October 1, 2020 Malte Schierwater Siemens Mobility, Inc 7464 French

Total Page:16

File Type:pdf, Size:1020Kb

October 1, 2020 Malte Schierwater Siemens Mobility, Inc 7464 French October 1, 2020 Malte Schierwater Siemens Mobility, Inc 7464 French Road Sacramento, CA 95828-4600, USA Dear Mr. Schierwater: This letter responds to the Siemens Mobility Inc. request for a California Air Resources Board (CARB) locomotive verification for the Tier 4 Siemens Charger passenger locomotive. CARB verifies that the Siemens Charger Locomotive achieves U.S. EPA Tier 4 locomotive emission levels. This verification is applicable to the Siemens Charger passenger locomotive. The Siemens Charger locomotive is powered with a Cummins QSK95 16-cylinder diesel engine that is equipped with a urea based Selective Catalytic Reduction aftertreatment system meeting US EPA Tier 4 line haul standards. Design and technology improvements to the configuration are allowed as long as EPA emissions certification is maintained. Emission compliance and warranty is still covered by Cummins under its Certificate of Conformity with USEPA. The test CDTX 2120 passenger locomotive accumulated 7,944 in-use hours operating with Amtrak on the Pacific Surfliner Route in Southern California for passenger transportation. West Virginia University Center for Alternative Fuels Engines and Emissions performed all emission tests during this in-use field demonstration. In addition, Cummins obtained a U.S. EPA Tier 4 Certificate of Conformity in October 2019 (Engine family name: LCEXG95.0AAA). For the most current EPA Certificate of Conformity, please see the EPA web site at https://iaspub.epa.gov/otaqpub/. Based on CARB staff evaluation of the application, exhaust emission data, and additional information provided, CARB staff hereby verifies that this locomotive configuration and technology achieves U.S. EPA Tier 4 line haul NOx, PM, CO, and HC exhaust emission levels. Mr. Malte Schierwater October 1, 2020 Page 2 If you have any questions or comments, please email Ajay Mangat, Manager, Freight Systems Section at [email protected] or Mike Jaczola, Staff Air Pollution Specialist, Freight Approvals Section at [email protected]. Sincerely, Heather Arias, Chief Transportation and Toxics Division cc: Dennis Johnson, Director Technology Assessment Center U.S. Environmental Protection Agency Ariel Rios Building 1200 Pennsylvania Avenue, N.W. Mail Code: 6406J Washington, D.C. 20460 .
Recommended publications
  • Venture Trainsets Redefining the Intercity Rail Experience
    Venture Trainsets Redefining the intercity rail experience usa.siemens.com/mobility Venture Trainsets | Mobility Next generation rail, built for North America. With our latest, intercity trainset, Built, tested, and proven Siemens is redefining what intercity rail While designed and built for tomorrow, the can be. It’s an unsurpassed passenger Venture trainsets are a proven product. Our experience that’s also raising the bar for vehicles are in use throughout North America efficiency with service-proven vehicles and have been built on a tested and designed for tomorrow and in production service-proven platform. Benefiting from today. In short, the Venture is a 21st century decades of experience in North America, trainset that’s being embraced by passengers, we’ve developed them to meet the unique operators, and agencies alike. needs of the market. All vehicles are designed and validated in accordance with FRA Riders will enjoy new levels of comfort and regulations, APTA standards and PRIIA 305 convenience along with the latest amenities. specifications for next generation equipment. The Venture features spacious interiors and flexibility for multiple configurations of First in safety economy, business, cafe and cab cars. Providing the most protection for the riding Integrated crash energy management public is our top priority. That’s why Venture provides next generation safety. trainsets feature the safest rail car design on Reduce operating costs and enhance the market. All carbodies incorporate Crash sustainability with the clean and green Energy Management (CEM) crumple zones Charger diesel-electric locomotive. Light to absorb energy at both ends of the car. and powerful, it delivers maximum Our design also includes a controlled performance and reliability up to collapse feature to enhance safety in the 125 mph.
    [Show full text]
  • March 25, 2019 Volume 39
    MARCH 25, 2019 ■■■■■■■■■■■ VOLUME 39 ■■■■■■■■■■ NUMBER 3 13 The Semaphore 17 David N. Clinton, Editor-in-Chief CONTRIBUTING EDITORS Southeastern Massachusetts…………………. Paul Cutler, Jr. “The Operator”………………………………… Paul Cutler III Cape Cod News………………………………….Skip Burton Boston Herald Reporter……………………… Jim South 24 Boston Globe & Wall Street Journal Reporters Paul Bonanno, Jack Foley Western Massachusetts………………………. Ron Clough Rhode Island News…………………………… Tony Donatelli “The Chief’s Corner”……………………… . Fred Lockhart Mid-Atlantic News……………………………. Doug Buchanan PRODUCTION STAFF Publication…………….………………… …. … Al Taylor Al Munn Jim Ferris Bryan Miller Web Page …………………..………………… Savery Moore Club Photographer……………………………. Joe Dumas The Semaphore is the monthly (except July) newsletter of the South Shore Model Railway Club & Museum (SSMRC) and any opinions found herein are those of the authors thereof and of the Editors and do not necessarily reflect any policies of this organization. The SSMRC, as a non-profit organization, does not endorse any position. Your comments are welcome! Please address all correspondence regarding this publication to: The Semaphore, 11 Hancock Rd., Hingham, MA 02043. ©2019 E-mail: [email protected] Club phone: 781-740-2000. Web page: www.ssmrc.org VOLUME 39 ■■■■■ NUMBER 3 ■■■■■ MARCH 2019 CLUB OFFICERS BILL OF LADING President………………….Jack Foley Vice-President…….. …..Dan Peterson Treasurer………………....Will Baker Book Review ........ ………12 Secretary……………….....Dave Clinton Chief’s Corner ...... ……. .3 Chief Engineer……….. .Fred Lockhart Contests ................ ……….3 Directors……………… ...Bill Garvey (’20) ……………………….. .Bryan Miller (‘20) Clinic……………..………3 ……………………… ….Roger St. Peter (’19) Editor’s Notes. ….….....….12 …………………………...Gary Mangelinkx (‘19) Members ............... …….....12 Memories .............. ………..4 th Potpourri ............... ..…..…..5 ON THE COVER: March 9-10 Show Running Extra....... .….……13 and Open House memories. (Photos by Joe Dumas) 2 FORM 19 ORDERS Fred Lockhart MARCH B.O.D.
    [Show full text]
  • Transportation: Request for Passenger Rail Bonding -- Agenda Item II
    Legislative Fiscal Bureau One East Main, Suite 301 • Madison, WI 53703 • (608) 266-3847 • Fax: (608) 267-6873 Email: [email protected] • Website: http://legis.wisconsin.gov/lfb October 31, 2019 TO: Members Joint Committee on Finance FROM: Bob Lang, Director SUBJECT: Department of Transportation: Request for Passenger Rail Bonding -- Agenda Item II REQUEST On October 3, 2019, the Department of Transportation (DOT) submitted a request under s. 85.061 (3)(b) of the statutes for approval to use $13,248,100 BR in GPR-supported, general obligation bonding from DOT's passenger rail route development appropriation to fund the required state match for a recently awarded Federal Railroad Administration (FRA) grant for the purchase of six single-level coach cars and three cab-coach cars to be placed into service in the Milwaukee- Chicago Hiawatha corridor. BACKGROUND DOT is required to administer a rail passenger route development program funded from a transportation fund continuing appropriation (SEG) and a general fund-supported, general obligation bonding appropriation (BR). From these sources, DOT may fund capital costs related to Amtrak service extension routes (the Hiawatha service, for example) or other rail service routes between the cities of Milwaukee and Madison, Milwaukee and Green Bay, Milwaukee and Chicago, Madison and Eau Claire, and Madison and La Crosse. Under the program, DOT is not allowed to use any bond proceeds unless the Joint Finance Committee (JFC) approves the use of the proceeds and, with respect to any allowed passenger route development project, the Department submits evidence to JFC that Amtrak, or the applicable railroad, has agreed to provide rail passenger service on that route.
    [Show full text]
  • Northern Michigan Rail Ridership Feasibility and Cost Estimate Study
    NORTHERN MICHIGAN RAIL RIDERSHIP FEASIBILITY AND COST ESTIMATE STUDY PREPARED FOR: The Groundwork Center For Resilient Communities Grant Fiduciary: Bay Area Transportation Authority PREPARED BY: Transportation Economics & Management Systems, Inc. OCTOBER 2018 FINAL REPORT This page intentionally left blank NORTHERN MICHIGAN RAIL RIDERSHIP FEASIBILITY AND COST ESTIMATE STUDY About the Groundwork Center for Resilient Communities The Groundwork Center for Resilient Communities works with people to build a thriving local farm and food economy; to make Michigan towns and villages stronger, more walkable, bike-able, and transit- friendly; and to develop local, clean energy. They seek to achieve on-the-ground results in northwest Michigan and leverage them to support other communities and improvements to state policy. All of this is designed to strengthen the local economy, protect the environment, and build community. Re-establishing passenger rail service between Ann Arbor, Petoskey, and Traverse City—homes to growing technology industries—will link the growing northwest with population centers in the southeast and universities along the way. Civic and business leaders believe this effort will help our state attract the next generation workforce that wants to live and thrive in Michigan without depending on a car. Groundwork believes that bringing passenger rail service back to northern Michigan is possible in less than a decade with a focused campaign of public engagement, technical analysis, and support from community, state and federal agencies. For More Information Groundwork center 148 E. Front Street, Suite 301 Traverse City, MI 49684-5725 (231) 941-6584 [email protected] Introduction October 2018 Page i NORTHERN MICHIGAN RAIL RIDERSHIP FEASIBILITY AND COST ESTIMATE STUDY This page intentionally left blank Introduction October 2018 Page ii NORTHERN MICHIGAN RAIL RIDERSHIP FEASIBILITY AND COST ESTIMATE STUDY Acknowledgements This study was prepared by Transportation Economics & Management Systems, Inc.
    [Show full text]
  • Amtrak Cascades Fleet Management Plan
    Amtrak Cascades Fleet Management Plan November 2017 Funding support from Americans with Disabilities Act (ADA) Information The material can be made available in an alternative format by emailing the Office of Equal Opportunity at [email protected] or by calling toll free, 855-362-4ADA (4232). Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711. Title VI Notice to Public It is the Washington State Department of Transportation’s (WSDOT) policy to assure that no person shall, on the grounds of race, color, national origin or sex, as provided by Title VI of the Civil Rights Act of 1964, be excluded from participation in, be denied the benefits of, or be otherwise discriminated against under any of its federally funded programs and activities. Any person who believes his/her Title VI protection has been violated, may file a complaint with WSDOT’s Office of Equal Opportunity (OEO). For additional information regarding Title VI complaint procedures and/or information regarding our non-discrimination obligations, please contact OEO’s Title VI Coordinator at 360-705-7082. The Oregon Department of Transportation ensures compliance with Title VI of the Civil Rights Act of 1964; 49 CFR, Part 21; related statutes and regulations to the end that no person shall be excluded from participation in or be denied the benefits of, or be subjected to discrimination under any program or activity receiving federal financial assistance from the U.S. Department of Transportation on the grounds of race, color, sex, disability or national origin.
    [Show full text]
  • HQ-2017-1239 Final.Pdf
    Federal Railroad Administration Office of Railroad Safety Accident and Analysis Branch Accident Investigation Report HQ-2017-1239 Amtrak 501 DuPont, Washington December 18, 2017 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report, including this one, made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. U.S. Department of Transportation FRA File #HQ-2017-1239 Federal Railroad Administration FRA FACTUAL RAILROAD ACCIDENT REPORT SYNOPSIS On December 18, 2017, at 7:33 a.m., PST, southbound National Railroad Passenger Corporation (Amtrak) Passenger Train Number 501 (Train 501) derailed in an 8-degree, 22-minute, left-hand curve at Milepost (MP) 19.86 on the Central Puget Sound Regional Transit Authority, Sounder Commuter Rail (Sound Transit) Lakewood Subdivision, in DuPont, Washington. The lead locomotive and 12 cars derailed, with some sliding down an embankment, and some landing on the southbound lanes of Interstate 5, colliding with several highway vehicles. Train 501 is part of the Amtrak Cascades passenger train service funded by the States of Washington and Oregon. The Cascades passenger train service operates between Vancouver, British Columbia, and Eugene, Oregon, using Talgo, Inc. (Talgo) passenger equipment. DuPont, Washington, is located approximately 18 miles southwest of Tacoma, Washington. Sound Transit is the host railroad to Amtrak on the Lakewood Subdivision, which is approximately 20 miles in length from Tacoma to DuPont. Train 501 was traveling from Seattle, Washington, to Portland, Oregon, over the Point Defiance Bypass track between Tacoma and DuPont.
    [Show full text]
  • Hiawatha Service, Travel Time Is 92-95 Minutes
    10/3/2018 Chicago – Milwaukee Intercity Passenger Rail Corridor Past, Present, and Future Arun Rao, Passenger Rail Manager Wisconsin Department of Transportation Elliot Ramos, Passenger Rail Engineer Illinois Department of Transportation MIIPRC 2018 Annual Meeting Milwaukee 10/8/2018 2 1 10/3/2018 1945 80 round trips daily between Milwaukee and Chicago operated on three railroads: • Milwaukee Road • Chicago‐ Northwestern • North Shore Line Chicago-Milwaukee Passenger Rail: The Past MIPRC Annual Meeting 2018d Milwaukee10/6/2016 3 Milwaukee-Chicago Passenger Rail: The Past Amtrak: The 1970s • 1971: Amtrak begins service with 5 round‐ trips, 2 of which continue to St. Louis • 1973: The St. Louis through service is discontinued • 1975: One of the five round‐trips extends to Detroit • 1975: Turboliner equipment is introduced • 1977: Detroit run‐through is eliminated • 1977 – 1979: Chicago – Twin Cities regional train is added (Twin Cities Hiawatha) 10/6/2016 d 4 MIPRC Annual Meeting 2018 Milwaukee 2 10/3/2018 Milwaukee-Chicago Passenger Rail: The Past Amtrak: The 1980s • 1981: • Service reduced to 2 round-trips daily • Turboliners are eliminated, Amfleets are introduced. • 1984: • Service increased to 3 round-trips daily • 1989: • Amtrak, WI, and IL launch a 2 year demonstration project with states funding 2 additional roundtrips for a total of 5. Amtrak operates 3 without assistance. • The service is renamed Hiawatha Service, travel time is 92-95 minutes. • Horizon coach cars are introduced. 10/6/2016 d 5 MIPRC Annual Meeting 2018 Milwaukee
    [Show full text]
  • Hydrogen-Rail (Hydrail) Development
    H2@Rail Workshop Hydrogen-Rail (hydrail) Development Andreas Hoffrichter, PhD Burkhardt Professor in Railway Management Executive Director of the Center for Railway Research and Education [email protected] H2@Rail Workshop, Lansing, MI March 27, 2019 Contents • Current rail energy consumption and emissions • Hybrids • Primary power plant efficiencies • Hydrail development • Past and on-going research - 2 - Michigan State University, 2019 Current Rail Energy Efficiency and GHG DOT (2018), ORNL (2018) - 3 - Michigan State University, 2019 Regulated Exhaust Emissions • The US Environmental Protection Agency (EPA) has regulated the exhaust emissions from locomotives • Four different tiers, depending on construction year of locomotive • Increasingly stringent emission reduction requirements • Tier 5 is now in discussion (see next slide) • Achieving Tier 4 was already very challenging for manufacturers (EPA, 2016) - 4 - Michigan State University, 2019 Proposed Tier 5 Emission Regulation • California proposed rail emission regulation to be adopted at the federal level (California Air Resources Board, 2017) - 5 - Michigan State University, 2019 Class I Railroad Fuel Cost 2016 (AAR, 2017) • Interest from railways in alternatives high when diesel cost high, interest low when diesel cost low • When diesel cost are high, often fuel surcharges introduced to shippers • Average railroad diesel price for the last 10 years ~US$2.50 per gallon (AAR, 2017) - 6 - Michigan State University, 2019 Dynamic Braking • Traction motors are used as generators • Generated electricity is: – Converted to heat in resistors, called rheostatic braking – Fed back into wayside infrastructure or stored on-board of train, called regenerative braking • Reduces brake shoe/pad wear, e.g., replacement every 18 month rather than every18 days (UK commuter train example) • Can reduces energy consumption.
    [Show full text]
  • The Bulletin in MEMORIAM: WILLIAM J
    ERA BULLETIN — SEPTEMBER, 2020 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 63, No. 9 September, 2020 The Bulletin IN MEMORIAM: WILLIAM J. MADDEN, 1947-2020 Published by the Electric Railroaders’ by Jeff Erlitz Association, Inc. P. O. Box 3323 Grand Central Station New York, NY 10163 For general inquiries, or Bulletin submissions, contact us at bulletin@erausa. org or on our website at erausa. org/contact Editorial Staff: Jeff Erlitz Editor-in-Chief Ron Yee Tri-State News and Commuter Rail Editor Alexander Ivanoff North American and World News Editor David Ross Production Manager Copyright © 2020 ERA This Month’s Cover Photo: Public Service of New Jer- sey double-truck motor cars 2282 and 2235 on Main Avenue & Glendale Street in Nutley, New Jersey on February 11, 1936. Unknown photographer William J (Bill) Madden during a station stop on the Canadian at Thunder Bay, Ontario, July 24, 1977. Jeff Erlitz photograph With deep sadness, I must pass along the around 1970, initially on Saturday mornings In This Issue: news that William Madden passed away on and then on Monday evenings. Like most of Assorted Wednesday, August 12, at the age of 73 due us, he could be found collating, stamping Travels from to complications from COVID-19. envelopes, and bagging sacks of mail for Bill, as everyone knew him, joined the Elec- both the New York Division Bulletin and Na- the First Half of tric Railroaders’ Association on February 21, tional’s Headlights. When the ERA began 2020…Page 18 1964 and was member number 3062. He offering Life memberships, Bill was one of probably started volunteering at headquar- the few members who took up that offer.
    [Show full text]
  • Capital Investment Plan for Amtrak Equipment
    DRAFT September 8, 2017 Major Update For acceptance by the “514” Subcommittee of the NGEC “514” PRIIA Section 209 Equipment Capital Subcommittee of the CIP for Amtrak Equipment Deployed in State Corridor Service FY2018 – FY2022 Acknowledgements The development of this Capital Investment Plan (CIP) for Amtrak Equipment Deployed in State Corridor Service was a collaborative effort of Amtrak, its state funding partners, and the Federal Railroad Administration (FRA) through the Next Generation Equipment Committee’s (NGEC’s) Passenger Rail Investment and Improvement Act of 2008 (PRIIA) “514” Section 209 Equipment Capital Subcommittee. Special thanks go to the members of the Subcommittee who worked to see the CIP through to completion. The members of the Subcommittee are: Brian Beeler II, John Pagano, Mike Jenkins, NNEPRA for Maine DOT, Chair California DOT Oregon DOT John Dees, Brian Tsukamoto, Jennifer Sellers, North Carolina DOT, Vice Chair California DOT Oregon DOT Allan Paul, Tom Clark, Quentin Huckaby, North Carolina DOT CCJPA - California Texas DOT Paul Worley, David Kutrosky, Gil Wilson, North Carolina DOT CCJPA - California Texas DOT Ron Pate, Marci Petterson, Arun Rao, Washington State DOT, Past Connecticut DOT Wisconsin DOT Chair Jason Biggs, Al Johnson, Lynn Everett, Washington State DOT Michigan DOT Federal Railroad Admin. Brent Thompson, Jeff Martin, Beth Nachreiner, Washington State DOT Michigan DOT Federal Railroad Admin. Mario Bergeron, Ray Hessinger, Ashok Sundararajan, Amtrak New York State DOT FRA consultant Darrell Smith, John Bell, Shayne Gill, Amtrak New York State DOT AASHTO Tim Ziethen, Bryan Hong, Amtrak AASHTO All states are welcome and encouraged to participate in the CIP development provided that they either currently or have funded plans to use Amtrak equipment for the provision of intercity passenger rail service.
    [Show full text]
  • Amtrak's Positive Train Control Compliance Efforts
    Testimony of Scot Naparstek Chief Operating Officer National Railroad Passenger Corporation Before the United States House of Representatives House Committee on Transportation & Infrastructure Subcommittee on Railroads, Pipelines, and Hazardous Materials Amtrak’s Positive Train Control Compliance Efforts September 13, 2018 Amtrak 1 Massachusetts Avenue, N.W. Washington, DC 20001 (202) 906-3918 Introduction Good morning. I wish to thank Chairman Denham and Ranking Member Capuano for hosting this important discussion on Positive Train Control (PTC). My name is Scot Naparstek, and I am Amtrak’s Chief Operating Officer. I joined Amtrak in 2012, and currently oversee Amtrak’s operations, including the Transportation, Engineering, and Mechanical departments, and their nearly 17,000 hardworking operating employees. Our workforce does a great job and I am proud to represent them here today, on behalf of our President and Chief Executive Officer Richard Anderson, who previously testified before this Subcommittee in February of this year. Amtrak is committed to running the safestintercity passenger rail system we can for our custom- ers and employees. PTC represents an essential next step for the rail industry to improve safety of train operations, and it will make the entire U.S. rail network safer for passengers, railroad employees, and the cities and towns through which the national rail network traverses. Thus, we have developed a policy of network-wide PTC or PTC-equivalency at Amtrak. Simply stated, we believe that all of our trains and routes should eventually be equipped with PTC or employ some other suite of technology and operating practices that addresses the safety risks that PTC helps to mitigate.
    [Show full text]
  • HO-Scale Conversion List Handout
    ® HO-SCALE COUPLER CONVERSION LIST 7-8-21 The Coupler People Most of the below listings have conversion drawing and instructions on our web site at www.kadee.com/hocc.htm Newer models that have factory installed knuckle couplers are easily converted by using our standard head #148 or scale head #158 Whisker® Couplers. Always check the coupler heights with either our #205 or newer #206 Coupler Height Gauge. This coupler conversion list is our suggested starting coupler for the conversion. (Typically requiring the least modification to a model utilizing our newest couplers even though other couplers also work for the model). Our conversion’s based on only one model from a production run, there may be inconsistencies in a model’s production run that require a different coupler or model modifications to achieve the proper coupler height for coupler function. ACCURAIL ARISTO - CRAFT ATHEARN "GENESIS" All Rolling Stock .........................................NO.5® or 148 STEAM STEAM AHM (RIVAROSSI) All Steam Locomotives (Generic) ..............NO.5® or 148 USRA 2-8-2 Lt. Mikado (road pilot) .............................. STEAM ATHEARN .........................................36 Pilot, NO.5® or 148 Tender 0-4-0 Dockside .................. (Early model) 34 Pilot, 31 Rear STEAM USRA 2-8-2 Lt. Mikado (step pilot) .............................. 0-4-0 Dockside .................(Late model) 34 Pilot, 34 Rear 0-4-2 T "Little Monster" ..............................NO.5® or 148 .........................................34 Pilot, NO.5® or 148 Tender 0-4-0 Switcher w/Tender ......................................... 37 0-6-0 Switcher with Tender ........................NO.5® or 148 4-6-2 Pacific .....................36 Pilot, NO.5® or 148 Tender 0-8-0 Switcher .................38 Pilot, NO.5® or 148 Tender 4-6-2 Pacific ...............................................NO.5® or 148 4-8-2 Mt-4 ..................................................NO.5® or 148 2-4-0 Bowker (Tender only) ....................................
    [Show full text]