Port Pirie Regional Council Interactions Through the City

Total Page:16

File Type:pdf, Size:1020Kb

Port Pirie Regional Council Interactions Through the City PORT PIRIE: A Strategic Port Solution for South Australia PORT EXPANSION PROPOSAL Key Features Advantages Initial Estimated Capacity: 20mTPA Capital Cost* • The major advantage of this • The proposed storage area is proposal is that it is highly Rail Loop $25 located east of Port Pirie off of Port flexible and is scalable to Rail Separation $25 Germein Road (Spencer Highway), meet initial and future Train Unloading Facility $50 next to the north-south rail line (and demand Storage Shed (x1) $25 in close proximity to the eastern line • The project can be started at Conveyor to Wharf $18 from Crystal Brook which services lower volumes and the Basic Wharf/Piles $15 the Braemar mining region) and is transhipment approach will Fixed Ship Loader $10 outside the CBD and residential allow it to be expanded Contingencies $15 areas of the City. beyond 20mtpa. Total Cost $183m • It features a 4km balloon loop for • The lead time to obtain all rail access off of the main north- relevant approvals, construct Transhipping Costs Est. † south line with the potential to have and be operational is 2-3 $2.5/tonne (for 20mTPA) multiple rail lines, within the loop, if years required. *Initial cost estimates are based on x1 • It is in good proximity to the 200,000t storage shed and a single rail • The site will allow for suitable existing freight rail network loop. Both are capable of being unloading facilities with conveyors • The port is capable of expanded beyond this when required taking the materials from the train a for increased capacity. servicing both northern mines short distance to the storage sheds. and those to the east †Port access & handling fees TBC, and • A key feature of the site is its (Braemar) via rail or excludes CAPEX. scalability with multiple 200,000t potentially by slurry pipe line. storage sheds able to be located on • The existing freight rail this land. network has some 10 to 12 • Material from the storage shed m.t.p.a. spare capacity to would then travel 1.2 km to one of carry additional mining two self propelled barges to be product without augmentation. moored on the eastern side of the If this capacity is exceeded existing port swing basin. additional passing loops • A fixed loading facility will load the would be required. transhipper(s) which will then take • The proposed port expansion the material to a cape size vessel. has a relatively low capital • In order to minimise loading times cost the cape size vessel will be loaded • The Council and the Port Pirie from three points in the channel. community are supportive of • It is estimated that it would take the proposal approx. 2.5 days to load a cape size • The storage site has good vessel. access to the national highway, is on a road train route with power, water and gas nearby. PORT EXPANSION DETAILS Rail Operations Storage Facilities Transhipment The rail network in this region Council has identified a number of The port is located in a consists of the standard gauge rail allotments of land on the east of protected river, making loading links between Broken Hill and Port Pirie, off of Pt. Germein Road conditions relatively calm. Crystal Brook, on to Adelaide (Spencer Highway), and close to south of Crystal Brook and on to the Pirie River, suitable for It is proposed to provide Port Augusta north of Crystal locating appropriate storage mooring dolphins and a fixed Brook (as a part of the Adelaide – facilities. loading facility on the eastern Perth rail line). These corridors side of the river, opposite form part of the defined interstate This land is predominantly owned Nyrstar and the existing port rail network (DIRN) and are owned by Council and the state facilities and parallel to the and operated by the Australian government, reducing issues river. The single load out Rail Track Corporation (ARTC). associated with its acquisition. boom at the wharf is estimated These rail lines are able to carry The land in total occupies approx. to cost $10m, with the mooring 1800m trains with 25 tonne axle 140ha. facilities estimated to cost loads and an 80km/h speed limit. another$15m. It is proposed to provide initially The proposed port expansion one large, covered and negatively It is also proposed to use two lends itself to being able to service pressured ore management shed 25,000DWT self-propelled, the resource sector in both north capable of storing up to 200,000 self-discharging vessels, to and the east (Braemar) of South tonnes of product. A negative tranship the material out to a Australia pressure shed of this size with cape size export vessel in the loading and unloading conveyors shipping channel in the Gulf. In order to export 20mtpa of would have a cost starting from minerals from Port Pirie five trains around $25m. The cape size vessel can first per day would be required, with anchor at 11 nm off shore, then each being 1.8 km long and The benefit of this proposal is that top up at 12 nm and then transporting 11,520 tonnes per it is scalable. There is ample moved further out at 20 nm to train. Each train would take room for additional sheds to cater complete loading. approx. 4hrs to unload depending for increased demand and to allow on the system implemented. separate sheds for multiple The two self-propelled barges A 4km rail loop off of the main operators/mines. will have a wharf load out rate north-south line would be of minimum 3,500TPH; a barge constructed on the designated The facility will also include rail discharge rate of 9500TPH and land off of Pt. Germein Road; with unloader (bottom-dump or tippler), cost approx. $2.5/tonne to an option to provide multiple rail conveyors to the wharf area, operate up to 20mTPA. lines for multiple trains, within the wash-down facilities etc. rail loop. It is expected to take 7 barge Material will be taken from storage loads to fill a 180,000t cape The unloading facility will also sheds to loading facilities by way size which could be loaded in include a rail unloader (tippler). of a 1.2km long enclosed 2.5 days. conveyor which would necessitate The cost of this is in the range of crossing a small section river at an $40m-$80m depending on the Based on this, it is expected throughput rate and if a multicar est. cost of $12m to $18m that to achieve 20mtpa will tippler is used. require on average a little over The facility will be designed to 2 barge movements a day to Once the train is unloaded, the minimise dust and noise. The load 114 cape size vessels material is conveyed a short negative pressure shed offers dust throughout the year. distance to a number of storage suppression and rain protection sheds. which will meet the latest Transhipment is common environmental standards. The major advantage of this throughout the world, and is proposed port expansion is that becoming more widely utilised train movements are kept out of as environmental and cost the Central Business District and pressures are making the rail/road interactions are construction of greenfield ports minimised. difficult. PORT PIRIE PORT PIRIE Port Pirie Resource Projects Existing Port Facilities Port Pirie has been identified as a The Yorke and Mid-North/Braemar Port Pirie’s existing port facilities strategic port solutions to the region currently has two operating are open access and are operated expanding mining sector in South mines: White Dam (gold) and by Flinders Ports Pty Ltd who Australia. The City is ideally located Honeymoon (uranium). manage shipping, maintain port, in the upper Spencer Gulf region of channel, wharfs etc. An South Australia. It is only 2 ½ hours Current development activity in the Agreement to use the Port Pirie north of the states capital Adelaide, is Braemar region is predominantly shipping channel would be central to the increasing mining around iron ore and uranium, with required to be entered into with activities being experienced in the numerous magnetite projects at Flinders Ports. east (Braemar region) and to the advanced stages of development North (Olympic Dam & the Woomera within the area between Peterborough Port Pirie is effectively located on protected region) of South Australia, and Broken Hill in New South Wales, a river with the overall shipping and is the gateway to the spectacular and a number of uranium prospects channel into the port being Southern Flinders Ranges. around the existing Honeymoon mine approximately 9 nautical miles in and northwards (into the Far North length and with a channel depth of Port Pirie has a growing population of region). If all of the significant iron 6.4 metres and 90m wide. 17,000 and is the major regional prospects located along the existing service centre to the mid north of the rail corridor progress to production, The port features approx. 11 state. this could result in the Braemar region berths of which Nyrstar operate 4, providing over 50 million tonnes per with2 being used for recreation; 2 The City boasts modern regional year. The Yorke Peninsula region has for vessel storage and potentially 3 health facilities, offering a variety of continued its history of providing rich being potentially available for third general and specialist medical copper deposits, with the Hillside party use. services. It has a thriving retail sector project nearing the construction phase, and a large range of cultural and and a number of other exploration The port currently services recreation actives to choose from.
Recommended publications
  • Central Eyre Iron Project Environmental Impact Statement
    Central Eyre Iron Project Environmental Impact Statement EIS REFERENCES REFERENCES COPYRIGHT Copyright © Iron Road Limited, 2015 All rights reserved This document and any related documentation is protected by copyright owned by Iron Road Limited. The content of this document and any related documentation may only be copied and distributed for the purposes of section 46B of the Development Act, 1993 (SA) and otherwise with the prior written consent of Iron Road Limited. DISCLAIMER Iron Road Limited has taken all reasonable steps to review the information contained in this document and to ensure its accuracy as at the date of submission. Note that: (a) in writing this document, Iron Road Limited has relied on information provided by specialist consultants, government agencies, and other third parties. Iron Road Limited has reviewed all information to the best of its ability but does not take responsibility for the accuracy or completeness; and (b) this document has been prepared for information purposes only and, to the full extent permitted by law, Iron Road Limited, in respect of all persons other than the relevant government departments, makes no representation and gives no warranty or undertaking, express or implied, in respect to the information contained herein, and does not accept responsibility and is not liable for any loss or liability whatsoever arising as a result of any person acting or refraining from acting on any information contained within it. References A ADS 2014, Adelaide Dolphin Sanctuary, viewed January 2014, http://www.naturalresources.sa.gov.au/adelaidemtloftyranges/coast-and-marine/dolphin-sanctuary. Ainslie, RC, Johnston, DA & Offler, EW 1989, Intertidal communities of Northern Spencer Gulf, South Australia, Transactions of the Royal Society of South Australia, Adelaide.
    [Show full text]
  • EYRE PENINSULA 9/9/2019 – 14/9/2019 Itinerary
    EYRE PENINSULA 9/9/2019 – 14/9/2019 Itinerary Day 1 Monday 9 Sept. Drive to Port Lincoln. 7:30 am start and brief stop in Lipson and Tumby Bay on the way to Lincoln and at Poonindie Mission and church. Other stops in Port Augusta, Whyalla, Cowell etc. Overnight at the modern and luxurious four star four storey Port Lincoln Hotel on the Esplanade. PORT LINCOLN HOTEL/MOTEL DINNER BED & BREAKFAST Day 2 Tuesday 10 Sept. Morning tour to spectacular Whalers Way with side trip to Mikkira Homestead ruins. Admission about $5 to be paid on the day and not included. Afternoon explorations of Port Lincoln, including a drive to the lookout over the bay. PORT LINCOLN HOTEL/MOTEL DINNER BED & BREAKFAST Day 3 Wednesday 11 Sept. We head up the coast and stop in to Coffin Bay. Stop Dutton Bay on way for morning tea. Brief stops at Sheringa and Lake Hamilton and its pioneer cemetery. Lunch stop in Elliston where we take southern coast drive circuit. We travel on to Colton for brief stop at the church and burial site of SA’s first Greek settler. We pass through Venus Bay on our journey to Streaky Bay. We stay at Streaky Bay Hotel Motel right on the esplanade. STREAKY BAY HOTEL/MOTEL DINNER, BED & BREAKFAST Day 4 Thursday 12 Sept. We explore the town and then drive a circuit from Streaky Bay to Sceale Bay, Point Labatt with its seal colony and then inland to Murphy’s haystacks. We will see Eyre’s memorial near Streak Bay.
    [Show full text]
  • Heavy Metal Contamination in the Northern Spencer Gulf
    ENVIRONMENT PROTECTI ON AUTH ORITY Heavy metal contamination in the northern Spencer Gulf—a community summary The northern Spencer Gulf is an important environmental, social and economic region in South Australia. Its vast seagrass meadows, saltmarshes and mangrove forests sustain a diverse aquatic ecosystem. It is a Studies significant nursery and feeding area for a number of commercially important fish and shellfi sh, including King George whiting, southern sea garfi sh, snapper, conducted southern calamari, blue swimmer crabs and king prawns. over a number The aquaculture of yellowtail kingfish is also expanding in the region and ecotourism continues to of decades grow, particularly due to the annual spawning of the Australian giant cuttlefi sh near Whyalla. have shown The northern Spencer Gulf is also an important industrial area, accommodating industries such as the elevated Zinifex lead-zinc smelter at Port Pirie (formerly known as Pasminco) and the OneSteel steelworks at Whyalla. levels of While the industries in the region provide economic benefit to the state, they discharge signifi cant amounts of heavy metals into the air, onto land and metals in the directly to the gulf waters. Studies conducted over a number of decades have upper section shown elevated levels of metals in the upper section of the gulf, particularly in Germein Bay near Port Pirie. of the gulf. Steelworks at Whyalla Port Pirie smelter > heavy metal pollution has affected the diversity of animal life in the region, with a reduction in the number of animals living in seagrass beds near the pollution sources > concentrations of some metals in razorfi sh collected from Germein Bay, near Port Pirie, were found to be Factors affecting the water above food standards; as a result, the collection of quality of the northern marine benthic molluscs is currently prohibited from Spencer Gulf most of Germein Bay.
    [Show full text]
  • Coke Making in the Illawarra : a Talk Given by Don Reynolds
    COKE MAKING IN ILLA WARRA A talk given by Don Reynolds to the Society in March 2006. Coke making began in Illawarra in 1874 by Osborne and Ahearn who built a small battery of circular beehive coke ovens on a site just to the south of Wollongong Harbour, that undertalcing only lasted till about 1890. In 1984 the site was exposed by council when carrying out road works just south east of Belmore Basin; the site was examined and recorded by Brian Rogers and then filled in. In 1884 Thomas Bertram opened the Broker's Nose Coal Company in the escarpment behind what is now CorrimaJ; he built a set of 7 beehive coke ovens (presumably of the circular type) on the northern side of Tarrawanna Road, it appears that these ovens only operated spasmodically. The Southern Coal Company (SCC) was formed in the UK to build a coJliery on the southern slopes ofMt Kembla and a railway from the mine to a jetty they were building in an unprotected bay at Five Islands. They also built a large set of modem rectangular beehive coke ovens alongside their railway near where the Commonwealth Steel stainless steel plant was much later built. This coke ovens plant, which was known as the Australian Coke Making Company, went into service in 1888. The coal mine of the SCC immediately ran into problems due to geological disturbances and the mine was abandoned. They negotiated with Thomas Bertram and leased his Corrimal coal mining and railway facilities in order to meet their commitments. The SCC quickly upgraded the Corrimal facility and began to rail coal to their new jetty and coke works.
    [Show full text]
  • There Has Been an Italian Presence in the Riverland Since
    1 Building blocks of settlement: Italians in the Riverland, South Australia By Sara King and Desmond O’Connor The Riverland region is situated approximately 200 km. north-east of Adelaide and consists of a strip of land on either side of the River Murray from the South Australian-Victorian border westwards to the town of Morgan. Covering more than 20,000 sq. km., it encompasses the seven local government areas of Barmera, Berri, Loxton, Morgan, Paringa, Renmark and Waikerie.1 The region was first identified as an area of primary production in 1887 when two Canadian brothers, George and William Chaffey, were granted a licence to occupy 101,700 hectares of land at Renmark in order to establish an irrigated horticultural scheme. By 1900 a prosperous settlement had developed in the area for the production of vines and fruit, and during the 1890s Depression other ‘village settlements’ were established down river by the South Australian Government to provide work for the city-based unemployed.2 During the years between the foundation of the villages and the First World War there was intense settlement, especially around Waikerie, Loxton, Berri and Barmera, as the area was opened up and increased in value.3 After World War 1, the SA Government made available new irrigation blocks at Renmark and other localities in the Riverland area to assist the resettlement of more than a thousand returned soldiers. A similar scheme operated in New South Wales, where returned servicemen were offered blocks in Leeton and Griffith, in the Murrumbidgee Irrigation Area.4 The period after World War 2 saw further settlement of returned soldiers on fruit blocks in the Riverland and new irrigation areas were developed to cater for this growth.
    [Show full text]
  • The Development of Coal Trade in the Wollongong District of New South Wales, with Particular Reference to Government and Business, 1849-1889
    University of Wollongong Research Online University of Wollongong Thesis Collection 1954-2016 University of Wollongong Thesis Collections 1993 The development of coal trade in the Wollongong district of New South Wales, with particular reference to government and business, 1849-1889 Henry Lee Dr UOW College, [email protected] Follow this and additional works at: https://ro.uow.edu.au/theses University of Wollongong Copyright Warning You may print or download ONE copy of this document for the purpose of your own research or study. The University does not authorise you to copy, communicate or otherwise make available electronically to any other person any copyright material contained on this site. You are reminded of the following: This work is copyright. Apart from any use permitted under the Copyright Act 1968, no part of this work may be reproduced by any process, nor may any other exclusive right be exercised, without the permission of the author. Copyright owners are entitled to take legal action against persons who infringe their copyright. A reproduction of material that is protected by copyright may be a copyright infringement. A court may impose penalties and award damages in relation to offences and infringements relating to copyright material. Higher penalties may apply, and higher damages may be awarded, for offences and infringements involving the conversion of material into digital or electronic form. Unless otherwise indicated, the views expressed in this thesis are those of the author and do not necessarily represent the views of the University of Wollongong. Recommended Citation Lee, Henry Dr, The development of coal trade in the Wollongong district of New South Wales, with particular reference to government and business, 1849-1889, Doctor of Philosophy thesis, Department of History and Politics, University of Wollongong, 1993.
    [Show full text]
  • Submission: SA 2021–2022 State Budget
    Advocating for SA Submission: SA 2021–2022 State Budget March 2021 756k+ $50m 70k+ members member discounts insurance claims and savings settled RAA at a glance South Australia’s Advocating for South $230m+ Australians341k+ for over 38k+770k+ 1000+ insulargestrance claims road se rvice currenttravel members staff employed membershippaid organisation 115cal loutsyears (55%bookin of SAgs adults) across SA 13% 20% 75+ 16—34 37% 31% 150k+ 55—74 35—54 Largest 340k+ RAA29k+ members are Our1000+ members span 7k+personal lines roadside callouts peoplealso edu cyclistscated on road, Southall adult Aust ageralians groups vinsurerehicle in SA per year bike and child safety employed inspections 500+ 530+ businesses accredited 27k 23k+ tourism providers through RAA’s Approved SA school students educated free lessons delivered to promoted13k+ on Experience SA Repairer12k+ network on 1.3k+road safety each year keep SA learner drivers safe driver education COVID-19 COVID-19 2 lessons care calls care deliveries Contents Foreword Executive summary 4 RAA is South Australia’s largest member organisation, Road safety 5 representing more than 770,000 South Australians – Public transport 6 about half the state’s population. Our diverse motor, Future mobility 6 home and travel expertise means that we can help translate public policy into opportunity for South Cycling 7 Australians and advocate for the things that matter. Tourism 7 RAA’s advocacy efforts support the economic prosperity Key recommendations for the 2021–2022 8 of South Australia, including its regions – recognising State Budget our role as an employer of almost 1,000 people across Road safety 9 our state.
    [Show full text]
  • Discover South Australia's Eyre Peninsula Day 1. Adelaide
    www.drivenow.com.au – helping travellers since 2003 find the best deals on campervan and car rental Discover South Australia’s Eyre Peninsula One of Australia’s lesser explored regions, the Eyre Peninsula in South Australia is home to some of the most stunning coastlines and the Seafood capital of Australia, Port Lincoln, on Boston Bay. This 10 day 1565km tour takes you north from Adelaide to Port Augusta before heading south and looping around the Peninsula. Day 1. Adelaide Collect your campervan in Adelaide today. Even for those who have travelled by campervan before, allow an hour in order to familiarise yourself with the vehicle before you leave the branch. Adelaide is the capital city of South Australia and offers a variety of activities suited to everyone’s tastes. Visit Hahndorf, Australia’s oldest surviving German settlement. The town retains a strong German heritage, transporting you to an entirely new cultural experience. There are plenty of places to try some food, buy some souvenirs and enjoy the history. If you have time, visit the Art Gallery of South Australia to top off your cultural day! Founded in 1881, the gallery is found in the cultural precinct of Adelaide, right next to www.drivenow.com.au – helping travellers since 2003 find the best deals on campervan and car rental the Adelaide Museum and University of Adelaide. The gallery has a collection of over 38,000 works comprising of different nationalities and types. Stay: Adelaide Caravan Park Day 2. Adelaide to Port Pirie Depart this morning and follow the National Highway 1 to the Spencer Highway/ B89 in Bungama.
    [Show full text]
  • SOUTH AUSTRALIA, Statistical Divisions 1010101010101010 10
    SOUTH AUSTRALIA, Statistical Divisions CooberCooberCoober PedyPedyPedy 3535 NorthernNorthern RoxbyRoxbyRoxby DownsDownsDowns WoomeraWoomera CedunaCedunaCeduna PortPortPort AugustaAugustaAugusta 1515 YorkeYorke andand PortPortPort PiriePiriePirie LowerLower NorthNorth 3030 EyreEyre RenmarkRenmarkRenmark 2020 MurrayMurray LandsLands PortPortPort LincolnLincolnLincoln Murray Lands MurrayMurray BridgeBridge 0505 0505 KingscoteKingscoteKingscote AdelaideAdelaide 1010 2525 OuterOuter AdelaideAdelaide SouthSouth EastEast NaracoorteNaracoorteNaracoorte MountMount GambierGambierGambier 0 500 Kilometres 184 ABS • AUSTRALIAN STANDARD GEOGRAPHICAL CLASSIFICATION (ASGC) • 1216.0 • JUL 2006 SOUTH AUSTRALIA, Adelaide Statistical Division P o r t W a GawlerGawlerGawler k GawlerGawlerGawler e f i e l d R d d R h t r o N in a M ElizabethElizabethElizabeth BBaaarrrrkkkeeerrrr IIIIInnnllllleeetttt 05050505 NorthernNorthern AdelaideAdelaide 0505 AdelaideAdelaide BoatingBoating LakeLakeLake 05100510 WesternWestern AdelaideAdelaide 05150515 rrrr RRiiiiivvvveeerrrr rrrrrrreeennnsss RR TTTooorrrrrrreee EasternEastern AdelaideAdelaide y w H c za An GulfGulf StSt VincentVincent P rin c es H w y HappyHappy ValleyValley ReservoirReservoir 05200520 SouthernSouthern AdelaideAdelaide NoarlungaNoarlungaNoarlunga 05100510 Statistical Subdivision WesternWestern AdelaideAdelaide 0505 Statistical Division AdelaideAdelaide 0 20 Kilometres ABS • AUSTRALIAN STANDARD GEOGRAPHICAL CLASSIFICATION (ASGC) • 1216.0 • JUL 2006 185 SOUTH AUSTRALIA, Statistical Subdivisions and Statistical
    [Show full text]
  • Attachment A: COVID-19 Economic Stimulus Proposal Roads
    Attachment A: COVID-19 Economic Stimulus Proposal Roads Casualty crashes (fatality Road name Key road crashes) (and section) Project description Region users 2014-18 Justification SA Road Maintenance – Statewide Freight 26,229 (437) DPTI has identified a renewal backlog across the SA network at around $723 Network Progress existing Commuter million, which has serious long-term road safety and cost implications if not commitments and boost Local addressed. The recently announced $120m package is welcomed. However, further road maintenance Tourism spending in this area would have significant benefits. RAA, Infrastructure Australia works across the and the SA Freight Council have identified clearing the backlog as a key priority. network to address the COVID-19 has meant more of SA’s freight is reliant upon our road network, making $723 million renewal a strong maintenance program even more critical at this time. In RAA's regional backlog, including an road assessments, respondents consistently indicate that roads are not maintained arterial road resealing to an acceptable standard, with uneven surfaces and potholes some of the most program for the metro regularly raised issues. The condition of sealed roads was voted as the top road area. safety issue in each of the past 5 regional road assessment surveys, and maintenance was listed as having the biggest impact to tourism. Clearing the backlog would, make the road network safer, more efficient for freight and better for road-based tourism. Salisbury Maintenance – Greater Freight 88 (1) Salisbury Highway forms a vital link for freight and commuters to Outer Harbor, the Highway Rehabilitate and Adelaide Commuter North South Motorway and the Northern Connector and is therefore one of the (Port resurface 4km of the busiest road segments in metropolitan Adelaide with an annual average daily traffic Wakefield Salisbury Highway of 67,300 vehicles.
    [Show full text]
  • Yorke Peninsula Council Rural Roads Rack Plan
    .! .! .! .! ! . !. !. !. !. .! !. !. .! ! . !. !. ! . !. !. !. ! . ! . ! . .! !. !. !. ! ! . ! . ! . ! . ! . ! RACK PLAN 953 CO . ! PPE . ! R COAS Yorke Peninsula Council HIG T HWAY !. !. K Y O . ! D ! C . E O G N D A AILWAY O R R T R !. W E A D D O H C E COCONUT R O CE R . TERRA ! G R . O ! A A E R I Rural Roads R E A N B R O R N O Y O E . ROAD ! N E R D T . ! D R R A D N RO O A HOLMA S . .! ! C O N P R ! . This plan reflects the Rural & State road names & road A L A E S . DLER ROAD ! B A C . PE ! B IN N A U R A L SS S W E R D D E I A C D N A O D . ! S R T D IR B O A C O . O A R ! H A H extents approved by the Yorke Peninsula Council U O G T O O P O T P D P !. O A R . R E ! O D M A . R ! A D P R A A D O PORT ARTHUR 5572 H O AD S R .! E O R OAD R R D NG E I . NA ! PE MSH LA R N G R ! . CKEY ROAD STU S N L O (Section 219 Local Government Act) C H Y U D .! C L M D C O A R W A . L ! O E IL K H D .! U A YS D E . ! L O EL V O K A A .
    [Show full text]
  • CARRAPATEENA PROJECT Environment Protection and Biodiversity Conservation Act 1999 – Referral of Proposed Action
    CARRAPATEENA PROJECT Environment Protection and Biodiversity Conservation Act 1999 – Referral of Proposed Action March 2017 Carrapateena Project This page has been left blank intentionally. Carrapateena Project / March 2017 Carrapateena Project EPBC Referral of Proposed Mining Lease and Associated Tenements ACKNOWLEDGEMENTS Kokatha Aboriginal Corporation The Kokatha People have a direct, unbroken and unique relationship with the land on which the Carrapateena Project is located. OZ Minerals recognises that the sense of place and belonging of the Kokatha People is linked to their identity, creation stories, travel, trade, ceremonies, family and places held sacred. We recognise the deep and ongoing feelings of relationship and attachment they hold for their lands. OZ Minerals acknowledges Kokatha connection to ‘country’, the contribution of Kokatha People to their region and the enduring importance to Kokatha People of values, cultural authority, cultural norms and customary laws. OZ Minerals places great value on our relationship with the Kokatha People. OZ Minerals and Kokatha Aboriginal Corporation seek to work in partnership, as equals, to further develop the Partnering Agreement Nganampa palyanku kanyintjaku ‘Keeping the future good for all of us’. This collaborative agreement encapsulates, recognises and values the ongoing contribution of both partners, and will inform the relationship between Kokatha and OZ Minerals throughout and beyond the development of the Carrapateena Project. Pernatty and Oakden Hills Station Owners The Far North region of South Australia has a long and rich history of pastoralism. The proposed Carrapateena Project is located on Pernatty station and the proposed supporting infrastructure is located within Oakden Hills Station. OZ Minerals recognises the importance of the land to its owners and their operations and acknowledges their cooperation in developing the Project.
    [Show full text]