, and for ensuring that those activities are accomplished in compliance with the Project's environmental requirements, specifications, goals and objectives. They will ensure coordination at field level with representatives of government agencies in charge of EMP supervision as well as those in charge of control and monitoring activities. During this reporting period, corresponding EFIs have been appointed for all the work contracts that have entered construction stage.

Onsite Environmental Engineer (OEE): An OEE will be appointed by each Contractor to be responsible for the implementation of environmental mitigation measures and internal monitoring. During this reporting period, corresponding OEEs have been appointed for all the work contracts that have entered construction stage.

External Environmental Monitor Consultant (EEM): EEM will review all environment reports, including internal and compliance monitoring reports and the semi-annual environment performance report, and prepare a semi-annual environment monitoring verification report. The report should confirm the project’s compliance with the EMP and PRC legislated standards, identify any environment-related implementation issues and necessary corrective actions, and reflect these in a corrective action plan. Currently Mr. ZHANG Defa and Mr. QIU Aihua (aka. Anthony QIU) are the EEM consultants of the Project.

Table 2.1 below summarizes the information of relevant dedicated correspondents for the Project:

Table 2.1 Information of dedicated environmental management correspondents (Till March 2020)

Environmental Contract Contract Name Management Organization Name Contacts No. Roles

Mr. Xiong - - ESMU Rep HSPMO 159 7154 1799 Yongqing

16 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Environmental Contract Contract Name Management Organization Name Contacts No. Roles Project P-CB01 Management LIEC ESD Mr. Yu Jialiang 135 0193 8523 Support Mr. Anthony Qiu 139 1746 3460 P-CB03 EEM EEM SGS Mr. Zhang Defa 130 0121 4518

Huangshi Municipal Infrastructure Mr. OEE 135 4551 8031 Engineering Co., Yunzheng Ltd. Ci Lake WW-C01 catchment pipe network Hubei Dongtai EFI Construction Mr. Luo Keping 138 8601 4012 Consulting Co., Ltd

Hubei Xing Tian Mr. Wei OEE Rui Engineering 138 7205 4810 Xuesong Co., Ltd Qingshanhu and WW-C02 Qinggang lake area network Hubei Dongtai EFI Construction Mr. Luo Keping 138 8601 4012 Consulting Co., Ltd

Huangshi Municipal Infrastructure Mr. Wu OEE 159 0723 1802 Engineering Co., Lixin Ltd. Hexi WWTP WW-C03 and 2 pump Hubei Dongtai EFI Construction Mr .Xiang Shang 158 2695 1852 Consulting Co., Ltd.

Huangshi Municipal OEE Infrastructure Mr. 186 7221 2321 Hexi area Engineering Co., WW-C04 network (27,159 Ltd. m) Hubei Dongtai Construction EFI Mr. Xiang Shang 158 2695 1852 Supervision Co., Ltd.

Tian’en Tieshan WW-C05-1 OEE Construction Group Mr. Hu Angang 138 7214 1511 network Co., Ltd

17 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Environmental Contract Contract Name Management Organization Name Contacts No. Roles Wuhan Construction Engineering EFI Management & Mr. Liao 150 7204 9222 Consultancy Co., Ltd.

Jiagnxi Construction OEE Engineering First Mr. Ren Jianping 158 2697 397 LLC WW-C05-2 Xialu network Wuhan Jiangnan Construction EFI Mr. You Jianjun Engineering Supervision Co., Ltd Guangzhou Hydropower OEE Mr. Quanliu 139 9955 0615 Construction Ci Lake Engineering Co., Ltd LR-C01-1 dredging part 1 Hubei HuaAo 180 8600 8438 EFI Hydropower Mr. Dong Wenbing

Consulting Co., Ltd

Gezhouba Dam Polytron Technologies Inc 150 7148 6122 OEE and Hubei water Mr. Luo Jie

conservancy and Ci Lake LR-C01-2 hydropower dredging part 2 construction Limited

Hubei Hua’Ao EFI Hydropower Mr. Tao 135 0726 0668 Consulting Co., Ltd

Hubei HuaYa Construction OEE Mr. Xie Bangyuan 138 8669 1627 Engineering Co., Qingshanhu Ltd. LR-C01-3 dredging Hubei HuaAo Mr. EFI Hydropower 180 8600 8438 Wenbing Consulting Co., Ltd.

Gezhouba Dam Polytron Technologies Inc OEE and Hubei water Mr. Xu Xiong 132 8286 9966 Qinggang Lake conservancy and LR-C01-4 dredging hydropower construction Limited Hubei HuaAo EFI Hydropower Mr. Zhao Runzhe 134 7708 3858 Consulting Co., Ltd

Water recovery Wuhan Bio-an LR-C01-5 OEE Mr. Chen 132 6067 4772 after dredging Biotech Co., Ltd.

18 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Environmental Contract Contract Name Management Organization Name Contacts No. Roles Hubei HuaAo EFI Hydropower Mr. Dong Wenbing 180 8600 8438 Consulting Co., Ltd. Jiangxi Green Giant Ecological OEE Mr. Zou Xinmin 135 8129 7386 Phase I of Environment Co., Ecological Ltd. LR-C03-1 Restoration on Hubei Huatai the South Shore Construction of Ci Lake EFI Supervision Mr. Pan Xilin 158 2697 5055 Engineering Co., Ltd. Changhong OEE Construction Group Mr. Wu Hao 159 7252 0505 Phase II of Co., Ltd. Ecological LR-C03-2 Restoration on Hubei Huatai the South Shore Construction of Ci Lake EFI Supervision Mr. Fu Senlin 181 6409 4205 Engineering Co., Ltd. Hunan landscape OEE architecture Co., Mr. He Mingmin 181 1038 7686 Ecological Ltd. remediation of LR-C03-3 Hubei Huatai Qingshanhu and Construction Qinggang lake EFI Supervision Mr. Ye Youhua 159 0712 1076 Engineering Co., Ltd. Honggu Beach Landscaping Ecological OEE Mr. Fang Jianghua 139 7280 4650 Construction Co., remediation of Ltd. LR-C03-4 Qingshanhu and Wuhan Municipal Qinggang lake, Engineering Design Phase II EFI Mr. Fang Neng 173 8648 5996 & Research Institute Co., Ltd Jiangsu Xingye Environmental Group Co., Ltd. and Downstream OEE Guangdong Mr. Wang Weixing 136 2560 6429 wetland for Zhujiang Landscape LR-C04-1-1 Tuanchengshan Construction Co., WWTP outflow, Ltd. Bid I Wuhan Hongyu Construction EFI Mr. Zou Minjun 138 7210 1958 Engineering Consulting Co., Ltd Tengwangge Downstream OEE Mr. Qiu Changlong 139 7176 2272 Construction Group wetland for LR-C04-1-2 Tuanchengshan Wuhan Hongyu WWTP outflow, Construction EFI Mr. Zou Minjun 138 7210 1958 Bid II Engineering Consulting Co., Ltd Downstream China Railway LR-C04-1-3 wetland for OEE NO.3 GROUP Mr. Gao Xin 186 8881 6234 Tuanchengshan Co.,LTD

19 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Environmental Contract Contract Name Management Organization Name Contacts No. Roles WWTP outflow, Wuhan Hongyu Bid II Construction EFI Mr. Huang Yingfa 137 0723 6200 Engineering Consulting Co., Ltd Wuhan HuaTian OEE International Art Mr.Li Maoxue 138 7135 2450 Co., Ltd. Upstream LR-C04-2 Beijing Eastern Wetland HuaTai EFI Construction Mr. Zhou Jingfu 153 4226 7171 Supervision Co., Ltd.

Jiangxi Construction Engineering Group OEE Mr. Wan Shulin 138 7214 3525 No.1 Construction Co., Ltd. Transfer station SW-C01 batch 1 Guangdong TianHeng Engineering EFI Ms. 189 7278 4859 Consulting Supervision Co., Ltd.

Chidong Mr. Peng OEE Construction Group 138 7214 3525 Andong Co., Ltd

Transfer station SW-C02 batch 2 Guangdong TianHeng Engineering EFI Mr. Wang Lin 189 7278 4859 Consulting Supervision Co., Ltd.

Chidong Mr. Peng OEE Construction Group 138 7214 3525 Andong Co., Ltd

Transfer station SW-C03 batch 3 Guangdong TianHeng Engineering EFI Mr. Wang Lin 189 7278 4859 Consulting Supervision Co., Ltd.

Jiangsu Tianyu Wastewater environmental treatment and protection group SL-C01 OEE Mr. Wang Yong 183 2600 9186 disposal project Municipal of Hexi Engineering Co., Ltd.

20 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Environmental Contract Contract Name Management Organization Name Contacts No. Roles

Hubei Huatai Construction EFI Supervision Mr. Fu Senlin 181 6409 4205 Engineering Co., Ltd.

2.2 ENVIRONMENTAL MONITORING

The Environmental Monitoring Plan is incorporated into the EMP. It defines necessary criteria including environmental monitoring standards, parameter, time, frequency, implementing and supervising institutes and cost estimates towards each component projects. Supervised by Huangshi Environmental Bureau and commissioned by PMU, all environmental monitoring services will be conducted by a qualified 3rd party environmental monitoring agency.

In August 2015, PMO and Centre Testing International (CTI) Company signed an environmental monitoring contract for the various construction projects and the background monitoring.

2.3 INSTITUTIONAL STRENGTHENING

To ensure the effective implementation of EMP, and better understanding of environmental management goal, methods and practice by stake holders related to all implementing measures and environmental performance monitoring, Hubei Provincial Environmental Protection Bureau and Loan Implementation Environmental Consultant will provide specific EMP trainings according to project requirements. Specific training plan is described in EMP. 0.544 million RMB is expected to distribute in institutional strengthening.

2.4 ENVIRONMENTAL REQUIREMENTS IN CONTRACTS

EMP defines environmental requirements and standards for component projects during construction and operation period, to guarantee project related environmental impact effectively controlled and reduced. Specific environmental requirements for contractors are incorporated into bidding documents, including:

1) Contractors should guarantee that solid waste will not pollute soil and water body. Contractors should allocate relevant equipment and personnel for cleaning. Vehicles should be washed before leaving the site. Vehicles should have back plate and head cover to prevent soil and materials leak.

2) Solid waste should be sent to designated points or apply designated methods for disposal

3) Soil, especially sludge and solid waste, should be sent to designated location for stacking at designated time according to project supervision requirements. Soil can be sent to

21 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

secondary preserved land for stacking if no specific requirements by supervision company; cost for soil transportation is considered included into bidding quotation of the contractor;

4) Contractor should comply with local regulations of Municipal Gardening and transportation when using vehicles. Shipping vehicles should be sealed, covered and prevent soil leaking and falling. Any punishment resulted in violation should be burdened by contractor itself.

5) Soil onsite or offsite should be stably stacked, kept regular shape and expedite draining. Stacked soil cannot influence surrounding buildings and facilities, traffic, water pollution and blocks of irrigation and rivers. All consequences induced should be burdened by contractor itself.

6) Contractor should follow these provisions by arranging necessary tools, facilities, and personnel.

Contactor should comply with relevant environmental laws, regulations and provisions in the PRC and strictly implement requirements in the EMP.

22 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

3. COMPLIANCE WITH ENVIRONMENTAL RELATED PROJECT COVENANTS

Up to this reporting period, all provisions in loan agreement and project agreement are being implemented. Relevant environmental impact related provisions and compliance status can be found in the following Table 3.1:

Table 3.1 Environmental Related Project Covenants Compliance Status

Provisions Compliance

HMG shall, and shall cause the IA to ensure that: 1) During project preparation, separate domestic environmental impact assessment forms/reports were prepared for each of four subprojects in compliance with the PRC regulatory framework. An environmental Compliant impact assessment report, including an environmental management plan, for the overall project was prepared in compliance with ADB’s requirement. 2) the preparation, design, construction, implementation, operation and decommissioning of the Project and all Project facilities comply with (a) all applicable laws and regulations of the Borrower relating to environment, health and safety; (b) the Environmental Safeguards Implementing stipulated in the SPS; and (c) all measures and requirements set forth in the EIA, the EMP, and any corrective or preventative actions set forth in a Safeguards Monitoring Report. 3) (a) any changes to the Project design are reviewed, including the Linked Facilities, that may potentially cause negative environmental impacts; (b) in consultation with ADB, environmental monitoring and mitigation measures are revised as necessary to assure full environmental compliance; and (c) provide ADB within 60 days from Implementing the date of any emergency action, justification for any proposed changes to the mitigation measures required during design, construction and operation for safety or emergency reasons.

4) (a) emergency preparedness and response mechanisms are developed for the Project in compliance with relevant regulations of the Borrower Will be implemented in and the EMP; and (b) emergency preparedness and response operational stage mechanisms are incorporated into the emergency preparedness and response system of HMG and concerned districts of Huangshi.

23 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

4. IMPLEMENTATION OF ENVIRONMENTAL IMPACT MITIGATION MEASURES

Environmental Management Plan is designed to develop corresponding environmental impact mitigation and protection measures for all subprojects, prevent environmental pollution generated at the construction and operation period, and minimize the negative environmental impact caused in the project implementation stage. The EMP seeks to ensure continuously improving environmental protection activities during preconstruction, construction, and operation in order to prevent, reduce, or mitigate adverse impacts and risks. The EMP is based on domestic EIA reports and feasibility study reports (FSR), and draws on the findings of the project EIA, PPTA and ADB review mission discussions and agreements with the relevant government agencies.

Referring to the EMP requirements, the implementation of mitigation measures at design and preconstruction stage of the project is summarized in the following Table 4.1:

Table 4.1 Potential Environmental Impacts and Mitigation Measures at Design and Preconstruction Phase Potential Mitigation Measures and/or Implementation Item Impacts and Remarks Safeguards / Compliant Issues

Develop detailed dredging plan. Compliant - Lake dredging, Review and confirm the exact dredging dredged area; design proper seepage prevention Compliant - material measures. management

Include technical requirements in the bidding documents and construction Compliant - Detailed contracts for the dredging works. Design Stage

Develop detailed spoil disposal sites Spoil disposal management and rehabilitation plans; Compliant - Submit plans to HEPB for approval.

Sewage Design seepage prevention measures for Sludge the sludge dewatering unit, sludge Compliant - treatment stirring unit.

Include environment requirements in the Bidding and bidding documents; contract Include environmental mitigation and Compliant - documents monitoring clauses defined in the EMP in the construction contracts. Construction Mr. Xiong Yongqin Preparation has become the Stage ESMU Establish and ESMU in the HPMO Compliant Primary Contact of ESMU in the HPMO. For the construction Updating of the civil contract, Update mitigation measures defined in EMP, site EMP has been this EMP and the component EMPs Compliant specific updated, split and sent EMPs. based on final detailed design, submit to

24 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Potential Mitigation Measures and/or Implementation Item Impacts and Remarks Safeguards / Compliant Issues HPMO and ADB for approval and to the construction disclosure. and supervision units

Carried out by Shanghai Centre Prior to construction, engage HEMS; Implementing Testing International External / (CTI) Company. Compliance environmental monitoring Prepare a compliance environmental The environmental monitoring plan to meet the Compliant monitoring plan has requirements in the EIAs, the CEIA and been updated. the EMP.

Include environment provisions in the LIEC TOR for selecting the loan Compliant implementation consultants;

LIEC, or invited environment specialists and/or officials from the Huangshi and Hubei provincial EPBs provide training on construction Environmental environmental management and Training plan has Management Compliant implementation and supervision of been developed. Training environmental mitigation measures to contractors, CSCs, IA and PIU staff in accordance with the defined training plan.

Internal environment Prepare an internal environmental The environmental monitoring monitoring plan to meet the Compliant monitoring plan has and requirements defined in the EIAs, the been updated. supervision CEIA and the EMP. plan Relevant GRM personnel has been Establish a Public Complaints Unit identified and GRM (PCU) in the HPMO‟s office; provide Non-compliant information boards are training for PCU members and GRM not erected or updated access points; Establish in some construction operational sites. GRM Disclose the PCU‟s phone number, fax, GRM information address, and email to the public on City boards are not erected Non-compliant EPB‟s website and on information or updated in some boards at each construction site. construction sites.

Environmental EFIs have been Appoint EFIs within the CSCs Field assigned for all work responsible for daily inspection, Inspectors Implementing contracts that have monitoring, and evaluation of (EFI) commenced implementation of mitigation. construction.

25 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020Mar - 2020June)

Potential Mitigation Measures and/or Implementation Item Impacts and Remarks Safeguards / Compliant Issues

OEEs have been Onsite After contract award and prior to start assigned for all work environment of construction, assign an onsite Not Completed contracts that have engineer environmental engineer for each commenced (OEE) contract. construction.

Progress of work contracts work which has been awarded during this reporting period (from March 2020 to June 2020) is summarized in Table 1.3 in Chapter 1. This report will focus on the implementation of EMP at current stage in contract packages on

1) Downstream wetland for Tuanchengshan WWTP outflow, Bid I(LR-C04-1-1) 2) Downstream wetland for Tuanchengshan WWTP outflow, Bid II(LR-C04-1-2) 3) Downstream wetland for Tuanchengshan WWTP outflow, Bid III(LR-C04-1-3) 4) Phase II of ecological restoration on the south shore of Ci Lake (LR-C03-2) 5) Transfer station batch 3(SW-C03) 6) Ecological remediation of Qingshanhu and Qinggang lake, Phase II (LR-C03-4)

26 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Table 4.2 Potential Environmental Impact and Mitigation Measures (at Construction Stage)

Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance

Implement dredging activities zone by zone to reduce the destruction of non-polluted clay layers;

Install high-precision positioning and monitoring system to improve the dredging accuracy and reduce secondary pollution;

Adjust the slant angle of the cutter-suction arm of the dredger to reduce the destruction of non-polluted clay layer.

Carefully select material and laying of dredging tubes to prevent any leakage during the transport of dredged sediment;

During dredging, conduct daily maintenance and inspection of pipes for early detection of any potential leakage and prevention of any subsequent impact on lake quality; Potential water Adopt a Performance Standard of suspended solids (SS) levels pollution from lake Surface measured during dredging, whereas SS levels at the impact monitoring dredging, lake Compliant water, stations must be ≤130% of the average ambient SS levels measured at embankment Groundwater the control monitoring stations (see the monitoring plan for details). works, engineered wetland Adopt mitigation measures such as reducing the dredging rate or fitting of funnel-shaped “nose” or other measures described in the detailed Dredging Plan when the Performance Standard is exceeded.

All construction vessels will be equipped with oil-water separators to treat the oil wastewater from the bilge (in particular, oily wastewater discharge into the lake);

Compliance with Discharge Standard for Pollutants from Ship (GB3552-83) will be enforced; when a leakage is discovered, the dredge pumps will be shut down until the leak is repaired;

Monitor water quality of the affected lakes during and after dredging in accordance with the monitoring plan, define corrective actions if necessary;

27 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance

Implement dredging machinery maintenance program.

Unauthorized discharge of wastewater will be prohibited within the project sites;

Production wastewater generated during construction must be treated by bar screen and settling tank before being discharged into the municipal sewage system in compliance with national standards;

Develop contingency plans for control of oil and other dangerous substances (Spill Management Plan);

Equip all areas where construction equipment is being washed with Construction water collection basins and sediment traps; Compliant wastewater, work

camp wastewater Station fuel storage, maintenance shop and vehicle cleaning areas at least 500m away from the nearest water body;

Place storage facilities for fuels, oil, and other hazardous materials within secured areas on impermeable surfaces, and provide bunds and cleanup installations;

Install septic tanks together with mobile toilets within the project sites and work camps, and pre-treat wastewater from work camps and canteens before discharge to the municipal sewer in compliance with national standards.

Develop borrow pits and spoil disposal site management and restoration plans, to be approved by responsible authority (HWRB, HEPB);

establish a protocol with the Huangshi Municipal Utilities Bureau to Phase II of ecological restoration on the clarify the spoil quantity get permit for the clearance of excavated south shore of Ci Lake (LR-C03-2) Earthwork, Spoil earthwork; Soil Partially Compliant •There is water in low-lying areas on the disposal Manage, rehabilitate and restore temporary spoil disposal sites in road. accordance with approved plan by the HEPB/HWRB;

Use watertight tippers with cover for earth transport to prevent spillage; The vehicles should be cleaned of mud when entering and leaving the construction sites to avoid contaminating the road surface;

28 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance

Conduct regular internal supervision and periodic external monitoring of the spoil disposal sites; and

Conduct project completion audit to confirm that the spoil disposal sites were rehabilitated in accordance with the approved rehabilitation plan and government regulations; hold contractors liable in case of non-compliance. Pit restoration will follow the completion of works in full compliance with all applicable standards and specifications, and will be required before final acceptance and payment under the terms of contracts.

Strip and stockpile topsoil, cover or seed temporary soil stockpiles;

Build drainage system and settling ponds at construction sites to minimize the soil erosion;

Lay straws or cloths at the entry/exist of each construction site;

Limit construction and material handling during periods of rains and high winds;

Carry out lake embankment protection and rehabilitation works section Compliant Soil erosion by section with greening works implemented at the same time in order to avoid large scale soil erosion in rainy season; and

Properly slope or re-vegetate disturbed surfaces, such as compacted pipeline trenches and lake banks;

The soils on the tires of construction vehicles will be regularly cleaned;

Implement soil erosion monitoring program, as defined in the Soil Erosion Protection Plan for the Project.

Properly store petroleum products, hazardous materials and wastes on impermeable surfaces in secured and covered areas, and use the best management practice to avoid soil contamination;

Soil contamination Remove all construction wastes from the sites to approved waste Compliant disposal sites;

Establish emergency preparedness and response plan (Spill Management Plan) in compliance with PRC regulations and the

29 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance

Worldbank Group‟s EHS Guidelines; train workers on safe and diligent handling of chemicals to avoid accidental spills and on emergency response when a spill would occur;

Provide spill cleanup measures and equipment at each construction site and require contractors to conduct training in emergency spill response procedures.

Temporary store dredged sediment (760,200m3 dewatered and solidified with water content of 40%) at the site of Huajiabei;

Conduct leaching tests of treated dredged material to identify suitable Dredged sediment Solid waste application or disposal mechanism. Use material for greening Compliant disposal application or as road basement material whenever possible; Dispose in Xisai landfill only as a last resort if pollution levels exceed national quality standards for beneficial utilization.

Provide appropriate waste collection and storage containers at strategic locations away from surface water or sensitive receivers; multi- Downstream wetland for Tuanchengshan compartment collection bins shall be provided to facilitate the reuse, recycling and composting of solid waste; WWTP outflow, Bid I(LR-C04-1-1)• • On-site domestic garbage was piled Prior to construction, reach agreement with Huangshi Municipal Utilities Bureau and municipal waste collection services for regular on the muddy ground in the open air, collection of waste; and the oil drums were piled on the Hold contractors responsible for proper removal and disposal of any muddy ground in the open air. The site significant residual materials, wastes and contaminated soils that Construction waste, was messy and oily pollution. Solid Waste remain on the ground after construction; Partially Compliant demolition waste Downstream wetland for Tuanchengshan Burning of waste is strictly prohibited. Licensed demolition companies shall be WWTP outflow, Bid III(LR-C04-1-3)

contracted to carry out demolition of houses; • On-site trash cans were stacked in the open air on the muddy ground, and the Maximize reuse/recycling of deconstruction wastes generated during the demolition (.g. , bricks, windows, doors, steel bars etc.), ground was polluted by oil. dispose other demolition debris on municipal solid waste landfill or

special construction and demolition debris landfill, subject to approval by HEPB.

30 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance Locate sediment pretreatment site at least 200m downwind from residential areas and other sensitive receptors such as schools (the dominant wind direction in Huangshi is NE).

Cover sediments with a layer of weed followed by a thin layer of soil, and then compact with necessary ventilation holes to reduce the odor emission;

Odor from Install enclosure with dust screen or dust cloth around the temporary Air sediment dredging storage site to minimize the potential impacts on surrounding residents; Compliant and storage The vehicles transporting treated sediment from the temporary treatment site must be covered with tarpaulin sheets; Overloading of these vehicles must be avoided;

Conduct regular interviews with residents living adjacent to sediment pretreatment site and sediment transportation routes to identify community complaints about odor, and seek suggestions from community members to reduce odor nuisance.

Stop construction activities likely to crease dust when there is weather forecast of wind above wind force 4 or when the municipal government issues an early warning of air quality,

Spray water on construction sites and material handling routes where fugitive dust is being generated; especially at construction sites involving significant earthwork (Qingshanhu PS, Qingshanhu Box Culvert, Panlongshan Tunnel, Qinggang Lake PS, Daquan Road Box Culvert, Wangjiaqiao Ecological Channel, Qinggang Lake Ecological Channel and Ci Lake Ecological Channel); Dust Compliant Roads must be kept clean and clear of all dust, mud, or extraneous materials dropped from transportation vehicles;

When construction takes places during dry and windy days, spray water on earth piles and exposed surfaces to suppress dust;

Pay particular attention to dust suppression near sensitive receptors such as schools, hospitals, residential areas and wildlife habitats;

Cover materials during truck transportation, in particular, the fine

31 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance

material, to avoid dust generation;

Upon completion of construction, all construction sites will be re- vegetated with trees and grasses.

Initiate a regular inspection and certification system for vehicle and equipment emission;

Store petroleum or other harmful materials in appropriate places and cover to minimize fugitive dust and emission;

Equip concrete mixing plants with dust collector, locate them at least Gaseous air 200m away from sensitive receptors such as schools, hospitals and emissions from residential areas; use commercial ready-mixed concrete; mixing Compliant

machinery and cement and lime soil will not be allowed on construction sites; equipment Maintain vehicles and construction machinery to a high standard to ensure efficient running and fuel-burning and compliance with PRC national emission standards. The “Criteria for Liquidation of Motor Vehicles in Use” will be strictly implemented to timely eliminate old vehicles with high fuel consumption, low efficiency and incompliance emission of exhaust gas.

Conduct ambient air quality monitoring during construction in The environmental monitoring unit carried accordance with the monitoring plan. Conduct additional monitoring out ambient air quality monitoring in the whenever necessary (e.g., if complaints are made by local second quarter of 2020. The 24-hour communities). average concentration of inhalable particulate matter and total suspended Air quality Partially Compliant particulate matter at some testing points monitoring slightly exceeded the "Ambient Air Quality Standard" (GB 3095-2012) and was revised Single Table 1 and Table 2 are the requirements for the concentration limits of the secondary standards. Ensure that noise levels from equipment and machinery conform to the Noise from PRC standard of GB12523-90, and properly maintain machinery to Construction activities were ceased at Noise construction minimize noise; Compliant night. activities Apply noise reduction devices or methods where equipment is operating within 500 m of sensitive sites such as schools, hospitals and

32 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance

residential areas;

Locate sites for concrete-mixing, and similar activities at least 500 m away from sensitive areas;

Restrict the operation of machinery generating high levels of noise, such as piling, and movement of heavy vehicles along urban and village roads between 20:00 and 06:00 the next day in accordance with PRC regulations;

Monitor noise at sensitive areas at regular intervals (refer to the monitoring plan). If noise standards are exceeded, equipment and The environmental monitoring unit carried construction conditions shall be checked, and mitigation measures shall out environmental air quality monitoring be implemented to rectify the situation; and in the second quarter of 2020. The noise value of noise sensitive points within 60 Noise monitoring, Conduct regular interviews with residents living adjacent to Partially Compliant meters of the construction area of some public complaints construction sites and transportation routes to identify community projects is higher than the requirements of complaints about noise, and seek suggestions from community the Class 2 limit of the "Sound members to reduce noise annoyance. Community suggestions will be Environmental Quality Standard" (GB used to adjust work hours of noise-generating machinery. 3096-2008) .

Appoint Onsite environment engineer (OEE) to supervise All sub-projects have resumed work in environmental, health, and safety management at construction sites; succession since March 2020, and according to the National Health Develop a Environmental, Health and Safety Management Plan Commission’s website, the new (EHSMP); Establish a Records Management System to store and coronavirus infection pneumonia diagnosis maintain easily retrievable records protected against loss or damage. It and treatment plan (trial version 4) was will include documenting and reporting occupational accidents, released in the early morning of January diseases, and incidents. The records will be reviewed during 28, following the comprehensive treatment compliance monitoring and audits. and utilization of water pollution in Health and Occupational Compliant Huangshi City. The bank loan project Provide a clean and sufficient supply of fresh water at construction Safety health and safety management office and the local sites; provide an adequate number of latrines and other sanitary construction administrative department arrangements at construction sites, and ensure that they are cleaned and require that, in accordance with the actual maintained in a hygienic state; provide sufficient garbage receptacles at situation, do a good job in the prevention construction sites; and control of the new coronavirus Provide personal protection equipment (PPE) in accordance with pneumonia epidemic, and at the same time relevant health and safety regulations; provide a fully equipped first-aid make the manpower, material, and base in each construction; technical preparations, and the emergence of suspected new coronavirus pneumonia Train all construction workers in general health and safety matters, and cases in the project In case of

33 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance

on emergency preparedness and response procedures; circumstances, emergency plans can be taken in time to control the level of Implement SITs/HIV/AIDS and other communicable diseases accident risk. Developed prevention and awareness and prevention program; emergency plans for new crown pneumonia in various aspects such as Buy insurances before construction for casualty accident (for workers); project construction site management, personnel return management, and epidemic monitoring and disposal. At the same time, a protection and emergency leadership team was established to strictly monitor the entire resumption process to ensure the normal production of the project and the living order of employees . Carefully and clearly mark pedestrian-safe access routes; If school children are in the vicinity, include traffic safety personnel to direct traffic during school hours;

Inform residents and businesses in advance through media of the construction activities, given the dates and duration of expected disruption;

Place clear signs at construction sites in view of the public, warning people of potential dangers, informing on the GRM, and raising Community health awareness on safety issues. Compliant and safety Implement safety measures around the construction sites to protect the public, including barriers to prevent public access to construction sites;

Plan construction activities so as to minimize disturbances to utility services. Temporary land occupation shall be planned well ahead of construction to minimize its impact;

Conduct three-dimensional underground detection before construction to avoid damage of underground facilities, potential accidents, and service interruptions;

Develop and implement traffic control and operation plans, (approved by HTPB), which shall include provisions for diverting or scheduling Traffic disturbance Compliant construction traffic to avoid morning and afternoon peak traffic hours, regulating traffic at road crossings, building interim roads, selecting

34 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance

transport routes to reduce disturbance to regular traffic;

Reinstating roads, and opening them to traffic as soon as the construction is completed;

Strictly control the lake dredging depth to avoid over-dredging in order to provide good conditions for natural restoration of aquatic flora in Ci Lake, Qingshanhu and Qinggang Lake;

To prevent algal bloom due to sudden deterioration of water quality Flora and Aquatic flora (lake after refilling Compliant Fauna dredging) the dredged lakes, the “WMB Microorganism Ecological Restoration Technique” shall be applied, that is, to dose microorganism bacteria agent into Ci Lake, Qingshanhu and Qinggang Lake for water quality control;

Protect existing vegetation nearby construction sites;

Properly backfill, compact and re-vegetate pipeline trenches after pipeline installation;

As far as possible, native plant species of local provenance must be used for replanting; Replanting along the lakes will only use native species of local provenance;

Take special precautions during construction for the protection of Flora and fauna Compliant fauna, i.e., protect sites where small animals, reptiles, and birds of common species live such as trees, along the lake banks, etc.

The construction supervision companies (CSCs) and the ESMU of the HPMO will regularly inspect construction sites to ensure that flora and fauna are well protected.

Increase awareness of construction workers on the need to protect the environment and vegetation around the construction sites;

35 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance Establish chance-find procedures for physical cultural resources; if a new site is unearthed, work will be stopped immediately and HCRB Physical and the HPMO promptly notified, and construction will resume only cultural after thorough investigation and with the permission of the appropriate Not Applicable Currently not included. resources authority.

Compared with the requirements in the EMP, the implementation of the mitigation measures during the operation phase of the project is shown in Table 4.3 below;

Table 4.4 Potential Environmental Impact and Mitigation Measures (at Operational phase of the project)

Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance Survey of industrial sources upstream of sewage treatment plants and industrial pollution control ;

Compare wastewater monitoring and constructed wetland performance data of wastewater treatment plants ; take remedial measures if Poor performance necessary ; of constructed wetlands due to Detect the constructed wetland sewage before it is discharged into the poor maintenance lake to prevent poor treatment effect and make necessary and timely Compliant or excessive adjustments; load / toxic Regularly clean up the accumulated sludge to prevent it from entering Surface water pollutants upstream and depositing to the bottom of the lake, causing secondary pollution due to its high content of organic matter;

Under the ADB treatment project and final recommendations, the sludge is collected and transported to the sludge treatment system.

Monitor the amount of sediment transported in the sediment transport Excessive sediment system and optimize the pumping system accordingly ; transport and Compliant Detect the accumulation of sediment in the lake and, if necessary, redeposition dredge it regularly

36 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Potential Impacts Implementation / Item Mitigation Measures and/or Safeguards Remarks and Issues Compliance Strengthen management of point source and non-point source pollution Sewage discharged around lakes, and strictly prohibit the discharge of untreated Compliant into the lake wastewater into lakes.

Potential impact of Wetland impermeable liner bottom and sides of the design ; constructed Groundwater wetlands on local Regularly check groundwater / soil quality; Compliant and soil groundwater and If necessary, implement remedial measures. soil Debris, residue and The sundries, residues, and sludge deposited during the operation in the Solid Waste deposited sludge in tank channel will be removed regularly. These materials will be Compliant the channel properly collected and disposed of in a landfill. Properly maintain all vegetation coverage and inspect all lakeside Ecological stable sites. Clean up in time to avoid dead aquatic plants in the lake Re-green area Compliant resources and avoid redeposition. If signs of failure are found, the repair procedure will be executed immediately.

37 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Table 4.5 Municipal solid waste collection and transportation system, potential environmental impacts and mitigation measures (At Project operational phase)

Potential Impacts and Implementation / Item Mitigation Measures and/or Safeguards Remarks Issues Compliance The maximum capacity of the collection station is 10 tons / day, and it complies with the latest technical guidelines for solid waste collection stations of the People’s Republic of China; the solid waste is bagged and then stored in a closed solid waste tank in the closed solid waste collection station; it will be cleaned and collected every day Incoming solid waste;

The transfer station will comply with the "Domestic Solid Waste Transfer Station Technical Specifications" (CJJ47-2006 ) ;

Malodorous gas emitted Completely close the transmission workshop to reduce the release of odor into the Air quality from collection stations and surrounding environment; ensure the ventilation of the workshop; Compliant transmission stations An air curtain is installed at the entrance of the unloading transmission station to prevent the emission of odor and dust;

Sprinkle disinfectants and deodorants for equipment and workshops regularly to control odor generation;

Regularly ask about the odor of nearby residents and take corrective measures if necessary.

Start a regular inspection and verification system to ensure that exhaust gas meets emission standards;

Vehicle emissions must comply with the "Measures for the Limitation and Measurement of Emissions from Light- Duty Vehicles " (third and fourth issues ) (GB18352-2005 ) , and the "Measures for the Limitation and Fly dust, exhaust Measurement of Exhaust Pollutants from Vehicles with Compression Ignition and gas, NH3 and H2S emitted Gasoline Ignition Engines " (third and fourth) Fourth, the fifth period) (GB17691- Compliant by transportation vehicles 2005) ;

Properly maintain vehicles and diesel engine equipment to avoid unnecessary vehicle operation;

Garbage trucks will be closed to avoid the emission of malodorous gas.

38 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Potential Impacts and Implementation / Item Mitigation Measures and/or Safeguards Remarks Issues Compliance Keep the buffer zone and green belt;

High-noise equipment will be installed indoors; the transmission station building will be designed with sound-absorbing and sound-proof materials;

Vehicles with low noise, vibration and good structure will be selected as solid waste transportation vehicles; Noise Transmission station, vehicle Compliant The transmission workshop, repair room and garage will be designed as a closed structure to reduce the impact on the surrounding environment;

Maintain machinery and vehicles regularly and keep them in good condition;

Conduct environmental noise monitoring to determine whether further mitigation measures are needed.

Municipal solid waste collection and transfer stations will be designed to prevent potential seepage and pollution of groundwater;

Before being discharged into the municipal sewage system together with domestic sewage and sent to the municipal sewage treatment plant for treatment, the on-site Leachate, washing septic tank will be used to pre-treat the sewage leaking from the transmission Sewage wastewater and domestic station and washing sewage to meet the "Comprehensive Wastewater Discharge Compliant sewage Standard" ( GB8978- 1996) third level ;

Desilting the seepage sewage storage tanks and septic tanks in the transmission station on a regular basis; special vehicles will be used to transport the sludge to the Xisaishan garbage landfill for treatment.

Coordinate with local traffic management departments to strictly formulate urban solid waste transportation routes and plans to reduce the impact of noise on local residents;

Control residents' access to the transmission station;

Health and Community health and Implement pest control measures at collection stations and transmission stations Compliant safety safety (sprinkle disinfectant at least once a day in summer);

Perform regular flies / mosquito density monitoring;

Regularly inquire about the health and safety issues of nearby residents, and formulate corrective measures when necessary.

39 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Potential Impacts and Implementation / Item Mitigation Measures and/or Safeguards Remarks Issues Compliance Provide protective equipment and clothing for employees in accordance with the Workers’ Health Protection Law of the People’s Republic of China; Occupational health and Compliant safety Improve public health services, including the provision of safe drinking water and sanitation facilities.

120 sanitation jobs may be Economic affected by the Implement the labor and employment plan stipulated in the "Social Action Plan." Compliant Transformation modernization of garbage collection

40 Jul 2019 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

5. ENVIRONMENTAL MONITORING PLANS AND RESPONSIBILITIES

5.1 ENVIRONMENTAL MONITORING RESPONSIBILITIES

The environmental monitoring plans are included in the Environmental Management Plan (EMP) of this project. They are established with regard to each part of engineering activities and are specified with parameters, time and frequencies, implementing and supervising agencies, and budgets.

The environmental monitoring plans are intended to ensure that the project is implemented in an environmentally acceptable way, covering both constructional and operational phases. According to the requirements of EMP, environmental monitoring should be carried out simultaneously in two ways during the implementation of this project:

1) Internal monitoring and inspection – Project EAs shall entrust construction management agencies to carry out internal monitoring and inspection during construction, thereby ensure the implementation of appropriate mitigation measures. Results of the internal monitoring and inspection should be recorded in detail and reported to the contractor, PIUs and EAs. During operation, the owner and operators of the properties will be responsible for internal monitoring, inspections and reporting to Huangshi PMO. Progress reports shall be submitted to PMO, including data from environmental monitoring and inspection which is collected by construction management agencies.

2) Compliance monitoring and inspection – A qualified 3rd party environmental monitoring agency will be responsible for periodical and random environmental monitoring during construction, operation, and emergencies. If the results are found to exceed relevant standards, a notice on rectification within a certain time limit will be issued by HEPB. This agency will submit monitoring reports twice every year to PMO, HEPB, HPEPB and EAs.

5.2 TARGET OF ENVIRONMENTAL QULIATY AND METHODS FOR SAMPLING AND ANALYSIS

According to the requirements of EMP, a cost analysis breakdown should be provided when preparing detailed environmental monitoring procedures at the beginning of implementation of the project. All monitoring activities should be in accordance with methods provided in corresponding national environmental monitoring standards. Other relevant standards include national environmental quality standards, emission/discharge standards, and internationally recognized standards provided by WB EHS guides. Table 5.1 provides list of relevant standards.

41 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Table 5.1 Environmental standards that applicable to this project

Period Indicators Standard

Construction Soil erosion ⚫ Class II Control Standards for Soil and Water Loss on Development and Construction Projects (GB50434-2008) ⚫ Class II, Ambient Air Quality Standard (GB3095- Dust, TMP, PM10 2012)

⚫ Highest Allowable Concentration of Atmospheric Odor (NH3 and H2S) Toxic Substance in Residential Areas (TJ36-79)

⚫ Noise Limits for Construction Site (GB12523- Noise limits of power mechanical 2011) equipment at boundary of construction site

⚫ Class II, Standard of Integrated Wastewater Discharge of wastewater from Discharge Standard (GB8978-1996) construction sites and supernatant ⚫ Implement according to the water classification water from dredged sediment IV standard of Surface Water (GB3838-2002) disposal sites (Reference)

Vibration ⚫ Standard for Urban Area Environmental Vibration (GB10070-88)

Operation Odor (NH3 and H2S) ⚫ Highest Allowable Concentration of Atmospheric Toxic Substance in Residential Areas (TJ36-79)

⚫ Class II, Standard of Noise Environment Quality Noise from WWTP, sludge Standards (GB3096-2008) treatment plant, PS and MSW ⚫ Emission Standard for Industrial Enterprises transfer station Noise at boundary (GB12348-2008) ⚫ EHS targets for industrial noise

⚫ Class 1B , Standard of Pollutants for Municipal Water quality of treated wastewater Wastewater Treatment Plant (GB18918-2002) (for Hexi WWTP) ⚫ Grade V of Environmental Quality Standards for Surface Water (GB3838-2002) (for constructed wetlands)

⚫ Grade III, IV (where appropriate) of River and lake water quality Environmental Quality Standards for Surface Water (GB3838-2002)

⚫ Control Standards for Pollutants in Sludge for Quality of dredged sediment for Gardens and Parks (GB/T23486-2009), and land urban landscaping improvement (CJ/T291–2008)

⚫ Disposal of Sludge from Municipal Wastewater Quality of sewage sludge for co- Treatment Plant – Quality of Sludge for Co- landfilling in MSW landfill and for landfilling (GB/T23485–2009) processing in cement kilns ⚫ Standard for landfilling of sewage sludge in municipal landfills (GB16889-2008) ⚫ Wastewater Treatment Plant – Quality of Sludge Used for the Preparation of Cement Clinker (CJ/T 314 – 2009)

42 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Period Indicators Standard

⚫ Control Standards on the Municipal Solid Waste MSW Incineration Incineration (GB18485-2014)

Municipal landfill Pollution Control Standard for Municipal Landfill Sites (GB16889-2008)

Monitoring methods and assessment criteria for this project will be determined based on relevant standards and regulations above, as well as environmental functional regionalization and related contents from the EIA report.

5.3 ARRANGEMENT FOR ENVIRONMENTAL MONITORING

Environmental monitoring activities will be arranged based on environmentally sensitive points, environmental indicators and correlated major environmental impacts which have been recognized in EIA report for each subproject under this project, as well as actual progresses.

In Sept 2014, PMO initiated a tripartite meeting with SGS (EEM), ESD (Project Management Support Consultant) and WSP (Institutional Strengthening Support Consultant) to discuss the amendment of the environmental monitoring plan, which was then revised by SGS and agreed by PMO.

In Feb 2016, PMO initiated a tripartite meeting with SGS (EEM), ESD (Project Management Support Consultant) and CTI according to the specific progress of the project, updated the 5 sub projects of the construction period monitoring plan

5.4 CONTENTS OF MONITORING

Until the end of June 2020, CTI has carried out environmental monitoring to 17 projects. The monitoring work includes monitoring of the project construction period and monitoring of the project operation. The monitoring reports have not been released at the time of this report. The completed contents of the environmental monitoring are summarized as Table 5.2:

Table 5.2 The summarized completed contents of the environmental monitoring- project construction monitoring

Monitoring Contract No. Contract Name Monitoring Date Monitoring content period

Construction Environmental Air、 Nov 2017 Monitoring Environmental Noises

Construction Environmental Air、 WW-C01 Ci Lake catchment pipeline Jan 2018 Monitoring Environmental Noises

Construction Environmental Air、 Aug 018 Monitoring Environmental Noises

43 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Monitoring Contract No. Contract Name Monitoring Date Monitoring content period Qingshan & Qinggang lake Construction WW-C02 Jan 2016 Environmental Air、Noises area network Monitoring

Construction Oct 2015 Environmental Air、Noises Monitoring

Construction WW-C03 Hexi WWTP Jan 2016 Environmental Air、Sediment Monitoring

Operation April 2018 Environmental Waste Water Monitoring

Construction Environmental Air、 Oct 2015 Hexi waste water area Monitoring Construction industry noise WW-C04 network Construction Environmental Air、 Apr 2016 Monitoring Construction industry noise

Construction Environmental Air、 Nov 2017 Monitoring Construction industry noise WW-C05-1 Tieshan District Pipeline Construction Environmental Air、 Jan 2018 Monitoring Construction industry noise

Construction Environmental Air、 Nov 2017 Monitoring Construction industry noise WW-C05-2 Xialu District Pipeline Construction Environmental Air、 Jan 2018 Monitoring Construction industry noise

Background Environmental Air、 Dec 2015 Monitoring Environmental Noises Environmental Air、 Construction Aug 2016 Environmental Noises Monitoring Sediment Environmental Air、 Construction Nov 2016 Environmental Noises Monitoring Sediment Groundwater Environmental Air、 Construction Jan 2017 Environmental Noises Monitoring Sediment Groundwater Environmental Air、 Ci Lake dredging part 1 LR-C01-1 Construction Apr 2017 Environmental Noises Monitoring Sediment Groundwater Environmental Air、 Construction Jul 2017 Environmental Noises Monitoring Sediment Groundwater Environmental Air、 Construction Nov 2017 Environmental Noises Monitoring Sediment Groundwater Environmental Air、 Construction Feb 2018 Environmental Noises Monitoring Sediment Groundwater

44 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Monitoring Contract No. Contract Name Monitoring Date Monitoring content period Environmental Air、 Construction Aug 2016 Environmental Noises Monitoring Sediment Environmental Air、 Construction Nov 2016 Monitoring Environmental Noises Sediment Environmental Air、 Construction Jan 2017 Environmental Noises Monitoring Sediment Environmental Air、 Construction LR-C01-2 Ci Lake dredging part 2 Apr 2017 Monitoring Environmental Noises Sediment Environmental Air、 Construction Nov 2017 Monitoring Environmental Noises Sediment Environmental Air、 Construction Jan 2018 Monitoring Environmental Noises Sediment Environmental Air、 Construction Jul 2018 Monitoring Environmental Noises Sediment Construction Oct 2015 Environmental Air、Sediment Monitoring LR-C01-3 Qingshanhu dredging Construction Jan 2016 Environmental Air、Sediment Monitoring Background Dec 2015 Environmental Air、Noises Monitoring Construction Environmental Air、 Aug 2016 Monitoring Environmental Noises Sediment Construction Environmental Air、 Oct 2016 Monitoring Environmental Noises Sediment Environmental Air、 Construction Jan 2017 Environmental Noises Monitoring Sediment Qinggang Lake dredging Environmental Air、 LR-C01-4 Construction part 1 Apr 2017 Monitoring Environmental Noises Sediment Environmental Air、 Construction Jul 2017 Monitoring Environmental Noises Sediment Environmental Air、 Construction Nov 2017 Monitoring Environmental Noises Sediment Environmental Air、 Construction Jan 2018 Environmental Noises Monitoring Sediment Construction Aug 2016 Ci Lake water quality Monitoring Water restoration after Construction LR-C01-5 Sep 2016 Ci Lake water quality dredging Monitoring Construction Oct 2016 Ci Lake water quality Monitoring

45 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Monitoring Contract No. Contract Name Monitoring Date Monitoring content period Construction Nov 2016 Ci Lake water quality Monitoring Construction Dec 2016 Ci Lake water quality Monitoring Construction Jan 2017 Ci Lake water quality Monitoring Construction Feb 2017 Ci Lake water quality Monitoring Construction Apr 2017 Ci Lake water quality Monitoring Construction May 2017 Ci Lake water quality Monitoring Construction Jun 2017 Ci Lake water quality Monitoring Construction Jul 2017 Ci Lake water quality Monitoring Construction Feb 2018 Ci Lake water quality Monitoring Construction Jul 2018 Ci Lake water quality Monitoring Construction Environmental Air、 Aug 2016 Monitoring Environmental Noises Construction Environmental Air、 Nov 2016 Monitoring Environmental Noises Construction Environmental Air、 Jan 2017 Monitoring Environmental Noises Construction Environmental Air、 Apr 2017 Monitoring Environmental Noises Huajiabei temporary - Environmental Air、 storage yard Construction Jul 2017 Monitoring Environmental Noises, *Groundwater Environmental Air、 Construction Nov 2017 Environmental Noises, Monitoring *Groundwater Construction Environmental Air、 Jan 2018 Monitoring Environmental Noises Construction Environmental Air、 Jul 2018 Monitoring Environmental Noises Construction Environmental Air、 Jul 2018 Phase I of Ecological Monitoring Environmental Noises LR-C03-1 Restoration on the South Construction Environmental Air、 Shore of Ci Lake Jul 2019 Monitoring Environmental Noises

Construction Environmental Air、 Apr 2016 Monitoring Environmental Noises Qingshanhu and Qinggang LR-C03-3 lake Ecological restoration Construction Environmental Air、 Aug 2016 Monitoring Environmental Noises

46 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Monitoring Contract No. Contract Name Monitoring Date Monitoring content period

Construction Environmental Air、 Nov 2016 Monitoring Environmental Noises

Construction Environmental Air、 Jan 2017 Monitoring Environmental Noises

Construction Environmental Air、 Apr 2017 Monitoring Environmental Noises

Construction Environmental Air、 Jul 2017 Monitoring Environmental Noises Qingshanhu and Qinggang Construction Environmental Air、 LR-C03-4 lake Ecological restoration Jul 2019 Monitoring Part 2 Environmental Noises Construction Environmental Air、 Aug 2018 Monitoring Environmental Noises

Construction Environmental Air、 Downstream wetland for Oct 2018 Monitoring Environmental Noises Tuanchengshan WWTP LR-C04-1-1 outflow, Bid I (LR-C04-1- Construction Environmental Air、 1) Jul 2019 Monitoring Environmental Noises

Construction Environmental Air、 May 2020 Monitoring Environmental Noises

Construction Environmental Air、 Jul 2018 Monitoring Environmental Noises

Construction Environmental Air、 Downstream wetland for Nov 2018 Monitoring Environmental Noises Tuanchengshan WWTP LR-C04-1-2 outflow, Bid II (LR-C04-1- Construction Environmental Air、 2) Jul 2019 Monitoring Environmental Noises

Construction Environmental Air、 May 2020 Monitoring Environmental Noises

Construction Environmental Air、 Nov 2018 Monitoring Environmental Noises Downstream wetland for Tuanchengshan WWTP Construction Environmental Air、 LR-C04-1-3 Jul 2019 outflow, Bid III (LR-C04- Monitoring Environmental Noises 1-3) Construction Environmental Air、 May 2020 Monitoring Environmental Noises

Construction Surface water、Environmental Oct 2015 Monitoring Air

Construction Surface water、Environmental LR-C04-2 Upstream wetland Jan 2016 Monitoring Air

Construction Surface water、Environmental Apr 2016 Monitoring Air

47 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Monitoring Contract No. Contract Name Monitoring Date Monitoring content period

Operation Jan 2017 Surface water Monitoring

Operation Feb 2017 Surface water Monitoring

Operation Apr 2017 Surface water Monitoring

Operation May 2017 Surface water Monitoring

Operation Jun 2017 Surface water Monitoring

Operation Jul 2017 Surface water Monitoring

Operation Aug 2017 Surface water Monitoring

Operation Sep 2017 Surface water Monitoring

Operation Oct 2017 Surface water Monitoring

Operation Nov 2017 Surface water Monitoring

Construction Environmental Air、 Oct 2015 Monitoring Construction industry noise

Construction Environmental Air、 Jan 2016 Monitoring Construction industry noise

Construction Apr 2016 Environmental Air Monitoring

Construction Environmental Air、 Aug 2016 Monitoring Construction industry noise SW-C01 Transfer station batch 1 Construction Environmental Air、 Oct 2016 Monitoring Construction industry noise

Construction Environmental Air、 Jan 2017 Monitoring Construction industry noise

Construction Environmental Air、 Apr 2017 Monitoring Construction industry noise

Construction Environmental Air、 Nov 2017 Monitoring Construction industry noise

Construction Environmental Air、 SW-C02 Transfer station batch 2 Jan 2017 Monitoring Environmental Noises

48 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Monitoring Contract No. Contract Name Monitoring Date Monitoring content period

Construction Environmental Air、 Apr 2017 Monitoring Environmental Noises

Construction Environmental Air、 Jul 2017 Monitoring Environmental Noises

Construction Environmental Air、 Nov 2017 Monitoring Environmental Noises

Construction Environmental Air、 Jan 2017 Monitoring Environmental Noises

Construction Environmental Air、 Jul 2018 Monitoring Environmental Noises

Construction Environmental Air、 Nov 2018 Monitoring Environmental Noises SW-C03 Transfer station batch 3 Construction Environmental Air、 May 2020 Monitoring Environmental Noises

Construction Environmental Air、 Aug 2017 Monitoring Construction industry noise

Construction Environmental Air、 Nov 2017 Monitoring Construction industry noise Wastewater treatment and SL-C01 disposal project of Hexi Environmental Air、 Construction Jan 2017 Construction industry noise、 Monitoring Environmental noises Environmental Air、 Construction Aug 2017 Construction industry noise、 Monitoring Environmental noises Note: The groundwater monitoring well belongs to the site of Ci Lake Dredging Part II, which is located within Huajiabei area.

5.5 RESULTS OF MONITORING

The monitoring results of the above 17 items are summarized as Table 5.3

49 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Table 5.3 The monitoring results summarized

Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results The environment air detection was taken in total 2 construction areas with the monitoring indicators including inhalable particles, total suspended particulates. The Environmental Air monitoring results shows that both inhalable particles and Construction total suspended particulates exceeded Environmental Air Nov 2017 Monitoring Quality Standard (GB3095-2012) Grade II, amounting to 2.5 times and 2.2 times of the corresponding reference limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Ci lake inhalable particles, total suspended particulates. The Environmental Air WW-C01 catchment monitoring results shows that both parameters are lower than Construction pipeline Jan 2018 the corresponding limits in Environmental Air Quality Monitoring Standard (GB3095-2012) Grade II. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 2 The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air inhalable particles, total suspended particulates. the Construction monitoring results are lower than the corresponding Aug 2018 Monitoring reference standard limit value. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 2 material field, a construction detour, 1 annex residential area, a total of 4 points (2 points in a area) with the monitoring indicators including inhalable particles, total suspended particulates and Qingshan & Construction the monitoring results showed in annex residential area there WW-C02 Qinggang lake Jan 2016 Environmental Air Monitoring were 2 inhalable particles monitoring points exceeding area network standard with exceeding multiples to a maximum of 1.2 times and 2 total suspended particulates in a material field exceeding standard with exceeding multiples to a maximum of 1.7 times.

50 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results 2 boundary points and 1 sensitive point noise monitoring was Noises taken in daytime with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 2 material field, a construction detour, 1 annex residential area, a total of 4 points(2 points in a area) with the monitoring indicators including inhalable particles, total suspended particulates and the monitoring results showed in annex residential area there Environmental Air were 2 inhalable particles monitoring points exceeding Construction Oct 2015 standard with exceeding multiples to a maximum of 1.2 times Monitoring and 8 total suspended particulates monitoring points exceeding standard with exceeding multiples to a maximum of 1.7 times in the above 4 areas. 2 boundary points and 1 sensitive point noise monitoring were Noises taken in daytime with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 2 material field, a construction detour, 1 annex residential area, a total of 4 points(2 points in a area) with the monitoring indicators including inhalable particles, total suspended particulates and the monitoring results showed in annex residential area there WW-C03 Hexi WWTP Environmental Air were 2 inhalable particles monitoring points exceeding Construction standard with exceeding multiples to a maximum of 1.5 times Jan 2016 Monitoring and 6 total suspended particulates monitoring points exceeding standard with exceeding multiples to a maximum of 1.2 times in the above 4 areas except the annex residential area. 2 boundary points and 1 sensitive point noise monitoring were Noises taken in daytime with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 2 material field, a construction detour, 1 annex residential area, a total of 4 points(2 points in a area) with the monitoring indicators Environmental Air including inhalable particles, total suspended particulates and Construction Apr 2016 the monitoring results lower than the corresponding reference Monitoring standard limit value. 2 boundary points and 1 sensitive point noise monitoring were Noises taken in daytime with the monitoring result lower than the corresponding reference standard limit value. Construction 2 material fields, a construction detour, 1 annex residential WW-C04 Oct 2015 Environmental Air Monitoring area, a total of 4 points(2 points in a area) with the monitoring

51 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results indicators including inhalable particles, total suspended particulates and the monitoring results showed in annex residential area there were 2 inhalable particles monitoring points exceeding standard with exceeding multiples to a Hexi waste maximum of 2 times and 8 total suspended particulates water area monitoring points in the above 4 areas exceeding standard network with exceeding multiples to a maximum of 2 times. 2 boundary points and 1 sensitive point noise monitoring was Construction industry taken in daytime with the monitoring result lower than the noise corresponding reference standard limit value. 1 material field and 1 annex residential area, a total of 2 points (1 points in 1 area) with the monitoring indicators including Construction Environmental Air inhalable particles, total suspended particulates and the Monitoring monitoring results showed neither of the parameters exceed Nov 2017 the reference limits of corresponding standard. 1 boundary point and 1 sensitive point noise monitoring was Construction Construction industry taken in daytime with the monitoring results both lower than Monitoring noise Tieshan district the corresponding reference standard limit values. WW-C05-1 pipeline 1 material field and 1 annex residential area, a total of 2 points (1 points in 1 area) with the monitoring indicators including Construction Environmental Air inhalable particles, total suspended particulates and the Monitoring monitoring results showed neither of the parameters exceed Jan 2018 the reference limits of corresponding standard. 1 boundary point and 1 sensitive point noise monitoring was Construction Construction industry taken in daytime with the monitoring results both lower than Monitoring noise the corresponding reference standard limit values. 1 material field and 1 annex residential area, a total of 2 points (1 points in 1 area) with the monitoring indicators including Construction Environmental Air inhalable particles, total suspended particulates and the Monitoring monitoring results showed neither of the parameters exceed Nov 2017 the reference limits of corresponding standard. 1 boundary point and 1 sensitive point noise monitoring was Xialu district Construction Construction industry WW-C05-2 taken in daytime with the monitoring results both lower than pipeline Monitoring noise the corresponding reference standard limit values. 1 material field and 1 annex residential area, a total of 2 points (1 points in 1 area) with the monitoring indicators including Construction Jan 2018 Environmental Air inhalable particles, total suspended particulates and the Monitoring monitoring results showed neither of the parameters exceed the reference limits of corresponding standard.

52 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results 1 boundary point and 1 sensitive point noise monitoring was Construction Construction industry taken in daytime with the monitoring results both lower than Monitoring noise the corresponding reference standard limit values. The environment air detection was taken in total 4 points (2 points in a area) of 2 construction areas with the monitoring Environmental Air indicators including NO2, inhalable particles, total suspended Background particulates and the monitoring results were lower than the Dec 2015 Monitoring corresponding reference standard limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and the monitoring results were lower than the corresponding reference standard limits. Construction Aug 2016 1 sensitive point noise monitoring was taken in daytime with Monitoring Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample with monitoring indicators including pH, Sediment Cr (six), Hg, Cu, Pb, Cd, As and the results were all lower Ci Lake than the corresponding reference standards. LR-C01-1 dredging part 1 The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and the monitoring results were lower than the corresponding reference standard limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. Construction Nov 2016 1 sediment sample with monitoring indicators including pH, Monitoring Sediment Cr (six), Hg, Cu, Pb, Cd, As and the results were all lower than the corresponding reference standards. 3 groundwater monitoring points, monitoring parameters including copper, lead, mercury, cadmium, arsenic, chromium six, petroleum, and total coliform; the oil concentration exceed Groundwater the value of the Holland intervention 0.6mg/L standard, total coliform exceeded "water quality standards" (GB T14848-93) Grade IV. Construction The environment air detection was taken in total 2 construction Jan 2017 Environmental Air Monitoring areas with the monitoring indicators including NO2, inhalable

53 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results particles, total suspended particulates, inhalable particles and total suspended particulates exceeded "Ambient air quality standard" (GB3095-2012) Grade II, the maximum exceed multiple were 1.1 times and 1.3 times respectively. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd and As. The concentration of Cd and As Sediment exceeded "soil environmental quality standard" (GB15618- 1995) Grade III, the exceed multiple were 4.6 times and 1.6 times respectively. 3 groundwater monitoring points, monitoring parameters including copper, lead, mercury, cadmium, arsenic, chromium Groundwater six, petroleum, and total coliform; and the results were all lower than "water quality standards" (GB T14848-93) Grade IV. The environment air detection was taken in total 2 construction areas with the monitoring indicators including NO2, inhalable Environmental Air particles, total suspended particulates and the monitoring results were lower than the corresponding reference standard limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample with monitoring indicators including pH, Cr Construction Apr 2017 (six), Hg, Cu, Pb, Cd and As. The concentration of Cd and As Monitoring Sediment exceeded "soil environmental quality standard" (GB15618- 1995) Grade III, the exceed multiple were 2.0 times and 1.3 times respectively. 3 groundwater monitoring points, monitoring parameters including copper, lead, mercury, cadmium, arsenic, chromium six, petroleum, and total coliform; and the total coliform Groundwater concentration exceeded "water quality standards" (GB T14848-93) Grade IV, the maximum exceed multiple was 3.3 times. The environment air detection was taken in total 2 construction areas with the monitoring indicators including NO2, inhalable Construction Jul 2017 Environmental Air particles, total suspended particulates and the monitoring Monitoring results were lower than the corresponding reference standard limits.

54 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd and As. The concentration of Cd and As exceeded "soil environmental quality standard" (GB15618- Sediment 1995) Grade III, Cd concentration is 2.8 times of the reference concentration, while for As it is 2.3.

The environment air detection was taken in total 2 construction areas with the monitoring indicators including NO2, inhalable Environmental Air particles, total suspended particulates and the monitoring results were lower than the corresponding reference standard limits. Construction 1 sensitive point noise monitoring was taken in daytime with Nov 2017 Monitoring Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd and As. The concentration of Cd and As Sediment exceeded "soil environmental quality standard" (GB15618- 1995) Grade III. The environment air detection was taken in total 2 construction areas with the monitoring indicators including NO2, inhalable Environmental Air particles, total suspended particulates. Inhalable particles are found higher than the corresponding limit, the concentration is about 1.1 and 1.4 times of the reference limit. Construction 1 sensitive point noise monitoring was taken in daytime with Feb 2018 Monitoring Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd and As. The concentration of Cd and As Sediment exceeded "soil environmental quality standard" (GB15618- 1995) Grade III. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and Ci Lake LR-C01-2 Aug 2016 Construction the monitoring results were lower than the corresponding dredging part 2 Monitoring reference standard limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value.

55 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results 1 sediment sample was collected from Qingshanhu with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd Sediment and the results were all lower than the corresponding reference standards. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and the monitoring results were lower than the corresponding reference standard limits. Construction 1 sensitive point noise monitoring was taken in daytime with Nov 2016 Monitoring Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample was collected from Qingshanhu with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd Sediment and the results were all lower than the corresponding reference standards. The environment air detection was taken in total 2 construction areas with the monitoring indicators including NO2, inhalable particles, total suspended particulates, Environmental Air inhalable particles and total suspended particulates exceeded "Ambient air quality standard" (GB3095-2012) Grade II, the maximum exceed multiple were 1.1 times and 1.4 times respectively. Construction Jan 2017 1 sensitive point noise monitoring was taken in daytime with Monitoring Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd and As. The concentration of Cd and Sediment As exceeded "soil environmental quality standard" (GB15618-1995) Grade III, the exceed multiple were 4.2 times and 1.8 times respectively. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and the monitoring results were lower than the corresponding Construction reference standard limits. Apr 2017 Monitoring 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample with monitoring indicators including pH, Sediment Cr (six), Hg, Cu, Pb, Cd and As. The concentration of As

56 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results exceeded "soil environmental quality standard" (GB15618- 1995) Grade III, the exceed multiple was 1.1 times. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and the monitoring results were lower than the corresponding reference standard limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. Construction 1 sediment sample with monitoring indicators including pH, Jul 2017 Monitoring Cr (six), Hg, Cu, Pb, Cd and As. The concentration of As is Sediment 2.1 times of the reference concentration in "soil environmental quality standard" (GB15618-1995) Grade III. 3 groundwater monitoring points with monitoring indicators including Cu, Pb, Hg, Cr(six), Cd, petroleum hydrocarbon and total coliform. The results shows that total coliform Groundwater exceeds Groundwater Quality Standard (GB T14848-93), Grade IV, the result is about 241 times of the reference value. The environment air detection was taken in total 2 construction areas with the monitoring indicators including NO2, inhalable particles, total suspended particulates and Environmental Air inhalable particles exceed Environmental Air Quality Standard (GB3095-2012), about 2.3 times of the reference value. 1 sensitive point noise monitoring was taken in daytime with Construction Environmental Noises the monitoring result lower than the corresponding reference Nov 2017 Monitoring standard limit values. 1 sediment sample with monitoring indicators including pH, Sediment Cr (six), Hg, Cu, Pb, Cd and As and the monitoring result lower than the corresponding reference standard limit value. 3 groundwater monitoring points with monitoring indicators including Cu, Pb, Hg, Cr(six), Cd, petroleum hydrocarbon Groundwater and total coliform and the monitoring result lower than the corresponding reference standard limit values. The environment air detection was taken in total 2 Construction construction areas with the monitoring indicators including Jan 2018 Environmental Air Monitoring NO2, inhalable particles, total suspended particulates and 2 points of inhalable particles exceed Environmental Air Quality

57 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results Standard (GB3095-2012), about 1.1 and 1.1 times of the reference value. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit values. 1 sediment sample with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd and As. As and Cr exceed the corresponding reference values. The concentration of Cd Sediment and As are respectively 1.7 and 1.2 times of the reference concentration in "soil environmental quality standard" (GB15618-1995) Grade III. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and the monitoring results were lower than the corresponding reference standard limits. Construction Jul 2018 1 sensitive point noise monitoring was taken in daytime with Monitoring Environmental Noises the monitoring result lower than the corresponding reference standard limit values. 1 sediment sample with monitoring indicators including pH, Sediment Cr (six), Hg, Cu, Pb, Cd and As and the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in total 8 points (2 points in a area) of 2 construction areas and 2 yards with the monitoring indicators including NO2, inhalable particles, total suspended particulates, the monitoring results showed that in Environmental Air construction area there were 2 inhalable particles monitoring points exceeding standard with exceeding multiples to a Construction Oct 2015 maximum of 2 times; 3 suspended particulates monitoring Monitoring points exceeding standard with exceeding multiples to a Qingshanhu maximum of 1.8 times. LR-C01-3 dredging 1 sediment sample was collected from Qingshanhu with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd Sediment and the results were all lower than the corresponding reference standards. The environment air detection was taken in total 8 points (2 points in a area) of 2 construction areas and 2 yards with the Construction Jan 2016 Environmental Air monitoring indicators including NO2, inhalable particles, total Monitoring suspended particulates, the monitoring results showed that in construction area there were 3 inhalable particles monitoring

58 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results points exceeding standard with exceeding multiples to a maximum of 1.1 times. 1 sediment sample was collected from Qingshanhu with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd Sediment and the results were showed that the mercury content exceeded the standard limit of 1. 3 times, copper exceeds the standard limit of 1.2 times. The environment air detection was taken in total 4 points (2 points in an area) of 2 construction areas with the monitoring Environmental Air indicators including NO2, inhalable particles, total suspended Background particulates and the monitoring results were lower than the Dec 2015 Monitoring corresponding reference standard limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and the monitoring results were lower than the corresponding reference standard limits. Construction 1 sensitive point noise monitoring was taken in daytime with Aug 2016 Monitoring Environmental Noises the monitoring result lower than the corresponding reference standard limit value. Qingganghu LR-C01-4 1 sediment sample was collected from Qingshanhu with dredging part 1 monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd Sediment and the results were all lower than the corresponding reference standards. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and the monitoring results were lower than the corresponding reference standard limits. Construction 1 sensitive point noise monitoring was taken in daytime with Oct 2016 Monitoring Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample was collected from Qingshanhu with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd Sediment and the results were all lower than the corresponding reference standards. Construction The environment air detection was taken in total 2 Jan 2017 Environmental Air Monitoring construction areas with the monitoring indicators including

59 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results NO2, inhalable particles, total suspended particulates and the monitoring results were lower than the corresponding reference standard limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd and As. The concentration of Cd Sediment exceeded "soil environmental quality standard" (GB15618- 1995) Grade III, the exceed multiple was 1.3 times. The environment air detection was taken in total 2 construction areas with the monitoring indicators including NO2, inhalable particles, total suspended particulates, Environmental Air inhalable particles exceeded "Ambient air quality standard" (GB3095-2012) Grade II, the maximum exceed multiple was 1.4 times. Construction Apr 2017 1 sensitive point noise monitoring was taken in daytime with Monitoring Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample was collected from Qingshanhu with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd Sediment and the results were all lower than the corresponding reference standards. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates, and the monitoring result shows no items exceed corresponding reference limits. Construction 1 sensitive point noise monitoring was taken in daytime with Jul 2017 Monitoring Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample was collected from Qingshanhu with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd Sediment and the results were all lower than the corresponding reference standards. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Construction NO2, inhalable particles, total suspended particulates, Nov 2017 Environmental Air Monitoring inhalable particles exceeded "Ambient air quality standard" (GB3095-2012) Grade II, the maximum concentration are 2.8 and 2.2 times of the corresponding reference value

60 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample was collected from Qingshanhu with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd Sediment and Cd exceeds the Soil Environment Quality Standard (GB15618-1995), Grade III. Cd concentration is about 2.2 times of the corresponding reference value. The environment air detection was taken in total 2 construction areas with the monitoring indicators including NO2, inhalable particles, total suspended particulates, Environmental Air inhalable particles exceeded "Ambient air quality standard" (GB3095-2012) Grade II, the maximum concentration are 1.2 and 1.8 times of the corresponding reference value Construction 1 sensitive point noise monitoring was taken in daytime with Jan 2018 Monitoring Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 1 sediment sample was collected from Qingshanhu with monitoring indicators including pH, Cr (six), Hg, Cu, Pb, Cd Sediment and Cd exceeds the Soil Environment Quality Standard (GB15618-1995), Grade III. Cd concentration is about 1.6 times of the corresponding reference value. The detection was taken in 4 construction areas which each area with 4 times test. The monitoring parameters included Construction Aug 2016 Ci Lake Water Quality suspended solids, total phosphorus and total nitrogen. All the Monitoring results were in accordance with the "IV" (GB 3838-2002) standard limits The detection was taken in 4 construction areas which each area with 4 times test. The monitoring parameters included Construction Sep 2016 Ci Lake Water Quality suspended solids, total phosphorus and total nitrogen. All the Monitoring results were in accordance with the "IV" (GB 3838-2002) Water Recovery LR-C01-5 standard limits after dredging The detection was taken in 4 construction areas which each area with 4 times test. The monitoring parameters included Construction suspended solids, total phosphorus and total nitrogen. The Oct 2016 Ci Lake Water Quality Monitoring concentration of total nitrogen concentration the 2 test results at 4 points exceeded the IV limit value of “surface water quality standards (GB 3838-2002)" The detection was taken in 6 construction areas which each Construction Nov 2016 Ci Lake Water Quality area with 4 or 5 times test. The test parameters include Monitoring suspended solids, total nitrogen and total phosphorus; 19

61 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results times (68%) of the total phosphorus concentration exceed "surface water quality standards (GB 3838-2002)" IV limit; total nitrogen concentration all exceed the “surface water quality standards (GB 3838-2002)" the IV class limit The detection was taken in 6 construction areas which each area with 4 or 5 times test. The test parameters include suspended solids, total nitrogen and total phosphorus; 21 Construction Dec 2016 Ci Lake Water Quality times (75%) of the total phosphorus concentration exceed Monitoring "surface water quality standards (GB 3838-2002)" IV limit; total nitrogen concentration all exceed the “surface water quality standards (GB 3838-2002)" the IV class limit The detection was taken in 8 construction areas which each area with 4 times test. The test parameters include suspended solids, total nitrogen and total phosphorus; 8 Construction Jan 2017 Ci Lake Water Quality times (25%) of the total phosphorus concentration exceed Monitoring "surface water quality standards (GB 3838-2002)" IV limit; total nitrogen concentration all exceed the “surface water quality standards (GB 3838-2002)" the IV class limit The detection was taken in 8 construction areas which each area with 4 times test. The test parameters include suspended solids, total nitrogen and total phosphorus; Construction Feb 2017 Ci Lake Water Quality 21times (66%) of the total phosphorus concentration exceed Monitoring "surface water quality standards (GB 3838-2002)" IV limit; total nitrogen concentration all exceed the “surface water quality standards (GB 3838-2002)" the IV class limit The detection was taken in 8 construction areas which each area with 4 times test. The test parameters include suspended solids, total nitrogen and total phosphorus; 30 Construction Apr 2017 Ci Lake Water Quality times (94%) of the total phosphorus concentration exceed Monitoring "surface water quality standards (GB 3838-2002)" IV limit; total nitrogen concentration all exceed the “surface water quality standards (GB 3838-2002)" the IV class limit The detection was taken in 8 construction areas which each area with 5 times test. The test parameters include suspended solids, total nitrogen and total phosphorus; 12 Construction May 2017 Ci Lake Water Quality times (30%) of the total phosphorus concentration exceed Monitoring "surface water quality standards (GB 3838-2002)" IV limit; total nitrogen concentration all exceed the “surface water quality standards (GB 3838-2002)" the IV class limit Construction The detection was taken in 8 construction areas which each Jun 2017 Ci Lake Water Quality Monitoring area with 4 times test. The test parameters include

62 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results suspended solids, total nitrogen and total phosphorus; 23 times (71.9%) of the total phosphorus concentration exceed "surface water quality standards (GB 3838-2002)" IV limit; 25 times (78%) of the total nitrogen concentration exceed "surface water quality standards (GB 3838-2002)" IV limit. The detection was taken in 8 construction areas which each area with 4 times test. The test parameters include suspended solids, total nitrogen and total phosphorus; 11 Construction Jul 2017 Ci Lake Water Quality times (34%) of the total phosphorus concentration exceed Monitoring "surface water quality standards (GB 3838-2002)" IV limit; 8 times (25%) of the total nitrogen concentration exceed "surface water quality standards (GB 3838-2002)" IV limit. The detection was taken in 8 construction areas which each area with 1 time test. The test parameters include suspended solids, total nitrogen and total phosphorus; all the total Construction Feb 2018 Ci Lake Water Quality phosphorus concentration exceed "surface water quality Monitoring standards (GB 3838-2002)" IV limit; all the total nitrogen concentration exceed "surface water quality standards (GB 3838-2002)" IV limit. The detection was taken in 6 construction areas which each area with 1 test. The test parameters include suspended solids, total nitrogen and total phosphorus; all the total Construction Jul 2018 Ci Lake Water Quality phosphorus and total nitrogen concentration exceed "surface Monitoring water quality standards (GB 3838-2002)" IV limit; all the total nitrogen concentration exceed "surface water quality standards (GB 3838-2002)" IV limit. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and Construction the monitoring results were lower than the corresponding Aug 2016 Monitoring reference standard limits. Huajiabei 1 sensitive point noise monitoring was taken in daytime with - temporary Environmental Noises the monitoring result lower than the corresponding reference storage yard standard limit value. The environment air detection was taken in total 2 Construction construction areas with the monitoring indicators including Nov 2016 Monitoring Environmental Air NO2, inhalable particles, total suspended particulates and the monitoring results were lower than the corresponding reference standard limits.

63 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and Construction the monitoring results were lower than the corresponding Jan 2017 Monitoring reference standard limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and Construction the monitoring results were lower than the corresponding Apr 2017 Monitoring reference standard limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and Construction the monitoring results were lower than the corresponding Jul 2017 Monitoring reference standard limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in total 2 construction areas with the monitoring indicators including Environmental Air NO2, inhalable particles, total suspended particulates and Construction the monitoring results were lower than the corresponding Nov 2017 Monitoring reference standard limits. 1 sensitive point noise monitoring was taken in daytime with Environmental Noises the monitoring result lower than the corresponding reference standard limit value. 2 sensitive point noise monitoring was taken in daytime with Environmental Air the monitoring result lower than the corresponding reference Construction standard limit value. Jul 2018 Monitoring The Groundwater quality test was taken on 3 points with Groundwater parameters to be copper, lead, mercury, chromium (VI), Cadmium, petroleum hydrocarbon and total coliform. Of

64 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results which 3 points (100%) were detected to be exceeding the Groundwater quality standard (GB 14848-2017) Table I Grade IV, amounting to 4, 101 and 920 times of the corresponding reference limits. The environment air detection was taken in 4 points on construction areas with the monitoring indicators including Environmental Air nitrogen dioxide, inhalable particles, total suspended Construction particulates with the monitoring result lower than the Jul 2018 Monitoring corresponding reference standard limit value 2 sensitive points noise monitoring was taken in daytime Noise once with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 4 points on Phase I of construction areas with the monitoring indicators including Ecological nitrogen dioxide, inhalable particles, total suspended LR-C03-1 Restoration on particulates. The average 24-hour average concentration of the South Shore inhalable particulates and total suspended particulates of of Ci Lake Environmental Air point 3 # on the first day is higher than corresponding Construction reference standard limit value, The test result of the 24-hour Jul 2019 Monitoring average concentration at the # 3 detection point exceeds the standard, the inhalable particles exceed the standard by 0.29 times, and the total suspended particles exceed the standard by 0.66 times. 2 sensitive points noise monitoring was taken in daytime Noise once with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 1 point on construction areas with the monitoring indicators including Environmental Air inhalable particles, total suspended particulates with the Construction monitoring result lower than the corresponding reference Apr 2016 Monitoring standard limit value Qingshanhu 1 sensitive point noise monitoring was taken in daytime with and Qinggang LR-C03-3 Noise the monitoring result lower than the corresponding reference lake Ecological standard limit value. restoration The environment air detection was taken in 1 point on Construction construction areas with the monitoring indicators including Aug 2016 Monitoring Environmental Air inhalable particles, total suspended particulates with the monitoring result lower than the corresponding reference standard limit value

65 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results 2 sensitive points noise monitoring was taken in daytime with Noise the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 1 point on construction areas with the monitoring indicators including Environmental Air inhalable particles, total suspended particulates with the Construction Nov 2016 monitoring result lower than the corresponding reference Monitoring standard limit value 2 sensitive points noise monitoring was taken in daytime with Noise the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 1 point on construction areas with the monitoring indicators including Environmental Air inhalable particles, total suspended particulates with the Construction monitoring result lower than the corresponding reference Jan 2017 Monitoring standard limit value. 2 sensitive points noise monitoring was taken in daytime for w Noise times with the monitoring results exceeded (GB3096-2008) II class limit 60dB(A). The environment air detection was taken in 1 point on construction areas with the monitoring indicators including Environmental Air inhalable particles, total suspended particulates with the Construction monitoring result lower than the corresponding reference Apr 2017 Monitoring standard limit value 2 sensitive points noise monitoring was taken in daytime once Noise with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 1 point on construction areas with the monitoring indicators including Environmental Air inhalable particles, total suspended particulates with the Construction monitoring result lower than the corresponding reference Jul 2017 Monitoring standard limit value 2 sensitive points noise monitoring was taken in daytime once Noise with the monitoring result lower than the corresponding reference standard limit value. Qingshanhu The environment air detection was taken in 4 points on and Qinggang construction areas with the monitoring indicators including Construction LR-C03-4 lake Ecological Jul 2019 Environmental Air nitrogen dioxide, inhalable particles, total suspended Monitoring restoration particulates. The average 24-hour average concentration of Part 2 inhalable particulates and total suspended particulates of point

66 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results 1 # on the first day is higher than corresponding reference standard limit value, 2 sensitive points noise monitoring was taken in daytime once Noise with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 4 points on construction areas with the monitoring indicators including nitrogen dioxide, inhalable particles, total suspended particulates. The 24-hour average concentration of Total suspended particulates and Inhalable particles on the second day of the Near by the construction zones(5#) &(7#)&(8#) Environmental Air were exceeded the limits of“Ambient air quality standard” Construction May 2020 Monitoring (GB 3095-2012) level 2,table 1 and 2., The 24-hour average concentration of Total suspended particulates on the second day of the Near by the construction zones(6#) was exceeded the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 2. 2 sensitive points noise monitoring was taken in daytime once Noise with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 3 point on construction areas with the monitoring indicators including Environmental Air nitrogen dioxide, inhalable particles, total suspended Construction particulates with the monitoring result lower than the Aug 2018 Monitoring corresponding reference standard limit value 1 sensitive points noise monitoring was taken in daytime once Noise with the monitoring result lower than the corresponding reference standard limit value. Downstream The environment air detection was taken in 3 points on wetland for construction areas with the monitoring indicators including Tuanchengshan LR-C04-1-1 Environmental Air nitrogen dioxide, inhalable particles, total suspended WWTP outflow, Construction particulates with the monitoring result lower than the Bid I (LR-C04- Oct 2018 Monitoring corresponding reference standard limit value 1-1) 1 sensitive points noise monitoring was taken in daytime once Noise with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 3 points on construction areas with the monitoring indicators including Construction Jul 2019 Environmental Air nitrogen dioxide, inhalable particles, total suspended Monitoring particulates. The 24-hour average concentration of the total suspended particulate matter on the second day of the

67 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results downstream point 3 # is 0.3 times over corresponding reference standard limit value. The monitoring result of one point near a construction area is Noise lower than the corresponding reference standard limit. The environment air detection was taken in 3 points on construction areas with the monitoring indicators including nitrogen dioxide, inhalable particles, total suspended Environmental Air particulates. The 24-hour average concentration of Inhalable particles on the second day of the Near by the construction zones(2#)was exceeded the limits of“Ambient air quality ” ) Construction standard (GB 3095-2012 level 2,table 1 and 2. May 2020 Monitoring Comparison of the testing results:The noise values of Noise sensitive point within 60 meters of construction area(1#)was below the limits of“Environmental quality standard for noise” Noise (GB 3096-2008) level 2. The noise values of Noise sensitive point within 60 meters of construction area(2#)was exceeded the limits of“Environmental quality standard for noise”(GB 3096-2008) level 2. The environment air detection was taken in 3 points on construction areas with the monitoring indicators including Environmental Air nitrogen dioxide, inhalable particles, total suspended Construction particulates with the monitoring result lower than the Jul 2018 Monitoring corresponding reference standard limit value 1 sensitive points noise monitoring was taken in daytime once Noise with the monitoring result lower than the corresponding reference standard limit value. Downstream wetland for The environment air detection was taken in 3 points on Tuanchengshan construction areas with the monitoring indicators including LR-C04-1-2 WWTP outflow, nitrogen dioxide, inhalable particles, total suspended Bid II (LR-C04- particulates. Downstream point 1 # (second day), point 2 # (first day and second day), point 3 # (first day) total average 1-2) Environmental Air Construction suspended particulate matter concentration in 24 hours is Jul 2019 Monitoring higher than corresponding reference standard limit value and. The average concentration of respirable particulate matter in the downstream wet point 1 # on the second day is higher than corresponding reference standard limit value. The monitoring result of one point near a construction area is Noise lower than the corresponding reference standard limit.

68 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results The environment air detection was taken in 3 points on construction areas with the monitoring indicators including nitrogen dioxide, inhalable particles, total suspended particulates. The 24-hour average concentration of Total Environmental Air suspended particulates and Inhalable particles on the first day Construction May 2020 of the Near by the construction zones(1#) &(2#)&(3#)were Monitoring exceeded the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2. The monitoring result of one point near a construction area is Noise lower than the corresponding reference standard limit.

The environment air detection was taken in 3 points on construction areas with the monitoring indicators including nitrogen dioxide, inhalable particles, total suspended particulates. The 24-hour average concentration of Inhalable particles on the first day of the Near by the construction zones Environmental Air ( 2# ) was exceeded the limits of “ Ambient air quality standard ” (GB 3095-2012) level 2,table 1. The 24-hour Construction average concentration of Inhalable particles on the second Nov 2018 Monitoring day of the Near by the construction zones(1#)was exceeded the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1. Downstream 2 sensitive points noise monitoring was taken in daytime. The wetland for noise values of Noise sensitive point within 60 meters of ( ) Tuanchengshan Noise construction area 2# was exceeded the limits of LR-C04-1-3 WWTP outflow, “Environmental quality standard for noise” (GB 3096-2008) Bid III (LR- level 2. C04-1-3) The environment air detection was taken in 3 points on construction areas with the monitoring indicators including nitrogen dioxide, inhalable particles, total suspended Environmental Air particulates. The 24-hour average concentration of the total Construction Jul 2019 suspended particulate matter on the second day of the Monitoring downstream point 1 # is 0.03 times over corresponding reference standard limit value. The monitoring result of one point near a construction area is Noise lower than the corresponding reference standard limit. The environment air detection was taken in 3 points on Construction construction areas with the monitoring indicators including May 2020 Environmental Air Monitoring nitrogen dioxide, inhalable particles, total suspended particulates. The 24-hour average concentration of Total

69 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results suspended particulates and Inhalable particles on the first day of the Near by the construction zones(1#) &(2#)&(3#)were exceeded the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2. The monitoring result of one point near a construction area is Noise lower than the corresponding reference standard limit. Collected a surface water sample from Xialu harbor , the monitoring parameters included pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum types, Escherichia coli and the monitoring results Surface water showed the monitoring parameters of the COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, Escherichia coli exceeding standards with exceeding Construction multiples to a maximum of 1.2 times, 3.5 times, 1.8 times, 5.2 Oct 2015 Monitoring times, 1.3 times and 80 times. The environment air detection was taken in 3 construction areas, a total of 6 points (2 points in a area) with the monitoring indicators including inhalable particles, total suspended Environmental Air particulates and the monitoring results showed in 1 area there were 2 total suspended particulates monitoring points exceeding standard with exceeding multiples to a maximum of 1.1 times Collected a surface water sample from Xialu harbor, the Upstream LR-C04-2 monitoring parameters included pH, suspended solids, COD, wetland BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum types, Escherichia coli and the monitoring results Surface water showed the monitoring parameters of the BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum types, Construction Escherichia coli exceeding standards with exceeding Jan 2016 Monitoring multiples to a maximum of 1.3 times, 2.1 times, 4.5times, 1.5 times, 7.1 times and 4.6 times. The environment air detection was taken in 3 construction areas, a total of 6 points (2 points in a area) with the monitoring Environmental Air indicators including inhalable particles, total suspended particulates with the monitoring result lower than the corresponding reference standard limit value Collected a surface water sample from Xialu harbor, the monitoring parameters included pH, suspended solids, COD, Construction Apr 2016 Surface water BOD5, ammonia nitrogen, total phosphorus, total nitrogen, Monitoring petroleum types, Escherichia coli and the monitoring results showed the monitoring parameters of the ammonia nitrogen,

70 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results total phosphorus, total nitrogen, Escherichia coli exceeding standards with exceeding multiples to a maximum of 2 times, 2.1 times, 4.1times, and 46 times. The environment air detection was taken in 3 construction areas, a total of 6 points (2 points in a area) with the monitoring Environmental Air indicators including inhalable particles, total suspended particulates with the monitoring result lower than the corresponding reference standard limit value 1 surface water sample was collected from the Xialu harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total phosphorus, total nitrogen, coliform exceeded the standard limits, and the exceeded multiples were 3.9 times, 1.6 times, 5.3 times, 12 times Operation respectively. Jan 2017 Surface Water Monitoring 1 surface water sample was collected from the Donggang harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total phosphorus, total nitrogen, coliform exceeded the standard limits, and the exceeded multiples were 4.4 times, 1.6 times, 6.5 times, 11 times respectively. 1 surface water sample was collected from the Xialu harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total phosphorus, total nitrogen, coliform exceeded the standard limits, and the exceeded multiples were 4.2 times, 1.6 times, 5.6 times, 6.5 times Operation respectively. Feb 2017 Surface Water Monitoring 1 surface water sample was collected from the Donggang harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total phosphorus, total nitrogen, coliform exceeded the standard limits, and the exceeded multiples were 4.1 times, 1.4 times, 5.8 times, 12 times respectively.

71 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results 1 surface water sample was collected from the Xialu harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total phosphorus, total nitrogen exceeded the standard limits, and the exceeded multiples Operation were 3.2 times, 1.5 times, 4.6 times respectively. Apr 2017 Surface Water Monitoring 1 surface water sample was collected from the Donggang harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total nitrogen, coliform exceeded the standard limits, and the exceeded multiples were 3.9 times, 5.8 times, 12 times respectively. 1 surface water sample was collected from the Xialu harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total phosphorus, total nitrogen exceeded the standard limits, and the times of corresponding reference limits were 4.2 times, 2.1 times, 5.8 times Operation respectively. May 2017 Surface Water Monitoring 1 surface water sample was collected from the Donggang harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total phosphorus, total nitrogen exceeded the standard limits, and the times of corresponding reference limits were 5.7 times, 2.2 times, 7.3 times respectively. 1 surface water sample was collected from the Donggang harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total Operation nitrogen, petroleum, coliform, the monitoring results indicated Jun 2017 Surface Water Monitoring that ammonia nitrogen, total phosphorus, total nitrogen exceeded the standard limits, and the times of corresponding reference limits were 4.7 times, 2.7 times, 6.9 times respectively. 1 surface water sample was collected from the Xialu harbor Operation Jul 2017 Surface Water inlet, monitoring parameters including pH, suspended solids, Monitoring COD, BOD5, ammonia nitrogen, total phosphorus, total

72 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total phosphorus, total nitrogen and coliforms exceeded the standard limits, and the times of corresponding reference limits were 3.4 times, 2.1 times, 6.2 and 13 times respectively. 1 surface water sample was collected from the Donggang harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total phosphorus, total nitrogen and coliform exceeded the standard limits, and the times of corresponding reference limits were 4.8 times, 2.7 times, 8.9 and 13 times respectively. 1 surface water sample was collected from the Xialu harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen and total nitrogen exceeded the standard limits, and the times of corresponding reference limits were 3.5 times and 4.6 times, respectively. Operation Aug 2017 Surface Water 1 surface water sample was collected from the Donggang Monitoring harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total phosphorus, total nitrogen exceeded the standard limits, and the times of corresponding reference limits were 7.9 times, 2.6 times, 8.5 times respectively. 1 surface water sample was collected from the Xialu harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total Operation Sep 2017 Surface Water nitrogen, petroleum, coliform, the monitoring results indicated Monitoring that ammonia nitrogen and total nitrogen exceeded the standard limits, and the times of corresponding reference limits were 3.6 times and 4.9 times respectively. 1 surface water sample was collected from the Xialu harbor inlet, monitoring parameters including pH, suspended solids, Operation Oct 2017 Surface Water COD, BOD5, ammonia nitrogen, total phosphorus, total Monitoring nitrogen, petroleum, coliform, the monitoring results indicated that total phosphorus, total nitrogen and coliform exceeded the

73 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results standard limits, and the times of corresponding reference limits were 5.1 times, 2.1 times, 6.0 times respectively. 1 surface water sample was collected from the Donggang harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total nitrogen and coliform exceeded the standard limits, and the times of corresponding reference limits were 4.2 times, 5.4 times, 7.5 times respectively. 1 surface water sample was collected from the Xialu harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total phosphorus, total nitrogen exceeded the standard limits, and the times of corresponding reference limits were 4.5 times, 2.1 times, 6.3 times Operation Nov 2017 Surface Water respectively. Monitoring 1 surface water sample was collected from the Donggang harbor inlet, monitoring parameters including pH, suspended solids, COD, BOD5, ammonia nitrogen, total phosphorus, total nitrogen, petroleum, coliform, the monitoring results indicated that ammonia nitrogen, total nitrogen and coliform exceeded the standard limits, and the times of corresponding reference limits were 4.3 times, 5.4 times, 7.5 times respectively. The environment air detection was taken in 2 material field and 1 annex residential area, a total of 6 points(2 points in a area) with the monitoring indicators including inhalable particles, total suspended particulates and the monitoring results showed in annex residential area there were 2 inhalable Environmental Air particles monitoring points exceeding standard with exceeding Construction Oct 2015 multiples to a maximum of 1.3 times and 7 total suspended Monitoring particulates monitoring points exceeding standard with Transfer SW-C01 exceeding multiples to a maximum of 1.4 times in the above 3 station batch 1 areas except 1 point in the annex residential area. 1 sensitive point noise monitoring was taken in daytime with Construction industry the monitoring result lower than the corresponding reference noise standard limit value. The environment air detection was taken in 2 material field and Construction 1 annex residential area, a total of 6 points(2 points in a area) Jan 2016 Environmental Air Monitoring with the monitoring indicators including inhalable particles, total suspended particulates and the monitoring results

74 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results showed in annex residential area there were 2 inhalable particles monitoring points exceeding standard with exceeding multiples to a maximum of 1.3 times and 7 total suspended particulates monitoring points exceeding standard with exceeding multiples to a maximum of 1.4 times in the above 3 areas except 1 point in the annex residential area. The environment air detection was taken in 2 material field and 1 annex residential area, a total of 6 points (2 points in a area) Construction Apr 2016 Environmental Air with the monitoring indicators including inhalable particles, Monitoring total suspended particulates and the monitoring results lower than the corresponding reference standard limit value 3 transfer stations (Sike transfer station, Yujiashan transfer station and Tiehe road transport station), air detection 3 points at each station including the monitoring indexes of PM10, total Environmental Air suspended particulates, the monitoring results showed that in Construction Aug 2016 the Tiehe road transport station had 2 points total suspended Monitoring particles exceed the standard with 1.77 times 1 sensitive point noise monitoring was taken in daytime at 3 Construction industry stations with the monitoring result lower than the noise corresponding reference standard limit value. Tiehe road transport station, the building materials factory with 3 points of the ambient air detection, monitoring indicators, Environmental Air including respirable particulate matter, total suspended Construction particulate matter, monitoring results showed that all Oct 2016 Monitoring parameters meet the corresponding standard limits 1 sensitive point noise monitoring was taken in daytime at Construction industry Tiehe station with the monitoring result lower than the noise corresponding reference standard limit value. 2 transport stations (Tiehe road transfer station and Guangzhou road transfer station), air detection 3 points at Environmental Air each station including the monitoring indexes of PM10, total suspended particulates with monitoring results lower than the corresponding reference standard limit value. Construction Jan 2017 2 stations, 1 sensitive point noise monitoring was taken in Monitoring daytime at each station, the monitoring result of Tiehe road Construction industry transfer station was exceeded (GB 3096-2008) II class limit noise 60dB(A); the monitoring result of Guangzhou road transfer station was lower than the corresponding reference standard limit value. Construction 3 transport stations (Tiehe road transfer station, Guangzhou Apr 2017 Environmental Air Monitoring road transfer station and Sike transfer station), air detection 3

75 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results points at each station including the monitoring indexes of inhalable particles, total suspended particulates with monitoring results lower than the corresponding reference standard limit value. 1 sensitive point noise monitoring was taken in daytime at 3 Construction industry stations with the monitoring result lower than the noise corresponding reference standard limit value. 3 transport stations (Tiehe road transfer station, Guangzhou road transfer station and Sike transfer station), air detection 3 points at each station including the monitoring indexes of Environmental Air inhalable particles, total suspended particulates with Construction Jul 2017 monitoring results lower than the corresponding reference Monitoring standard limit value. 1 sensitive point noise monitoring was taken in daytime at 3 Construction industry stations with the monitoring result lower than the noise corresponding reference standard limit value. 3 transport stations (Tiehe road transfer station, Guangzhou road transfer station and Sike transfer station), air detection 3 points at each station including the monitoring indexes of Environmental Air inhalable particles, total suspended particulates with Construction Nov 2017 monitoring results lower than the corresponding reference Monitoring standard limit value. 1 sensitive point noise monitoring was taken in daytime at 3 Construction industry stations with the monitoring result lower than the noise corresponding reference standard limit value. The environment air detection was taken in 2 points on each construction areas of Jiangbei Transfer Station, Hekou Transfer Station and Xisai Mountain Transfer Station, and 1 Environmental Air point near the residential area with the monitoring indicators including inhalable particles, total suspended particulates with Construction the monitoring result lower than the corresponding reference Apr 2017 Monitoring standard limit value Transfer 2 points on each construction areas of Jiangbei Transfer SW-C02 station batch 2 Station, Hekou Transfer Station and Xisai Mountain Transfer Noise Station, and 1 sensitive point near the residential area noise monitoring was taken in daytime with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 2 points on each Construction construction areas of Jiangbei Transfer Station, Hekou Jul 2017 Environmental Air Monitoring Transfer Station and Xisai Mountain Transfer Station, and 1 point near the residential area with the monitoring indicators

76 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results including inhalable particles, total suspended particulates with the monitoring result lower than the corresponding reference standard limit value 2 points on each construction areas of Jiangbei Transfer Station, Hekou Transfer Station and Xisai Mountain Transfer Noise Station, and 1 sensitive point near the residential area noise monitoring was taken in daytime with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 2 points on each construction areas of Jiangbei Transfer Station, Hekou Transfer Station and Xisai Mountain Transfer Station, and 1 point near the residential area with the monitoring indicators including inhalable particles, total suspended particulates. Monitoring result of Inhalable particles in Hekou Transfer Environmental Air Station exceeded the reference limit of Environmental Air Quality Standard (GB3095-2012) Grade II, amounting to 2.7 Construction times of the reference limit. Monitoring result of Total Nov 2017 Monitoring suspended particles in Hekou Transfer Station exceeded the reference limit of Environmental Air Quality Standard (GB3095-2012) Grade II, amounting to 3.8 times of the reference limit. 2 points on each construction areas of Jiangbei Transfer Station, Hekou Transfer Station and Xisai Mountain Transfer Noise Station, and 1 sensitive point near the residential area noise monitoring was taken in daytime with the monitoring result lower than the corresponding reference standard limit value. The environment air detection was taken in 2 points on each construction areas of Jiangbei Transfer Station, Hekou Transfer Station and Xisai Mountain Transfer Station, and 1 point near the residential area with the monitoring indicators Environmental Air including inhalable particles, total suspended particulates with the monitoring result lower than the corresponding reference Construction Jan 2018 standard limit value Monitoring 2 points on each construction areas of Jiangbei Transfer Station, Hekou Transfer Station and Xisai Mountain Transfer Noise Station, and 1 sensitive point near the residential area noise monitoring was taken in daytime with the monitoring result lower than the corresponding reference standard limit value.

77 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results The environment air detection was taken in 2 points on each construction areas of Jiangbei Transfer Station and Erqiao Transfer Station, and 1 point near the residential area with the Environmental Air monitoring indicators including inhalable particles, total suspended particulates with the monitoring result lower than the corresponding reference standard limit value Construction Jul 2018 Monitoring 2 points on each construction areas of Jiangbei Transfer Station and Erqiao Mountain Transfer Station, and 1 sensitive point near the residential area noise monitoring was taken in Noise daytime with the monitoring result lower than the corresponding reference standard limit value.

The environment air detection was taken in 2 points on each construction areas of Wangrenzhen Transfer Station and Taizizhen Transfer Station, and 1 point near the residential area with the monitoring indicators including total suspended particulates and inhalable particles. Of which in Wangrenzhen Transfer Station:2 out of 2 points are detected with total suspended particulates surpassing the corresponding reference limits in Environmental Air Quality Standard (GB3095-2012), amounting to 3.3 times and 2.9 times of the reference limite value..2 out of 2 points are detected with Environmental Air inhalable particles surpassing the corresponding reference limits in Environmental Air Quality Standard (GB3095-2012), Transfer Construction amounting to 3.3 times and 2.8 times. Tazizhen Transfer SW-C03 Nov 2018 station batch 3 Monitoring Station:2 out of 2 points are detected with total suspended particulates surpassing the corresponding reference limits in Environmental Air Quality Standard (GB3095-2012), amounting to 2.9 times and 2.8 times.2 out of 2 points are detected with inhalable particles surpassing the corresponding reference limits in Environmental Air Quality Standard (GB3095-2012), amounting to 2.0 times and 2.6 times. 2 points on each construction areas of Wangrenzhen Transfer Station and Taizizhen Transfer Station, and 1 sensitive point Noise near the residential area noise monitoring was taken in daytime with the monitoring result lower than the corresponding reference standard limit value.

78 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results The environment air detection was taken in 3 points on construction areas with the monitoring indicators including nitrogen dioxide, inhalable particles, total suspended particulates. 、Comparison of the testing results:The 24-hour average concentration of Total suspended particulates of Workplace of building materials in Seventh Central Sanitation Base Project batch 3 (1#) & (2#) and Development Avenue Environmental Air Construction Waste Transfer Station Project batch 3 were below the limits May 2020 Monitoring of“Ambient air quality standard” (GB 3095-2012) level 2,table 2. The 24-hour average concentration of Total suspended particulates and Inhalable particles of Residence zone near by the construction site in Seventh Central Sanitation Base Project batch 3 were below the limits of “Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2. The monitoring result of one point near a construction area is Noise lower than the corresponding reference standard limit. 3 points on construction areas, and 1 point near the residential area with the monitoring indicators including inhalable Environmental Air particles, total suspended particulates with the monitoring result lower than the corresponding reference standard limit Construction Aug 2017 value Monitoring 3 points on construction areas, and 1 sensitive point near the residential area noise monitoring was taken in daytime with Noise the monitoring result lower than the corresponding reference standard limit value. 3 points on construction areas, and 1 point near the residential area with the monitoring indicators including inhalable Wastewater particles, total suspended particulates. Monitoring result of treatment and Environmental Air SL-C01 Total suspended particles exceeded the reference limit of disposal Construction Environmental Air Quality Standard (GB3095-2012) Grade II, project of Hexi Nov 2017 Monitoring amounting to 2.2 times of the reference limit. 3 points on construction areas, and 1 sensitive point near the residential area noise monitoring was taken in daytime with Noise the monitoring result lower than the corresponding reference standard limit value. 3 points on construction areas, and 1 point near the residential area with the monitoring indicators including inhalable Construction particles, total suspended particulates. Monitoring result of Jan 2017 Environmental Air Monitoring Total suspended particles exceeded the reference limit of Environmental Air Quality Standard (GB3095-2012) Grade II, amounting to 1.3 times of the reference limit.

79 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June) Contract No. Contract Name Monitoring Date Monitoring period Monitoring content Summary of monitoring results 3 points on construction areas, and 1 sensitive point near the residential area noise monitoring was taken in daytime with Noise the monitoring result lower than the corresponding reference standard limit value.

80 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

The following conclusions are drawn from the above monitoring results: 1. Seventh Central Sanitation Base Project batch 3 (SW-C03). The 24-hour average concentration of Total suspended particulates of Workplace of building materials in Seventh Central Sanitation Base Project batch 3 (1#) & (2#) were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 2. The 24-hour average concentration of Total suspended particulates and Inhalable particles of Residence zone near by the construction site in Seventh Central Sanitation Base Project batch 3 were below the limits of “Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2.

Noise:The noise value of the Construction zones around of Seventh Central Sanitation Base Project batch 3 was below the limits of “Environmental quality standard for noise” (GB 3096-2008) level 2.

2. Development Avenue Waste Transfer Station Project batch 3 (SW-C03) : The 24-hour average concentration of Total suspended particulates of Workplace of building materials in Development Avenue Waste Transfer Station Project batch 3 (1#) & (2#) were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 2. The 24-hour average concentration of Total suspended particulates and Inhalable particles of Residence zone near by the construction site in Development Avenue Waste Transfer Station Project batch 3 were below the limits of “Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2.

Noise:The noise value of the Construction zones around of Development Avenue Waste Transfer Station Project batch 3 was below the limits of “Environmental quality standard for noise” (GB 3096-2008) level 2.

3. Downstream wetland for Tuanchengshan WWTP outflow, Bid 1 (LR-C04-1-1) :The 1-hour average concentration of Nitrogen dioxide, 24-hour average concentration of Total suspended particulates and Inhalable particles of the Near by the construction zones(1#)&(3#)were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2. The 1-hour average concentration of Nitrogen dioxide, 24-hour average concentration of Total suspended particulates and Inhalable particles on the first day of the Near by the construction zones(2#)were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2. The 1-hour average concentration of Nitrogen dioxide and 24-hour average concentration of Total suspended particulates on the second day of the Near by the construction zones(2#)were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2. The 24-hour average concentration of Inhalable particles on the second day of the Near by the construction zones(2#)was exceeded the limits of“Ambient air quality standard” (GB 3095-2012)level 2,table 1 and 2.

81 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Noise: The noise values of Noise sensitive point within 60 meters of construction area(1#) was below the limits of“Environmental quality standard for noise”(GB 3096-2008) level 2. The noise values of Noise sensitive point within 60 meters of construction area(2#)was exceeded the limits of“Environmental quality standard for noise”(GB 3096-2008) level 2.

4. Downstream wetland for Tuanchengshan WWTP outflow, Bid II (LR-C04-1-2), The 1-hour average concentration of Nitrogen dioxide of the Near by the construction zones(1#)&(2#) &(3#)were below the limits of“Ambient air quality standard”(GB 3095-2012) level 2,table 1. The 24-hour average concentration of Total suspended particulates and Inhalable particles on the second day of the Near by the construction zones(1#)&(2#)&(3#)were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2. The 24- hour average concentration of Total suspended particulates and Inhalable particles on the first day of the Near by the construction zones(1#) &(2#)&(3#)were exceeded the limits of “Ambient air quality standard”(GB 3095-2012) level 2,table 1 and 2. Noise: The noise values of Noise sensitive point within 60 meters of construction area(1#) &(2#)were below the limits of“Environmental quality standard for noise” (GB 3096- 2008) level 2. 5. Downstream wetland for Tuanchengshan WWTP outflow, Bid III (LR-C04-1-3), The 1-hour average concentration of Nitrogen dioxide and the 24-hour average concentration of Total suspended particulates of the Near by the construction zones(1#)&(2#)&(3#)were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1. The 24-hour average concentration of Inhalable particles on the first day of the Near by the construction zones(1#)&(3#)were below the limits of“Ambient air quality standard” (GB 3095- 2012) level 2,table 1. The 24-hour average concentration of Inhalable particles on the first day of the Near by the construction zones(2#)was exceeded the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1. The 24-hour average concentration of Inhalable particles on the second day of the Near by the construction zones(2#)&(3#)were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1. The 24-hour average concentration of Inhalable particles on the fsecond day of the Near by the construction zones(1#)was exceeded the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1. Noise: The noise values of Noise sensitive point within 60 meters of construction area(1#) was below the limits of“Environmental quality standard for noise”(GB 3096-2008) level 2. The noise values of Noise sensitive point within 60 meters of construction area(2#)was

82 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

exceeded the limits of“Environmental quality standard for noise” (GB 3096-2008) level 2.

6. Phase II of Ecological Restoration on the South Shore of Ci Lake (LR-C03-2), 1-hour average concentration of Nitrogen dioxide, 24-hour average concentration of Total suspended particulates and Inhalable particles of the Near by the construction zones(1#) &(2#)&(3#) &(4#) were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2.

Noise: The noise values of Noise sensitive point within 60 meters of construction area(1#) was exceeded the limits of“Environmental quality standard for noise”(GB 3096-2008) level 2. The noise values of Noise sensitive point within 60 meters of construction area(2#) was below the limits of“Environmental quality standard for noise” (GB 3096-2008) level 2. 7. Ecological remediation of Qingshanhu and Qinggang lake, Phase II (LR-C03-4), The 1-hour average concentration of Nitrogen dioxide of the Near by the construction zones(5#) &(6#) & (7#)&(8#)were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1. The 24-hour average concentration of Total suspended particulates and Inhalable particles on the first day of the Near by the construction zones(5#) &(7#)&(8#) were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2. The 24-hour average concentration of Total suspended particulates and Inhalable particles on the second day of the Near by the construction zones(5#) &(7#)&(8#)were exceeded the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2. The 24- hour average concentration of Total suspended particulates on the first day and the 24-hour average concentration of Inhalable particles of the Near by the construction zones(6#) were below the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1 and 2. The 24-hour average concentration of Total suspended particulates on the second day of the Near by the construction zones(6#) was exceeded the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 2.

Noise: The noise values of Noise sensitive point within 60 meters of construction area(3#) &(4#)were below the limits of“Environmental quality standard for noise” (GB 3096- 2008) level 2.

Please note that The above is a summary of the semi-annual monitoring results in June 2020.

83 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

6. PUBLIC CONSULTATION AND COMPLAINTS

Public participation includes public consultation and complaints processing. Future plans for public involvement during the design, construction, and operation phases were developed during the Project preparation. These plans include public participation in (i) monitoring impacts and mitigation measures during the construction and operation stages, (ii) evaluating environmental and social benefits impacts, and (iii) interviewing the public after the Project is completed.

According to the EMP requirement, the public consultation plan and implementation status are shown in Table 6.1 below:

Table 6.1 Public Consultation Plan

Organizer Approach Times Subject Participants Status

A. Project Design and Preconstruction Project information, existing environmental Questionnair Residents quality, major impacts e within the Three and HPMO, IA, survey, project’s area of rounds benefits, proposed EIA Institute interviews, influence, and during mitigation measures, On-going and PPTA stakeholder representatives project comments and Consultants visits, and of enterprises preparation recommendations from public and government affected people and hearings agencies stakeholders, proposed GRM. Project information, planned interventions At least once including timeframe, Information All residents for each main IA in within projects component stakeholders On-going Local area of before (contractors, newspaper influence construction IA) and contact information of GRM entry points. Project information, Information planned interventions All residents disclosure on Prior to IA, including timeframe, within construction project contractors, responsibilities, GRM Project On-going site implementat PCU structure and entry boundary are of information ion points, influence boards contact information B. Construction Actual construction Residents impacts, complaints, within comments and Questionnair construction suggestions from e At least once area, IA, HPMO affected Pending survey, or a year and affected public and interviews enterprises and stakeholders; government adjusting mitigation agencies measures if necessary;

84 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

comments to the GRM. Adjustment of Representatives mitigation of Public At least once measures if necessary, residents and Pending workshop a year construction impacts, other comments and stakeholders suggestions C. Operation Effectiveness of Residents and Questionnair At least once mitigation enterprises e in the first measures, impacts of within Not Started survey, or year of operation, comments project’s area of interviews operation and influence recommendations Representatives As needed, Effects of mitigation of Public based on measures, impacts of IA, HPMO residents and Not Started workshop public operation, comments other consultation and suggestions. stakeholders

Evaluation, comments Representatives Public Once after and of satisfaction firstyear of suggestions for each residents and Not Started survey operation component and other subcomponent. stakeholders Evaluation of the project Government (benefits and negative Once after agencies, local IA, HPMO Press impacts), comments first year of media, Not Started and HMG conference and operation interested suggestions during public operation, and public opinions.

The ESMU had already been set up in the HPMO which will be in charge of supervising the implementation of public consultation plan, procedure evaluation and response to affected communities. Meanwhile, the responsible personnel within HPMO and each subcomponent have already been identified.

During the EEM mission, it was observed that the GRM flow chart and environmental information board, including GRM personnel and contact details, were not erected at some project sites which the construction work just stared. Prior to the submission of this report, the construction unit was making the appeal mechanism public board and would erect it in the construction site.

85 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

7. INSTITUTIONAL STRENGTHENING AND TRAINING

Huangshi Environmental Bureau and Loan Implementation Consultant are responsible to provide EMP related trainings, aiming at ensuring smooth implementation of EMP, and better understanding of environmental management goal, methods and practice by stake holders related to all implementing measures and environmental performance monitoring. Training plan during project implementation stage is shown in Table 7.1.

Table 7.1 Institutional Strengthening and Training Program Number Source Period Budget Training Attendees Contents Times of of (CNY) (Day) Person Funds ⚫ ADB’s SPS and other ADB‟s and environmental PRC‟s HPMO, IA, regulations; environmental EFIs, ⚫ Project applicable 2 105 30 10,000 PC laws, OEEs, PRC’s environmental regulations and contractors laws, policies, policies standards and regulations HPMO, ⚫ GRM structure, responsibilities, PPCU, timeframe Grievance IAs, ⚫ Types of grievances; Redress GRM entry 1 1 20 5,000 PIC eligibility assessment Mechanism points, ⚫ Gender responsive HEPB GRM; Reporting HEPB procedures. ⚫ Developing environmental management clauses and incorporating them into construction and Environmental 、 PIUs operational contracts Management POCs、 ⚫ Developing / revising 1 1 25 10,000 PIC 、 Clauses and HPMO environmental Protocols HEPB monitoring clauses; ⚫ Developing environmental emergency response measures HPMO, IA, ⚫ Responsibility and PIUs, EFIs, duties of OEEs, environmental EMP contractors, protection during 2 1 50 40,000 PIC Implementation HEMS, construction stage; HEPB, ⚫ Task of environmental protection and reports; HWRB HPMO, IA, EMP Update ⚫ Review and update of 2 2 20 20,000 PIC PIUs, EFIs, EMP Review and

86 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Number Source Period Budget Training Attendees Contents Times of of (CNY) (Day) Person Funds OEEs, update of contractors, environmental monitoring protocols HEMS, HEPB, HWRB Subtotal 85,000

HPMO、 ⚫ Introduce techniques, Environmental PIUs、 pollution control techniques and 2 1 40 40,000 PCBC 、 facility type and their facilities POCs Contractor functions ⚫ Fundamental knowledge of Wastewater Wastewater management, lake management, dredging, wetland lake dredging, management, wetland HPMO、 lake/river organisms’ management, PIUs、 remediation; 3 2 60 80,000 PCBC lake/river POCs ⚫ International best organisms practice and remediation management senior trainings convention ⚫ Relevant project experiences in the PRC. ⚫ Industrial pollution HMG, control – basic HEPB, principles, Development HPMO and & ⚫ PRC regulations, PRC other and international best 1 1 60 50,000 Implementation PCBC relevant practices of 1 2 30 50,000 authorities, ⚫ Development of IPCAP local industrial pollution control action plan industries (IPCAP) for Huangshi ⚫ GIS and load estimation for point/non-point pollution sources; Lake Basin ⚫ Lake modeling HPMO、 Modeling, (hydraulic and water HWRB、 Integrated lake quality principles); 2 2 30 100,000 PCBC HEPB、 basin ⚫ Eutrophication PIUs management analysis; ⚫ Definition of responsibilities for lake basin model operation and maintenance.

87 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Number Source Period Budget Training Attendees Contents Times of of (CNY) (Day) Person Funds ⚫ Monitoring and HPMO, IA, inspection methods, PIUs, ⚫ QA/QC procedures; Environmental POCs, ⚫ responsibilities for monitoring, contractors, monitoring and 1 1 20 5,000 PCBC inspection, and HEMS, reporting; reporting EFIs, ⚫ Reporting OEEs, requirements; HEPB development of report templates.

⚫ 3R’s (reduce、 Community HPMO、 recycle、reuse); environmental PIUs、 ⚫ Wastewater reduction; and hygiene 2 1 40 50,000 PCBC 、 awareness POCs ⚫ Solid water reduction; planning Contractor ⚫ Community, household and individual hygiene Subtotal 375,000 Total 460,000

Per the requirements of the project, ESD, the project implementation support consultant of the project, listed updated training plans starting from May 2014 in Table 7.2 below.

Table 7.2 List of Upcoming Training Plans

Training Content Time Location Participant Trainer Program Project Establishment of KPI Within 3 Huangshi PMO and Project framework, criteria of months after PMO project manager / Management assessment and benchmark project owners deputy project of KPI, milestone plans, initiation manager and trace of KPI. Preparation of monthly reports; procedures for project progress assessment and reporting; requirements on quality control; principles on dealing with pre-review and post-review contracts, ADB style contract management, management on contract alteration, etc.

Financial Financial management and Within 3 Huangshi PMO and Financial Management; reimbursement procedure; months after PMO project specialist / Environmental Procedures according to project owners Experts on Compliance; ADB requirements on initiation social Management on implementation of development Social environmental and safety Compliance

88 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020 Mar–2020 June)

Training Content Time Location Participant Trainer Program assurance, EMP, and environmental complaints; Measures on social and safety assurance; Prevention and control of infectious disease and AIDs Elimination of inference from communities to the contractors Publicity on prohibition on drug selling and human trafficking

Procurement Principles and procedure Within 3 Huangshi PMO and Project Procedures and of procurement; months after PMO project manager / Management; preparation of initiation owners, deputy project Environmental procurement plans and supervision manager / Protection and procurement documents; personnels Experts on Safety During Mitigation measures on and wastewater or Construction; environmental impacts; managers sludge Operation and safety at construction sites; of treatment / Maintenance of Trainings on Wastewater contractors; environmental Wastewater/ treatment plant and sludge PMO and experts, etc. Sludge treatment plant relevant Treatment Plant departments and Waste of project Classification owners and Transportation

Further to the EEM site visit carried out in June 2015, the visit summary found that the Contractor and Construction Supervision Company (CSC) units general lacked understanding and knowledge on the environmental management requirement and environmental management plan of ADB projects. In this regard, SGS and ESD recommended PMO to organize a purpose-built training on environment management to ensure better implementation of environmental management plan in all subprojects.

The training was organized on 20th July 2015, with environmental experts of ESD and SGS to speak on ADB’s environmental policy and requirement, and the non-compliance findings identified during SGS’s site visit. The training targeted representatives from IAs, Contractors and CSC. The aim was to strengthen the management awareness on environmental protection and management, and a detailed guidance on the implementation of the EMP.

All the training items of the upcoming training plan were completed.

89 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) 8. SITE CONDITIONS OF EACH SUBPROJECT

8.1 KEY ENVIORNMENTAL ISSUES AND STATUS OF RESUMPTION PROJECT

Based on the results of this external environmental monitoring and inspection, the main environmental-related issues of each sub-project need to be taken and the corresponding rectification suggestions are shown in the following table TABLE 8.1 BELOW:

Table 8.1 Main environmental issues and rectification suggestions for each subproject

Contract Contract Contractor Supervision Start date Key Issues Proposed Corrective actions No. Name

C2: Lake Circulation and Ecological Restoration

• • On-site domestic garbage is stacked in the • • Put domestic garbage in the trash can and open air, and oil drums are stacked in the remove the residue on site. Put the equipment Jiangsu Xingye Downstrea open air on the mud. The site is messy and and oil drums indoors to remove the oil on site. Environmental Wuhan m wetland has oil pollution. Group Co., Ltd. Hongyu for LR-C04-1- and Guangdong Construction Tuanchengs Dec 2017 1 Zhujiang Engineering han WWTP Landscape Consulting outflow, Bid Construction Co., Co., Ltd I Ltd.

• • There is serious water accumulation at the • • Remove the accumulated water and remove the Phase II of entrance of the entrance, water stones as soon as possible. Hubei Huatai Ecological accumulation on the construction road, and Changhong Construction Restoration random accumulation of stones LR-C03-2 Construction Supervision June 2019 on the South Group Co., Ltd. Engineering Shore of Ci Co., Ltd. Lake

90 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) 8.2 THE STATUS AND ADEQUACY OF THE COVID-19 (NEW CORONAVIRUS) RESPONSE OF EACH SUB-PROJECT

Due to the impact of the COVID-19 (new coronavirus) epidemic, after the end of March, all sub-projects shall apply according to the national and local documents on the start (resumption) of housing construction and municipal infrastructure projects, and gradually resume construction after obtaining approval. The reference policy documents are as follows:

1. Guofa Dian [ 2020 ] No. 12 - Notice of the State Council on the Joint Prevention and Control Mechanism for the Prevention and Control of the Novel Coronavirus Infection and Pneumonia Epidemic on Issuing the Guidelines for the Prevention and Control of the Epidemic of the Resumption of Work and Production of Enterprises and Institutions in Different Risk Areas across the Country

In order to further promote the full resumption of work and production of enterprises and institutions in low-risk areas across the country, and restore normal production and living order as soon as possible, at the same time, promote high-risk and medium-risk areas to continue to follow relevant requirements such as scientific prevention and control, precise policy implementation, and zoning and grading, and coordinate enterprises The unit’s epidemic prevention and control and resumption of work and production, and orderly restoration of production and living order, have formulated this guide for prevention and control measures. 1. Enterprises and institutions in low-risk areas (1) All units should implement foreign defense import strategies, keep abreast of the flow of employees, and implement health management for personnel from high-risk, medium-risk areas and overseas in accordance with local requirements; for personnel from low-risk areas, such as body temperature If the test is normal, you can start to work, no more obstacles can be set up, and no pre-job isolation is allowed. (2) All units must keep abreast of the physical condition of employees, and when employees are found to have fever or respiratory symptoms, they must arrange for medical treatment in designated hospitals as soon as possible. Once suspected or confirmed cases are found, they must immediately initiate response plans for proper treatment. (3) All units shall maintain ventilation in the workplace. Natural ventilation is preferred when conditions permit. (4) All units shall set up hand-washing facilities or be equipped with non-washing and disinfection supplies in the workplace, and pay attention to the cleaning and disinfection of work and living places.

91 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) (5) During the epidemic prevention period, all units shall minimize the gathering of people and group activities, maintain air circulation in indoor gathering places, strengthen the management of meals for employees, and clean and disinfect canteen tableware. (6) Under the premise of taking effective measures to ensure air circulation in the dormitory of employees, and cleaning and disinfection in place, each unit independently decides the number of personnel arranged in each dormitory. (7) All units must do a good job in the popularization of epidemic prevention and control knowledge, guide and urge employees to increase their awareness of protection, implement personal protection requirements, develop the habit of frequent hand washing, and cover when sneezing or coughing. (8) Employees of all units engaged in work related to hazards such as exposure to dust and chemical poisons shall wear masks in accordance with relevant requirements of occupational health regulations. Other employees may wear masks in accordance with the requirements of the "Public Scientific Wearing Masks Guidelines". The specific units shall be based on their own conditions. Decided. (9) All units must ensure emergency response capabilities to ensure early detection, early reporting, early isolation and early treatment of asymptomatic infections, suspected and confirmed cases, and prevention of cluster epidemics. 2. Enterprises and institutions in high-risk and medium-risk areas On the basis of implementing prevention and control measures for enterprises and public institutions in low-risk areas, all units in high-risk and medium-risk areas shall strengthen employee health monitoring and entry and exit registration management, and conduct temperature testing before employees and outsiders enter the unit or factory, and enter normally ; Implement workplace prevention and control measures, reduce meeting meetings, shorten the time and control the scale of meetings that need to be held, advocate video or telephone conferences, and adopt wrong time commuting, flexible work or home office methods according to the actual situation; guide employees to do well Personal protection, minimize going out, especially avoid places with crowds or poor air mobility; clarify emergency measures and handling procedures for epidemic prevention and control, assign prevention and control responsibilities to departments and individuals, and properly handle abnormal situations. Various specific prevention and control measures continue to be implemented in accordance with the requirements of the "Notice of the State Council's Joint Prevention and Control Mechanism for the Joint Prevention and Control Mechanism of the Novel Coronavirus Infection and Pneumonia on Issuing the Guidelines for the Prevention and Control of the Epidemic Prevention and Control Measures for the Resumption of Work and Production of Enterprises and Institutions.

92 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) 3. Relevant work requirements The people's governments of all provinces, autonomous regions, and municipalities directly under the Central Government shall dynamically adjust the low risk in their jurisdictions in accordance with the requirements of the "Guiding Opinions of the State Council on the Scientific Prevention and Accurate Measures to Prevent and Control the New Coronary Pneumonia Epidemic in the Joint Prevention and Control Mechanism of the State Council on Scientific Prevention and Accurate Measures, Division and Classification" , Medium-risk, and high-risk counties (cities, districts, and flags) are listed and released in a timely manner to strengthen the overall guidance for the prevention and control of the epidemic situation and the resumption of work and production in enterprises and institutions.

2. Guo Invention Power [ 2020 ] No. 13 - Guiding Opinions of the Central Leading Group for Response to the Novel Coronavirus Infection Pneumonia Epidemic on Actively Promoting the Resumption of Work and Production While Effectively Preventing and Controlling the Epidemic

1. Conduct prevention and control of epidemics related to resumption of work (1) Consolidate the main responsibility of local and unit epidemic prevention and control. Strictly implement the requirements of the "Guidelines for the Prevention and Control of Epidemic Prevention and Control Measures for the Resumption of Work and Production of Enterprises and Institutions in Different Risk Areas across the Country", do a good job in the prevention and control of air circulation, cleaning and disinfection in parks, factories, buildings, canteens, dormitories and other places, and strengthen health monitoring and entry and exit registration Manage, keep abreast of employee turnover in a timely manner, implement employee personal protection requirements, and minimize personnel gathering and collective activities. All regions should establish mechanisms to ensure the supply of anti-epidemic materials such as masks,and strive to meet the relevant needs of enterprises and institutions. (2) Combining normalized prevention and control with emergency response. Keep the fever clinic, pre-examination, triage and other systems, standardize the emergency response process of the epidemic, find that employees have fever and respiratory symptoms, immediately arrange for medical treatment in designated hospitals, and immediately initiate the implementation of response plans and implement precise control and control to ensure no

93 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) symptoms Early detection, early reporting, early isolation, and early treatment of infected, suspected and confirmed cases should prevent cluster epidemics. Publish epidemic information in an open and transparent manner, and no concealment or late reporting is allowed. 2. Actively and orderly promote the resumption of work and production (3) Restoring production order by partition and level. Low-risk areas must shift from emergency and super-conventional prevention and control to normalized prevention and control, promptly cancel prevention and control measures that are not compatible with normal production and living order, adjust work focus and response measures according to the time and situation, and do not take approval or filing Delay the resumption of work by other means. Hubei Province, Beijing, and other provinces with medium and high risk counties, wearing masks, etc., must take differentiated measures based on the epidemic prevention and control situation in the region to resume work and production in a safe and orderly manner. (4) Promote the resumption of work and production across the industry chain. Increase factor guarantees, promptly help solve the problems of enterprise employment, capital, raw material supply, and the resumption of major projects, and support core companies in the supply chain to drive upstream and downstream, especially supporting small and medium-sized enterprises, to resume work and production, and ensure that they have an important influence in the global industrial chain Production and export of key products. We will do a good job in agricultural production and stable production and supply of important non-staple foods, and fully resume farmer’s market operations. (5) Promote the service industry to resume work and market. In low-risk areas, the operators independently determine the time to resume work and resume the market. For cultural tourism, catering, and places where the space is closed and crowded, the density of personnel is controlled through appointments, diversion and flow restriction. Under the premise that the prevention and control measures are in place, we will orderly promote the resumption of various shopping malls and markets. National cultural and sports activities and cross-provincial and cross-border tourism will not resume temporarily. Improve the prevention and control measures related to the logistics and express delivery industry, and allow express personnel to enter the community (village) for delivery.

3. Ezhengbanfa [ 2020 ] No. 10 -The General Office of the Provincial People's Government issued a notice on several measures to deal with the impact of the new crown pneumonia epidemic and to do a good job in stabilizing employment

94 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Fully promote the safe and orderly return to work (1) Promote enterprises to resume work and production in an orderly manner. Adhere to zoning, classification, and time-sharing precision prevention and control, improve the convenience of resumption of work and production, cancel unreasonable approvals, and resolutely correct unreasonable regulations restricting workers from returning to work. Accelerate the promotion of employment in manufacturing, construction, logistics, public service, agricultural production and other industries and low-risk areas, and gradually promote employment in other industries and regions. Coordinate and solve the daily needs of protective materials for enterprises that resume work and resume production, and urge them to implement prevention and control measures such as workplaces, canteens and dormitories. Strengthen the labor scheduling guarantee mechanism for key enterprises, and ensure the prevention and control of the epidemic, the operation of public utilities, the needs of people’s lives, and other important national economy and people’s livelihood enterprises, major engineering projects, clarify the list of enterprises, set up service specialists, and establish " employment alliances " and implement " sharing " " Employees " and " replacement of labor " and other methods to guide enterprises in the adjustment of labor shortage. During the epidemic prevention and control period, enterprises that start production and distribute urgently needed materials for epidemic prevention and control can receive a one-time employment subsidy of 2,000 yuan per person if they meet the conditions . (The Provincial Development and Reform Commission, the Provincial Department of Economy and Information Technology, the Provincial Department of Finance, the Provincial Department of Human Resources and Social Security, the Provincial Department of Housing and Urban-Rural Development, the Provincial Department of Transportation, the Provincial Health Commission, and the Provincial Federation of Trade Unions are responsible according to the division of responsibilities) (2) Accelerate the advancement of precision transportation and return to work . Strengthen the safe and orderly return to work service guarantee mechanism for migrant workers, promote mutual recognition of the " health code " of our province with other provinces (regions, cities), and do a good job of health testing, prevention and control protection and transportation guarantees for returning workers to work. Improve the ability to transport and guarantee the concentrated return of workers. Strengthen labor cooperation and docking with importing places, collect and release employment information in a timely manner, and organize and guide laborers to orderly seek employment. A one-time transportation subsidy may be given to those who adopt " point-to-point, one-stop " chartered cars , boxes, and special trains to uniformly organize migrant workers to go out for work across regions. Provide employment and entrepreneurship service subsidies to human resource service agencies and labor brokers that carry out cross-regional

95 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) organized labor export. (The Provincial Public Security Department, the Provincial Department of Finance, the Provincial Department of Human Resources and Social Security, the Provincial Department of Transportation, and the Provincial Health Commission shall be responsible according to the division of responsibilities)

4. Huang Fangzhifa [ 2020 ] No. 94 - Huangshi City's New Coronavirus Pneumonia Epidemic Prevention and Control Headquarters Document: Notice on the start (resumption) of housing construction and municipal infrastructure projects

1. Opening (resumption) time From 3 Yue 15 began, the city's housing construction and municipal infrastructure projects may apply to open (re) work; in accordance with the program approved, you can start. 2. Application process for opening (resuming) work (1) Application The housing construction and municipal infrastructure project construction unit shall submit the project start (resumption) approval application review materials to the housing construction authority of the county (city, district) in accordance with the requirements of "One Form, One Plan, Two Commitments". "One Form": "Application Form for Start (Resumption) of Housing and Municipal Engineering in Huangshi City". "One Plan": According to the "Basic Conditions and Work Requirements for the Start (Resumption) of the Housing Construction and Municipal Infrastructure Project in Huangshi City", the "Project Start (Resumption) Plan" was organized and compiled. The plan must be reviewed and approved by relevant units such as construction, construction, and supervision. "Two Commitments": Enterprise Epidemic Prevention and Control Commitment Letter, Work Safety Responsibility Commitment Letter. (2) Approval After each county (city, district) housing and construction department receives the application (resumption) materials submitted by the project construction unit, it shall organize personnel to complete the data review and on-site verification within 2 days. For eligible projects, the construction unit shall submit the approved "Application Form" to the epidemic prevention and control headquarters of the county (city, district) for approval.

96 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Table 8.1 Implementation status of main epidemic prevention measures for some construction/operation subprojects Based on this external environmental monitoring site inspection, the site policies and measures of each sub-project are summarized in the following table 8.2. See Appendix 2 for details of the response and resumption of epidemic prevention plan for each sub-project. Contract Contract Supervisi Start Contractor On-site epidemic prevention policy Implementation of on-site measures No. Name on date

2:Lake Circulation and Ecological Rehabilitation

Strengthen the disinfection treatment of medical sewage to control the source of the disease; strengthen the safety protection of building drainage and cut off the path of infection at home; improve the operation level of urban sewage and control the final pass. This guide is applicable to designated medical institutions and newly-built temporary medical institutions (including rescue centers and shelter hospitals constructed in Jiangsu Hubei accordance with the "Xiaotangshan" model) in Hubei Province that accept

Wastewat Tianyu Huatai patients or suspected patients with new coronavirus pneumonia. er environme Construct Expropriated various centralized isolation points for sewage treatment, treatment ntal ion operation of urban domestic sewage plants and management of building May.20 SL-C01 and protection Supervisi drainage systems. 17 disposal group on Sewage treatment stations (including septic tanks) of medical project of Municipal Engineeri institutions involved in the epidemic should adopt measures such as Hexi Engineerin ng Co., covering, collecting gas, centralized deodorization and disinfection, g Co., Ltd. Ltd. especially the aeration tanks should prevent droplets from escaping, and avoid virus particles with the gas twice Into the atmosphere. During the new crown pneumonia epidemic, in order to ensure environmental safety, the above requirements should be followed to strengthen the sterilization and disinfection of the sewage discharged from the centralized isolation point. The direct discharge of sewage or the discharge of non-compliant sewage is prohibited, and the second is carried

97 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Contract Contract Supervisi Start Contractor On-site epidemic prevention policy Implementation of on-site measures No. Name on date out at the entrance of the municipal pipeline network (sewage well). Time disinfection treatment.

Offices, canteens, and dormitories must be disinfected regularly, not less than three times a day, and records must be made for each disinfection The leading group inspects the employees’ working areas, living areas, canteens and other places every day, and if they find that they do not meet the requirements, they will immediately make Jiangsu corrections. Xingye The Office of Protection and Emergency Response is Wuhan Downstrea Environme responsible for the new coronavirus pneumonia risk monitoring of Hongyu m wetland ntal Group the project department. Responsible for the health administrative Constructi for Co., Ltd. departments, the Centers for Disease Control and Prevention, LR-C04- on Tuanchengs and Dec 2017 contact your local government to obtain novel coronavirus 1-1 Engineeri han WWTP Guangdong pneumonia epidemic information, when the information is received ng outflow, Zhujiang novel coronavirus pre pneumonia . Should be promptly reported up Consultin Bid I Landscape an emergency office units. g Co., Ltd Constructio Control the entry and exit of personnel, and at the same time n Co., Ltd. conduct health checks on personnel entering and exiting, and immediately isolate and observe those suspected of acute

infectious diseases. Set up a temperature check point at the entrance of the construction site, and personnel entering and exiting will perform temperature check. In particular, the temperature of foreign visitors is checked, masks are issued, and registration is performed.

98 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Contract Contract Supervisi Start Contractor On-site epidemic prevention policy Implementation of on-site measures No. Name on date Disinfect and sterilize. Coronavirus is sensitive to heat, 56 ℃ for 30 minutes, ether, 75 alcohol, chlorine disinfectant, perhydroacetic acid and chloroform and other fetal solvents can effectively inactivate the pathogen. Disinfect construction sites, office areas, dormitories, meeting rooms, etc., and open doors and windows regularly for natural ventilation to improve indoor air quality. Long-term open-air storage of garbage is forbidden on the construction site, and the garbage dump shall be cleaned up in time to prevent the cross flow of sewage. All personnel in the project department, including subcontracted team members, measure their body temperature every morning before going to work and before leaving get off work in the afternoon. People with fever, body temperature over 38 ℃ and general malaise, take antipyretic drugs, such as acethydrolphenol, and conduct isolation observation . The construction area is completely enclosed. The construction site is equipped with continuous fences. Each project site is only set Downstrea Wuhan up with one entrance and exit for personnel and one entrance and m wetland Hongyu exit for vehicles and equipment; only one entrance and exit are set for Teng Constructi in the living area and office area. During the import and export use LR-C04- Tuanchen wangge on Dec 2017 period , personnel must be on duty for 24 hours. The guard should 1-2 gshan Constructio Engineeri wear disposable Medical masks, medical gloves and protective WWTP n Group ng clothing, and temperature correction of the infrared body outflow, Consultin thermometer used. Bid II g Co., Ltd Complete complete disinfection. Before the start of construction, each construction project shall conduct a comprehensive

99 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Contract Contract Supervisi Start Contractor On-site epidemic prevention policy Implementation of on-site measures No. Name on date disinfection of the construction area, living area, and office area. The key parts of the disinfection are the operation room, operation room, work shed, construction sites, offices, dormitories, bathhouses, meeting places, toilets, etc. And door handles and other appliances that people often touch and use. Sufficient material reserves. Equipped with disinfectant, masks, protective clothing, and medical gloves that can be used on site for at least 2 weeks. Emergency vehicles and sufficient thermometers and mercury thermometers should be equipped. There should be more than 2 rooms for personnel isolation and must be equipped on site. The isolation room should be set up separately and away from the crowded area of the construction site. Personnel health requirements. Before all personnel ( including security, cleaning, canteen, commissary and other service personnel ) return to work, the employer must understand and remind the necessary health conditions. Those who can provide a health certificate or health code, and check that they have no symptoms of fever, dry cough, fatigue, etc., can go to work; those who cannot provide valid certificates or who have symptoms of fever, dry cough, fatigue, etc., are strictly prohibited from entering the construction site. During the period of the epidemic, people living in Wuhan shall, in principle, be postponed to return to work and go to work. After the epidemic is controlled, they will be notified to return at a suitable time, or implemented according to the requirements of the provincial and municipal prevention and control headquarters.

100 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Contract Contract Supervisi Start Contractor On-site epidemic prevention policy Implementation of on-site measures No. Name on date Reasonably arrange rework. In accordance with the principle of gradual and orderly progress, each project should adopt the method of starting and resuming work in batches at different peaks to organize personnel to work, and avoid personnel entering the construction site within 15 days before the resumption of work. Fully enclosed control. Strictly implement fully enclosed management at the construction site, register personnel and vehicle entry and exit times one by one, and record key information such as the working position of each team. Outsiders must be approved by the prevention and control team and have a normal body temperature before entering the scene. In principle, outside vehicles are strictly forbidden to enter the scene. All entering vehicles and personnel must be disinfected. Minimize the entry and exit of personnel in the construction site area and the contact of site personnel with the outside world. Strictly check body temperature. All personnel in the construction site, office area, and living area shall measure their body temperature twice a day ( before work, after work, or morning and evening ) , and register truthfully so as to achieve full records, traceability, and query. Designate a person to summarize the health status of employees every day and report to the competent department and the community where the construction project is located. If any abnormal situation is found, it should be reported immediately and corresponding prevention and control measures should be taken.

101 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Contract Contract Supervisi Start Contractor On-site epidemic prevention policy Implementation of on-site measures No. Name on date Strengthen personal protection. All on-site personnel must wear masks, gloves, etc., and take necessary personal protection. Ensure that masks, gloves, etc. are hygienic. In principle, masks are replaced every 4 hours and cannot be reused. Arrange special personnel to carry out daily disinfection work on the construction site in the living area to ensure a sanitary environment. The scope of disinfection is: air disinfection of unmanned spaces in the office and living areas. Spray or wipe countertops, door handles, tables and chairs and armrests, railings, switches, easily accessible walls, wash basins, faucets, toilets and other surfaces that people often touch. Downstrea Wuhan The project strictly implements the real-name management m wetland Hongyu system for migrant workers, establishes personal files for China for Constructi employment status, sets up special personnel records for entry Railway LR-C04- Tuancheng on personal information registration, and the person in charge inquires NO.3 Oct.2018 1-3 shan Engineeri the personnel 's consumption location in the past 14 days through GROUP WWTP ng the mobile phone APP . At the entrances and exits of the living area, Co.,LTD outflow, Consultin temperature monitoring is set up. All personnel entering and exiting Bid II g Co., Ltd need to measure their body temperature. Once a person with abnormal body temperature is found, they should immediately report to the project department office and project manager and send them to the designated fever hospital in Huangshi City. The project cooperates with various labor service units, all living

area management personnel and workers to implement the out-of- office registration policy to control the outgoing of existing personnel in the project and do a good job of tracking. (A sample registration

102 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Contract Contract Supervisi Start Contractor On-site epidemic prevention policy Implementation of on-site measures No. Name on date form for going out is attached). Arrange special personnel for regular purchases to avoid a large number of people going out of Huangshi city, which increases the risk of infection. Epidemic prevention and control supervisors are set up in teams (one in groups of 10 ). Their main duties are to supervise the team members to take body temperature measurements every day and report the epidemic prevention and control situation to the project department on that day. In the canteen, avoid diners gathering in the canteen for intensive dining, and conduct temperature testing of the diners who enter the canteen to prevent virus carriers from entering the canteen. Strengthen food management on construction sites. The system is divided into meals. Diners should be equipped with independent tableware, and set up a special pre- and post-meal washing area. Dining at different peaks is strictly prohibited. The meal should be taken in batches, and the number of people in the batch should be controlled. Each batch should not exceed 5 people, and one batch every 15 minutes. Wear a mask before attending each meeting, and wash your hands and disinfect before entering the meeting room. The meeting personnel are separated by more than 1 meter. Reduce centralized meetings, control meeting time, and keep windows open when the meeting time is too long. Bring your own cups for the meeting. After the meeting, the venue and furniture must be disinfected. Sterilize utensils by soaking in boiling water.

103 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Contract Contract Supervisi Start Contractor On-site epidemic prevention policy Implementation of on-site measures No. Name on date During work in the morning, the vehicle is parked in the designated area as required, and the personnel enter the project department through the front entrance wearing a mask. Before entering, the designated staff will measure the body temperature of the entering personnel. The temperature is lower than 37.3 ℃ before entering the project department; the driver enters the project department Hands should be washed in accordance with regulations; staff breakfast should be completed before entering the Hubei project department. Workers must wear masks when commuting to Phase II of Huatai and from get off work by public transportation, and wash their Ecological Constructi hands promptly after getting off the bus. Changhong Restoration on Those who are found to have a cold, cough, fever, etc. or LR-C03- Constructio on the Supervisio June 2019 suspected persons shall be required to observe at home or seek 2 n Group South n medical treatment, and shall not return to work until they have Co., Ltd. Shore of Ci Engineeri recovered. Lake ng Co., For employees with abnormal body temperature found in the Ltd. office area, please go to the nearest conference room for a break and take a supplementary temperature after 30 minutes. If it still exceeds the standard, please report it immediately and contact the hotline of the project department for medical treatment guide. Employees with fever and physical abnormalities have priority to drive home or seek medical treatment alone. If they have difficulty, they can call 120 ambulances to assist in transportation. If the project department dispatches a car, the driver needs to wear professional protective clothing. Within 20 minutes after the

104 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Contract Contract Supervisi Start Contractor On-site epidemic prevention policy Implementation of on-site measures No. Name on date employee leaves , his work station and place of stay shall be completely eliminated. Keep the office environment clean, open windows regularly and switch on fresh air equipment, maintain ventilation, and keep warm during ventilation. Open windows for ventilation at least 3 times a day, 20-30 minutes each time . Keep the working distance between people at least 1 meter, and wear masks when working with multiple people. Special garbage bins for discarded masks are set up in the office area. During the epidemic prevention period, 75% alcohol or chlorine-containing disinfectant is used twice a day to disinfect the garbage bins.

4:Solid Waste Management

1. Establish an organization. The construction unit takes the 1. The construction area is completely lead in establishing a project safety production and epidemic closed. Construction site provided with a Guangdon prevention and control team, establishing a project epidemic continuous enclosure, the project site is g prevention and control system covering all participating units of the set only a staff entrance, a vehicle TianHeng Chidong project, and setting up an epidemic prevention and control team. equipment entrance; living area, office Transfer Engineeri Constructio Hui, the project leader of the Huangshi City Management area only provided with a entrances, must SW-C03 station ng July 2019 n Group Committee, served as the team leader; Chen Jiaming, the project arrange for export during use 24- hours batch 3 Consultin Co., Ltd manager, Liu Tianrong, the deputy project manager, and Liu on duty, on duty personnel should wear g Daorong, the project director, served as the deputy team leaders, disposable medical Masks, medical Supervisio and key position management personnel such as the technical gloves and protective clothing, as well as n Co., Ltd leader, safety director, and construction staff served as team temperature correction for the infrared members , And appointed a full-time epidemic prevention thermometer used.

105 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Contract Contract Supervisi Start Contractor On-site epidemic prevention policy Implementation of on-site measures No. Name on date commissioner Zhang Zhisheng at the construction site to be 2. Complete complete disinfection. responsible for sanitation and epidemic prevention. The team Before the start of construction, complete members perform their duties and are responsible for organizing disinfection of the construction area, living and carrying out safety self-inspection, epidemic prevention and area, and office area. The key parts of the control, and docking with local authorities. Ensure the work of disinfection are the operation room, safety production and epidemic prevention and control teams. workshop, building structure and other 2. Clear the division of responsibilities. The construction unit is construction sites, offices, dormitories, responsible for the epidemic prevention and control work, bathhouses, meeting places, toilets, and establishes a project safety production and epidemic prevention door handles. , The equipment used. and control organization mechanism, comprehensively organizes, 3. Sufficient material reserves. coordinates, and handles the construction site epidemic prevention Equipped with disinfectant, masks, and control, and fully implements the management requirements of protective equipment, and medical gloves the construction department and the health and epidemic that can be used on site for at least 2 prevention department . It is not allowed to request the construction weeks. Emergency vehicles and sufficient unit for reasons such as the tight schedule or in a disguised form to thermometers and mercury thermometers request the construction unit to start work without filing or should be equipped. There should be implementing epidemic prevention and hunting measures. The more than 2 rooms for personnel isolation construction unit is responsible for establishing a safety production and necessary Living facilities and and epidemic prevention and control system covering all supplies, the high-rise rooms should be professional contracting, labor subcontracting and other units, set up separately and away from the formulating and implementing various specific plans and measures crowded areas of the construction site for safety production and epidemic prevention and control at the 4. Life is guaranteed. Establish life construction site, and responsible for the management of on-site procurement channels and strictly management personnel and migrant workers. Real-name implement sanitary standards for food management and closed management. The supervision unit is procurement, processing, and preparation responsible for reviewing relevant plans, measures and their . Hand washing points are set up in the

106 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June) Contract Contract Supervisi Start Contractor On-site epidemic prevention policy Implementation of on-site measures No. Name on date feasibility, and checking their implementation. Guide and supervise office area, dormitory area, construction the implementation of various measures for safety production and area personnel entrances and exits, epidemic prevention and control at the construction site, and find toilets, canteens, etc., equipped with hidden dangers of safety accidents and inadequate implementation hand sanitizer. of epidemic prevention and control instructions, promptly supervise the construction unit to make rectification, and the construction unit should promptly report to the construction unit if it refuses to make rectification Report with the local housing construction management department.

107 Mar 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June)

9. CONCLUSION

During the period from March to June 2020, the project has successively entered into the epidemic resumption stage with civil construction contracts, and some projects have completed the completion acceptance. Compared with previous construction projects, the environmental management measures of the projects that are still under construction have gradually improved.

In terms of operation project management, according to the on-site inspection, the existing problems mainly include the following items:

1. Wastewater treatment and disposal project of Hexi(SL-C01), after the completion and acceptance in April 18 , the latest wastewater discharge test report was not provided.

2. Transfer station batch 2(SW-C02), only the civil engineering completion acceptance materials were provided at the second phase of the transfer station, and the environmental protection completion acceptance monitoring report was not provided, and the pollution discharge permit was provided on site.

In terms of environmental management at the construction site, according to the site inspection, the environmental problems on site mainly include the following items:

1. Downstream wetland for Tuanchengshan WWTP outflow, Bid I(LR-C04-1-1), the site is messy, and domestic garbage is piled in the open air on the mud. The 24-hour average concentration of Inhalable particles on the second day of the Near by the construction zones(2#)was exceeded the limits of“Ambient air quality standard” (GB 3095-2012)level 2,table 1 and 2.

2. Downstream wetland for Tuanchengshan WWTP outflow, Bid II(LR-C04-1-2), The 24-hour average concentration of Total suspended particulates and Inhalable particles on the first day of the Near by the construction zones(1#) &(2#)&(3#)were exceeded the limits of“Ambient air quality standard”(GB 3095-2012) level 2,table 1 and 2.

3. Downstream wetland for Tuanchengshan WWTP outflow, Bid III,(LR-C04-1-3)the on-site oil drums are stacked on the muddy ground in the open, and the site is messy and has oil pollution. The 24-hour average concentration of Inhalable particles on the first day of the Near by the construction zones(2#)was exceeded the limits of“Ambient air quality standard” (GB 3095-2012) level 2,table 1;The noise values of Noise sensitive point within 60 meters of construction area(2#)was exceeded the limits of“Environmental quality standard for noise ” (GB 3096-2008) level 2.

4. Phase II of ecological restoration on the south shore of Ci Lake(LR-C03-2)has water accumulation at the entrance gate. The noise values of Noise sensitive point within 60 meters of construction area(1#)was

108 June 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June)

exceeded the limits of“Environmental quality standard for noise”(GB 3096-2008) level 2.

5. Ecological remediation of Qingshanhu and Qinggang lake, Phase II(LR-C03-4), the project is at a standstill. The problem of where the sludge was previously raised has been clarified. The sludge from Qinggang Lake is solidified on site and transported to Houhu, Yangye Town, City for backfilling.

The 24- hour average concentrations of inhalable particulate matter and total suspended particulate matter at points 5# & 7# & 8# near the project construction area were higher than those in the "Ambient Air Quality Standards" ( GB 3095-2012 ) Table 1 and Table 2 requirements for the concentration limits of the secondary standards; the 24- hour average concentration of total suspended particulates at point 6# near the construction area on the second day is higher than the "Ambient Air Quality Standards" ( GB 3095-2012 ) Table 2 Concentration limit requirements of the secondary standard; noise sensitive point 1# within 60 meters of the project area is higher than the requirements of the category 2 limit of the "Environmental Quality Standard for Acoustics" ( GB 3096-2008 ) .

Appendix I summarizes all the key issues identified during the site inspection and the corresponding corrective measure. Project owners carried out rectification measures on the projects under their management and most of the problems had been rectified.

109 June 2020 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June)

APPENDIX I

KEY ISSUES AND CORRECTIVE ACTIONS

110 June 2020 ADB Loan 2940 P-CB03 - Comprehensive Water Pollution Control Project in Huangshi, Hubei, External Environmental Monitoring The Recification Plan of The 13th Investigation Monitoring Date 22-24 June, 2020 Inspector Anthony QIU, Marcus Zhuang

Responsible Contract No Problem Description Problem Reference Photo (If Any) Improvement Recommendations Priority Rectification description Reference Photo After Improvement(If Any) State Entity

Regularly entrust an external third party to inspect the wastewater in the main outlet of the sewage treatment Wastewater The latest wastewater discharge facility, covering the standards treatment and test report was not provided after mentioned in the EMP plan during the disposal project 1 N/A the completion and acceptance operation period: of Hexi in April 2018 Discharge standard of municipal (SL-C01) sewage treatment plant (GB18918- 2002) Class 1B standard (Hexi sewage treatment plant)

Jiangsu Xingye Environmental Group Co., Ltd. On-site domestic garbage is Put domestic garbage in the trash bin Domestic garbage has been and Guangdong 1 stacked in the open air on the and main the hygiene of the working High transported away and the site has Closed Zhujiang mud environment. been cleaned up Landscape Construction Co., Ltd.

Downstream wetland for Tuanchengshan WWTP outflow, Bid I (LR-C04-1-1)

Jiangsu Xingye Environmental The oil drums on site were Group Co., Ltd. The oil drums on site have been stacked in the open air on the Put the equipment and oil drums and Guangdong 2 High placed indoors, and the oil has been Closed mud, the site was messy and oily indoors to remove the oil on site. Zhujiang removed pollution. Landscape Construction Co., Ltd.

1 ADB Loan 2940 P-CB03 - Comprehensive Water Pollution Control Project in Huangshi, Hubei, External Environmental Monitoring The Recification Plan of The 13th Investigation Monitoring Date 22-24 June, 2020 Inspector Anthony QIU, Marcus Zhuang

Responsible Contract No Problem Description Problem Reference Photo (If Any) Improvement Recommendations Priority Rectification description Reference Photo After Improvement(If Any) State Entity

Changhong Serious water accumulation at Water accumulated at the entrance 1 Remove stagnant water Medium Construction Group Closed the entrance door door has been cleared Co., Ltd.

Phase II of ecological restoration on the south shore of Ci Lake (LR-C03-2)

This project has been started Immediately set up the GRM Changhong Water and rocks on the road area 2 without posting GRM borad set information boards in an obvious Medium Construction Group Closed have been removed up in the construction area. location of the site Co., Ltd.

It is necessary to conduct environmental completion acceptance The site of the second phase of Transfer Stain monitoring and apply for a pollutant the transfer station only provided Batch 2 1 discharge permit according to the the completion acceptance data (SW-C02) pollutant parameters involved in the of the civil engineering EIA and the limits of relevant laws and regulations

2 ADB Loan 2940 P-CB03: Hubei Huangshi Urban Pollution Control and Environmental Management Project - External Environment Monitor Semi-Annual External Environmental Monitoring Report(2020.Mar-2020.June)

APPENDIX II

EPIDEMIC RESPONSE PLAN FOR EACH SUBPROJECT

111 June 2020 亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

80

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

81

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

82

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

83

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

84

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

85

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

86

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

87

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

88

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

89

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

90

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

91

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

92

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

93

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

94

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

95

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

96

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

97

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

98

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

99

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

100

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

101

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

102

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

103

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

104

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

105

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

106

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

107

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

108

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

109

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

110

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

111

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

112

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

113

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

114

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

115

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

116

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

117

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

118

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

119

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

120

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

121

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

122

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

123

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

124

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

125

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

126

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

127

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

128

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

129

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

130

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

131

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

132

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

133

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

134

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

135

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

136

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

137

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

138

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

139

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

140

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

141

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

142

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

143

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

144

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

145

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

146

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

147

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

148

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

149

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

150

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

151

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

152

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

153

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

154

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

155

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

156

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

157

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

158

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

159

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

160

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

161

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

162

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

163

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

164

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

165

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

166

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

167

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

168

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

169

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

170

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

171

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

172

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

173

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

174

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

175

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

176

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

177

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

178

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

179

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

180

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

181

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

182

亚行湖北黄石水污染综合治理项目 外部环境监测半年度环境监测报告 (2020 年 3 月 – 2020 年 6 月底)

183