World Bank Document PROCUREMENT PLAN (Textual Part) Project information: country]Sri Lanka – Water Resources Management Project-P-166865 Project Implementation agency: Ministry of Mahaweli Development and Environment Public Disclosure Authorized Date of the Procurement Plan: 24 June, 2019 Period covered by this Procurement Plan: 24 June 2019-31 Dee. 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan Public Disclosure Authorized for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with the Procurement Regulations for IPF Borrowers (July 2016, revised November 2017) (“Procurement Regulations”), when approaching the national market, as agreed in the Procurement Plan tables in STEP, the country’s own Public Disclosure Authorized procurement procedures may be used. When the Borrower, for the procurement of goods, works and non-consulting services, uses its own national open competitive procurement arrangements as set forth in Sri Lanka’s Procurement Guidelines 2006, such arrangements shall be subject to paragraph 5.4 of the Bank’s Procurement Regulations and the following conditions: 1. Only bidding documents acceptable to the Bank shall be used for all national open competitive procurement. 2. The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. Public Disclosure Authorized 3. The eligibility of bidders shall be as defined under Section III of the World Bank Procurement Regulations for IPF Borrowers (Procurement Regulations): accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. PROCUREMENT Sri Lanka : Sri Lanka Integrated Watershed and Water Resources Management Project PLAN General Information Country: Sri Lanka Bank’s Approval Date of the Original Procurement Plan: 2019-06-28 Revised Plan Date(s): (comma delineated, leave blank if none)2020-03-15 Project ID: P166865 GPN Date: 2019-09-23 Project Name: Sri Lanka Integrated Watershed and Water Resources Management Project Loan / Credit No: / Executing Agency(ies):Ministry of Mahaweli Development and Environment WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOMDE-117185-CW- RFQ / Refurbishment of Component 4: Project Request for Single Stage - One / Post Limited 45,311.47 38,887.42 Signed 2019-06-26 2019-06-18 2019-08-14 2019-09-04 2019-11-12 PMU office Management Quotations Envelope (IWWRMP/PP/WORKS/01) LK-MOMDE-123620-CW- RFB / Improvements to Unnichchai LB main channel Component 2: Infrastructure Single Stage - One / Post Request for Bids Open - National 923,033.71 0.00 Canceled 2019-12-09 2019-12-23 2020-01-13 2020-02-12 2020-03-18 2021-03-18 from stn 0+000 to stn Improvements Envelope 13+725 (IWWRMP- 2/WORKS/ID/OCBN/04-1) LK-MOMDE-124032-CW- RFB / Improvements to Unnichchai RB main channel Component 2: Infrastructure Single Stage - One / Post Request for Bids Open - National 906,741.57 0.00 Canceled 2019-11-22 2019-12-06 2019-12-27 2020-01-26 2020-03-01 2021-03-01 from stn 0+000 to stn 4+950 Improvements Envelope ( IWWRMP- 2/WORKS/ID/OCBN/04-2 ) LK-MOMDE-124217-CW- RFB / Improvements to Unnichchai RB main channel Component 2: Infrastructure Single Stage - One / Post Request for Bids Open - National 887,640.45 0.00 Canceled 2019-11-22 2019-12-06 2019-12-27 2020-01-26 2020-03-01 2021-03-01 from stn 4+950 to stn Improvements Envelope 10+000 ( IWWRMP- 2/WORKS/ID/OCBN/04-3 ) LK-MOMDE-124409-CW- RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One / Post Request for Bids Open - National 342,696.63 0.00 Canceled 2019-11-26 2019-12-10 2019-12-31 2020-01-30 2020-03-05 2021-03-05 Panama Tank ( IWWRMP- Improvements Envelope 2/WORKS/ID/OCBN/07 ) LK-MOMDE-124659-CW- RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One Peramaduwa Scheme ( / Post Request for Bids Open - National 898,876.40 0.00 Canceled 2019-12-20 2020-01-03 2020-01-24 2020-02-23 2020-03-29 2021-03-29 Improvements Envelope IWWRMP- 2/WORKS/ID/OCBN/17 ) LK-MOMDE-124666-CW- RFB / Improvements Component 2: Infrastructure Single Stage - One / Post Request for Bids Open - National 950,185.39 0.00 Canceled 2019-12-20 2020-01-03 2020-01-24 2020-02-23 2020-03-29 2021-03-29 Viyadikulam Spill ( Improvements Envelope IWWRMP- 2/WORKS/ID/OCBN/18-2 ) LK-MOMDE-124667-CW- RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One Abakolawewa Tank ( / Post Request for Bids Open - National 325,505.62 0.00 Canceled 2020-01-24 2020-02-07 2020-02-28 2020-03-29 2020-05-03 2021-05-03 Improvements Envelope IWWRMP- 2/WORKS/ID/OCBN/19 ) LK-MOMDE-124683-CW- RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One / Post Request for Bids Open - National 393,258.43 0.00 Canceled 2019-11-25 2019-12-09 2019-12-30 2020-01-29 2020-03-04 2021-03-04 Karawita tank ( IWWRMP- Improvements Envelope 2/WORKS/ID/OCBN/20 ) LK-MOMDE-125489-CW- RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One / Post Request for Bids Open - National 464,775.28 0.00 Canceled 2019-12-23 2020-01-06 2020-01-27 2020-02-26 2020-04-01 2021-04-01 Madiyawa Tank ( IWWRMP- Improvements Envelope 2/WORKS/ID/OCBN/23 ) LK-MOMDE-125508-CW- RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One Mannankatiya Tank ( / Post Request for Bids Open - National 280,898.88 0.00 Canceled 2019-12-27 2020-01-10 2020-01-31 2020-03-01 2020-04-05 2021-04-05 Improvements Envelope IWWRMP- 2/WORKS/ID/OCBN/27 ) LK-MOMDE-125511-CW- RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One Main Canal of Kimbulawana / Post Request for Bids Open - National 347,780.90 0.00 Canceled 2019-12-09 2019-12-23 2020-01-13 2020-02-12 2020-03-18 2021-03-18 Improvements Envelope Oya Scheme (LBMC) ( IWWRMP- 2/WORKS/ID/OCBN/28-1 ) LK-MOMDE-125513-CW- RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One Main Canal of Kimbulawana / Post Request for Bids Open - National 262,859.69 0.00 Canceled 2019-12-09 2019-12-10 2019-12-31 2020-01-30 2020-03-05 2021-03-05 Improvements Envelope Oya Scheme (RBMC) ( IWWRMP- 2/WORKS/ID/OCBN/28-2) Page 1 LK-MOMDE-125515-CW- RFB / Rehabilititation of Component 2: Infrastructure Single Stage - One / Post Request for Bids Open - National 896,067.42 0.00 Canceled 2019-12-09 2019-12-23 2020-01-13 2020-02-12 2020-03-18 2021-03-18 Maha Andara Wewa ( Improvements Envelope IWWRMP- 2/WORKS/ID/OCBN/29 ) LK-MOMDE-125834-CW- RFB / Improvement of Component 2: Infrastructure Single Stage - One Spillway Tail Canal of / Post Request for Bids Open - National 369,101.12 0.00 Canceled 2019-11-26 2019-12-10 2019-12-31 2020-01-30 2020-03-05 2021-03-05 Improvements Envelope Kotmale Dam ( IWWRMP- 2/WORKS/MASL/OCBN/101 ) LK-MOMDE-125839-CW- RFB / Repairs to gates of irrigation structures in Component 2: Infrastructure Single Stage - One / Post Request for Bids Open - National 337,078.65 0.00 Canceled 2019-12-06 2019-12-20 2020-01-10 2020-02-09 2020-03-15 2021-09-16 Kalawewa Left Bank main Improvements Envelope canal (IWWRMP- 2/WORKS/MASL//OCBN/105) LK-MOMDE-125846-CW- RFB / Reconstruction of Muthuiyankaddu RB Canal - Component 2: Infrastructure Single Stage - One Muthuiyankaddu Division - / Post Request for Bids Open - National 365,168.54 0.00 Canceled 2019-11-15 2019-11-29 2019-12-20 2020-01-19 2020-02-23 2020-11-19 Improvements Envelope Package 01 (RB/Track 03) ( IWWRMP- 2/WORKS/NPC/OCBN/200-1 ) LK-MOMDE-125994-CW- RFB / Reconstruction of Muthuiyankaddu LB Canal - Component 2: Infrastructure Single Stage - One / Post Request for Bids Open - National 337,078.65 0.00 Canceled 2020-02-14 2020-02-28 2020-03-20 2020-04-19
Recommended publications
  • Final Report Volume Ii Appendix (1/2)
    DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA MAHAWELI AUTHORITY OF SRI LANKA (MASL) PREPARATORY SURVEY ON MORAGAHAKANDA DEVELOPMENT PROJECT FINAL REPORT VOLUME II APPENDIX (1/2) JULY 2010 JAPAN INTERNATIONAL COOPERATION AGENCY NIPPON KOEI CO., LTD. SAD CR (5) 10-011 DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA MAHAWELI AUTHORITY OF SRI LANKA (MASL) PREPARATORY SURVEY ON MORAGAHAKANDA DEVELOPMENT PROJECT FINAL REPORT VOLUME II APPENDIX (1/2) JULY 2010 JAPAN INTERNATIONAL COOPERATION AGENCY NIPPON KOEI CO., LTD. PREPARATORY SURVEY ON MORAGAHAKANDA DEVELOPMENT PROJECT FINAL REPORT LIST OF VOLUMES VOLUME I MAIN REPORT VOLUME II APPENDIX (1/2) APPENDIX A GEOLOGY APPENDIX B WATER BALANCE Not to be disclosed until the APPENDIX C REVIEW OF DESIGN OF contract agreements for all the FACILITIES OF THE PROJECT works and services are concluded. APPENDIX D COST ESTIMATE APPENDIX E ECONOMIC EVALUATION VOLUME III APPENDIX (2/2) APPENDIX F ENVIRONMENTAL EVALUATION APPENDIX A GEOLOGY APPENDIX A GEOLOGY REPORT 1. Introduction Geological Investigations for Moragahakanda dam were commenced by USOM in 1959, and core drilling surveys were subsequently done by UNDP/FAO and Irrigation Department of Sri Lanka in 1967/1968 and 1977/1978 respectively. A full-scale geological investigation including core drilling, seismic prospecting, work adit, in-situ rock shear test, construction material survey and test grouting was carried out for the feasibility study by JICA in 1979 (hereinafter referred to FS (1979)). Almost twenty years had past after FS (1979), additional feasibility study including 34 drill holes was carried out by Lahmeyer International Associates in 2000/2001 (hereinafter referred to FS (2001)). Subsequently, supplemental geological investigations including core drilling, electric resistivity survey and laboratory tests for rock materials were done by MASL in 2007.
    [Show full text]
  • The Government of the Democratic
    THE GOVERNMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA FINANCIAL STATEMENTS OF THE GOVERNMENT FOR THE YEAR ENDED 31ST DECEMBER 2019 DEPARTMENT OF STATE ACCOUNTS GENERAL TREASURY COLOMBO-01 TABLE OF CONTENTS Page No. 1. Note to Readers 1 2. Statement of Responsibility 2 3. Statement of Financial Performance for the Year ended 31st December 2019 3 4. Statement of Financial Position as at 31st December 2019 4 5. Statement of Cash Flow for the Year ended 31st December 2019 5 6. Statement of Changes in Net Assets / Equity for the Year ended 31st December 2019 6 7. Current Year Actual vs Budget 7 8. Significant Accounting Policies 8-12 9. Time of Recording and Measurement for Presenting the Financial Statements of Republic 13-14 Notes 10. Note 1-10 - Notes to the Financial Statements 15-19 11. Note 11 - Foreign Borrowings 20-26 12. Note 12 - Foreign Grants 27-28 13. Note 13 - Domestic Non-Bank Borrowings 29 14. Note 14 - Domestic Debt Repayment 29 15. Note 15 - Recoveries from On-Lending 29 16. Note 16 - Statement of Non-Financial Assets 30-37 17. Note 17 - Advances to Public Officers 38 18. Note 18 - Advances to Government Departments 38 19. Note 19 - Membership Fees Paid 38 20. Note 20 - On-Lending 39-40 21. Note 21 (Note 21.1-21.5) - Capital Contribution/Shareholding in the Commercial Public Corporations/State Owned Companies/Plantation Companies/ Development Bank (8568/8548) 41-46 22. Note 22 - Rent and Work Advance Account 47-51 23. Note 23 - Consolidated Fund 52 24. Note 24 - Foreign Loan Revolving Funds 52 25.
    [Show full text]
  • A Case Study of the Kotmale Dam in Sri Lanka Jagath Manatungea* and Naruhiko Takesadab
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Digital Repository, University of Moratuwa International Journal of Water Resources Development Vol. 29, No. 1, March 2013, 87–100 Long-term perceptions of project-affected persons: a case study of the Kotmale Dam in Sri Lanka Jagath Manatungea* and Naruhiko Takesadab aDepartment of Civil Engineering, University of Moratuwa, Sri Lanka; bFaculty of Humanity and Environment, Hosei University, Tokyo, Japan (Received 3 June 2012; final version received 11 June 2012) Many of the negative consequences of dam-related involuntary displacement of affected communities can be overcome by careful planning and by providing resettlers with adequate compensation. In this paper the resettlement scheme of the Kotmale Dam in Sri Lanka is revisited, focusing on resettlers’ positive perceptions. Displaced communities expressed satisfaction when income levels and stability were higher in addition to their having access to land ownership titles, good irrigation infrastructure, water, and more opportunities for their children. However, harsh climate conditions, increased incidence of diseases and human–wildlife conflicts caused much discomfort among resettlers. Diversification away from paddy farming to other agricultural activities and providing legal land titles would have allowed them to gain more from resettlement compensation. Keywords: dam construction; involuntary displacement; livelihood rebuilding; resettlement compensation Introduction Over the decades, there has been growing concern about the negative consequences of the involuntary displacement of rural communities for large-scale infrastructure development (De Wet, 2006; Robinson, 2003). The construction of dams is the most often cited example of development projects that cause forced displacement of communities (McCully, 2001).
    [Show full text]
  • 1 SRI LANKA: Integrated Watershed & Water Resources Management
    SRI LANKA: Integrated Watershed & Water Resources Management Project Executive Summary of Safeguard Documents (A) ENVIRONMENT AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) Background: The Global Climate Risk Index 2019 ranks Sri Lanka as the second among the most affected countries of the World by climate change. The impacts of climate change are already starting to show with severe and long duration droughts followed by severe flooding and landslides occurring almost every year in several parts of the country. The island’s major rivers originate from the mountains in the central region and radiate out to the lowlands to distribute water across the country; making the central region the main watershed of the country. Over the years, forest cover in the upper watersheds have been extensively modified, degraded and fragmented. The natural montane wetlands and marshlands have been converted to agricultural lands and other anthropogenic land uses. Lowered capacity for water infiltration and retention in the upper watershed areas has contributed to increasingly variable and uncertain water availability affecting agriculture and industrial growth, community and individual livelihoods, and even lives. Studies show that these trends are likely to exacerbate, and the wetter areas of the country would eventually become wetter and the drier areas drier. Unplanned settlements, industrial projects, and maladaptive agricultural practices are creating additional water stresses. It is estimated that approximately 80% of the river basins have greatly reduced their water quality and quantity due to these unplanned activities. Sri Lanka’s water resources are critically important to sustain the country’s socio-ecological integrity and development goals. As such, the Government of Sri Lanka (GoSL) has initiated many watershed and water resources management programs focusing on various geographical areas of the country to address these challenges.
    [Show full text]
  • Statistical Book
    Mahaweli Authority of Sri Lanka Socio – Economic Statistics 2018 Mahaweli Authority of Sri Lanka Mahaweli Authority of Sri Lanka was Established Under Act No. 23 of 1979 VISION “The best organization in Sri Lanka, in excellence use of land & water for the innovative Agriculture, renewable energy, conserving environment and raising the living standards of citizens” MISSION “We strive to lead the use of land & water for the innovative Agriculture productivity based on the latest technology supplementing the generation of renewable energy, best environment and tourism for the enrichment of the Sri Lankan community and their living standards” Contents Selected Economic and Social Indicators I- IV 1. Introduction 01-02 2. Background Information 03-05 2.1. Mahaweli Areas belonging to the Mahaweli Authority of Sri Lanka 2.2. Basic Information on Mahaweli Areas 3. Irrigation and Power Generation 06-16 3.1. Current Water Capacity of Irrigation Reservoirs for Agriculture as at 31.12.2018 3.2. Hydropower Generation in Major Reservoirs and Mini Hydropower Stations 4. Land Development 17-20 5. Settlement and Household Information 21-29 6. Economic and Social Infrastructure Facilities 30-37 6.1. Social Infrastructure Facilities (Cumulative) 6.2. Social and Economic Infrastructure Facilities (Cumulative) – 2018 6.3. Distribution of Type of Schools in Mahaweli Areas – 2018 6.4. Economic Infrastructure Facilities (Cumulative) 7. Agriculture and Livestock 38-84 7.1. Agriculture 7.2. Extent and Production of Other Field Crops in Mahaweli Areas 7.3. Livestock and Inland Fish 8. Investment Projects in Mahaweli Areas 85-86 9. SME Loan Facilities in Mahaweli Areas – 2018 87-88 10.
    [Show full text]
  • Feasibility Study for Expansion of Victoria Hydropower Station in Sri Lanka
    Ministry of Power and Energy Ceylon Electricity Board Democratic Socialist Republic of Sri Lanka Feasibility Study for Expansion of Victoria Hydropower Station in Sri Lanka Final Report (Summary) June 2009 Japan International Cooperation Agency Electric Power Development Co., Ltd. Nippon Koei Co., Ltd. PROJECT AREA Location Map Existing Victoria Dam Existing Powerhouse & Switchyard Existing Intake for Expansion Existing Surge Tank Existing Powerhouse Existing Powerhouse Units Expansion Area adjacent to Existing Powerhouse Work Shop Held on February 11, 2009 SUMMARY Feasibility Study for Expansion of Victoria Hydropower Station Table of Contents Conclusions and Recommendations Conclusions.....................................................................................................................1 Recommendations...........................................................................................................7 Chapter 1 Introduction Chapter 2 General Information of Sri Lanka 2.1 Geography ............................................................................................................12 2.2 Climate .................................................................................................................12 2.3 Government ..........................................................................................................12 2.4 Population.............................................................................................................13 2.5 Macro-economy....................................................................................................13
    [Show full text]
  • Pumped Energy Storage System for the Randenigala Hydropower Plant in Sri Lanka
    Pumped Energy Storage System for the Randenigala Hydropower Plant in Sri Lanka Duminda Nalin Habakkala Hewage Master of Science Thesis KTH School of Industrial Engineering and Management Energy Technology TRITA-ITM-EX 2018:161 Division of Heat & Power SE-100 44 STOCKHOLM Master of Science Thesis in Energy Technology TRITA-ITM-EX 2018:161 Pumped Energy Storage System for the Randenigala Hydropower Plant in Sri Lanka Duminda Nalin Habakkala Hewage Approved Examiner Supervisors at KTH 2018-06-26 Miroslav Petrov - KTH/ITM/EGI Amir Vadiee, Miroslav Petrov Commissioner Local Supervisor Open University of Sri Lanka Dr. K.A.C. Udayakumar Abstract The main focus of this thesis work is to perform a preliminary evaluation for the introduction of a pumped energy storage system to an existing hydropower plant located on the Randenigala water reservoir in Sri Lanka. The selected power plant is located in an area where farming is done extensively, therefore electrical power generation and release of water for downstream irrigation purposes is to be properly coordinated with relevant authorities. The solution to this situation is to introduce a wind powered pumped energy storage power plant to the Mahaweli hydro cascade for the purpose of saving peak power for around half an hour. A feasibility study was carried out on the utilization of wind energy and excess power to drive the motors of the pumped storage system. Three versions with different numbers of pump motors and wind turbines have been considered to meet the half hour peak demand of the energy storage system. The optimum number of turbines and motor capacities and their number and brand have been selected with view of both energy and water management system.
    [Show full text]
  • Introduction
    A Place for Dams in The 21st Century? INTRODUCTION “remarkable feat in the history of mankind to reshape and exploit the resources” was how AChinese President Jiang Zemin described the closure of the Yangtze River in November 1997.1 Similar statements have been made by every major politician in developed and developing countries in the past 60 years. Scientists, economists, artists and naturalists have also been ‘impressed and inspired’ by the human endeavour to ‘exploit’ rivers to produce food and energy.2 Differing Viewpoints Dam construction has raised concerns and sentiments in many countries (see, for example, comments on the Three Gorges Dam, Box 1). The greatest challenge now is to start a genuine and fruitful debate on finding the most suitable ways and means to meet energy needs, water requirements and food production, while conserving biodiversity. Dams have to be seen as a means to an end, rather than an end in themselves. The conservation of natural resources and an improvement in the quality of human life should be at the heart of this issue. The issues and debates over large dams have not changed significantly since the 1940s and 1950s. What has changed is that dam construction has shifted geographically from developed to developing countries. Several developing countries that are now building similar, or even larger, dams than those in the west emphasise the same arguments of the benefits of dams. WWF, in principle, does not favour the construction of any new large dam as they all lead to environmental damage. In the past, WWF has expressed concern over many proposed dams – The large dam Gabcikovo and Hydrovia, for example.
    [Show full text]
  • Back on the Road Next Month
    BILLIONS IN LOSSES CUSTOMS FRIED BY PALM OIL IMPORTERS SLPP-SLFP RS. 70.00 PAGES 80 / SECTIONS 7 VOL. 03 – NO. 11 SUNDAY, DECEMBER 13, 2020 HIT BY SHORT-CIRCUITING NEW FUEL THE POWER FORMULA ALLIANCE SECTOR? COMING SOON BLUES »SEE PAGE 4 »SEE PAGE 3 »SEE BUSINESS PAGE 1 »SEE PAGES 8 & 9 GENERAL PREVENTIVE GUIDELINES For verified information on the coronavirus (Covid-19) contact any of the following authorities Suwasariya Ambulance Service 1999 Health Promotion Bureau Quarantine Unit 0112 112 705 1990 Epidemiology Unit 0112 695 112 Govt. coronavirus hotline 0113071073 PRESIDENTIAL SPECIAL TASK FORCE FOR ESSENTIAL SERVICES Telephone 0114354854, 0114733600 Wash hands with soap for 40-60 Wear a commercially available mask/ Maintain a minimum distance Use gloves when shopping, using Use traditional Sri Lankan greeting Always wear a mask, avoid crowded Hotline 0113456200-4 seconds, or rub hands with alcohol- cloth mask or a surgical mask at all of 1 metre from others, especially public transport, etc. and discard into at all times instead of handshaking, vehicles, maintain distance, and wash Fax 0112333066, 0114354882 based handrub for 20-30 seconds times in public places in public places a lidded bin lined with a bag hugging, and/or kissing hands before and after travelling Email [email protected] RUWANPURA EXPRESSWAY Ministry mulls noble violation? z Maga submits lowest bids for Ruwanpura Expressway z Only entitled to one section under tender conditions BY MAHEESHA MUDUGAMUWA expressway. However, according to the bids submitted by other companies expedited, considering the delay faced calculated and then a loan would be the tender conditions, one company are nowhere near as low as the bids by the project during the past few applied from state banks to raise the The Ministry of Highways is likely to seek special permission could bid only for one section of the submitted by Maga Engineering.
    [Show full text]
  • Dam Safety – Annexes
    Annexes: Concept Paper for a Dam-related Hazard Warning System in Sri Lanka A Participatory Study on Actions Required to Avoid and Mitigate Dam Disasters http://www.lirneasia.net/2006/01/Dam-Safety-Concept-Paper-Released/ Annex A Consultation Process Input.........................................................t A1 Annex B Comments on Interim Concept Paper: H.A.L.S Yapa, Hydro Tasmania, Australia.................................................................a A19 Annex C Expert Consultation Agenda: 20 May 2005 ................................ A25 Annex D Expert Consultation Invitation letter..........................................r A26 Annex E Sample Public Consultation (town meeting) invitation Letter: Gampola, 2 July 2005*5 ............................................................ A28 Annex F Public Consultation (town meeting) Agenda: Kandy, 2 July 2005.A315 Annex G Public Consultation (town meeting) Agenda: Polonnaruwa, 16 July 2005 ...................................................................................... A32 Annex H Media Conference Agenda: 10 August, 2005..............................5 A33 Annex I Press Conference invitation letter: 10, August 2005 ................... A35 16 January 2006 Annexes: Concept Paper for a Dam-related Hazard Warning System in Sri Lanka Annex A Consultation Process Input Annex A: Consultation process input Comment/Suggestion and Source Response Explanation Governance One agency should be entrusted with dam oversight. Accepted with The agency must not, for ???, Irrigation Department caveat reasons of potential interference, be involved in owning/operating dams. Attempts in the past to create legislation have not Noted progressed past legal drafts stage. Mr de Silva?, speaker #2 in open forum In the past steps have been taken by a Presidential Noted Commission toward establishing a regulatory body. KSR de Silva, Director General of Irrigation & President, Sri Lanka National Committee on Large Dams We need to pass and implement a Dams and Accepted Reservoir Safety Act.
    [Show full text]
  • Forum23 植松g Optimization of Multireservoir Operation by Stochastic Dynamic Programming for Moragolla Hydropower Project in S
    Optimization of Multi-reservoir Operation by Stochastic Dynamic Programming for Moragolla Hydropower Project in Sri Lanka International Consulting Operations, Water Resources Division, Water Resources & Energy Department, Sohei UEMATSU ○ Keywords reservoir operation, optimization, hydropower, stochastic dynamic programming ○ Outline Development of new hydropower project into an existing river management system sometimes impair the original purpose of the existing system, especially the new project was not considered in the original design of the river system. It is ideally imperative that the operation performance of existing facilities with planned new facilities is optimized together. However, it is practically difficult to optimize complex river management system without efforts to reduce the time for computation of the modern desktop computers. In the article, the optimization study for the Moragolla hydropower project in Sri Lanka is introduced in detail. The project is a newly planned hydropower project in the Mahaweli river system and the project was not originally designed during the first planning of the river management. Therefore the optimization is done with existing facility in the study. This article introduces the study as an example for multi-dimensional optimization. ○Technical Points This article explained as an example of limiting the number of multi-dimension problem. The optimization algorithm applied for the problem is stochastic dynamic programming (SDP). The program algorithm of SDP is expanded for n-dimension problems and applied for a feasibility study of the planned hydropower project, namely Moragolla Hydropower Project. In the study, daily operation of an existing hydropower and the planned Moragolla hydropower is simultaneously optimized with the multi-dimension SDP. ○ Figure, table, and picture Time Step (day) C.A.
    [Show full text]
  • SALES and GENERATION DATA BOOK 2018 Ceylon Electricity Board
    Ceylon Electricity Board SALES AND GENERATION DATA BOOK 2018 Statistical Unit Corporate Strategy & Regulatory Affairs Branch Corporate Strategy & Regulatory Affairs Branch CEYLON ELECTRICITY BOARD Colombo 00200, Sri Lanka www.ceb.lk Statistical Unit, Corporate Strategy & Regulatory Affairs Branch Ceylon Electricity Board No. 100 2/2, 2nd floor, Lady Lochore Loan Fund Building, Sir Chittampalam A.Gardiner Mawatha, Colombo 02. CONTENTS Page No Salient Features 01 – 04 DATA ON SALES Historical Behaviour pattern 05 Summary Statistics of Electricity Sales 07 Regional & Provincial Electricity Sales by Tariff 08 – 24 Electricity Sales by Province & Region 25 Provincial Electricity Sales by Area 26 – 32 Provincial Electricity Sales by Tariff 33 – 35 Electricity Sales by Area & Tariff 36 – 47 Monthly Data on Electricity Sales by Tariff 48 – 50 Monthly Data on Electricity Sales by Province 51 – 53 DATA ON ELECTRICITY GENERATION Year of commissioning of Power Station 55 – 58 Summary Statistics of Electricity Generation 59 – 60 Data on Power Stations – CEB 61 – 62 Monthly Electricity Generation by Source & Sectors 63 Gross Generation, Auxiliary & Net Generation 64 Monthly Gross Generation by Power Stations 65 – 76 Monthly Station Consumption & Net Generation by Power Stations 77 – 79 Fuel Consumption & Fuel Cost by Power Stations – CEB 80 – 81 Coal Shipment Details 82 Fuel Cost by Power Stations – Private 83 – 84 Monthly System Peak Demand & Load Factor 86 Catchment Areas Rainfall Data 87 – 89 Reservoir Operation Data 90 – 91 Daily & Weekly Load Curves 92 – 95 Combined Reservoir storage curve 96 C.E.B. Tariff 97 SALES & GENERATION DATA BOOK 2018 Salient Features – 2018 Installed Capacity The total Installed Capacity (CEB & Private) at the end of year 2018 was 4,046 MW as given below.
    [Show full text]