Wong Tai Sin Police Station
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Overview of Existing Services for the English Speaking Children with Special Needs Government Subsidized Programme Private Programme English Kindergartens from E.G
Overview of Existing Services for the English Speaking Children with Special Needs Government Subsidized Programme Private Programme English Kindergartens From e.g. AP, ARN, TCI, Little Kids Learning e.g. Anfield, ESF, Small World Christian, Birth to The Child Development Centre Academy, Kids Connect, Bridge Academy, Woodland, KBCK, Yiu Chung, David Exodus, Int’l Montessori, Safari Kids, Bebegarten, Age of Watchdog Early Education Centre Rainbow Early Intervention Progrmme Kingston, Letterland Childcare Centre, YMCA, 6 KCIS, DBIS, DMK, Tutor Time Int’l, SunIsland, Delia English Kindergarten / Debroah English Kindergarten ESF Special Needs Provisions Other Alternatives Learning Support Classes Segregated •Springboard Project • Island Christian Academy •Bradbury (21) Setting •Family Partners School •The Children Institute of HK (Harbour School) • NIS •Quarry Bay (7) •ICS (Bridges class) •Hong Lok Yuen Int’l School •Peak School (7) • Jockey Club •Aoi Pui School & Autism Partnership •DBIS & DMPS •Glenealy school (7) Sarah Roe •Rainbow Project (HK Island) * • Christian Alliance Int’l School Primary •Kennedy School (7) School (70) •Autism Recovery Network •Kellett School •Bridge Academy Schools •Beacon Hill (21) •Hong Kong Academy • The International Montessori School •Kowloon Junior School •St. Bosco Centre (Anfield School) • Kingston Int’l Primary School •Kids Connect (14) • Woodland Int’l Primary School •Clearwater Bay (7) Local System • Think International School •Shatin Junior School (14) • Japanese International School •Catholic Mission -
List of Buildings with Confirmed / Probable Cases of COVID-19
List of Buildings With Confirmed / Probable Cases of COVID-19 List of Residential Buildings in Which Confirmed / Probable Cases Have Resided (Note: The buildings will remain on the list for 14 days since the reported date.) Related Confirmed / District Building Name Probable Case(s) Islands Hong Kong Skycity Marriott Hotel 5482 Islands Hong Kong Skycity Marriott Hotel 5483 Yau Tsim Mong Block 2, The Long Beach 5484 Kwun Tong Dorsett Kwun Tong, Hong Kong 5486 Wan Chai Victoria Heights, 43A Stubbs Road 5487 Islands Tower 3, The Visionary 5488 Sha Tin Yue Chak House, Yue Tin Court 5492 Islands Hong Kong Skycity Marriott Hotel 5496 Tuen Mun King On House, Shan King Estate 5497 Tuen Mun King On House, Shan King Estate 5498 Kowloon City Sik Man House, Ho Man Tin Estate 5499 Wan Chai 168 Tung Lo Wan Road 5500 Sha Tin Block F, Garden Rivera 5501 Sai Kung Clear Water Bay Apartments 5502 Southern Red Hill Park 5503 Sai Kung Po Lam Estate, Po Tai House 5504 Sha Tin Block F, Garden Rivera 5505 Islands Ying Yat House, Yat Tung Estate 5506 Kwun Tong Block 17, Laguna City 5507 Crowne Plaza Hong Kong Kowloon East Sai Kung 5509 Hotel Eastern Tower 2, Pacific Palisades 5510 Kowloon City Billion Court 5511 Yau Tsim Mong Lee Man Building 5512 Central & Western Tai Fat Building 5513 Wan Chai Malibu Garden 5514 Sai Kung Alto Residences 5515 Wan Chai Chee On Building 5516 Sai Kung Block 2, Hillview Court 5517 Tsuen Wan Hoi Pa San Tsuen 5518 Central & Western Flourish Court 5520 1 Related Confirmed / District Building Name Probable Case(s) Wong Tai Sin Fu Tung House, Tung Tau Estate 5521 Yau Tsim Mong Tai Chuen Building, Cosmopolitan Estates 5523 Yau Tsim Mong Yan Hong Building 5524 Sha Tin Block 5, Royal Ascot 5525 Sha Tin Yiu Ping House, Yiu On Estate 5526 Sha Tin Block 5, Royal Ascot 5529 Wan Chai Block E, Beverly Hill 5530 Yau Tsim Mong Tower 1, The Harbourside 5531 Yuen Long Wah Choi House, Tin Wah Estate 5532 Yau Tsim Mong Lee Man Building 5533 Yau Tsim Mong Paradise Square 5534 Kowloon City Tower 3, K. -
G.N. (E.) 50 of 2021 PREVENTION and CONTROL of DISEASE
G.N. (E.) 50 of 2021 PREVENTION AND CONTROL OF DISEASE (COMPULSORY TESTING FOR CERTAIN PERSONS) REGULATION Compulsory Testing Notice I hereby exercise the power conferred on me by section 10(1) of the Prevention and Control of Disease (Compulsory Testing for Certain Persons) Regulation (the Regulation) (Chapter 599, sub. leg. J) to:— Category of Persons (I) specify the following category of persons:— any person who had been present on the following premises in any capacity (including but not limited to residents, visitors and workers) for more than 2 hours at any time during the period from 12 January to 25 January 2021:— (1) Wing Tai Building, 280–286 Yu Chau Street, Sham Shui Po, Kowloon, Hong Kong; (2) 171–173 Yu Chau Street, Sham Shui Po, Kowloon, Hong Kong; (3) Block C Tung Fat Building, 37–43A Kam Ping Street, North Point, Hong Kong; (4) Nam Cheong Court, 133–135 Nam Cheong Street/148 Apliu Street, Sham Shui Po, Kowloon, Hong Kong; (5) 137–139 Nam Cheong Street, Sham Shui Po, Kowloon, Hong Kong; (6) 169 Cheung Sha Wan Road/147–149 Nam Cheong Street, Sham Shui Po, Kowloon, Hong Kong; (7) 173–175 Cheung Sha Wan Road, Sham Shui Po, Kowloon, Hong Kong; (8) 177 Cheung Sha Wan Road, Sham Shui Po, Kowloon, Hong Kong; (9) 179–181 Cheung Sha Wan Road, Sham Shui Po, Kowloon, Hong Kong; (10) 183–185 Cheung Sha Wan Road, Sham Shui Po, Kowloon, Hong Kong; (11) Wah Tong House, 187–189 Cheung Sha Wan Road, Sham Shui Po, Kowloon, Hong Kong; (12) Cheong Lok Building, 191–203 Cheung Sha Wan Road, Sham Shui Po, Kowloon, Hong Kong; (13) 150–152 Apliu -
Directors and Parties Involved in the [Redacted]
THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED “WARNING” ON THE COVER OF THIS DOCUMENT. DIRECTORS AND PARTIES INVOLVED IN THE [REDACTED] DIRECTORS Name Address Nationality Executive Directors Mr. Fu Chun Keung (傅鎮強) Flat A, 57/F, Block 1 Chinese Ocean Pointe 8 Sham Tsz Street Sham Tseng New Territories Hong Kong Ms. Cheung Lai Yuk (張麗玉) Flat A, 57/F, Block 1 Chinese Ocean Pointe 8 Sham Tsz Street Sham Tseng New Territories Hong Kong Ms. Fu Wan Ling (傅雲玲) Flat 3515, 35/F, Block M Chinese Chung Chak House Tin Chung Court Tin Shui Wai New Territories Hong Kong Independent non-executive Directors Mr. Chan Cheong Tat (陳昌達) Flat A, 7/F Chinese Block 3, City Garden North Point Hong Kong Mr. Wong Wing Keung Meyrick (王泳強) Room 1907, Block M Chinese Kornhill Quarry Bay Hong Kong Mr. Chan Chi Ming Tony (陳子明) Flat A, 19/F Australian Tower 9, The Visionary 1 Ying Hong St Tung Chung Hong Kong For the biographies of the Directors, please refer to the section headed “Directors and senior management” in this document. —47— THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED “WARNING” ON THE COVER OF THIS DOCUMENT. DIRECTORS AND PARTIES INVOLVED IN THE [REDACTED] PARTIES INVOLVED Sole Sponsor South China Capital Limited A corporate licensed under the SFO and permitted to carry out Type 6 (advising on corporate finance) of regulated activities as defined under the SFO 28/F, Bank of China Tower No.1 Garden Road Central Hong Kong [REDACTED] Legal advisers to the Company As to Hong Kong law: Li & Partners 22/F, World-Wide House 19 Des Voeux Road Central Central Hong Kong —48— THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED “WARNING” ON THE COVER OF THIS DOCUMENT. -
Temporary Service Arrangement in Relation to the Peak Tramway's
Information Paper C&WDC T&TC Paper No. 43/2019 Central & Western District Council – Traffic & Transport Committee Temporary Service Arrangement in Relation to the Peak Tramway’s Upgrading Plan On 2 October 2018, the Chief Executive in Council (“ExCo”) has approved, under the Peak Tramway Ordinance (Cap. 265), the grant of the second 10-year (2026 - 2035) operating right of the peak tramway to the Peak Tramways Company Limited (“PTC”) for maintaining the peak tramway as an important tourism and recreational facility. Since early 2019, PTC has embarked on works related to the upgrading plan. At present, the progress of the upgrading plan is on schedule, and the Government will continue to closely monitor the progress of the upgrading plan carried out by PTC. To enable District Council members to have an understanding of the latest progress of the upgrading plan and the temporary service arrangement in respect of service suspension starting from 23 April 2019 for around two to three months, the information paper prepared by PTC is attached for members’ reference. Tourism Commission Commerce and Economic Development Bureau 4 April 2019 Information Paper The Peak Tram Upgrading Plan Following consultation with Central & Western District Council (“C&WDC”) - Traffic & Transport Committee (“T&TC”) on 12 April 2018, the Peak Tramways Company Limited’s (“PTC”) application for the second ten-year operating right, together with the upgrading plan and the proposed legislative amendments arising from the upgrading plan, was also submitted to the Legislative Council (“LegCo”) Panel of Economic Development on 25 June 2018, and the proposal gained the support of Panel members. -
Progress of Admiralty Station Expansion Works Under the Shatin to Central Link Project
For Circulation C&W DC Paper No. 109/2017 Central and Western District Council Progress of Admiralty Station Expansion Works under the Shatin to Central Link Project Introduction 1. This paper aims to update members of the Central and Western District Council on the progress of the expansion works of Admiralty Station under the Shatin to Central Link (“SCL”) project. Background 2. The 17-kilometre SCL is a territory-wide strategic railway project linked with a number of existing and future railways to form two strategic railway corridors, namely the “East West Corridor” and the “North South Corridor”. The “East West Corridor” will be formed by extending the Ma On Shan Line from Tai Wai Station to Hung Hom Station where it will connect with the West Rail Line. The “North South Corridor” will extend the existing East Rail Line from Hung Hom Station across the Victoria Harbour to Admiralty Station via Exhibition Station. The “East West Corridor” and “North South Corridor” are expected to commission in mid-2019 and the 2021 respectively. 3. Admiralty Station will become the railway transport hub on Hong Kong Island that serves as the interchange for Island Line, Tsuen Wan Line, South Island Line (“SIL”) and the SCL. As part of the facilities are integrated for both the SCL and the South Island Line (East) (SIL(E)) project, part of the major works including platforms and interchange concourse were carried out under the SIL(E) project to shorten the overall construction time and minimise disturbance to the environment, road traffic and community. As SIL has been in operation since December 2016, SCL has taken over the works site from SIL(E) in Admiralty to continue the remaining railway construction works. -
Branch List English
Telephone Name of Branch Address Fax No. No. Central District Branch 2A Des Voeux Road Central, Hong Kong 2160 8888 2545 0950 Des Voeux Road West Branch 111-119 Des Voeux Road West, Hong Kong 2546 1134 2549 5068 Shek Tong Tsui Branch 534 Queen's Road West, Shek Tong Tsui, Hong Kong 2819 7277 2855 0240 Happy Valley Branch 11 King Kwong Street, Happy Valley, Hong Kong 2838 6668 2573 3662 Connaught Road Central Branch 13-14 Connaught Road Central, Hong Kong 2841 0410 2525 8756 409 Hennessy Road Branch 409-415 Hennessy Road, Wan Chai, Hong Kong 2835 6118 2591 6168 Sheung Wan Branch 252 Des Voeux Road Central, Hong Kong 2541 1601 2545 4896 Wan Chai (China Overseas Building) Branch 139 Hennessy Road, Wan Chai, Hong Kong 2529 0866 2866 1550 Johnston Road Branch 152-158 Johnston Road, Wan Chai, Hong Kong 2574 8257 2838 4039 Gilman Street Branch 136 Des Voeux Road Central, Hong Kong 2135 1123 2544 8013 Wyndham Street Branch 1-3 Wyndham Street, Central, Hong Kong 2843 2888 2521 1339 Queen’s Road Central Branch 81-83 Queen’s Road Central, Hong Kong 2588 1288 2598 1081 First Street Branch 55A First Street, Sai Ying Pun, Hong Kong 2517 3399 2517 3366 United Centre Branch Shop 1021, United Centre, 95 Queensway, Hong Kong 2861 1889 2861 0828 Shun Tak Centre Branch Shop 225, 2/F, Shun Tak Centre, 200 Connaught Road Central, Hong Kong 2291 6081 2291 6306 Causeway Bay Branch 18 Percival Street, Causeway Bay, Hong Kong 2572 4273 2573 1233 Bank of China Tower Branch 1 Garden Road, Hong Kong 2826 6888 2804 6370 Harbour Road Branch Shop 4, G/F, Causeway Centre, -
Pok Fu Lam Road Bus-Bus Interchange Scheme
Pok Fu Lam Road Bus-Bus Interchange Scheme Passengers on selected routes can interchange, at the bus stop opposite Queen Mary Hospital, for connection to Central, Admiralty, Mid-levels, Wan Chai, Eastern districts or Kowloon. Passengers from Central, Admiralty, Mid-levels, Wan Chai, Eastern districts or Kowloon on selected routes can interchange at the bus stop on outside Queen Mary Hospital, to different Southern districts. Please note that passengers will not be able to enjoy any discount if they interchange on the same bus route. From Southern District to Central / Admiralty / Wan Chai First Journey on Interchange Point Second Journey on Discount Fare Time Limit (Direction) (Direction) 7 from Shek Pai Wan Queen Mary Hospital, 7 to Central (Ferry Piers) Free 90 minutes 37X from Chi Fu Pok Fu Lam Road 37X to Admiralty 71 from Wong Chuk Hang 71 to Central 71P from Sham Wan 71P to Central (Ferry 90B from South Horizons Piers) 40 from Wah Fu (North) 90B to Admiralty 40M fromWah Fu (North) 40P from Sham Wan 4 from Wah Fu (South) / Tin Wan 4Xfrom Wah Fu (South) 30X from Cyberport 33Xfrom Cyberport 93from South Horizons 93Afrom Lei Tung Estate 970 from Cyberport 970X from Aberdeen X970 from South Horizons 973 from Stanley Market / Free 120 minutes Aberdeen 40 from Wah Fu (North) Queen Mary Hospital, 40 to Wan Chai (North) Free 90 minutes 40M from Wah Fu (North) Pok Fu Lam Road 40M toAdmiralty (Central 40P from Sham Wan Government Offices) 33X from Cyberport 40P to Robinson Road 93from South Horizons 93C to Caine Road 93Afrom Lei Tung Estate -
Directors and Parties Involved in the Global Offering
DIRECTORS AND PARTIES INVOLVED IN THE GLOBAL OFFERING DIRECTORS Name Address Nationality Executive Directors Mr. Chan Kwun Fung Flat A, 78/F., Block 1 Chinese ( ) Sorrento, 1 Austin Road West Tsim Sha Tsui Kowloon Hong Kong Mr. Chan Kwun Pan 52C, Tower 2 Chinese ( ) The Harbourside 1 Austin Road West Tsim Sha Tsui Kowloon Hong Kong Mr. Ngai Shing Kin Flat D, 21/F., Tower 6 Australian ( ) Peak One 63 Mei Tin Road Tai Wai New Territories Hong Kong Mr. Ngai Chi Ho Alwin Flat D, 16/F., Tower 6 Australian ( ) Vision City 1 Yeung Uk Road Tsuen Wan New Territories Hong Kong Mr. Cheung Ting Pong Flat D, 25/F., Block 9 Chinese ( ) Palatial Coast Tuen Mun Hong Kong Mr. Chan Chi Yuen Flat A, 78/F., Block 1 Chinese ( ) Sorrento, 1 Austin Road West Tsim Sha Tsui Kowloon Hong Kong Dr. Chan Ronald Yik Long 52C, Tower 2 Chinese ( ) The Harbourside 1 Austin Road West Tsim Sha Tsui Kowloon Hong Kong Ms. Chan Yik Yu 52C, Tower 2 Chinese ( ) The Harbourside 1 Austin Road West Tsim Sha Tsui Kowloon Hong Kong —63— DIRECTORS AND PARTIES INVOLVED IN THE GLOBAL OFFERING Name Address Nationality Independent Non-Executive Directors Dr. Cheung Wai Bun Charles J.P. A2, 6/F, Evergreen Villa Chinese ( ) 43 Stubbs Road Hong Kong Dr. Chan Yue Kwong Michael House B6 Chinese ( ) Flamingo Garden Lot 831 DD 226 Fei Ngo Shan Road Kowloon Hong Kong Dr. Wong Ho Ching Flat 7A Chinese ( ) East View 3 Cox’s Road Jordan, Kowloon Hong Kong Dr. Cheung Wai Man William 3B Chinese ( ) 8 Wistaria Road Yau Yat Chuen Kowloon Hong Kong Further information is disclosed in the section headed “Directors and Senior Management” in this prospectus. -
List of Electors with Authorised Representatives Appointed for the Labour Advisory Board Election of Employee Representatives 2020 (Total No
List of Electors with Authorised Representatives Appointed for the Labour Advisory Board Election of Employee Representatives 2020 (Total no. of electors: 869) Trade Union Union Name (English) Postal Address (English) Registration No. 7 Hong Kong & Kowloon Carpenters General Union 2/F, Wah Hing Commercial Centre,383 Shanghai Street, Yaumatei, Kln. 8 Hong Kong & Kowloon European-Style Tailors Union 6/F, Sunbeam Commerical Building,469-471 Nathan Road, Yaumatei, Kowloon. 15 Hong Kong and Kowloon Western-styled Lady Dress Makers Guild 6/F, Sunbeam Commerical Building,469-471 Nathan Road, Yaumatei, Kowloon. 17 HK Electric Investments Limited Employees Union 6/F., Kingsfield Centre, 18 Shell Street,North Point, Hong Kong. Hong Kong & Kowloon Spinning, Weaving & Dyeing Trade 18 1/F., Kam Fung Court, 18 Tai UK Street,Tsuen Wan, N.T. Workers General Union 21 Hong Kong Rubber and Plastic Industry Employees Union 1st Floor, 20-24 Choi Hung Road,San Po Kong, Kowloon DAIRY PRODUCTS, BEVERAGE AND FOOD INDUSTRIES 22 368-374 Lockhart Road, 1/F.,Wan Chai, Hong Kong. EMPLOYEES UNION Hong Kong and Kowloon Bamboo Scaffolding Workers Union 28 2/F, Wah Hing Com. Centre,383 Shanghai St., Yaumatei, Kln. (Tung-King) Hong Kong & Kowloon Dockyards and Wharves Carpenters 29 2/F, Wah Hing Commercial Centre,383 Shanghai Street, Yaumatei, Kln. General Union 31 Hong Kong & Kowloon Painters, Sofa & Furniture Workers Union 1/F, 368 Lockhart Road,Pakling Building,Wanchai, Hong Kong. 32 Hong Kong Postal Workers Union 2/F., Cheng Hong Building,47-57 Temple Street, Yau Ma Tei, Kowloon. 33 Hong Kong and Kowloon Tobacco Trade Workers General Union 1/F, Pak Ling Building,368-374 Lockhart Road, Wanchai, Hong Kong HONG KONG MEDICAL & HEALTH CHINESE STAFF 40 12/F, United Chinese Bank Building,18 Tai Po Road,Sham Shui Po, Kowloon. -
Administration's Paper on the Progress Update of the Construction of The
LC Paper No. CB(4)610/15-16(05) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Progress Update of the Construction of the Shatin to Central Link (As at 31 December 2015) Introduction This paper reports to Members on the progress of the main construction works of the Shatin to Central Link (“SCL”) as at 31 December 2015. Background 2. SCL, with a total length of 17 kilometres, consists of the following two sections – (a) Tai Wai to Hung Hom section: this is an extension of the Ma On Shan Line from Tai Wai via Southeast Kowloon to Hung Hom where it will join the West Rail Line; and (b) Hung Hom to Admiralty section: this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. 3. SCL will have ten stations. Apart from bringing improvements to the existing Tai Wai Station, the SCL project will involve construction of new stations or extension of existing stations at Hin Keng, Diamond Hill, Kai Tak, To Kwa Wan, Ma Tau Wai, Ho Man Tin, Hung Hom, the Hong Kong Convention and Exhibition Centre, and Admiralty. It is a territory-wide strategic railway project (alignment layout at Annex 1). Admiralty Station and Ho Man Tin Station will become integrated stations providing interchange service to passengers of SCL and South Island Line (East)(“SIL(E)”), as well as passengers of SCL and Kwun Tong Line Extension (“KTE”) respectively. 4. The Approved Project Estimate for the entire SCL project is $79,800 million (in money-of-the-day prices) and the project is funded by the Government under the “concession approach”. -
Islands District Council Traffic and Transport Committee Paper T&TC
Islands District Council Traffic and Transport Committee Paper T&TC 41/2020 2020 Hong Kong Cyclothon 1. Objectives 1.1 The 2020 Hong Kong Cyclothon, organised by the Hong Kong Tourism Board, is scheduled to be held on 15 November 2020. This document outlines to the Islands District Council Traffic and Transport Committee the event information and traffic arrangements for 2020 Hong Kong Cyclothon, with the aim to obtain the District Council’s continuous support. 2. Event Background 2.1. Hong Kong Tourism Board (HKTB) is tasked to market and promote Hong Kong as a travel destination worldwide and to enhance visitors' experience in Hong Kong, by hosting different mega events. 2.2. The Hong Kong Cyclothon was debuted in 2015 in the theme of “Sports for All” and “Exercise for a Good Cause”. Over the past years, the event attracted more than 20,000 local and overseas cyclists to participate in various cycling programmes, as well as professional cyclists from around the world to compete in the International Criterium Race, which was sanctioned by the Union Cycliste Internationale (UCI) and The Cycling Association of Hong Kong, China Limited (CAHK). The 50km Ride is the first cycling activity which covers “Three Tunnels and Three Bridges (Tsing Ma Bridge, Ting Kau Bridge, Stonecutters Bridge, Cheung Tsing Tunnel, Nam Wan Tunnel, Eagle’s Nest Tunnel)” in the route. 2.3. Besides, all the entry fees from the CEO Charity and Celebrity Ride and Family Fun Ride and partial amount of the entry fee from other rides/ races will be donated to the beneficiaries of the event.