LEA RIVER PARK PRIMER © Philip Vile LEA RIVER PARK PRIMER

CONTENTS

Welcome to the Park 4 Executive Summary 6 Introduction 8 Completing the 10

An Amazing Valley 12 The Context of the 14 The Six Parks and the Leaway 16 A Day Out in the Lea River Park 18 Curating the Valley 20

The Leaway 22 The Leaway - Overcoming Severance 24 Twelvetrees Crescent 26 Poplar Reach and Cody Dock 28 Connections 30 Exotic Wild 32 Viaduct 36 Future Phased Delivery 38

Conclusion 40

Published October 2016 WELCOME TO THE PARK

The Lea River Park provides an exciting opportunity to invest in Newham’s wealth of natural resources in waterways and green spaces, in addition to the industrial and built heritage, to create an outstanding public space accessible to all who live and work in the borough. Our vision for the Lea River Park is for high quality, accessible parkland incorporating open space and waterways with new walking and cycling routes which will add to the decades of investment in transport infrastructure that have gone into the borough, enabling our community to be even better connected.

Running through the spine of the borough’s key opportunity area, the park and improved connections will help to attract further investment into the borough whilst providing high quality leisure and recreational space to those who live and work here.

With the scale of regeneration taking place in Newham, it makes us one of the most exciting places to visit in the UK.

Sir

Everybody recognises the Thames as the lifeblood of . But very little is said about the and its importance to . It’s one of the few Thames tributaries to still exist as an above ground river. It’s an area fi lled with green spaces, wildlife, and fl ows through some of the most interesting parts of Tower Hamlets

The Leaway is an idea I have long championed, since my time as the Deputy Chair of the London . In my time at City Hall, I have become additionally aware of the spaces ‘between’ boroughs and quite how important, but often neglected, they can be. Running through historic parts of the borough such as , and East India Dock Basin, it will connect a series of existing public open spaces along the river, helping to make this river a destination for leisure and tourism and better tie our communities together.

Tower Hamlets will see lots of new and exciting developments over the coming years and it is crucial that we protect and enhance the green spaces along the River Lea.

John Biggs Three Mills Green, the fi rst park area of the Lea River Park completed in 2012

4 Lea River Park - Primer © Philip Vile © Philip Vile EXECUTIVE SUMMARY

The Lea River Park connects Queen Elizabeth Olympic Park to the and the with new continuous public parklands - completing the 26-mile long Lee Valley Regional Park. The strategic initial phase of this vision is the delivery of a named The Leaway which creates a continuous walking and cycling route along the River Lea. The Leaway connects a series of existing but fragmented public open spaces; over time this route will be added to with new parks and additional pedestrian and cycle connections, delivered as land becomes available.

This document introduces the concepts behind the Lea River Park, an initiative that will aid regeneration and address the acute lack of public open space for existing and future residents within the Lower Lea Opportunity Area and Poplar Riverside Housing Zone.

The creation of this Primer was supported by the local boroughs and key stakeholders and is intended to act as a reader, distilling the previous 8 years’ work to provide the conceptual guide to the park, its distinct characters and development context.

The Leaway will provide 1.41ha of new and improved public open space through its initial projects. However, this measure of scale belies the project’s strategic importance: in tackling the most challenging physical severances that affect the valley these projects fulfi l a key enabling role. By providing the backbone of the emerging park, The Leaway will be instrumental in creating and assembling 235ha of new and improved public open space within the .

An accompanying volume The Design Manual, covers the standard approaches to details and specifi cations, supporting an incremental delivery of The Leaway and surrounding parkscape by different organisations.

Twelvetrees Ramp, currently under construction - open October 2016

6 Lea River Park - Primer

A12 South Park Hub

Interim INTRODUCTION Leaway route

Stratford > The Lea River Park is central to the wider regeneration of the Lower Lea Valley area, which will undergo Pudding Mill Lane massive change over the coming decades. It completes a vision for leisure in the valley that was fi rst < Aldgate expressed in the 1940s, but also responds to pressing contemporary needs. It is strongly supported in planning policy at both the Mayoral level and at Borough level through its incorporation into Local Bow Church CS2 Plans. The park also represents a response to the needs of local communities and stakeholders for Stratford High Street new exciting open spaces, as expressed consistently in consultation and engagement over a number of years. Mill Abbey Three Mills Meads Mills The route will connect Queen Elizabeth Olympic Park and Three Mills Green to the Thames at Trinity Green Buoy Wharf and East India Dock Basin, as well as Canning Town and the Royal Docks. The route will primarily follow the eastern (Newham) bank of the River Lea, connecting stretches of previously -by-Bow underused public realm by delivering new park infrastructure and landscaped routes. The project also The House Mill incorporates improvements to local routes connecting neighbourhoods on both sides of the river to the Devons Road Leaway. Twelvetrees The value in the completion of the Leaway would also allows - for the fi rst time - a series of previously disconnected attractions to operate as a cohesive whole. This linear park connects the major attractions Cut in Queen Elizabeth Olympic Park, the unique heritage destinations at Three Mills, Trinity Buoy Wharf Twelvetrees and East India Dock Basin, the nature reserve at Bow Ecology Park, the Royal Docks and onwards Park

via the Cable Car to North and The O2. Not only does this offer appeal to residents of the neighbouring communities but also has a London-wide impact. In structuring a proper ‘day out’ the The visitor offer that the Lower Lea Valley presents is substantially greater than the sum of its parts, and is Cody expected to further catalyse investment and the creation of jobs in the area. Langdon Park Wilds Interim Leaway route

Project History Star Lane Cody Dock

In early 2013 the London Legacy Development Corporation (LLDC) completed the transfer of rights/ Working land related to the Lea River Park project from the London Thames Gateway Development Corporation Wharves (LTGDC). Poplar Canning Town As one of the LTGDC’s fl agship projects, the Lea River Park and its constituent project - then known River Park Riverside under the working title ‘The Fatwalk’ - had been developed over the course of several years, with A13 planning consent gained in 2010 for a number of interventions that would complete a riverside route A12 A13 along the Lea River between Three Mills in the north and the Thames in the south. The LTGDC had Silvocea < Tower Gateway Way CS3 also secured land agreements necessary to complete this work. The early closure of the LTGDC Canning Town Barking > halted any further progress on this project. Ecology park East India Given the strategic importance of the project, the park’s designers 5th Studio were retained by the East India The Exotic LLDC to examine the issues and options relating to implementing the scheme. Under the new lead of Dock Basin Wild

the LLDC the name of the park’s principle route has been re-named as ‘The Leaway’. Silvertown Way Silvertown Silvertown Viaduct he Tham T es Trinity Buoy Wharf Royal Victoria

The proposed park connecting the river valley with the communities and landscapes on either side North Greenwich

8 Lea River Park - Primer A12 South Park Hub

Stratford > Pudding Mill Lane < Aldgate

Leaway route Bow Church CS2 Stratford High Street Leaway route (coming soon)

Leaway accessAbbey routes Mills Three Mills Leaway future phase routes Green Future Lea River Park park area projects

Bromley-by-Bow Development/regeneration sites A12 The House Mill South Park Hub Cycle superhighways

Interim Leaway route Devons Road Underground/DLR/railways

Twelvetrees West Ham Stratford > Pudding Mill Lane < Aldgate

Bow Church CS2 The Stratford High Street Cody Mill Abbey Langdon Park Wilds Three Mills Meads Mills Star Lane Green Cody Dock

Bromley-by-Bow Working The House Mill Wharves Devons Road

A13 The Connector Twelvetrees West Ham A12 A13Limehouse Cut Silvocea Twelvetrees < Tower Gateway CS3 Barking > Park Canning Town Ecology park East India The East India Cody Dock Basin Langdon Park Wilds Interim Leaway route

Star Lane

Cody Dock Silvertown Way Silvertown Silvertown Working Viaduct e Tha Wharves Th m Trinity Buoy Wharf es Royal Victoria Poplar Canning Town River Park Riverside A13

A12 A13 Silvocea North Greenwich < Tower Gateway Way CS3 Canning Town Barking >

Ecology park East India East India The Exotic

Dock Basin Wild Silvertown Way Silvertown Silvertown Viaduct he Tham T es Trinity Buoy Wharf Royal Victoria

North Greenwich COMPLETING THE LEE VALLEY REGIONAL PARK

The Lea River Park exists within a context of several other great parks in London’s East End: Victoria Park, Park and Queen Elizabeth Olympic Park. The Lea River Park completes the fi nal section of the Lee Valley Regional Park, itself an act of highly conscious planning that prefi gures the ongoing regeneration of the area. Ultimately it will meet the practical need for more local green space within the wider area, which suffers a defi ciency at district and local levels.

The possibility of re-imagining the largely industrial Lee Valley as a “Great Playground for Londoners” was fi rst mooted before the Second World War, and in 1944 Sir Patrick Abercrombie revived the idea in his Greater when he suggested “the valley gives the opportunity for a great piece of regenerative planning... every piece of land welded into a great regional reservation.”

Today the Regional Park occupies around 10,000 acres of the Lee Valley, of which some 4,000 acres are actually owned by the Authority. The Park currently stretches from up to Ware in . At no point is it wider than a mile, and in some it is little more than the width of the towpath. There is no other area of comparable size so close to the centre of London that has been set aside specifi cally for leisure and recreational use.

Strategically, the Lea River Park is an important project to fi nally deliver the vision set out in the original plan for the regional park, linking the dense inner city with the countryside through a continuous chain of open space.

Lee Valley The location of the proposed Lea River Regional Park Park (in red) with respect to the Lee Valley Regional Park (outlined), the London Legacy Development Corporations area (green) and the Olympic legacy boroughs

Waltham LEA Forest RIVER London Legacy Hackney PARK Development Corporation Tower Newham Hamlets

Greenwich

10 Lea River Park - Primer THE LEA RIVER PARK PROJECT WILL DELIVER A NUMBER OF STRATEGIC OBJECTIVES AND SUPPORT THE SUCCESSFUL REGENERATION OF THE LOWER LEA VALLEY: erra ncognit Lee Valley Regional Park 2010

Route on quieter roads Route signed for cyclists Provision for cyclists Routes through parks and recommended by that may be on busier adjacent to busy roads. on towpaths cyclists roads May be shared with for walking and cycling. pedestrians Pedestrians have priority but responsible cycling is permitted

Fatwalk route for Future desired route for Strategic Walking Route: Strategic Walking Route: Olympic Park pedestrians and cyclists and pedestrians Capital Ring and River Zone responsible cyclists to connect the Fatwalk Walking and Cycling with existing strategic enhancements routes

Source: Transport for London, except Olympic related enhancements (Source: London2012)

Leaway 2017

Route on quieter roads Route signed for cyclists Provision for cyclists Routes through parks and 1. recommended2. by that may be on busier adjacent to busy roads. on canal towpaths cyclists roads May be shared with for walking and cycling. pedestrians Pedestrians have priority Completing the 26-mile Lea Valley Park, connecting Unlocking local connectivity acrossbut responsible cyclingthe is Queen Elizabeth Olympic Park to the River Thames Lower Lea Valley and opening uppermitted the River Lea

Fatwalk route for Future desired route for Strategic Walking Route: Strategic Walking Route: Olympic Park pedestrians and cyclists and pedestrians Lea Valley Walk Capital Ring and River Zone responsible cyclists to connect the Fatwalk Walking and Cycling with existing strategic enhancements routes

Source: Transport for London, except Olympic related enhancements (Source: London2012)

STRATFORD CITY

OLYMPIC LEGACY DEVELOPMENTS

THAMES WATER ESTATE

BROMELY by BOW MASTERPLAN STEPHENSON STREET SITE

LEASIDE CODY ROAD ESTATE

POPLAR HARCA CANNING TOWN REGENERATION MASTERPLAN

3. 4. Tackling severe defi ciency to open space by Shaping the major redevelopment improving access and creating new spaces anticipated adjacent to the Lea River Park AN AMAZING VALLEY

‘Out of the strong came forth sweetness’ 1

The Lower Lea Valley is a ‘made’ landscape, which plays an intimate role in provisioning the city around it. Naturalistic landscape scenography is not appropriate here. Rather, park space is created from adopting and ‘contaminating’ elements of infrastructure and monocultural land uses, which have had free reign in the valley, forcing them to culture a richer, more urbane role. Elements such as railway tunnels, by-pass structures and gasholders are co-opted into making places for a day out in the valley.

Early pieces of infrastructure are regarded as catalysts for converting what is currently land used for gas storage, sewage pumping and transport infrastructure into the diverse park spaces of the Lea River Park, turning what is an industrial backwater into the foreground of a new public space which people can start to access, use and enjoy. The ‘Leaway’ is the fi rst stage - a linear park connecting disparate landscape areas and combining existing routes and left-over land.

The landscape strategy for the park aims to:

• Draw out the extraordinary landscape narratives that have shaped the valley, juxtaposing ‘native’ riverine landscape with an ‘exotic’ overlay, referencing, for example, the global trading of the docks, and the adaptation of colonising plants to industrial sites.

• Respond to and enhance particular landscapes that already exist in the valley.

• Create new landscapes that help uncover the overlaid uses that have shaped the landscape.

• Create ‘edible landscapes’ referencing the valley’s role in provisioning London.

• Use tree planting to create ‘urban connectors’ leading into the park, and to mark the course of the river.

1. The old testament motto of the locally based Tate and Lyle factory (at Plaistow Wharf and West Silvertown) which features on their characteristic tins of golden syrup.

12 Lea River Park - Primer

THE CONTEXT OF THE LEA VALLEY

Since London’s establishment, the Lea Valley has been a provisioning ground for the city, supporting its need for energy, food and water, as well as disposing of its waste. The vision for the Lea River Park draws upon this heritage as well as the renewed importance of sustainable cycles. The park is conceived of as a Cornucopia - a place that explores, humanises and celebrates the systems that support the city.

The maps below have been produced through overlaying historic maps and studies of former land uses to develop an understanding of the layers of landscape history which have supported the Valley’s development.

Mill Stream

Mill Stream

Mill Stream

ten ex t o f ti Mill Stream dal flooding

STRATFORD CAUSEWAY Abbey Gardens

Allotments

M A R K E T G A RD ENS

The Orchard

H C A E BUGSBY

R

L

L

A

’ W S

K R

E C A

A C

L H B ^ An augmented ‘natural’ landscape of drainage and agriculture ^ A landscape of autonomous industrial enclaves obscuring the which provisioned London’s growth. river from the increasingly urbanised valley.

A productive landscape An instrumental landscape

The physical characteristics of the Lea - with abundant One of the area’s most evident qualities is the complex over water to power mills, transporting and receiving goods from layering and imposition of infrastructure. elsewhere, and at the boundary of the city’s regulations - has meant that it has consistently been a place which has From the 18th century onwards the Lea Valley was a key site supported London. of London’s economic development. The present landscape is shaped by technical processes and infrastructure. From the early 12th century, Stratford Langthorne Abbey Gasworks, power and sewage infrastructure, , began to reclaim marshland reinforcing a history of major highways and rail lines, wharves, docks and tunnels food production from orchards and market gardens to establish a purposeful topography of problem-solving slaughterhouses and bakeries. technical enclaves, each one fenced and autonomous.

14 Lea River Park - Primer Stratford Causeway

Victorian Infrastructure

CODY CAMPUS

W O R K I NG POPLAR GREEN GRID W HA RV ES

Canning Town

EXOTIC WILD

A public landscape

Two millennia of land use have created a remarkable valley, but also a landscape which is inaccessible, hard to navigate, monofunctional and certainly not public. The Lea River Park will transform this working landscape into a new public foreground for London, animated by the tradition of provisioning the city.

es ham T e h T

Palette THE SIX PARKS AND THE LEAWAY

The strategic approaches to developing the Lea River Park are contained in the Lea River Park Design Framework produced for the London Thames Gateway Development Corporation; a document published in May 2008 and developed to explore the character of the park and its delivery methods. This document has informed the local planning context through its integration into local borough and London-wide planning policies.

The establishment of a phased approach to delivering the park is necessary to respond to the availability of land and funding, with initial investments focussed on the creation of the riverside route, the Leaway. The Leaway acts both as a strategic walking and cycling route and as an armature for the later development of the six core park areas: each delivered in accordance with the completion of construction or decommissioning of infrastructure.

1 2

Three Mills Green, completed in 2012, the reinvention of the Green parkland aims to reframe the natural fl uvial marshlands and included the new Wild Kingdom playground and the fi rst section of the the lushness of the allotment gardens as a foreground to the infrastructural Leaway along the canal edge. compounds of ’s operations and the historic Abbey Mills pumping station.,

To Limehouse

3 4

Twelvetrees Park is created from the ongoing decommissioning of the Poplar River Park responds to the critical need for additional recreational largest group of listed gas holders in the UK, offering a unique opportunity and open space in Poplar. The park will combine sports provisions with for a new destination for London, incorporating industrial heritage, events renewable energy demonstration structures which continue the site’s and botanical collections. history of power generation.

5 6 The Exotic Wild is a new kind of park space, resulting from the East India Dock Basin acts as a gateway to the journey up the River aggregation of a series of landscapes currently fragmented by large- Lea: in time, a place to hire bikes, buy a picnic or prepare for a day out. scale transport infrastructure to form a coherent and connected whole. A This provisioning for a day in the park is aligned with the docks’ own set of extraordinary colonised estuarine landscapes will emerge, allowing history of global trade, and its role in providing London with exotic plants, access to the River Lea as it prepares to meet the Thames. from spices to tea.

16 Lea River Park - Primer The Six Parks

Rivers and

To Ware The Leaway

Interim - Future Additions Leaway route The Greenway To Victoria Park The Lee Valley Walk The Thames Path - Future improvements

The Leaway

1 Three Mills Green 2 Mill Meads To Barking

3 Twelvetrees Park

Interim Leaway route

To Limehouse 4 Poplar River

Park The Leaway 5 The Exotic Wild

6 East India Dock Basin

To Barrier Park

To

To Greenwich 0 200m 400m 600m 800m

To 10 min walk @3mph

4 min cycle @8mph A DAY OUT IN THE LEA RIVER PARK

The completion of the Leaway allows for the fi rst time a series of previously disconnected attractions to operate as a cohesive whole, greater than the sum of its parts. A network of routes are being created which anticipate the completion of a set of new park spaces in the coming decade, together creating the Lea River Park.

Three Mills Green

The Royal Docks Ecology Three Mills Park

Queen Elizabeth Olympic Park Cody Dock Trinity Buoy Wharf

Poplar Reach

+ East India Dock Basin +The Leaway + + +

18 Lea River Park - Primer The Leaway

Routes to the River - Future routes Key Valley Attractions South Plaza Hub - Future Attractions

ROUTES TO THE RIVER

Three Mills / House Mill

Twelvetrees Park (future)

Cody Dock

Poplar River Park (future)

Bow Creek Ecology Park

ROUTES TO THE RIVER

East India Dock Basin (future)

Victoria Dock Trinity Buoy Wharf

To Barrier Park

To Island Gardens

To Greenwich 0 200m 400m 600m 800m

To Woolwich 10 min walk @3mph

4 min cycle @8mph CURATING THE VALLEY

One of the key challenges of the area is to reinstate a sense of identity and pride: to restore it as a ‘place’ in the public’s mental map. In earlier times, the valley was both a place of meeting and of division - the historic boundary between London and the eastern , with the river providing an important connection to the north - but more recently, the physical fragmentation of the valley into communities severed from each other is mirrored in perceptions of the area, which largely turn away from the river. The park presents the opportunity to reunify the valley through physically connecting it and celebrating the river as the centre, not the edge.

A key part of making the new park a success is to shift perceptions of the area towards understanding its positive value, identity and heritage. It is also important to signal change, to intrigue and excite local communities as well as visitors from the wider area and to promote a more cohesive identity for the valley.

A curatorial strategy has been produced by Create London for the LLDC. This document identifi es key artefacts and stories which tell the stories which underlie the park. These themes are broad and include; maritime endeavor, industrial development, revolutions in public health, social struggle and emancipation, immigration, creative energy, agricultural innovation and environmental change.

The two key outcomes of this strategy are:

1. Summer 2015 Community Engagement Events

In August 2015, Create invited members of the public to join the Leaway team on a fantastical and surprising journey along the River Lea. Through a series of events and live music, visitors could explore the incredible natural history of the area, uncovering the part the River Lea played in the story of dirt, pollution and sewage in London. Other events involved an exploration of the cultural story of east London through Grime music, and a story-telling session on the epic industrial history of the area.

2. Lea River Park Curatorial Strategy

The Strategy is intended as a catalyst from which ideas and approaches can be adapted to fi t the objectives of a particular commissioner, community or site. It provides a springboard for future activity including potential audience development, community engagement and press and communications for the Leaway. Proposed activity ranges from long-term community engagement to high profi le permanent art commissions and bold and engaging public festivals.

Events which took place in August 2015 The Museum of London’s stores, contain The Odd Guides, produced by Create in included exploring the foragable produce a vast array of objects which directly collaboration with Artists Leigh Clarke, which lines the riverbanks. represent the history of the Lea Valley. Dash N’ Dem and Gayle Chong Kwan.

20 Lea River Park - Primer The political actions of working people on the River Lea led A to radical improvements in the social conditions of work throughout the UK. In the late 19th century a new political confidence swept TURNING through the working population of industries on the River Lea, propelled by the Match Girls’ Strike at the Bryant and May Match Factory in 1888. There, women workers formed a strike IN group that forced one of the most powerful employers in east London to concede to their demands. This unexpected victory THE roused confidence amongst other employees to challenge POINT oppressive and inhumane working conditions. Next came the Gas Workers Petition that led to the implementation of an eight-hour day and The Great London Dock Strike of 1889 OF that established the idea of general workers’ unions for all HISTORY OUR classes of workers and inspired the British Labour Movement. INDUSTRIAL DEVELOPMENT An ODD

GUIDE Bryant & May matches.

to the Leaway Trade & Industry

A. The Bryant and May Match Factory: the site of the Match Girls’ Strike now redeveloped as The Bow Quarter gated community, Fairfield Road, Bow. 3

Today, waste management is still a feature of the River Lea. Bywaters is one of the UK’s leading recycling and resource management companies, based in Bow and established in 1952, it handles a total of 800,000 tonnes of waste annually, offering all types of businesses the option of a ‘zero direct The River to landfill’ solution. I Beast

An apocryphal crocodile appeared in the River Lea on 5 August 2005, when boat trippers witnessed ‘a goose being pulled underwater very quickly.’ Several cygnets also mysteriously disappeared and it was suggested that the creature responsible was a large fish, a caiman, or possibly a crocodile. On 13 December 2011, a similar attack was reported to have occurred when another goose went ‘vertically down’. An Observed by two boat trippers on a section of the River Lea, it was said that the large goose vanished ‘in the space of half a second’. The observers did not see any sign of the creature. ODD Other suggestions for the predator have been a snapping turtle or catfish (which are known to exist in small numbers in the Thames and its tributaries). A GUIDE spokeswoman said “We don’t believe there is a crocodile in the river… but we would encourage people to get in touch to the Leaway Nature & Food if they have seen anything.”

I. Bywaters is one of the UK’s leading recycling and resource management companies, established in 1952. 31

If you are lost between the Lea Valley Gasholders on a bleak London night, you may be encircled by two large, monstrous black ghosts covered in streams of glowing orange liquid. They will stare deep into your eyes, hoping you might be the inventor. Their deafening song will penetrate your ears with the lines from the Star Spangled Banner over and over and over again… rsting in air, bs bu om e b th ting in air, s burs , mb re bo gla e ed t h ursting in air, ‘An ets r bs b d the rock e, om lar e b d g th ting in air…’ a s re s burs nd the rocket , mb re bo gla e ed th an ts r d the rocke e, An ar gl red ODD and the rockets GUIDE

to the Leaway Dirt

12 THE LEAWAY

The Lower Lea Valley has historically suffered from major physical severances: where accessible stretches of landscape and riverside paths have been delivered they are currently fractured, limiting connectivity and the creation of user groups.

The delivery of the Leaway creates for the fi rst time a continuous route between Queen Elizabeth Olympic Park, the Thames and the Royal Docks by opening up the edges of the River Lea to pedestrians and cyclists.

This section identifi es the key severances which need to be resolved, where effort and investment are needed to overcome physical separation.

These ‘knuckles’ are characterised by complex topography, each holding the potential to not only provide connections but to become interesting and engaging places in their own right: locations for art installations, new landscapes and activities to be introduced to the Valley’s already rich sense of place.

These ‘knuckles’ each have the capacity to act as gateways into the Lea River Park and are being developed as engaging spaces which anticipate the development of the future park spaces.

Above: An example of the severances which exist in the valley, especially Right: An example of a section of new apparent around existing infrastructure such as at the Poplar Reach cable riverside path proposed between the bridge: a structure designed to allow a pedestrian path beneath it but which has A13 and Cody Dock, linking existing, yet, formed an obstruction for 20 years. Work is in progress to open this connection, disconnected sections of path. which will unlock nearly a mile of existing riverside paths.

22 Lea River Park - Primer

THE LEAWAY OVERCOMING SEVERANCE

A process of analysis and discussion with the project team and other stakeholders has resulted in a clear strategy for the early phase of investment in the park. A focused series of projects unlock a connective route down and across the valley, enabling a spine of places to enjoy, while anticipating future adoption of park spaces in later phases of the project.

These tactical points of investment will have much greater effect: opening up existing riverside routes, enabling connections between existing transport infrastructure and access to the River Lea. These interventions aim to humanise and unlock the potential of their contexts, which are too often dominated by the scale of existing infrastructure.

BEFORE - Disconnected AFTER - Connected local centres by the park

24 Lea River Park - Primer Stratford Public open space

Rivers and canals

The Leaway

Interim Stratford High - Future additions Leaway route Street THE LEAWAY OVERCOMING SEVERANCE Connecting routes - Future additions A process of analysis and discussion with the project team and other Roads stakeholders has resulted in a clear strategy for the early phase of investment in the park. A focused series of projects unlock a connective route down and across the valley, enabling a spine of places to enjoy, while anticipating future Pudding Mill Lane Stratford High Street adoption of park spaces in later phases of the project.

These tactical points of investment will have much greater effect: opening Abbey Road up existing riverside routes, enabling connections between existing transport infrastructure and access to the River Lea. These interventions aim to humanise and unlock the potential of their contexts, which are too often dominated by the A12 scale of existing infrastructure.

CS2 < Aldgate West Ham THREE MILLS Bow Church

Bromley-by-Bow

BOW LOCKS / TWELVETREES CRESCENT

Interim Star Lane Leaway route Barking Road

POPLAR REACH & CODY DOCK A13

Barking >

Limehouse Cut A12 CS3

Langdon Park CANNING TOWN Canning Town CONNECTIONS

EXOTIC WILD A13 SILVERTOWN All Saints VIADUCT Royal Victoria < Tower Gateway East India

EAST INDIA Royal Docks DOCK BASIN

BEFORE - Disconnected AFTER - Connected local centres by the park West Silvertown

North Greenwich 0 200m 400m 600m 800m

Greenwich Peninsula 10 min walk @3mph

24 Lea River Park - Primer 4 min cycle @8mph TWELVETREES CRESCENT

A ramp connection between the spit and Twelvetrees Bridge links two existing but discontinuous sections of riverside walk. This overcomes a critical severance through the creation of a continuous walking and cycling route - the Leaway - along the Lower Lea Valley.

The connection is a scalable response providing a highly effective and useful connection in the short term, enhanced by later improvements to provide manifold connections alongside the River Lea. The completed route creates a fully accessible network of riverside East Bank paths. The project has been developed in consultation 2 landscaping with Transport for London and with the London Boroughs of Tower Hamlets and Newham. New public realm being delivered at the eastern landing of Twelvetrees Crescent Bridge Both the lower spit area and the upper surface of the bridge allow wonderful south-facing vantage points to enjoy views down the valley, and across both tidal and non-tidal working waterways of the Lea. The project also brings Western towpath Twelvetrees Bridge back into public use as an important 3 creation piece of valley heritage. The various components which enable the link, together with supporting landscape work, create an important gateway into and across the valley.

Proposed Phase 2 Western Towpath A fully accessible connection from Twelvetrees Crescent to Bromley-by-Bow town centre

1 Ramp structure 2

The new connecting ramp at Twelvetrees with its distinctive wayfi nding structure

26 Lea River Park - Primer To Bromley- To Three Mills and by-Bow Queen Elizabeth Olympic Park

TWELVETREES CRESCENT Leaway - Phase 2 Twelvetrees Park project - Future park area A ramp connection between the Bow Locks spit and Twelvetrees Bridge links two existing but discontinuous sections of riverside walk. This overcomes a critical severance through the creation of a continuous walking and cycling route - the Leaway - along the Lower Lea Valley. Western towpath The connection is a scalable response providing a 3 creation highly effective and useful connection in the short term, Ramp Direct stair Eastern bank enhanced by later improvements to provide manifold 1 structure connection 2 works and connections alongside the River Lea. The completed landscaping route creates a fully accessible network of riverside East Bank paths. The project has been developed in consultation 2 landscaping with Transport for London and with the London Boroughs New public realm of Tower Hamlets and Newham. New public realm being delivered at the eastern landing of improvements Twelvetrees Crescent Bridge Both the lower spit area and the upper surface of the bridge allow wonderful south-facing vantage points to enjoy views down the valley, and across both tidal and non-tidal working waterways of the Lea. The project also brings Western towpath Twelvetrees Bridge back into public use as an important 3 creation piece of valley heritage. The various components which Leaway enable the link, together with supporting landscape work, create an important gateway into and across the valley. To Limehouse Cut To Poplar Reach and the Thames

Proposed Phase 2 Western Towpath A fully accessible connection from Twelvetrees Crescent to Bromley-by-Bow town centre ^ Bromley-by-Bow Tube station 1 Ramp structure 2

Twelvetrees Crescent Bridge

Bow School

A12

Gillender Street Bow Locks Lee Navigation (canal)

River Lea (tidal) New developments surrounding Bow

The Cody Wilds Locks and Twelvetrees Crescent Bridge Sun Flour Mills

N The new connecting ramp at Twelvetrees with its distinctive wayfi nding structure

26 Lea River Park - Primer 27 POPLAR REACH & CODY DOCK

A crossing - Poplar Reach Bridge - has been designed to connect the boroughs of Newham and Cody Dock Tower Hamlets in Phase 2 and will establish a new public 2 improvements riverside park on the site of the decommissioned Leven Road gasworks.

Cody Dock is becoming a thriving valley attraction, and therefore is an important location on the Leaway route. A wider bridge crossing is required over Cody Dock Lock mouth to allow access to the existing towpath further north once the dock is reopened.

A utilities bridge carrying high voltage cables, previously © Ruth Keating blocked the riverside path at the northern end of Electra Wharf. This bridge was designed to allow a walkway The thriving community-driven Cody Dock, and Line Sculpture trail. to pass beneath it, so a connection to Cody Dock is established by removing the fence. Connection under Poplar The creation of a permissive riverside route along the 3 Reach cable bridge edges of the working wharves will connect to an extant public walkway at Electra riverside, linking Cody Dock to Canning Town.

Continuing south, a connection to Canning Town will rely upon the creation of a new section of publc riverside across Mayer Parry, Worlands and Crown Wharf, as illustrated at the start of this chapter.

Access and landscaping have been delivered to enable a connection to Wharfside Road when the riverside along Crown, Mayer Parry and Whorlands Wharf is completed in Phase 2 of the Leaway.

Poplar Reach 1 Bridge

View from Poplar Reach Bridge towards Poplar Reach Park. The bridge will provide a connection from the fi rst phase of the Leaway to a new 6ha active park landscape, providing much needed open space to the surrounding estates in Poplar and a moment of expansiveness on the Leaway

28 Lea River Park - Primer Star Lane public realm Interim route to Star Lane improvements > DLR and Canning Town Cody Dock improvements 2

Planned public realm improvements Leaway - Phase 2 project New connection under 3 Poplar Reach cable bridge

Poplar Reach (phase 1) Bridge 1 Leaway - Phase 2 Leaway

To Twelvetrees Crescent

To Canning Town and the Thames Leaway - Phase 2 project Poplar River Park - Future park area

To Star Lane DLR >

Cody Dock

Gasworks Dock Partnership

Proposed development of the landscapes around Poplar Reach

N The Cody Wilds Electra Wharf

Cable Bridge

River Lea (tidal)

29 CANNING TOWN CONNECTIONS

Canning Town is separated from the River Lea by a confl uence of transport infrastructure, which forms a physical barrier to movement and divides Canning Town and its population from the River.

The opportunity here lies in adopting an under-used area of land between the DLR and the A13, rediscovering an accessible riverside for Canning Town - reconnecting the community to both the heritage and open spaces of the Valley. A13 Connector These interventions also form a key manifold of routes 1 West on both sides of the river for recreational use and commuting. A series of public realm projects will greatly A13 Connector - Western bank increase orientation within a connected valley and Planning approval 2011 - Phase 2 Project steer the communities of adjacent developments to the river, while supporting their requirement for improved connections to local centres and transport nodes.

As one of only eight crossings of the Lea Valley south of the M25, there is an opportunity to celebrate the valley at this point, signalling its signifi cance to drivers on the A13 as part of a placemaking strategy.

The existing underpass is being upgraded and made more pleasant as a means of continuing a park landscape beneath the severance of the A13.

There is also the potential to provide a connection between the A13 ramp and the North bridge, (outline design work has been undertaken to investigate Before: Whafside Road was subject to fl y tipping, parking issues its feasibility). Any interventions in the area should ensure and poor public realm. Routes to connections were obscured and that the necessary levels and space are safeguarded to felt dangerous. allow its future delivery.

Wharfside 2 Road

After: have worked in close collaboration with Transport for London to rationalise the position of fences to produce clear site lines. Actions such as installing CCTV and closing the road to traffi c will create a new safe pedestrian and cyclist dominated access point to the park. Hardlandscaping and tree planting is complete and soft landscaping will be fi nished in Autumn 2016.

30 Lea River Park - Primer Interim route to Star Lane To Poplar Reach DLR and Poplar Reach and Cody Dock Leaway - Phase 2 New public realm improvements

Wharfside Road 2

To Canning Town and the Royals A13 Ramp A13 Underpass renovation Potential DLR Leaway Phase 2 Project bridge

A13 Connector Canning Town West 1 riverside

Leamouth North bridge

Possible Phase 2 Project

Silvocea N Way

To East India Dock Basin and the Thames

European Metal Recycling Proposed development of the land around the A13 to deliver a connected landscape

A13

Canning Town

River Lea (tidal)

London City Island development

31 EXOTIC WILD

Leamouth boasts spectacular views of both the River Lea and its entrance to the River Thames with the potential to maximise access to the river’s edge. Features such as and the expansive reed beds of Bow Creek strengthen the natural riverine character of the area. Valley attractions like East India Dock Basin and Trinity Buoy Wharf tell the narrative history of trade and maritime activities in the valley. The Leaway seeks to catch and steer surrounding developments to implement a fully accessible riverside that unifi es the changes coming forward in the area.

Previously fragmented and diffi cult for pedestrians and Canning Town Riverside cyclists to navigate, additional river crossings connect stretches of riverside, park destinations and transport Before: Dense vegetation and anti-social behaviour restricted connections to create a network of legible routes. access and use of the area.

Canning Town 1 Riverside

After: Once cleared, the large riverside space has been populated with boulders and benches. A brick plinth can become a stage or event space for the community and the steep existing topography can be negotiated by a gentle path to the river’s edge. Long grasses and riverine species will be planted in Autumn 2016, whilst the canopies of the existing white willows are lifted creating good visibility from Wharfside Road.

Before: The dense overgrowth removed any connection to the river After: The clearance of the site has created an invitation to come to and along with the derelict state of fences and sreet furniture this the rivers edge. space was univiting.

CONTINUES ON NEXT SPREAD >

32 Lea River Park - Primer Interim route to Star Lane Phase 2 to Cody Dock DLR and Poplar Reach and Poplar Reach Phase 2 A13 Connector to Poplar Ramp to A13 and bridge over DLR

Canning Town To Silvertown and the Riverside 1 Royal Docks

Planned public realm improvements Silvocea Way Phase 2 2 Pedestrian and cycle bridge to Silvertown Way

Leaway

The Limmo 5 Park

East India Dock Basin 3

Instone Thames Path Extension Trinity Buoy Wharf Crossing Wharf (future)

Thames Path Extension

A13

Canning Town

Proposed development of Leamouth focused to deliver a connected landscape Bow Creek

Leamouth Road Future development site Bow Creek

Silvocea Way

Bow Creek N Ecology Park The Limmo Park

Lower Lea Crossing East India Leamouth Crossing East India 4 (future) Dock Basin

Leamouth Development

(future)

The Thames

33 EXOTIC WILD (CONTINUED)

Both East India Dock Basin and Trinity Buoy Wharf should be protected for their respective narratives of ecology and heritage. Scoping studies have been carried out to extend the Thames Path, connecting the Leaway to a wider network of Thames-edge walking routes. A possible future link across the Lea to Instone Wharf would connect these park attractions with the Royal Docks.

The Limmo, currently occupied by ’s construction compound, is identifi ed in LB Newham’s 2027 local plan as an open space forming appropriate connections and a terminus to the Lea River Park. An opportunity exists here to create a large scale riverside green space for Canning Town. Proposals for this site should work to ‘re- naturalise’ its river edge creating an ecologically focussed park space, akin to Bow Creek Ecology park. Before: Silvocea Way’s landscapes had fallen into a state of disrepair, with tree roots lifting block paving and a lack of screening from the road.

Silvocea 2 Way

East India Dock Basin

Ambition for the creation of a visitor and educational centre, balancing the needs of visitors and that of the established wildlife preserve in the basin. The location of the placement of this facility will require further detailed design development with project partners.

East India Potential exists for such a centre to include Dock Basin a dedicated bird-watching hide (left) with 3 views over East India Dock’s wetland bird reserve.

34 Lea River Park - Primer Silvocea Way

Silvocea Way, a major stretch of Tower Hamlet’s Leaside riverine edge, benefi ts from improvements to allow park users to make the most of this riverside space, including extensive new planting with exotic colonisers that reference the history of trade in the area.

Before: Highways environment dominated the riverside walk. After: Removal of hoardings and landscaped berms create a more sheltered envirnoment against the river.

Leamouth The Limmo 4 Crossing 5 Park

Leamouth Crossing, planned to connect the Limmo peninsual to Leamouth and Trinity Buoy Wharf.

The Limmo The Limmo is an important area of open space for the Lea River Park: here there is the opportunity to create a sizeable new park at the confl uence of Lea and Thames. It is also one of the few locations where softening of the river edge is practical.

35 SILVERTOWN VIADUCT

Silvertown Viaduct is an underused section of the Leaway route. Constructed in 1934 the bypass was Britain’s Inhabiting the fi rst fl yover. Originally built to serve the Royal Docks 1 undercroft in their heyday, traffi c levels on the viaduct have since reduced signifi cantly, presenting a signifi cant opportunity to increase its role as a strong pedestrian connection between the growth areas of the Royal Docks and Canning Town. This new use would exploit its pier-like qualities and the extraordinary views that it offers of the Lea Valley and the Thames at Blackwall Reach.

The decrease in traffi c volume has seen its wide carriageway become a fast urban road. With the surrounding sites on Caxton Street, Peto Street and Tidal Basin Road being identifi ed as sites for tall buildings within the regenerated Canning Town South area, the character of this streetscape is key to a successful regeneration. The opportunity is recognised to calm The spaces beneath could be re-purposed, infi ll walls removed and the traffi c by narrowing the carriageways, providing generous public halls and community workshops retrofi tted, a spine segregated cycle paths, and more generous pavements, of amenities which can be added to, as surrounding developments leading to an enhanced Road and are delivered. proposed new local centres in the Royal Docks.

Surrounding sites which were previously vacant and designated for development are considered as locations for ‘meanwhile uses’. These temporary occupations of the sites offer community groups the opportunity to gain a foothold in the growth of a new neighbourhood, succesful examples include ‘Canning Town Caravanserai’ located on Silvertown Way.

Before: The existing road, engineered for dock traffi c that has now ceased, has the potential to be generously re-purposed Silvertown Viaduct 2 reinvention

After: Re-imagining the viaduct as a ‘pier’, a curious boulevard; with a widened pavement, improved cycle provision, belvederes and a collection of dock- related artefacts, narrating the surrounding landscape.

36 Lea River Park - Primer Leaway

Planned public realm Thames Path Extension improvements Leamouth bridge

The Limmo site - Future park space Lock Park Silvertown Viaduct Future Thames path link reinvention 2 Meanwhile uses

Continued public Inhabiting the Caxton Street public realm realm improvements To Canning Town undercroft 1 improvements around the dockside

Tidal Basin Road tree planting

The Thames

River Lea (tidal)

Lower Lea Crossing DLR Silvertown Viaduct

DLR

Emirates Air Line Proposed development of the area Tidal Basin Road surrounding the Silvertown Viaduct

37 Interim FUTURE PHASED DELIVERY Leaway route

Organic Growth

As envisaged by the Lea River Park Design Framework, the delivery of the Lea River Park over the next decade will be enabled by the completion of city- scaled infrastructure projects and developments along the valley’s edges.

This drawing maps what is possible to achieve in the short term, against an CROSSRAIL aggregate of projects that form, over time, a signifi cant new foreground for east London, connecting the adjacent boroughs back to the River Lea.

TIDEWAY LEA RIVER A PARK THAT GROWS PARK

2015- Catalytic fi rst phase Leaway - highlighting and enabling 2017 Interim connections to the river and completing an interim riverside route Leaway route

Limehouse Cut Full Leaway and Lea River Park vision completed through the 2017- development of accompanying sites: the decommissioned gas 2020 storage sites at Leven Road and Twelvetress and the major commercial developments on the Leamouth Peninsular

CROSSRAIL Short term restriction/uncertainties offer longer term opportunities 2020 through the remediation of sites to provide new landscapes and onwards connections following the construction of Crossrail, Thames and the

or th Pa es am h T

SILVERTOWN CANARY TUNNEL WHARF WOOD + WHARF O2

A proposed solution to a phased delivery GREENWICH of the park, start with establishing a North- PENINSULAR South connection,

38 Lea River Park - Primer Existing open space Rivers and canals Phase 1 Route Network

Interim Severances overcome in Phase 1 Leaway route Phase 2 Route Additions Phase 2 park space Long term route opportunities Long term opportunity areas

CROSSRAIL

TIDEWAY

Interim Leaway route

Limehouse Cut

CROSSRAIL

or th Pa es am h T

SILVERTOWN CANARY TUNNEL WHARF WOOD + WHARF O2

0 200m 400m 600m 800m GREENWICH PENINSULAR

10 min walk @3mph

4 min cycle @8mph CONCLUSION

The proposals set out here address key severances in the Lower Lea Valley and together form the Leaway, the central parkland spine of the Lea River Park, establishing a network of pedestrian and cycling routes along and across the Valley. A ‘catch and steer’ strategy should be adopted with forthcoming developments in the area to help deliver the required public realm improvements and to create a comphrehensive network of public riverside routes.

This connective landscape network benefi ts from comprehensive policy support and ongoing investment from key stakeholders, including the London Legacy Development Corporation and the London Boroughs of Tower Hamlets and Newham. The Lea River Park and the Leaway continue to receive extensive and enthusiastic support from the , the Authority, Transport for London and Poplar HARCA. Delivery partners Gasworks Dock Partnership, Canal and Rivers Trust, Lea Valley Regional Park Authority, and Thames 21 have and will continue to enable the delivery of key parts of the Leaway.

The project has been recognised through initiatives such as the Mayor of London’s Great Spaces and Big Green Fund, demonstrating the project’s signifi cance in supporting valley regeneration and addressing the east London context of defi ciency of access to open spaces. By providing the backbone of the emerging park, the Leaway will be instrumental in creating and assembling 235ha of new and improved public open space within the Lower Lea, fi nally realising the long-imagined connection between the Lee Valley Regional Park and the River Thames.

40 Lea River Park - Primer

The Leaway is being delivered by the London Legacy Corporation, the London Boroughs of Newham and Tower Hamlets and Transport for London, Poplar HARCA, and Gasworks Dock Partnership.

To fi nd out more about the Leaway visit: queenelizabetholympicpark.co.uk/leaway

Leaway Design Team/ Document produced by;

with ENVIRONMENT JCLA & LANDSCAPE

Contact:

Tom Holbrook Director Darkroom Unit 8, Dales Brewery Gwydir Street Cambridge CB1 2LJ

Published: October 2016

THE LEAWAY PROJECT IS FUNDED BY:

Copyright © London Legacy Development Corporation, 2016