Complaint Mcc.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Complaint Mcc.Pdf sl Com date Name of Party/Other ECI Memo ECI Date Forwaded Forwaded Forwaded Content Of the Synopsis of Action taken Fwd ECI Memo Fwd ECI Date Remarks Complainant No District Memo No Memo Date Complaint No 1 05-03-2014 "Amal Halder CPI(M) "61/WB/201 13-03-2014 BURDW "1533- 18-03-2014 Bringing back the The complaint was enquired DISPOSED Sec, CPIM, 4/1027 & AN Home(Elec)" evicted residents to into by the DEO. As reported, Burdwan Dist. 61/WB/2014 cast their votes information sent to Committee" /793" Commissioner of police and SP and all concerned to take necessary action.The report from CP, Asansol Durgapur and SP Burdwan have detailed information on the 135 reported oustees. The details reveal about 61 oustees are residing at locality, 22 oustees have reportedly shifted, where about of 8 oustees are not known, 12 are working in various places.OC Mangalkote has contected the families of reported oustees and is holding confidence building measures. 2 11-03-2014 Biman Basu, CPI(M) - BURDW "1275- 11-03-2014 MCC Reg.Anubrata " FIR lodged by BDO against 1320 12-03-2014 DISPOSED Left Front AN Home(Elec) Mondal & Seizure of Anubrata.Mondal at Home (Elec) " 45 Kg. Gold Mangalkote PS on 12.03.14 and Showcuase issued by SDO to Apurba Chowdhury, President, Mangalkote Block Trinamool Committee " 3 11-03-2014 "Amal Halder CPI(M) 437/WB/201 13-03-2014 BURDW "1535- 18-03-2014 Stopping the work on The complaint was enquired DISPOSED Sec, CPIM, 4/791 AN Home(Elec) "High Mast Tower" into by the DEO. As reported, Burdwan Dist. " Chief Executive Officer, Committee" Burdwan Development authority reported that that the works on High Mast Lights were started prior to announcement of election date. 4 12-03-2014 "Amal Halder CPI(M) BURDW "1459- 15-03-2014 Move against The complaint was enquired DISPOSED Sec, CPIM, AN Home(Elec) Hoardings & posters into by the DEO. As reported, Burdwan Dist. " of AITC removal of hoardings , Committee" banners ets has been started by MCC teams 5 13-03-2014 Runu Dutta, CPI(M) BURDW "1401- 14-03-2014 Wall writing on The complaint was enquired In progress secretary, AN Home(Elec) propertirs of into by the DEO. As reported, CPI(M) zonal " Ecoalfield Ltd. he MCC team of Raniganj Committee, has issued notice vide raniganj, 07/RNJ /MCC-AST/14 dt. Burdwan 14.03.14 and 08/RNJ/MCC- AST/14 dt. 14.03.14 to the President, AITC Raniganj Block Unit for removing of wall writing for the above mentioned place within 24 hrs. The MCC squad of Raniganj Block with the Police personnel of Raniganj Station has removed 170 nos. of Posters and 4 nos. of Banners sub-motto on 14.03.14. But when the MCC Team, Ranigaj visited again on the above places on 15.3.14 with defacement team of Raniganj Development Block they found that political party cocerned has removed wall writing within 24 hrs after receiving of notice. 6 13-03-2014 Runu Dutta, CPI(M) BURDW "1431- 15-03-2014 Chick distribution in The complaint was enquired DISPOSED secretary, AN Home(Elec) presence of AITC into by the DEO. As reported, CPI(M) zonal " leaders no political leader were Committee, present during distribution of raniganj, chick. Burdwan 7 14-03-2014 "Amal Halder CPI(M) BURDW "1452- 15-03-2014 Omission of ghost The complaint was enquired DISPOSED Sec, CPIM, AN Home(Elec) voters from Voter list into by the DEO. As reported, Burdwan Dist. " on enquiry by BLO the name Committee" of Manas Das was found enlisted in two parts, Hearing notice was issued to him for deletion from one part after completion of all formalities. 8 14-03-2014 "Amal Halder CPI(M) BURDW "1457- 15-03-2014 Not allowing the The complaint was enquired DISPOSED Sec, CPIM, AN Home(Elec) village and civic into by the DEO. As reported, Burdwan Dist. " police to do election instruction was sent to all Committee" duty SDOs for taking necessary action vide DM%s Memo No 74(6)/MCC dt 18.03.2014 9 15-03-2014 Vivek CPI(M) BURDW "1432- 15-03-2014 Wall writing without The complaint was enquired DISPOSED Chowdhury, AN Home(Elec) prior permission into by the DEO. As reported, G.S. Colliery " wall writings have been MazdoorSabha removed on 17.03.2014 of India 10 15-03-2014 "Amal Halder CPI(M) BURDW "1460- 15-03-2014 Illegal removing of The complaint was enquired DISPOSED Sec, CPIM, AN Home(Elec) wall writing of CPI(M) into by the DEO. As reported, Burdwan Dist. " notices have been served in Committee" all three cases and the complainant has been asked to show the permission letter 11 15-03-2014 Runu Dutta, CPI(M) BURDW "1461- 15-03-2014 Procession with The complaint was enquired DISPOSED secretary, AN Home(Elec) mike, loudspeaker, into by the DEO. As reported, CPI(M) zonal " drum,band etc by Sri Subash Banerjee of AITC Committee, AITC during HS has taken prior permisssion raniganj, Exam vide Licence No Burdwan 51/14/ACP©/ADPC for the rally on 14.03.2014 from 14.00hrs to 19.00hrs. 12 16-03-2014 "Amal Halder CPI(M) BURDW "1666- 20-03-2014 Provocative remarks The complaint was enquired DISPOSED Sec, CPIM, AN Home(Elec) by Minister Swapan into by the DEO. As reported, Burdwan Dist. " Debnath BDO, Monteswar Block & Committee" SDO, Kalna both lodged complaints in the Monteswar Police Station & the police submitted prosecution u/s 107/116(c ) Cr.P.C. against Sajal Panja, the organiser of the meeting. The enquiry is continuing to verify the statement reported in newspaper. 13 16-03-2014 "Amal Halder CPI(M) BURDW "1655- 20-03-2014 Removal of wall The complaint was enquired DISPOSED Sec, CPIM, AN Home(Elec) writing in 38- into by the DEO. As reported, Burdwan Dist. " Bardhaman such type of wall writings Committee" Purba(SC) PC have been removed. 14 16-03-2014 Gouranga CPI(M) BURDW "1667- 20-03-2014 Violation of MCC by The complaint was enquired DISPOSED Chatterjee, AN Home(Elec) Dola Sen, sohrab Ali into by the DEO. As reported, Secretariate " etc for campaigning Dola Sen did not seek Member, in college during BA permission to visit the college CPI(M), & B.Com Exam. campus and it appears from Burdwan Dist. the police report that no Committee political campaign, speech and procession was held . 15 17-03-2014 "Amal Halder CPI(M) BURDW "1598- 19-03-2014 Violent attack on The complaint was enquired DISPOSED Sec, CPIM, AN Home(Elec) senior party worker into by the DEO. As reported, Burdwan Dist. " the allgation was found not Committee" correct. 16 17-03-2014 Sk Saidul CPI(M) BURDW "1662- 20-03-2014 "Attack & The complaint was enquired DISPOSED Haque, MP & AN Home(Elec) harassment on party into by the DEO. As reported, contesting " activists the allegation was found not candidate of & correct. However police L.F. from 39- Violent attack on patrolling continues in the Bardhaman- Senior party worker" area. DurgapurPC 17 17-03-2014 Sk Saidul CPI(M) BURDW "1728- 21-03-2014 Complaint against The complaint was enquired Haque, MP & AN Home(Elec) the administration of into by the DEO. As reported, contesting " 260-Durgapur East no such incident occurred candidate of AC for wrong-doing and no such evidence could L.F. from 39- & dereliction of duty. be collected from the local Bardhaman- enquiry in favour of the DurgapurPC petitioner. So the allegation does not sustain. 18 17-03-2014 Biman Basu, CPI(M) BURDW 1815(3)- 22-03-2014 Continued violence The complaint was enquired Chairman, Left AN Home(Ele by AITC in pre-poll into by the DEO. As reported, Front West Bengal. some TMC followers Committee, threatened some CPIM WB. followers due to political grudge and a prosecution u/s 107/115 CrPC vide NCR No 181/14 dated 12-3-14 for bound down for maintaining peace at the locality has been initiated by the police. 19 19-03-2014 Abhijit Konwar, CPI(M) BURDW "1648- 20-03-2014 Threatening & The complaint was enquired DISPOSED Secretary, AN Home(Elec) hindrance by AITC into by the DEO. As reported, CPI(M) Memari- " workers during SDO Burdwan Sadar(south) I Zonal election campaign has taken suitable action Committee 20 19-03-2014 Runu Dutta, CPI(M) BURDW "1649- 20-03-2014 Forcefully occupying The complaint was enquired DISPOSED secretary, AN Home(Elec) a building of into by the DEO. As reported, CPI(M) zonal " RANIGANJ the allegation was found Committee, PRATIBANDHI baseless and false as per IC raniganj, KARMAKENDRA at Ballavpur O.P. report duly Burdwan Raghunathchak endorsed by BDO Raniganj by 66/RNG/Elec dt 21.03.2014 21 20-03-2014 Runu Dutta, CPI(M) BURDW "1663- 20-03-2014 Non conducive The complaint was enquired DISPOSED secretary, AN Home(Elec) atmosphere of law & into by the DEO. As reported, CPI(M) zonal " order in and around BDO, Raniganj vide his Committee, RANIGANJ for Memo No 57 dt 20.03.2014 raniganj, holding free and fair requested the OC, raniganj Burdwan election. Police Station to take appropriate action. 22 20-03-2014 Sk Saidul CPI(M) BURDW "1693- 20-03-2014 Worse law &order The complaint was enquired DISPOSED Haque, MP & AN Home(Elec) situationin Kurmun into by the DEO. As reported, contesting " village under SP, Burdwan. Had been candidate of Burdwan Sadar requested to take appropriate L.F. from 39- Police station. action. Bardhaman- DurgapurPC 23 20-03-2014 "Amal Halder CPI(M) BURDW "1692- 20-03-2014 Move against forcibly The complaint was enquired DISPOSED Sec, CPIM, AN Home(Elec) occupied & painted into by the DEO.
Recommended publications
  • Refund Against So Closed Under Road E-Auction Mode for the Period 21-01-2021
    REFUND AGAINST SO CLOSED UNDER ROAD E-AUCTION MODE FOR THE PERIOD 21.01.2021 to 20.02.2021 Deduction for Forest Tr. Fees ( Customer Net Refundable Customer Name Pan Cardno Area Desc So No Closed Date Refund Amt 1.1.21-20.2.21) & Code Amount Ledger Balance ( As on 20.02.21) Associated Ceramics Ltd AABCA9234A Kajora Area 2020118588 15-Feb-21 101.90 Satgram Area 2020118589 15-Feb-21 680.68 500012 Consignee WiseTotal: 782.58 0.00 783 M/S Evergreen Coal Industries AAAFE5419M Salanpur Area 2020118082 06-Feb-21 610.75 500030 Consignee WiseTotal: 610.75 8551.80 0.00 Shree Balaji Glass Manufacturing Pvt.Ltd. AADCS8283K Kajora Area 2020118396 15-Feb-21 110.93 Kajora Area 2020118397 15-Feb-21 101.79 500031 Consignee WiseTotal: 212.72 0.00 212.72 United Trading Company ACFPJ9860Q Kunustoria Area 2020108677 06-Feb-21 84.03 500040 Consignee WiseTotal: 84.03 31798.20 0.00 Shree Enterprises Coal Sales Pvt. Ltd. AADCS6017K Bankola Area 2020108695 04-Feb-21 729.55 500044 Consignee WiseTotal: 729.55 0.00 730 Industrial Fuels And Commodities AIOPG1874C Pandaveswar Area 2020108242 29-Jan-21 898.02 Bankola Area 2020108687 04-Feb-21 673.71 Bankola Area 2020108696 04-Feb-21 291.34 Pandaveswar Area 2020109040 04-Feb-21 430.26 Pandaveswar Area 2020118524 15-Feb-21 4081.01 Kajora Area 2020118804 15-Feb-21 60462.11 Satgram Area 2020118812 15-Feb-21 197.01 500060 Consignee WiseTotal: 67033.46 17865.00 49168 Total Fuels Private Ltd. AACCT1679D Kajora Area 2020118058 15-Feb-21 86975.93 500070 Consignee WiseTotal: 86975.93 57029.40 29947 Shree Bahubali Mercantile Pvt.
    [Show full text]
  • LIST of REPORTS SENT to the SPONSORER from 1ST JANUARY, 2016 to 14Th JULY, 2021
    LIST OF REPORTS SENT TO THE SPONSORER FROM 1ST JANUARY, 2016 TO 14th JULY, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”.
    [Show full text]
  • Impact of Coal Mining on Environment: a Study of Raniganj and Jharia Coal Field in India Sribas Goswami1
    Impact of Coal Mining on Environment: A Study of Raniganj and Jharia Coal Field in India Sribas Goswami1 Abstract Coal mining adversely affects the eco-system as a whole. On the unstable earth; the unresting mankind constantly uses a variety of resources for their daily lives. Coal is recognized to have been the main source of energy in India for many decades and contributes to nearly 27% of the world’s commercial energy requirement. Coal is mainly mined using two methods – surface or ‘opencast’ and underground mining. The geological condition determines the method of mining. Coal mining is usually associated with the degradation of natural resources and the destruction of habitat. This causes invasive species to occupy the area, thus posing a threat to biodiversity. Huge quantities of waste material are produced by several mining activities in the coal mining region. If proper care is not taken for waste disposal, mining will degrade the surrounding environment. The method of waste disposal affects land, water and air and in turns the quality of life of the people in the adjacent areas. This paper throws light on the burning issues of coal mines and its impact on the environment. Keywords: coal mining, development, displacement, explosive, pollution Introduction: Mining activity puts tremendous pressure on local flora and fauna, particularly where division of forest land for mining takes place. The effect of mining on ground water level, silting of surrounding water bodies and land are also of great concern. Coal mining contributes greatly towards the economic development of the nation, although it also has a great impact upon human health.
    [Show full text]
  • Eastern Coalfields Limited (A Subsidiary of Coal India Ltd.)
    HALF YEARLY ENVIRONMENT CLEARANCE COMPLIANCE REPORT OF CLUSTER 11 J-11015/245/2011-IA.II(M) FOR THE PERIOD OF OCTOBER 2018 TO MARCH 2019 Eastern Coalfields Limited (A subsidiary of Coal India Ltd.) Half Yearly EC Compliance report in respect of mines Area (Cluster 11), ECL Period:- October 2018 to March 2019 Specific Conditions Condition no.(i) The Maximum production from the mine at any given time shall not exceed the limit as prescribed in the EC. Compliance Kenda - Complied S.No Name of Mines Peak EC Production from(Oct ’18 to Capacity March ’19) (MTPA) (MT) 1 Krishnanagar 0.05 Temporarily closed. (U/G) 2 Haripur Group 2.30 0.565458 of Mines A Haripur(U/G + 0.75 Haripur UG is Temporarily OC ) closed & OCP Not yet started. B CBI(U/G) 0.10 0.029889 C Chora 7,9 & 10 0.15 0.07793 pit(U/G) D Bonbahal OC 0.5 0.102754 Patch(OCP) E Shankarpur/CL 0.8 0.354885 Jambad OC Patch/Mine(52 Ha) 3 New Kenda 2.00 0.119282 Group of Mines A New Kenda (UG) 0.05 0.015802 B West Kenda OC 0.75 Not yet started. Patch/Mines C New Kenda OC 1.2 0.10348 mine(240 Ha) 4 Bahula Group of 0.45 0.146471 Mines A Lower 0.15 0.035949 Kenda(U/G) B Bahula (U/G) 0.25 0.085078 C CL Jambad 0.05 0.025444 (U/G) 5 Siduli(U/G +OC) 1.2 0.054887, OCP not yet started.
    [Show full text]
  • Eastern Coalfields Limited (A Subsidiary of Coal India Ltd.)
    HALF YEARLY ENVIRONMENT CLEARANCE COMPLIANCE REPORT OF CLUSTER 10 J-11015/180/2011-IA.II(M) FOR THE PERIOD OF April 2018 TO September 2018 Eastern Coalfields Limited (A subsidiary of Coal India Ltd.) Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner SPECIFIC CONDITION Condition The maximum production from the mine at any given time shall not no. (i) exceed the limit as prescribed in the EC. Compliance Complied Mine Peak EC Capacity Total production in (MTPA) April to September, 2018 North Searsole OCP 2.0 0.252613 Kunustoria & Amrasota UG 0.15 0.066252 Belbaid UG 0.12 0.033502 Bansra UG & OC 0.735 0.126843 Parasea UG & OC 0.55 0.082130 Jambad OC 0.80 0.222744 Jambad UG 0.24 0.082177 Naba Kajora UG 0.30 0.022265 Madhabpur UG 0.030839 Madhabpur OC Patch 0.50 0.145851 Lachipur UG 0.06 0.00 Central Kajora UG 0.15 0.033807 Khas Kajora UG 0.35 0.110713 Moira UG 0.12 0.00 Madhusudanpur UG 0.24 0.041477 Madhujore UG 0.12 0.00 Ghanashyam UG 0.12 0.00 Parascole East & West 0.39 PSC(E) – 0.034844 PSC(W) – 0.024166 Condition The validity of the EC is for the life of the mine or as specified in the EIA (ii) Notification, 2006, whichever is earlier. Compliance Agreed Condition There shall be no mine void and no external dumps at the end of mining. (iii) Compliance Agreed Condition Adequate measures shall be taken to mitigate subsidence as per DGMS (iv) stipulations.
    [Show full text]
  • M/S. Parasea Colliery
    PROCEEDINGS OF THE PUBLIC HEARING FOR THE PROPOSED INCREASE OF THE PRODUCTION LEVEL OF PARASEA COLLIERY, EASTERN COALFIELDS LIMITED WITHOUT INCREASING THE LEASE AREA AT P.O.- PARASEA, P.S.-JAMURIA, DIST.-BURDWAN, W.B. HELD ON 20.07.2007 AT JAMURIA PANCHAYAT SAMITY OFFICE, DIST.- BURDWAN, W.B. M/s. Eastern Coalfields Limited submitted an application to West Bengal Pollution Control Board for conducting Public Hearing for the proposed increase of the production level from 675 TPD to 1200 TPD of Parasea Colliery at P.O.-Parasea, P.S.-Jamuria, Dist.-Burdwan, W.B. As per the EIA notification S.O. 1533 dated 14th September, 2006 of the MoEF, Govt. of India, Environment Clearance of the said project is required to be obtained from the MoEF, Govt. of India after conducting public hearing. Accordingly, WBPCB after observing all formalities, held a public hearing on 20th July, 2007 at 14.30 Hrs. at Jamuria Panchayat Samity Office. Panel members were present in the hearing. A large gathering was also present in the hearing. List of the panel members and the others present in the public hearing are enclosed. The hearing started with a welcome note from Ms. S. Mahapatra, IAS, Additional District Magistrate, Asansol, Dist.-Burdwan who presided over the hearing. Dr. T. K. Gupta, Senior Environmental Engineer, WBPCB explained about the provisions of the above stated MoEF notification. ADM then requested the Project Proponent to explain the details about the proposed expansion in Parasea underground coal mining project for the benefit of the panel members and other public present in the hearing.
    [Show full text]
  • ANSWERED ON:03.03.2010 ILLEGAL MINING in ASANSOL AREA Chowdhury Shri Bansagopal;Haque Shri Sk
    GOVERNMENT OF INDIA COAL LOK SABHA UNSTARRED QUESTION NO:947 ANSWERED ON:03.03.2010 ILLEGAL MINING IN ASANSOL AREA Chowdhury Shri Bansagopal;Haque Shri Sk. Saidul Will the Minister of COAL be pleased to state: (a) whether attention of the Government has been drawn to the on-going-large-scale illegal mining in Asansol-Raniganj- Jharia coal belt areas; (b) if so, the details thereof and the reasons therefor; (c) whether the Government has taken any preventive steps to stop illegal mining with the help from the State Government; (d) if so, the details thereof; and (e) if not, the reasons therefor ? Answer MINISTER OF STATE (IC) IN THE MINISTRY OF COAL AND MINISTER OF STATE (IC) IN THE MINISTRY O F STATISTICS & PROGRAMME IMPLEMENTATION (SHRI SRIPRAKASH JAISWAL) (a)& (b) : Yes, Sir. As per the information received from Coal India Ltd. (CIL), the details of illegal coal mining in Asansol-Raniganj- Jharia coal belt are as under: i) The areas of illegal coal mining activities within the leasehold of Eastern Coalfields Ltd. (ECL), but where the surface rights belong to others, are Sripur area, Sodepur area, Salanpur area, Satgram area, Kenda area, Kunustoria area, Bankola area and Kajora area. ii) In Jharia coal belt, areas of illegal mining activities are Barora, Govindpur, Katras, Sijua, Kusunda, Kustore, Bastacolla, Lodna, E.J. area, W.J. area and C.V. area. The following reasons are attributable to the menace of illegal coal mining: a) Socio-Economic−unemployment, poverty; b) Administrative−innumerable small pockets spread over vast coalfield area; c) Geological − easy access to coal with very low cover; d) Economic − demand from end-users, willing to pay good price; e) Legal action against offenders-time consuming; and f) Landlessness/marginal land holding.
    [Show full text]
  • Environmental Statement in Form-V Cluster No. – 10
    ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental (Protection) Rules, 1986) (2019-2020) FOR CLUSTER NO. – 10 (GROUP OF MINES) Kunustoria, Kajora and Bankola Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2015 Company Environmental Statement (Form-V) for Cluster No. – 10 (Group of Mines) 2019-20 ENVIRONMENTAL STATEMENT FORM – V Environmental statement for the financial year ending 31st March, 2020 Cluster No. – 10 FOR THE YEAR: 2019-20 CONTENTS SL.NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-8 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I ) 9-22 LIST OF ANNEXURES ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY AND HEAVY METAL ANALYSIS 23-32 II NOISE LEVEL REPORT 33-34 III WATER QUALITY REPORT – MINE WATER QUALITY AND GROUND 35-45 WATER QUALITY IV GROUNDWATER LEVEL REPORT 46 PLATES I LOCATION PLAN II PLAN SHOWING LOCATION OF MONITORING STATIONS 1 Environmental Statement (Form-V) for Cluster No. – 10 (Group of Mines) 2019-20 CHAPTER – I INTRODUCTION 1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd.22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above and in fulfillment of condition laid out in the EC for the Cluster, the work of Environmental Statement for Cluster No.
    [Show full text]
  • A Demographic Survey and Socio- Economic Study for the Project Affected People
    DRAFT REPORT 288888222222225 A Demographic Survey and Socio- economic Study for the Project Affected People (PAP) and NON- PAP People of New Kenda OCP, WEST Burdwan District SUBMITTED BY: Dr. Amitabh Pandey Dr. Parul Rishi Dr. Bal Krishna Upadhyay Dr. Ujjal Sarma SUBMITTED TO: EASTERN COALFIELDS LIMITED, KENDA AREA WEST BURDWAN DISTRICT Indian Institute of Forest Management, P.O. Box 357, Nehru Nagar Bhopal (MP) 462003 1 AKNOWLEDGEMENTS Our team would like to express its sincere gratitude towards the General Manager Kenda area Mr. S.K. Singh, for providing us an opportunity to work with their prestigious institution and also for providing us with all the necessary help, support and guidance for the consultancy project. we would like to express our sincere thanks to the Director, IIFM for his kind support throughout the project. We would like to thank Mr. Uday Shankar Choubey (Agent, Kenda Area), Mr. Indranath Chatterjee (Manager, Kenda Area), Mr. Ashish Kumar (Assistant Manager, Environment officer, Kenda Area) and Mr. Monoj Bhattacharjee for supporting me throughout the field visits and facilitating smooth and productive field work. We are highly indebted to the people of Kenda village for their cooperation and support throughout the study. Amitabh Pandey Parul Rishi B K Upadhyay U K Sarma 2 TABLE OF CONTENTS Contents LIST OF ABBREVIATONS4 ................................................................................................................. 4 EXECUTIVE SUMMARY5 ..................................................................................................................
    [Show full text]
  • 20.11.2018 REPORT for WEBSITE.Xlsx
    LIST OF REPORTS SENT TO THE SPONSORER FROM 1st JANUARY, 2016 TO OCTOBER'2018 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”.
    [Show full text]
  • Annual Report & Accounts 2019-20
    Eastern Coalfields Limited (A subsidiary of Coal India Limited) ANNUAL REPORT & ACCOUNTS 2019-20 EASTERN COALFIELDS LIMITED (A subsidiary of Coal India Limited) www.easterncoal.nic.in Mission To produce and market the planned quantity of coal and coal products efficiently and economically in an eco-friendly manner with due regard to safety, conservation and quality. Vision To emerge as a global player in the primary energy sector committed to provide energy security to the country by attaining environmentally & socially sustainable growth through best practices from mine to market. CONTENTS Sl.No. Contents Page No. 1. Management ............................................................................................ 04 2. Bankers/Auditors .................................................................................... 06 3. Notice of Annual General Meeting ........................................................... 08 4. Chairman’s Statement ............................................................................. 11 5. Operational Statistics/Financial Position ................................................. 15 6. Profile of Directors ................................................................................... 33 7. Boards’ Report ......................................................................................... 37 8. Comments of the Comptroller and Auditor General of India .................... 128 9. Auditors Report and Management’s Reply ............................................... 130 10. Balance Sheet
    [Show full text]
  • Of 3 OFFICEORDER Consequent Upon the Recommendation of the Departmental Selection Committee, the Competent Au
    Page 1 of 3 ईट셍न कोलफील्ड्स लललिटेड EASTERN COALFIELDS LIMITED कोल इंडिया का एक अंग (A Subsidiary of Coal India Limited) अध्यक्ष- सह प्रबन्धक निर्देशक का कायाालय, Office of the Chairman-Cum-Managing Director, सं啍टोरिया, पो-दर्दशेिगढ़, जिला-वधामाि, Sanctoria, PO: Dishergarh, Dist. Burdwan. West Bengal - 713333. पजचिम बंगाल-713333 Office of the General Manager (P&IR). महाप्रबंधक(का/औ.स.) का कायाालय CIN-U10101WB1975GOI030295. CIN-U10101WB1975GOI030295. Telefax- 0341-2523586. फ़ै啍स- 0341-2523586. Website: www.easterncoal.gov.in Website: www.easterncoal.gov.in Ref. NO. ECL/CMD/Rectt/SRD/Clerk-17/32/240 Date: 29th May, 2017. O F F I C E O R D E R Consequent upon the recommendation of the Departmental Selection Committee, the Competent Authority has accorded approval for selection of the following employees as “Clerk” Grade-III from amongst the SC/ST eligible departmental candidates of ECL who applied against the notification no: ECL/CMD/Rectt/SRD/Clerk-17/32/2102 dated 07.02.2017 under special drive. On being selected, they are hereby posted in the Areas/Units/Estb. as given against their names: List of SC category candidates Sl. Previous Father’s U. Man ROLL New place of N Name place of Unit Name Caste Name No. NO posting o posting Samiran Lt. Sukumar 1 192231 Jhanjra MIC SC 50521 Jhanjra Area Mondal Monday Lt-Dilip Raju Narsamuda 2 Kumar 190649 Sodepur SC 50612 Sodepur Area Paswan Colliery Paswan Raghunath Lt. Fela Ram 3 132604 Satgram Nimcha SC 50591 ECL,Hq.
    [Show full text]