Ongoing Project
Total Page:16
File Type:pdf, Size:1020Kb
ONGOING PROJECT SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment COMBINED CYCLE / SINGLE CYCLE POWER PLANT (GAS/LNG BASED OR DUEL FUEL) 1. Pre -Feasibility study for a Gas fired CCGT Sumitomo and - Joint venture plant at Moheshkhali, Cox’s bazar CPGCBL with Ramboll 2. ESIA of Beximco 460 MW LPG based power INDEX ECA Sole Consultant plant at Narayanganj 3. IEE, EIA and ESIA of 1200 MW LNG based INDEX/ ECA Sole Consultant power plant at Kutubdia, Cox’s Bazar - BEXIMCO 4. IEE, EIA and ESIA of 1200 MW LPG based INDEX/ ECA Sole Consultant power plant at Kutubdia, Cox’s Bazar BEXIMCO 5. Environmental Monitoring for “225 MW Dual Shapoorji ADB/AIIB Sole Consultant Fuel (Gas and HSD based) Combined Cycle Pallonji Power Plant (Bhola- II): Burhanuddin, Bhola District, Bangladesh 6. Construction Phase Environmental, Health, North West MIGA/SCB Sole Consultant Safety and Social Compliance audit of Power Sirajganj 225MW Combined Cycle Power Company Plant Project (Dual Fuel-3rd Unit) Limited (NWPGCL) 7. Environmental Monitoring in Construction SDCI ADB Sole Consultant Phase for 413.792 MW (Gas)/333.02 MW (HSD) (Net) Duel Fuel Fired Combined Cycle Power Plant (Sirajganj Unit-4) project at Saidabad Union under Sadar Upazila, Sirajganj. 8. Pre -operational period baseline monitoring of Sembcorp- ADB Sole Consultant 413.792 MW (Gas)/333.02 MW (HSD) (Net) NWPGCL Duel Fuel Fired Combined Cycle Power Plant (Sirajganj Unit-4) project at Saidabad Union under Sadar Upazila, Sirajganj. 9. Pre -Feasibility study for a Gas fired CCGT Sumitomo/ - SC with plant at Moheshkhali, Cox’sbazar CPGCBL Sumitomo COAL BASED POWER PLANT 10. Preparation, Implementation and monitoring BEPCL Power China Sole Consultant of RAP and LRP relevant to Barishal 350MW Coal fired power plant at Taltoli, Barguna, Bangladesh 11. Environmental Impact Assessment (EIA) of Zhejiang - Sole Consultant proposed Coal Fired 2x660 MW Power Plant Zheneng (Phase-II), Mirsharai BEZA Economic Zone, Electric Power Mirsharai, Chittagong Co., Ltd 12. Environmental Impact Assessment (EIA) of Hangzhou - Sole Consultant construction of 2x660 MW Coal Power Plant Jinjiang Group in Mirsharai Economic Zone at Mirsharai Co., Ltd. SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment BEZA area in Chittagong District 13. EIA of Payra 1320 MW Coal Fired Power BCPCL China - EXIM Sole Consultant Plant (2nd Phase) Project at Dhankhali, Kalapara, Patuakhali 14. Environmental Impact Assessment (EIA) GUO PENG - Sole Consultant Study of a 1320 MW Thermal Power Plant Project at Payra, Kalapara, Patuakhali. 15. Environment and Social Monitoring for Payra BCPCL China-EXIM Sole Consultant 1320 MW Thermal Power Plant at Dhankhali, Bank Kalapara, Patuakhlai. 16. Environmental and Social Impact Assessment Sembcorp and - SC with AECOM (ESIA) study for 2X700 MW Kohelia Thermal Coal Power Power Project Generation Company Limited HFO BASED POWER PLANT 17. Environmental and Social Impact Assessment EnergyPac - SC with ERM (ESIA) study of 115 MW HFO fired power plant at Thakurgaon Sadar Upazilla of Thakurgaon District, Bangladesh GAS BASED ENGINE POWER PLANTS 18. Environmental Impact Assessment (EIA) for BEZA JICA Sole Consultant the Proposed 50 MW Power Plant at Araihazar Economic Zone including Substation, Electricity Transmission Line and Gas Transmission Line from the Haripur TBS to Dighi Barabo CGS SOLAR AND WIND POWER PLANT 19. IEE and ESIA of 200 MW Solar Power Plant Beximco ECA Sole Consultant at Gaibandha 20. IEE & ESIA of 30 MW Solar Power Plant at Beximco ECA Sole Consultant Panchagar 21. Solar And Wind Resource Measurements in World Bank World Bank JV with Suntrace Bangladesh GmBH 22. Pre -feasibility study of offshore wind SC with Ramboll Bangladesh 23. Initial Environmental and social Inventory of Sun Edison - Sole Consultant 200 MW Solar power plant in Cox's Bazar 24. ESIA and E&S Compliance Audit of 35 MW Spectra ADB/DEG/KfW SC with ERM Solar Project at Manikganj Engineers Limited TRANSMISSION LINE 25. Resettlement Action Plan (RAP), Livelihood Beximco Power - Sole Consultant Restoration Plan (LRP) for the 35-km Company transmission line & RAP and LRP for Main SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment Power Plant of a 200 MW Solar Project site in Limited Sundarganj to Rangpur Substation 26. Environmental Impact Assessment (EIA) for JICA JICA Sole Consultant the Proposed 50 MW Power Plant at Araihazar Economic Zone including Substation, Electricity Transmission Line and Gas Transmission Line from the Haripur TBS to Dighi Barabo CGS OTHERS 27. Selection of Local Consultant Services for IMED - Sole Consultant Preparation of Monitoring and Evaluation Guidelines on Industry, Power & Energy ESRU/LNG/FSU 28. IEE and ESIA for the Proposed LNG based Kutubdia IFIs Sole Consultant FSRU at Banskhali Upazila, Chittagong, Energy Hub Bangladesh 29. IEE and ESIA for Construction a FSRU based Kutubdia IFIs Sole Consultant LNG terminal/ Jetty in the Kutubdia channel Energy Hub for transferring LNG to the national gas grid/ power plant 30. EIA of Rupkalpa-5 Drilling Project at Srikail BAPEX GoB Sole Consultant North-1, Mubarakpur South East-1 and Behumganj-4, Shonaimuri, Noakhali LPG SECTOR 31. IEE & EIA Study for LPG Bottling Plant of INDEX Beximco Sole Consultant Index Power & Energy Limited at Narsingdi, Bangladesh 32. Environmental Management Plan (EMP) for INDEX Beximco Sole Consultant ESCORP LPG Bottoling Plant at Mongla 33. Initial Environmental Examination (IEE), INDEX IFIs Sole Consultant Environmental Impact Assessment (EIA) and Environmental and Social Impact Assessment (ESIA) for LPG Import Terminal at Sitalakha River, New Dhaka to establish LPG facilities with storage, bottling and distibution plant 34. IEE and ESIA for the Temporary LPG based Kutubdia IFIs Sole Consultant FSU at Banskhali Upazila, Chittagong, Energy Hub Bangladesh 35. Environmental & Social Impact Assessment Dipon Group EFI Sole Consultant (ESIA) of a LPG Terminal and LPG bottling Plant Project at Moheskhali, Cox’s Bazar, Bangladesh METRO RAIL 36. Environmental Monitoring for Dhaka Mass Synohydro – JICA Sole Consultant Rapid Transit Development Project MRT Line ITD-JV / DMRT SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment 6 (CP02) 37. Environmental Monitoring for Dhaka Mass Italian-Thai JICA Sole Consultant Rapid Transit Development Project MRT Line Development 6 (CP03 & 4) Public Company Limited / DMRT 38. Environmental Monitoring for Dhaka Mass Tekken-AML- JICA Sole Consultant Rapid Transit Development Project MRT Line Abenikko JV 6 (CP 05) 39. Environmental Monitoring for Dhaka Mass SMCC _Italian- JICA Sole Consultant Rapid Transit Development Project MRT Line Thai 6 (CP06) Development Public Company Limited 40. Environmental Monitoring for Dhaka Mass L&T Power JICA Sole Consultant Rapid Transit Development Project MRT Line 6 (CP 07) RAILWAY 41. Environment, Monitoring of construction of CTM-JV/ ADB Sole Consultant dual gauge double rail line and conversion of Bangladesh existing rail line into dual gauge between Railway Akhaura and Laksam Project ( ALDLP) -48 months during construction Period (quarterly) ROADS AND HIGHWAY 42. Environmental Monitoring of the MIR Akhter JICA Sole Consultant Construction of the 7.35Km road from Rajghat Hossain to Mohoriguna, Work Package No-03 JICA Limited Access Road Package 3.3 43. Initial Environmental Examination (IEE) & Kunhwa ADB/ OFID Sole Consultant Environmental Impact Assessment (EIA) for Engineering & Slow Moving Vehicles Transport (SMVT) Consulting Co., Route Ltd. 44. Environmental and Social Monitoring for AML-HCM JV ADB Sole Consultant Improvement of Road from Kaliakoir Bypass Intersection (km 18+900) to Dullamari Road (km 36+900) from 2-Lane to 4-Lane under SASEC Road Connectivity Project (Package 2)- 36 months during construction Period 45. Environmental and Social Monitoring for SAMWHAN- ADB Sole Consultant Improvement of Road from Dullamari Road MIR AKHTER Intersection (km 36+900) to Tangail Bypass JV (km 59+300) from 2-Lane to 4-Lane under SASEC- Road Connectivity Project ( package- 3)- 36 months during construction Period 46. Environmental and Social monitoring and Spectra JICA Sole Consultant SL# Name of the Assignment Name of Client Lenders Involved Role of Assignment construction mitigation implementation Construction support of Chittagong City outer Ring Road Engineering Project -36 months ( monthly) Ltd BRIDGES (ROAD AND RAIL) 47. Environmental Monitoring for Contracts Monico-CPC JV JICA Sole Consultant Package No. PW-01(Construction of 19 Nos. Bridges Under Rangpur Zone) of Western Bangladesh Bridge Improvement Project (JICA L/A No. BD-P82) 48. Environmental Management and Monitoring Monico Limited JICA Sole Consultant Plan (EMMP), Engagement of Environmental Management Officer, Environmental Monitoring, Submission of Report(s) Contracts Package No. PW-03 (Construction of 9 Nos. Bridges Under Khulna Zone) of Western Bangladesh Bridge Improvement Project (JICA L/A No. BD-P82) 49. Environmental Management and Monitoring Monico Limited JICA Sole Consultant Plan (EMMP), Engagement of Environmental Management Officer, Environmental Monitoring, Submission of Report(s) for Contracts package No. PW-05 (Construction of 07 Nos. Bridges under Gopalganj Zone) of Western Bangladesh Bridge improvement Project (JICA L/A NO. BD-P82) 50. Environmental Impact Assessment and LGED GoB Sole Consultant Economic Feasibility Study for 70 (seventy) no of Bridges (Part -1) under Bridge Development