Download Doosan Corporate Brochure

Total Page:16

File Type:pdf, Size:1020Kb

Download Doosan Corporate Brochure GLOBAL NETWORK EUROPE [NEW DELHI OFFICE] TAIPEI OFFICE Branches 16th Floor, DLF Square Building, 8F-7, No.495, Guangfu S. Rd., Taipei, Taiwan Subsidiaries Jacaranda Marg, Near NH-8, DLF Tel 63 2 949 8060 ABU DHABI OFFICE Phase-II, Gurgaon, Haryana 122 002, India # 508, Al Ghaith Tower, Hamdan Street, DOOSAN POWER SYSTEMS LTD. Tel 91-124-439-8200 P.O. Box 27767, Abu Dhabi, UAE Doosan House, Crawley Business Fax 91-124-414-7006 AMERICAS Tel 971-2-627-6273 Quarter, Manor Royal, Crawley, Fax 971-2-627-6274 [KOLKATA OFFICE] West Sussex, RH10 9AD, United Kingdom Subsidiaries South City Pinnacle, Mangalam Business Tel 44-1293-612888 CAIRO OFFICE Center Suite No - 1214, 12th Floor, Salt Fax 44-1293-584321 DOOSAN HEAVY INDUSTRIES 2nd Floor, Land Mark Building 1, Lake, Sector – V Kolkata – 700091 AMERICA CORP. 67 El Teseen St., 5th Settlement, New Cairo T- 91 33 4019-3425 Tel 20-2-2537-1040 DOOSAN BABCOCK F- 91 33 4019-3430 10th Floor, Parker Plaza, 400 Kelby Street, Porterfield Road, Renfrew, Fort Lee, NJ 07024, USA Fax 20-2-2537-1041 PA4 8DJ, United Kingdom DOOSAN HEAVY INDUSTRIES Tel 1-201-944-4554 31, 24 Tel 44-141-886-4141 VIETNAM CO., LTD. (DOOSAN VINA) Fax 1-201-944-5022 DUBAI OFFICE Fax 44-141-885-3338 Dung Quat Economic Zone, Office Unit No. 2202/2203, 22nd Floor Binh Thuan Commune Binh Son District, DOOSAN ATS AMERICA, LLC Ubora Tower, Al Abraj Street, Business Bay DOOSAN Škoda POWER Quangngai Province, Vietnam 11360 N. Jog Road, Palm Beach P.O. Box 282131, Dubai, U.A.E. Tylova 1/57, 301 28 Plzen, Czech Tel 84-55-3618-900 Gardens,FL 33418, USA Tel 971-4-327-5545 Fax 971-4-327-5529 Tel 420-378-185-000 Fax 84-55-713-950 Tel 1 561 572 9100 Fax 420-378-185-910 Fax 1 561 572 9101 DOOSAN HEAVY INDUSTRIES KUWAIT OFFICE DOOSAN LENTJES JAPAN CORP. DOOSAN GRIDTECH PO Box 2031 Laila Commercial Tower, 4F, Sanno Park Tower, 2-11-1, Daniel-Goldbach-Strasse. 19, 71 Columbia St, Suite 300, Seattle, Floor 7B, Block No.4, Plot No. 35, Nagatacho, Chiyoda-ku, Salmiya, Kuwait 40880 Ratingen, Germany WA 98104, USA Tokyo, Japan 100-6104 Tel 965-2575-3126 Tel 49-2102-166-0 Tel 1 888 452 7715 Fax 49-2102-166-2500 Tel 81-3-5510-5460 Fax 965-2575-2001 Fax 81-3-5510-5461 DOOSAN HF CONTROLS MIDDLE EAST OPERATION CENTER DOOSAN ENPURE 1624 West Crosby Road, Suite 124 Branches Office Unit No. 2202/2203, 22nd Floor Doosan Enpure House, Parklands Carrollton, Texas 75006, U.S.A. Business Park, Rubery, Birmingham, Ubora Tower, Al Abraj Street, Business Bay BEIJING OFFICE Tel 1 469 568 6526 B45 9PZ, United Kingdom P.O. Box 282131, Dubai, U.A.E. 19th Floor, Gateway Plaza, Tower B, Tel 44-121-683-2801 Tel 971-4-327-5545 No. 18 Xiaguangli, North Road, DOOSAN Power SERVICES AMERICA Fax 44-121-251-9111 Fax 971-4-327-5529 East Third Ring Chaoyang District, 1050 Crown Pointe PKWY, STE-1200, Beijing 100027,China Atlanta, GA-30338, USA RIYADH OFFICE Branches Tel 86-10-8454-7122, 7136 Tel 1 770 861 9400 # 205~206, The Plaza Building (Akariya Fax 86-10-8484-7139 FRANKFURT OFFICE No. 4), Olaya Street, P.O.Box 9656, DOOSAN Turbomachinery SERVICES Riyadh 11423, Kingdom of Saudi Arabia 7th Floor, Arabella Center, Lyoner Strasse BANGKOK OFFICE 12000 N. P Street, La Porte, TX 77571, USA 44-48, 60528 Frankfurt am Main, Germany 10th Floor, M-Thai Tower, Tel 966-11-419-1696 Tel 1 713 364 7500 Tel 49-69-69-5004-0 All Seasons Place, 87 Wireless Road Fax 966-11-419-1995 Fax 49-69-69-5004-10 Phatumwan, Bangkok 10330, Thailand Branches Tel 66-2-654-0690 BIRMINGHAM WATER R&D CENTER Fax 66-2-654-0693 AFRICA Doosan Enpure House, NEWINGTON OFFICE Parklands Business Park, Rubery, HANOI OFFICE 178 Shattuck Way, Newington,NH 03801, Branches Birmingham, B45 9PZ, United Kingdom #1101, Daeha Business Center, 360 Kim USA Tel 44-121-683-2800 Ma, Ba Dinh District Hanoi, Vietnam Tel 1-603-433-5507 JOHANNESBURG OFFICE Fax 44-121-683-2888 Tel 84-4-6273-0545~9 Fax 1-603-433-1060 12F, The Forum, 2 Maude Street, Fax 84-4-6273-0550 Sandton, Johannesburg, South Africa PITTSBURGH OFFICE Tel 27-113-265-790 ASIA JAKARTA OFFICE c/o Westinghouse Electric Company Fax 966-1-419-1995 Menara Sentraya 17th Floor, Unit B2, 1000 Westinghouse Drive, Building 1, 256A, Subsidiaries Jalan Iskandarsyah Raya No. 1A, Cranberry Township, PA, 16066, USA Kebayoran Baru, Jakarta Indonesia Tel 1 412 374 6071 DOOSAN POWER SYSTEMS Tel 62-21-2788-1802 INDIA PVT. LTD. Fax 62-21-2788-1803 SANTIAGO OFFICE Av. Nueva Tajamar 481, Torre Sur, Piso 11, MANILA OFFICE [CHENNAI OFFICE] Oficina 1103, Las Condes, Santiago, Chile Unit 1802, One World Place, 32nd street, 18/2A, Senneerkuppam, Bypass Road, Tel 56-2-2657-3333 Bonifacio Global City, Taguig City 1634, Poonamallee, Chennai 600 056, Tamil Fax 56-2-2657-3343 Nadu, India Philippines Tel 91-44-3303-5000 Tel 63-2-801-4619 Fax 91-44-3303-5001 Fax 63-2-801-4616 MIDDLE EAST & AFRICA SHANGHAI OFFICE [MUMBAI OFFICE] Subsidiary 501,5th Floor, CNB Square Bldg. Rm2903A, Gubei International Sangam Complex, Near Sangam Cinema, Fortune Center, No.1438, DOOSAN Power SYSTEMS ARABIA Andheri-Kurla Road, Chakala, Hong Qiao Road, Chang Ning District, Al Hamra Plaza, Unit no. 12, 1st floor, Andheri(East), Mumbai 400 059, India Shanghai, 201103, China Palestine Road, Jeddah 23212-7663, Tel 91-22-6177-0500 Tel 86-21-5877-8696 Kingdom of Saudi Arabia Fax 91-22-6177-0599 Fax 86-21-5877-5938 Tel 966 012 610 3600 Doosan Heavy Industries & Construction www.doosanheavy.com Bundang Doosan Tower Changwon Head Office 155, Jeongjail-ro, Bundang-gu, Seongnam-si, (641-792) 22 Doosanvolvo-ro, Seongsan-gu, Gyeonggi-do, Korea (13557) Changwon City, Gyeongsangnam-do, 641-792, Korea (T) +82-55-278-6114, (F) +82-55-264-5551/5552 Doosan creates value for the world with its advanced technology and capabilities. Doosan Heavy Industries & Construction has been supplying specialized products and services for power plants and desalination plants in 40 countries around the world. It has now grown to become an energy solution provider that helps create value for the world. At Doosan, we have the technology for manufacturing the main components of power plants, such as boilers, turbines and generators. Having expanded into the Services business, we also offer performance upgrades and life cycle extension for power plant equipment and implement various environmental control systems and self-developed digital solutions to help reduce the emission of pollutants. We are a globally recognized leader of seawater desalination and have also been cultivating the nuclear power business by leveraging our unrivalled expertise in this field. We have delivered more nuclear power plant equipment than any other company worldwide over the last two decades, and have recently ventured into the Small Modular Reactor business in the U.S. The SMRs are receiving worldwide attention these days as an effective alternative for reducing carbon emissions. We have also completed development of a cask for transporting and storing nuclear spent fuel and are now branching out into the nuclear decommissioning business. Our business focus is shifting toward eco-friendly energy solutions, such as gas turbines, wind power, solar energy and hydrogen power. Doosan is the first in Korea and fifth in the world to succeed in developing a H-class gas turbine, and we expect to soon have our gas turbine model commercialized. As the sole Korean offshore wind turbine manufacturer that holds superior technology and a solid track record, Doosan is solidifying its position as a key player in the wind power market. Guided by our vision of becoming a global leader in the power generation and water fields, we strive to create a better future by supplying light and water to all mankind and developing technologies that help enhance the value of our Earth. Qurayyah and Fadhili Combined Cycle Power Plant projects in Saudi systems (installed capacity of 239.5MW) in Korea. Adding on to these the main equipment supplier for a UAE nuclear power plant project, the Arabia, the combined cycle power plant project in Guam, the Mundra achievements, we introduced a 5.5MW wind power system in 2017, one to which Korea made its very first export of a Korean-standard nu- Thermal Power Plant project in India, the Vinh Tan 4 and Nghi Son 2 and then in 2018, we started development of a 8MW wind power sys- clear reactor, and it has also signed on as a plant maintenance service Thermal Power Plant projects in Vietnam, and many more. tem, which we expect to complete by 2022. provider, all of which reveals the level of recognition Doosan is gaining in the field of nuclear power technology. Having been recognized for our technological prowess as the first Ko- In 2016, we acquired 1Energy Systems, a US-based company with pro- rean company to manufacture and deliver gas turbines, we have also prietary technology in the field of energy storage systems (ESS) control Doosan aims to continuously implement projects successfully to pro- made bold investments in the development of gas turbines and are system software, to form Doosan GridTech, through which we are now duce and replace main equipment for nuclear power plants and ex- expecting to soon perform a demonstration project on our own gas playing a leading role in stabilizing power supply in the renewable en- pand its services business, at the same time stepping up efforts to turbine model.
Recommended publications
  • Doosan Infracore
    Management Direction of Doosan September 2008 0 Disclaimer The information herein is provided for your convenience only. This document includes forward-looking statements including profit and loss estimates for 2008 and beyond. Such forward-looking statements involve both known and unknown risks, uncertainties and changes in market or other projected circumstances, which may cause actual results or performance to differ materially from stated or implied results or performance. Exchange rates and raw material prices could cause actual profits and revenue to differ materially from those stated and implied by such forward-looking statements. Please note that projections contained in this document reflect current market situations and management direction of Doosan and its affiliates, and may change or be modified in accordance with changes in market conditions and group strategy. The information is for information purposes only. We make no guarantees and assume no responsibility for the use of the information provided. Please do not base your investment decision on the information contained in this document. 1 Doosan is the 6th largest conglomerate in Korea (T KRW) Conglomerate ranking in Korea Key facts of Doosan (based on market capitalization) Ranking Market Cap Items Facts(’08 E) 1. Samsung 151.5 Revenue 23 2. LG 54.5 3. SK 39.5 EBITDA 2.4 4. Hyundai Motor Company 38.1 5. Hyundai Heavy Industries 27.5 Asset 26 6. Doosan 18.4 Total # of employees 35,300 7. Lotte 15.9 (August, ’08) 8. Kumho Asiana 11.0 9. GS 8.3 10. Hanjin 6.8 Source : `08. 7.17. Disclosure by Korea Exchange 2 Doosan is the oldest conglomerate in Korea with 112 years of history Early Market Restruct- Transition Growth Diversification Dominance uring to new biz.
    [Show full text]
  • Doosan-Annual-Brochure-2017-En.Pdf
    Table of Contents 2 CEO Message 4 About Doosan A History of Transformation An Explosive Growth Record Global Expansion that Extends Our Reach The Doosan Credo Sponsorship 16 Our Infrastructure Support Businesses 38 Holding Company and Other Affiliates 54 Corporate Social Responsibility 68 Financial Review 74 Korea/Global Network Doosan has selected “ ” as the corporate slogan, which is based on the conviction that companies must contribute to humankind and help to shape the future. All Doosan employees now embrace this slogan, and we continue to enhance our capabilities as a global company through our unique value and philosophy. Doosan is working at this very moment to provide the basics necessary for improving the quality of people’s lives. Doosan’s presence can be found in every area of the infrastructure support business, which encompasses industrial facilities, machinery, heavy equipment and construction. You are invited to watch how we are helping to shape the future for all. CEO Message Extending our sincere gratitude to our shareholders and customers for their unwavering love and support for us, we pledge to be a global company that you can be proud of. To our esteemed shareholders and customers As Korea’s first modern company with 122 years of history, Doosan has gone through many changes and significant growth over the years. Toward the end of the 1990s, however, we started to make bolder, innovative moves to completely reshape ourselves at an unprecedented rate, and have achieved remarkable growth. As a result, Doosan has established itself as a world-class infrastructure support business (ISB) provider, with about 40,000 employees in 37 countries.
    [Show full text]
  • Trade Marks Inter Partes Decision O/211/15
    O-211-15 TRADE MARKS ACT 1994 IN THE MATTER OF CONSOLIDATED PROCEEDINGS BETWEEN BABCOCK INTERNATIONAL LIMITED AND BABCOCK POWER UK LIMITED CONCERNING BABCOCK POWER UK LIMITED’S APPLICATION UNDER NO 84234 TO REVOKE REGISTRATION NO 756324 IN THE NAME OF BABCOCK INTERNATIONAL LIMITED BABCOCK POWER UK LIMITED’S APPLICATION UNDER NO 84235 TO REVOKE REGISTRATION NO 756324 IN THE NAME OF BABCOCK INTERNATIONAL LIMITED BABCOCK POWER UK LIMITED’S APPLICATION UNDER NO 84236 TO REVOKE REGISTRATION NO 1283519 IN THE NAME OF BABCOCK INTERNATIONAL LIMITED BABCOCK POWER UK LIMITED’S APPLICATION UNDER NO 84237 TO REVOKE REGISTRATION NO 1283519 IN THE NAME OF BABCOCK INTERNATIONAL LIMITED BABCOCK INTERNATIONAL LIMITED’S OPPOSITION UNDER NO 103564 TO BABCOCK POWER UK LIMITED’S APPLICATION FOR REGISTRATION UNDER NO 2601397 AND BABCOCK INTERNATIONAL LIMITED’S OPPOSITION UNDER NO 103567 TO BABCOCK POWER UK LIMITED’S APPLICATION FOR REGISTRATION UNDER NO 2601670 1. This decision concerns six sets of proceedings as follows: 1: An application under No 84232 by Babcock Power UK Ltd (“BPUK”) to revoke registration No 756324 in the name of Babcock International Ltd (“BIL”). The registration is for the mark BABCOCK, which was entered into the register on 3 August 1956 and is registered for the following goods: Class 11 Boilers (not parts of machines), reheaters being parts of steam generating installations, heat exchangers, (not parts of machines), air heating appliances, fuel economising apparatus, automatic and mechanical stokers, furnace grates, fuel burners,
    [Show full text]
  • 05-December-2012 Register of Sponsors Licensed Under the Points-Based System
    REGISTER OF SPONSORS (Tiers 2 & 5 and Sub Tiers Only) DATE: 05-December-2012 Register of Sponsors Licensed Under the Points-based System This is a list of organisations licensed to sponsor migrants under Tiers 2 & 5 of the Points-Based System. It shows the organisation's name (in alphabetical order), the tier(s) they are licensed for, and whether they are A-rated or B-rated against each sub-tier. A sponsor may be licensed under more than one tier, and may have different ratings for each tier. No. of Sponsors on Register Licensed under Tiers 2 and 5: 25,750 Organisation Name Town/City County Tier & Rating Sub Tier (aq) Limited Leeds West Yorkshire Tier 2 (A rating) Tier 2 General ?What If! Ltd London Tier 2 (A rating) Tier 2 General Tier 2 (A rating) Intra Company Transfers (ICT) @ Bangkok Cafe Newcastle upon Tyne Tyne and Wear Tier 2 (A rating) Tier 2 General @ Home Accommodation Services Ltd London Tier 2 (A rating) Tier 2 General Tier 5TW (A rating) Creative & Sporting 1 Life London Limited London Tier 2 (A rating) Tier 2 General 1 Tech LTD London Tier 2 (A rating) Tier 2 General 100% HALAL MEAT STORES LTD BIRMINGHAM West Midlands Tier 2 (A rating) Tier 2 General 1000heads Ltd London Tier 2 (A rating) Tier 2 General 1000mercis LTD London Tier 2 (A rating) Tier 2 General Tier 2 (A rating) Intra Company Transfers (ICT) 101 Thai Kitchen London Tier 2 (A rating) Tier 2 General 101010 DIGITAL LTD NEWARK Page 1 of 1632 Organisation Name Town/City County Tier & Rating Sub Tier Tier 2 (A rating) Tier 2 General 108 Medical Ltd London Tier 2 (A rating) Tier 2 General 111PIX.Com Ltd London Tier 2 (A rating) Tier 2 General 119 West st Ltd Glasgow Tier 2 (A rating) Tier 2 General 13 Artists Brighton Tier 5TW (A rating) Creative & Sporting 13 strides Middlesbrough Cleveland Tier 2 (A rating) Tier 2 General 145 Food & Leisure Northampton Northampton Tier 2 (A rating) Tier 2 General 15 Healthcare Ltd London Tier 2 (A rating) Tier 2 General 156 London Road Ltd t/as Cake R us Sheffield S.
    [Show full text]
  • Babcock Is an Engineering Services Specialist
    Aligned for growth Archie Bethel, Chief Executive Investor seminar 14 March 2017 1Babcock International – Realignment Presentation - March 2017 Disclaimer This document has been prepared by Babcock International Group PLC (the “Company”) solely for use at a presentation in connection with the Company’s Re-alignment Seminar for analysts and investors on 14 March 2017. For the purposes of this notice, the presentation that follows (the “Presentation”) shall mean and include the slides that follow, the oral presentation of the slides by the Company, the question-and-answer session that follows that oral presentation, hard copies of this document and any materials distributed at, or in connection with, that presentation. The Presentation does not constitute or form part of and should not be construed as, an offer to sell or issue, or the solicitation of an offer to buy or acquire, securities of the Company in any jurisdiction or an inducement to enter into investment activity. No part of this Presentation, nor the fact of its distribution, should form the basis of, or be relied on in connection with, any contract or commitment or investment decision whatsoever. Statements in this Presentation, including those regarding the possible or assumed future or other performance of the Company or its industry or other trend projections, as well as statements about Babcock’s or management’s beliefs or expectations, may constitute forward-looking statements. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors, many of which are beyond Babcock’s control. These risks, uncertainties and factors may cause actual results, performance or developments to differ materially from those expressed or implied by such forward-looking statements.
    [Show full text]
  • Carbon Capture Journal
    CCJ10:Layout 1 14/07/2009 10:50 Page 1 Doosan Babcock - the future of energy in the UK Sulzer - putting a chill on global warming July / August 2009 Issue 10 High rate CO2 injection into oil reservoirs for EOR and storage Cryogenic carbon capture technology Revaluing mine waste rock for carbon capture and storage Transporting CO2 by pipeline: US issues and opportunities Element Energy - new study into CO2 pipeline infrastructure CCJ10:Layout 1 14/07/2009 10:51 Page 2 www.senergyworld.com Your answer to carbon storage is here NEW CCS Training Course (1 Day) – Fee: £690 (Inc. VAT) Introduction to the Geological Storage of Carbon Dioxide Highly acclaimed course now updated to incorporate current thinking on the workflows required to appraise and qualify storage sites. Instructors: Grahame Smith (Technical Head, Carbon Storage), Dr Mark Raistrick (Geologist and MMV Specialist) Banchory (Aberdeen) Thursday 1st October, 2009 London Thursday 8th October, 2009 For full course description and details visit www.senergyworld.com/training or email [email protected] Over 400 leading geological, geophysical, reservoir engineering and well engineering consultants across more than 15 international locations, engineering the smart solutions to your carbon storage challenges. Senergy - results driven by Brainergy® Site selection, injectivity, storage capacity, reservoir integrity, flow/phase studies, storage simulation, enhanced hydrocarbon recovery, monitoring, facilities requirements, commercial services. United Kingdom Ireland Norway Russia United
    [Show full text]
  • Sponsorship Prospectus About the Summit
    May 25-26, 2021 December 8-9, 2021 Virtual | Everywhere SPONSORSHIP PROSPECTUS ABOUT THE SUMMIT The Robotics for Inspection & Maintenance Summit gathers the latest robotic/drone and data analytic technologies for safer, faster, efficient inspection and maintenance solutions. • Watch and participate in discussions focused on robotic platforms, challenges, data needs, and industry issues. • Virtually network with decision makers and influencers among asset owners, robotic OEMs, robotic inspection and maintenance service providers, and others. 5/24/2021 2 WHY MOBILE ROBOTICS? SAFETY | QUALITY | EFFICIENCY | SAVINGS Inspecting, maintaining, and repairing industrial assets and infrastructure is dangerous, challenging, and costly. Owners and operators need to increase safety, efficiencies, and profitable operations. Rapidly advancing mobile robots, UAVs, navigation systems, mapping, sensors, and end effectors provide intelligence and dexterity for performing tasks remotely or autonomously in complex environments. Mobile robotics are changing the way industrial assets and infrastructure are being inspected, repaired and maintained across industries globally. Reducing personnel exposure to hazardous work environments is a key benefit and new inspections, not previously feasible, are being developed. Robotics paired with machining learning and advanced analytics will take inspection and predictive maintenance to the next level. 5/24/2021 3 SUMMIT OVERVIEW 2-day virtual summit for 400+ attendees Created for decision makers for inspection, maintenance
    [Show full text]
  • Oil, Gas and Petrochemical Doosan Babcock Oil, Gas and Petrochemical
    Doosan Babcock Oil, gas and petrochemical Doosan Babcock Oil, gas and petrochemical Total oil, gas, petrochemical and power professionals globally: 5,000 Supported by the strong network of 40,000 professionals at the globally renowned Doosan Group Offices globally: 17 Expertise designed for you Doosan Babcock is a world leader in the delivery of engineering and asset management services to the oil, gas and petrochemical sectors. Using the latest technologies, best-in-class engineering expertise and an industry- leading project management capability, we build, maintain and maximize the life and efficiency of customer assets worldwide. Lifecycle support A powerful partner Our expertise in engineering design, manufacturing, At Doosan Babcock, our engineering pedigree is built project execution and servicing puts your asset at on more than a century of innovation in the field of the forefront of efficient operations. We harness maintenance, repair and upgrade. Backed by the 40,000 the commitment and collaborative spirit of strong, globally renowned Doosan Group, we represent almost 5,000 professionals globally to provide a powerful force in the building, maintenance and life unparalleled capabilities across the full performance of energy assets worldwide, covering oil, operational spectrum - from project design and gas, petrochemical, and thermal and nuclear power. construction, plant maintenance, asset integrity Whether you are looking for support in your day-to- and shutdown/turnaround management to plant day plant operations, an expert in asset performance life extension and upgrade. Our “cradle to grave” optimisation, or a trusted partner to take the lead on a approach allows you to realise optimum performance major construction, conversion or upgrade project, we and efficiency from your asset throughout all stages can help.
    [Show full text]
  • Demonstration of an Oxyfuel Combustion System Project Update IEAGHG International Oxy-Combustion Workshop 3Rd Workshop, 5Th –6Th March 2008, Japan
    Demonstration of an Oxyfuel Combustion System Project Update IEAGHG International Oxy-Combustion Workshop 3rd Workshop, 5th –6th March 2008, Japan E D Cameron and F D Fitzgerald Date: 6th March 2008 Department: Research & Development Doosan Babcock Energy Limited • Doosan Babcock Energy Limited is a global, multi-specialist, energy services company, operating in the thermal power, nuclear, petrochemical, oil and gas and pharmaceutical industries • Established in 1891 and headquartered in the UK, Doosan Babcock Energy Limited is a leading Original Equipment Manufacturer (OEM) of clean coal power plants and emission control technology • In December 2006, Doosan Heavy Industries and Construction acquired Mitsui Babcock Energy Limited from Mitsui Engineering and Shipbuilding • Doosan Heavy Industries & Construction forms part of the Doosan Group – one of the top 10 conglomerates in Korea - active in engineering, manufacturing and construction of power plants and industrial facilities worldwide • Listed on the Korean Stock Exchange. Largest shareholder is Doosan Corporation Page 1 Doosan Babcock Energy Limited Crawley • Headquartered in Crawley, England, with main facilities in Renfrew, Scotland, and Branch offices throughout the UK • FY 2007 annual order book £771 million (US$1500m approx) • Employees 4,500 worldwide • The only remaining UK based boiler OEM supplier • Strong local aftermarket service capability and Renfrew presence, combined with Engineer-Procure- Construct (EPC) capability • Accreditations include: - ISO9001 : 2000 (Quality) - OHSAS 18001 (Health & Safety) - ISO14001 : 1996 (Environment) • Dedicated to developing market leading technology through investment in people Page 2 Research & Development • Long tradition in R&D and technical support • 250 multi-disciplinary scientists and engineers in purpose built building (2001) • Specialised facilities and equipment • Dedicated R&D Centre established July 07 growing from 50 to 200 staff.
    [Show full text]
  • Thermal Power Doosan Babcock Thermal Power
    Doosan Babcock Thermal power Doosan Babcock Thermal power Delivering engineering excellence Doosan Babcock is a trusted partner for the delivery of reliable and efficient steam production. We bring together more than a century of experience in boiler design and construction to provide combustion technologies that maximise performance and efficiency from your plant throughout all stages of its lifecycle. Our engineering pedigree is built on more • Fuel Choices than a century of innovation in the field of We provide all types of boiler fuel new build, maintenance, repair and upgrade. conversions to help our customers Whether you are looking for support in your access lower-cost and cleaner fuels day-to-day plant operations, an expert in asset performance optimisation, or a trusted partner • Emissions reduction to take the lead on a major construction, Our technologies reduce harmful conversion or upgrade project, we can help. emissions, helping customers We rely on our specialist skills to provide comply with even the most stringent flexible power generation systems for even the environmental requirements most difficult fuels, delivering to challenging Award-winning project timescales and the highest standards of safety • Efficiency upgrades Hundreds of plant 133 years Our expertise in boiler upgrade and experience, including and quality. references in more than of pioneering retrofit extracts maximum lifetime Eraring Power Station 30 countries boiler technologies. performance from your plant. around the world. upgrade in 2013. • Asset management Our multi-specialist teams support the safe through-life management of your plant. 02 03 Doosan Babcock Thermal power In 2013, we became one Our safety approach The way we work of only 68 organisations on the Castle Peak worldwide to receive Power Station emissions the prestigious British reduction project We aspire to be a leading innovator of products and Safety Council Sword achieved 10 million services that improve the quality of life for people and of Honour.
    [Show full text]
  • CCUS 2019: Capturing the Clean Growth Opportunities Final Delegate List
    CCUS 2019: Capturing the Clean Growth Opportunities Final delegate list Name Job Title Organisation Dewi ab Iorwerth All Energy Consulting Funké Adeosun EHS Specialist UKPIA Andrea Ahern CCS Development Manager Ervia Henrik Andersen Senior Project Director Equinor Dhanush Arun Vice President Capstone Helen Atkinson Business Development Manager c-capture ltd Neil Atkinson Chief Executive Officer Institution of Gas Engineers & Managers Ernst Petter Axelsen Managing Director Technology Centre Mongstad (TCM) Jonathan Baker-Brian BEIS Oliver Barnes EIC Julian Barnett National Grid Chris Barron Business Development Manager Costain Xiaomian Baxter SSE Thermal Christopher Beauman Senior Adviser EBRD Marieke Beckmann Research Lead National Physical Laboratory Andrew Benjamin Head of Project Development National Grid Graham Bennett Vice President, Business Development DNV GL UK and West Africa Nick Bevan BEIS Stefano Bezzato Head of European Utilities Research Credit Suisse R Bhrara Head of GRA UK, Marketing and Equinor Trading Simon Bittlestone Audit Manager National Audit Office Michael Blakemore Director KBR Carys Blunt UKCCSRC Centre Manager UKCCSRC / University of Sheffield Richard Bowcutt Sales & Services Director Heatric-Meggitt Giorgia Bozzini EU Policy & Communications Officer CCSA Roger Brandwood Environmental Compliance Uniper Technologies Ltd Ian Brass Public Affairs Director - Europe Air Products PLC Barny Brennan Head of Subsurface Whalsay Energy Stuart Broadley CEO Energy Industries Council Michael Brown Climate Change HM Treasury
    [Show full text]
  • Doosan Babcock Energy
    POST COMBUSTION CAPTURE TECHNOLOGY Matthew Hunt Doosan Babcock, United Kingdom POWER-GEN Europe 2010 Amsterdam, The Netherlands, 8 – 10 June 2010 Page 0 Carbon Capture Global One Team The Doosan Organisation Development of a high performing organisation Page 1 THE DOOSAN FAMILY Doosan Heavy & Doosan Power Systems are part of the Doosan Group – the oldest and one of the most successful Corporations in Korea Doosan Group is active in Project Management, Construction, Engineering and Manufacturing of power plants, industrial facilities, desalination, engines and construction equipment Manufacturing facilities: world-leading, fully integrated power plant manufacturing facility in Changwon, Korea & Vina, Vietnam Doosan Corporation DoosanDoosan Revenue: GBP 11.2 billion [£GBP, 2009] GroupGroup Asset: GBP ≈ 19 billion Doosan Heavy Doosan Heavy DoosanDoosan Doosan DoosanDoosan DoosanDoosan IndustriesIndustries && DoosanDoosan Industrial Doosan Corporation Infracore Mecatec Industrial Engine Corporation Infracore ConstructionConstruction Mecatec DevelopmentDevelopment Engine DoosanDoosan PowerPower Doosan Heavy SystemsSystems Turnover: GBP 4.2 billion Doosan Power Systems Turnover: GBP 0.9 billion Page 2 COMMITMENT TO SAFETY Our 120 year reputation, and preferred employer status is underpinned by our World-Class safety record Doosan Babcock (2009) mobilised over 10 million man hours with only 1 Lost Time Accident We believe this world leading record is not enough and strive to achieve every working hour LTA and Error Free Customers choose Doosan
    [Show full text]