Hillsborough MPO List of Priority Projects 2018/2019 Transportation Improvement Program Table 1: EXISTING PRIORITIES FUNDED FOR CONSTRUCTION

Project FPN LRTP Project Number Project Limits Project Description Project Status in 2017/2018 TIP Sponsor

Widen 2 lanes to 6 lanes County / 415489 3 101 US 301 from SR 674 to Balm Rd Under Construction divided FDOT Bruce B Downs Blvd from Bearss Ave To Palm Widen 4 lanes to 8 lanes 405492 5 129 County Under Construction Springs divided Bruce B Downs Blvd from Pebble Creek Dr to Widen 4 lanes to 6 lanes 405492 4 130 County Under Construction County Line Rd divided Cross Creek Blvd from Cory Lake Isles to Morris Widen 2 Lanes to 4 Lanes 420625 1 134 Tampa Completed Bridge Rd Divided Widen 2 lanes to 4 lanes 257862 3 124 Sam Allen Rd from SR 39 to Park Rd FDOT Construction programmed 2018 divided Widen 4 lane to 6 lane 408459 3 132 I-75 From N of Bb Downs Blvd to S Of Sr 56 FDOT Under Construction freeway 410909 2 Minimize Traffic I-75 From Fowler Ave to I-275 ITS Freeway Management FDOT Under Construction 410909 9 Widen 4 lanes to 6 lane 408459 2 131 I-75 from S of Fowler Ave to N Of BB Downs Blvd FDOT Under Construction freeway Widen 6 lanes to 8 lane 258399 2 114 I-275 from Himes Ave to Hillsborough River FDOT Completed freeway Widen 6 lanes to 8 lane 258398 5 114 I-275 from SR 60 (Memorial Hwy) to Himes Ave FDOT Under Construction freeway 258398 3 Minimize Traffic I-275 from Himes Ave to Hillsborough River ITS Freeway Management FDOT Completed Widen 2 lanes to 4 lanes 255793 1 126 US 301 from Tampa Bypass Canal to Fowler Ave FDOT Completed divided Bayshore Blvd from Rome Ave to Bay To Bay Blvd - 413092 2 Reduce Crashes Re-Stripe for Bike Lane Tampa Under Construction Phase II Bayshore Blvd from S Howard Ave to Gandy Blvd - 413092 3 Reduce Crashes Re-Stripe for Bike Lane Tampa Construction programmed 2017 Phase III 413086 1 Real Choices Upper Tampa Bay Trail Phase IV-C Multi-Use Trail County Completed 430175 1 Real Choices Maintain Current Vanpools Vanpool Vehicles TBARTA Program funded in 2017, 18 & 19 Public Outreach & 408205 2 Real Choices Regional Transportation Demand Management TBARTA Program funded in 2019 Education Widen 4 lanes to 6 lanes 405525 2 110 SR 60 from US 301 to Falkenburg Rd FDOT Construction programmed 2017 divided Widen 2 Lanes to 4 Lanes 255893 2 122A SR 574 from Highview Rd to Parsons Ave FDOT Completed Divided Adopted: June 13, 2017 Page 1 Printed: 6/29/2017 Hillsborough MPO List of Priority Projects 2018/2019 Transportation Improvement Program Table 1: EXISTING PRIORITIES FUNDED FOR CONSTRUCTION

Project FPN LRTP Project Number Project Limits Project Description Project Status in 2017/2018 TIP Sponsor

Widen 2 lanes to 4 lanes ROW Acquisition Underway; Construction 255893 3 122B SR 574 from Parsons Ave to Kingsway FDOT divided programmed 2016 Widen 2 lanes to 4 lanes ROW Acquisition Underway; Construction 255893 4 122C SR 574 from Kingsway to Mcintosh Rd FDOT divided programmed 2022 428214 2 Reduce Crashes Fletcher Ave from I-275 to 56th St Pedestrian Enhancement County Completed Nebraska Ave to 30th St I-275 Howard Frankland Bridge Eastbound (NB) Replacement & Support 422904 4 Preserve System FDOT Design-Build programmed 2020 Span Transit 410909 6 Minimize Traffic I-75 from Manatee County to Bloomingdale Ave ITS Freeway Management FDOT Completed Hillsborough River Greenway Kennedy Riverwalk - 257805 5 Real Choices Multi-Use Trail Tampa Completed MacDill Park to Curtis Hixon Park Hillsborough River Greenway Doyle Carlton 257805 6 Real Choices Multi-Use Trail Tampa Under Construction Riverwalk - Straz Center to Water Works Park Nebraska Ave (or Alt Rte Fla) from Fowler Ave to 429077 1 Reduce Crashes Re-Stripe for Bike Lane FDOT Completed Linnwood Dr Courtney Campbell Cswy from Pinellas County to 424507 2 Minimize Traffic ITS FDOT Design-Build programmed 2017 Veterans Expy. 406151 1 Widen to 6 lanes to 8 lane 406152 1 116 Veterans Expwy from Memorial Hwy to Gunn Hwy Under Construction freeway Turnpike 431275 1 435141 1 Preserve System Maintain Current Streetcar Capital Maintenance HART Capital 2019 432715 1 Reduce Crashes Bougainvillea Ave from 30th St to 46th St Pedestrian / Bicycle Safety Tampa Construction programmed 2016

435908 2 Landscaping, Ped 437044 1 Reduce Crashes Busch Blvd from N Dale Mabry Hwy to Florida Ave Enhancement, Intersection Tampa Construction programmed 2019 437530 1 Impr

432714 1 Real Choices Cypress Corridor from U-Path to Blvd Pedestrian / Bicycle Safety Tampa Under Construction

432716 1 Reduce Crashes Palm Ave from N. Blvd to Nebraska Ave Pedestrian / Bicycle Safety Tampa Construction Programmed 2017

432717 1 Reduce Crashes Willow Ave from Swann Ave to Main St Pedestrian / Bicycle Safety Tampa Construction Programmed 2017

432584 1 East Hillsborough Ave from Nebraska Ave to 56th Resurfacing & Drainage Improvements Reduce Crashes CMP / Crash Mitigation MPO 432584 2 St Programmed 2019 Fowler Avenue from Nebraska Ave fo Bruce B 429077 2 Reduce Crashes CMP / Crash Mitigation MPO Under Construction Downs Blvd Adopted: June 13, 2017 Page 2 Printed: 6/29/2017 Hillsborough MPO List of Priority Projects 2018/2019 Transportation Improvement Program Table 1: EXISTING PRIORITIES FUNDED FOR CONSTRUCTION

Project FPN LRTP Project Number Project Limits Project Description Project Status in 2017/2018 TIP Sponsor

Downtown ATMS Project Ph 2 (S of Scott St, E of 424213 3 Minimize Traffic 191 Signals Tampa Design Build 2020 Hillsborough River, W of Channelside Dr) Kennedy//Dale Mabry ATMS Project Ph 3 424213 4 Minimize Traffic 142 Signals Tampa Design Build 2020 (Incl. Bayshore, Kennedy, Hyde Park) University Area/Busch Blvd ATMS Project Ph 4 (Incl. 424213 6 Minimize Traffic 119 Signals Tampa Design Build 2020 Busch Blvd and Fowler Ave) Additional funding may be needed to complete 257805 1 Real Choices Tampa Riverwalk - Kennedy Boulevard Elevator / Stairs Tampa project Construction in FY 18 for: 437243 1 1. Stowers - $108,988 437244 1 Safe Routes To School Candidate Projects, Sidewalks and Intersection County Reduce Crashes 2. Summerfield - $125,854 437248 1 Hillsborough County Improvements Priority 3. Eisenhower (Old Big Bend Rd) - $169,451 437242 1 5. Cypress Creek - $114,741 436639 1 Reduce Crashes Columbus Dr from Nebraska Ave to 14th St Walk/Bike Safety Tampa PE FY18, Construction 2020 437246 1 Reduce Crashes 46th St from Busch Blvd to Fowler Ave Walk/Bike Safety Tampa PE FY18, Construction 2020 437243 1 Reduce Crashes Rome Ave from Kennedy Blvd to Columbus Dr Walk/Bike Safety Tampa PE FY18, Construction 2020 Complete Street Plant City 437642 1 Reduce Crashes Sr 39 / S Collins Street from Merrick St to E Laura St DDR Enhancements Priority #1 County 438450 1 Minimize Traffic Dale Mabry Hwy from Sligh to Van Dyke Rd ATMS - Signalization Design Build 2018 Priority Operational Improvements PE FY18, Construction 2020 437640 1 Minimize Traffic US 301/ SR 43 from Falkenburg Rd to Sligh Ave FDOT Metropolitan $196,000 MPO funds in 2018, $196,000 District 438747 1 Transportation District 7 Travel Behavior Surveys Household Travel Surveys FDOT funds 2018-2021 Planning 439691 1 Mort - PE FY18, Construction 2020 Safe Routes to School Candidate Projects, Sidewalks and Intersection County 439696 1 Reduce Crashes Kenly - PE FY18, Construction 2020 Hillsborough County Improvements Priority 439692 1 Gibsonton - PE FY18, Construction 2020 Walk Bike Emphasis Tampa 439476 1 Reduce Crashes Green Spine: Phases 2b Construction 2020 Corridor Priority #3 436713 1 Real Choices UTBT Connector: Lutz Lake Fern sidewalk Sidewalk County PE FY18, Construction 2020 Selmon Greenway connector to Kennedy Blvd at 433925 1 Real Choices Multi-Use Trail THEA PE FY18, Construction 2020 19th St, trailhead

Adopted: June 13, 2017 Page 3 Printed: 6/29/2017 Hillsborough MPO List of Priority Projects FY2018/2019-2022/2023 Transportation Improvement Program Table 2: CANDIDATES FOR NEW FUNDING 2040 2017 LRTP Project Suggested Funding Priori- FPN Project Limits Project Sponsor Project Status / Request Prioritization Criteria Refer- Description Type ty ence Imagine 2040 Plan Funding Level ($m) Metropolitan Transportation Planning Federal Metro 0.62 Funds Systems & 439336 2 Figure Ongoing planning need: $600,000 per year for LRTP development, 1 Metropolitan Transportation Planning Corridor MPO SU $600k per year FY19-23 5-6 Planning Studies, and Regional Travel Surveys 439336 3 Planning Goals by 2040 Imagine 2040 Plan * Resurface major roads every 14-17 years, local roads every 20-25 years Funding Levels: Status Quo: $70M * Replace buses every 10-12 years Needed to Reach Preserve the System * Replace deficient bridges Goals: $98M Transit State of CNG Bus Replacement, $4million added in FY22, $4M recommended for 414963 2 Good Repair FY23, $28M requested by HART Paratransit Vehicle Replacement, $7.1 million Preserve CNG Duplex Compressor, $575,000 Listed based on HART's priority 2 Maintain Current Bus Service HART SU, FTA System Transit State of Marion Transfer Center (MTC) concrete infrastructure improvements, setting Good Repair $1 million HART CAD/AVL System Replacement $10,100,000 Streetcar Maintenance Improvements, $1 million Imagine 2040 Plan Goals by 2040 Funding Levels: Number of total crashes and * Reduce crashes 21-50%, to levels comparable to peer cities Status Quo: $56M Reduce Crashes & Vulnerability bike/ped crashes, 2012 - 2016 * Protect low-lying major roads from flooding, cutting recovery time in half Needed to Reach Goals: $108M 2040 Illustrative Safety Project; Reduce Walk/Bike Hillsborough Multimodal Safety Improvements, Mid-block crossings, cost estimates 3 Busch Blvd (Dale Mabry to 56th) SU, HSIP 1,304 total crashes, 141 Crashes Safety MPO/FDOT to be provided by FDOT bike/ped Construction of access management (vehicular safety) improvements is Reduce Hillsborough Ave (Memorial Walk/Bike Hillsborough programmed in FY 20. Additional funding may be needed to construct 2040 Illustrative Safety Project; 4 437641 1 SU, HSIP Crashes Hwy/Sheldon Rd to Himes Ave) Safety MPO/FDOT walk/bike safety improvements in the same year. Cost estimates to be 890 total crashes, 45 bike/ped provided summer 2017 thru a joint FDOT-MPO study. Currently part of the "Heights Multimodal Plan", funded in FY22, PD&E Reduce Florida Ave/Tampa St (Tyler St to Hanna Walk/Bike Hillsborough 2040 Illustrative Safety Project; 5 requested prior to TBX Segments 6 & 7 design completion, advance to Crashes Ave) Safety MPO/FDOT 732 total crashes, 63 bike/ped FY18. * Project in neighboring county, reflected as a Transportation Management Area priority Denotes new project

Adopted: June 13, 2017 Page 1 Printed: 6/29/2017 Hillsborough MPO List of Priority Projects FY2018/2019-2022/2023 Transportation Improvement Program Table 2: CANDIDATES FOR NEW FUNDING 2040 2017 LRTP Project Suggested Funding Priori- FPN Project Limits Project Sponsor Project Status / Request Prioritization Criteria Refer- Description Type ty ence Reduce Walk/Bike Added $78k for design in FY21 & 22, $441,000 needed for construction, 6 436640 1 Floribraska Ave (Tampa St to Nebraska) Tampa SU 424 total crashes, 18 bike/ped Crashes Safety request to advance in work program Construction of access management (vehicular safety) improvements is SU, HSIP, Urban 437644 1 Reduce Walk/Bike Hillsborough programmed in FY 20. Additional funding may be needed to construct 2040 Illustrative Safety Project; 7 436489 1 Kennedy Blvd (Westshore to Brevard) Corridor Crashes Safety MPO/FDOT walk/bike safety improvements in the same year. Cost estimates to be 361 total crashes, 10 bike/ped 437645 1 Improvement, RRR provided summer 2017 thru a joint FDOT-MPO study.

Reduce Complete Street City conducting design study of Channelside Dr from Kennedy Blvd to 8 Channelside Dr (Meridian to Adamo) Port Authority To Be Determined 156 total crashes, 11 bike/ped Crashes Enhancements Cumberland Dr * Phase 3a – Nuccio Pkwy (Nebraska Ave to 7th Ave) - $861,000 Walk Bike 2040 Illustrative Safety Project; 439476 2 Reduce Tampa Priority * Phase 3b - Nuccio Pkwy (7th Ave to 13th Ave) - $630,000 9 Green Spine: Phases 3a, 3b, 2a, and 3c Emphasis TA, SUNTrail 115 total crashes; 439476 3 Crashes #3 * Phase 2a - Cass St (Howard to Willow) - $493,400 Corridor 1 bike/ped * Phase 3c - 15th St (13th Ave to 21st Ave) - $396,700 40 total crashes; Reduce Walk/Bike $254,560 requested for design & construction, various locations, ROW 10 Tomlin Middle School Plant City TA, SR2S 4 bike/ped; Safe Routes to Crashes Safety and estimates needed School FDOT/Temple 439532 2 Reduce Morris Bridge Rd Bike Lanes/Paved Walk/Bike Fowler to Fletcher: design FY18, cst FY20/21 (TA funds); Davis Rd to 36 total crashes; 11 Terrace Priority TA, HSIP 439532 1 Crashes Shoulders, Davis to Fletcher Safety Fowler: design FY18, cst FY21 (safety funds) 2 bike/ped #2 Segment part of a 2040 Reduce Bullard Pkwy/Temple Terrace Hwy from Complete Street Temple Terrace 12 MPO study on going To Be Determined Illustrative Safety Project; 43 Crashes Glen Arven Ave to 78th St Enhancements Priority #4 total crashes, 0 bike/ped Design: $367,000 (preliminary estimate) Segment 1: $1.1M (Town ‘n’ Country Greenway to Clifton St) Reduce Hillsborough 13 George Rd Complete Street Segment 2: $2.1M (Clifton St to Memorial Hwy) SU, TA, HSIP 34 total crashes, 0 bike/ped Crashes MPO Segment 3: $1M (Memorial Hwy to U-Path) Request for Design funding Reduce Walk/Bike $494,600 requested for design & construction, various locations, ROW 11 total crashes, 1 bike/ped; 14 Marshall Middle School Plant City TA, SR2S Crashes Safety and estimates needed Safe Routes to School

Reduce Columbus Dr/17th/18th/19th 2-way Complete Street Hillsborough 15 2-way conversion, $1.6 million needed for signals, signing, and marking SU 6 total crashes, 1 bike/ped Crashes conversion Enhancements MPO Stormwater improvements and Reduce Vulnerability HART Priority Listed based on HART's priority 16 pavement rehabilitation at HART admin $3.5 million FTA Crashes Reduction #4 setting and maintenance facility * Project in neighboring county, reflected as a Transportation Management Area priority Denotes new project

Adopted: June 13, 2017 Page 2 Printed: 6/29/2017 Hillsborough MPO List of Priority Projects FY2018/2019-2022/2023 Transportation Improvement Program Table 2: CANDIDATES FOR NEW FUNDING 2040 2017 LRTP Project Suggested Funding Priori- FPN Project Limits Project Sponsor Project Status / Request Prioritization Criteria Refer- Description Type ty ence Imagine 2040 Plan Manage Congestion for Drivers Goals by 2040 Funding Levels: 2040 forecasted Planning Time * Traffic flow 17% better on non-freeways with ATMS and 640 intersections improved Status Quo: $14M Index (PTI) travel time & Shippers * Traffic flow 10% better on freeways Plus truck quick fixes & RR overpasses Needed to Reach reliability Goals: $53M Minimize Intersection Port Authority/ 17 US41 (Pendola Point/Madison Ave) SIS 3.934 PIT, low TT reliability Traffic Improvements FDOT (tent.) 2040 Priority freeway needing CM impr - 1.58 V/C peak Minimize Interchange Added $694k for design in FY21 & 22, funding needed to add EB left turn 18 437650 1 Gibsonton Dr at I-75 FDOT SU, SIS period 2040 Priority art Traffic Improvements lane & NB entrance lane needing CM impr - 1.00 peak period V/C Minimize Intersection Plant City 2040 Priority Art needing CM 19 440733 1 Alexander St at SR 39 Added $101k for design in FY21 & 22, $2M needed for construction SU Traffic Improvements Priority #3 impr - 0.73 V/C peak period

Minimize Intersection Plant City 2040 Priority Art needing CM 20 440736 1 Alexander St at Jim Johnson Rd Added $101k for design in FY21 & 22, $2M needed for construction SU Traffic Improvements Priority #7 impr - 0.81 V/C peak period Minimize Intersection Plant City Other major arterial - 1.61 V/C 21 440734 1 S Park Rd at Coronet Rd Added $101k for design in FY21 & 22, $2M needed for construction SU Traffic Improvements Priority #8 peak period Temple Terrace Partially funded with $1M special appropriation, $3M from Hills. Co. Alleviates US 301/Harney Rd 22 439413 1 9996 Davis Rd Ext (Harney Rd to Maislin Dr) New 2LU Rd SU Priority #1 $3.8M total needed intersection Minimize ATMS - HART Priority Listed based on HART's priority 23 Fiber Optic Ring between Jurisdictions $460,000 R-TIEs, FTA, SU Traffic Signalization #10 setting Imagine 2040 Plan Goals by 2040 Density rating based on Funding Levels: * Wide paved trails & sidepaths within walking distance of 1/4 of residents number of jobs and residents Status Quo: $122M Real Choices When Not Driving within a 1/4 of a mile of a bus * Frequent bus service within walking distance of nearly half of people & jobs Needed to Reach route or trail facility in 2040 * Outside bus service area, Sunshine Line services grow with senior population growth Goals: $182M Real New Expanded HART Priority 2040 Investment Level 1 - 24 EAST-WEST METRORAPID $30 million needed for construction, Added $2.5M for PD&E FY18 DDR, FTA Choices Transit Service #9 density rating 5 Service Development, Real HART Airporter (Express bus from Downtown 2040 Investment Level 1 - density 25 Paratransit Hillsborough MPO $3M annually, add to Emerging SIS Urban Corridor Choices Tampa, TIA, and St. Pete rating 5 Improvement Real $922,104 capital costs (increase fleet to 72 small buses), needs verification from 26 Sunshine Line Capital Costs Transit Sunshine Line SU Countywide Choices Hillsborough County I-275 Greenway Extension from W of Dale 2040 Investment Level 1 - density Real Hillsborough MPO feasibility study of pedestrian overpass on going, request for Design $350K, 27 Mabry to MacFarlane Park (Dale Mabry Multi-Use Trail SUNTrail rating 5, MPO UPWP study in FY Choices MPO/FDOT (tent.) could be part of Supplemental EIS and included as part of Tampa Bay Next Pedestrian Overpass) 16/17 Real Gandy Bridge Trail (Hillsborough County line to 2040 Investment Level 1 - density 28 441250-1 Multi-Use Trail FDOT & MPO PD&E study for Hillsborough Portion Choices Westshore Blvd) rating 5 * Project in neighboring county, reflected as a Transportation Management Area priority Denotes new project

Adopted: June 13, 2017 Page 3 Printed: 6/29/2017 Hillsborough MPO List of Priority Projects FY2018/2019-2022/2023 Transportation Improvement Program Table 2: CANDIDATES FOR NEW FUNDING 2040 2017 LRTP Project Suggested Funding Priori- FPN Project Limits Project Sponsor Project Status / Request Prioritization Criteria Refer- Description Type ty ence Prioritized by CCC; TA Real Greenway (Manhattan Tampa Priority $50,000 requested for PD&E ($1,800,000 total cost estimate), Need 2040 Investment Level 1 - 29 Multi-Use Trail application needs Choices Ave to Picnic Island Park) #12 agreement with MacDill AFB for ROW use for 25 years post-construction density rating 5 additional info * Segment D - Park Dr (22nd St Park to Sulpher Spring Park) $39,800 441338 1 Real 2040 Investment Level 1 - 30 GreenARTery Walk/Bike Loop Multi-Use Trail Tampa * Segment E - E River Shore Dr (Sulpher Spring Park/Florida Ave to Sligh TA 441338 2 Choices density rating 4 Ave/Lowry Park) $225,400 HC needs maintenance agreement w/ SWFWMD; Added $751k for 439482 1 Real Tampa Bypass Canal Trail (34th St to County/Temple TA, SUNTrail 2040 Investment Level 2 - 31 Multi-Use Trail PD&E In FY18, $379k for design in FY20, 439482 2 Choices Bruce B. Downs) Terrace Priority Connecting, SU density rating 3 Segment/Phasing to come from PD&E, Total cost $6.5M Real West River Gwy (Bayshore Blvd to MLK Tampa Priority $132,000 requested for Design ($982,000 total cost estimate); Waiting 2040 Investment Level 2 - 32 Multi-Use Trail TA Choices Recreation Complex) #11 for verification of ownership of ROW density rating 3 Funding needed for PD&E and Design for Ph III-IV; SUNTrail application Real 2040 Investment Level 2 - 33 439481 1 South Coast Gwy (Phases I and III-VI) Multi-Use Trail County submitted for Maydell Bridge over Palm River. Added $2.4M for CST of TA, SUNTrail Choices density rating 3 Ph 1A in FY21 $2,582,000 to construct A Real UPPER TAMPA BAY TRAIL (UTBT) PHASE Prioritized by CCC; 2040 Investment Level 3 - 34 Multi-Use Trail County $1,562,000 to construct B Choices IV-A and IV-B Elig & Feas for TA density rating 1 Alignment to be determined by County Selmon Greenway Next Phases - SR 60 Real Phase 2. $214,338 - Construct Connection to Nuccio Pkwy 2040 existing trail - density 35 between 19th St & Channelside Dr, Multi-Use Trail THEA TA Choices Phase 3. $138,614 - Safety & Sec Signage rating 1 extension to Nuccio Pkwy Real Shared-Use path to connect Temple Temple Terrace 2040 Investment Level 2 - 36 Multi-Use Trail MPO feasibility study FY18 To Be Determined Choices Terrace to USF Priority #3 density rating 2

Real Light Vehicle/footbridge over Temple Terrace 2040 Investment Level 2 - 37 Multi-Use Trail TA Application needed TA Choices Hillsborough River at Whiteway Dr Priority #6 density rating 2

Real York Street (Channelside Drive to Ybor Complete Street 0 total crashes, on Port 38 Port Authority $1.3 million for conversion to pedestrian promenade To Be Determined Choices Channel, on Port Property) Enhancements property Real Off-Road Bicycle $105,500 needed for des & const; Review/revise in Plant City Walk-Bike 39 McIntosh Tract Trail Plant City Not eligible for TA n/a Choices Trail Plan (MPO study on going) * Project in neighboring county, reflected as a Transportation Management Area priority Denotes new project

Adopted: June 13, 2017 Page 4 Printed: 6/29/2017 Hillsborough MPO List of Priority Projects FY2018/2019-2022/2023 Transportation Improvement Program Table 2: CANDIDATES FOR NEW FUNDING 2040 2017 LRTP Project Suggested Funding Priori- FPN Project Limits Project Sponsor Project Status / Request Prioritization Criteria Refer- Description Type ty ence

2040 job density and Major Investments for Economic Growth forecasted traffic congestion volume/capacity ratio (V/C) 1002, I-275 at SR 60 Interchange Modify 412531 2 FDOT 1093 (TBX Sec. 4) Interchange Express toll I-275 (Lois to Willow) 434045 2 1003 lanes with with FDOT 1.45 V/C peak period (TBX Sec. 5) Exp. Bus Express toll Funding is requested for reconstruction of two interchanges, I-275/SR n/a* I-275 (4th St to Gandy Blvd) lanes with with FDOT 60 and I-275/I-4; interstate modernization including technology; n/a Exp. Bus reevalution of Tampa Interstate Study EIS; and for locational studies for SIS; prioritized by 40 I-275 at I-4 (Downtown Interchange) Modify transit centers in the Gateway and Fletcher/Fowler areas. TMA 433821 2 1005 FDOT (TBX Sec. 6) Interchange Environmental impact studies are underway, and construction is funded Express toll I-275 (N of MLK to N of Busch Blvd) for the Howard Frankland Bridge replacement. 431821 2 1006 lanes with with FDOT 1.13 V/C peak period (TBX Sec. 7) Exp. Bus Express toll I-4 (Selmon Connector to E of Branch 431746 1 1008 lanes with with FDOT 1.44 V/C peak period Forbes) (TBX Sec. 8) Exp. Bus Regional Transit Catalyst Project(s) which may include: Westshore Regional Intermodal Center Intermodal 415348 1 83 FDOT a. Central Avenue BRT, St. Petersburg downtown to beaches; ROW acquired in FY2016 (Regional Transit Catalyst Project) Center b. Westshore Multimodal Center with fixed guideway connections to downtowns and airports; c. Further development of the Regional Transit Feasibility Plan; SIS, FDOT transit Connection to Airport People Mover Transit FDOT/Aviation 41 62 d. Regional Express Bus - opportunities include SR 60/Gulf-to-Bay Blvd, programs; prioritized (Regional Transit Catalyst Project) Connection Auth the Veterans Exwy/Suncoast Pkwy, the Gandy/Selmon Exwy corridor, by TMA the SR 54/56 corridor, and as a part of Tampa Bay Next; and expansion of regional farebox system to adjoining counties; Modern Streetcar Extension (Regional Transit 61 Tampa e. Elevated transit in the SR 60 corridor – pilot project from downtown Transit Catalyst Project) Connection Clearwater to Clearwater Beach.

Commuter Funding is requested for right-of-way preservation for development of 42 437804 1 60 US 41 CSX Rail Corridor Joint Use FDOT Transit potential commuter routes.

* Project in neighboring county, reflected as a Transportation Management Area priority Denotes new project

Adopted: June 13, 2017 Page 5 Printed: 6/29/2017 Hillsborough MPO List of Priority Projects FY2018/2019-2022/2023 Transportation Improvement Program Table 2: CANDIDATES FOR NEW FUNDING 2040 2017 LRTP Project Suggested Funding Priori- FPN Project Limits Project Sponsor Project Status / Request Prioritization Criteria Refer- Description Type ty ence 2040 Priority freeway needing CM impr - 1.58 V/C peak Minimize Interchange SU, TRIP, SIS, 43 Big Bend Rd at I-75 FDOT/County County requested $47.8M for additional improvements, IOAR underway period Traffic Improvements prioritized by TMA Other major art - 1.20 peak period V/C TRIP, TIGER, FDOT Real Regional Farebox Rev. Collection & Regional Transit HART Priority Partially funded; balance of $8.9M needed (New Request is for $3.5M 44 436677 1 transit; prioritized by Choices Inter-Jurisdictional Mobility (Flamingo) Fare Collection #7 for fareboxes, HART upgrades ) TMA Funding is requested for regional waterborne transportation priority SIS, FDOT transit Real Commuter Hillsborough projects, which could include the Cross-Bay Ferry, waterborne service 45 Waterborne Transit - High Speed Ferry programs; prioritized Choices Transit County from south Hillsborough County to MacDill Air Force Base, and other by TMA regional projects. Need This segment is considered to be policy constrained in the Hillsborough Widen 4 to 6 Port Authority 1.89 V/C peak period, 3.934 46 beyond US41 (Madison to Denver S) County Comprehensive Plan an would require and amendment to the SIS lanes Request PTI, low TT reliability 2040 plan. US 41 at 50th St CSX Grade Separated 2040 Priority Art needing CM Minimize Grade Separated Port Tampa Bay request' Added $1.5M for PD&E FY18, $5.4M for design Freight, Intermodal, 47 440749 1 Interchange/Rail Overpass South of FDOT impr - 1.70 V/C peak period, Traffic Intersection FY19 & 20, $15M for ROW FY22, CST $52.5M in FY26 SIS Causeway Blvd and at Causeway Blvd Delay reduction/mi = 1668

US 92 (US 301/I-4 to CR 579 (MANGO Widen 2 lanes to Delay reduction/mi = 57; 48 438997 1 1043 FDOT PD&E added $1.25M in FY17 SIS, Other Arterials RD) 4 lanes divided 2040 jobs/mi = 1760

FDOT; Plant Delay reduction/mi = 119; 49 438998 1 1045 US 92 from Park Rd to Polk County Widen to 4LD PD&E added: $1.8M in FY17 SIS, Other Arterials City Priority #4 2040 jobs/mi = 568 Closest segment Forbes to Alex W Sam Allen Rd (N Alexander St to SR Plant City 50 E+C map Widen to 4LD $7.12M for Construction SU delay reduction/mi = 31 39) Priority #2 2040 jobs/mi = 57

1038, New 4 Lane Plant City Delay reduction/mi = 189 & 20; 51 Sam Allen Rd (Park Rd to Polk County) MPO Alignment Study underway; $4.5M request for PD&E SU 1040 roadway Priority #6 2040 jobs/mi = 240 & 101 US41 from Causeway to CSX Intm Minimize Grade Separated 52 US 41 at SR 60 FDOT (tent.) Port Tampa Bay request Other Arterials delay reduction/mi = 1668 Traffic Intersection SR 60 from 50th to US301 PTI = 3.933 US41 from Causeway to CSX Minimize Grade Separated 53 US 41 at CSX 'A' Line to CSX 'S' Line FDOT (tent.) Port Tampa Bay request Other Arterials Intm Traffic Intersection delay reduction/mi = 1668 * Project in neighboring county, reflected as a Transportation Management Area priority Denotes new project

Adopted: June 13, 2017 Page 6 Printed: 6/29/2017 Hillsborough MPO List of Priority Projects FY2018/2019-2022/2023 Transportation Improvement Program Table 2: CANDIDATES FOR NEW FUNDING 2040 2017 LRTP Project Suggested Funding Priori- FPN Project Limits Project Sponsor Project Status / Request Prioritization Criteria Refer- Description Type ty ence Need Plant City Longer range need 54 beyond Rice Rd (Coronet Rd to Polk County) New 2LU Rd MPO Alignment Study underway; $3.757M requested for PD&E SU Priority #5 .12 V/C in 2018 E+C 2040 Real Expansion of existing or construction of HART Priority Listed based on HART's priority 55 Transit $16.5 million, MPO Feasibility Study on going Choices new maintenance facility #8 setting Need Operational Port Authority/ 56 beyond Causeway Blvd (US 41 to US 301) Longer Range Need Improvements FDOT (tent.) 2040 Madison Ave (Falkenberg Rd to US Widen from 2 to Port Authority/ 57 301) 4 lanes FDOT (tent.) McKay Street (Channelside Drive to Realignment of 58 Port Authority $1,600,000 Ybor Channel, on Port Property) roadway Channelside Lane (McKay St to York St, 59 New 2 lane road Port Authority $3,100,000 on Port Property) Central Street (Cumberland Dr to New 4 Lane 60 Port Authority $1,100,000 Whiting St, on Port Property) roadway New rail line to Port Authority/ 61 Port Redwing Rail (on Port Property) $2,000,000 FDOT Intermodal, SIS Port Redwing FDOT (tent.) Port Redwing Access Road (Port New 2 lane Port Authority/ 62 FDOT Intermodal, SIS Redwing to US41, on Port Property) access road FDOT (tent.) Guy N. Verger flyover spanning CSX's Grade Separated Port Authority/ 63 cargo artery north of GATX Dr (on Port $18,000,000 FDOT Intermodal, SIS Intersection FDOT (tent.) Property) East Cargo Yard Access Road (US41 to Widen from 2 to Port Authority/ 64 $2,000,000 Access Rd) 4 lanes FDOT (tent.) * Project in neighboring county, reflected as a Transportation Management Area priority Denotes new project

Adopted: June 13, 2017 Page 7 Printed: 6/29/2017