ONGOING PROJECT

SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment

COMBINED CYCLE / SINGLE CYCLE POWER PLANT (GAS/LNG BASED OR DUEL FUEL)

1. Pre -Feasibility study for a Gas fired CCGT Sumitomo and - Joint venture plant at Moheshkhali, Cox’s bazar CPGCBL with Ramboll

2. ESIA of Beximco 460 MW LPG based power INDEX ECA Sole Consultant plant at

3. IEE, EIA and ESIA of 1200 MW LNG based INDEX/ ECA Sole Consultant power plant at Kutubdia, Cox’s Bazar - BEXIMCO

4. IEE, EIA and ESIA of 1200 MW LPG based INDEX/ ECA Sole Consultant power plant at Kutubdia, Cox’s Bazar BEXIMCO

5. Environmental Monitoring for “225 MW Dual Shapoorji ADB/AIIB Sole Consultant Fuel (Gas and HSD based) Combined Cycle Pallonji Power Plant (Bhola- II): Burhanuddin, Bhola District,

6. Construction Phase Environmental, Health, North West MIGA/SCB Sole Consultant Safety and Social Compliance audit of Power 225MW Combined Cycle Power Company Plant Project (Dual Fuel-3rd Unit) Limited (NWPGCL)

7. Environmental Monitoring in Construction SDCI ADB Sole Consultant Phase for 413.792 MW (Gas)/333.02 MW (HSD) (Net) Duel Fuel Fired Combined Cycle Power Plant (Sirajganj Unit-4) project at Saidabad Union under Sadar , Sirajganj.

8. Pre -operational period baseline monitoring of Sembcorp- ADB Sole Consultant 413.792 MW (Gas)/333.02 MW (HSD) (Net) NWPGCL Duel Fuel Fired Combined Cycle Power Plant (Sirajganj Unit-4) project at Saidabad Union under Sadar Upazila, Sirajganj.

9. Pre -Feasibility study for a Gas fired CCGT Sumitomo/ - SC with plant at Moheshkhali, Cox’sbazar CPGCBL Sumitomo

COAL BASED POWER PLANT

10. Preparation, Implementation and monitoring BEPCL Power China Sole Consultant of RAP and LRP relevant to Barishal 350MW Coal fired power plant at Taltoli, Barguna, Bangladesh

11. Environmental Impact Assessment (EIA) of Zhejiang - Sole Consultant proposed Coal Fired 2x660 MW Power Plant Zheneng (Phase-II), Mirsharai BEZA Economic Zone, Electric Power Mirsharai, Co., Ltd

12. Environmental Impact Assessment (EIA) of Hangzhou - Sole Consultant construction of 2x660 MW Coal Power Plant Jinjiang Group in Mirsharai Economic Zone at Mirsharai Co., Ltd.

SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment BEZA area in

13. EIA of Payra 1320 MW Coal Fired Power BCPCL China - EXIM Sole Consultant Plant (2nd Phase) Project at Dhankhali, Kalapara, Patuakhali

14. Environmental Impact Assessment (EIA) GUO PENG - Sole Consultant Study of a 1320 MW Thermal Power Plant Project at Payra, Kalapara, Patuakhali.

15. Environment and Social Monitoring for Payra BCPCL China-EXIM Sole Consultant 1320 MW Thermal Power Plant at Dhankhali, Bank Kalapara, Patuakhlai.

16. Environmental and Social Impact Assessment Sembcorp and - SC with AECOM (ESIA) study for 2X700 MW Kohelia Thermal Coal Power Power Project Generation Company Limited

HFO BASED POWER PLANT

17. Environmental and Social Impact Assessment EnergyPac - SC with ERM (ESIA) study of 115 MW HFO fired power plant at Thakurgaon Sadar Upazilla of Thakurgaon District, Bangladesh

GAS BASED ENGINE POWER PLANTS

18. Environmental Impact Assessment (EIA) for BEZA JICA Sole Consultant the Proposed 50 MW Power Plant at Araihazar Economic Zone including Substation, Electricity Transmission Line and Gas Transmission Line from the Haripur TBS to Dighi Barabo CGS

SOLAR AND WIND POWER PLANT

19. IEE and ESIA of 200 MW Solar Power Plant Beximco ECA Sole Consultant at Gaibandha

20. IEE & ESIA of 30 MW Solar Power Plant at Beximco ECA Sole Consultant Panchagar

21. Solar And Wind Resource Measurements in World Bank World Bank JV with Suntrace Bangladesh GmBH

22. Pre -feasibility study of offshore wind SC with Ramboll Bangladesh

23. Initial Environmental and social Inventory of Sun Edison - Sole Consultant 200 MW Solar power plant in Cox's Bazar

24. ESIA and E&S Compliance Audit of 35 MW Spectra ADB/DEG/KfW SC with ERM Solar Project at Manikganj Engineers Limited

TRANSMISSION LINE

25. Resettlement Action Plan (RAP), Livelihood Beximco Power - Sole Consultant Restoration Plan (LRP) for the 35-km Company transmission line & RAP and LRP for Main

SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment Power Plant of a 200 MW Solar Project site in Limited Sundarganj to Rangpur Substation

26. Environmental Impact Assessment (EIA) for JICA JICA Sole Consultant the Proposed 50 MW Power Plant at Araihazar Economic Zone including Substation, Electricity Transmission Line and Gas Transmission Line from the Haripur TBS to Dighi Barabo CGS

OTHERS

27. Selection of Local Consultant Services for IMED - Sole Consultant Preparation of Monitoring and Evaluation Guidelines on Industry, Power & Energy

ESRU/LNG/FSU

28. IEE and ESIA for the Proposed LNG based Kutubdia IFIs Sole Consultant FSRU at Banskhali Upazila, Chittagong, Energy Hub Bangladesh

29. IEE and ESIA for Construction a FSRU based Kutubdia IFIs Sole Consultant LNG terminal/ Jetty in the Kutubdia channel Energy Hub for transferring LNG to the national gas grid/ power plant

30. EIA of Rupkalpa-5 Drilling Project at Srikail BAPEX GoB Sole Consultant North-1, Mubarakpur South East-1 and Behumganj-4, Shonaimuri, Noakhali

LPG SECTOR

31. IEE & EIA Study for LPG Bottling Plant of INDEX Beximco Sole Consultant Index Power & Energy Limited at Narsingdi, Bangladesh

32. Environmental Management Plan (EMP) for INDEX Beximco Sole Consultant ESCORP LPG Bottoling Plant at Mongla

33. Initial Environmental Examination (IEE), INDEX IFIs Sole Consultant Environmental Impact Assessment (EIA) and Environmental and Social Impact Assessment (ESIA) for LPG Import Terminal at Sitalakha River, New to establish LPG facilities with storage, bottling and distibution plant

34. IEE and ESIA for the Temporary LPG based Kutubdia IFIs Sole Consultant FSU at Banskhali Upazila, Chittagong, Energy Hub Bangladesh

35. Environmental & Social Impact Assessment Dipon Group EFI Sole Consultant (ESIA) of a LPG Terminal and LPG bottling Plant Project at Moheskhali, Cox’s Bazar, Bangladesh METRO RAIL

36. Environmental Monitoring for Dhaka Mass Synohydro – JICA Sole Consultant Rapid Transit Development Project MRT Line ITD-JV / DMRT

SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment 6 (CP02)

37. Environmental Monitoring for Dhaka Mass Italian-Thai JICA Sole Consultant Rapid Transit Development Project MRT Line Development 6 (CP03 & 4) Public Company Limited / DMRT

38. Environmental Monitoring for Dhaka Mass Tekken-AML- JICA Sole Consultant Rapid Transit Development Project MRT Line Abenikko JV 6 (CP 05)

39. Environmental Monitoring for Dhaka Mass SMCC _Italian- JICA Sole Consultant Rapid Transit Development Project MRT Line Thai 6 (CP06) Development Public Company Limited

40. Environmental Monitoring for Dhaka Mass L&T Power JICA Sole Consultant Rapid Transit Development Project MRT Line 6 (CP 07)

RAILWAY

41. Environment, Monitoring of construction of CTM-JV/ ADB Sole Consultant dual gauge double rail line and conversion of Bangladesh existing rail line into dual gauge between Railway Akhaura and Laksam Project ( ALDLP) -48 months during construction Period (quarterly)

ROADS AND HIGHWAY

42. Environmental Monitoring of the MIR Akhter JICA Sole Consultant Construction of the 7.35Km road from Rajghat Hossain to Mohoriguna, Work Package No-03 JICA Limited Access Road Package 3.3

43. Initial Environmental Examination (IEE) & Kunhwa ADB/ OFID Sole Consultant Environmental Impact Assessment (EIA) for Engineering & Slow Moving Vehicles Transport (SMVT) Consulting Co., Route Ltd.

44. Environmental and Social Monitoring for AML-HCM JV ADB Sole Consultant Improvement of Road from Kaliakoir Bypass Intersection (km 18+900) to Dullamari Road (km 36+900) from 2-Lane to 4-Lane under SASEC Road Connectivity Project (Package 2)- 36 months during construction Period

45. Environmental and Social Monitoring for SAMWHAN- ADB Sole Consultant Improvement of Road from Dullamari Road MIR AKHTER Intersection (km 36+900) to Tangail Bypass JV (km 59+300) from 2-Lane to 4-Lane under SASEC- Road Connectivity Project ( package- 3)- 36 months during construction Period

46. Environmental and Social monitoring and Spectra JICA Sole Consultant

SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment construction mitigation implementation Construction support of Chittagong City outer Ring Road Engineering Project -36 months ( monthly) Ltd

BRIDGES (ROAD AND RAIL)

47. Environmental Monitoring for Contracts Monico-CPC JV JICA Sole Consultant Package No. PW-01(Construction of 19 Nos. Bridges Under Rangpur Zone) of Western Bangladesh Bridge Improvement Project (JICA L/A No. BD-P82)

48. Environmental Management and Monitoring Monico Limited JICA Sole Consultant Plan (EMMP), Engagement of Environmental Management Officer, Environmental Monitoring, Submission of Report(s) Contracts Package No. PW-03 (Construction of 9 Nos. Bridges Under Zone) of Western Bangladesh Bridge Improvement Project (JICA L/A No. BD-P82)

49. Environmental Management and Monitoring Monico Limited JICA Sole Consultant Plan (EMMP), Engagement of Environmental Management Officer, Environmental Monitoring, Submission of Report(s) for Contracts package No. PW-05 (Construction of 07 Nos. Bridges under Gopalganj Zone) of Western Bangladesh Bridge improvement Project (JICA L/A NO. BD-P82)

50. Environmental Impact Assessment and LGED GoB Sole Consultant Economic Feasibility Study for 70 (seventy) no of Bridges (Part -1) under Bridge Development Project.

51. Environmental Impact Assessment and LGED GoB Sole Consultant Economic Feasibility Study for 55 (fifty-five) no of Bridges (Part -2) under Bridge Development Project.

52. Environmental Impact Assessment and LGED GoB Sole Consultant Economic Feasibility Study for 45 (forty-five) no of Bridges (Part -3) under Bridge Development Project.

53. Environmental Impact Assessment for 15 LGED GoB Sole Consultant (Fifteen) no of Bridges (Package - 63) under Bridge Development Project.

54. Environment Impact Assessment of Railway CGP/LGED JICA Sole Consultant Flyover Project in the Gazipur City Corporation

55. Environment Impact Assessment of Turag CGP/LGED JICA Sole Consultant Bridge Project in the Gazipur City Corporation

56. Environment Impact Assessment of 4th CGP/LGED JICA Sole Consultant

SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment Sitalokha Bridge Project in the Narayanganj City Corporation

57. Environmental & Social Management LGED World Bank Sole Consultant Framework (ESMF) for Proposed Bridge Construction, Rehabilitation And Maintenance Program (BCRMP) (National) under LGED, Contract Package: S-25

58. Construction Environmental Action Plan TEKKEN – JICA Sole Consultant (CEMP) and Environmental Monitoring of AML – YBC JV Kalna Bridge over Matamuhuri River (Contracts Package No. A1) under Cross Border Road Network Improvement Project (CBRNIP),

59. Construction Environmental Action Plan Concord JICA Sole Consultant (CEMP) and Environmental Monitoring for Pragatee reconstruction of 8 numbers 2-lane PC-I Consortium Ltd Girder Bridges and 7 numbers Boxes Culverts along with the approach roads on Bariyarhat- Heako-Ramgarh road including installation of axle load control station at Ramgarh- Package No. B under Cross Border Road Network Improvement Project (CBRNIP)

60. Construction Environmental Action Plan SPECTRA- JICA Sole Consultant (CEMP) and Environmental Monitoring for CR24B Joint reconstruction of 4 numbers Bridges on Venture Chittagong –Cox’s Bazar Road - Package No. C under Cross Border Road Network Improvement Project (CBRNIP)

61. Consultancy services for EIA (Environmental RHD ADB/ China Sole Consultant Impact Assessment) and TIA (Traffic Impact Grand Assessment) Study for the Construction of 8th Bangladesh-China-Friendship Bridge

ECONOMIC ZONE

62. Feasibility Study and Environmental Impact Bashundhara - Sole Consultant Assessment (EIA) of Bashundhara Special Group Economic Zone ( A private economic zone)

FOOD AND BEVARAGE

63. Environmental and Social Monitoring of Meghna Sugar DEG/ In Association Meghna Sugar Refinery Limited Refinery KfW - with EOH Limited Coastal & Environmental Services

BRICK FIELD

64. ESIA of auto Brick Kiln of Hexagone HBL IDCOL Sole Consultant 65. ESIA report for energy efficient Brick kiln Nowhata Green IDCOL Sole Consultant projects (Nowhata Green Bricks Ltd) Bricks Ltd

SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment

FISHERIES STUDY

66. Fisheries study for 225 MW Dual Fuel (Gas Shaporji Palonji ADB Sole Consultant and HSD based) Combined Cycle Power Plant (Bhola-II): Burhanuddin, Bhola District, Bangladesh