Appendix 3.3 Construction of Underwater Tunnel in Bay

TEMPORARY RECLAMATION

WIDTH OF PROPOSED UNDERWATER WORKING SPACE TUNNEL = APPROX. 47m TO 56m WORKING SPACE

FILLING MATERIALS

SEA LEVEL

SEABED LEVEL SEABED LEVEL MARINE DEPOSIT (TO BE LEFT IN SITU)

MARINE DEPOSIT TO BE LEFT IN- ALLUVIUM SITU WITH POSSIBLE GROUND TREATMENT SUCH AS STONE COLUMN (TO BE CONFIRMED)

SAPROLITE PIPEPILE SEAWALL DIAPHRAGM WALL PROPOSED UNDERWATER TUNNEL

Typical Section of Proposed Temporary Reclamation TYPICAL SECTION OF PROPOSED TEMPORARY RECLAMATION (Pipepile Seawall Scheme) FOR CONSTRUCTION OF UNDERWATER TUNNEL (PIPEPILE SEAWALL SCHEME)

Figure A3.3.1 __ H L –~ L L Kai Yip L Estate

4.0 L KAI TAK H 5.4 5.2

L L 5 Œ» 3.9 International¤¤ L L Skyƶ³ Tower Trade and L 4.9 Exhibition Centre 4.1 3.9

5.1 Yªaº L 5.0 Jubilant Place 4.7 4.1 4.0 3.9 L L TS Grands Waterfront

L ·‰ Ferry Pier 820200 N KowloonE¤s 5.4 TO KWA 3.6 Rock WAN L E⁄sF 3.6 L ˆƒ⁄I” TS Kowloon East DWFI L Pumping Station

3.9 4.5 L KEY LOCATION PLAN L L 4.0 5.1 H 5.7 L TS H

L 4.0 TS 4.1 LEGEND Naphtha Reforming Plant

L KAI TAK L EXTENT OF TEMPORARY RECLAMATION

L 4.9 5.6 3.7 L TS EXCAVATION FOR TUNNEL CONSTRUCTION »›·⁄⁄•fi‡ƒ››‰ WITHIN TEMPORARY RECLAMATION The & China Gas Company Limited 4.3 L 4.1 3.4 TS SURFACE DREDGING FOR NAVIGATION L L 3.4 H EXCAVATION FOR NAVIGATION WITHIN H L 3.6 3.8 H TEMPORARY RECLAMATION 5.0

L 4.8

4.4 L 3.5 L

29.8 MA TAU KOK L 3.7 L

L L

L L 4.5 29.8 L H L 21.4

L

H

29.8

4.0 820000 N

L

H L

3.9 4.1

LT –fi L H Car Park L L H

4.1 3.3 EXTENT OF STAGE 1

L TEMPORARY RECLAMATION

L L L E¤s A FIRST ISSUE RC 07/12 L KOWLOON BAY E¤s 3.9 Kowloon Bay Rev Description By Date L 3.9 Consultant

L 4.2 3.9 3.5

L KOWLOON BAY

L H Joint Venture 3.7 3.8 L 4.3 L H Project title 8.5 TO KWA WAN L Agreement No. CE 43 2010 (HY)/

3.4 L L L LT Central Kowloon Route - L 3.7 9.0 8.2 y Design and Construction 3.4 Dolphin L LT EXTENT OF STAGE 2 L L L H TEMPORARY RECLAMATION L 3.0 Drawing title

L L PROPOSED TEMPORARY

8.9 8.5 L L RECLAMATION AND DREDGING

3.6

L FOR UNDERWATER TUNNEL 4.6 819800 N (STAGE 1) 3.7 Drawing no. Rev. CKR/SK/24/1207 A Drawn Date Checked Approved RC 07/12 HYJL DS g⁄˚¥W˘ Scale Status To Kwa Wan 1:1000 @ A1 Vehicle Examination Centre MARINE ACCESS OF NAPHTHA PRELIMINARY TANKER DURING STAGE 1 COPYRIGHT RESERVED TEMPORARY RECLAMATION

4.2 E¤s Kowloon Rock

BN H L –~ L L KOWLOON CITY Kai Yip L Estate

4.0 L KAI TAK H 5.4 5.2

L L 5 Œ» 3.9 International¤¤ KOWLOON BAY L MA TAU WAI L Skyƶ³ Tower Trade and L 4.9 Exhibition Centre 4.1 3.9

5.1 Yªaº L 5.0 Jubilant Place 4.7 MA TAU KOK 4.1 4.0 3.9 L L TS Grands Waterfront

L ·‰ Ferry Pier 820200 N KowloonE¤s 5.4 TO KWA 3.6 Rock WAN L E⁄sF 3.6 L ˆƒ⁄I” TS Kowloon East DWFI L Pumping Station To Kwa Wan

3.9 4.5 L KEY LOCATION PLAN L L 4.0 5.1 H 5.7 L TS H

L 4.0 TS 4.1 LEGEND Naphtha Reforming Plant

L KAI TAK L EXTENT OF TEMPORARY RECLAMATION

L 4.9 5.6 3.7 L TS EXCAVATION FOR TUNNEL CONSTRUCTION »›·⁄⁄•fi‡ƒ››‰ WITHIN TEMPORARY RECLAMATION The Hong Kong & China Gas Company Limited 4.3 L 4.1 3.4 TS L L 3.4 H

H L 3.6 3.8 H 5.0

L 4.8

4.4 L 3.5 L

29.8 MA TAU KOK L 3.7 L

L L

L L 4.5 29.8 L H L 21.4

L

H

29.8

4.0 820000 N

L

H L

3.9 4.1

LT –fi L H Car Park L L H

4.1 3.3 EXTENT OF STAGE 1

L TEMPORARY RECLAMATION

L L L E¤s A FIRST ISSUE RC 07/12 L KOWLOON BAY E¤s 3.9 Kowloon Bay Rev Description By Date L 3.9 Consultant

L 4.2 3.9 3.5

L KOWLOON BAY

L H Joint Venture 3.7 3.8 L 4.3 L H Project title 8.5 TO KWA WAN L Agreement No. CE 43 2010 (HY)/

3.4 L L L LT Central Kowloon Route - L 3.7 9.0 8.2 y Design and Construction 3.4 Dolphin L LT EXTENT OF STAGE 2 L L L H TEMPORARY RECLAMATION L 3.0 Drawing title

L L PROPOSED TEMPORARY

8.9 8.5 L L RECLAMATION AND DREDGING

3.6

L FOR UNDERWATER TUNNEL 4.6 819800 N (STAGE 2) 3.7 MARINE ACCESS OF NAPHTHA Drawing no. Rev. TANKER DURING STAGE 2 CKR/SK/24/1208 A TEMPORARY RECLAMATION Drawn Date Checked Approved RC 07/12 HYJL DS g⁄˚¥W˘ Scale Status To Kwa Wan Vehicle Examination Centre 1:1000 @ A1 PRELIMINARY COPYRIGHT RESERVED

4.2 E¤s Kowloon Rock

BN