Development Application

Proposed Road House |Lot 101 Forrest , Vittoria

PREPARED BY HARLEY DYKSTRA PTY LTD FOR SARACEN DEVELOPMENTS PTY LTD

DOCUMENT CONTROL

Control Version Date Status Distribution Comment A 25 October 2017 Draft Client Draft for Comment and Approval Local For Preliminary Consideration B 5 December 2017 Final Authority C 10 May 2018 Final JDAP For Determination

Prepared for: Saracen developments Pty Ltd

Prepared by: DM

Reviewed by: LB

Date: 10 May 2018

Job No: 21169

Version: C

DISCLAIMER

This document has been prepared by HARLEY DYKSTRA PTY LTD (the Consultant) on behalf of the Client. All contents of the document remain the property of the Consultant and the Client except where otherwise noted and is subject to Copyright. The document may only be used for the purpose for which it was commissioned and in accordance with the terms of engagement for the commission.

This document has been exclusively drafted. No express or implied warranties are made by the Consultant regarding the research findings and data contained in this report. All of the information details included in this report are based upon the existent land area conditions and research provided and obtained at the time the Consultant conducted its analysis.

Please note that the information in this report may not be directly applicable towards another client. The Consultant warns against adapting this report's strategies/contents to another land area which has not been researched and analysed by the Consultant. Otherwise, the Consultant accepts no liability whatsoever for a third party's use of, or reliance upon, this specific document.

Development Application- Lot 101 , Vittoria i | P a g e

CONTENTS

DOCUMENT CONTROL ...... i DISCLAIMER ...... i

CONTENTS ...... ii

1. INTRODUCTION ...... 1 2. SITE CONTEXT ...... 1

2.1 Site Title Description ...... 1

2.2 Site Location and Characteristics ...... 1 2.3 Landform, Soils and Hydrology ...... 2

2.4 Bushfire Hazard ...... 3

2.5 Zoning ...... 4

2.5.1 Greater Bunbury Region Scheme (GBRS) ...... 4 2.5.2 Local Planning Scheme No. 8 ...... 5 2.6 Servicing ...... 6

2.6.1 Reticulated Sewer ...... 6 2.6.2 Power Supply ...... 6 2.6.3 Water Supply ...... 6 2.6.4 Telecommunications ...... 6 3. APPLICATION DETAILS ...... 7 3.1 Development Summary ...... 7

3.2 Building Design and Site Layout ...... 7 3.3 Access and Car Parking ...... 8

3.4 Stormwater Management ...... 9

4. PLANNING CONSIDERATIONS ...... 10 4.1 Greater Bunbury Region Scheme ...... 10

4.2 City of Bunbury Local Planning Scheme No.8 ...... 10

4.2.1 Land Use Permissibility ...... 10 4.2.2 Special Control Areas ...... 11 4.2.2 Development Standards ...... 13

4.3 City of Bunbury Local Planning Strategy ...... 14 4.4 Bunbury Port Inner Harbor Structure Plan ...... 14

4.5 Development Control Policy 1.10 ...... 15 4.6 Local Planning Policy – Signage and Advertisements ...... 16

4.7 EPA Guidance No.3 – Separation Distances between Industrial and Sensitive Uses ...... 17

5. CONCLUSION ...... 17

Development Application- Lot 101 Forrest Highway, Vittoria ii | P a g e

1. INTRODUCTION

This submission has been prepared by Harley Dykstra on behalf of on behalf of Saracen Property Pty Ltd.

This application seeks development approval for a Road House (and associated pylon signage) at Lot 101 Forrest Highway, Vittoria (the ‘subject site’). The purpose of this report is to present details and justification for the proposed development to assist the Southern Joint Development Assessment Panel (JDAP) in determining this application.

The siting and design of the proposed Road House is shown on the attached Development Plans (Appendix A). It is respectfully requested that the JDAP favourably consider the proposal for a Road House at Lot 101 Forrest Highway, Vittoria to enable the development to proceed.

2. SITE CONTEXT

2.1 SITE TITLE DESCRIPTION

Lot 101 Forrest Highway (Lot 101 on Diagram 93343) has a total lot area of 0.7351 ha. The site is contained on Certificate of Title Vol. 2146 Fol. 208. The registered proprietor is Victor John Howes. A copy of the Certificate of Title is attached at Appendix B.

2.2 SITE LOCATION AND CHARACTERISTICS

The site is situated approximately 4km east of the Bunbury City Centre, on the north side of the Forrest Highway, east of Vittoria Road (refer to Figure 1 below). The site is immediately north-east of the Bunbury Farmer’s Market, on the opposite side of Forrest Highway.

Figure 1 – Location Plan (subject site outlined in red)

Development Application- Lot 101 Forrest Hwy, Vittoria 1 | P a g e

The subject site contains a shed, but is otherwise vacant and has been predominantly cleared of vegetation in the past, consistent with its use for low key rural purposes. An Aerial Photograph is included as Figure 2 below which depicts the nature of existing land use.

Figure 2 – Aerial Photograph

2.3 LANDFORM, SOILS AND HYDROLOGY

The subject site is relatively flat, having a height of approximately 2m AHD. A Feature Survey of the subject site is included as Appendix C.

Structerre Consulting Engineers undertook geotechnical investigations over Lot 101 Forrest Highway on 29 May 2017. A copy of the resultant Geotechnical Investigation report is included at Appendix D.

The average subsurface soil profile encountered comprised topsoil to 0.3m, sand to 1.3m overlying the clayey SAND trace gravel to an averaged depth of 1.7m, and underlain with the medium dense to dense, locally loose sand to the investigated depth of 2.5m. The Geotechnical Assessment of Lot 101 Forrest Highway reports that the water table was encountered at a depth of 1.4m below the existing ground level.

A search of the Shared Land Information Platform was conducted in June 2017 in order to ascertain the risk of Acid Sulfate Soils (ASS) on the site. Whilst the search indicates there is a high to moderate risk of ASS occurring within 3m of natural soil surface over the site, no deep excavation is proposed and in fact the site will be filled. Appropriate management of any actual ASS encountered onsite would be undertaken at construction stage.

Development Application- Lot 101 Forrest Hwy, Vittoria 2 | P a g e

2.4 BUSHFIRE HAZARD

Lot 101 is not designated as bushfire prone by the Fire and Emergency Services Commissioner as illustrated on the Department of Fire and Emergency Services mapping at Figure 3 below.

Figure 3 – Bushfire Prone Areas Mapping (subject area marked in red)

Development Application- Lot 101 Forrest Hwy, Vittoria 3 | P a g e

2.5 ZONING

2.5.1 Greater Bunbury Region Scheme (GBRS)

The subject site is zoned ‘Rural’ under the Greater Bunbury Region Scheme (GBRS). The site is adjoined by Forrest Highway to the south, which is a Primary Regional Road. Immediately adjoining land to the north, east and west is also zoned Rural. Further to the north- west of the subject site, land is predominantly reserved for ‘Port Installations’. To the south of Forrest Highway, land is zoned ‘Urban’ (Refer to Figure 4 below).

Figure 4 – GBRS zoning (subject site outlined in red)

Development Application- Lot 101 Forrest Hwy, Vittoria 4 | P a g e

2.5.2 City of Bunbury Local Planning Scheme No. 8

The subject site is zoned ‘Rural’ under the recently gazetted City of Bunbury Local Planning Scheme No. 8 (LPS 8). Lot 101 is included within a ‘Development Area’ Special Control Area (SCA). The subject site is also partially affected by the ‘Flood Prone Areas’ SCA. Figure 5 below depicts the Rural zoning of the site and surrounds under LPS 8 and the SCA overlays. The Purpose, Objectives and Additional provisions relevant to the SCAs are set out in Schedule 7 – Table 10 of LPS 8. Further details are provided at section 4 of this Report.

Figure 5 – LPS 8 zoning (subject site outlined in red)

Development Application- Lot 101 Forrest Hwy, Vittoria 5 | P a g e

2.6 SERVICING

2.6.1 Reticulated Sewer

Existing Water Corporation sewer infrastructure is located on the south side of Forrest Highway. An extension will be required across Forrest Highway in order to service Lot 101. It is anticipated current sewer invert levels (1.1m AHD – 1.45m AHD) are able to accommodate development on Lot 101, based on a typical 1:200 fall. In this regard, the Department of Water and Environment Regulation (DWER) have advised the existing level of Lot 101 will need to be filled to approximately 3.5m AHD to achieve adequate flood protection into the future.

2.6.2 Power Supply

Currently power infrastructure is available on the north side of Forrest Highway, with underground services being available at Johnston Road. An extension will be required to provide power to Lot 101.

2.6.3 Water Supply

Reticulated water is currently available at the Johnston Road/Forrest Highway on the north side of the Highway. A mains extension will be required from Johnston Road to service Lot 101 via a 100AC Aqwest main.

2.6.4 Telecommunications

Telstra and the NBN network are available at the corner of Johnston Road and Forrest Highway on the north side of the highway and could be extended to service Lot 101.

Development Application- Lot 101 Forrest Hwy, Vittoria 6 | P a g e

3. APPLICATION DETAILS

3.1 DEVELOPMENT SUMMARY

This application seeks Development Approval for a Road House comprising the following components:

 A service station with fuel refilling (4 bowsers/8 refueling bays) and associated canopy;  A convenience store of 199m2 Gross Floor Area (GFA);  Fast Food outlet 150m2 in area;  Take Away coffee outlet 138m2 in area;  Signage, including two (2) pylon signs adjacent to Forrest Highway;  Car parking and landscaped areas;  Emergency vehicle breakdown area;  Parking for freight vehicles and coaches; and  Outdoor rest stop facilities.

An area has also been set aside for ‘Future Development’ which is subject to further planning and does not form part of this application.

The siting, layout and design of the Road House is illustrated on the Development Plans at Appendix A.

3.2 BUILDING DESIGN AND SITE LAYOUT

Building design has been undertaken to reflect the requirements of the primary tenant of the Road House facility. The site layout has also been informed by a Traffic Impact Assessment (included at Appendix E) and as such has been designed to accommodate safe and efficient traffic circulation through the site.

The fuel pump area and associated canopy is setback 14.8m from Forrest Highway. An underground tank farm will be located adjacent to the canopy, with landscaping provided adjacent to Forrest Highway.

The setbacks provided to other lot boundaries follows:

 Western (side) setback (awning): 4.7m  Northern (rear) setback (awning): 5.3m  Eastern (side) setback (awning): 1.2m

Development Application- Lot 101 Forrest Hwy, Vittoria 7 | P a g e

3.3 ACCESS AND CAR PARKING

Access to the Road House will be via a left turn pocket which shall be constructed on Forrest Highway to provide for a ‘left in’ only arrangement adjacent to the western lot boundary. A ‘left out’ arrangement will enable vehicles to exit the site adjacent to the eastern boundary and continue east bound along Forrest Highway.

The Traffic Impact Assessment (TIA) prepared by Transcore (Appendix E) confirms the access and egress arrangements will not impact on the safe and efficient function of Forrest Highway and further, can be integrated with future access arrangements for other lots fronting Forrest Road when land use planning for these lots is progressed at a later stage. The interim and ultimate access arrangements are detailed in the TIA.

Detailed turn path analyses have been undertaken which demonstrate B-Doubles (the largest heavy vehicles that will enter the site) can be accommodated as well as all other traffic movements anticipated to occur within the development.

The car parking requirements for the facility have been considered having regard to Table 7 – Car Parking Table of LPS 8.

Car Parking Table – LPS 8

LAND USE CLASSES MINIMUM CAR PARKING REQUIREMENTS Fast Food Outlet • 1 bay per 15 square metres of nla; plus • a car queuing area sufficient to accommodate 10 cars where drive through facilities are included. Road house • 4 bays per workshop and/or service bay, plus 1 bay per employee. • In addition to the service station use, car parking bays are to be provided for each additional land use (e.g. convenience store, fast food outlet, lunch bar, restaurant / café and short-term accommodation uses) in accordance with the Car Parking Table. Service Station • 4 bays per workshop and/or service bay; plus • 1 bay per employee. Shop 1 bay per 20 square metres of nla.

The proposed development provides 47 car parking bays, including one electric vehicle charging station and three (3) ACROD bays. The development also provides additional vehicle parking spaces at the fuel bowsers (8 fuelling positions), plus additional stacking positions within the driveway system.

In addition to the car bays, small truck and caravan parking is provided, as well as freight vehicle and coach parking capable of accommodating three (3) B-Double vehicles.

The proposed car parking arrangements have been considered by Transcore as part of the TIA, which concludes the proposed number of bays is suitable for a development of this type and accordingly, car parking arrangements satisfy the car parking standards prescribed by LPS 8.

Development Application- Lot 101 Forrest Hwy, Vittoria 8 | P a g e

3.4 STORMWATER MANAGEMENT

A Stormwater Management Plan and supporting technical note has been prepared by Wood and Grieve Engineers which is included at Appendix F. The Stormwater Management Plan demonstrates all drainage up to the 100ARI event can be accommodated on site, using a combination of bio- filtration basins/swales and cell storage.

Drainage management shall also include a suitable hydro-carbon interceptor to capture incidental spillages during tank filling and dispensing. Such systems form part of the design of all modern service station developments and are used as a matter of standard practice by the major fuel retailers.

Hardstand areas, car parking and access ways shall be designed to ensure that any fuel spills area are precluded from contact with uncontaminated storm water. Any liquid runoff within these areas will be directed to an oil/water separator for treatment.

Hydro-carbon interceptors (such as the SPEL puraceptor) address pollution prevention, as well as storm water treatment and hydrocarbon capture as follows:

 Are tested and certified to independent European Standard BSEN 858- 1:2002 for the capture and retention of hydrocarbons with a hydrocarbon content of less than 5ppm and discharge quality exceeding the required ‘no visible trace’ from a tested inflow concentrator of >5,000ppm;  Include integrated alarm and monitoring systems to alert operators with an audible alarm when the oil level reaches 10% of total storage volume providing early warning in the case of a spill or lack of maintenance; and  Include an integrated auto closure device which is activated when the maximum storage capacity of light liquid (oil) containment is reached. No bypass device is installed to prevent trace hydrocarbons discharging to the storm water network even in the unlikely scenario of the entire volume of a refueling tanker compartment being spilled in the forecourt.

The specific hydro-carbon interceptor which shall be installed to service the proposed development shall be determined at a subsequent design stage which meets best practice methods for the capture and treatment of runoff and complies with all regulatory requirements.

Development Application- Lot 101 Forrest Hwy, Vittoria 9 | P a g e

4. PLANNING CONSIDERATIONS

4.1 GREATER BUNBURY REGION SCHEME

The site is currently zoned Rural under the Greater Bunbury Region Scheme (GBRS). The purpose of the Rural Zone as stated in the GBRS is:

‘to provide for the sustainable use of land for agriculture, assist in the conservation and wise use of natural resources including water, flora, fauna and minerals, provide a distinctive rural landscape setting for the urban areas and accommodate carefully planned rural living developments’.

The GBRS does not contain a land use permissibility table as is the case with the Local Planning Scheme. However, it is noteworthy that the WAPC’s DC Policy 1.10 recommends that where a Region Scheme applies, service centres should generally be located on Rural zoned land. As evidenced by LPS 8, which includes a ‘Road House’ as a permissible land use within the Rural zone, the proposed use of the site for a Road House is consistent with the Rural zoning of the land under the Region Scheme.

It is also noted that the subject site abuts Forrest Highway which is reserved as a ‘Primary Regional Road’. Further details are provided at section 4.5 below.

4.2 CITY OF BUNBURY LOCAL PLANNING SCHEME NO.8

4.2.1 Land Use Permissibility

Under LPS 8, a Freeway Service Centre is defined as:

…premises that has direct access to a freeway and which provides all the following services or facilities and may provide other associated facilities or services but does not provide bulk fuel services -

(a) service station facilities;

(b) emergency breakdown repair for vehicles;

(c) charging points for electric vehicles;

(d) facilities for cyclists;

(e) restaurant, cafe or fast food services excluding the sale or consumption of alcohol under the Liquor Licencing Act 1988;

(f) take-away food retailing without a drive-through facility;

(g) public ablution facilities, including provision for disabled access and infant changing rooms;

(h) parking for passenger and freight vehicles;

(i) outdoor rest stop facilities such as picnic tables and shade areas; and

(j) dump points for the disposal of black and/or grey water from recreational vehicles.

Development Application- Lot 101 Forrest Hwy, Vittoria 10 | P a g e

Under LPS 8, a Road House is defined as follows:

…premises that has direct access to a State road other than a freeway and which provides the services or facilities provided by a freeway service centre and may provide any of the following facilities or services (bold text added for emphasis)-

(a) a full range of automotive repair services;

(b) wrecking, panel beating and spray painting services;

(c) transport depot facilities;

(d) short-term accommodation for guests;

(e) facilities for being a muster point in response to accidents, natural disasters and other emergencies; and

(f) dump points for disposal of black and/or grey water from recreational vehicles.

A Road House is an ‘A’ use in the Rural zone under LPS 8, meaning the use is not permitted unless the local government (or other determining authority) has exercised its discretion by granting development approval after giving notice in accordance with clause 64 of the deemed provisions.

Given Forrest Highway is a ‘state road not designated as a freeway’, and the range of facilities and services which shall be provided, the proposed use clearly falls into the category of a Road House. The proposed use includes or can accommodate each of the ‘anticipated’ elements for a Road House. With regard to the provision of facilities for cyclists, in the event demand for cycling facilities becomes apparent once the Road House commences operation, such facilities could readily be provided. The additional ‘discretionary’ facilities or services that may be considered for a Road House are not proposed in this instance. This notwithstanding, the proposed use of the premises is entirely consistent with the definition of a Road House.

4.2.2 Special Control Areas

The Purpose, Objectives and Additional provisions relevant to the SCAs are set out in Schedule 7 – Table 10 of LPS 8.

Development Area SCA

Purpose:

To designate areas requiring further investigations and structure and/or local development planning in relation to environmental and natural resource values, natural hazards, land use options, infrastructure servicing requirements, transportation infrastructure needs, landscaping and urban design.

Objectives:

(a) To identify areas requiring structure planning and/or local development planning prior to subdivision and/or development.

(b) To coordinate and integrate orderly subdivision, infrastructure provision, land use and development in areas requiring structure planning and/or local development planning;

Development Application- Lot 101 Forrest Hwy, Vittoria 11 | P a g e

(c) To guide the layout and design of lots, land uses and developments on land within a structure plan and/or a local development plan area;

(d) To establish a framework for the assessment of applications for development approval within a structure plan and/or a local development plan area; and

(e) To institute arrangements for the implementation of the plan by landowners, infrastructure providers and the local government.

Additional Provisions:

1. A Structure Plan is required in accordance with the provisions of Schedule 2, Part 4 of the Planning and Development (Local Planning Schemes) Regulations 2015.

2. Structure planning for any locality affected by these provisions shall take into consideration mechanisms to limit impact to Carnaby’s cockatoo habitat.

With respect to structure planning, the Planning and Development (Local Planning Schemes) Regulations 2015 (‘the Regulations’) at Schedule 2, Part 4 Clause 27 (2) state:

(2) A decision-maker for an application for development approval or subdivision approval in an area referred to in clause 15 as being an area for which a structure plan may be prepared, but for which no structure plan has been approved by the Commission, may approve the application if the decision-maker is satisfied that —

(a) the proposed development or subdivision does not conflict with the principles of orderly and proper planning; and

(b) the proposed development or subdivision would not prejudice the overall development potential of the area.

In this instance, approval of the proposed Road House in the absence of an approved structure plan is able to satisfy the above tests for the following reasons:

 The land use is consistent with the objectives of the Rural zoning of the land under the GBRS, as evidenced by WAPC DC Policy 1.10.

 The land use is consistent with the relevant objectives of the Rural zoning of the land under LPS 8 and in particular, the following objective:

‘To provide for a range of non-rural land uses where they have demonstrated benefit and are compatible with surrounding rural uses’.

The proposed Road House shall provide significant benefit to the travelling public in this ‘edge of centre’ location in terms of providing safe and convenient access to a range of facilities and services. The location of the site fronting Forrest Highway within a relatively narrow band of land adjoined by land reserved for port functions to the north-west makes it particularly suited to this purpose.

 Traffic access from Forrest Highway has been thoroughly investigated, including ongoing consultation with Main Roads and has demonstrated the proposal provides for both interim and ultimate access scenarios along this section of Forrest Highway. Future road

Development Application- Lot 101 Forrest Hwy, Vittoria 12 | P a g e

planning shall not be compromised and access arrangements for adjacent properties fronting Forrest Highway can be accommodated should they be developed in the future.

 Stormwater management can be accommodated and given the proposed fill and retention of all water on site, the development is not expected to impact adversely on, or be negatively impacted by the surrounding development areas.  All services can readily be extended to the site.

Flood Prone Areas SCA

Purpose:

To minimise the potential for flood damage resulting from decisions relating to land use and development on defined river floodplains.

Objectives:

(a) To identify land within the Scheme area at risk of being affected by flooding consistent with the Greater Bunbury Region Scheme - Floodplain Management Policy.

(b) To assist in the protection of life, property and community infrastructure from flood hazard.

(c) To assist the natural flood carrying capacity of floodplains by ensuring any use or development maintains the free passage and temporary storage of flood waters.

(d) To protect water quality and waterways as natural resources in accordance with Statement of Planning Policy No. 2 - Environment and Natural Resources Policy.

Additional Provisions:

Land use, subdivision and development within this Special Control Area is to comply with all the matters set out in the Greater Bunbury Region Scheme - Floodplain Management Policy.

The Stormwater Management Plan at Appendix F has considered the recommendations of the Floodplain Management Policy and following discussions with DWER, concludes the development is supported on the basis that filling of the site will achieve clearance to flood levels and the impact on floodplain storage volume is expected to be minimal.

4.2.2 Development Standards

Within the Rural zone, the following setbacks are specified:

Front Side Rear 15m 5m 7.5m

The development achieves a 14.8m setback to the canopy and 13.5m to the convenience store from the front boundary with only the corner of each structure marginally encroaching into the setback area. These minor encroachments are readily balanced by compensating open space behind the setback line. The side and rear setbacks of buildings generally comply with the standards in LPS 8, with only lightweight structures (awnings) marginally encroaching into the side setbacks and a minor variation to the rear setback (6.9m) proposed along a short length of the overall rear boundary.

No significant clearing of vegetation is required to accommodate the development.

Development Application- Lot 101 Forrest Hwy, Vittoria 13 | P a g e

4.3 CITY OF BUNBURY LOCAL PLANNING STRATEGY

Lot 101 is included within a ‘Rural Area’ designation under the recently endorsed City of Bunbury Local Planning Strategy (‘the Strategy’).

In addition to the Rural Area designation, the Strategy shows a ‘Future Fast Rail’ link across the southern portion of the subject site adjacent to Forrest Highway.

The concept of a Future Fast Rail service is an unfunded, long term strategic planning consideration, and as such the indicative alignment should not be viewed as a seriously entertained proposal which would prevent approval of an appropriate land use on Lot 101. In the event more detailed planning for a fast rail link is progressed in the future, there are a range of other alignment options that could be explored, particularly given the alignment that has currently been depicted has significant constraints. As such, approval of the proposed Road House on Lot 101 would not prejudice future planning for a fast rail link as envisaged by the Strategy.

The Strategy also shows a visual amenity corridor along the north side of Forrest Highway. This planning objective is recognised via the layout, built form and landscaping for the Road House which acknowledges the location of the site at the gateway to the City of Bunbury.

4.4 BUNBURY PORT INNER HARBOR STRUCTURE PLAN

The Bunbury Port Inner Harbour Structure Plan was finalised in 2009. Under the provisions of the Port Authority Act, the Public Works Act, the P&D Act and the GBRS, the Port Authority is exempted from requiring formal planning approval for any port related development or other public work. As a consequence of the ‘Port Installation’ reservation under the GBRS, the reserved land was not subject to the structure plan process under the former LPS 7.

Whilst the Inner Harbour Structure Plan boundary extends to Forrest Highway and hence includes the subject site, Lot 101 is subject to the planning provisions of LPS 8. The Inner Harbour Structure Plan does not and is not intended to have a statutory effect in terms of LPS 8 or the GBRS. Rather, it has been approved by the Bunbury Port Authority as a policy document to guide future development and decision making within the Inner Harbour.

Accordingly, the development proposal for a Road House on Lot 101 is not bound by the land use and development intent as reflected in the Inner Harbour Structure Plan. An extract from the Inner Harbour Structure Plan is included as Figure 6 overpage.

It is noted the majority of the rural zoned land between the Port land and Forrest Highway is identified as ‘subject to further planning’. An indicative road connection is shown between Forrest Highway and Thomson Road adjacent to the realigned and three site options are proposed as potential sites to accommodate the relocation of the Leschenault Homestead (one of which includes Lot 101).

It is considered alternative options (other than Lot 101) are available for the relocation of Leschenault Homestead and that the proposed development will in no way compromise future planning for the Port land.

Development Application- Lot 101 Forrest Hwy, Vittoria 14 | P a g e

Figure 6 – Inner Harbour Structure Plan

4.5 DEVELOPMENT CONTROL POLICY 1.10

The WAPC has prepared Development Control Policy 1.10 – Freeway service centres and roadhouses, including signage. The Policy applies to development applications and hence it is relevant to this proposal. This development application has been informed by a TIA (Appendix E) which has been prepared having regard to the provisions of DC Policy 1.10.

The proposal is considered to satisfy all relevant aspects of the Policy including applicable locational, siting and design measures and will function as an ‘edge of centre’ facility as described by the Policy.

It is noted DC 1.10 provides for convenience shopping to occupy an aggregate retail floor space of up to 150 m2 in the case of a Road House (or greater, under special circumstances). The convenience store and fast food components form part of an integrated building along with the fuel canopy. The convenience store component is well below 150m2 in terms of net lettable area. The takeaway coffee outlet is an incidental use and a logical inclusion for the Road House as a ‘driver reviver’.

With regard to signage, DC 1.10 provides for a single, multi-tenancy pylon sign up to 12m in height. The intent of specifying a single pylon sign is to avoid a proliferation of signage and ‘visual clutter’. In this instance, two pylon signs are proposed, being an illuminated sign 12m in height and a multi-tenancy illuminated sign 7m in height. From the proponent’s perspective, it is desirable for two pylon signs to be located along the 107m lot frontage to Forrest Highway, given the mix and distribution of uses proposed on the site. It is also relevant that one of the signs is only 7m in height and therefore significantly smaller than the maximum height of 12m contemplated by DC 1.10. It is noted approval for the proposed signage will also need to be obtained from Main Roads WA.

Development Application- Lot 101 Forrest Hwy, Vittoria 15 | P a g e

4.6 LOCAL PLANNING POLICY – SIGNAGE AND ADVERTISEMENTS

The City of Bunbury has adopted a Local Planning Policy – Signage and Advertisements. The purpose of the Policy is to control and guide the development of signage and advertisements on zoned land in order to safeguard and enhance the character and amenity of the built and natural environment of the Local Planning Policy Area.

Table 2 of the Policy – Maximum Luminance Levels prescribes a maximum permitted luminance (candelas per m2) of 300 cd/m² within the Rural zone. A condition of planning approval can be applied to ensure the luminance of the proposed signage is appropriate having regard to the location of the site fronting Forrest Highway.

Table 5 of the Policy – Assessment Categories for Signs and Advertisements applies an ‘I’ level of assessment (impact assessable) for pylon signs and ‘-’ (likely to be inconsistent with Scheme objectives, the Regulations and the Policy) for pylon sign – large in the Rural zone. However, the nature of the proposed use adjacent to the Forrest Highway should also be considered, having regard to the provisions of DC 1.10.

Appendix A of the Policy includes Table 6 - Standard Design Requirements for Signs and Advertisements. Some specific standards for pylon signs are considered below:

Pylon sign

 The maximum height above the ground is to be 6.5m or the height of a building in close proximity, whichever is the greater, but is not to exceed 10m. The height of a building is defined as the height of the uppermost part of the building above ground level.

Pylon sign - large

 The maximum height above the ground is to be 6.5m or the height of a building in close proximity, whichever is the greater, but should not exceed 8.4m. The height of a building is defined as the height of the uppermost part of the building above ground level.  A pylon sign large is not to be located along a street frontage of a property, along which is located another pylon sign large, billboard sign, pylon sign, billboard sign large or pole sign, and in no case less than 3.0m from the front boundary.  Where pylon signs large are to be erected on a property on which a building/s with multiple tenancies (such as shopping centres) is erected or is to be erected, the pylon signs may be required to be consolidated into one sign.

It is apparent there is some inconsistency in the Policy. For example, it would be assumed a ‘Pylon sign – large’ category would describe a larger category of sign than the standard ‘Pylon sign’ category, which appears to provide for larger signs up to 10m. There is also inconsistency between the height of signs provided for in DC 1.10 which allows for signs up to 12m and under special circumstances, up to 20m in height in the case of Road Houses (and Freeway Service Centres).

It is also relevant to note the Policy does not prohibit more than one pylon sign on a property where multiple tenancies are proposed, as is the case with the Road House development at Lot 101 Forrest Highway. For these reasons, a flexible approach should be applied to the consideration of the pylon signs proposed as part of this development.

Development Application- Lot 101 Forrest Hwy, Vittoria 16 | P a g e

4.7 EPA GUIDANCE NO.3 – SEPARATION DISTANCES BETWEEN INDUSTRIAL AND SENSITIVE USES

EPA Guidance No. 3 recommends generic separation distances between industrial land uses and sensitive land uses. With respect to a Freeway Service Centre with 24 hour operation, a 100m buffer is recommended for sensitive uses. The proposed Road House satisfies this recommended buffer distance given there are no sensitive land uses within 100m of Lot 101.

5. CONCLUSION

Development approval is sought for a Road House (and associated pylon signage) as detailed in this report. The proposed use is permissible in the Rural zone under LPS 8 and satisfies Scheme requirements. In this regard, this submission has demonstrated the development can proceed in the absence of a structure plan, in a manner that is consistent with orderly and proper planning and will not prejudice the overall development potential of the locality.

The site can be provided with suitable traffic and drainage management to provide for a sustainable form of development.

In view of the details provided in the report, it is respectfully requested that the JDAP approve the Road House proposed at Lot 101 Forrest Highway, Vittoria.

Development Application- Lot 101 Forrest Hwy, Vittoria 17 | P a g e

APPENDIX A

Development Plans

LEGEND

PROPOSAL DETAILS 9 8 Subject Land

Area of Subject Land 7351m²

Proposed Building

Awnings

Paving Walkways 100.58

Soft Landscaping 3

.

9

.

5 6 (Details ref: Exzo dwg A008) 11.9

Child Proof Security Fence FUTURE DEVELOPMENT with Self Closing Gate AREA

16 15 14 13 12 11 10 UTDOOR REST O 09 5.5 STOP AREA

ELECTRIC

N VEHICLE 08 W CHARGING AIR O STATION

D & 1.2 T

Y WATER 23.4 07 E A PROPOSED

23 22 21 20 19 18 17

S 24 B

Y CONVENIENCE R

2 .

0 T 06 STORE AND

N E

FAST FOOD O 05 N 344m² 6 205 Y 45 A LOT 101 3 B FFL 3.7 1 IT A 9 7351m² .

W

4 5 37 25 6.8 04

38 26 PROPOSED 4 03 6 2.5 27 TOLL 39 8m ISLE WIDTH 02

6.7 CANOPY

5 .

40 28 0 LINK 3 WITH 2 01 .

0 5

. 2 41 29 5.4 PROPOSED

SMALL SERVICE

TAKE- 42 30 TRUCK & NO PARKING -

2 D . YAR

AWAY CARAVAN 0 LOADING ZONE 5 COFFEE . PARKING 4.7 2 43 31 138m² 2

6 FFL 3.5 44 32

5 NO ENTRY

.

1 9

33

1 45 2 . 5

.

0 8

2 . 0

46 34

47 35 UNDERGROUND

FUEL TANKS

0 .

W 36 2 A 1 IT 4 . B 8 A Y

02 Y NG R KI T 7 AR . P N 5 CH E A 4 O R O C E EXISTING IRON ND V N A 3 E O SHED TO BE 0 CL S H G HI S T ISHED IN E ID DEMOL RK V O TS A HT R W 6 IN P IG C . O CH E 6 P A 4 FR ILL CO F D AN LE IC EH T V GH EI FR 01 EXIT G IN RK

PA

H 2

415 0 . C 2 A .0 CO D 3 Y AN A LE IC W EH H V G HT I IG RE 0 H F .2 1m MINIMUM LANDSCAPING WIDTH 3 NG 9 PI P 3 A 9 SC . . D Y 2 AN 2 T L L F SO O 0 7m HIGH . N 5 ILLUMINATED I.D SIGN 5 .1 4 3 P 9 12m HIGH . Y 2 TBM 2 L ILLUMINATED . O 0 I.D SIGN 1 N ENTRY HD2 4 . 1 1 .1 7 9 3 .8 Spike 2 Buried

RL: 2.89

6 .0 7 8 3 .8 C 2 RO SS W O ID VE ® TH R ST 6 E 2 .0 R .8 3 R 2 FO

Plan No. | 21169-01 BUNBURY OFFICE: COPYRIGHT: 21 Spencer Street, This document is and shall remain the Date | 09/05/18 Bunbury WA 6230 property of HARLEY DYKSTRA. The document may only be used for the T: 08 9792 6000 F: 08 9721 9611 PROPOSED ROADHOUSE Drawn | BdR purpose for which it was commissioned E: [email protected] and in accordance with the terms of Checked | SB W: www.harleydykstra.com.au engagement for the commission. ® Unauthorised use of this document in Revision | I Kelmscott and any form whatsover is prohibited Lot 101 Forrest Highway Scale | 1:500@A3 0 5m 10m 15m VITTORIA PLANNING & SURVEY SOLUTIONS NOTE: This plan has been prepared for planning purposes. Areas, Contours and Dimensions shown are subject to survey

PTY LTD. PTY DRAFTING EXZO OF PERMISSION WRITTEN THE OUT WITH D REPRODUCE BE NOT SHALL AND COPYRIGHT IS DESIGN THIS © LN

7 ¨ Rev

20/11/2017 27/11/2017 § SEPTEMBER 2017 SEPTEMBER

0003-16 A001

¦ ¥

Lot: 101 ¤

Revision Schedule Revision £ Vittoria, W.A., 6230. Proposed Roadhouse, 9850 Forrest Highway,

Site Area 7343.3sqm= ¡ Drawing Number Drawing area, electrical charging station station and charging electrical area, added. picnic area Transcore's per as crossovers recommendation A1 Date Scale Drawnby No. Description Date GeneralNotes: 1. ARE DIMENSIONS INALLMILLIMETRES. 2. WRITTENSHALLTAKE DIMENSIONS PRECEDENCE OVER SCALEDDIMENSIONS. 3. SCALE LARGE DRAWINGS SHALLTAKE PRECEDENCE OVER SCALESMALLER DRAWINGS. SHALLCHECK 4. CONTRACTOR VERIFY ALL AND THE SITETHE COMMENCEMENT ON PRIOR TO DIMENSIONS WORK. BUILDING ANY OF 5. THIS BEDRAWINGIS READINTO CONJUNCTION WITH ALL DRAWINGSCONSULTANT AND THE SPECIFICATIONS. Description Project Status Project Client Site Project Number Project Size Sheet DEVELOPMENT APPLICATION DEVELOPMENT PROPERTIES SARACEN HIGHWAY, FORREST (#9850) 101 LOT WA VITTORIA, DETAILS PROJECT

A1 forfirstDA issue Drawings 2 breakdown parking, vehicle Passenger 3and road Service FFL's Updated. 4 05/10/2017 56revised Road Service & Crossovers 7 Truck addedparkings removed Retailexpansion 01/12/2017 Revision General revised Crossovers 23/04/2018 22/03/2018 30/04/2018 08/05/2018 08/May/2018 10:32:01 AM 10:32:01 08/May/2018 LOT: 101 SITE = 7351SQM AREA PROPOSED ROADHOUSE, PROPOSED ROADHOUSE, SARACEN PROPERTIES PTY PROPERTIES SARACEN LTD 9850 FORREST HIGHWAY, VITTORIA, W.A., HIGHWAY, FORREST 6230. 9850

PTY LTD. PTY DRAFTING EXZO OF PERMISSION WRITTEN THE OUT WITH D REPRODUCE BE NOT SHALL AND COPYRIGHT IS DESIGN THIS © LN

7 ¨ Rev As indicated As

20/11/2017 27/11/2017 § SEPTEMBER 2017 SEPTEMBER

0003-16 A002

¦ ¥

Lot: 101 ¤

Revision Schedule Revision £ Vittoria, W.A., 6230. Proposed Roadhouse, 9850 Forrest Highway,

Site Area 7343.3sqm= ¡ Drawing Number Drawing area, electrical charging station station and charging electrical area, added. picnic area Transcore's per as crossovers recommendation A1 Date Scale Drawnby No. Description Date GeneralNotes: 1. ARE DIMENSIONS INALLMILLIMETRES. 2. WRITTENSHALLTAKE DIMENSIONS PRECEDENCE OVER SCALEDDIMENSIONS. 3. SCALE LARGE DRAWINGS SHALLTAKE PRECEDENCE OVER SCALESMALLER DRAWINGS. SHALLCHECK 4. CONTRACTOR VERIFY ALL AND THE SITETHE COMMENCEMENT ON PRIOR TO DIMENSIONS WORK. BUILDING ANY OF 5. THIS BEDRAWINGIS READINTO CONJUNCTION WITH ALL DRAWINGSCONSULTANT AND THE SPECIFICATIONS. Description Project Status Project Client Site Project Number Project Size Sheet DEVELOPMENT APPLICATION DEVELOPMENT PROPERTIES SARACEN HIGHWAY, FORREST (#9850) 101 LOT WA VITTORIA, PLAN SITE

A1 forfirstDA issue Drawings 2 breakdown parking, vehicle Passenger 3and road Service FFL's Updated. 4 05/10/2017 56revised Road Service & Crossovers 7 Truck addedparkings removed Retailexpansion 01/12/2017 Revision General revised Crossovers 23/04/2018 22/03/2018 30/04/2018 08/05/2018

08/May/2018 11:00:05 AM 11:00:05 08/May/2018

3.08 2.92

30 2.81

2.82

2.85 2.76 2.53 205

LOT LOT 205 20

3.20

3.02

H T

2.72 D I

W

B

R R 15

E E

V K

2

O E 4

T T 6 S

I E 6

S

2.74 R

2.65

O 2.63 X C 2.58

R N

O 2.51 C B E 54 910mm BOUNDARY LINE BOUNDARY 910mm 54 R C E K

1220 AWNING SETBACK TE

E SOFT LANDSCAPING SOFT SOFT LANDSCAPING SOFT R C

N 1490

O 10 AWNING OVER AWNING 54.91 KERB CONCRETE C 8 3520

6 NO ENTRY NO

Y

CONCRETE PATH CONCRETE

A

4

2.36

W

3.15

-

H

AWNING SETBACK AWNING

2

2.99

205290 G

I

2

SCALE 1:200 SCALE

0 2.28

H

2.44

2.29 FFL 3.70

T

YARD

344m

7

401490 SERVICE

S

1

NORTH .

PROPOSED PROPOSED

STORE AND AND STORE E

FAST FOOD FAST 5

CONCRETE KERB CONCRETE CONVENIENCE CONVENIENCE

R

2

R

AWNING OVER AWNING 2.25

CONCRETE PATH CONCRETE

O

2.09

2.29

F

HD2

TBM

2.09

2.06

RL:2.89 0

SOFT LANDSCAPING SOFT

NO PARKING - PARKING NO

LOADING ZONE LOADING 5 2.08 BuriedSpike

3.11

8

5400 2.94

2.18 9

1.69

CONCRETE KERB CONCRETE 1.94

SETDOWNBAY 1.80

1.66 :1 200 06

SITE PLAN SITE 09 08 07 05 04 03 02 01 TATION S 2.33

CHARGING CHARGING 1.68

VEHICLE VEHICLE 2.20 502500

1.74 ELECTRIC ELECTRIC 1

10 2.28

1150

2.32 1.73 80 94 0

SW SW SW 481

1 ACK

1.72 TB 11 SE 2.14

OPY

N

7000 AISLE WIDTH A

807800 0 57 19 103130 C

D

CONCRETE KERB CONCRETE 2

2.24

N 0

A

G 12 1.85

E

N

I L

K 7000 AISLE WIDTH AISLE 7000 0 C

I

0

R

0

H

A 0

E 3

G

13 P

V

N

I

H

P T

C

A

H

A C

2.07

G

S

8000 I

O 3.06

D

14 E

C

N

2.89

2.33 TOLL TOLL R

A

503520

F L

CANOPY CANOPY T

2.19 F

WITH LINK WITH D

3 O

15

2.24 N 0 S

PROPOSED 4 PROPOSED

A

E

SW G

D/T ENTRY ENTRY D/T SIGN E

SW N

N 1.87 I

I 2.21 L

L

K

C

I

05 0 50 30

Y

16 R

H

AIR& R A

WATER E

A P

V

D

H

T N

C

H U

A

G

O

I O

SW SW B

E

C

R

LOT 9 LOT 2.25 m

B A F D C 8330 AISLE WIDTH

CONCRETE KERB CONCRETE

FUEL TANKS FUEL m 0

UNDERGROUND UNDERGROUND

1

0

CONCRETE KERB CONCRETE

7

0

1

0 CONCRETE FOOTPATH CONCRETE 0

2.27 0

0

3

N

A

V

A

R

2 B

100.58 A

3.06

3500 G R

C

SW 2.23

2.88

E N

2.28

2.54

I

&

K

2.18

K

K

E R

C T

A

S

U

E P

T

R R

PARKING T N C

I

2.32

L

7351m N

L

LOT LOT 101 O O

A

P C

CONCRETE KERB CONCRETE

M

L

17 S

L

I

SMALL TRUCK &TRUCKCARAVAN SMALL

D

CONCRETE FOOTPATH CONCRETE 1 F

N 0

4

A

LANDSCAPING LANDSCAPING

40 G

5 E 8

7 N

SOFT SOFT SOFT 2.15 B

18 I L 7500 AISLE WIDTH AISLE 7500 H

T .

R ID

K

C

2.18 W E I

CONCRETE KERB CONCRETE E

L 1 R

K IS

A H

A

E

8 E

P T

K

V C

E A

B

0 T

H E 19 R 0 S

T ON 0

C L

C Y

H

0 0 P

A N 6

100 580mm BOUNDARY LINE BOUNDARY 580mm 100 3 5

G

O

I O

C

E

AREA C

VEHICLE VEHICLE R

20 F

EMERGENCY 2.21 BREAKDOWN BREAKDOWN 2.26 CONCRETE KERB CONCRETE 3.02

CONCRETE KERB CONCRETE

SW

25 26 27 28 29 30 31 32 33 G

N 2.19 I

2.82

P 2.38

502500 A 21

2.28

C

S

CONCRETE KERB CONCRETE D

2.29

N

A

L

22 T

SW SW SW F O

4000 S 8000 AISLE WIDTH 23 4000 3

502500 HIGH 12M ILLUMINATED I.D. SIGN .

2.11 2500 0

24 2.17

2.18 34 35 36 37 38 39 40 41 42 43 44

SETDOWN BAY SETDOWN FUTURE DEVELOPMENTAREA FUTURE 2.11

560

3000

5400 2.28 3200

ON

SW PYL

405400

2.13 2.28

NO ENTRY NO EXISTING SHED IRON DEMOLISHED BETO

B 2.23

2.96 1.47

R

E K

BAY

T E 2.80

AI T 1.58

E 1.40

Y

503520

503520 W R R

T C

SCAPING N

N E

SOFT LAND- SOFT

2.10

O O

N 2.16 C

CONCRETE PATH CONCRETE

2.28 AWNING OVER AWNING 4020 1.48 HD1 TBM

2.67 2.14

- 2.19

2.35

KERB

- 2.22 2 2.52

2.22

ETE

D/T ENTRY ENTRY D/T SIGN

SW 2.18 NCR

6000 2.40

BAY

CO ENTRY D/T SIGN

T FFL 3.50 AI

138m AWAY AWAY

TAKE W

B

R

H E

K

CONCRETE KERB CONCRETE COFFEE T

PICNIC TABLES TE

7M HIGH 7M I.D. ILLUMINATED SIGN D E PROPOSED PROPOSED

I R

C

N

2.37

2.26 W O

SW C 5 2.74

5 R

AWNING OVER AWNING Y 2.04 9

STOP AREA STOP E 2.24 6 V

R OUTDOOR REST OUTDOOR O

S

T 2.53

S 2.38 4090

2.24 O N

R NO EXIT NO SIGNAGE 6660 KERB CONCRETE 0 7 2.33 41 K C

BAC E

SET

4750 2.07

2.00 0 1.98

1.94 1 ON B

2.43 0

SOFT LANDSCAPING SOFT 2 YL

2.19

P R 2.18

2.12 2.21

9BUILDING SETBACK 1.56 E

N 2.25 K

O

YL 2.16

SOFT SOFT LANDSCAPING P E

2080 T

AWNING SETBACK E

R

91 560mm BOUNDARY LINE BOUNDARY 560mm 91 C

N

O C 49.50

LOT LOT 45

2.24 LOT LOT 415 2.11 2.16 ADJACENT LOT BOUNDARY LINE BOUNDARY LOT ADJACENT ADDITIONAL DOCUMENTATION: ADDITIONAL ENGINEERSTRUCTURALTO REFER ALL STRUCTURAL FOR DOCUMENTATION ELEMENTS HYDRAULICS TOENGINEER REFER ALL HYDRAULIC FOR DOCUMENTATION ELEMENTS ELECTRICALTOREFER ENGINEER ALL ELECTRICALFOR DOCUMENTATION ELEMENTS CIVILSTOENGINEERREFER ALL DRAINAGEFOR DOCUMENTATION GENERAL NOTES: CHECK BUILDERMUST CONFIRM AND LEVELSEXISTING SITETO ON PRIOR WORKS. REPORT ANY ANY COMMENCING DISCREPANCIES SUPERINTENDENT THE TO PROCEEDING. VERIFY DIMENSIONSALL BUILDER MUST COMMENCEMENT SITETHE TO ON PRIOR ANY OF PRODUCTION WORKOR THE OF DISCREPANCIES SUPERINTENDENT THE TO PROCEEDING. WITH INACCORDANCE THE MOST AND REGULATIONSBUILDING CURRENT RELEVANTS.A.A AND AUSTRALIANCODES STANDARDSAMENDMENTS. INCLUDING OF REQUIREMENTS THE AUTHORIZED OTHER LOCAL AND AUTHORITIES BE ARE AUTHORITIES TO STATUTORY WITH. COMPLIED ALLOWBUILDERTO FEESALL FOR TO CHECKSHOP DRAWINGS. NOT DRAWINGS. SCALEDO AND SHALLISTHIS DESIGN COPYRIGHT REPRODUCED BE NOT WITH THE OUT WRITTENEXZO DRAFTING PERMISSION OF LTD. PTY AND STORMWATERAND ELEMENTS SEEKANDTO INSTRUCTION PRIOR SHOP ANY DRAWINGS. REPORT ANY SEEKANDTO INSTRUCTION PRIOR ALL BEWORKMANSHIPAND MATERIALSTO 2010

T/O 7M PYLON (RL 10500)

CONCRETE KERB

11690 D/T ENTRY SIGN 220 11250 220 220

AIR & WATER General Notes: 1. ALL DIMENSIONS ARE IN MILLIMETRES. 2. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. 3. LARGE SCALE DRAWINGS SHALL TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS. ALL DIMENSIONS TO BE 4. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONFIRMED DIMENSIONS ON SITE PRIOR TO THE COMMENCEMENT TENANCY 1 - OF ANY BUILDING WORK. 16 15 14 13 12 11 10 5. THIS DRAWING IS TO BE READ IN CONJUNCTION LAYOUT TO BE LANDSCAPING SOFT WITH ALL CONSULTANT DRAWINGS AND THE SPECIFICATIONS. 09 CONFIRMED 13060 13500 150 m² 13060

08 7000 7 METER ILLUMINATED Revision Schedule TENANCIES SIGNAGE PYLON. SW SW SIGNAGE TO BE CONFIRMED No. Description Date 07 A Drawings first issue for DA 05/10/2017 1 Passenger vehicle parking, breakdown 20/11/2017 area, electrical charging station and picnic area added. CONCRETE PATH CONCRETE 2 FFL's Updated. Service road and 27/11/2017 crossovers as per Transcore's PTY LTD. recommendation 290 290 06 3 Crossovers & Service Road revised 01/12/2017

920 4 Truck parkings added 22/03/2018 5 Retail expansion removed 23/04/2018 6 General Revision 30/04/2018 7 Crossovers revised 08/05/2018 FREEZER3390

05 31780

D

CONVENIENCE STORE

199 m² 13380

KERBRAMP COOL CONCRETE PATH CONCRETE SETDOWN BAY ROOM D WITH THED WRITTENEXZODRAFTING PERMISSION OUT OF 15810 04

FFL (RL 3500) 03 C 22270 5 5

A004 A004

01 7M SIGNAGE PYLON ELEVATION SW 02 2 1 : 25 P.O.S U.A.T

01 THIS DESIGN IS COPYRIGHT BESHALL AND REPRODUCE ISTHIS DESIGN NOT COPYRIGHT © ¨ § ¦ ¥ ¤ £ ¡ 5400 2500 OFFICE CONCRETE KERB CONCRETE

CONCRETE KERB

B Project Description SERVICE YARD Proposed Roadhouse,

NO PARKING - WITH LOCKABLE 3910 9850 Forrest Highway, LOADING ZONE 3980 GATES Vittoria, W.A., 6230. 3770 Lot: 101 Site Area = 7343.3sqm 220 3760 220 2090 90 2340 90 220 3760 220 2090 90 1210 CONCRETE KERB Project Status 220 2650 90 3230 220 3770 220 DEVELOPMENT APPLICATION SOFT LANDSCAPING SOFT 6180 4210 Client

CONCRETE KERB SW SARACEN PROPERTIES

A Site LOT 101 (#9850) FORREST HIGHWAY, VITTORIA, WA

CONVENIENCE STORE FLOOR PLAN & SIGNAGE Project Number 0003-16 Sheet Size Drawing Number Rev A1 A003 7 1 2 3 4 5 7.5 10 15 CONVENIENCE STORE FLOOR PLAN 0 AM 11:42:00 08/May/2018 Date SEPTEMBER 2017 1 1 : 100 SCALE 1:100 Scale As indicated NORTH Drawn by LN CANOPY WITH NON - ILLUMINATED YELLOW D C B A STRIP AND T/O CANOPY (RL 9100) ILLUMINATED RED BAR

U/S CANOPY (RL 8250) 850 T/O PARAPET (SERVICE STATION) (RL 8050) PAINTED CONCRETE ILLUMINATED SHELL TILT -PANEL WALLS SIGNAGE 1550 T/O SF (SERVICE STATION) (RL 6500) 5550 4700 ALUMINIUM FRAMED 4500 SHOPFRONTS 2800 PAINTED CONCRETE PAINTED CONCRETE TILT -PANEL WALLS TILT -PANEL WALLS FFL (SERVICE STATION) (RL 3700) T/O PAVING (RL 3350) 02 SERVICE STATION WEST ELEVATION 1 1 : 100

T/O CANOPY (RL 9100) FASCIA TRUSS CLAD IN ALUCOBOND WITH FASCIA TRUSS CLAD IN APPLIED VINYL 850 U/S CANOPY (RL 8250) ALUCOBOND WITH General Notes: APPLIED VINYL T/O PARAPET (SERVICE STATION) (RL 8050) 1. ALL DIMENSIONS ARE IN MILLIMETRES. 2. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. 3. LARGE SCALE DRAWINGS SHALL TAKE PRECEDENCE T/O SF (SERVICE STATION) (RL 6500) 3200 OVER SMALLER SCALE DRAWINGS.

5550 4. THE CONTRACTOR SHALL CHECK AND VERIFY ALL 12M PYLON (RL 15500) DIMENSIONS ON SITE PRIOR TO THE COMMENCEMENT SELECTED ALUCOBOND 4700 4500 OF ANY BUILDING WORK. CLADDING 5. THIS DRAWING IS TO BE READ IN CONJUNCTION

FUEL BOWSERS BY 2800 1550 WITH ALL CONSULTANT DRAWINGS AND THE ALUMINIUM FRAMED OTHERS SPECIFICATIONS. SHOPFRONTS PAINTED CONCRETE FFL (SERVICE STATION) (RL 3700) TILT -PANEL WALLS

03 SERVICE STATION NORTH ELEVATION 2 1 : 100

FASCIA TRUSS CLAD IN ALUCOBOND WITH A B C D Revision Schedule APPLIED VINYL T/O CANOPY (RL 9100) No. Description Date A Drawings first issue for DA 05/10/2017 U/S CANOPY (RL 8250) 850 1 Passenger vehicle parking, breakdown 20/11/2017 T/O PARAPET (SERVICE STATION) (RL 8050) area, electrical charging station and picnic area added. 2 FFL's Updated. Service road and 27/11/2017 1550 crossovers as per Transcore's PTY LTD. T/O SF (SERVICE STATION) (RL 6500) recommendation

5550 3 Crossovers & Service Road revised 01/12/2017 4 Truck parkings added 22/03/2018 PAINTED CONCRETE PAINTED CONCRETE 4700 4500 TILT -PANEL WALLS TILT -PANEL WALLS 5 Retail expansion removed 23/04/2018 6 General Revision 30/04/2018 2800 T/O 7M PYLON (RL 10500) 7 Crossovers revised 08/05/2018

FFL (SERVICE STATION) (RL 3700) 12000

ALL DIMENSIONS TO BE 04 SERVICE STATION EAST ELEVATION CONFIRMED 3 1 : 100

T/O CANOPY (RL 9100) 12 METER ILLUMINATED U/S CANOPY (RL 8250) 850 SIGNAGE PYLON. SIGNAGE T/O PARAPET (SERVICE STATION) (RL 8050) TO BE CONFIRMED WITH THED WRITTENEXZODRAFTING PERMISSION OUT OF CANOPY WITH NON - ILLUMINATED YELLOW PAINTED CONCRETE 1550 STRIP AND TILT -PANEL WALLS T/O SF (SERVICE STATION) (RL 6500) ILLUMINATED RED BAR 5550 4700 SELECTED ALUCOBOND 4500 CLADDING

FUEL BOWSERS BY 2800 OTHERS

FFL (SERVICE STATION) (RL 3700)

05 SERVICE STATION SOUTH ELEVATION 4 1 : 100

406 KLIPLOK ZINCALUME FFL (RL 3500) T/O CANOPY (RL 9100) ROOF SHEETING

406 KLIPLOK ZINCALUME 850

U/S CANOPY (RL 8250) BESHALL AND REPRODUCE ISTHIS DESIGN NOT COPYRIGHT ROOF SHEETING © ¨ § ¦ ¥ ¤ £ ¡ T/O PARAPET (SERVICE STATION) (RL 8050) 14 12M SIGNAGE PYLON ELEVATION FASCIA TRUSS CLAD IN PAINTED CONCRETE 8

ALUCOBOND WITH TILT -PANEL WALLS 1550 1 : 50 APPLIED VINYL T/O SF (SERVICE STATION) (RL 6500)

CONVENIENCE 5550

4700 Project Description STORE 4500 199 m² Proposed Roadhouse, FUEL BOWSERS BY 2800 9850 Forrest Highway, OTHERS Vittoria, W.A., 6230. FFL (SERVICE STATION) (RL 3700) Lot: 101 Site Area = 7343.3sqm

01 SERVICE STATION SECTION A-A 0 1 2 3 4 5 7.5 10 15 5 1 : 100 Project Status SCALE 1:100 DEVELOPMENT APPLICATION

Client SARACEN PROPERTIES

Site LOT 101 (#9850) FORREST HIGHWAY, VITTORIA, WA

SERVICE STATION ELEVATIONS

Project Number 0003-16 Sheet Size Drawing Number Rev A1 A004 7

08/May/2018 11:44:45 AM 11:44:45 08/May/2018 Date SEPTEMBER 2017

Scale As indicated Drawn by LN T/O PARAPET (RL 7850)

BACKLIT SIGNAGE SELECTED FEATURE

TIMBER CLADDING 1150 1150 AWNING (D/T) (RL 6700)

CL (D/T) (RL 6100) 600

ALUMINIUM 4500 HD GALVANISED RHS SERVICE BIN ENCLOSURE WALLS 37 COLUMNS WINDOWS IN KLIPLOK 406 3200 ZINCALUME SHEETING 2600 FFL (RL 3500)

5400 2500 T/O PAVING (RL 3350) 5 A005 38 4 A005 06 TAKE-AWAY COFFEE EAST ELEVATION 90 2 1 : 100

General Notes: 39 1. ALL DIMENSIONS ARE IN MILLIMETRES. BIN STORAGE AREA 2. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE 3370 T/O PARAPET (RL 7850) 6000 OVER SCALED DIMENSIONS. 3. LARGE SCALE DRAWINGS SHALL TAKE PRECEDENCE SELECTED FEATURE 2640 90 3180 90 BACKLIT SIGNAGE OVER SMALLER SCALE DRAWINGS.

TIMBER CLADDING 1150 1150 AWNING (D/T) CL (RL (SERVICE 6700) STATION) (RL 6700) 4. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS ON SITE PRIOR TO THE COMMENCEMENT 90

CL (D/T) (RL 6100) 600 OF ANY BUILDING WORK. 40 5. THIS DRAWING IS TO BE READ IN CONJUNCTION 90 3960 90 BIN ENCLOSURE WALLS WITH ALL CONSULTANT DRAWINGS AND THE

IN KLIPLOK 406 4500

2060 ALUMINIUM SPECIFICATIONS. U.A.T ZINCALUME SHEETING HD GALVANISED RHS

SERVICE 3200 COLUMNS WINDOWS 2600 90 FFL (RL 3500) 41 T/O PAVING (RL 3350) 2410 100 08 TAKE-AWAY COFFEE WEST ELEVATION Revision Schedule 42 4 1870 1 : 100 No. Description Date A Drawings first issue for DA 05/10/2017 1 Passenger vehicle parking, breakdown 20/11/2017 100 area, electrical charging station and picnic area added. TENANCY 3 - 2 FFL's Updated. Service road and 27/11/2017 LAYOUT TO BE 43 crossovers as per Transcore's PTY LTD. 14660 recommendation CONFIRMED 3 Crossovers & Service Road revised 01/12/2017

24400 87 m² 24400 T/O PARAPET (RL 7850) T/O PARAPET (RL 7850) 4 Truck parkings added 22/03/2018 AWNING OVER 5 Retail expansion removed 23/04/2018 BACKLIT SIGNAGE 6 General Revision 30/04/2018 SOFT LANDSCAPING SOFT 1150 1150 AWNING (D/T) (RL 6700) AWNING (D/T) (RL 6700) 7 Crossovers revised 08/05/2018 44

CL (D/T) (RL 6100) 600 CL (D/T) (RL 6100)

8630 SELECTED FEATURE 8 8 TIMBER CLADDING SELECTED FEATURE 4500 4500 A005 A005 3200 1150 TIMBER CLADDING 3200 BIN ENCLOSURE WALLS 2600 IN KLIPLOK 406 2600 600 1150 45 ZINCALUME SHEETING FFL (RL 3500) FFL (RL 3500) T/O PAVING (RL 3350) T/O PAVING (RL 3350)

90 46 07 TAKE-AWAY COFFEE SOUTH ELEVATION 09 TAKE-AWAY COFFEE NORTH ELEVATION CONCRETE KERB CONCRETE 3 5 AWNING OVER 1 : 100 1 : 100 D WITH THED WRITTENEXZODRAFTING PERMISSION OUT OF

406 KLIPLOK ZINCALUME ROOF SHEETING 47 T/O PARAPET (RL 7850) 5510 5510 90 BACKLIT SIGNAGE LINE OF ROOF OVER 1150 1150 AWNING (D/T) (RL 6700) STEEL FRAMED AWNING

CL (D/T) (RL 6100) 600 TENANCY 3 - LAYOUT TO BE SELECTED FEATURE 4500 TIMBER CLADDING 2 3200 90 5820 90 CONFIRMED 2600 A005 87 m² 6000 FFL (RL 3500) 3 A005 T/O PAVING (RL 3350)

02 TAKE-AWAY COFFEE SECTION C-C BESHALL AND REPRODUCE ISTHIS DESIGN NOT COPYRIGHT © ¨ § ¦ ¥ ¤ £ ¡ 8 1 : 100

1 2 3 4 5 7.5 10 15 TAKE-AWAY COFFEE FLOORPLAN 0 Project Description 1 1 : 100 SCALE 1:100 NORTH Proposed Roadhouse, 9850 Forrest Highway, Vittoria, W.A., 6230. Lot: 101 Site Area = 7343.3sqm

Project Status DEVELOPMENT APPLICATION

Client SARACEN PROPERTIES

Site LOT 101 (#9850) FORREST HIGHWAY, VITTORIA, WA

TAKE-AWAY COFFEE

Project Number 0003-16 Sheet Size Drawing Number Rev A1 A005 7

08/May/2018 11:50:12 AM 11:50:12 08/May/2018 Date SEPTEMBER 2017

Scale 1 : 100 Drawn by LN 12M PYLON (RL 15500)

T/O 7M PYLON (RL 10500)

T/O CANOPY (RL 9100) U/S CANOPY (RL 8250) T/O PARAPET (RL 7850) T/O SHOPFRONT (RL 6300)

FFL (SERVICE STATION) (RL 3700) FFL (RL 3500)

11 OVERALL SOUTH ELEVATION 1 1 : 200

12M PYLON (RL 15500) General Notes: 1. ALL DIMENSIONS ARE IN MILLIMETRES. 2. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE D C B A OVER SCALED DIMENSIONS. 3. LARGE SCALE DRAWINGS SHALL TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS. 4. THE CONTRACTOR SHALL CHECK AND VERIFY ALL T/O 7M PYLON (RL 10500) DIMENSIONS ON SITE PRIOR TO THE COMMENCEMENT OF ANY BUILDING WORK. 5. THIS DRAWING IS TO BE READ IN CONJUNCTION T/O CANOPY (RL 9100) WITH ALL CONSULTANT DRAWINGS AND THE U/S CANOPY (RL 8250) SPECIFICATIONS. T/O PARAPET (RL 7850) T/O SHOPFRONT (RL 6300)

FFL (SERVICE STATION) (RL 3700) FFL (RL 3500)

10 OVERALL WEST ELEVATION Revision Schedule 2 1 : 200 No. Description Date A Drawings first issue for DA 05/10/2017 1 Passenger vehicle parking, breakdown 20/11/2017 area, electrical charging station and picnic area added. 12M PYLON (RL 15500) 2 FFL's Updated. Service road and 27/11/2017 crossovers as per Transcore's PTY LTD. recommendation 3 Crossovers & Service Road revised 01/12/2017 4 Truck parkings added 22/03/2018 5 Retail expansion removed 23/04/2018 6 General Revision 30/04/2018 T/O 7M PYLON (RL 10500) 7 Crossovers revised 08/05/2018

T/O CANOPY (RL 9100) U/S CANOPY (RL 8250) T/O PARAPET (RL 7850) T/O SHOPFRONT (RL 6300)

FFL (SERVICE STATION) (RL 3700) FFL (RL 3500)

12 OVERALL NORTH ELEVATION 3 1 : 200 WITH THED WRITTENEXZODRAFTING PERMISSION OUT OF

12M PYLON (RL 15500) A B C D

T/O 7M PYLON (RL 10500)

T/O CANOPY (RL 9100) U/S CANOPY (RL 8250) T/O PARAPET (RL 7850) T/O SHOPFRONT (RL 6300)

FFL (SERVICE STATION) (RL 3700) FFL (RL 3500) THIS DESIGN IS COPYRIGHT BESHALL AND REPRODUCE ISTHIS DESIGN NOT COPYRIGHT © ¨ § ¦ ¥ ¤ £ ¡

13 OVERALL EAST ELEVATION 4 1 : 200

Project Description Proposed Roadhouse, 9850 Forrest Highway, Vittoria, W.A., 6230. Lot: 101 Site Area = 7343.3sqm

Project Status DEVELOPMENT APPLICATION

Client SARACEN PROPERTIES

Site LOT 101 (#9850) FORREST HIGHWAY, VITTORIA, WA

OVERALL ELEVATIONS

Project Number 0003-16 Sheet Size Drawing Number Rev A1 A006 7

08/May/2018 11:53:06 AM 11:53:06 08/May/2018 Date SEPTEMBER 2017

Scale 1 : 200 Drawn by LN LOT 9 LANDSCAPING LEGEND 100 580mm BOUNDARY LINE 3 3 2 3 1 2 4 1 2 SOFT LANDSCAPING 3 1 4 1 LARGE SHRUB - KANGEROO PAWS (ANIGOZANTHOS) 1 3

2 SMALL SHRUB - YELLOW GAZANIA 1 (GAZANIA) FUTURE DEVELOPMENT AREA

3 SMALL SHRUB - SOCIETY GARLIC OUTDOOR REST (TULBAGHIA VIOLACEA ) STOP AREA

4 SMALL SHRUB - EREMOPHILA NIVEA (EREMOPHILA NIVEA)

*NOTE: • MULCH - 'NATURES MIX' BLEND OF COMPOST AND MARRI CHIPS CONCRETE PATH LANDSCAPING SOFT • RETICULATION INSTALLED TO ALL PLANTED AREAS CONCRETE KERB 4 LAWNED AREA 3

PICNIC TABLES General Notes: SETDOWNBAY 1. ALL DIMENSIONS ARE IN MILLIMETRES. 3 2. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE 1 OVER SCALED DIMENSIONS. 3. LARGE SCALE DRAWINGS SHALL TAKE PRECEDENCE 2 OVER SMALLER SCALE DRAWINGS. 4. THE CONTRACTOR SHALL CHECK AND VERIFY ALL NO ENTRY NO PROPOSED DIMENSIONS ON SITE PRIOR TO THE COMMENCEMENT 1 OF ANY BUILDING WORK. 3 5. THIS DRAWING IS TO BE READ IN CONJUNCTION CONVENIENCE WITH ALL CONSULTANT DRAWINGS AND THE D SPECIFICATIONS. 1 1 STORE AND 3 FAST FOOD - 4 2 1 344m 2 PATH CONCRETE 1 2 SETDOWN BAY 2 3 LOT 205 LOT 45 1 1 3 2 3 SOFT LAND- PROPOSED 4 SCAPING 1 C 3 91 560mm BOUNDARY LINE 560mm 91 BOUNDARY 1 TOLL Revision Schedule 4 1 CANOPY No. Description Date 3 3 WITH LINK A Drawings first issue for DA 05/10/2017 3 3 1 Passenger vehicle parking, breakdown 20/11/2017 2 area, electrical charging station and 1 picnic area added.

54 910mm BOUNDARY LINE 910mm 54 BOUNDARY 2 FFL's Updated. Service road and 27/11/2017 LOT 101 crossovers as per Transcore's PTY LTD. 4 2 recommendation 7351m B 3 Crossovers & Service Road revised 01/12/2017 1 4 Truck parkings added 22/03/2018

ADJACENT LOT BOUNDARY LINE LANDSCAPING SOFT PROPOSED 1 5 Retail expansion removed 23/04/2018 6 General Revision 30/04/2018 TAKE - 3 3 7 Crossovers revised 08/05/2018 2

AWAY 3 LANDSCAPING SOFT COFFEE - 1 NO ENTRY 2 138m 2 4 A 3 3

2 LANDSCAPING SOFT 3 4 3 1 1 4 3 3 3 1 2 S 3 3 3 EE WITH THED WRITTENEXZODRAFTING PERMISSION OUT OF TR NG 2 3 STI 2 3 1 EXI 1 1 3 1 4

Y 3 R T 1 N E O 1 3 N 3 3 3

LOT 415 4 1 1 2 G PIN IT CA DS X 2 LAN E FT SO 1 3 E 1 LIN RY DA UN BO m

3 0m BESHALL AND REPRODUCE ISTHIS DESIGN NOT COPYRIGHT 01 © ¨ § ¦ ¥ ¤ £ ¡ 1 107 SOFT LANDSCAPING 1 2 1 Project Description 2 2 1 3 Proposed Roadhouse, 3 3 9850 Forrest Highway, 3 1 Vittoria, W.A., 6230. 4 2 3 Lot: 101 1 1 Site Area = 7343.3sqm G PIN 2 CA DS AN TO T L S OF EE S TR ED Project Status ING RM IST NFI 1 EX CO DEVELOPMENT APPLICATION BE Y Client W A H SARACEN PROPERTIES I G H B T Site R S E E K R LOT 101 (#9850) FORREST HIGHWAY, E R T O E F VITTORIA, WA R C 0 B 5 N R 8 O E 9 C K

E T E R C N O C

EN TRY LANDSCAPING PLAN

Project Number 0003-16 Sheet Size Drawing Number Rev A1 A007 7

08/May/2018 11:54:21 AM 11:54:21 08/May/2018 Date SEPTEMBER 2017 0 2 4 6 8 10 15 20 30 LANDSCAPING PLAN Scale As indicated 1 SCALE 1:200 Drawn by LN 1 : 200 NORTH

APPENDIX B

Certificate of Title

LANDGATE COPY OF ORIGINAL NOT TO SCALE Fri May 11 11:46:20 2018 JOB 56682193

www.landgate.wa.gov.au

APPENDIX C

Feature Survey

A B C D E Centreline Electrical MH LEGEND Footpath 9 Fence

Boundary (Approx) Bollard

2

Gate .92 . Sewer MH 1 0 Fence 0 1.94 . 1.95 .97 .05 ® .97 1 2 .17 Ground Level 2 1 2 Dam .02 .33 Change of grade 2 2 Light pole Shed Shoulder Edge of water Edge of Bitumen Drainage pipe Water pipe (DBYD)

0 IL 2

. 5 PLANNING & SURVEY SOLUTIONS

2 . 5 5 Gas main (DBYD) .25 .29 .09 .09 .09 2 2 Bottom of Bank .03 .01 2 2 2 Shoulder 1.85 2 2 .50 Stay Wire Optic Fibre (DBYD) 2 .53 Bollard .98 .29 .51 2 Edge of Bitumen UG power (DBYD) 1 .04 .14 .11 .15 .21 .32 2 2 Aerial power (DBYD) 2 2 2 2 2 2 Gas marker .98 100.58 Power Pole 1 White Line Sewer main (DBYD) .29 .39 .76 .19 .18 2 2 .58 2 2 .18 2 .25 .24 2 2 2 2

1.94

2 . 0 .00 2

.28 .33 2 .36 .28 2 2 .28 2 .35 2 .51 2 2 .82 2 .28 2 45 54.91 .25 .00 2 2 .36 .13 2 2 205 .08 .33 2 .43 2 2 .65 2 2 .0 .00 .54 2 2 .03 1.85 .73 .06 .38 2 1 2 2 91.56 .37 2 .68 .09 1 2 .52 1.66 2 .49 .03 .09 .85 2 2 2 2 1.69 .28 .28 2 .23 2 101 .80 2 .72 1 .88 .07 1 1.74 .09 1 2 .43 2 .11 7351 m² 2 .25 2 2 .24 2 .58 .63 1.58 1 1.87 .12 2 199.98 1.53 2 .20 .17 2 1.54 .47 2 .18 .14 .36 1 2 2 2 .19 .73 .48 .40 2 4 1 1.67 1 1 4 .81 2

.43

2 2 .13

2 . .37 .10 0 2 2 .74 .18 .94 2 2 .07 1 2

.07 .12 2 2 .28 .17 2 .27 5 2 2 .22 2 .18 2 .26 IRON 2 49.50 .92 SHED 2

.19 2 .19 .08 .16 2 .72 3 2 2

.22 .23 3 2 .02 3 .84 .44 81 2

.22 .21 2 2 .20 3 .33 .99 415 2 2 .18 2 J .23 .11 2 2 .15 OH 1.4795 ha .24 .94 3 2 2 A Original drawing CJV 06/04/17 .18 TBM 2 HD2 .24 .11 2 .89 3 1 2 Buried Spike N .21 0 2 .32 2 rev details approved date 1 .26 2 RL: 2.89 . 0 .25 ST 2 8 .06 .21 3 2 .29 .88 2 2 survey cad file

O .21 .40 2 .33 2 .06 2 .16 .82 3 2 2 DM 30/03/17 21169-02A.lcd N .52 2 .12 .67

2 .16 .38 2 .02

2 2 3

R .80 drawn checked

3 3 .18 2 . 2 0 3 .53 OA .18 2 2 .18 .96 2 TBM 2 CJV 06/04/17 SJB 07/04/17 .74 .24 2 2 HD1 .19 D 2 .12 Buried Spike 2 .94 horiz datum level datum 2 6 .69 RL: 2.48 197.6 2 .18 .14 Sign 2 2 PCG '94 AHD .91 2 .15 2 .05 2 .11 .63 2 2 scale at A2 all distances are in metres

.17 2 .85 2 .01 .61 Y 2 2 A .13 2 W .29 1 : 750 2 H .80 G 2 I .56 1.99 2 H 0 5 10 15 20 25 30 .08 .32 2 T 2 .17 S 2 .08 2 RE .12 .76 .82 2 2 R 1 .50 .18 2 O 2 .16 plan type 2 .05 .13 F 2 2

.24 .80 2 1 .44 .70 .44 2 2 2 .12 .17 2 2 Feature and Contour Survey 1.72

.14 .41 .65

.49 .20 2 2 2 2 2 2 .40 . .26 5 2 2 .24 .41 2 .09 .19 1.68 .44 2 2 2

2 .27

.46 2 .41

2 L 1.59 .63 2 I .61 .55 1 2 1 . 300 RCP 1 5 client .49 2 .25 2 .42 .23 2 2 .38 .17 .28 2 2 49427 2

.40 .14

2 2 .41

.19 2 .61 .31 2 2 2 . 2 1.95 5 .21 L 1.76 2 I Saracen Properties Pty Ltd .22 300 2 .28 2 2 350 RCP .24 RCP .22 .40 2 2 375 2 2

.64 IL 1.73 .20

1 2 206

0 .13

. 2 .42 2 2 2 . L 1.62 0 I .15 1.72 2

.40 .19 2 2 description

.45 2 This plan has been prepared forSaracen Properties Pty Ltd from a combination of field survey andexisting records for the purpose of showing the physicalfeatures of the land toassist in designing future development. It should not be used for any other purpose. Lot 101 on D 93343 102 The title boundaries shown hereonre we not verified or marked at the time of survey but are derived from the SCDB 04/2017, D93343, P16050 and DP 31758. They are estimated be to accurate only to +/- 0.05m. Forrest Highway This plan should not be used for building to boundary, or to prescribed 416 set-backs, without further boundary survey. Vittoria Underground services shown on this drawing have been plotted from service authority records obtained from 'Dial Before You Dig' or a similar source. Unless indicated otherwise only surface features have been located by survey . Before starting any demolition,cavation ex or construction on the site, the relevant person shouldmake an independent and updated enquiry of ‘Dial Before You Dig’and any relevant service providers drawing no to ascertain the existence ofrther fu services (if any) and the accurate location of those not surveyed at the time of preparing this plan (or data). 21169-02A No responsibility can be accepted by Harley Dykstra for any damage caused to any underground serviceor any loss or injury so suffered JUBILEE ROAD if enquiry and verification havenot been completed in accordance 726 with this note. BUNBURY OFFICE: AHD connection made to SSM BYN16 via VRS GNSS HARLEY DYKSTRA PTY LTD survey methods. 1 21 Spencer Street, BUNBURY WA 6230 1 Contractors to verify all survey control marks to be correct PO Box 778 Bunbury WA 6231 (by field checks) prior to utilisation for construction purposes. T: 08 9792 6000 F: 08 9721 9611 This note is an integral part ofis th plan or the data as transmitted. Failure to reproduce this note providingon this plan or accompanying E: [email protected] data or any part thereof to anyird th party will render this plan or W: www.harleydykstra.com.au data invalid. Offices also at Albany, , Kelmscott and Perth Harley Dykstra disclaims any liability whatsoever and howsoever caused for loss or damage arisingfrom any party who uses or relies upon this plan for any purpose otherthan that for which it was intended. NOTE: This drawing is the property of harley dykstra pty ltd it may not be copied or In any event the liability of Harley Dykstra Pty Ltd is limited to the altered without the consent of the owner 1 resupply of the relevant goodsd/or an services or the reasonable cost of resupply.

A BCD E

APPENDIX D

Geotechnical Assessment

WA | QLD | NSW | VIC

GE2.4.002

GEOTECHNICAL INVESTIGATION

For: Saracen Developments Pty Ltd Project Address: Lot 101 Forrest Highway, Vittoria

Project Number: D167019 Job Number: J178846 Revision Number: 0 Author: Amy Yates

Date: 14/6/2017

Structerre Consulting Engineers (+618) 9205 4500 1 Erindale Road, Balcatta WA 6021 [email protected] www.structerre.com.au

WA | QLD | NSW | VIC

TABLE OF CONTENTS

1. PROJECT DETAILS ...... 1 1.1. Introduction ...... 1 1.2. Site Description & Proposed Development ...... 1 1.3. Field Investigation – Scope of Works ...... 1 2. DESK STUDY ...... 2 2.1. Geological Setting ...... 2 2.2. Ground Surface and Groundwater Level ...... 2 2.3. Earthquake Coefficient ...... 2 2.4. Wind Classification ...... 2 2.5. Site History ...... 2 3. RESULTS OF THE INVESTIGATION ...... 3 3.1. Subsurface Soil Profile ...... 3 3.2. Groundwater ...... 3 3.3. Percolation Testing ...... 4 3.4. Laboratory Test Results ...... 4 4. GEOTECHNICAL CONSTRUCTION CONSIDERATIONS ...... 5 4.1. Site Classification ...... 5 4.2. Drainage ...... 6 4.3. Earthworks ...... 6 5. CONCLUSIONS ...... 7 6. LIMITATION OF FIELD INVESTIGATIONS ...... 8 7. REFERENCES ...... 9

TABLE 1 – HISTORICAL SITE INFORMATION ...... 2 TABLE 2 – SUBSURFACE SOIL PROFILE ...... 3 TABLE 3 – IN SITU PERCOLATION TEST RESULTS ...... 4 TABLE 4 – LABORATORY TEST RESULTS ...... 4 TABLE 5 – CLASSIFICATION BASED ON SITE REACTIVITY ...... 5 TABLE 6 – COMPACTION REQUIREMENTS ...... 6

APPENDIX 1 – GEOTECHNICAL INVESTIGATION SITE PLAN ...... 1 APPENDIX 2 – SITE PHOTOGRAPHS ...... 2 APPENDIX 3 – BOREHOLE LOGS & TERMINOLOGY ...... 3 APPENDIX 4 – LABORATORY TEST RESULTS ...... 4

WA | QLD | NSW | VIC 1 Erindale Road, Balcatta, 6021 | PO Box 792, Balcatta, Western Australia 6914 Phone (+618) 9205 4500 | Fax (+618) 9205 4501 | Email [email protected] | Web www.structerre.com.au ABN 71 349 772 837 Zemla Pty Ltd ACN 008 966 283 as trustee for the Young Purich and Higham Unit Trust trading as Structerre Consulting Engineers PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

1. PROJECT DETAILS

1.1. Introduction

At the request of Saracen Developments Pty Ltd (The Client), Structerre Consulting Engineers (Structerre) have conducted a Geotechnical Investigation at Lot 101 Forrest Highway, Vittoria. The purpose of the investigation was to provide the following:

• Desk top study including a summary of geology, groundwater and site history (obtained from historical photographs); • Summary of encountered ground and groundwater conditions; • Site classification in accordance with AS 2870-2011 Residential Slabs and Footings; • Wind Classification in accordance with AS 4055-2012 Wind Loads for Housing; • Recommendations for stormwater drainage design; • Site preparation requirements (earthworks); and • Preliminary footing detail considering surface movement and sand pad thickness. Terms of reference for this investigation were presented in a Structerre Consulting Engineers proposal reference Q68571 (dated 20 April 2017), which was submitted to and accepted by The Client.

1.2. Site Description & Proposed Development

The site is located at Lot 101 Forrest Hwy Vittoria, City of Bunbury. Forrest Highway lies to the south of the site and vacant land to the northeast and southeast.

The site is generally flat and level as is the surrounding topography. At the time of the field investigation a shed occupied the site. The front and the rear areas of the property were covered in vegetation.

We understand that it is proposed to subdivide the site for residential purposes.

1.3. Field Investigation – Scope of Works

The field investigation was carried out on 29 May 2017 and comprised:

• 7 x Sample Retrieval Probe (SRP) boreholes to a depth of 2.5m over the site for material assessment and soil profiling; • 7 x Dynamic Cone Penetrometer (DCP) tests in accordance with AS 1289.6.3.2 (1997) to a depth of 2.0m for evaluation of relative densities of the upper layers; and • 3 x In situ percolation tests to determine the permeability of the materials within the upper 1.0m. The borehole, percolation and DCP test locations are shown on the attached site plan in Appendix 1.

A geotechnical engineer from Structerre supervised the fieldwork and all fieldwork, interpretation and terminology used in this report are in accordance with the guidelines presented in AS1726-1993 Geotechnical Site Investigations.

1 of 9 PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

2. DESK STUDY

2.1. Geological Setting

The Collie sheet 1: 250,000 Environmental Geology Series (Sheet SI 50-6, 1983) prepared by the Geological Survey of Western Australia indicates that the following geological layers underlie the site:

• Alluvium (Qra) – clay, sand and loam.

2.2. Ground Surface and Groundwater Level

The Perth Groundwater Atlas (Waters & Rivers Commission) indicates the ground surface level at this site was approximately 5.0m Australian Height Datum (AHD).

No groundwater information is available to the site, however it should be noted that the groundwater levels can vary significantly due to seasonal variation and the data from the recorded maximum levels should be used only as a guide.

2.3. Earthquake Coefficient

In accordance with AS 1170.4-2007 Structural Design Actions the site is located within an area with an earthquake acceleration coefficient of 0.09.

2.4. Wind Classification

In accordance with AS 4055-2012 Wind Loads for Housing, wind classification of this site falls within the non-cyclonic “N2” category.

2.5. Site History

Historical aerial photographs dating back to 1996 are publically available through Landgate Map Viewer were assessed and a summary is presented in Table 1.

Table 1 – Historical Site Information

Date Description

The shed has been built. The immediate areas to the north, 1996 east and west were vacant.

The site and the immediate boundaries remain relatively 2017 unchanged to the current day.

2 of 9 PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

3. RESULTS OF THE INVESTIGATION

3.1. Subsurface Soil Profile

The subsurface soil profile presented below was determined from the ground conditions encountered within the SRP boreholes and through the interpretation of the DCP test results:

Table 2 – Subsurface Soil Profile

Depth to Base of Material Description Strata (m)

0.2 – 0.3 (Ave. 0.3) Topsoil

SAND, trace silt, loose to medium dense, locally very loose near 0.9 – 2.5 (Ave. 1.3) surface

1.3 – 2.0 (Ave. 1.7) Clayey SAND, trace gravel, loose to medium dense

Not Penetrated SAND, trace silt, medium dense to dense, locally loose to (>2.5m) medium dense

The soils encountered are consistent with the expected site conditions as predicted from the Environmental Geology Map. It is important to note that there may be pockets of fill on site that are deeper than that encountered by the investigation boreholes. The subsurface soil conditions encountered are presented in the borehole logs, within Appendix 3.

3.2. Groundwater

Groundwater was encountered in all of the SRP boreholes, and was established at depth of 1.4m. Based on our understanding of the proposed development, shallow excavations are envisaged. Therefore, it is considered unlikely that groundwater would be encountered.

If however deeper excavation or an undercroft/basement construction is proposed, groundwater would potentially be encountered during construction and allowance should be made for localised dewatering if groundwater is to be encountered during construction.

3 of 9 PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

3.3. Percolation Testing

Percolation testing of the in situ soils was undertaken in three locations. Results of the testing are summarised below:

Table 3 – In Situ Percolation Test Results

Test Location Testing Depth (m) Soil Type Permeability (m/day)

PERC1 0 - 1.0 Clayey SAND 0.5

PERC2 0 - 1.0 Clayey SAND 0.7

PERC3 0 - 1.0 SAND - Clayey SAND 0.9

*Permeability exceeded maximum reading on apparatus in accordance with AS 1547:2000.

3.4. Laboratory Test Results

Selected representative soil samples were tested by Structerre’s in-house NATA accredited laboratory for Atterberg Limits and Particle Size Distribution. The results are attached in Appendix 4.

Table 4 – Laboratory Test Results

Liquid Plastic Plasticity Linear Test Depth Limit % Limit % Index % Soil Shrinkage % Hole (m) Description AS1289 AS1289 AS1289 AS1289 3.4.1 3.1.2 3.2.1 3.3.1

Clayey SAND BH01 1.1–1.5 33 18 15 3 trace gravel

Test results indicate that the natural soil material has no low shrink swell capacity or degree of expansion.

4 of 9 PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

4. GEOTECHNICAL CONSTRUCTION CONSIDERATIONS 4.1. Site Classification AS 2870-2011 Residential Slabs and Footings provides guidance on site classification for residential slabs and footing design based on the expected ground surface movement and depth of expected moisture changes.

Table 5 – Classification Based on Site Reactivity

AS 2870-2011 Residential Slabs and Footings - Clause 2.1.2 Table 2.1

Class Foundation

Most sand and rock sites with little or no ground movement from moisture A changes

Slightly reactive clay sites, which may experience only slight ground movement S from moisture changes (0

Moderately reactive clay or silt sites, which may experience moderate ground M movement from moisture changes (20

Highly reactive clay sites, which may experience high ground movement from H1 moisture changes (40

Highly reactive clay sites, which may experience very high ground movement from H2 moisture changes (60

Extremely reactive sites, which may experience extreme ground movement from E moisture changes (ys>75mm)

Clause 2.1.3 Classification of other Sites Sites which include soft or unstable foundations such as soft clay or silt or loose sands, landslip, mine subsidence, collapsing soils and soils subject to erosion, P reactive sites subject to abnormal moisture conditions and site that cannot be classified in accordance to Table 2.1

The site in its current condition is classified as Class “P”. Based on results of this investigation the site can be upgraded to a Class “S” in accordance with AS 2870-2011 provided that all unsuitable materials are removed and replaced with engineer-controlled sand fill materials in accordance with the earthwork recommendations outlined in Section 4.3 of this report. Footings suitable for this site should be adopted to accommodate expected ground surface movements of approximately ys = 6mm associated with the presence of low reactive clayey sand deposits within the building site.

5 of 9 PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

4.2. Drainage

The existing ground conditions are not suitable for on-site disposal of stormwater runoff through the use of soakwells. It is recommended that all stormwater from roofed, paved and driveway areas be collected and detained to reduce peak flow rates prior to discharging offsite as per council requirements. Sub soil drainage may be required at this site to control groundwater perching in the upper soil layers.

4.3. Earthworks

All earthworks shall be undertaken in accordance with AS 3798-2007 Guidelines on earthworks for commercial and residential developments and are to include the following:

• All unsuitable materials to be stripped and removed from the site. Unsuitable materials include topsoil, deleterious and organic materials. • It is considered that the near surface very loose to loose sand requires improvement. Therefore, it is proposed to excavate and stockpile the materials for reuse, provided it is free from clay/silt (i.e. <5%), deleterious and organic materials. The depth of excavation may vary depending on conditions encountered and is subject to inspection. However, it is envisaged that the average depth of excavation would be approximately 0.8m. Should the site levels be reduced the excavated materials can be reused or removed off site. • Excavation should not be greater than 2.0m and/or undermine the surrounding structures. A 1V: 2H slope should be maintained for temporary excavations. If excavation is required closer than the 1V: 2H slope would allow or deeper, it is recommended that this office be contacted for retaining system design. • Proof compact the exposed base. The compaction requirements are set out in the table below, as per AS 3798-2007:

Table 6 – Compaction Requirements

Minimum relative compaction, %

Minimum density ratio Item Application Minimum density (Standard Compaction Effort) index (Cohesive soils) (Cohesionless soils)

1 Residential - lot, fill, house, sites 95 70

Fill to support pavements

a) General fill 2 95 70 b) Subgrade (to a depth of 98 75 0.3m)

6 of 9 PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

• After excavation and proof compaction, the excavated base is to be inspected and approved by a representative from this office prior to backfilling. At this stage it can be assessed whether any further materials need to be removed or whether further compaction of the base is required. • A minimum of 0.6m sand cover is to be maintained above the reactive material in order to achieve a Class “S” site with ys = 6mm. • The ground level should be built up to design levels with the stockpiled sand FILL and imported fill, if required. The imported fill should consist of free draining sand with not more than 5% passing a 75μm sieve and be free of organic matter and other deleterious materials. The fill materials should be placed in layers not exceeding 300mm loose thickness and compacted to achieve a minimum 8 Perth Sand Penetrometer (PSP) blows over the interval of 150 – 450mm, 9 PSP blows over the interval 450 – 750mm and 11 PSP blows over the interval 750 – 1050mm. • After remedial earthworks have been completed, the earthworks should be inspected and approved by a representative from this office. 5. CONCLUSIONS

A site investigation has been carried out at the site of the proposed residential development to assess the geotechnical conditions. Parameter and design recommendations are incorporated in the body of the report. The following conclusions have been drawn from the site investigation:

• The average subsurface soil profile encountered comprised topsoil to 0.3m, sand to 1.3m overlying the clayey SAND trace gravel to an averaged depth of 1.7m, and underlain with the medium dense to dense, locally loose sand to the investigated depth of 2.5m. • The water table was encountered at the depth of 1.4m below the existing ground. • It is considered that the site is not suitable for on-site drainage. • The site can be classified as Class “S” in accordance with AS 2870-2011, provided that the recommended earthworks are undertaken. • The full scope of the recommended earthworks is presented in Section 4.3, but generally comprises: o Stripping of topsoil and unsuitable materials o Proof compaction of the base o Placement of sand fill to required level o Compaction to final level

7 of 9 PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

6. LIMITATION OF FIELD INVESTIGATIONS

This report has been prepared in accordance with generally accepted consulting practice for The Client using information supplied at the time and for the project specific requirements as understood by Structerre. To the best of our knowledge the information contained in this report is accurate at the date of issue, however it should be emphasised that any changes to ground conditions and/or the proposed structures may invalidate the recommendations given herein.

The conclusions and recommendations in this report are based on the site conditions revealed through selective point sampling, representing the conditions of the site in total, although the area investigated represents only a small portion of the site. The actual characteristics may vary significantly between successive test locations and sample intervals other than where observations, explorations and investigations have been made.

The materials and their geotechnical properties presented in this report may not represent the full range of materials and strengths that actually exist on site and the recommendations should be regarded as preliminary in nature. Allowances should be made for variability in ground conditions and any consequent impact on the development. Structerre accepts no responsibility and shall not be liable for any consequence of variations in ground conditions.

If ground conditions encountered during construction are different to that described in this report, this office should be notified immediately.

For and behalf of

STRUCTERRE CONSULTING ENGINEERS

1-2-063633050266-0000000-11399-000052243031302 Author: Amy Yates Title: Engineering Geologist Credentials: BSc (Hons), FGS

1-2-063633050274-0000000-12225-000052243031302 Checked By: Prasudi Atmajaya Title: Geotechnical Engineer Credentials: BE Civil & Construction (Hons), MIEAust

Disclaimer This report is at the request of the addressee and no liability is accepted by Structerre Consulting Engineers to any third person reading or relying upon the report, not withstanding any rule of law and/or equity to the contrary and that this report is strictly confidential and intended to be read and relied upon only be the addressee.

Job # Revision Authored Checked

J178846 0 AY PA

8 of 9 PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

7. REFERENCES

Department of Water – Perth Groundwater Atlas

Geological Survey of Western Australia 1:250,000 Environmental Geology Series

AS 1170.4-2007 Structural design actions – Earthquake actions in Australia

AS 1289.3.1.2-2009 Methods of testing soils for engineering purposes – Soil classification tests – Determination of the liquid limit of a soil

AS 1289.3.2.1-2009 Methods of testing soils for engineering purposes – Soil classification tests – Determination of the plastic limit of a soil

AS 1289.3.3.1-2009 Methods of testing soils for engineering purposes – Soil classification tests – Calculation of the plasticity index of a soil

AS 1289.3.4.1-2009 Methods of testing soils for engineering purposes – Soil classification tests – Determination of the linear shrinkage of a soil

AS 1289.6.3.2-1997 Methods of testing soils for engineering purposes – Soil strength and consolidation tests – Determination of the penetration resistance of a soil – 9kg dynamic cone penetrometer test

AS 1726-1993 Geotechnical site investigation

AS 2870-2011 Residential slabs and footings

AS 3798-2007 Guidelines on earthworks for commercial and residential developments

AS 4055-2012 Wind loads for housing

9 of 9 PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

APPENDIX 1 – GEOTECHNICAL INVESTIGATION SITE PLAN

N BH04 BH02

LOT 45 BH03

LOT 205 PERC2

BH07 LOT 101 Area 7531 m2

BH05

LOT 415 PERC1 BH06

BH01

PERC1

NEARMAP dated 30/5/17 PROJECT: Lot 101 Forrest Highway, VITTORIA

LEGEND PROJECT #: CLIENT: D167019 SRP: Sample Retrieval Probe Saracen Developments Pty Ltd JOB #: DCP: Dynamic Cone Penetrometer Test J178846 TITLE: Zemla Pty Ltd (ABN 71 349 772 837) ATF the Young Purich and Higham SCALE: PERC: Percolation Test Unit Trust trading as Structerre Consulting Engineers NTS Geotechnical Investigation Site Plan 1 ERINDALE ROAD, BALCATTA, WA 6021 DATE: DRAWN BY: TEL 9205 4500 FAX 9205 4501 EMAIL: [email protected] 29 May '17 PA c COPYRIGHT STRUCTERRE CONSULTING GROUP - JUL'05 PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

APPENDIX 2 – SITE PHOTOGRAPHS

PHOTO 1

PHOTO 2

PROJECT: Lot 101 Forrest Highway, VITTORIA

PROJECT #: CLIENT: D167019 Saracen Developments Pty Ltd JOB #: J178846 TITLE: Zemla Pty Ltd (ABN 71 349 772 837) ATF the Young Purich and Higham SCALE: Unit Trust trading as Structerre Consulting Engineers NTS Site Photographs

1 ERINDALE ROAD, BALCATTA, WA 6021 DATE: DRAWN BY: TEL 9205 4500 FAX 9205 4501 EMAIL: [email protected] 29 May '17 PA c COPYRIGHT STRUCTERRE CONSULTING GROUP - JUL'05 PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

APPENDIX 3 – BOREHOLE LOGS & TERMINOLOGY

Test No. Project Lot 101 Forrest Highway, Vittoria BH01 Client Saracen Developments

Project No. D167019 Logged By Amy Yates Machine Sample Retrieval Probe Easting 373553 Job No. J178846 Date 29/05/2017 Hole Dia. 65mm Northing 6311693

DCP Samples Depth Graphic Stratum Description Consistency Blows/150mm Level 5101520 Water Depth Type Moisture Topsoil: VL

MD

SP: SAND: fine to medium grained, non-plastic, trace silt, brown MD - D (Alluvium) MD

L-MD

MD 1 SC: Clayey SAND: fine to medium grained, medium plasticity, trace gravel, grey 1.1 - 1.5 B (Alluvium)

MD-D

S 2 SP: SAND: fine to medium grained, non-plastic, trace silt, grey (Alluvium)

Terminated at 2.50 m

3

Remarks 1. Termination reason: Target depth 2. Hole stability: Hole stable 3. Samples taken: As indicated 4. Co-ordinate system: WGS 84 Test No. Project Lot 101 Forrest Highway, Vittoria BH02 Client Saracen Developments

Project No. D167019 Logged By Amy Yates Machine Sample Retrieval Probe Easting 377303 Job No. J178846 Date 29/05/2017 Hole Dia. 65mm Northing 6310872

DCP Samples Depth Graphic Stratum Description Consistency Blows/150mm Level 5101520 Water Depth Type Moisture Topsoil: VL

SP: SAND: fine to medium grained, non-plastic, trace silt, L brown (Alluvium)

MD

1

L-MD SC: Clayey SAND: fine to medium grained, medium plasticity, trace gravel, dark grey/brown (Alluvium)

MD SP: SAND: fine to medium grained, non-plastic, trace silt, brown (Alluvium) S 2

dark grey

Terminated at 2.50 m

3

Remarks 1. Termination reason: Target depth 2. Hole stability: Hole stable 3. Samples taken: None 4. Co-ordinate system: WGS 84 Test No. Project Lot 101 Forrest Highway, Vittoria BH03 Client Saracen Developments

Project No. D167019 Logged By Amy Yates Machine Sample Retrieval Probe Easting 377353 Job No. J178846 Date 29/05/2017 Hole Dia. 65mm Northing 6310879

DCP Samples Depth Graphic Stratum Description Consistency Blows/150mm Level 5101520 Water Depth Type Moisture Topsoil: VL

SP: SAND: fine to medium grained, non-plastic, trace silt, dark brown (Alluvium)

L

SC: Clayey SAND: fine to medium grained, medium 1 plasticity, trace gravel, grey/brown 1.0 - 1.5 B (Alluvium)

MD

SP: SAND: fine to medium grained, non-plastic, trace silt, grey (Alluvium) S 2 dark grey

grey

Terminated at 2.50 m

3

Remarks 1. Termination reason: Target depth 2. Hole stability: Hole stable 3. Samples taken: As indicated 4. Co-ordinate system: WGS 84 Test No. Project Lot 101 Forrest Highway, Vittoria BH04 Client Saracen Developments

Project No. D167019 Logged By Amy Yates Machine Sample Retrieval Probe Easting 377396 Job No. J178846 Date 29/05/2017 Hole Dia. 65mm Northing 6310891

DCP Samples Depth Graphic Stratum Description Consistency Blows/150mm Level 5101520 Water Depth Type Moisture Topsoil: VL

SP: SAND: fine to medium grained, non-plastic, trace silt, dark grey (Alluvium)

L

1

dark brown L-MD

dark grey

dark brown MD

S 2

grey

Terminated at 2.50 m

3

Remarks 1. Termination reason: Target depth 2. Hole stability: Hole stable 3. Samples taken: None 4. Co-ordinate system: WGS 84 Test No. Project Lot 101 Forrest Highway, Vittoria BH05 Client Saracen Developments

Project No. D167019 Logged By Amy Yates Machine Sample Retrieval Probe Easting 377401 Job No. J178846 Date 29/05/2017 Hole Dia. 65mm Northing 6310844

DCP Samples Depth Graphic Stratum Description Consistency Blows/150mm Level 5101520 Water Depth Type Moisture Topsoil: VL

SP: SAND: fine to medium grained, non-plastic, trace silt, dark grey (Alluvium) L-MD

1

MD

L-MD

S 2

Terminated at 2.50 m

3

Remarks 1. Termination reason: Target depth 2. Hole stability: Hole stable 3. Samples taken: None 4. Co-ordinate system: WGS 84 Test No. Project Lot 101 Forrest Highway, Vittoria BH06 Client Saracen Developments

Project No. D167019 Logged By Amy Yates Machine Sample Retrieval Probe Easting 377335 Job No. J178846 Date 29/05/2017 Hole Dia. 65mm Northing 6310858

DCP Samples Depth Graphic Stratum Description Consistency Blows/150mm Level 5101520 Water Depth Type Moisture Topsoil: VL

SP: SAND: fine to medium grained, non-plastic, trace silt, dark brown (Alluvium) with gravel, brown

L

1 SC: Clayey SAND: fine to medium grained, medium plasticity, trace gravel, grey/brown (Alluvium)

MD

SP: SAND: fine to medium grained, non-plastic, trace silt, S 2 dark grey (Alluvium)

Terminated at 2.50 m

3

Remarks 1. Termination reason: Target depth 2. Hole stability: Hole stable 3. Samples taken: None 4. Co-ordinate system: WGS 84 Test No. Project Lot 101 Forrest Highway, Vittoria BH07 Client Saracen Developments

Project No. D167019 Logged By Amy Yates Machine Sample Retrieval Probe Easting 377337 Job No. J178846 Date 29/05/2017 Hole Dia. 65mm Northing 6310833

DCP Samples Depth Graphic Stratum Description Consistency Blows/150mm Level 5101520 Water Depth Type Moisture Topsoil: VL

L

SP: SAND: fine to medium grained, non-plastic, trace silt, brown (Alluvium) L-MD

L 1

SC: Clayey SAND: fine to medium grained, medium plasticity, trace gravel, grey/brown (Alluvium) SP: SAND: fine to medium grained, non-plastic, trace silt, MD brown (Alluvium)

MD-D

S 2 dark grey

Terminated at 2.50 m

3

Remarks 1. Termination reason: Target depth 2. Hole stability: Hole stable 3. Samples taken: None 4. Co-ordinate system: WGS 84 Commercial & Residential Geotechnical Infrastructure

Inspect & Energy Investigate Assessment Environmental BORELOG TERMINOLOGY Particle Size Distribution Plasticity

Major Division Subdivision Size % 40 Boulders >200mm ), CH (I Cobbles 200 - 63mm 30 CL CI Gravel Coarse 63 - 20mm

Index 20 OH or MH Medium 20- 6mm Fine 6 - 2.36mm 10 OL or ML Sand Coarse 2.36 - 0.6mm OL or ML

Medium 0.6 - 0.2mm Plasticity 0 10 20 30 40 50 60 70 80 Fine 0.2 - 0.075mm Liquid Limit (W ), % Consistency of Cohesive Soils Term Undrained Strength Su (kPa) Field Guide Very Soft < 12 Exudes between the fingers when squeezed in hand Soft 12 - 25 Can be moulded by light finger pressure Firm 25 - 50 Can be moulded by strong finger pressure Stiff 50 - 100 Cannot be moulded by Fingers. Can be indented by thumb. Very Stiff 100 - 200 Can be indented by thumb nail Hard > 200 Can be indented with difficulty by thumb nail. Friable - Crumbles or powders when scraped by thumbnail Consistency/Density of Non-Cohesive Soils Moisture Content Term Density Index (%) SPT "N" Value Comparison Very Loose < 15 0 - 4 D Dry Loose 15 - 35 4 - 10 M Moist Medium Dense 35 - 65 10 - 30 W Wet Dense 65 - 85 30 - 50 S Saturated Very Dense > 85 > 50

Minor Components Term Assessment(Guide Proportion(of(Minor(Component(In: Trace Presence just detectable by feel or eye, but soil Coarse grained soils: < 5 % properties little or no different to general properties Fine grained soils: <15% of primary component With Presence easily detected by feel or eye, soil Coarse grained soils: 5 - 12 % properties little different to general properties Fine grained soils: 15 - 30% of primary component

Soil Legend FILL CLAY GRAVEL CONCRETE TOPSOIL SILT LIMESTONE COMBINATIONS PEAT SAND BEDROCK eg: Clay, Silty, Sandy USCS GW Well graded gravel SC Clayey sand OL Organic low plasticity silt CL Low plasticity clay GP Poorly graded gravel SM Silty sand ML Low plasticity silt CI Intermediate plasticity clay SW Well graded sand MH High plasticity silt CH High plasticity clay SP Poorly graded sand OH Organic high plasticity silt PT Peat Doc: GE 2.2.3

Perth | Brisbane | Sydney | Bunbury | Geraldton | Gold Coast | Albany | Karratha 1 Erindale Road, Balcatta, Western Australia 6021 | PO Box 792, Balcatta, Western Australia 6914 Phone (+618) 9205 4500 | Fax (+618) 9205 4501 | Email [email protected] | Web www.structerre.com.au ABN 71 349 772 837 Zemla Pty Ltd ACN 008 966 283 as trustee for the Young Purich and Higham Unit Trust trading as Structerre Consulting Engineers PROJECT No: D167019 JOB No: J178846 PROJECT ADDRESS: Lot 101 Forrest Highway, Vittoria CLIENT: Saracen Developments Pty Ltd

APPENDIX 4 – LABORATORY TEST RESULTS

Commercial & Residential Geotechnical Infrastructure

Inspect & Energy Investigate Assessment Environmental

Sample No. 29739 Client Geotechnical

Job No. J178846 Project Lot 101 Forrest Highway, Vittoria

SAMPLE DETAILS

BH No. / Depth : 1 1.1-1.5m Sampling Method Client Sample History : Air Dried 500C Oven Dried Sample Preparation AS 1289 1.1

ATTERBERG LIMITS

Description Method Result (%)

Liquid Limit AS 1289.3.1.2 33 Plastic Limit AS 1289.3.2.1 18 Plasticity Index AS 1289.3.3.1 15 Linear Shrinkage AS 1289.3.4.1 3 Nature of Shrinkage Flat

PARTICLE SIZE DISTRIBUTION

Method: AS 1289.3.6.1 Description: Particle size distribution by sieve analysis

Sieve Size (mm) % Passing 19.0 100 2.36 98 0.425 78 0.075 17

Material Description: Clayey SAND trace gravel AS 1726 Appendix A Section A2: SC

Wayne Rozmianiec Date: 06-Jun-17 Authorised Signatory

Soils Analysis Workbook with Full PSD V 2.09 02-May-17 AS 1289.3.6.1 SAW Rev 1NATA Jan-15 WA | QLD | NSW | VIC 1 Erindale Road, Balcatta, Western Australia 6021 | PO Box 792, Balcatta, Western Australia 6914 Phone (+618) 9205 4500 | Fax (+618) 9205 4501 | Email [email protected] | Web www.structerre.com.au ABN 71 349 772 837 Zemla Pty Ltd ACN 008 966 283 as trustee for the Young Purich and Higham Unit Trust trading as Structerre Consulting Engineers

APPENDIX E

Traffic Impact Assessment

Proposed Roadhouse Lot 101 Forrest Highway, Vittoria Transport Impact Assessment

PREPARED FOR: Saracen Developments Pty Ltd

May 2018

Document history and status

Date Author Revision Approved by Revision type approved Paul Ghantous r01 14/07/17 Draft Paul Ghantous r01a 21/08/17 2nd Draft Paul Ghantous r01b 17/10/17 3rd Draft Paul Ghantous r01c B Bordbar 06/12/17 Final Paul Ghantous r01d B Bordbar 02/05/18 Revised Draft Paul Ghantous r01e B Bordbar 10/05/18 Revised Final

File name: t16.342.pg.r01e

Author: Paul Ghantous

Project manager: Behnam Bordbar

Client: Saracen Developments Pty Ltd

Project: North-east Cnr Johnston Rd & Forrest Hwy, Bunbury

Document revision: r01e

Project number: t16.342

Copyright in all drawings, reports, specifications, calculations and other documents provided by the Consultant in connection with the Project shall remain the property of the Consultant.

The Client alone shall have a license to use the documents referred to above for the purpose of completing the Project, but the Client shall not use, or make copies of, such documents in connection with any work not included in the Project, unless written approval is obtained from the Consultant or otherwise agreed through a separate contract.

TABLE OF CONTENTS

1.0 SUMMARY ...... 1

2.0 INTRODUCTION ...... 2

3.0 EXISTING SITUATION ...... 4

3.1 EXISTING SITE USE, ACCESS AND PARKING ...... 4 3.2 EXISTING SITE TRAFFIC GENERATION ...... 4 3.3 SURROUNDING ROAD NETWORK AND TRAFFIC MANAGEMENT ON FRONTAGE ROADS ...... 5 3.4 EXISTING TRAFFIC VOLUMES ON ROADS AND MAJOR INTERSECTIONS ...... 6 3.5 PUBLIC TRANSPORT ACCESS ...... 6 3.6 PEDESTRIAN AND CYCLIST FACILITIES ...... 8 3.7 CRASH DATA ...... 8 4.0 CHANGES TO SURROUNDING TRANSPORT NETWORKS ...... 10

4.1 MEETING WITH MAIN ROADS WA – 20 FEBRUARY 2017 ...... 10 4.2 BUNBURY PORT INNER HARBOUR STRUCTURE PLAN ...... 10 4.3 MAIN ROADS WA FORREST HIGHWAY UPGRADE PLANS ...... 10 4.4 ADVICE FROM DEPARTMENT OF PLANNING ...... 11 5.0 DEVELOPMENT PROPOSAL ...... 12

5.1 PROPOSED SITE USE ...... 12 5.2 PROPOSED ACCESS FOR ALL MODES ...... 12 6.0 INTEGRATION WITH SURROUNDING AREA ...... 14

7.0 TRAFFIC ASSESSMENT ...... 15

7.1 ASSESSMENT YEARS AND TIME PERIODS ...... 15 7.2 DEVELOPMENT GENERATION AND DISTRIBUTION ...... 15 7.2.1 PROPOSED DEVELOPMENT TRAFFIC GENERATION ...... 15 7.3 TRAFFIC FLOWS ...... 19 7.4 IMPACT ON SURROUNDING ROADS ...... 21 7.5 IMPACT ON NEIGHBOURING AREAS...... 22 7.6 TRAFFIC NOISE AND VIBRATION ...... 22 8.0 PARKING ...... 23

9.0 PROVISION FOR HEAVY VEHICLES ...... 24

10.0 CONCLUSIONS ...... 25

APPENDIX A: BUNBURY PORT INNER HARBOUR STRUCTURE PLAN APPENDIX B: MAIN ROADS FORREST HIGHWAY CONCEPT PLANS APPENDIX C: PROPOSED SITE PLAN APPENDIX D: PROPOSED ACCESS CONCEPT SKETCHES APPENDIX E: SWEPT PATH ANALYSIS

REPORT FIGURES

Figure 1: Location of the subject site ...... 2 Figure 2: Location of the subject site in context of the Greater Bunbury Region Scheme ...... 3 Figure 3: Subject site from Forrest Highway ...... 4 Figure 4: Traffic treatments near the subject site ...... 5 Figure 5: Existing bus routes ...... 7 Figure 6: Crash statistics for Forrest Highway / Vittoria Road...... 9 Figure 7: Passing trade component - weekday AM & PM peak hour traffic for the proposed development (interim & ultimate access) ...... 17 Figure 8: Additional (non-passing trade) component weekday AM & PM peak hour traffic for the proposed development (interim access) ...... 17 Figure 9: Additional (non-passing trade) component weekday AM & PM peak hour traffic for the proposed development (ultimate access) ...... 18 Figure 10: Net change in peak hour traffic generated by the proposed development – Weekday AM and PM peak hours (interim access) ...... 18 Figure 11: Net change in peak hour traffic generated by the proposed development – Weekday AM and PM peak hours (ultimate access) ...... 19 Figure 12: Existing traffic flows near the subject site – Weekday AM & PM peak hours ...... 19 Figure 13: Immediately post-development traffic flows near the subject site – Weekday AM and PM peak hours (interim access) ...... 20 Figure 14: Immediately post-development traffic flows near the subject site – Weekday AM and PM peak hours (ultimate access) ...... 20

1.0 Summary

This Transport Impact Assessment (TIA) is prepared with respect to the proposed roadhouse at Lot 101 Forrest Highway, Vittoria.

The proposed access arrangement entails provision of a left turn pocket and access road for the eastbound direction of traffic flow on Forrest Highway. A single left out crossover is proposed for the development, to be located east of the traffic signals.

Two access concept design sketches have been prepared which consider the existing and ultimate geometry of Forrest Highway. The proposed development layout and access arrangements consider other future potential developments on nearby properties in the area by permitting shared access and egress to and from Forrest Highway. Accordingly, allowance has been made to accommodate an internal service road which can provide future connectivity between the proposed development and other adjoining Lots in the immediate locality.

The proposed development layout has been assessed with respect to truck access, egress and circulation. Swept path analysis confirms that the proposed access and egress arrangements facilitate safe and efficient circulation through the site for fuel tankers and trucks as large as B-Doubles.

The analysis undertaken as part of the Transport Impact Assessment confirms minimal, manageable and therefore acceptable impact on the surrounding road network.

t16.342.pg.r01e Page 1

2.0 Introduction

This Transport Impact Assessment has been prepared by Transcore on behalf of Saracen Developments Pty Ltd. The subject of this report is the proposed roadhouse development at Lot 101 Forrest Highway, Vittoria.

As shown in Figure 1, the subject site is located on the northern side of Forrest Highway, approximately 220m east of the intersection of Forrest Highway / Vittoria Road. The subject site is located within and forms part of Bunbury Port Inner Harbour Structure Plan.

The proposed access and egress arrangements for the proposed development have given due consideration to potential future integration with adjacent properties in the locality, and support the principle of minimise direct property access to Forrest Highway.

The location of the site in the context of the Greater Bunbury Region Scheme is indicated in Figure 2.

Key issues that will be addressed in this report include the traffic generation of the proposed development, future planning for Forrest Highway, operation of the site crossovers and heavy vehicle access, egress and circulation.

Subject Site

Source: Harley Dykstra Figure 1: Location of the subject site

t16.342.pg.r01e Page 2

Subject Site

Figure 2: Location of the subject site in context of the Greater Bunbury Region Scheme

t16.342.pg.r01e Page 3

3.0 Existing Situation

3.1 Existing Site Use, Access and Parking

As shown in Figure 3 the site is mostly vacant and fenced off. A storage shed is currently located on the site. An unsealed driveway connecting to Forrest Highway is currently provided at the site.

The site is surrounded by primarily vacant land north of Forrest Highway. The Bunbury Farmers Markets, an existing Shell Service Station and residential development is located nearby south of Forrest Highway.

Figure 3: Subject site from Forrest Highway

3.2 Existing Site Traffic Generation

The subject site is mostly vacant and generates negligible traffic.

t16.342.pg.r01e Page 4

3.3 Surrounding Road Network and Traffic Management on Frontage Roads

Forrest Highway

Forrest Highway at this location is constructed to a four-lane, divided carriageway standard with sealed shoulders on both sides of the road.

Forrest Highway is classified as a Primary Distributor road in the Main Roads WA Functional Road Hierarchy. Forrest Highway also forms part of the State road network and is covered by a Primary Regional Roads (PRR) reservation in the GBRS (Red Road) and as such is under care and control of Main Roads WA.

Forrest Highway operates with a sign-posted speed limit of 80km/h in the immediate vicinity of the subject site.

As detailed in Figure 4, the signalised intersection of Forrest Highway / Vittoria Road is controlled on the south approach for left and right turn movements, the east approach for left and through movements and the west approach for right turn movements. The through movement on the west approach is uninterrupted, resulting in continuous traffic flow in the eastbound direction on Forrest Highway through the intersection. Right turn movements from Vittoria Road are provided with an acceleration and merging lane in the eastbound direction on Forrest Highway.

Two median breaks are currently provided on Forrest Highway near the existing Shell service station. The eastern median break is provided with a U-turn facility including turn pocket for eastbound traffic on Forrest Highway. The U-turn facility is provided near the left turn pocket and access into the Shell service station, and therefore also allows eastbound traffic on Forrest Highway to access the Shell service station on the southern side of the road. The western median break permits right out movements from the Shell service station.

Figure 4: Traffic treatments near the subject site

t16.342.pg.r01e Page 5

3.4 Existing Traffic Volumes on Roads and Major Intersections

Traffic count data obtained from Main Roads WA indicates that Forrest Highway carried average weekday traffic flows of approximately 29,100 vehicles per day (vpd) in August 2013 west of Vittoria Road. The recorded heavy vehicle traffic component was 8% of total weekday traffic volume.

The weekday AM peak hour at this location on Forrest Highway occurs between 8:00am and 9:00am and the PM peak hour occurs between 4:00pm and 5:00pm.

To establish existing base traffic flows at the intersection of Forrest Highway / Vittoria Road, Transcore requested SCATS intersection data for both this intersection and the next signalised intersection to the east (Forrest Highway / Thomson Road).

The existing peak hour traffic flows are outlined in Section 7.3 of this report.

3.5 Public Transport Access

The following bus routes run pass the subject site on Forrest Highway:

• 841 - Bunbury – Kingston via Bunbury Forum and Australind Shop Ctr; • 844 - Bunbury – Eaton via Bunbury Forum and Eaton Fair Shop Ctr; and, • 845 - Bunbury – Eaton / Millbridge via Bunbury Forum and Eaton Fair Shop Ctr.

The existing bus routes are detailed in Figure 5. The nearest bus stops are in place on Forrest Highway approximately 350m west of the subject site.

The roadhouse development is intended to cater for passing traffic and is primarily motor vehicle oriented. Therefore, public transport connectivity is not a significant consideration in this assessment.

t16.342.pg.r01e Page 6

Subject Site

Figure 5: Existing bus routes

t16.342.pg.r01e Page 7

3.6 Pedestrian and Cyclist Facilities

No footpaths or off-road cycle facilities are provided within the vicinity of the site due to the low density of development in this area.

Footpaths and cycle facilities are not considered to be significant issues for the proposed development which is intended to be vehicle orientated.

As the surrounding land is developed in future, it is anticipated that the pedestrian and cycle network would be developed as required, and facilities for cyclists would be provided within the development.

3.7 Crash Data

Information available on the Main Roads WA website indicates that the intersection of Forrest Highway / Vittoria Road near the subject site recorded a total of 35 road crashes including 6 casualties during the five-year period ending in December 2016. This intersection is ranked 569 in the state in terms of the number of crashes.

t16.342.pg.r01e Page 8

Figure 6: Crash statistics for Forrest Highway / Vittoria Road

t16.342.pg.r01e Page 9

4.0 Changes to Surrounding Transport Networks

4.1 Meeting with Main Roads WA – 20 February 2017

Transcore met with Main Roads WA in Bunbury on 20 February 2017 to discuss key considerations relevant to the transport assessment. The key considerations of note include:

• The access system to the site needs to consider access to the whole precinct. • Main Roads are likely to require closure of the U-turn facilities on Forrest Highway for the existing Shell service station. • The design of the access system will need to allow for the future upgrading of Forrest Highway to three lanes each way. • A left-turn in crossover should be provided only (no right turn entry from Forrest Highway). • The left-turn lane will need to be a minimum length of 125m including taper. • The design of the left turn lane may impact the existing bus stop in the verge, but its relocation if required, is not an issue.

4.2 Bunbury Port Inner Harbour Structure Plan

The Bunbury Port Inner Harbour Structure Plan, attached in Appendix A, shows a planned waterway running along the rear of the subject site and neighbouring properties. The proposed railway alignment shown in the structure plan is located to the north of the waterway. The Inner Harbour Structure Plan does not and is not intended to have a statutory effect in terms of LPS 7 or the GBRS. Rather, it has been approved by the Bunbury Port Authority as a policy document to guide future development and decision making within the Inner Harbour.

4.3 Main Roads WA Forrest Highway Upgrade Plans

Transcore has reviewed the preliminary ultimate concept plans for the planned upgrading of Forrest Highway, provided by Main Roads WA. Revision B of the plans (attached in Appendix B) show the following items of note:

• Three traffic lanes in each direction. • Two-lane busway in the median. • Construction of bus platforms east and west of the intersection with Vittoria Road with modification of the signalised intersection to accommodate bus priority and access.

t16.342.pg.r01e Page 10

• Double right turn pocket from Vittoria Road into Forrest Highway. • Full signalisation of the intersection of Forrest Highway / Vittoria Road, with eastbound traffic becoming signal controlled. • A Principal Shared Path (PSP) running along the southern side of Forrest Highway. • An alternative rail alignment running immediately north of Forrest Highway.

The Local Planning Strategy shows a ‘Future Fast Rail’ link across the site adjacent to Forrest Highway. Given the proposal for a Future Fast Rail service is an unfunded, long term strategic planning consideration, it could not at this stage be viewed as a seriously entertained proposal and hence has not been considered in this Transport Impact Assessment.

In the even that more detailed planning for a fast rail link is progressed in the future, there are a range of alternative alignment options that could be explored, particularly given the alignment that is currently depicted has significant constraints. As such, approval of the proposed development would not prejudice future planning for a fast rail link as envisaged by the strategy.

4.4 Advice from Department of Planning

Based on email information provided to Transcore, Harley Dykstra has been advised by the Department of Planning that Forrest Highway is planned for 4 lanes each direction (including bus and cycle lanes). Traffic is forecast to be in the range of 70,000 to 80,000 vehicles per day.

The planned cross-section of 3 traffic lanes plus 1 bus lane in each direction is consistent with the Main Roads WA, Forrest Highway upgrade concepts provided to Transcore and has been considered in the interim and ultimate access concept sketches prepared by Transcore for the proposed development.

t16.342.pg.r01e Page 11

5.0 Development Proposal

5.1 Proposed Site Use

The proposed development is for a roadhouse with convenience store and ancillary food offerings, comprising:

Light vehicle canopy with 8 fuelling points for light vehicles; Associated convenience store building (~200m2); Fast food outlet (total ~150m2); Drive through coffee shop; Service vehicle areas / loading bays; Freight vehicle and coach parking (three (3) bays with Bay No. 3 accommodating B-Double trucks and also serving as the fuel delivery point; Small truck and caravan parking; Emergency vehicle breakdown area; and, Approximately 44 car parking spaces (including one electric vehicle charging station and three ACROD bays).

The layout of the proposed development is shown in the concept plan included in Appendix C.

5.2 Proposed Access for all Modes

Vehicle access to the site is proposed via a single left-in crossover and a single left-out crossover on Forrest Highway.

Transcore has prepared two concept access design sketches for the proposed development which consider the interim (existing) configuration of Forrest Highway, and the ultimate (planned) configuration of Forrest Highway.

Both concept options feature a left-turn pocket for the development access for the eastbound direction of traffic flow on Forrest Highway. The interim concept sketch proposes the extension of the existing eastbound merging lane on Forrest Highway, which entails approximately 1.5m of widening into the median and extension of the concrete island separating merging traffic (turning right from Vittoria Road into Forrest Highway).

The total length of the turn pocket exceeds minimum 125m length required by Main Roads WA.

The left turn pocket and service road cannot be accessed by vehicles which turn right from Vittoria Road into Forrest Highway in the interim scenario. This is to prevent any weaving of these vehicles across Forrest Highway to enter the site which would conflict with uninterrupted eastbound through traffic on Forrest Highway.

t16.342.pg.r01e Page 12

The concept options provide a single left turn out crossover at the eastern end of the site for egress to Forrest Highway.

The proposed development and access concepts can potentially integrate with and be shared by other neighbouring Lots within the immediate locality. This supports the principle of minimising direct property access to this section of Forrest Highway.

The proposed access concept sketches are included in Appendix D.

t16.342.pg.r01e Page 13

6.0 Integration with Surrounding Area

The proposed development will be consistent with other developments fronting sections of Forrest Highway and will integrate well with surrounding future planned land uses and road network changes in the area.

The proposed access arrangements integrate well with the existing road environment to prevent weaving of traffic. The access arrangements also make allowance for the ultimate design of Forrest Highway.

t16.342.pg.r01e Page 14

7.0 Traffic Assessment

7.1 Assessment Years and Time Periods

The proposed development is expected to generate highest traffic movements during the peak hour periods of the adjacent road network.

Review of the Main Roads WA traffic count data indicates that the peak weekday traffic hours on Forrest Highway are between 8:00am and 9:00am and between 4:00pm and 5:00pm.

7.2 Development Generation and Distribution

7.2.1 Proposed Development Traffic Generation

The traffic volume that would be generated by the proposed development has been estimated using trip generation rates derived from various sources as following:

Roads and Traffic Authority of New South Wales Guide to Traffic Generating Developments (2002); ITE Trip Generation Manual 9th Edition; and, Traffic surveys for drive through coffee outlets in Transcore’s database.

The trip rates which were used to estimate the proposed development traffic generation are listed for each land use component as following:

Gasoline/Service Station with Convenience Market (945) – Regular Fuelling Points

AM Peak hour: 10.16 trips per fuelling point. PM Peak hour: 13.51 trips per fuelling point. Weekday: 163 trips per fuelling point.

Assume conservatively 70% passing trade for a robust assessment as the site is adjacent to Forrest Highway.

t16.342.pg.r01e Page 15

Retail / Take Away Food Outlets

A(SS): Specialty shops, secondary retail GLFA - includes specialty shops and take-away stores such as McDonalds. These stores are grouped as they tend to not be primary attractors to the centre.

Trip rate A(SS) – Specialty Retail:

AM peak: 46 trips per 1000m2 (50% in / 50% out); PM peak: 46 trips per 1000m2 (50% in / 50% out); and, Daily: 555 trips per 1000m2 (50% in / 50% out).

Assume conservatively 50% passing trade discount for a robust assessment.

Coffee Drive Through Outlet

The surveyed daily and peak hour traffic generation contained in Transcore’s database was based on surveys undertaken for a busy metro Perth coffee outlet. Therefore, a trip reduction factor of 50% was applied for the proposed coffee drive through at this subject site, to account for the low development density in the surrounding area and for cross-trade particularly with the service station.

50% passing trade was also conservatively assumed for the coffee drive through for a robust assessment.

Total Development Traffic Generation

It is conservatively estimated that the proposed development would generate approximately 1,824 vehicular trips per day (both inbound and outbound) with approximately 150 and 144 trips during the weekday AM and PM peak hours respectively.

The net addition of traffic when accounting for passing trade of the site is +650vpd (daily), +58vph (AM peak hour) and +50vph (PM peak hour) on the surrounding road network.

The directional split of inbound and outbound trips for the proposed development is estimated to be about 50/50 for inbound/outbound trips during the peak hour.

Two traffic distributions have been modelled for the weekday AM and PM peak hours for the interim & ultimate access scenarios:

Passing trade traffic as detailed in Figure 7 for both the interim and ultimate access scenarios. Non-passing trade traffic as detailed in Figure 8 (interim access) & Figure 9 (ultimate access).

t16.342.pg.r01e Page 16

The total proposed development traffic is detailed in Figure 10 (interim access) & Figure 11 (ultimate access).

All traffic is assumed to turn left in from Forrest Highway and left out onto Forrest Highway.

Passing Trade - Interim & Ultimate in out SUBJECT AM AM 46 46 SITE PM PM 47 47

47 46

Proposed Access Road 47

0 0 47 46 46

0 0 0 0 -47 -46 -47 -46

0 0 0 0 Forrest Highway 0 0

0 0 0 0

0 0 Vittoria Road

Figure 7: Passing trade component - weekday AM & PM peak hour traffic for the proposed development (interim & ultimate access)

Non Passing Trade - Interim in out SUBJECT AM 29 29 SITE PM 25 25

25 29

Proposed Access Road 25

25 29 25 29 29

25 29 0 0 0 0 0 0

0 0 0 0 Forrest Highway 0 0

0 0 0 0

0 0 Vittoria Road

Figure 8: Additional (non-passing trade) component weekday AM & PM peak hour traffic for the proposed development (interim access)

t16.342.pg.r01e Page 17

Non Passing Trade - ultimate in out SUBJECT AM 29 29 SITE PM 25 25

25 29

Proposed Access Road 25

15 18 25 29 29

15 18 0 0 0 0 0 0

0 0 0 0 Forrest Highway 0 0

0 11 0 0

0 10 Vittoria Road

Figure 9: Additional (non-passing trade) component weekday AM & PM peak hour traffic for the proposed development (ultimate access)

Total Development Traffic - Interim in out SUBJECT AM 75 75 SITE PM 72 72

72 75

Proposed Access Road 72

25 29 72 75 75

25 29 0 0 -47 -46 -47 -46

0 0 0 0 Forrest Highway 0 0

0 0 0 0

0 0 Vittoria Road

Figure 10: Net change in peak hour traffic generated by the proposed development – Weekday AM and PM peak hours (interim access)

t16.342.pg.r01e Page 18

Total Development Traffic - Ultimate in out SUBJECT AM 75 75 SITE PM 72 72

72 75

Proposed Access Road 72

15 18 72 75 75

15 18 0 0 -47 -46 -47 -46

0 0 0 0 Forrest Highway 0 0

0 11 0 0

0 10 Vittoria Road

Figure 11: Net change in peak hour traffic generated by the proposed development – Weekday AM and PM peak hours (ultimate access)

7.3 Traffic Flows

The existing traffic flows near the subject site are presented in Figure 12. The existing traffic volumes were derived from Main Roads WA SCATS and midblock traffic data.

AM SUBJECT PM SITE 0 0

Proposed Access Road 0

1522 615 0 0 0

1765 727 243 112 1827 740 1827 740

1744 1448 1464 1175 Forrest Highway 1739 1420

280 125 275 245

273 305 Vittoria Road Figure 12: Existing traffic flows near the subject site – Weekday AM & PM peak hours

The combined base and development traffic volumes are presented in Figure 13 (interim access) & Figure 14 (ultimate access).

t16.342.pg.r01e Page 19

Total Development Traffic - Interim in out SUBJECT AM 75 75 SITE PM 72 72

72 75

Proposed Access Road 72

1547 644 72 75 75

1790 756 243 112 1780 694 1780 694

1744 1448 1464 1175 Forrest Highway 1739 1420

280 125 275 245

273 305 Vittoria Road

Figure 13: Immediately post-development traffic flows near the subject site – Weekday AM and PM peak hours (interim access)

Total Development Traffic - Ultimate in out SUBJECT AM 75 75 SITE PM 72 72

72 75

Proposed Access Road 72

1537 633 72 75 75

1780 745 243 112 1780 694 1780 694

1744 1448 1464 1175 Forrest Highway 1739 1420

280 136 275 245

273 315 Vittoria Road

Figure 14: Immediately post-development traffic flows near the subject site – Weekday AM and PM peak hours (ultimate access)

t16.342.pg.r01e Page 20

7.4 Impact on Surrounding Roads

The WAPC Transport Impact Assessment Guidelines (2016) provides guidance on the assessment of traffic impacts:

“As a general guide, an increase in traffic of less than 10 per cent of capacity would not normally be likely to have a material impact on any particular section of road, but increases over 10 per cent may. All sections of road with an increase greater than 10 per cent of capacity should therefore be included in the analysis. For ease of assessment, an increase of 100 vehicles per hour for any lane can be considered as equating to around 10 per cent of capacity. Therefore, any section of road where development traffic would increase flows by more than 100 vehicles per hour for any lane should be included in the analysis.”

The proposed development will not increase traffic flows anywhere near the quoted WAPC threshold to warrant further detailed analysis. As detailed in Section 7.2, the proposed development will not increase traffic on any lanes on the surrounding road network by more than 100vph, therefore the impact on the surrounding road network is insignificant.

The proposed development crossover on Forrest Highway will permit left turn exit movements only and therefore operation of this crossover will be satisfactory. No impact on the signalised intersection operation is anticipated either, due to the very low percentage increase in traffic (<5%).

t16.342.pg.r01e Page 21

7.5 Impact on Neighbouring Areas

The traffic generated by the proposed development is not expected to significantly affect surrounding areas and the road network has been designed to accommodate this type of development traffic. Therefore, there is not expected to be any impact on neighbouring areas that would require any further consideration.

7.6 Traffic Noise and Vibration

It generally requires a doubling of traffic volumes on a road to produce a perceptible 3dB (A) increase in road noise. The proposed development will not increase traffic volumes or noise on surrounding roads anywhere near this level to result in any perceptible increase in noise.

t16.342.pg.r01e Page 22

8.0 Parking

The proposed development provides 44 car parking bays including one electric vehicle charging station and three ACROD bays.

A freight vehicle/coach parking zone is provided along the southern frontage of the site with around 90m stacking capacity in three bays. A dedicated waste collection/loading zone is provided adjacent to the convenience store.

Two parking lanes are also provided within the site for small truck and/or caravan parking.

The proposed development also provides additional vehicle parking spaces at the fuel bowsers (8 fuelling positions), plus additional stacking positions in the coffee drive through and within the fast food drive through.

It is considered that the proposed parking provision is sufficient to accommodate the needs of the proposed development.

t16.342.pg.r01e Page 23

9.0 Provision for Heavy Vehicles

The proposed development plan makes provision for loading at the convenience store and drive through takeaway. 8.8m SRVs are anticipated to service these areas of the site.

The proposed development plan has been revised to accommodate parking for B- Double trucks.

Therefore, turn path analysis was undertaken for both 19m fuel tankers and B-Doubles to confirm satisfactory access, egress and circulation. The turn path diagrams are included in Appendix E, and confirm that there is sufficient space available to accommodate fuel tanker and B-Double circulation through the site.

Turn path analysis was also undertaken of the loading zones and drive through lanes to confirm satisfactory circulation.

t16.342.pg.r01e Page 24

10.0 Conclusions

This Transport Impact Assessment has been prepared by Transcore on behalf of Saracen Developments Pty Ltd. The subject of this report is the proposed roadhouse development at Lot 101 Forrest Highway, Vittoria.

Vehicle access to the site is proposed via a single left-in crossover and a single left-out crossover on Forrest Highway.

Transcore has prepared two concept access design sketches for the proposed development which consider the interim and the ultimate configuration of Forrest Highway, which is planned to be widened to four lanes each way in the future.

Both concept options feature a left-turn pocket for the development access in the eastbound direction of traffic flow on Forrest Highway. The concept options provide a single left turn out crossover at the eastern end of the site for egress to Forrest Highway. The concepts also make allowance for the future provision of a two-way service road between the proposed development and Forrest Highway to provide access to properties to the east of the subject site.

Traffic generation has been assessed and the proposed development is anticipated to generate traffic flows of approximately 150 and 144 vph during the weekday AM and PM peak hours respectively. Most of this traffic is related to pass-by trips already passing the site on the surrounding road network.

The proposed access arrangement and relatively low additional traffic generation will result in minimal impact on the road network. No impact on the operation of the Forrest Highway / Vittoria Road intersection is anticipated.

In conclusion, the findings of this Transport Impact Assessment are supportive of the proposed development.

t16.342.pg.r01e Page 25

Appendix A

BUNBURY PORT INNER HARBOUR STRUCTURE PLAN

t16.342.pg.r01e Page 26

t16.342.pg.r01e Page 27

Appendix B

MAIN ROADS FORREST HIGHWAY CONCEPT PLANS

t16.342.pg.r01e Page 28

t16.342.pg.r01e Page 29

t16.342.pg.r01e Page 30

Appendix C

PROPOSED SITE PLAN

t16.342.pg.r01e Page 31

t16.342.pg.r01e Page 32

Appendix D

PROPOSED ACCESS CONCEPT SKETCHES

t16.342.pg.r01e Page 33

t16.342.pg.r01e Page 34

t16.342.pg.r01e Page 35

t16.342.pg.r01e Page 36

Appendix E

SWEPT PATH ANALYSIS

t16.342.pg.r01e Page 37

t16.342.pg.r01e Page 38

t16.342.pg.r01e Page 39

t16.342.pg.r01e Page 40

t16.342.pg.r01e Page 41

t16.342.pg.r01e Page 42

t16.342.pg.r01e Page 43

t16.342.pg.r01e Page 44

THIS PAGE IS INTENTIONALLY BLANK

t16.342.pg.r01e Page 45

APPENDIX F

Stormwater Management Plan

Fred Wallefeld

From: Simon Rodgers Sent: Wednesday, 15 November 2017 2:41 PM To: Krish Seewraj; Fred Wallefeld; [email protected] Cc: Daniel Wong Subject: Floodplain management advice - Lot 101 Forest Highway Vittoria - Fred Wallefeld - 15112017 Attachments: 21169-01C DA.PDF

Categories: Filed by Newforma

Fred

The following guiding principles are used by the DoW to ensure proposed development in floodprone areas is acceptable with regard to major flooding:

• proposed development has adequate flood protection from a 1 in 100 AEP flood • proposed development does not detrimentally impact on the existing 1 in 100 AEP flooding regime of the general area

The DoW has 1 in 100 AEP floodplain mapping and floodplain development strategies for the Preston River (includes scenarios of breaching of existing levee banks, Stages 1 & 2 Moorlands, proposed diversion of Preston River due to the expansion of Bunbury Port Authority, etc).

This modelling shows that the entire land is effected by flooding with the 1 in 100 AEP flood level currently estimated to be ~2.7 m AHD. Should mean sea level rise as expected over the next century (ie, 0.9 m by 2110) the 1 in 100 AEP flood level will reach ~ 3.0 m AHD. The available survey information shows that the general natural surface level of the Lot is ~ 2.2 to 2.5 m AHD.

When development is proposed within a floodplain our department assesses each proposal based on its merits and the factors examined include depth of flooding, velocity of flow, its obstructive effects on flow, possible structural and potential flood damage, difficulty in evacuation during major floods and its regional benefit.

For this particular proposal, • the lot is located on the edge of the existing relatively broad floodplain (~ 1 kilometre wide) with the level of Forrest Highway at the front of the property above the 1 in 100 AEP flooding • the proposed development would result in a minor loss in flood storage and will not detrimentally impact on the existing flooding regime. However, the cumulative impact of similar development of other lots in the area could result in detrimental impacts to the existing flooding regime. • The proposed building floor levels of 2.65 m AHD do not provide 1 n 100 AEP flood protection. Minimum habitable floor levels of 3.5 m AHD are recommended to provide adequate 1 in 100 AEP flood protection into the future.

If you require any further information please contact me on 6364 6923.

Regards

Simon Rodgers Supervising Engineer

1 Floodplain management

Department of Water and Environmental Regulation Level 4, The Atrium, 168 St Georges Terrace, PERTH WA 6000 Locked Bag 33, Cloisters Square, PERTH WA 6850 T: (08) 6364 6923 E: [email protected] | www.dwer.wa.gov.au Twitter: @DWER_WA

Disclaimer: This e-mail is confidential to the addressee and is the view of the writer, not necessarily that of the Department of Water and Environmental Regulation, which accepts no responsibility for the contents. If you are not the addressee, please notify the Department by return e-mail and delete the message from your system; you must not disclose or use the information contained in this email in any way. No warranty is made that this material is free from computer viruses.

2 P:\32854\Project Documentation\Civil\UWMP\Basin Catchment 1 10ARI.xls 24/10/2017

RAINFALL DISCHARGE / BASIN VOLUME ESTIMATE Estimation by Rational Method - 1987 Australian Rainfall and Runoff

Job : Lot 101 Forrest Highway Client : Harley Dykstra Catchment : 1 Job # : 32854 Date : 24/10/2017 By : F.Wallefeld

Design Rainfall Intensity Wood Wood & Grieve Location : Duration :

Storm Event : Intensity : 29.6 mm/hr ENGINEERS

Catchment Details Outflow Details Soakage Rate Area : 620 m2 Soil Type : 0.5 m/day Run-off Coefficient : 0.90 Soakage Rate : 0.00000579 m/s  0.0006 m3/s draining time

Flow Rate : 4.6 L/s Outlet : 0.0 m3/s (Total Soakage) 8.1264 hours 16 Altona 16 Altona Street, West Perth WA 6005

Storage Details Volume : 16.25 m3 at 3 hours Freeboard 0 mm Surface Area : 96.00 m2 no freeboard - m2

Batter/Slope

Base Area : 96.00 m2 Depth 0.25 m

Output Current base area, depth and batter slopes can hold a Volume of : 24.00 m3 The Volume required to store a 10 year storm is : 16.25 m3 Does the proposed basin hold the design storm ? Yes

Note: Volume Calculated is based on a circular base and top shape. It is the volume between the RL of the outlet and the RL of the overflow point.

Page 1 of 1 P:\32854\Project Documentation\Civil\UWMP\Basin Catchment 1 100ARI.xls 24/10/2017

RAINFALL DISCHARGE / BASIN VOLUME ESTIMATE Estimation by Rational Method - 1987 Australian Rainfall and Runoff

Job : Lot 101 Forrest Highway Client : Harley Dykstra Catchment : 1 Job # : 32854 Date : 24/10/2017 By : F.Wallefeld

Design Rainfall Intensity Wood Wood & Grieve Location : Duration :

Storm Event : Intensity : 44.7 mm/hr ENGINEERS

Catchment Details Outflow Details Soakage Rate Area : 620 m2 Soil Type : 0.5 m/day Run-off Coefficient : 0.90 Soakage Rate : 0.00000579 m/s  0.0006 m3/s draining time

Flow Rate : 6.9 L/s Outlet : 0.0 m3/s (Total Soakage) 13.2798 hours 16 Altona 16 Altona Street, West Perth WA 6005

Storage Details Volume : 26.56 m3 at 6 hours Freeboard 0 mm Surface Area : 96.00 m2 no freeboard - m2

Batter/Slope

2 Base Area : 96.00 m Depth 0.25 m Run Solve Depth!

Output Current base area, depth and batter slopes can hold a Volume of : 24.00 m3 The Volume required to store a 100 year storm is : 26.56 m3 Does the proposed basin hold the design storm ? No Balance of volume as ponding

Note: Volume Calculated is based on a circular base and top shape. It is the volume between the RL of the outlet and the RL of the overflow point.

Page 1 of 1 P:\32854\Project Documentation\Civil\UWMP\Basin Catchment 2 ARI10.xls 24/10/2017

RAINFALL DISCHARGE / BASIN VOLUME ESTIMATE Estimation by Rational Method - 1987 Australian Rainfall and Runoff

Job : Lot 101 Forrest Highway Client : Harley Dykstra Catchment : 2 Job # : 32854 Date : 24/10/2017 By : F.Wallefeld

Design Rainfall Intensity Wood Wood & Grieve Location : Duration :

Storm Event : Intensity : 29.6 mm/hr ENGINEERS

Catchment Details Outflow Details Soakage Rate Area : 1,820 m2 Soil Type : 0.5 m/day Run-off Coefficient : 0.90 Soakage Rate : 0.00000579 m/s  0.0013 m3/s draining time

Flow Rate : 13.5 L/s Outlet : 0.0 m3/s (Total Soakage) 11.5796 hours 16 Altona 16 Altona Street, West Perth WA 6005

Storage Details Volume : 53.07 m3 at 6 hours Freeboard 0 mm Surface Area : 220.00 m2 no freeboard - m2

Batter/Slope

Base Area : 220.00 m2 Depth 0.40 m

Output Current base area, depth and batter slopes can hold a Volume of : 88.00 m3 The Volume required to store a 10 year storm is : 53.07 m3 Does the proposed basin hold the design storm ? Yes

Note: Volume Calculated is based on a circular base and top shape. It is the volume between the RL of the outlet and the RL of the overflow point.

Page 1 of 1 P:\32854\Project Documentation\Civil\UWMP\Basin Catchment 2 ARI100.xls 24/10/2017

RAINFALL DISCHARGE / BASIN VOLUME ESTIMATE Estimation by Rational Method - 1987 Australian Rainfall and Runoff

Job : Lot 101 Forrest Highway Client : Harley Dykstra Catchment : 2 Job # : 32854 Date : 24/10/2017 By : F.Wallefeld

Design Rainfall Intensity Wood Wood & Grieve Location : Duration :

Storm Event : Intensity : 44.7 mm/hr ENGINEERS

Catchment Details Outflow Details Soakage Rate Area : 1,820 m2 Soil Type : 0.5 m/day Run-off Coefficient : 0.90 Soakage Rate : 0.00000579 m/s  0.0013 m3/s draining time

Flow Rate : 20.4 L/s Outlet : 0.0 m3/s (Total Soakage) 18.6962 hours 16 Altona 16 Altona Street, West Perth WA 6005

Storage Details Volume : 85.69 m3 at 6 hours Freeboard 0 mm Surface Area : 220.00 m2 no freeboard - m2

Batter/Slope

Base Area : 220.00 m2 Depth 0.40 m

Output Current base area, depth and batter slopes can hold a Volume of : 88.00 m3 The Volume required to store a 100 year storm is : 85.69 m3 Does the proposed basin hold the design storm ? Yes

Note: Volume Calculated is based on a circular base and top shape. It is the volume between the RL of the outlet and the RL of the overflow point.

Page 1 of 1 P:\32854\Project Documentation\Civil\UWMP\Basin Catchment 3 ARI10.xls 24/10/2017

RAINFALL DISCHARGE / BASIN VOLUME ESTIMATE Estimation by Rational Method - 1987 Australian Rainfall and Runoff

Job : Lot 101 Forrest Highway Client : Harley Dykstra Catchment : 3 Job # : 32854 Date : 24/10/2017 By : F.Wallefeld

Design Rainfall Intensity Wood Wood & Grieve Location : Duration :

Storm Event : Intensity : 29.6 mm/hr ENGINEERS

Catchment Details Outflow Details Soakage Rate Area : 4,908 m2 Soil Type : 0.5 m/day Run-off Coefficient : 0.90 Soakage Rate : 0.00000579 m/s  0.0043 m3/s draining time

Flow Rate : 36.3 L/s Outlet : 0.0 m3/s (Total Soakage) 8.27399 hours 16 Altona 16 Altona Street, West Perth WA 6005

Storage Details Volume : 129.28 m3 at 3 hours Freeboard 0 mm Surface Area : 750.00 m2 no freeboard - m2

Batter/Slope

Base Area : 750.00 m2 Depth 0.30 m

Output Current base area, depth and batter slopes can hold a Volume of : 225.00 m3 The Volume required to store a 10 year storm is : 129.28 m3 Does the proposed basin hold the design storm ? Yes

Note: Volume Calculated is based on a circular base and top shape. It is the volume between the RL of the outlet and the RL of the overflow point.

Page 1 of 1 P:\32854\Project Documentation\Civil\UWMP\Basin Catchment 3 ARI100.xls 24/10/2017

RAINFALL DISCHARGE / BASIN VOLUME ESTIMATE Estimation by Rational Method - 1987 Australian Rainfall and Runoff

Job : Lot 101 Forrest Highway Client : Harley Dykstra Catchment : 3 Job # : 32854 Date : 24/10/2017 By : F.Wallefeld

Design Rainfall Intensity Wood Wood & Grieve Location : Duration :

Storm Event : Intensity : 44.7 mm/hr ENGINEERS

Catchment Details Outflow Details Soakage Rate Area : 4,908 m2 Soil Type : 0.5 m/day Run-off Coefficient : 0.90 Soakage Rate : 0.00000579 m/s  0.0043 m3/s draining time

Flow Rate : 54.9 L/s Outlet : 0.0 m3/s (Total Soakage) 13.5355 hours 16 Altona 16 Altona Street, West Perth WA 6005

Storage Details Volume : 211.49 m3 at 6 hours Freeboard 0 mm Surface Area : 750.00 m2 no freeboard - m2

Batter/Slope

Base Area : 750.00 m2 Depth 0.30 m

Output Current base area, depth and batter slopes can hold a Volume of : 225.00 m3 The Volume required to store a 100 year storm is : 211.49 m3 Does the proposed basin hold the design storm ? Yes

Note: Volume Calculated is based on a circular base and top shape. It is the volume between the RL of the outlet and the RL of the overflow point.

Page 1 of 1 MEMO

TO: Sebastian Bolhuis (Harley Dykstra)

FROM: Fred Wallefeld

PROJECT: Lot 101 Forrest Highway, Vittoria

PROJECT NUMBER: 32854 DATE: 23 April 2018

SUBJECT: Lot 101 Forrest Highway, Vittoria – Stormwater Management Plan

Wood and Grieve Engineers have been engaged by Harley Dykstra to prepare a Stormwater Management Plan (SWMP) for the proposed development of Lot 101 Forrest Highway, Vittoria.

Relevant Documents We have prepared this SWMP based on the following information.  Site Feature Survey by Harley Dykstra 30/03/2017 (DWG 21169-02A)  Site Plan by Harley Dykstra 18/08/2017 (DWG 21169-01H DA)  Geotechnical Investigation by Structerre 14/06/2017 (J178846 Rev 0)  Groundwater Bore Monitoring results by Harley Global.  Greater Bunbury Region Scheme – Floodplain Policy 2016 (DRAFT)  MPM Development – Preston River Flood Study 2012 (by SKM. Excerpt only provided, status unknown)

Consultation WGE have had preliminary discussions with the City of Bunbury and Department of Water and Environmental Regulation (DWER) in relation to this Stormwater Management Plan.

The City of Bunbury have advised both Harley Dykstra and ourselves of the need to ensure that the SWMP accommodates a 1 into a 100 year event given the site is located on a Main Roads WA highway.

DWER has provided advice on regional flood levels and has stipulated a minimum FFL for buildings of 3.5m AHD.

Strategic Stormwater Planning and Flood Studies No information on applicable District Water Management Strategies has been provided to date by the City of Bunbury.

A review of the Draft GBRS Floodplain Management Policy 2016 indicates that the site is on the edge of the Preston river flood plain, and such the recommendations of the Policy shall be applicable. Page 1 of 3

To us, it’s more than just work PO Box 634, Level 1, The Terrace Centre, 96-102 Stirling Terrace, Albany WA 6330 Phone +61 8 9842 3700 Email [email protected] www.wge.com.au Wood & Grieve Engineers Limited ACN 137 999 609 trading as Wood & Grieve Engineers ABN 97 137 999 609 Albany  Brisbane  Busselton  Melbourne  Perth  Sydney DOCUMENT: P:\32854\PROJECT DOCUMENTATION\CIVIL\UWMP\COVER MEMO REVISED 20180423.DOCX (FW)

MEMO

Subsequent discussions with DWER indicate that the development is supported on the basis that filling of the site will achieve clearance to flood levels, and the impact on floodplain storage volume is expected to be minimal. (DWER Advice Attached)

Stormwater Management Methodology The design approach to manage stormwater runoff is in line with Department of Water (Better Urban Water Management) and Local Authority guidelines. The intention is to collect runoff from impervious services and treat via biofiltration to remove pollutants and sediments. Storage infrastructure will be sized to accommodate the 100ARI event.

Regional Context This development is sited on higher ground relative to surrounding lots on the north side of this section of Forrest Highway and, given the additional fill proposed and retention of all water on site, the development is not expected to impact negatively on or be negatively impacted by the surrounding development areas.

The cumulative impact of filling in the flood zone on the existing flooding regime will need to be confirmed with the DWER. It is noted that at this point the Preston River flood plain is wide (~1km) and the area impact by the development minor.

Extract from the DRAFT GBRS Floodplain Management Policy

Further development of adjacent lots in this area will also require filling to similar standards in order to meet drainage requirements.

Page 2 of 3

MEMO

Design Criteria  Min finished floor level (FFL) of 3.5m AHD, as advised by DWER.

 Finished floor levels are set to achieve min 300mm freeboard to internal 100ARI water levels.

 Rainfall from events up to the critical 100ARI event will be contained onsite, ponded and infiltrated.

 Design infiltration rate is 0.5m/day.

 Approximate depth of ponding in basins will be 300mm (for 100ARI event).

 Biofiltration basins will be to FAWB design guidelines, with target minimum base area of 2% of connected impervious surfaces.

 Minimum offset from the base of biofiltration basin or swale to AAMGWL is to be 0.5m.

 Minimum offset from the base of cell storage structures to AAMGWL is to be 0.5m.

Please refer to the attached documents.

Should you have any questions please don’t hesitate to contact the undersigned.

Yours faithfully

Fred Wallefeld for Wood & Grieve Engineers

Attachments: – Correspondence from DWER, Lot 101 Forrest Highway - Stormwater Management Plan SWMP1 (B), Calculations, Catchment Sizing

Page 3 of 3

Regional Context of SWMP LEGEND • No discharge off site is proposed. • Run off from the upstream catchments is not to enter the site post PROPOSAL DETAILS development. Run•off from Forrest Highway Rd reserve is to be 9 8 Subject Land contained to the road side swale and directed in SW direction. t is Area of Subject Land 7351m² expected that adjacent Lot 205 will fill to similar levels as Lot 101 and Proposed Building contain run•off on•site. Awnings x ~2.50m CATCHMENT ONE Paving Walkways 100.58 Description: Road with Biofiltration Basin/Swale ~2.00m x x ~3.4m

Soft Landscaping 3 Area = 620m2

. 9

~3.2m x . 5 42m2 6 C = 0.9 (Details ref: Exzo dwg A008) CATCHMENT11.9 ONE Design Infiltration Rate = 0.5m/day ChildCatchment Proof Boundary Security Fence FUTURE DEVELOPMENT AREA Required Biofiltration Area (minimum based on 2% of FFL ~3.2m withProposed Self ClosingFinished Gate Floor Level (~300m2) Impervious Area)= 15.5m2 Basin Area (Floor) = 96m2 (1m wide swale) Proposed Top Water Level (Event) TWL (100 ARI) 2.9m min FFL 3.5m 10 year ARI max Volume required = 16m3 100 year ARI max Volume required = 26m3 Biofiltration Swale 16 15 14 13 12 11 10 250UTDO sqOR R EmST O 09 5.5 STOP AREA Biofiltration Basin ponded depth = 0.25m ELECTRIC Biofiltration Basin

N VEHICLE Biofiltration Basin volume = 24m3 (assumed vertical 08 W CHARGING AIR walls no freeboard) Runoff Direction O STATION

D BASIN & 1.2

T Extent of 10 ARI ponded area outside of basin/swale 0

Y WATER 23.4 07 E A PROPOSED

Existing Spot Height ~2.0m x 23 22 21 20 19 18 17 S 24 B m2

Y FLOOR CONVENIENCE R

2 . ~3.1m x 0 T Extent of 100 ARI ponded area outside of basin/swale Proposed Spot Height 06 STORE AND

N LEVEL E

~ minor m2 7 sq m CATCHMENT FAST FOOD Proposed Storage Cells, Pit, Pipe O 05 N 3.1m FFL3 ~3.7m44m² 10 year ARI ponded depth to carpark = 0m 6 205 Y THREE 45 A LOT 101 3 100 year ARI ponded depth to carpark = ~ minor B FFL 3.7 1 IT A 9 10 year ARI Time to empty = 8.2 hours 7351m² .

W 4

CATCHMENT TWO 5 100 year ARI Time to empty = 13.5 hours Design Criteria 37 25 6.8 30m2 04 • Site to be filled by ~1.0m to achieve offset to groundwater levels. 38 26 PROPOSED 4 03 Subsoil drains to be installed to control GW level is required (subject to 6 2.5 27 TOLL 39 8m ISLE WIDTH CATCHMENT TWO BASIN 02

6.7 CANOPY 5 confirmation during design stage). . Description: Carpark with Underground Cell Storage 40 28 0 LINK FLOOR 3 WITH 2 1 54m2 . 0

• Treatment for up to 1 Year 1 Hour events to remove pollutants (via0 5 Area = 1,800m2 . LEVEL 2 41 29 C = 0.9 biofiltration where possible, or alternatively via gross pollutant traps) 5.4 PROPOSED (~2.00m x) 2.9m SMALL SERVICE Design Infiltration Rate = 0.5m/day

• Biofiltration filter media permeability 100•300mm/hour. TAKE- 42 30 TRUCK & NO PARKING -

2 D . YAR 0 Required Biofiltration Area (minimum based on 2% of

AWAY ~3.40m x CARAVAN LOADING ZONE 5 COFFEE . x ~3.20m PARKING • Retain up to 100 ARI event onsite and infiltrate (via unlined basin/swale ~3.2m x 2 4.7 43 31 Impervious Area)= 36m2 138m² 2 165 sq m or ungerground 'cell' storage). Some ponding (< 300mm) in carpark (for TWL (100 ARI) 3.2m Proposed Basin/Swale Area (Floor) = 0m2 (Basin not 6 FFL 3.5 44 32

5 NO ENTRY practical) . min FFL 3.5m > 10AR). 1

9 30m2 220 sq m Proposed Underground Cell Storage Area (Floor) = 220m2

33

1 45 2 . 5

.

• Floor Levels to have 300mm free board to internal 100ARI water0 levels. 8 Required 10 year ARI Storage Volume = 53m3

2 . 0 • Min FFL 3.5m AHD (as per DWER requirements) 46 34 Required 100 year ARI Storage Volume = 86m3 75m2 Cell storage depth = 0.4m (Cell Height) 47 35 UNDERGROUND Proposed Cell Storage volume = 88m3

Site Characteristics FUEL TANKS x ~3.4m

0 . 2 Time to empty for 10 ARI event = 12 hours W 36 (x ~2.70m ) • Lot is cleared with some trees and outbuildings. Existing dam/soak, to A 1 IT 4 Time to empty for 100 ARI event = 19 hours . B 8 A be filled in. Y Note: Refuelling area hydrocarbon and oil removal to • Design Infiltration Rate = 0.5m/day Y R R T E N V Local Authority requirements. No discharge to E TS 02 O IN G S H • Silty Sand with measured maximum winter groundwater level ~ 0.2m O IN T O EXISTING IRON P K S D stormwater system. N LL R O I FI PA R SHED TO BE H W .5 AC C 6 below current surface (monitoring ongoing). DEMOLISHED CO 03 D G N IN E A RK CL PA HI • Post Development Runoff Coefficient (C10) = 0.9 H E C T V OA H C IG D RE • Land grades slightly to NW. 100m2 AN F LE IC EH T V EXIT • Minor upstream catchment, contained to road reserve. H 01 IG G RE IN F RK

PA 2 415 0 . 2 H 0 A50m2C . CATCHMENT THREE CO 3 Y TWL (100 ARI) 3.0m D A AN LE W Type: Roof(s) and Carpark with Biofiltration 50m2 IC H EH G T V I GH H Basins/Swales and Underground Cell Storage EI 0 FR .2 TWL (100 ARI) 3.1m 1m MINIMUM LANDSCAPING WIDTH 3 G 9 Area = 4,908m2 IN P P 3 A 9 SC . . D Y 2 AN 2 T L L F C = 0.9 SO BASIN O 0 7m HIGH . N 5 Infiltration Rate = 0.5m/day ILLUMINATED BASIN I.D SIGNFLOOR 5 .1 Biofiltration Area Required (minimum based on 2% of 4 3 SWMP1 (C) P .9 Y FLOOR 12m HIGH LEVEL 2 TBM Impervious Area) = 98m2 2 L ILLUMINATED . O 0 I.D SIGN Basin/Swale Area (Floor) = 335m2 1 N ENTRY LEVEL 2.7m HD2 4 . 1 10 year ARI Volume required = 130m3 1 2.8m .1 7 9 3 MAINTAIN ROAD SIDE SWALE.8 Buried Spike 100 year ARI Volume required = 212m3 (~2.20m x) 2 Biofiltration Basin ponded depth = 0.3m ~3.1m x RL: 2.89

Biofiltration Basin volume = 100.5m3 (assumed vertical 6 C 0 RO . SS 8 3 walls no freeboard) W O 8 ID VE . TH R 2 STORMWATER MANAGEMENT PLAN Proposed Underground Cell Storage Area = 415m2 6.6 Cell storage ®depth = 0.4m (Cell Height) ST 6 E 2 .0 R F.WALLEFELD 2018.04.23 Proposed Cell Storage volume = 166m3 .8 3 R 2 O 10 year ARI Time to empty = 8.2 hours F 100 year ARI Time to empty = 13.5 hours

Plan No. | 21169-01H DA BUNBURY OFFICE: COPYRIGHT: 21 Spencer Street, This document is and shall remain the Date | 19/04/18 Bunbury WA 6230 property of HARLEY DYKSTRA. The document may only be used for the T: 08 9792 6000 F: 08 9721 9611 PROPOSED ROADHOUSE Drawn | BdR purpose for which it was commissioned E: [email protected] and in accordance with the terms of Checked | SB W: www.harleydykstra.com.au engagement for the commission. ® Unauthorised use of this document in Revision | H Kelmscott and Perth any form whatsover is prohibited Lot 101 Forrest Highway Scale | 1:500@A3 0 5m 10m 15m VITTORIA PLANNING & SURVEY SOLUTIONS NOTE: This plan has been prepared for planning purposes. Areas, Contours and Dimensions shown are subject to survey