Riding the Red Line

Total Page:16

File Type:pdf, Size:1020Kb

Riding the Red Line Riding the Red Line A As the Red Line is a service that is brand MERIDIAN 96th new to our riders and our bus operators, 91st we expect there may be delays and local route 90 occasional challenges for the first few weeks. Please be patient as everyone TRANSFER TO works to get comfortable with the system ROUTE 90 and ensure that everything is working together properly. B 66th St. Trips north and south of the 13-mile Red 18 Broad Ripple Line corridor will be served by IndyGo COLLEGE local service. These routes will be called Route 90 and will offer free transfers at Kessler 66th and College and at the University of Indianapolis. The Red Line rapid portion 54th St. of the route is expected to operate 19 52nd St. approximately every 10-15 minutes. 19 46th St. If your trip starts or ends on College 42nd St. Avenue between 66th and 96th streets, Meridian/38th Park 38 28 18 C 38th IndyGo will serve riders with Route 90 via 4 19 38 39 a transfer at the 66th and College Red Line 34th St. station. Riders will board local service on MERIDIAN the northeast corner of 66th and College, 30th/Museum 30 Time Point Connecting Route Fall Creek/Ivy Tech and this service will arrive every 30 Local Route 90: 30 min. frequency Local Route 90: 20 min. frequency minutes for the local on weekdays and 30 22nd St. on weekends. Rapid Transit IU Health 18 28 18th St. 14th St. 18 25 28 If your trip starts or ends on Madison or CAPITOL Shelby between University of Indianapolis 9th St. 18 25 28 and Greenwood Park Mall, IndyGo will Vermont 18 25 28 serve riders with Route 90 via a transfer D Statehouse 8 18 24 at the University of Indianapolis Red Line 25 28 Transit Center 12 13 14 New Jersey station. Riders will board on the east side VIRGINIA of Shelby Street northbound at the station 14 Fletcher Pl. crosswalk, and this service will arrive 14 Fountain Sq. every 20 minutes during the week and 40 minutes on weekends. 12 Pleasant Run 13 Raymond The Red Line and local extensions on SHELBY College Avenue, Shelby Street, and Garfield Park Madison Avenue will be free for the month 16 Troy of September. Within the coming months, IndyGo E University anticipates providing riders with a no- transfer, seamless trip north and south of Red Line stations along Route 90 using TRANSFER TO MADISON F local route 90 Red Line buses. Additional schedules and ROUTE 90 information will be provided. 31 G County Line Road weekday: weekday: weekday: weekday: University to county line road 96th to 66th 66th to 96th county line road to university 96th/College #52500 College/66th #52024 College/66th #52024 96th/College #52500 A B A B 515a 530a 535a 544a 545a 600a University of Indianapolis of University #70052 Madison/Greenwood #52930 Greenwood Park Mall Park Greenwood #52953 University of Indianapolis of University #70052 Madison/Greenwood #53006 Greenwood Park Mall Park Greenwood #52953 605a 614a 615a 630a F E G 635a 644a F E G 645a 700a 705a 714a 715a 730a 501a 508a 518a 735a 744a 445a 453a 500a 745a 800a 521a 528a 538a 805a 814a 505a 513a 520a 815a 830a 541a 548a 558a 835a 844a 525a 533a 540a 845a 900a 601a 608a 618a 905a 914a 545a 553a 600a 915a 930a 621a 628a 638a 935a 944a 605a 613a 620a 945a 1000a 641a 648a 658a 1005a 1014a 625a 633a 640a 1015a 1030a 701a 708a 718a 1035a 1044a 645a 653a 700a 1045a 1100a 721a 728a 738a 1105a 1114a 705a 713a 720a 1115a 1130a 741a 748a 758a 1135a 1144a 725a 733a 740a 1145a 1200p 801a 808a 818a 1205p 1214p 745a 753a 800a 1215p 1230p 821a 828a 838a 1235p 1244p 805a 813a 820a 1245p 100p 841a 848a 858a 105p 114p 825a 833a 840a 115p 130p 135p 144p from 9:00 am to 5:00 pm 845a 853a 900a 145p 200p 205p 214p 215p 230p from 9:00 am to 7:00 pm 235p 244p :01 :08 :19 245p 300p 305p 314p :21 :28 :39 315p 330p :06 :13 :00 335p 344p :41 :48 :59 345p 400p :26 :33 :20 405p 414p 415p 430p :46 :53 :40 435p 444p 601p 608p 618p 445p 500p 505p 514p 621p 628p 638p 706p 713p 720p 515p 530p 535p 544p 641p 648p 658p 726p 733p 740p 545p 600p 605p 614p 701p 708p 718p 746p 753p 800p 615p 630p 635p 644p 721p 728p 738p 806p 813p 820p 645p 700p 705p 714p 741p 748p 758p 826p 833p 840p 715p 730p 735p 744p 801p 808p 818p 846p 853p 900p 745p 800p 805p 814p 821p 828p 838p 906p 913p 920p 815p 830p 835p 844p 841p 848p 858p 926p 933p 940p 845p 900p 905p 914p 901p 908p 918p 946p 953p 1000p 915p 930p 935p 944p 921p 928p 938p 1006p 1013p 1020p 945p 1000p 1005p 1014p 941p 948p 958p 1026p 1033p 1040p 1015p 1030p 1035p 1044p 1001p 1008p 1018p 1046p 1053p 1100p 1045p 1100p 1105p 1114p 1021p 1028p 1038p 1106p 1113p 1120p 1115p 1130p 1135p 1144p 1041p 1048p 1058p 1126p 1133p 1140p 1145p 1200a 1205a 1214a 1101p 1108p 1118p 1146p 1153p 1200a 1215a 1230a 1121p 1128p 1138p 1235a 1244a 1141p 1148p 1158p 1201a 1208a 1218a saturday: saturday: saturday: saturday: University to county line road 96th to 66th 66th to 96th county line road to university 96th/College #52500 College/66th #52024 College/66th #52024 96th/College #52500 A B A B 632a 641a 642a 657a 702a 711a 712a 727a University of Indianapolis of University #70052 Madison/Greenwood #53006 Greenwood Park Mall Park Greenwood #52953 University of Indianapolis of University #70052 Madison/Greenwood #52930 Greenwood Park Mall Park Greenwood #52953 732a 741a 742a 757a F E F E G G 802a 811a 812a 827a 832a 841a 842a 857a 612a 619a 629a 556a 605a 611a 902a 911a 912a 927a 652a 659a 709a 636a 645a 651a 932a 941a 942a 957a 732a 739a 749a 716a 725a 731a 1002a 1011a 1012a 1027a 812a 819a 829a 756a 805a 811a 1032a 1041a 1042a 1057a 852a 859a 909a 836a 845a 851a 1102a 1111a 1112a 1127a 932a 939a 949a 916a 925a 931a 1132a 1141a 1142a 1157a 1012a 1019a 1029a 956a 1005a 1011a 1202p 1211p 1212p 1227p 1052a 1059a 1109a 1036a 1045a 1051a 1232p 1241p 1242p 1257p 1132a 1139a 1149a 1116a 1125a 1131a 102p 111p 112p 127p 1212p 1219p 1229p 1156a 1205p 1211p 132p 141p 142p 157p 1252p 1259p 109p 1236p 1245p 1251p 202p 211p 212p 227p 132p 139p 149p 116p 125p 131p 232p 241p 242p 257p 212p 219p 229p 156p 205p 211p 302p 311p 312p 327p 252p 259p 309p 236p 245p 251p 332p 341p 342p 357p 332p 339p 349p 316p 325p 331p 402p 411p 412p 427p 412p 419p 429p 356p 405p 411p 432p 441p 442p 457p 452p 459p 509p 436p 445p 451p 502p 511p 512p 527p 532p 539p 549p 516p 525p 531p 532p 541p 542p 557p 612p 619p 629p 556p 605p 611p 602p 611p 612p 627p 652p 659p 709p 636p 645p 651p 632p 641p 642p 657p 732p 739p 749p 716p 725p 731p 702p 711p 712p 727p 812p 819p 829p 756p 805p 811p 732p 741p 742p 757p 852p 859p 909p 836p 845p 851p 802p 811p 812p 827p 932p 939p 949p 916p 925p 931p 832p 841p 842p 857p 1012p 1019p 1029p 956p 1005p 1011p 902p 911p 912p 927p 1052p 1059p 1109p 1036p 1045p 1051p 932p 941p 942p 957p 1132p 1139p 1149p 1116p 1125p 1131p 1002p 1011p 1012p 1027p 1212a 1219a 1229a 1156p 1205a 1211a 1032p 1041p 1042p 1057p 1102p 1111p 1112p 1127p 1132p 1141p 1142p 1157p sunday: sunday: sunday: sunday: University to county line road 96th to 66th 66th to 96th county line road to university 96th/College #52500 College/66th #52024 College/66th #52024 96th/College #52500 A B A B 752a 801a 802a 817a 822a 831a 832a 847a University of Indianapolis of University #70052 Madison/Greenwood #53006 Greenwood Park Mall Park Greenwood #52953 University of Indianapolis of University #70052 Madison/Greenwood #52930 Greenwood Park Mall Park Greenwood #52953 852a 901a 902a 917a F E F E G G 922a 931a 932a 947a 732a 739a 749a 716a 725a 731a 952a 1001a 1002a 1017a 812a 819a 829a 756a 805a 811a 1022a 1031a 1032a 1047a 852a 859a 909a 836a 845a 851a 1052a 1101a 1102a 1117a 932a 939a 949a 916a 925a 931a 1122a 1131a 1132a 1147a 1012a 1019a 1029a 956a 1005a 1011a 1152a 1201p 1202p 1217p 1052a 1059a 1109a 1036a 1045a 1051a 1222p 1231p 1232p 1247p 1132a 1139a 1149a 1116a 1125a 1131a 1252p 101p 102p 117p 1212p 1219p 1229p 1156a 1205p 1211p 122p 131p 132p 147p 1252p 1259p 109p 1236p 1245p 1251p 152p 201p 202p 217p 132p 139p 149p 116p 125p 131p 222p 231p 232p 247p 212p 219p 229p 156p 205p 211p 252p 301p 302p 317p 252p 259p 309p 236p 245p 251p 322p 331p 332p 347p 332p 339p 349p 316p 325p 331p 352p 401p 402p 417p 412p 419p 429p 356p 405p 411p 422p 431p 432p 447p 452p 459p 509p 436p 445p 451p 452p 501p 502p 517p 532p 539p 549p 516p 525p 531p 522p 531p 532p 547p 612p 619p 629p 556p 605p 611p 552p 601p 602p 617p 652p 659p 709p 636p 645p 651p 622p 631p 632p 647p 732p 739p 749p 716p 725p 731p 652p 701p 702p 717p 812p 819p 829p 756p 805p 811p 722p 731p 732p 747p 852p 859p 909p 836p 845p 851p 752p 801p 802p 817p 822p 831p 832p 847p.
Recommended publications
  • Greater Cleveland Regional Transit Authority
    Greater Cleveland Regional Transit Authority Joe Calabrese - General Manager RTA Ridership by Mode ! 500 Buses - 75 % ! 60 Heavy Rail Vehicles - 10% ! 24 RTV’s (BRT) - 8% ! 48 Light Rail Vehicles - 6% ! Paratransit - 100 vehicles - 1% RTA Fleet GCRTA HealthLine Euclid Avenue Transformation Euclid Avenue History Euclid Avenue History Alternatives Analysis - late 1990’s ! Subway ! Light Rail ! Do Nothing (keep the #6 bus) ! Bus Rapid Transit (BRT) Mode Selection Criteria ! Capacity (30,000 + daily customers) ! Connectivity ! Funding possibilities (FTA) ! Cost - capital and operating ! Economic development potential " Renew Aging Infrastructure Vision for the “Silver Line” BRT ! “Rail Like” Image ! Fast ! Simple ! Safe ! First Class ! Help Revitalize Corridor Euclid Corridor Project ! 9.38 miles long ! 36 stations (from 100 bus stops) ! Travel time from 40 to 28 minutes ! Building face to building face ! Pedestrian and bicycle friendly ! Landscape/hardscape treatment ! Pubic Art - Integrated/stand-alone Exclusive Right of Way Funding Pie Charts FTA 80% ODOT 20% 2000 ODOT FTA 25% 50% City MPO RTA 2004 Ground Breaking October 2004 “Silver Line” Construction “Silver Line” Construction (3.5 years) “Silver Line” Construction “Silver Line” Construction “Silver Line” Construction “Rail Like” Image ! Reduced Travel Time " Multi-Door Boarding " Exclusive Right-of-Way " Traffic Signal Prioritization " Higher Travel Speeds " Level Boarding " Precision Docking " Rear Facing Wheel Chair Restraints " Off-Board Fare Collection “Rail Like” Image ! Hi-Frequency
    [Show full text]
  • Greater Cleveland Regional Transit Authority
    Greater Cleveland Regional Transit Authority Joe Calabrese – General Manager Greater Cleveland RTA Overview . Service Area 59 municipalities 500 square miles Population of 1.5 million . Customers Served 200,000 on a typical weekday 1 RTA Overview . Services Modes 500 Buses 100 Paratransit Vans 20 Job Access Vans 60 Heavy Rail Vehicles 48 Light Rail Vehicles 24 RTV’s - (HealthLine BRT) 2 RTA Fleet 3 GCRTA HealthLine Euclid Avenue Transformation Euclid Avenue History 4 Euclid Avenue History Euclid Avenue History . Streetcars disappeared in 1954 . # 6 Bus Route put in service Great Service with Low Image . Alternative Analysis Subway or Light Rail Do Nothing (keep the #6 bus) Bus Rapid Transit (BRT) 5 Mode Selection Criteria . Capacity (30,000 + daily customers) . Connectivity . Funding possibilities (FTA) . Cost Capital Operating . Economic development potential Vision for the “Silver Line” . “Rail-Like” Image . Fast . Simple . Safe . First Class . Promote Economic Development 6 Euclid Corridor Project – 9.38 Miles . 36 stations . Travel time from 28 to 40 minutes . Building face to building face . Pedestrian friendly with bike lanes . Landscape/hardscape treatment 1,500 trees with irrigation . Integrated/stand-alone public art 7 Ground Breaking October 2004 8 Funding Pie Charts - $200 Million FTA 80% ODOT 20% 2000 ODOT FTA 25% 50% City MPO RTA 2004 Exclusive Right of Way 9 10 11 “Rail-Like” Characteristics . Quicker Travel Times Exclusive Right-of-Way Higher Travel Speed Limit Traffic Signal Prioritization Precision Docking Level Boarding “Stations” Off Board Fare Collection 12 “Rail-Like” Service and Image . Hi-Frequency Service 24x7 Peak every 5 minutes Off-Peak every 8 to 15 minutes .
    [Show full text]
  • Bus Rapid Transit (BRT) and Light Rail Transit
    Bus Rapid Transit (BRT) and Light Rail Transit (LRT) Performance Characteristics Stations Mixed Traffic Lanes* Service Characteristics Newest Corridor End‐to‐End Travel Departures Every 'X' Travel Speed (MPH) City Corridor Segment Open length (mi) # Spacing (mi) Miles % Time Minutes BRT Systems Boston Silver Line Washington Street ‐ SL5 2002 2.40 13 0.18 1.03 42.93% 19 7 7.58 Oakland San Pablo Rapid ‐ 72R 2003 14.79 52 0.28 14.79 100.00% 60 12 14.79 Albuquerque The Red Line (766) 2004 11.00 17 0.65 10.32 93.79% 44 18 15.00 Kansas City Main Street ‐ MAX "Orange Line" 2005 8.95 22 0.41 4.29 47.92% 40 10 13.42 Eugene Green Line 2007 3.98 10 0.40 1.59 40.00% 29 10 8.23 New York Bx12 SBS (Fordham Road ‐ Pelham Pkwy) 2008 9.00 18 0.50 5.20 57.73% 52 3 10.38 Cleveland HealthLine 2008 6.80 39 0.17 2.33 34.19% 38 8 10.74 Snohomish County Swift BRT ‐ Blue Line 2009 16.72 31 0.54 6.77 40.52% 43 12 23.33 Eugene Gateway Line 2011 7.76 14 0.55 2.59 33.33% 29 10 16.05 Kansas City Troost Avenue ‐ "Green Line" 2011 12.93 22 0.59 12.93 100.00% 50 10 15.51 New York M34 SBS (34th Street) 2011 2.00 13 0.15 2.00 100.00% 23 9 5.22 Stockton Route #44 ‐ Airport Corridor 2011 5.50 8 0.69 5.50 100.00% 23 20 14.35 Stockton Route #43 ‐ Hammer Corridor 2012 5.30 14 0.38 5.30 100.00% 28 12 11.35 Alexandria ‐ Arlington Metroway 2014 6.80 15 0.45 6.12 89.95% 24 12 17.00 Fort Collins Mason Corridor 2014 4.97 12 0.41 1.99 40.00% 24 10 12.43 San Bernardino sbX ‐ "Green Line" 2014 15.70 16 0.98 9.86 62.79% 56 10 16.82 Minneapolis A Line 2016 9.90 20 0.50 9.90 100.00% 28 10 21.21 Minneapolis Red Line 2013 13.00 5 2.60 2.00 15.38% 55 15 14.18 Chapel Hill N‐S Corridor Proposed 8.20 16 0.51 1.34 16.34% 30 7.5 16.40 LRT Systems St.
    [Show full text]
  • Indygo Red Line Rapid Transit Indianapolis, Indiana Small Starts Project Development (Rating Assigned November 2016)
    IndyGo Red Line Rapid Transit Indianapolis, Indiana Small Starts Project Development (Rating Assigned November 2016) Summary Description Proposed Project: Bus Rapid Transit 13.1 Miles, 28 Stations Total Capital Cost ($YOE): $96.33 Million Section 5309 Small Starts Share ($YOE): $74.99 Million (77.8%) Annual Operating Cost (opening year 2018): $7.03 Million Existing Corridor Ridership (Warranted): 7,800 Daily Linked Trips Overall Project Rating: Medium Project Justification Rating: Medium Local Financial Commitment Rating: Medium Project Description: The Indianapolis Public Transportation Corporation (IndyGo) proposes to build a bus rapid transit (BRT) line connecting the Indianapolis central business district (CBD) with the Village of Broad Ripple to the north, and the University of Indianapolis campus to the south. The project includes approximately 7.7 miles of dedicated bus lanes, traffic signal priority at intersections, and stations with weather protection, level vehicle boarding, real-time bus arrival information, and self-service fare vending. The project includes the purchase of 12 60- foot electric battery-powered buses. Service would be provided 20 hours per weekday, with buses every ten minutes during daytime hours and every 30 minutes during the evening. Weekend service would be provided 18 hours per day, with buses every 15 minutes during service hours. Project Purpose: The project will provide fast, reliable, convenient transit service in a key corridor serving downtown Indianapolis. It will operate through the densest area of the city, which has among the most diverse land uses in the region. The route serves four major universities, several hospitals, government agency offices, other community services, and the new Downtown Transit Center, which offers transfer opportunities to numerous connecting bus routes.
    [Show full text]
  • Final Design Traffic Operations Report
    FINAL DESIGN TRAFFIC OPERATIONS REPORT IndyGo Red Line Rapid Transit Project – Phase 1 IndyGo April, 2016 Table of Contents Section 1 Introduction ................................................................................................ 1-1 1.1 Project Description ........................................................................................................................................... 1-1 1.2 Existing Conditions ........................................................................................................................................... 1-5 1.2.1 Overview .................................................................................................................................................. 1-5 1.2.2 Roadway Conditions ........................................................................................................................... 1-5 1.3 Build Conditions ................................................................................................................................................. 1-8 1.3.1 Overview .................................................................................................................................................. 1-8 1.3.2 Roadway Conditions ........................................................................................................................... 1-8 Section 2 Traffic Analysis Methodology ....................................................................... 2-1 2.1 Traffic Impact Thresholds .............................................................................................................................
    [Show full text]
  • Nvtc Timeline Final
    1964 • Urban Mass Transit Act of 1964 paves the way for transit expansion nationwide • Transportation District Act of 1964 creates • NVTC September 1: Initial Commission meeting • NVTC starts work on rapid transit system 1965 1966 1967 1968 1969 • Endorse proposed rail rapid transit line • WMATA compact approved • WMATA ocially created • Metro planning begins! • Resolution to start • Outer Beltway Location Committee established • First WMATA board members selected • Right-of-Way preserved Metrorail construction • Washington and Old Dominion Railway for future Metrorail contacted for possible commuter rail line 1973 1972 1971 1970 • NVTC sets transit fares, routes and service levels in NoVA • 3 new bus routes and 20 new buses for the Shirley • Metro groundbreaking, • Grant to build nation’s rst transit way: 1974 • NVTC starts Computeride--a computerized carpool program Highway Bus project Shirley Expressway Shirley Highway Bus project • WMATA builds rst bus shelter – From 1974 to 1986 WMATA builds 828 bus shelters in the region • “Citizens First in Transportation" policy creates the Regional • First “fringe” parking lots – later “Park & Ride • Rosslyn pedestrian • NVTC coordinates Metro station site • NVTC's transfers Computeride to COG to merge with their growing carpool program Citizens Advisory Committee lots” - at the future Springeld Metrorail station bridge opens location and architectural design • NVTC coordinates Fairfax County's new bus program establishing a $100,000 fund to grant to • NVTC supports providing 3 computers for Fairfax, Arlington and site (400 spaces) and Huntington Metrorail • Aerial tour of NoVA with legislators to “any legitimate agency” to provide bus service – service later becomes Fairfax Connector Alexandria for trac signalization station site (150 spaces).
    [Show full text]
  • On to 2050 Regionally Significant Projects Benefits Report
    ON TO 2050 REGIONALLY SIGNIFICANT PROJECTS BENEFITS REPORT Draft for public comment Draft ON TO 2050 Regionally Significant Projects Benefits Report June 2018 Contents Introduction ................................................................................................................................................ 3 Process ......................................................................................................................................................... 4 Definition change from previous plans .............................................................................................. 4 Solicitation of projects............................................................................................................................ 5 Evaluation framework ......................................................................................................................... 14 Project evaluation ..................................................................................................................................... 14 Project cost estimates ........................................................................................................................... 14 Capital costs ...................................................................................................................................... 14 Operating costs ................................................................................................................................. 15 Cost summary for projects .............................................................................................................
    [Show full text]
  • E Line (Expo) Effective 11/02/19
    Saturday, Sunday and Holidays Saturday, Sunday and Holidays Effective Nov 2 2019 E Line (Expo) E Line (Expo) Eastbound to Los Angeles (Approximate Times) Westbound to Santa Monica (Approximate Times) SANTA SANTA MONICA WEST ANGELES LOS CENTURY CITY CITY CULVER WEST ADAMS JEFFERSON PARK EXPOSITION PARK DOWNTOWN ANGELES LOS DOWNTOWN ANGELES LOS EXPOSITION PARK JEFFERSON PARK WEST ADAMS CITY CULVER CENTURY CITY WEST ANGELES LOS SANTA MONICA Downtown Santa Monica 17th St/SMC 26th St/ Bergamot Expo/Bundy Expo/Sepulveda Westwood/ Park Rancho Palms City Culver La Cienega/ Jefferson Expo/La Brea Farmdale Expo/Crenshaw Expo/Western Expo/Vermont Expo Park/USC Jefferson/USC LATTC/ Ortho Inst. Pico 7th Street/ Center Metro 7th Street/ Center Metro Pico LATTC/ Ortho Inst. Jefferson/USC Expo Park/USC Expo/Vermont Expo/Western Expo/Crenshaw Farmdale Expo/La Brea La Cienega/ Jefferson City Culver Palms Westwood/ Park Rancho Expo/Sepulveda Expo/Bundy 26th St/ Bergamot 17th St/SMC Downtown Santa Monica — — — 3:27A 3:29A 3:31A 3:35A 3:37A 3:39A 3:42A 3:44A 3:46A 3:50A 3:53A 3:54A 3:56A 3:58A 4:03A 4:05A 4:01A 4:04A 4:08A 4:10A 4:12A 4:14A 4:17A 4:21A 4:23A 4:25A 4:28A 4:30A 4:32A 4:36A 4:38A 4:40A 4:44A 4:46A 4:48A — — — 3:45 3:47 3:49 3:53 3:55 3:57 4:00 4:02 4:04 4:08 4:11 4:12 4:14 4:16 4:21 4:23 4:13 4:16 4:20 4:22 4:24 4:26 4:29 4:33 4:35 4:37 4:40 4:42 4:44 4:48 4:50 4:52 4:56 4:58 5:00 — — — 4:05 4:07 4:09 4:13 4:15 4:17 4:20 4:22 4:24 4:28 4:31 4:32 4:34 4:36 4:41 4:43 4:33 4:36 4:40 4:42 4:44 4:46 4:49 4:53 4:55 4:57 5:00 5:02 5:04 5:08 5:10 5:12
    [Show full text]
  • Bus Rapid Transit Metroplanning.Org/Brt
    FACT SHEET Bus Rapid Transit metroplanning.org/brt What is bus rapid transit and how is it different from a regular bus? Bus Rapid Transit (BRT) provides commuters with a fast, affordable and easy way to travel. Regular buses compete with general traffic on congested roadways. This often causes delays and slow travel speeds. BRT is different as it offers the travel qualities of a rail system on a bus. While regular buses average nine miles per hour, BRT’s limited stops and dedicated lanes with signal priority allow vehicles to travel faster while largely avoiding street congestion. Sleek design and modern technology improve the customer’s experience at a much lower construction cost than rail. The most effective bus rapid transit systems include four critical elements, each of which offers a number of benefits for both transit riders and local communities: Dedicated Lanes Pay-Before-Boarding Stations Transportation: reduced boarding time, faster trips Community: permanence of stations sends positive signal to investors, iconic station design can reinforce community identity Bruce Fingerhood Transportation: faster trips; less traffic congestion; dependable, on-time service Community: more people connected to local destinations, fewer conflicts between modes Lucho Molina Signal Priority Level Boarding Transportation: faster trips, Transportation: reduced reduced bunching, safer travel boarding time, faster trips, more spacious buses Community: improved pedes- trian crossing signals and timing Community: greater acces- sibility to the elderly, people with disabilities, parents with strollers, etc. Aimee Gauthier Rob Wrenn FACT SHEET Bus Rapid Transit metroplanning.org/brt BRT in Chicago MPC’s report Bus Rapid Transit: Chicago’s New Route to Opportunity lays the groundwork for a 10-route BRT network in Chicago that would provide more equitable transit service to help people access jobs, shops, schools, hospitals, and other destinations across the city.
    [Show full text]
  • Attachment 1
    1 Abstract This document contains an examination of and recommendations for transit, bicycle, and pedestrian infrastructure that will help create complete transportation options. With the approval and adoption of this functional plan, the Master Plan of Highways will become the Master Plan of Highways and Transitways. Source of Copies The Maryland-National Capital Park and Planning Commission 8787 Georgia Avenue Silver Spring, MD 20910 Online at: MontgomeryPlanning.org/transportation/highways/brt 2 Prepared by the Montgomery County Planning Department April 2013 MontgomeryPlanning.org 3 Contents Introduction 8 Planning Context 9 Summary Recommendations 14 Background 17 Vision 20 Why Bus Rapid Transit? 20 Fitting BRT into the County’s Transportation Network 20 Guiding Principles 23 Determining BRT Treatments 24 Dedicated Lanes 24 Median vs. Curb Lanes 25 Lane Repurposing 26 Recommended Corridors and Treatments 28 Recommended Corridors 32 Corridor 1: Georgia Avenue North 33 Corridor 2: Georgia Avenue South 36 Corridor 3: MD 355 North 39 Corridor 4: MD 355 South 42 Corridor 5: New Hampshire Avenue 45 Corridor 6: North Bethesda Transitway 48 Corridor 7: Randolph Road 51 Corridor 8: University Boulevard 54 Corridor 9: US 29 57 Corridor 10: Veirs Mill Road 60 Setting Implementation Priorities for Transit Corridor Improvements 63 Implementation 64 Bicycle and Pedestrian Accommodation and Safety 65 Ensuring Pedestrian Safety and Accessibility 65 Bike Accommodation 65 Bicycle Pedestrian Priority Areas 66 4 MARC Brunswick Line Expansion 73 Carbon
    [Show full text]
  • Why Rapid Transit?
    NEW RAPID TRANSIT FOR A GROWING, EQUITABLE ROCHESTER TRANSIT-ORIENTED DEVELOPMENT PLANNING STUDY Phase 2 Public Engagement APRIL 7, 2020 Thank You for Participating during this time of Change The City of Rochester and its partners are committed to addressing immediate community needs. We are also committed to our resilience and success in the future, and advancing work that supports these goals. This engagement process began in February 2020. We are starting the next step in ongoing engagement of community members. Multiple platforms to learn about the project and provide feedback have been provided. We thank everyone for their flexibility and willingness to adapt in an ever-evolving time of change. Engagement and Feedback Engagement: Learning More! Future Webinars: Thursday, April 16th, Tuesday, April 21st. 6:00 PM City of Rochester project webpage: tiny.cc/RochesterTOD • Background on the rapid transit proposal and future steps • Sign up for webinars. • Station Area Plans PDF: area by area analysis and ideas • Interactive “Open House” Webpage and Survey: area by area analysis and ideas using interactive maps • Project Frequently Asked Questions page Engagement and Feedback Feedback: We Need Your Input! • Interactive “Open House” Webpage and Survey : area by area analysis and ideas using interactive maps • Send us an email at: [email protected] • Leave us a voicemail: 507-328-2025 Contents 1. Introduction to the Study 2. Rochester’s growth and the key role of transit 3. Rapid Transit Corridor Segments A. West Gateway 2nd St SW: West Lot to Hwy 52 B. City Corridor 2nd St SW: St Mary’s to 6th Ave C.
    [Show full text]
  • September 30, 2019 Connecticut DOT Connecticut DOT
    Candidate Pilot Projects September 30, 2019 Connecticut DOT Connecticut DOT Route Characteristic Value/Description Route Number/Name CTfastrak BRT (Route 101) Route 101 along CTfastrak's BRT system connects transit centers in Description Hartford and New Britain along a 9-mile bus-only roadway for a majority of the route. Length (roundtrip) 18 miles Type of Service BRT (Exclusive Lanes) Headway (peak) 7 minutes % in Exclusive Lane 98% Daily Ridership (weekday) 5,400 Operating Speed 24 mph (45 mph max) Number of Buses Assigned to Route 16 Number of Left Turns 3 EV Readiness (Low, Med, High) Medium Dallas Area Rapid Transit (DART) Dallas Area Rapid Transit (DART) Route Characteristic Value/Description Route Number/Name 524: Inwood/Love Field Route 524 connects the Love Field Airport terminal with the Inwood Description light rail station 2 miles away and transports both air travelers and workers. Length (roundtrip) 4 miles Type of Service Shuttle (Urban) Headway (peak) 18 minutes % in Exclusive Lane 0% Daily Ridership (weekday) 700 Operating Speed 15 mph Number of Buses Assigned to Route 2 (plus spares) Number of Left Turns 1 EV Readiness (Low, Med, High) Medium Virginia DRPT / Hampton Roads Transit (HRT) Virginia DRPT / Hampton Roads Transit (HRT) Route Characteristic Value/Description Route Number/Name 960: Virginia Beach/Norfolk Express Route 960 is a long distance express bus service between Norfolk and Description Virginia Beach utilizing the HOV/HOT lanes along I-264. Length (roundtrip) 42 miles Type of Service Freeway (HOT/HOV lanes)
    [Show full text]