Antwerp Airport
Total Page:16
File Type:pdf, Size:1020Kb
ANNUAL REPORT Luchthavenlei, z/n 2007 B- 2100 Antwerpen (Deurne) Tel.: 03-285 65 00 Fax: 03-285 65 01 ANTWERP AIRPORT 2007 Annual report ANTWERP AIRPORT 1 TABLE OF CON T EN T S PREFACEVOORWOORD 5 1 2007HOOGTEPUNTEN HIGHLIGHTS 2007 9 2 MANAGEMENTBEHEER EN BEHEERSRESULTATEN AND MANAGEMENT RESULTS 13 3 FIVEVIJF TROEVENASSETS OF VAN ANTWERP DE LUCHTHAVEN AIRPORT ANTWERPEN 15 3.1 20-MINUTE20 MINUTEN CONCEPT CONCEPT 15 3.2 FREEGRATIS PARKING PARKING AREA 15 3.3 ACCESSIBLEBEREIKBAAR BY MET CAR, AUTO, TRAIN TREIN AND EN BUS BUS 16 3.4 SITUATEDLIGGING IN AT HET FLANDERS’ ECONOMISCHE ECONOMIC HART HEART VAN VLAANDEREN 16 3.5 MODERNMODERNE PASSENGER PASSAGIERSTERMINAL TERMINAL 16 4 TRAFFICVERKEER 17 4.1 PASSENGERSPASSAGIERS 17 4.2 MOVEMENTSBEWEGINGEN 18 4.3 FREIGHTVRACHT 18 5 INVESTMENTSINVESTERINGEN 19 6 AIRPORTLUCHTHAVENBEVEILIGING SECURITY 20 6.1 SCREENINGSCREENINGAPPARATUUR DEVICES AND EN VEHICLES ROLLEND MATERIEEL 20 6.2 SECURITYVEILIGHEIDSINSPECTIES INSPECTIONS BYDOOR THE HET AVIATION DIRECTORAAT-GENERAAL DIRECTORATE-GENERAL LUCHTVAART 16 7 EMPLOYMENTWERKGELEGENHEID 22 7.1 PUBLICOPENBARE SERVICES DIENSTEN 22 7.2 AIRPORT-BASEDBEDRIJVEN GEVESTIGD BUSINESSES OP DE LUCHTHAVEN 22 8 ENVIRONMENTALMILIEUVERGUNNING LICENCE 23 9 PROMOTIONPROMOTIE 24 BALANCEBALANS SHEET 27 INCOMERESULTATENREKENING AND EXPENDITURE ACCOUNT 33 2 3 PREFA C E Growth continues with a passenger increase of 18% Following several years of falling figures, this trend was broken in 2006 with an increase of 3.6% to 147,849 passengers. The year 2007 was closed with an overall passenger number of 174,858, which means that growth continues with an increase of over 18% compared to the previous year. However, the number of flight movements declined by about 6% to 51,589. This is mainly due to the decreasing number of training flights. Works In 2007 efforts were also made to further improve the infrastructure of Antwerp Airport. Late October, the platform where aircraft are parked was rearranged. As a result the old markings were removed and replaced by new ones. Aircrafts can now park closer to the airport building. During the summer months a new ILS installation was fitted. This Instrument Landing System indicates the desired glideslope angle and the runway axis during landing. This allows pilots to also reach the airport in less favourable weather conditions. The previous installation dated from 1978 and was due for replacement after all those years. On 8 June, the Flemish Government decided in view of the construction of an obligatory runway safety area of 150m at the R11 Krijgsbaan, to opt for a limited diversion of the R11. This means that the Krijgsbaan, half-dug-in, will be diverted. When the current recommendation of 300 metres is transposed into a requirement, the diverted Krijgsbaan will then be provided with a roof slab and the safety area will run over the R11. The construction of the RESA’s will cause air traffic safety to further increase, but will not extend the runway itself. 4 5 Website 1 2007 HIG H LIG ht S An important project was realised in the field of communication. The Airport’s new website has been accessible since early July at the known web address www.antwerpairport.be. 12 January 2007 – opening of the new Flying Group hangar 2008 prospects In order to accommodate the ever growing fleet, Flying Group started in 2006 with the construction of an additional hangar. On 12 January 2007 this hangar In the course of 2008, the renovation of the airport building will be completed with a was inaugurated in the presence of the Flemish Minister for Public Works, thorough renovation of the Belair restaurant. The food and drink area will be divided into a Energy, the Environment and Nature, Kris Peeters. brasserie and a business restaurant. A new outdoor café will also be built which will look out onto the airport premises. A second important infrastructure project is the construction of a taxiway which will 19 February 2007 – the millionth passenger on the connect Platform 2 to taxiway Bravo. Following the recent extension of the number of Antwerp-London City connection hangars near Platform 2, the air traffic flow was considerably hampered. The connection with taxiway Bravo allows for an additional opening up, which solves this safety issue to a In 1993, VLM Airlines flew for the first time from Antwerp to large extent. London City. The millionth passenger on this route, Ms Louise Clifton, was welcomed in Antwerp by Alderman for Culture These and other projects contribute to the further development of Antwerp Airport as a and Tourism, Philip Heylen, and Johan Vanneste, CEO of VLM modern, comfortable and customer-friendly airport where all passengers, and not just Airlines. business travellers, feel at home. We hope to welcome you soon. Eddy Cleirbaut Airport Commander 17 April – presentation of the jet aircraft introduced by VLM Airlines The first aircraft with jet engines was introduced into VLM Airlines’ fleet to enable it to increase capacity on its busiest route. The BAe 146-300 seats 92 passengers and will be used to operate 4 out of the company’s 10 daily flights between Rotterdam and London City. 19-20 May – Stampe Fly-In As an annual tradition, the Antwerp Stampe Center, together with ASA, organised the 16th Stampe Fly-In. Historic aircraft, mainly of the type SV4, come together at Antwerp Airport where pioneers Stampe and Vertongen built these aircraft in the nineteen-twenties. On Sunday, a formation flight was performed. Visitors could make their first flight or simply enjoy the beauty of these aircraft. 6 7 13 July - entry into operation of new ILS 8 October – Active Trip The Instrument Landing System indicates the desired glideslope angle and Army exercise ‘Active Trip 07´ started with the landing of the runway axis during landing, allowing pilots to also reach the airport in less 8 C130 aircraft which disembarked soldiers and army favourable weather conditions. The work started early May by dismantling the material in record time to take off again seconds later. existing installation from 1978. Various parts were imported from Germany Purpose of the exercise, in which 2,500 soldiers took part, and assembled on site. After calibration, the new ILS was put into use on 13 was the evacuation of ‘threatened fellow-countrymen’. The July 2007. effective evacuation happened some days later at Zoersel airport. 26 July – official presentation of the new website 19-20 October – reconfiguring the platform and logo In the framework of the audit performed late 2005 by the Aviation In order to meet the increasing number of questions received from passengers Directorate-General, a reconfiguring of the aircraft parking area was by e-mail, both the lay-out and contents of the website have been thoroughly recommended. On 18 October, old markings were removed, with reviewed. General airport information is gathered in one section, whereas the exception of some points of reference. Afterwards completely separate sections have been provided for the target groups of passengers, pilots new aircraft parking positions were drawn allowing aircraft to be and visitors. The extra facilities provided by the airport, such as wireless internet, parked closer to the building. meeting rooms and Brabo lounge deserve special mention. Together with the new website, the airport’s logo was also officially introduced. The use of this new logo will further contribute to the airport’s recognisability and renown. 26-27-28 SnowCity 18 September – Day 27: Aviation Day for disabled Children The tourism boards of Austria and Switzerland transformed the Today, the 27th Aviation Antwerp Groenplaats into a winter wonder land to promote their Day for disabled winter sports facilities. Antwerp Airport and Air Agencies announced Children was organised the new Welcome Air programme, with weekly flights to Innsbrück. by the not-for-profit ‘Jeugd en Luchtvaart’, the first since its driving force Frank Sanders died. More 30 October – First anniversary of Antwerp – than 1,400 disabled Manchester route children could make their first flight thanks Flemish Minister-President Kris Peeters and Jaap Rosen Jacobson, president to the commitment of of VLM Airlines joined the celebrations marking the first anniversary of the numerous volunteers. Antwerp-Manchester route. VLM Airlines started its route Antwerp-Manchester on 30 October 2006. One year later, the airline company celebrated the first successful year of this connection, handling 16% more passengers than expected. 8 9 18 November – arrival of S a i n t 2 MANAGE M EN T AND M ANAGE M EN T RESUL T S Nicholas Antwerp Airport is managed as a “Separate Management Service” by the Flemish As an annual tradition, Saint Nicholas landed on government, Department of Mobility and Public Works. Its organic rules have been laid Sunday 18 November 2007 at 1.30 pm at Antwerp down by the Flemish Government Decree of 8 June 1994 (Belgian Official Gazette of 20 Airport. Numerous children and their parents were October 1994). This form of management allows the Airport to operate and to pursue a present to welcome Saint Nicholas and his helpers commercial policy with some degree of autonomy. At the same time it provides the Airport (Zwarte Pieten, or Black Peters). At 2 pm, the parade with the opportunity to benefit from the integration into the Flemish administration. began and wound its way along Diksmuidelaan – Statiestraat – Driekoningenstraat to end at the Apart from its own aeronautical and non-aeronautical revenues, Antwerp Airport also corner of Grotesteenweg at about 4.30 pm. ‘Fairy receives an operating allocation and an investment allocation from the Flemish Region. tales’ were the theme of the 22nd edition with The Airport’s operational staff comes under the Flemish government. Belgocontrol is in Hansel and Gretel and their house made of candies, charge of traffic control as well as the radio and meteorological services.