31 Bus Time Schedule & Line Route

Total Page:16

File Type:pdf, Size:1020Kb

31 Bus Time Schedule & Line Route 31 bus time schedule & line map 31 Forest Hills View In Website Mode The 31 bus line (Forest Hills) has 2 routes. For regular weekdays, their operation hours are: (1) Forest Hills: 12:10 AM - 11:55 PM (2) Mattapan: 12:08 AM - 11:53 PM Use the Moovit App to ƒnd the closest 31 bus station near you and ƒnd out when is the next 31 bus arriving. Direction: Forest Hills 31 bus Time Schedule 15 stops Forest Hills Route Timetable: VIEW LINE SCHEDULE Sunday 12:19 AM - 11:30 PM Monday 12:10 AM - 11:55 PM Mattapan Gillespies Lane, Boston Tuesday 12:10 AM - 11:55 PM 1624 Blue Hill Ave @ Mattapan Sq Wednesday 12:10 AM - 11:55 PM 1618 Blue Hill Avenue, Boston Thursday 12:10 AM - 11:55 PM Blue Hill Ave @ Babson St Friday 12:10 AM - 11:55 PM 1556 Blue Hill Avenue, Boston Saturday 12:10 AM - 11:55 PM Blue Hill Ave Opp Woodhaven St Woodhaven Street, Boston 1458 Blue Hill Ave Opp Almont St 1438 Blue Hill Avenue, Boston 31 bus Info Direction: Forest Hills Blue Hill Ave @ Mattapan Library Stops: 15 1366 Blue Hill Avenue, Boston Trip Duration: 14 min Line Summary: Mattapan, 1624 Blue Hill Ave @ Blue Hill Ave @ Fessenden St Mattapan Sq, Blue Hill Ave @ Babson St, Blue Hill Ave 1294 Blue Hill Avenue, Boston Opp Woodhaven St, 1458 Blue Hill Ave Opp Almont St, Blue Hill Ave @ Mattapan Library, Blue Hill Ave @ Blue Hill Ave @ Woolson St Fessenden St, Blue Hill Ave @ Woolson St, Morton St 1224 Blue Hill Avenue, Boston Opp Greendale Rd, Morton St @ Harvard St, Morton St @ Canterbury St, Morton St @ Shattuck Hospital, Morton St Opp Greendale Rd Morton St @ Circuit Dr, Arborway Opp Courthouse, 676 Morton Street, Boston Forest Hills Morton St @ Harvard St 616 Morton Street, Boston Morton St @ Canterbury St Canterbury Street, Boston Morton St @ Shattuck Hospital Morton St @ Circuit Dr Forest Hills Entrance Drive, Boston Arborway Opp Courthouse Arborway, Boston Forest Hills 11 Morton Street, Boston Direction: Mattapan 31 bus Time Schedule 17 stops Mattapan Route Timetable: VIEW LINE SCHEDULE Sunday 12:00 AM - 11:45 PM Monday 12:25 AM - 11:53 PM Forest Hills 11 Morton Street, Boston Tuesday 12:08 AM - 11:53 PM Arborway @ Courthouse Wednesday 12:08 AM - 11:53 PM Arborway, Boston Thursday 12:08 AM - 11:53 PM Morton St @ Arborway Friday 12:08 AM - 11:53 PM Morton St Opp Shattuck Hospital Saturday 12:08 AM - 11:35 PM Morton St @ Canterbury St Morton St @ Harvard St 591 Morton Street, Boston 31 bus Info Direction: Mattapan Morton St @ Greendale Rd Stops: 17 655 Morton Street, Boston Trip Duration: 15 min Line Summary: Forest Hills, Arborway @ Blue Hill Ave @ Morton St Courthouse, Morton St @ Arborway, Morton St Opp Morton Street, Boston Shattuck Hospital, Morton St @ Canterbury St, Morton St @ Harvard St, Morton St @ Greendale Rd, Blue Hill Ave @ Goodale Rd Blue Hill Ave @ Morton St, Blue Hill Ave @ Goodale 1257 Blue Hill Avenue, Boston Rd, Blue Hill Ave @ Wellington Hill St, Blue Hill Ave @ Mattapan St, Blue Hill Ave @ Almont St, Blue Hill Ave Blue Hill Ave @ Wellington Hill St @ Woodhaven St, Blue Hill Ave Opp Babson St, Blue 8 Wellington Hill Street, Boston Hill Ave @ Mattapan Sq, Blue Hills Pkwy @ River St, Mattapan Blue Hill Ave @ Mattapan St 1387 Blue Hill Avenue, Boston Blue Hill Ave @ Almont St 1461 Blue Hill Avenue, Boston Blue Hill Ave @ Woodhaven St 1505 Blue Hill Avenue, Boston Blue Hill Ave Opp Babson St 1575 Blue Hill Avenue, Boston Blue Hill Ave @ Mattapan Sq 1617-1619 Blue Hill Avenue, Boston Blue Hills Pkwy @ River St 14 Blue Hills Parkway, Milton Mattapan Gillespies Lane, Boston 31 bus time schedules and route maps are available in an o«ine PDF at moovitapp.com. Use the Moovit App to see live bus times, train schedule or subway schedule, and step-by-step directions for all public transit in Boston. Check Live Arrival Times About Moovit MaaS Solutions Supported Countries Mooviter Community © 2021 Moovit - All Rights Reserved.
Recommended publications
  • Archives I A-6 BPC Arnold Arboretum and Boston Parks Commission Partnership Records, 1882
    Archives I A-6 BPC Arnold Arboretum and Boston Parks Commission partnership records, 1882 - : Guide. The Arnold Arboretum of Harvard University © 2011 President and Fellows of Harvard College I A-6 BPC Arnold Arboretum and Boston Parks Commission partnership records, 1882 - : Guide Archives of the Arnold Arboretum of Harvard University 125 Arborway, Jamaica Plain, Massachusetts © 2012 President and Fellows of Harvard College Descriptive Summary Repository: Arnold Arboretum, Jamaica Plain, MA 02130 Call No.: I A-6 BPC Location: Archives Title: Arnold Arboretum and Boston Parks Commission partnership records, 1882- Dates: 1882- Creator(s): Arnold Arboretum; Boston Parks Commission Quantity: 4 linear inches Language of material: English Abstract: The Arnold Arboretum and Boston Parks Commission partnership records focus on the relations between the Arboretum and the city of Boston in administrating their shared responsibilities in the care and maintenance of the Arboretum. The bulk of the materials consist of correspondence from the office of the Director of the Arboretum to the Chairman of the Parks Commission. Note: Access to Finding Aid record in Hollis Classic or Hollis. Preferred Citation: Arnold Arboretum and Boston Parks Commission partnership records, 1882- . Archives of the Arnold Arboretum of Harvard University. Additional material: Sargent correspondence with the Boston Parks Department or the Chair’s designees may be found by searching the Arnold Arboretum Correspondence Database and the papers of the Arboretum’s subsequent directors: Oakes Ames (Supervisor) 1927-1935, Archives I B EDM Elmer Drew Merrill (1876- 1956) papers, 1920-1956 Karl Sax 1946-1954, Richard A. Howard, 1954-1978, Peter S. Ashton 1978-1987, Robert E.
    [Show full text]
  • District Journal for Jun 29, 2021 - Jun 30, 2021, District: ALL
    District Journal for Jun 29, 2021 - Jun 30, 2021, District: ALL Date: Reported Record Count: 212 Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:21:24 AM 212044094-00 6/28/2021 11:18:00 PM 055238 BRIAN DELAHANTY Location of Occurrence 38 WARREN ST Nature of Incident ASSAULT - AGGRAVATED Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:38:36 AM 212044098-00 6/28/2021 11:26:00 PM 132064 SEAN L. O'BRIEN Location of Occurrence 162 MAGNOLIA ST Nature of Incident ASSAULT - SIMPLE Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:45:15 AM 212044097-00 6/28/2021 11:39:00 PM 056354 KEVIN DONAHUE Location of Occurrence 51 THOMAS PARK Nature of Incident THREATS TO DO BODILY HARM Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:59:35 AM 212044102-00 6/29/2021 12:25:00 AM 144304 ADILSON ROSA Location of Occurrence 412 POPLAR ST Nature of Incident INVESTIGATE PERSON Report Date & Time Complaint # Occurrence Date & Time Officer 6/30/2021 3:02:32 PM Boston Police Department 6/29/2021 1:59:26 AM 212044107-00 6/29/2021 1:41:00 AM 140305 JASON HESSLER Location of Occurrence 1850 SOLDIERS FIELD RD Nature of Incident ASSAULT - SIMPLE Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 2:21:29 AM 212044108-00 6/29/2021 12:58:00 AM 103536 NORMAN TEXERIA Location of Occurrence 120 CRAWFORD ST Nature of Incident VAL - OPERATING AFTER REV/SUSP.
    [Show full text]
  • Charles W. Bradley III, AIA, NCARB Charles W
    the ARCH Resume Professional Group inc. architecture & planning Charles W. Bradley III, AIA, NCARB Charles W. Bradley III, aia PrincipalPrincipal Education Professional Experience Office: 260Massachusetts Blue Hills Parkway Institute of Technology Mr. Bradley is President and founder of The Arch Professional Milton,Cambridge, MA 02186 Massachusetts Group, Inc. (APG). The Firm’s past and present body of M.S. Architectural Studies. 1983 work includes Residential, Commercial, Educational, and c:Rensselaer617.538.1515 Polytechnic Institute Institutional projects with construction budgets ranging from f:Troy,617.296.3633 New York $300,000 to $1.5 Million. M.S. Environmental Studies. 1981 Bachelor of Architecture. 1981 Project Experience: Bachelor of Science in Building Sciences. 1980 [email protected] Historic Restoration / Adaptive Re-use Architectural Registration • 234 Berkeley Street, Boston, MA Massachusetts – License No. 9499 - Senior Designer/Draftsperson for the $2.8 Million renovation North Carolina – License No. 10300 to the old Bonwit Teller Building into new retail space for Georgia – License No. RA012393 Louis Boston. NCARB-National Council of Architectural Registration Boards - Certificate No. 49337 Renovation • Department of Veterans’ Affairs Headquarters, Washington, Certifications DC Minority Owned Business Enterprise (MBE) - Project Architect - Construction Administration - Massachusetts Supplier Diversity Office (SDO) • 745 Boylston Street, Boston, MA - Junior Designer/Technical Staff for the renovation for Disadvantaged Business Enterprise (DBE) office/retail use. - Massachusetts Supplier Diversity Office (SDO) • 40 Summer Street, Boston, MA Academic - Junior Designer/Technical Staff for the renovation for office/retail use. • Wentworth Institute of Technology - Part-time Instructor (1992-1993 academic year) Institutional / Office • M.I.T. - Research Affiliate [1992-1993]; Visiting Scholar [1991- 1992]; Teaching Assistant [1982] • Morning Star Baptist Church, Mattapan, MA • R.P.I.
    [Show full text]
  • Arborway Yard Concepts
    Arborway Yard Bianca Rabbie, Zeina Alkhaja, and Nathalia Galindo • Community services and amenities (grocery stores, pharmacy, childcare facilities, hardware shop, restaurants) • Need for: affordable housing, youth recreation, retail, light industrial, the Emerald Necklace Re-Connector and mixed-use development. • “for continuous pedestrian arcade. ... landscaped plaza areas and opportunities for outdoor seating.” Community • more connected mobility network for pedestrians and cyclist • Develop supportive housing units to accommodate Boston’s growing population of individuals facing severe mental illness, substance use Needs disorders, and homelessness • environmental justice • Assess the status of site contamination and develop the program for soil remediation. • Improve landscaping and access points to Franklin Park for pedestrian access. • 70% of respondents said that “wetlands’’ and “waterbodies” were the most popular park features used by residents • increase water-based recreation • Design a more modern bus parking, with efficient use of space • Provide community services and amenities (aiming to provide the "15 min city") • Pharmacy • Grocery store • Hardware Shop • Childcare facilities • Restaurants • Stormwater management strategies • Constructed Wetlands • Increase green space • Pervious surfaces • Provide more outdoor space • Seating area • Recreational space for children • Green connector-extension of Frankling Park • Increase tree canopy (Jamaica Plain and Roxbury both experienced a significant net loss of tree canopy in the last decade) / Housing for the formally Homeless MBTA 2 Stories Residential ~280,000 sf 6 Stories Residential Residential 4 Stories Housing for ~ 700,000 sf the Formally 5 Stories Homeless/ Health Clinic 5 Stories Housing for Residential ~5000,000 sf the Formally Units Homeless/ Health Clinic 3 Stories 3 Stories ~70,000 sf Landscaping Ideas? • Use of permeable floor surfaces.
    [Show full text]
  • SCANNED Firstsearch Technology Corporation
    SCANNED FirstSearch Technology Corporation Environmental FirstSearch Report TARGET PROPERTY: 3607 WASHINGTON ST BOSTON MA 02130 Job Number: 95-E-017 PREPARED FOR: Web Engineering Associates, Inc. 104 Longwater Drive Norwell, MA 02061 11-04-05 FIRSTS Tel: (781) 551-0470 Fax: (781) 551-0471 Environmental FirstSearch is a registered trademark of FirstSearch Technology Corporation. All rights reserved. EnvironmentalFirstSearch Search Summary Report Target Site: 3607 WASHINGTON ST BOSTON MA 02130 FirstSearch Summary Database Sel Updated Radius Site 1/8 1/4 1/2 1/2> ZIP TOTALS NPL Y 05-17-05 1.00 0 0 0 0 0 0 0 CERCLIS Y 08-01-05 0.50 0 0 0 0 - 0 0 NFRAP Y 08-01-05 0.25 0 0 0 - - 1 1 RCRA TSD Y 09-22-05 0.50 0 0 0 0 - 0 0 RCRA COR Y 09-22-05 1.00 0 0 0 0 0 0 0 RCRA GEN Y 06-13-05 0.25 0 1 1 - - 3 5 ERNS Y 12-31-04 0.25 0 0 1 - - 47 48 State Sites Y 09-16-05 1.00 0 1 / 4 7 22 11 45 Spills-1990 Y 09-16-05 0.50 0 2/ 8 27 - 63 100 Spills-1980 Y 03-10-98 0.15 0 3 0 - - 76 79 SWL Y 04-06-05 0.50 0 0 0 0 - 5 5 REG UST/AST Y 05-27-05 0.25 0 1 6 - - 0 7 Leaking UST Y 09-16-05 0.50 0 1 " 4 5 - 3 13 State Wells Y 06-08-05 0.50 0 0 0 0 - 0 0 Aquifers Y 06-15-04 0.50 0 0 0 0 - 0 0 ACEC Y 05-16-05 0.50 1 0 4 7 - 0 12 Floodplains Y 05-13-98 0.50 0 0 0 4 - 0 4 Releases(Air/Water) Y 12-31-04 0.25 0 0 0 - - 124 124 Soils Y 09-26-03 0.25 3 3 9 - - 0 15 - TOTALS - 4 12 37 50 22 333 458 Notice of Disclaimer Due to the limitations, constraints, inaccuracies and incompleteness of government information and computer mapping data currently available to FirstSearch Technology Corp., certain conventions have been utilized in preparing the locations of all federal, state and local agency sites residing in FirstSearch Technology Corp.'s databases.
    [Show full text]
  • Changes to Transit Service in the MBTA District 1964-Present
    Changes to Transit Service in the MBTA district 1964-2021 By Jonathan Belcher with thanks to Richard Barber and Thomas J. Humphrey Compilation of this data would not have been possible without the information and input provided by Mr. Barber and Mr. Humphrey. Sources of data used in compiling this information include public timetables, maps, newspaper articles, MBTA press releases, Department of Public Utilities records, and MBTA records. Thanks also to Tadd Anderson, Charles Bahne, Alan Castaline, George Chiasson, Bradley Clarke, Robert Hussey, Scott Moore, Edward Ramsdell, George Sanborn, David Sindel, James Teed, and George Zeiba for additional comments and information. Thomas J. Humphrey’s original 1974 research on the origin and development of the MBTA bus network is now available here and has been updated through August 2020: http://www.transithistory.org/roster/MBTABUSDEV.pdf August 29, 2021 Version Discussion of changes is broken down into seven sections: 1) MBTA bus routes inherited from the MTA 2) MBTA bus routes inherited from the Eastern Mass. St. Ry. Co. Norwood Area Quincy Area Lynn Area Melrose Area Lowell Area Lawrence Area Brockton Area 3) MBTA bus routes inherited from the Middlesex and Boston St. Ry. Co 4) MBTA bus routes inherited from Service Bus Lines and Brush Hill Transportation 5) MBTA bus routes initiated by the MBTA 1964-present ROLLSIGN 3 5b) Silver Line bus rapid transit service 6) Private carrier transit and commuter bus routes within or to the MBTA district 7) The Suburban Transportation (mini-bus) Program 8) Rail routes 4 ROLLSIGN Changes in MBTA Bus Routes 1964-present Section 1) MBTA bus routes inherited from the MTA The Massachusetts Bay Transportation Authority (MBTA) succeeded the Metropolitan Transit Authority (MTA) on August 3, 1964.
    [Show full text]
  • Annual Report of the Metropolitan District Commission
    Public Document No. 48 W$t Commontoealtfj of iWa&sacfmsfetta ANNUAL REPORT OF THE Metropolitan District Commission For the Year 1935 Publication or this Document Approved by the Commission on Administration and Finance lm-5-36. No. 7789 CONTENTS PAGE I. Organization and Administration . Commission, Officers and Employees . II. General Financial Statement .... III. Parks Division—Construction Wellington Bridge Nonantum Road Chickatawbut Road Havey Beach and Bathhouse Garage Nahant Beach Playground .... Reconstruction of Parkways and Boulevards Bridge Repairs Ice Breaking in Charles River Lower Basin Traffic Control Signals IV. Maintenance of Parks and Reservations Revere Beach Division .... Middlesex Fells Division Charles River Lower Basin Division . Bunker Hill Monument .... Charles River Upper Division Riverside Recreation Grounds . Blue Hills Division Nantasket Beach Reservation Miscellaneous Bath Houses Band Concerts Civilian Conservation Corps Federal Emergency Relief Activities . Public Works Administration Cooperation with the Municipalities . Snow Removal V. Special Investigations VI. Police Department VII. Metropolitan Water District and Works Construction Northern High Service Pipe Lines . Reinforcement of Low Service Pipe Lines Improvements for Belmont, Watertown and Arlington Maintenance Precipitation and Yield of Watersheds Storage Reservoirs .... Wachusett Reservoir . Sudbury Reservoir Framingham Reservoir, No. 3 Ashland, Hopkinton and Whitehall Reservoirs and South Sud- bury Pipe Lines and Pumping Station Framingham Reservoirs Nos. 1 and 2 and Farm Pond Lake Cochituate . Aqueducts Protection of the Water Supply Clinton Sewage Disposal Works Forestry Hydroelectric Service Wachusett Station . Sudbury Station Distribution Pumping Station Distribution Reservoirs . Distribution Pipe Lines . T) 11 P.D. 48 PAGE Consumption of Water . 30 Water from Metropolitan Water Works Sources used Outside of the Metropolitan Water District VIII.
    [Show full text]
  • Report of the Board of Metropolitan Park Commissioners (1898)
    A Digitized by the Internet Archive in 2013 http://archive.org/details/reportofboardofm00mass_4 PUBLIC DOCUMENT No. 48. REPORT ~ Board of Metropolitan Park Commissioners. J^ANUARY, 1899. BOSTON : W RIGHT & POTTER PRINTING CO., STATE PRINTERS, 18 Post Office Square. 1899. A CONTENTS. PAGE Report of the Commissioners, 5 Report of the Secretary, 18 Report of the Landscape Architects, 47 Report of the Engineer, 64 Financial Statement, . 86 Analysis of Payments, 99 Claims (chapter 366 of the Acts of 1898), 118 KEPOKT. The Metropolitan Park Commission presents herewith its sixth annual report. At the presentation of its last report the Board was preparing to continue the acquirement of the banks of Charles River, and was engaged in the investigation of avail- able shore frontages and of certain proposed boulevards. Towards the close of its last session the Legislature made an appropriation of $1,000,000 as an addition to the Metropolitan Parks Loan, but further takings were de- layed until the uncertainties of war were clearly passed. Acquirements of land and restrictions have been made or provided for however along Charles River as far as Hemlock Gorge, so that the banks for 19 miles, except where occu- pied by great manufacturing concerns, are in the control either of this Board or of some other public or quasi public body. A noble gift of about 700 acres of woods and beau- tiful intervales south of Blue Hills and almost surroundingr Ponkapog Pond has been accepted under the will of the late ' Henry L. Pierce. A field in Cambridge at the rear of « Elm- wood," bought as a memorial to James Russell Lowell, has been transferred to the care of this Board, one-third of the purchase price having been paid by the Commonwealth and the remaining two-thirds by popular subscription, and will be available if desired as part of a parkway from Charles River to Fresh Pond.
    [Show full text]
  • National Register of Historic Places Weekly Lists for 2003
    National Register of Historic Places 2003 Weekly Lists January 3, 2003 ............................................................................................................................................. 3 January 10, 2003 ........................................................................................................................................... 7 January 17, 2003 ......................................................................................................................................... 11 January 24, 2003 ......................................................................................................................................... 14 January 31, 2003 ......................................................................................................................................... 16 February 7, 2003 ......................................................................................................................................... 18 February 14, 2003 ....................................................................................................................................... 19 February 21, 2003 ....................................................................................................................................... 22 February 28, 2003 ....................................................................................................................................... 24 March 7, 2003 ............................................................................................................................................
    [Show full text]
  • Massachusetts Asian Longhorned Beetle Cooperative Eradication Program List of Businesses Under Compliance Agreement in BOSTON/BROOKLINE As Of: September 2010
    Massachusetts Asian Longhorned Beetle Cooperative Eradication Program List of Businesses Under Compliance Agreement in BOSTON/BROOKLINE as of: September 2010 Comp Establishment Contact Agrmnt Physical Address Mailing Address Telephone Name Name # PO Box 2689, A 1 Tree & 170 * Framingham, MA Tony Morais 508-626-0088 Landscaping Inc. 01703 26 Thayer Rd. Waltham, 26 Thayer Rd. Eileen 83 A Yard and a Half 781-788-8855 MA 02453 Waltham, MA 02453 Michaels 18 Ramelegh Road, 18 Ramelegh Road, Christopher 160 ACRT Contracting 774-242-2841 Brighton, MA 02135 Brighton, MA 02135 Gonzalez 259 Allandale Road, 259 Allandale Road, 173 Allandale Farm John Lee 617-524-1531 Brookline, MA 02467 Brookline, MA 02467 Allscape Tree & Turf 21 Fuller way Plymouth, 21 Fuller Way Craig 145 508-746-4407 Service Inc. MA 02360 Plymouth, MA 02360 Hillman American Quality 60 State Street, Suite 60 State Street, Suite 112 Dan Fallon 617-799-4837 Property Service 700, Boston, MA 700, Boston, MA Antonio Mercceri 38 Cherry Place, 38 Cherry Place, 172 Justin Forte 617-212-0995 Landscape Newton, MA 02456 Newton, MA 02456 450 American Legion 38 Turnpike Rd., Franco 781-697-0525, 10 Apple D'or Tree, Inc. Highway, Mattapan, MA Southboro, MA 01772 Nicoberg 508-229-2440 76 Wenham St., Arborway Tree Care 76 Wenham St., Jamaica Steven 78 Jamaica Plain, MA 617-522-6071 Inc. Plain, MA 02130 Burns 02130 Arcuri Landscape & 227 Derby St. Newton 227 Derby St. Newton 617-965-5654, 156 Vinnie Arcuri Construction MA 02465 MA 02465 617-839-4211 125 Arborway 125 Arborway Jamaica Stephen 2 Arnold Arboretum Jamaica Plain, MA 617-839-4659 Plain, MA 02130 Schneider 02130 15 Gay St., Westwood, 15 Gay St., Michael 7 Bark Busters 617-212-1158 MA 02090 Westwood, MA 02090 DuBreuil Barrett Tree Service 11 King St., Somerville, P.O.
    [Show full text]
  • Department of Conservation & Recreation, Boston, MA | 2014
    Department of Conservation and Recreation dC r NPDES Storm Water Management Program Permit Year 11 Annual Report Municipality/Organization: Department of Conservation and Recreation EPA NPDES Permit Number: MARO43001 MaDEP Transmittal Number: Annual Report Number & Reporting Period: No. 11: April 2013— March 2014 Department of Conservation and Recreation NPDES P11 Small MS4 General Permit Annual Report ) Part I. General Information Contact Person: Robert Lowell Title: Environmental Section Chief Telephone #: (617) 626-1340 Email: [email protected] Certification: I certify under penalty of law that this document and all attachments were prepared under my direction olsupervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on myinquiry of the person or persons who manage the system, or those persons directly responsible for gathing the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant pealties for submitting false information, includin the possibility of fine and imprisonment r knowing violations. Signature: Printed Name: John P. Murray Title: Commissioner Date: 30 2o ‘— 5/1/2014 Pa2e2 Department of Conservation and Recreation (DCR) NPDES Storm Water Management Program Permit Year 11 Annual Report For Coverage Under National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Small Municipal Separate Storm Sewer Systems (MS4s) Department of Conservation and Recreation 251 Causeway Street Suite 600 Boston, MA 02114-2104 Submittal: May 1, 2014 5/1/2014 Department of Conservation and Recreation NPDES Storm Water Management Program Permit Year 11 Annual Report Municipality/Organization: Department of Conservation and Recreation EPA NPDES Permit Number: MAR043001 MaDEP Transmittal Number: Annual Report Number & Reporting Period: No.
    [Show full text]
  • Roxbury 9-29-14
    THOMPSON B2-1 CONGLOMERATE IN AND AROUND THE BOSTON, BASIN, MASSACHUSETTS: U-PB GEOCHRONOLOGY, STRATIGRAPHY AND AVALONIAN TECTONIC SETTING by Margaret D. Thompson, Department of Geosciences, Wellesley College, Wellesley, MA [email protected] INTRODUCTION The bedrock geology of the Boston Basin presents numerous difficulties. The lack of outcrops in some areas impedes definitive conclusions on the stratigraphy and structure… The scarcity of fossils prevents their use in correlation. Moreover, many of the major rock units cannot be dated with any precision. — Marland P. Billings (1976) So begins Billings’ enduring synthesis of Boston Basin geology. At that time, Dedham Granite unconformably overlain by fossiliferous Cambrian strata was clearly known to be Precambrian (Billings, 1929; Dowse, 1950), but stratified units within and around the Basin still appeared as Mississippian (?) and Pennsylvanian (?). Microfossils (Vendian of Lenk et al., 1982) found in the Cambridge Argillite portion of the Boston Bay Group (LaForge, 1932) together with results of pioneering U-Pb geochronology by Robert Zartman and colleagues (Kaye and Zartman, 1980; Zartman and Naylor, 1984; Hermes and Zartman, 1985) soon provided evidence for more widespread Precambrian age. Thirty years later, many additional U-Pb results now establish latest Precambrian—specifically Ediacaran—ages for plutonic and volcanic rocks here and across southeastern New England (Table 1). Dates based on other chronometers (especially K-Ar and Rb-Sr) can be found in Zartman and Marvin (1991), but these are no longer useful for stratigraphic or tectonic interpretation because they have rarely been confirmed by subsequent U- Pb analyses from the same rocks. Even U-Pb dates obtained earlier than about 1985 (first column of Table 1) are best avoided because then available techniques could not overcome problems of Pb loss and inheritance in samples numbering many hundreds of zircons (further discussion in Thompson et al., 2010).
    [Show full text]