Public Transport Links Venue

Total Page:16

File Type:pdf, Size:1020Kb

Public Transport Links Venue Travelling to Public Transport Links Olympia London Your handy guide for getting to one of the best connected PADDINGTON venues in the capital. 20 MINS SHEPHERD’S • • • • BUSH 2 MINS KINGS CROSS AVE MARLEYBONE UX • • RK BRIDGE PA 30 MINS RD LAND HOL • • • • • • LIVERPOOL ST 35 MINS 2 A40 • • • • HOL RD WK LA LDHA ND GO SI RD NC L SHEP HIGH STREET AIR ST KENSINGTON RD HIGH KENSINGTON • • • HERD’S ON • GT OLYMPIA IN NS 9 MINS 12 MINS KE BUSH RD HEATHROW D A3 R Walking Cycling 55 MINS IA 2 E P 2 LONDON CITY YM W 0 TH OL AR EA 53 MINS Y LONDON WICK RL Olympia London is just a short walk The venue is very well supported by BL ’S CO CROMWELL RD RD from Barons Court, West Kensington, Santander cycles. If you wish to hire U A4 RT R Earls Court, Hammersmith, Shepherd’s a Santander cycle, there are three D HAMMERSMITH RD Bush and High Street Kensington. docking stations within a five minute B3 RD HAMMERSMITH 17 L VICTORIA walk of the venue. Public bike racks • • • • OMWEL 20 MINS are also closely located to the venue. 6 MINS 15 MINS W CR A3 • • • 2 2 TALGARTH RD A4 WEST 0 KENSINGTON FULHAM • BARONS GE 15 MINS 8 MINS ID COURT R PA B • • LLISER RD PA ITH 10 MINS NO M L AC RT RS E H GATWICK E EN RD 43 MINS MM D A RD H WEST BROMPTON • • 2 MINS Train Bus Venue Map The only venue in London The venue is serviced by a KENSINGTON • with a dedicated rail station, number of bus stops all within OLYMPIA • Kensington (Olympia) is served a very short walking distance Each of Olympia London’s spaces by London Overground and to our main entrances. are also easily accessible by bus, National Rail networks. cycle and foot; see map for details. Key Travel Information Bus Stop RE Santander Cycle Hire ENCE CENT K ER L OLYMPIA A R N CONF Public Cycle Racks CENT VENUE RECEPTIO Taxi Rank E Entrance For up to date travel information please visit olympia.london/visiting tfl.gov.uk/plan-a-journey.
Recommended publications
  • Peninsula House 14-15 Child’S Place Earls Court, SW5 Self-Contained Office Building to Let
    Peninsula House 14-15 Child’s Place Earls Court, SW5 Self-Contained Office Building To Let 6,463 sq ft (NIA) Executive Summary - Located 2 minutes walk from Earl’s Court underground station and 13 minutes from West Brompton overground station - Only 8 minutes to Paddington station on the District Line, 11 minutes into the heart of the West End and 43 minutes to Heathrow Airport via the Piccadilly Line from Earl’s Court station - Parking for two cars - Earls Court Road is an established retail pitch benefitting from a number of local and national occupiers - Attractive facade - 6,463 sq ft (NIA) - Comprehensively refurbished in a contemporary style - New LED lighting throughout - Shower facilities Ground Floor Indicative floor plans. Not to scale. Indicative DN UP RISER Floor Areas Floor Net Internal Area sq ft sq m Mezzanine 663 61.58 Second 976 90.68 First 1,750 162.53 Ground 1,589 147.60 Lower Ground 1,485 138.00 Total 6,463 600.41 11 10 15 9 16 17 4 3 Parking 14-15 29 Child’s Place 27 25 17 16 23 18 19 21 20 19 Child’s Mews Kenway Road Use B1 office. Planning We have been informed by the local planning authority that the property is not listed however it is situated within the Earl’s Court Village conservation area. The Planning Authority designates the building as B1 office accommodation. E ver sholt S treet REGENT'S PARK y Gos wa West well Rd Gr King’ a y Marylebone Road ’s Inn R s C r oss Rd Westbourne Grv oad Edgw Paddington FITZROVIA M A R YL EB O N ENOTTING HILL PADDINGTON are R MARYLEBONENOTTING x Gardens oad Regent Street A3220 usse S Wood Lane Wood Westfield London Grove Ladbroke Notting Lancaster Marble Kingsway Hill Gate Queensway Gate Arch Bayswater Road High Holborn Shepherd's venue COVENT Bush ark A SOHO Holland P GARDEN Strand P Holland ark Lane Park Holland R HOLLAND PARK HYDE PARK Stamford St oad Kensington Piccadilly Palace all he M Kensington Church St Kensington T Kensington Road SOUTHBANK Kensington ST.
    [Show full text]
  • Hampton Court to Berrylands / Oct 2015
    Crossrail 2 factsheet: Services between Berrylands and Hampton Court New Crossrail 2 services are proposed to serve all stations between Berrylands and Hampton Court, with 4 trains per hour in each direction operating directly to, and across central London. What is Crossrail 2? Crossrail 2 in this area Crossrail 2 is a proposed new railway serving London and the wider South East that could be open by 2030. It would connect the existing National Rail networks in Surrey and Hertfordshire with trains running through a new tunnel from Wimbledon to Tottenham Hale and New Southgate. Crossrail 2 will connect directly with National Rail, London Underground, London Overground, Crossrail 1, High Speed 1 international and domestic and High Speed 2 services, meaning passengers will be one change away from over 800 destinations nationwide. Why do we need Crossrail 2? The South West Main Line is one of the busiest and most congested routes in the country. It already faces capacity constraints and demand for National Rail services into Waterloo is forecast to increase by at least 40% by 2043. This means the severe crowding on the network will nearly double, and would likely lead to passengers being unable to board trains at some stations. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce congestion, and would enable us to run more local services to central London that bypass the most congested stations. Transport improvements already underway will help offset the pressure in the short term. But we need Crossrail 2 to cope with longer term growth.
    [Show full text]
  • Making Rail Accessible: Helping Older and Disabled Passengers
    Making Rail Accessible: Helping Older and Disabled Passengers Valid from May 2016 Contents Page Introduction 2 About our services Policy Summary 4 Passenger Assistance 5-6 Turn Up and Go 7 Ramps Journeys with multiple operators Changes to facilities 8 Alternative accessible transport 9 Passenger Information Tickets and fares 10 At our stations 11-15 Station Entrance Aural and visual information Information points and displays Ticket machines Ticket Gates Luggage Left Luggage Ramps for boarding and alighting trains Facilities provided by third parties Aural and visual information On our trains 16-17 Seats on our trains Wheelchairs and Scooters Information about our trains Making Connections 18-19 Connection with other train services Intermodal connections Disruption to facilities and services Contact us 20 Station accessibility and key features 21-25 Route map 26 Introduction Welcome to Making rail accessible: helping older and disabled passengers. This guide provides information to help older or disabled passengers plan their journey with c2c, and makes up one half of our Disabled People’s Protection Policy (DPPP). The other half is called Making rail accessible: guide to policies and practices, which sets out c2c’s policies and strategies relating to accessibility. You can find Making rail accessible: helping older and disabled passengers in leaflet racks at all c2c stations, at the ticket office at other stations where c2c trains call, and on our website (in both PDF and Word formats). You can request a copy of either document from our Customer Relations team, who will send one within seven working days. About our services c2c operate passenger trains between London Fenchurch Street and Shoeburyness, calling at intermediate stations via Basildon, Tilbury Town and Grays.
    [Show full text]
  • Standard-Tube-Map.Pdf
    Tube map 123456789 Special fares apply Special fares Check before you travel 978868 7 57Cheshunt Epping apply § Custom House for ExCeL Chesham Watford Junction 9 Station closed until late December 2017. Chalfont & Enfield Town Theydon Bois Latimer Theobalds Grove --------------------------------------------------------------------------- Watford High Street Bush Hill Debden Shenfield § Watford Hounslow West Amersham Cockfosters Park Turkey Street High Barnet Loughton 6 Step-free access for manual wheelchairs only. A Chorleywood Bushey A --------------------------------------------------------------------------- Croxley Totteridge & Whetstone Oakwood Southbury Chingford Buckhurst Hill § Lancaster Gate Rickmansworth Brentwood Carpenders Park Woodside Park Southgate 5 Station closed until August 2017. Edmonton Green Moor Park Roding Grange Valley --------------------------------------------------------------------------- Hatch End Mill Hill East West Finchley Arnos Grove Hill Northwood Silver Street Highams Park § Victoria 4 Harold Wood Chigwell West Ruislip Headstone Lane Edgware Bounds Green Step-free access is via the Cardinal Place White Hart Lane Northwood Hills Stanmore Hainault Gidea Park Finchley Central Woodford entrance. Hillingdon Ruislip Harrow & Wood Green Pinner Wealdstone Burnt Oak Bruce Grove Ruislip Manor Harringay Wood Street Fairlop Romford --------------------------------------------------------------------------- Canons Park Green South Woodford East Finchley Uxbridge Ickenham North Harrow Colindale Turnpike Lane Lanes
    [Show full text]
  • London Overground Key Statistics
    Delays and 2018-19 Punctuality and complaints percentage of total with variance to last year delays attributed to: Complaints rate Complaints Delay minutes and % of total, attributed to: London Overground Trains planned answered within (per 100k NR-on-TOC TOC-on-Self TOC-on-TOC passenger journeys) 20 working days Key Statistics - Table 2.14 522,369 0.7 94.6% 164,224 89,536 54,779 +4.0% 53.2% 29.0% 17.8% Publication date: 09 July 2019 -60.5% -2.2 pp Complaints rate Complaints answered in Owner Group: Delays by category group 2018-19 % change (per 100k passenger journeys) 20 working days Arriva Rail London Total delays 308,539 +17.0% NR-on-TOC 164,224 +2.8% Franchise start date: External 28,249 +29.8% 13 November 2016 Network Management / Other 56,173 -19.3% Franchise end date: Non-Track Assets 41,872 +30.5% 25 May 2024 Severe weather, autumn & structures 17,226 +41.7% Track 20,641 -14.1% Number of employees Number of stations TOC-on-Self Within 5 minutes Within 10 minutes 89,536 +80.1% managed Right time (MAA) 1,451 (MAA) (MAA) Fleet 30,616 +53.2% 81 Operations 5,695 +181.4% +0.8% 93.8% 95.7% 79.4% Stations 26,772 +150.6% Compared -0.5 pp -0.8 pp +1.1 pp to last TOC Other 10,636 +16.7% year Significantly late CaSL (MAA) Cancelled (MAA) Traincrew 15,798 +100.4% (MAA) TOC-on-TOC 54,779 +0.9% 3.8% 0.0% 3.8% Fleet 19,080 -16.8% +0.8 pp +0.0 pp +0.8 pp Operations 6,921 +41.8% Compared to last year PPM MAA CaSL MAA Stations 4,586 -3.8% TOC Other 12,682 +12.8% Passenger journeys 188.1 m -0.9% (millions) Traincrew 11,510 +9.8% Passenger kilometres % Change on last year (millions) 1,287.6 m -0.7% Green - Less than last year Passenger train kilometres (millions) 8.7 m +6.4% Red - More than last year Route kilometres 167.4 km +0.0% Delay minute totals may differ from the sum of the aggregated operated categories due to other miscellaneous categories being included.
    [Show full text]
  • Crossrail 2 Factsheet: Seven Sisters Station Crossrail 2 Factsheet: Victoria Station
    Crossrail 2 factsheet: Seven Sisters station Crossrail 2 factsheet: Victoria station Crossrail 2 is a proposed new railway line serving London and the South East, linking Surrey to Hertfordshire via central London destinations. A new Crossrail 2 station is proposed at Seven Sisters. The earliest the scheme could be open by is 2030. Why do we need a Crossrail 2 station here? Seven Sisters station currently experiences high levels of • Reduce crowding on the busiest part of the Victoria line crowding. A Crossrail 2 station would provide passengers during peak periods by approximately 40 per cent with a new interchange to the Victoria line, as well as London Overground services at South Tottenham and • Reduce congestion throughout the station Seven Sisters to reduce pressure at other central London rail termini. • Connect with existing London Overground and Victoria line services What are the benefits of Crossrail 2? • Provide step-free access from street level to the Crossrail 2 would add capacity to existing rail services Crossrail 2, Victoria line and London Overground and support economic regeneration by providing the platforms infrastructure needed to build new homes and create more jobs across London and beyond. Around 3,000 • Provide local people with access to more jobs within people per hour use Seven Sisters station everyday in a 45 minute journey peak times. We expect similar numbers of people to use the station if Crossrail 2 is built. • Support local businesses and economic growth by enabling more people to get to Seven Sisters within a A Crossrail 2 station at Seven Sisters would: 45 minute journey • Improve your journey with approximately 15 Crossrail 2 • Increase the likelihood of obtaining a seat on services trains per hour to destinations including London towards central London during the morning peak and Surrey 15 40% Trains per hour Reduction in crowding through the tunnelled section on existing services All figures are based on current working assumptions and are subject to change.
    [Show full text]
  • Bellblue Portfolio
    Bellblue Portfolio A portfolio of mainly income-producing HMOs, and mixed-use retail & residential buildings all situated within affluent North & North West London suburbs including Kensal Rise, Kilburn, Willesden, Stroud Green and Camden. Available as a portfolio or individually. Opportunities to increase the rental income and add value by way of letting of the current vacant units, refurbishment & modernisation, implementing existing planning consents & obtaining new planning consents (STP). Portfolio Schedule Property Description Income PA ERV Guide Price Gross Yield 26 Chamberlayne Retail & 7 studio £91,296 £116,000 £1,450,000 6.30% Road, Kensal Rise, flats above (Reversionary NW10 3JD Yield 8.0%) 76 Chamberlayne Retail with 3 £73,224 £80,000 £1,275,000 5.74% Road, Kensal Rise, studio & 1 x2-bed (Reversionary NW10 3JJ flats above Yield 6.27%) 88 Chamberlayne HMO – 8 studio Vacant £123,000 £1,525,000 *subject to Road, Kensal Rise, flats with PP to refurb/build NW10 3JL extend costs 112 Chamberlayne Retail with 4 £112,360 £136,000 £1,825,000 6.16% Road, Kensal Rise, studio & 4 1-bed (Reversionary NW10 3JP flats above Yield 7.45%) 7 Clifford Gardens, HMO – 5 studio & £72,936 £107,000 £1,500,000 4.86% Kensal Rise, NW10 2 1-bed flats above (1 unit vacant) (Reversionary 5JE Yield 7.13%) 17 St Pauls Avenue, HMO – 6 studio & £96,180 £123,000 £1,550,000 6.21% Willesden, NW2 5SS 2 1-bed flats above (Reversionary Yield 7.94%) 3 Callcott Road, HMO – 8 studio £95,868 £123,000 £1,595,000 6.01% Kilburn, NW6 7EB flats above (Reversionary Yield 7.71%)
    [Show full text]
  • Information for Meeting to Be Held at Bsi Offices, London
    INFORMATION FOR MEETING TO BE HELD AT BSI OFFICES, LONDON Location Address: BSI Group, Chiswick Tower, 389 Chiswick High Road, London, W4 4AL, UK BSI offices are situated in West London, approximately 10 km west of the centre of London and 15 km east of London Heathrow Airport. It is located in Chiswick Tower, directly above Gunnersbury Station which is served by the District Line (Richmond branch), London Overground and several bus routes. For travel around London, public transport is recommended for most journeys. Entry to BSI offices / Chiswick Tower We have been undertaking some refurbishment of both our office and meeting facilities at Chiswick Towers. Please be aware that the BSI Reception is on the first floor, and not on the ground floor. If you have parked in BSI’s car park, there are now doors that open automatically on the top level on your way to entering BSI. When leaving BSI, please exit through the barriers near to security, give them your temporary pass (swipe card/touch card), and ask them to let you out of BSI and through the car park doors. (If you have exited through the swing doors in Reception, stand near to the car park doors and they will see you on the camera and give you access to the car park). Access to the building is controlled. In order to gain access to the meeting rooms, you will need to go through two separate reception areas. • To enter the building, please report to the main Chiswick Tower Reception (open between 08:00 h and 17:30 h) on the ground floor via the Chiswick High Road entrance and show a paper or electronic copy of the Calling Notice for your meeting in either hard copy or electronic format.
    [Show full text]
  • Olympia-Brochure-2020-2.Pdf
    History 04 Vision 10 Neighbourhood 28 Connectivity 38 Offices 44 2 — FUTURE OLYMPIA FUTURE OLYMPIA — 3 1 History FUTURE OLYMPIA — 5 Olympia is no ordinary neighbourhood Olympia London has been home to the best of global innovation, culture and entertainment for over 130 years. From Britain’s first cinema and the world’s first computer exhibition to Victorian circuses and London Fashion Week. 01 04 02 01 BERTRAM MILLS CIRCUS 1924 02 AERO & MOTOR BOAT EXHIBITION 1911 03 MOTORCYCLE & CYCLE SHOW 1921 04 HYPER JAPAN 2017 05 05 VIVIENNE WESTWOOD, 03 LONDON FASHION WEEK 2009 6 — FUTURE OLYMPIA FUTURE OLYMPIA — 7 Then 04 05 With a projected two million visitors per year, Olympia London will 01 02 continue to provide world class exhibition space reflecting its tremendous heritage. 06 01 CHRIS EUBANK VS. GARY STRETCH BOXING MATCH ON 18TH APRIL 1991 IN THE GRAND HALL, WATCHED BY 9000 SPECTATORS 02 LONDON FASHION EXHIBITION 26–29 OCT 1976 03 QUEEN ELIZABETH, PRINCE CHARLES & PRINCESS ANNE VISIT BERTRAM MILLS 03 CIRCUS 1958 04 100% DESIGN EXHIBITION 2012 05 THE UK’S FIRST EVER DRAGWORLD 2017 06 VIVIENNE WESTWOOD’S FALL 2009 COLLECTION FOR LONDON FASHION WEEK 8 — FUTURE OLYMPIA Now FUTURE OLYMPIA — 9 2 Vision FUTURE OLYMPIA — 11 Vision A new destination with a taste for the spectacular — uniting art, entertainment, technology and industry under one iconic roof. A remarkable feat of British architecture and design conceived to enrich, reflect and shape the world around it. With over two million sq ft of contemporary communal space, there is a lot to explore.
    [Show full text]
  • Travel to British Standards Institution
    L D A V E C R S D E A T E S R A N Based on Bartholomews mapping. ReproducedB by permissionB Di L W S R E NEWTON AV U R st A Y O of HarperCollins Publishers Ltd., Bishopbriggs, Glasgow.Y 2012 r E A ic 272 D R A D A t R A RO V N C M 272 LD www.bartholomewmaps.com Y E L T HA Route27 until NovBBO 2012 in AN D O N A O C V C By Train e U L N E Digital Cartography by Pindar Creative n w L Getting to BSI mi alk 15 ing N A Acton0- t Route27 from Nov 2012 E V 1 imE Q • The London Overground runs between L e B491 D E ROAD N t e SOUTHFIELD E Ya Town f R U mR B 440 r B E i O o (subject to confirmation) Address: Chiswick Tower, Richmond and Stratford stopping at Travel to E U x L AD mD R o B L A R S O RO O r E Y R R G R s SPELDHUR E p EY L ID i ST R 389 Chiswick High Road, London W4 4AL. Gunnersbury. A R R O M NR B E t AD O p NU N H e A B E LLO C L A SU O T Y British Standards D RG B E T E ERSE 91 N L SOM T N F BEDFORD U N SOUTH H All visitors must enter the building through • The ‘Hounslow Loop’ has stations at E3 G ROAD B44 E B O R PARK the main entrance on Chiswick High Road Kew Bridge, Richmond, Weybridge, NE O Institution A ACTON L D L S A A D A R N E O E O 272 fields E U D EL A E V R E T U 94 and report to Reception on arrival.
    [Show full text]
  • London Overground Mike Stubbs Director London Overground
    London Overground Mike Stubbs Director London Overground Contents • What is London Overground? • The need for London Overground • Where we started • Our journey • Where we are today • Future direction • Lessons & Conclusions AWhat history is London of growth... Overground ? • The part of Transport for London responsible for our heavy rail train services • We operate an outer London orbital rail network within Greater London • We set the specifications for train frequency, station facilities and overall performance, and are responsible for fares and revenue • We plan and fund improvements and extensions to the network • Network Rail manages and maintains most of the track and signals, as London Overground is part of the National Rail network 30% of Londoners are within walking distance of a London Overground station The need for London Overground The existing networks only facilitated radial journeys Aims of London Overground • Provide metro services on mainline rail in London • Add capacity – make better use of London’s forgotten railways • New journey opportunities – enable orbital journeys • Drive regeneration and change – through improved transport links • Higher service standards – integration with wider TfL network, common ticketing, information and customer service standards Immediate Objectives Existing, underperforming routes were devolved to TfL in 2007, creating London Overground • Increased Safety and Customer Service – staffed stations, TfL standards • Increased Reliability – industry leading punctuality • Increased Frequency
    [Show full text]
  • Transport Study
    LLDC TRANSPORT REVIE W LOCAL PLAN REVIEW - TRANSPORT STUDY Prepared for London Legacy Development Corporation June 2018 CH2M HILL United Kingdom Elms House 43 Brook Green London W6 7EF T +44 203 479 8000 Name Signature Date Prepared by: Philip Edwards Checked by: Graham Stevenson Approved by: Richard Smith In preparing this report, CH2M relied, in whole or in part, on data and information provided by the Client and third parties, which information has not been independently verified by CH2M and which CH2M has assumed to be accurate, complete, reliable, and current. Therefore, while CH2M has utilised reasonable due kill and care in preparing this Report, CH2M does not warrant or guarantee the conclusions set forth in this Report which are dependent or based upon data, information, or statements supplied by third parties or the client. This Report is intended for Client’s sole and exclusive use and is not for the benefit of any third party and may not be distributed to, disclosed in any form to, used by, or relied upon by, any third party without prior written consent of CH2M, which consent may be withheld in its sole discretion. Use of this Report or any information contained herein, if by any party other than Client, shall be at the sole risk of such party and shall constitute a release and agreement by such party to defend and indemnify CH2M and its affiliates, officers, employees and subcontractors from and against any liability for direct, indirect, incidental, consequential or special loss or damage or other liability of any nature arising from its use of the Report or reliance upon any of its content.
    [Show full text]