EASTERN COALFIELDS LIMITED Name, Address and Contact
Total Page:16
File Type:pdf, Size:1020Kb

Load more
Recommended publications
-
Annual Report & Accounts 2016-17 Eastern Coalfields Limited
EASTERN COALFIELDS LIMITED ANNUAL REPORT & ACCOUNTS 2016-17 EASTERN COALFIELDS LIMITED ( A Subsidiary of Coal India Limited ) SANCTORIA , P.O. DISHERGARH, DIST. WEST BURDWAN ANNUAL REPORT 2016-17 CONTENTS Page No. 1. Management 1 2. Bankers / Auditors / Mission/VisionStatement 2 3. Notice of Annual General Meeting 3 4. Chairman’s Statement 6 5. Boards’ Report 8 6. Comments of the Comptroller and Auditor General of India 100 7. Auditors’ Report and Management’s Reply 102 8. Financial Position 117 9. Balance Sheet as on 31st March, 2017 121 10. Statement of Profit & Loss for the year ended 31st March, 2017 123 11. Statement of Changes in Equity for the year ended 31st March, 2017 125 12. Cash Flow Statement for the year ended 31st March, 2017 126 13. Corporate Information and Significant Accounting Policies 128 14. Notes forming part of Balance Sheet 152 15. Notes forming part of Statement of Profit & Loss 176 16. Additional Notes on Accounts 188 2 EASTERN COALFIELDS LIMITED MANAGEMENT DURING 2016-17 MANAGEMENT AS ON 26TH JULY, 2017 FUNCTIONAL DIRECTORS: FUNCTIONAL DIRECTORS: Shri Rajiv Ranjan Mishra Shri Subrata Chakravarty Chairman-cum-Mg. Director (additional charge) Chairman-cum-Mg. Director (w.e.f 23.11.2016) Shri K.S. Patro Shri Chandan Kumar Dey Director (Personnel) Chairman-cum-Mg. Director (additional charge) (upto 22.11.2016) Shri A.M. Marathe Director (Finance) Shri K.S. Patro Director (Personnel) and Director [(Technical) Shri B.N. Shukla (additional charge) (upto 16.08.2016)] Director (Technical) Operations Shri A.M. Marathe Shri A.K. Singh Director (Finance) and Director [(Technical) (additional Director (Technical) Project & Planning charge) (upto 16.08.2016)] PART-TIME OFFICIAL DIRECTORS: Shri B.N. -
Refund Against So Closed Under Road E-Auction Mode for the Period 21-01-2021
REFUND AGAINST SO CLOSED UNDER ROAD E-AUCTION MODE FOR THE PERIOD 21.01.2021 to 20.02.2021 Deduction for Forest Tr. Fees ( Customer Net Refundable Customer Name Pan Cardno Area Desc So No Closed Date Refund Amt 1.1.21-20.2.21) & Code Amount Ledger Balance ( As on 20.02.21) Associated Ceramics Ltd AABCA9234A Kajora Area 2020118588 15-Feb-21 101.90 Satgram Area 2020118589 15-Feb-21 680.68 500012 Consignee WiseTotal: 782.58 0.00 783 M/S Evergreen Coal Industries AAAFE5419M Salanpur Area 2020118082 06-Feb-21 610.75 500030 Consignee WiseTotal: 610.75 8551.80 0.00 Shree Balaji Glass Manufacturing Pvt.Ltd. AADCS8283K Kajora Area 2020118396 15-Feb-21 110.93 Kajora Area 2020118397 15-Feb-21 101.79 500031 Consignee WiseTotal: 212.72 0.00 212.72 United Trading Company ACFPJ9860Q Kunustoria Area 2020108677 06-Feb-21 84.03 500040 Consignee WiseTotal: 84.03 31798.20 0.00 Shree Enterprises Coal Sales Pvt. Ltd. AADCS6017K Bankola Area 2020108695 04-Feb-21 729.55 500044 Consignee WiseTotal: 729.55 0.00 730 Industrial Fuels And Commodities AIOPG1874C Pandaveswar Area 2020108242 29-Jan-21 898.02 Bankola Area 2020108687 04-Feb-21 673.71 Bankola Area 2020108696 04-Feb-21 291.34 Pandaveswar Area 2020109040 04-Feb-21 430.26 Pandaveswar Area 2020118524 15-Feb-21 4081.01 Kajora Area 2020118804 15-Feb-21 60462.11 Satgram Area 2020118812 15-Feb-21 197.01 500060 Consignee WiseTotal: 67033.46 17865.00 49168 Total Fuels Private Ltd. AACCT1679D Kajora Area 2020118058 15-Feb-21 86975.93 500070 Consignee WiseTotal: 86975.93 57029.40 29947 Shree Bahubali Mercantile Pvt. -
LIST of REPORTS SENT to the SPONSORER from 1ST JANUARY, 2016 to 14Th JULY, 2021
LIST OF REPORTS SENT TO THE SPONSORER FROM 1ST JANUARY, 2016 TO 14th JULY, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”. -
Dr. Brijesh Kumar Mishra Associate Professor [email protected] Dept
Dr. Brijesh Kumar Mishra Associate Professor [email protected] Dept. of Environmental. Sci. & Engg. [email protected] Indian Institute of Technology (ISM) +91-326-235752 (O); Dhanbad, Jharkhand- 826004 +91-9471191704 (Mob) ACADEMIC BACKGROUND Name of Branch / College/Institute/University Year CGPA/ Class Degree Specialization % Ph.D. Environmental IIT(ISM) Dhanbad, Jharkhand, India. 2014 N/A N/A Science & Engg M. Tech Environmental MNNIT Allahabad, UP, India. 2004 7.66 Ist Engineering B. Tech Agriculture Engg. AAI-DU, Allahabad, UP, India. 2002 76.41 Ist RESEARCH INTERESTS 1. Advanced oxidation processes coupled hybrid systems for the treatment of water and wastewater treatment. 2. Feasibility of different disinfection processes and devices for controlling disinfection by- product. 3. Pollution exposure and human health risk assessment. PROFESSIONAL APPOINTMENTS 1. 12.04.2021 to Till Now: Associate Professor of Env. Sci. & Engg., IIT(ISM), Dhanbad 2. 14.06.2011 to 11.04.2021: Assistant Professor of Env. Sci. & Engg., IIT(ISM), Dhanbad 3. 16.08.2005-13.06.2011: Assistant Professor of Environmental Sci., SHIATS, Allahabad LIST OF PUBLICATION 1. International Journal (SCI/SCIE Index): 39 (Average Impact factor: 4.95) 2. International Journal (Scoups Index): 04 3. Book Chapter: 07 4. International & National Conference: 31 RESEARCH GUIDANCE 1. Ph. D Guidance (Awarded): 02 (Sole Guide) + 01 (Co-guide) 2. Ph. D Guidance (Ongoing): 08 (Sole Guide) + 01 (Co-guide) 3. M. Tech Guidance (Awarded): 20 (Sole Guide) + 01 (Co-guide) 4. M. Tech Guidance (Ongoing): 01 (Sole Guide) 5. M.Sc Guidance (Awarded): 08 (Sole Guide) + 02 (Co-guide) RESEARCH PROJECTS 1. -
Jharkhand State Pollution Control Board Government of Jharkhand
Jharkhand State Pollution Control Board Government of Jharkhand DIPP Point No. 109 Question 5d. Authorization under Hazardous Waste (Management and Handling) Rules, 1989 Q: Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification Supporting: URL: http://jhkocmms.nic.in/OCMMS/index.gsp Userid : O1618801720 Password: bigbang123@ Click Here Click Here and select ‘Hazardous Waste Management Jharkhand State Pollution Control Board Government of Jharkhand Fill in General details Fill in Product details Jharkhand State Pollution Control Board Government of Jharkhand Fill in Fee details Fill in Hazardous Waste details Jharkhand State Pollution Control Board Government of Jharkhand Upload files Click on ‘Proceed’ to continue Jharkhand State Pollution Control Board Government of Jharkhand Select the payment mode and make payment FOR TRACKING AND MONITORING STATUS User can track status from here SUPPORTING DOCUMENT Application Type Status Occ Name Designation Ind Name Address City District Mobile No Email Id A-3, 2nd-Phase, Adityapur Kandra SERAIKELA 303293 HWM pending Diloo B Parikh Director Mithila Motors Pvt. Ltd. Adityapur 9204058603 [email protected] Road, Adityapur KHARSAWAN LARGE SCALE INDUSTRIAL ESTATE, SERAIKELA 303321 HWM pending K Shankar Marar Managing Director TAYO ROLLS LIMITED GAMHARIA 9243587464 [email protected] GAMHARIA KHARSAWAN OM PRAKASH BALMUKUND SPONGE & MANJHILADIH, GADISRIRAMPUR, 319248 HWM -
Environmental Statement in Form-V Cluster No
ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental (Protection) Rules, 1986) (2018-2019) FOR CLUSTER NO. – 7 (GROUP OF MINES) Salanpur Area and Sripur Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2015 Company Environmental Statement (Form-V) for Cluster No. – 7 (Group of Mines) 2018-19 ENVIRONMENTAL STATEMENT FORM – V Environmental statement for the financial year ending 31st March, 2019 Cluster No. – 7 FOR THE YEAR: 2018-19 CONTENTS SL.NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-5 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I ) 6-9 LIST OF ANNEXURES ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY AND HEAVY METAL ANALYSIS 10-12 II NOISE LEVEL REPORT 13 III WATER QUALITY REPORT – MINE WATER QUALITY AND GROUND 14-16 WATER QUALITY IV GROUNDWATER LEVEL REPORT 17 PLATES I LOCATION PLAN II PLAN SHOWING LOCATION OF MONITORING STATIONS 1 Environmental Statement (Form-V) for Cluster No. – 7 (Group of Mines) 2018-19 CHAPTER – I INTRODUCTION 1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd.22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above and in fulfillment of condition laid out in the EC for the Cluster, the work of Environmental Statement for Cluster No. -
Impact of Coal Mining on Environment: a Study of Raniganj and Jharia Coal Field in India Sribas Goswami1
Impact of Coal Mining on Environment: A Study of Raniganj and Jharia Coal Field in India Sribas Goswami1 Abstract Coal mining adversely affects the eco-system as a whole. On the unstable earth; the unresting mankind constantly uses a variety of resources for their daily lives. Coal is recognized to have been the main source of energy in India for many decades and contributes to nearly 27% of the world’s commercial energy requirement. Coal is mainly mined using two methods – surface or ‘opencast’ and underground mining. The geological condition determines the method of mining. Coal mining is usually associated with the degradation of natural resources and the destruction of habitat. This causes invasive species to occupy the area, thus posing a threat to biodiversity. Huge quantities of waste material are produced by several mining activities in the coal mining region. If proper care is not taken for waste disposal, mining will degrade the surrounding environment. The method of waste disposal affects land, water and air and in turns the quality of life of the people in the adjacent areas. This paper throws light on the burning issues of coal mines and its impact on the environment. Keywords: coal mining, development, displacement, explosive, pollution Introduction: Mining activity puts tremendous pressure on local flora and fauna, particularly where division of forest land for mining takes place. The effect of mining on ground water level, silting of surrounding water bodies and land are also of great concern. Coal mining contributes greatly towards the economic development of the nation, although it also has a great impact upon human health. -
GIPE-016017.Pdf
, '· ' - "'· -, , . 'I. • . •~- . YEA~ aNl>INO -31~t·. riaceM.aE;g_' "'·'- . ... ' .,. ':. 1917 •t ... ,_.,, . .· . ..... .(' :·~ ..... <--/~ ;_ ·~. _:._._-~¥ .. :!.,- - - .·} ,·.t· .~ , ~-G. F._ ,ADA)\is, M.~Inst. C. E~ ''; . 'c.izief lnspect.o;- ~f M;'nes in indi~ _· . ;,··- ' ., .... ' ~~·~-· .'-- •. · . ·: CALCUT'I'A. _ · . · ~E~DENT ogVERNMENr 'PRINTING, INDIA g ' . 11118. • ' ' '' ' ~i~~~~/a~d annas.· I~-~~~·· _9d: REP.ORT Ofl THB CHIEF INSPECTOR OF MINES IN .INDIA Under the Indian Mines Act (VIII of 1901) · FO~ THB VBA~ BNDING 31st DECBMBB.R. 1917 RV G. F. ADAMS, M. lnst. C. E. Chief Inspector of Mines in India ' CALCUTTA SUPERINTENDENT GOVERNMENT "PRINTING, INDIA ' 1918. l'rir;e Rupee 1 and anna• 12 or Zf·9:l. .Agents for the Sale of Books Published by the Superintendent of Government Printing, Indi"' Calcutta.. IN EUROPE. Luz&~>& Co., 48, Great Ru,.ell Street, London, W.C. Constable & Co., 10, Orange Street, Leicester Square, London, W.C. W, Thacker & Co., 2, Creed Lane, London, E.C. Kogan Pan!, Trenoh, t"rilhner & Co., 68-74, Corter T. Fisher Unwin, Ltd., 1, Adelphi Terrace, London, Lane, E,C., and 25, Museum Street! London, W.C. w.c. Wm. Wesley & Sons, 28, Esse• Street, Strand, Londou. Bernard Quaritch, 11, Gr&fton Street, New Bond Street. ]~ndon, W. B. H. Blackwell, 50 & 51, Broad Street, Oxford, P, S. King & Son I, 2 & 4, Great Smith Street, West. Deighton Bell & Co., Ltd., Cambridge. minrder, London, S,W. Oliver & Boyd, Tweeddale Court, Edinburgh, B. S. King~ Co., 65, Cornhill, E.C., and 9, Pall Mall, E. Ponsonby, Ltd.,ll6, Grafton Stteet, Dnblin, London, W. Ernest Leroux, 28, Rue Bonapa.rte; Paris. -
Eastern Coalfields Limited (A Subsidiary of Coal India Ltd.)
HALF YEARLY ENVIRONMENT CLEARANCE COMPLIANCE REPORT OF CLUSTER 11 J-11015/245/2011-IA.II(M) FOR THE PERIOD OF OCTOBER 2018 TO MARCH 2019 Eastern Coalfields Limited (A subsidiary of Coal India Ltd.) Half Yearly EC Compliance report in respect of mines Area (Cluster 11), ECL Period:- October 2018 to March 2019 Specific Conditions Condition no.(i) The Maximum production from the mine at any given time shall not exceed the limit as prescribed in the EC. Compliance Kenda - Complied S.No Name of Mines Peak EC Production from(Oct ’18 to Capacity March ’19) (MTPA) (MT) 1 Krishnanagar 0.05 Temporarily closed. (U/G) 2 Haripur Group 2.30 0.565458 of Mines A Haripur(U/G + 0.75 Haripur UG is Temporarily OC ) closed & OCP Not yet started. B CBI(U/G) 0.10 0.029889 C Chora 7,9 & 10 0.15 0.07793 pit(U/G) D Bonbahal OC 0.5 0.102754 Patch(OCP) E Shankarpur/CL 0.8 0.354885 Jambad OC Patch/Mine(52 Ha) 3 New Kenda 2.00 0.119282 Group of Mines A New Kenda (UG) 0.05 0.015802 B West Kenda OC 0.75 Not yet started. Patch/Mines C New Kenda OC 1.2 0.10348 mine(240 Ha) 4 Bahula Group of 0.45 0.146471 Mines A Lower 0.15 0.035949 Kenda(U/G) B Bahula (U/G) 0.25 0.085078 C CL Jambad 0.05 0.025444 (U/G) 5 Siduli(U/G +OC) 1.2 0.054887, OCP not yet started. -
Consultancy Project Detail
Institute Name IIT KHARAGPUR India Ranking 2017 ID IR17-I-2-18630 Discipline OVERALL ENGG Consultancy Projects Name of faculty (Chief Amount received (in words) S.No. Financial Year Client Organization Title of Consultancy of projectAmount received (in Rupees) PARAMETER Consultant) [Rupees] SOFTLORE SOLUTION-SCIENCE & DEVELOPMENT OF Twenty Two Thousand Four Hundred RAJLAKSHMI 1 2015-16 TECHNOLOGY ENTREPRENEURS PARK, PSYCHOMETRIC 22456 Fifty Six Only GUHA(T0109,RM) 2D.FPPP IIT KHARAGPUR ALGORITHMS Twenty Seven Lakh Sixty Three WATER & SANITATION SUPPORT Thousand Nine Hundred Thirty Only ORGANISATION (WSSO)-DEPARTMENT RIVER WATER QUALITY OF PUBLIC HEALTH ENGINEERING, EVALUATION FOR RIVER 2 2015-16 JAYANTA BHATTACHARYYA(87019,MI), ABHIJIT MUKHERJEE(10018,GG) 2763930 GOVERNMENT OF WEST BENGAL, N.S. BASED PIPED WATER SUPPLY BUILDING, 7TH FLOOR, 1, K. S. ROY SCHEME ROAD, KOLKATA - 700 001 One Lakh Only SRIKRISHNA COLD STORAGE-VILL & P. PROBLEMS OF CULTIVATION O. - NONAKURI BAZAR (KAKTIA BAZAR), 3 2015-16 PROSHANTA GUHA(04016,AG) AND PRESERVATION OF 100000 DISTRICT - PURBA MEDINIPUR, WEST BETEL LEAVES BENGAL - 721172 SUPERINTENDING ENGINEER,- Seventeen Lakh Ten Thousand Only EVALUATION OF FLOOD WESTERN CIRCLE-II, I&W MANAGEMENT SCHEME FOR 4 2015-16 RAJIB MAITY(08039,CE) DIRECTORATE, DIST, PASCHIM 1710000 KELIAGHAI - KAPALESWARI - MEDINIPUR, GOVERNMENT OF WEST BAGHAI RIVER BASIN BENGAL, PIN-721101 ORIENTAL STRUCTURAL ENGINEERS WIDENING & Two Lakh Twenty Four Thousand PVT. LTD.-21, COMMERCIAL STRENGTHENING OF Seven Hundred Twenty Only 5 2015-16 -
ENVIRONMENTAL STATEMENT in FORM-V (Under Rule-14, Environmental (Protection) Rules, 1986)
ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental (Protection) Rules, 1986) (2018-2019) FOR CLUSTER NO. – 6 (GROUP OF MINES) Sodepur Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2015 Company Environmental Statement (Form-V) Cluster No. – 6 (Group of Mines) 2018-19 ENVIRONMENTAL STATEMENT FORM – V Environmental statement for the financial year ending 31st March, 2019 Cluster No. – 6 FOR THE YEAR: 2018-19 CONTENTS SL.NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-6 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I ) 7-17 LIST OF ANNEXURES ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY 18-24 II NOISE LEVEL REPORT 25 III WATER QUALITY REPORT – MINE WATER QUALITY 26-32 AND GROUND WATER QUALITY IV WELL WATER LEVEL REPORT 33 PLATES I LOCATION PLAN II PLAN SHOWING LOCATION OF MONITORING STATIONS 1 Environmental Statement (Form-V) Cluster No. – 6 (Group of Mines) 2018-19 CHAPTER – I INTRODUCTION 1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd. 22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above and in fulfillment of condition laid out in the Environment Clearance granted by MoEF&CC, the work of Environmental Statement for Cluster No. -
Eastern Coalfields Limited (A Subsidiary of Coal India Ltd.)
HALF YEARLY ENVIRONMENT CLEARANCE COMPLIANCE REPORT OF CLUSTER 10 J-11015/180/2011-IA.II(M) FOR THE PERIOD OF April 2018 TO September 2018 Eastern Coalfields Limited (A subsidiary of Coal India Ltd.) Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner SPECIFIC CONDITION Condition The maximum production from the mine at any given time shall not no. (i) exceed the limit as prescribed in the EC. Compliance Complied Mine Peak EC Capacity Total production in (MTPA) April to September, 2018 North Searsole OCP 2.0 0.252613 Kunustoria & Amrasota UG 0.15 0.066252 Belbaid UG 0.12 0.033502 Bansra UG & OC 0.735 0.126843 Parasea UG & OC 0.55 0.082130 Jambad OC 0.80 0.222744 Jambad UG 0.24 0.082177 Naba Kajora UG 0.30 0.022265 Madhabpur UG 0.030839 Madhabpur OC Patch 0.50 0.145851 Lachipur UG 0.06 0.00 Central Kajora UG 0.15 0.033807 Khas Kajora UG 0.35 0.110713 Moira UG 0.12 0.00 Madhusudanpur UG 0.24 0.041477 Madhujore UG 0.12 0.00 Ghanashyam UG 0.12 0.00 Parascole East & West 0.39 PSC(E) – 0.034844 PSC(W) – 0.024166 Condition The validity of the EC is for the life of the mine or as specified in the EIA (ii) Notification, 2006, whichever is earlier. Compliance Agreed Condition There shall be no mine void and no external dumps at the end of mining. (iii) Compliance Agreed Condition Adequate measures shall be taken to mitigate subsidence as per DGMS (iv) stipulations.