UW IMP 2018 Vol2.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

UW IMP 2018 Vol2.Pdf For further information, please contact: Planning Services Engineering & Scientific Services Division Umgeni Water P.O.Box 9, Pietermaritzburg, 3200 KwaZulu-Natal, South Africa Tel: 033 341-1522 Fax: 033 341-1218 Email: [email protected] Web: www.umgeni.co.za PREFACE This Infrastructure Master Plan 2018 describes Umgeni Water’s infrastructure plans for the financial period 2018/2019 – 2048/2049. It is a comprehensive technical report that provides detailed information on the organisation’s current infrastructure and on its future infrastructure development plans. This report replaces the last comprehensive Infrastructure Master Plan that was compiled in 2017. The report is divided into six volumes summarised in Table i and shown schematically in Figure i. Table i Umgeni Water Infrastructure Master Plan 2018/2019 volumes. Focus Area Purpose Volume 1 describes the most recent changes and trends within the primary environmental dictates that influence Umgeni Water’s infrastructure development plans (Section 2). Section 3 provides a review of historic water sales against past projections, as well as Umgeni Water’s most recent water demand projections, compiled at the end of 2017. Section 4 describes Water Demand Management initiatives that are being undertaken by the utility and Section 5 contains a high level review of the energy consumption used to produce the water volumes analysed in Section 3. Section 6 focuses on research into the impacts of climate change and alternative supply options including waste water reuse and desalination. Section 7 provides an overview of the water resource regions and systems supplied within these regions in Umgeni Water’s operational area. Volume 2 describes the current water resource situation and the water supply infrastructure in the Mgeni System (Section 8; shown in orange in the adjacent figure). Included is the status quo with regards supply to the area as well recommendations on the development of infrastructure to meet future needs. i Focus Area Purpose Volume 3 summarises the uMkhomazi System (Section 9; illustrated in purple in the adjacent figure) current water resource situation and water supply infrastructure, the status quo on supply to the area and recommendations on the development of infrastructure to meet future needs. Volume 4 reports on the South Coast System (Section 10; shown in red in the adjacent figure) with regards to the current water resource situation and water supply infrastructure, the status quo on supply to the area and recommendations on the development of infrastructure meet future needs. ii Focus Area Purpose Volume 5 provides a description of the North Coast System (Section 11; illustrated in green in the adjacent figure) water resource situation and water supply infrastructure, the status quo on supply to the area and recommendations on the development of infrastructure meet future needs. Volume 6 describes the wastewater works currently operated by Umgeni Water (shown in pale brown in the adjacent figure) and plans for development of additional waste water treatment facilities. iii Figure i Umgeni Water Infrastructure Master Plan 2018/2019 report structure. iv It is important to note that information presented in this report is in a summarised form and it is recommended that the reader refer to the relevant planning reports if more detail is sought. Since the primary focus of this Infrastructure Master Plan is on Umgeni Water’s existing bulk infrastructure supply network, the water resource infrastructure development plans are not discussed at length. The Department of Water and Sanitation (DWS), as the responsible authority, has undertaken the regional water resource development investigations within Umgeni Water’s area of operation. All of these investigations have been conducted in close collaboration with Umgeni Water and other major stakeholders in order to ensure that integrated planning occurs. Details on these projects can be obtained directly from DWS, Directorate: Options Analysis (East). The Infrastructure Master Plan is a dynamic and evolving document. Outputs from current planning studies, and comments received on this document will therefore be taken into account in the preparation of the next update. v TABLE OF CONTENTS Preface ......................................................................................................................................................... i Table of Contents ....................................................................................................................................... vi List of Figures ............................................................................................................................................ vii List of Tables ............................................................................................................................................... x List of Acronyms ........................................................................................................................................ xii List of Units ............................................................................................................................................... xv 8. Mgeni System ...................................................................................................................................1 8.1 Synopsis of Mgeni System ......................................................................................................1 8.2 Water Resources of the Mgeni System ..................................................................................8 8.2.1 Description of Mgeni System Water Resource Regions ...............................................8 8.2.2 Reserve ...................................................................................................................... 26 8.2.3 Existing Infrastructure and Yields .............................................................................. 27 8.2.4 Operating Rules ......................................................................................................... 36 8.3 Supply Systems .................................................................................................................... 39 8.3.1 Description of the Mgeni System .............................................................................. 39 8.3.2 Status Quo and Limitations of the Mgeni System ..................................................... 80 8.4 Water Balance/Availability .................................................................................................. 99 8.5 Recommendations for the Mgeni System ......................................................................... 100 8.5.1 System Components ............................................................................................... 100 8.5.2 Projects.................................................................................................................... 115 8.6 Management and Operation of uMgungundlovu Water Treatment Plants (WTPs) ......... 150 8.6.1 Appelsbosch WTP .................................................................................................... 152 8.6.2 Lidgetton WTP ......................................................................................................... 154 8.6.3 Mpofana WTP ......................................................................................................... 158 8.6.4 Rosetta WTP ............................................................................................................ 161 References ...................................................................................................................................................I Acknowledgements .....................................................................................................................................II vi LIST OF FIGURES Figure i Umgeni Water Infrastructure Master Plan 2018/2019 report structure. ......................... iv Figure 8.1 General layout of the Mgeni System. ................................................................................. 2 Figure 8.2 Network chart of the Mgeni System. ................................................................................. 3 Figure 8.3 General layout of the Upper Mgeni System. ...................................................................... 4 Figure 8.4 Schematic of the Upper Mgeni System. ............................................................................. 5 Figure 8.5 General layout of the Lower Mgeni System. ...................................................................... 6 Figure 8.6 Schematic of the Lower Mgeni System. ............................................................................. 7 Figure 8.7 General layout of the Mooi/Mgeni Region (DEA and GTI 2015; KZN DoT 2011; MDB 2016; Umgeni Water 2017; WR2012). ...................................................................... 9 Figure 8.8 Groundwater potential in the Mooi/Mgeni Region (KZN DoT 2011; MDB 2016; Umgeni Water 2017; WR2012). ....................................................................................... 12 Figure 8.9 Percentage compliance vs. non-compliance with the Resource Quality Objective for Mgeni Midmar. ........................................................................................................... 14 Figure 8.10 Percentage compliance vs. non-compliance with the Resource Quality Objective for Spring Grove Dam. .....................................................................................................
Recommended publications
  • Descendants of William Park and Mary Martin
    Park Family History The following pages have a highly speculative attempt to reconstruct the history of the family of William Park, of Bath, Belfast and Quebec, who died in Bath, Somerset, England in 1844. It is known that his daughter Matilda married Richard Vause in Bath in January 1852, and that Matilda's sister married Frederick Hawkins on the same day, and that his wife was Mary Martin, daughter of John Martin, a merchant of Belfast, Antrim, Ireland. Most of the other information is based on circumstantial evidence and “connecting the dots”. Recently several people have helped by giving new dots to connect, but fresh evidence may show that they could be connected in entirely different way, so please do not add this information to your family tree yet. I've been helped a great deal by ShaunJ of the Rootschat website, who found some of the dots. I have compiled this family tree as a research tool only, as a working hypothesis to see where other family members might fit in. I will send this to some other family members who may be interested. If you have any more information on this family, please let me have it. If you would like me to pass on anything else I may find, please let me know. Please note the date on these documents. I am continuing my research and so the information here may be out of date and superseded within a few days, so please get in touch with me for the latest information. Stephen Hayes PO Box 7648 Pretoria 0001 South Africa E-mail: [email protected] Web: http://hayesgreene.wordpress.com http://hayesgreene.wikispaces.com Mon 26 September 2011 Family Group Record- 15 Page 1 of 3 Husband William PARK-2231 Born Place Abt 1780 Died-2 Place 23 May 1844Bath, Somerset, England Married Place Husband's father James PARK MRIN: 514 Husband's mother Elizabeth Wife Mary MARTIN-2223 Born-4 Place Abt 1784Belfast, Ulster, Ireland Died Place 19 Aug 1851Bath, Somerset, England Wife's father 5 John MARTIN-221 MRIN: 9 Wife's mother Children List each child in order of birth.
    [Show full text]
  • Between Empire and Revolution : a Life of Sidney Bunting, 1873-1936
    BETWEEN EMPIRE AND REVOLUTION: A LIFE OF SIDNEY BUNTING, 1873–1936 Empires in Perspective Series Editors: Emmanuel K. Akyeampong Tony Ballantyne Duncan Bell Francisco Bethencourt Durba Ghosh Forthcoming Titles A Wider Patriotism: Alfred Milner and the British Empire J. Lee Th ompson Missionary Education and Empire in Late Colonial India, 1860–1920 Hayden J. A. Bellenoit Transoceanic Radical: William Duane, National Identity and Empire, 1760–1835 Nigel Little Ireland and Empire, 1692–1770 Charles Ivar McGrath Natural Science and the Origins of the British Empire Sarah Irving Empire of Political Th ought: Indigenous Australians and the Language of Colonial Government Bruce Buchan www.pickeringchatto.com/empires.htm BETWEEN EMPIRE AND REVOLUTION: A LIFE OF SIDNEY BUNTING, 1873–1936 BY Allison Drew london PICKERING & CHATTO 2007 Published by Pickering & Chatto (Publishers) Limited 21 Bloomsbury Way, London WC1A 2TH 2252 Ridge Road, Brookfi eld, Vermont 05036-9704, USA www.pickeringchatto.com All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise without prior permission of the publisher. © Pickering & Chatto (Publishers) Limited 2007 © Allison Drew 2007 british library cataloguing in publication data Drew, Allison Between empire and revolution : a life of Sidney Bunting, 1873–1936. – (Empires in per- spective) 1. Bunting, Sidney Percival, 1873–1936 2. Social reformers – South Africa – Biography 3. Communists – South Africa – Biography 4. Lawyers – South Africa – Biography 5. South Africa – Politics and government – 1909–1948 6. South Africa – Politics and government – 1836–1909 7. South Africa – Social conditions I.
    [Show full text]
  • Provincial Road Network Provincial Road Network CLASS, SURFACE P, Concrete L, Blacktop G, Blacktop On-Line Roads !
    O D238 3 4 L0 Mkhize 3 6 Mahlutshini!. 4 Bhungane H 1 5 4 71 9 O 81 161 1 Enhlanganisweni H 1 6 OL0 L0 99 Treverton Treverton 0 7 7 Thibane 1 165 Mooi River Town L L 7 1 9 O 6 7 O Col Prep P 4 4 1 L0 Local Authority 2 1 P1 8 4 0 6 4-1 L 1 L 3 KwaMankonjane 7 8 0 O 44 Clinic R103 4 !.O P L OL016 12 L Weston 2 3 O 5 D 0 1 L 1 9 Mooi 6 1 - Agriculture R622 5 7 8 15 7 5 P !. 4 9 River P O L1 6 O 76 Col 4 L L 1 6 01 A I 01 9 1 1 68 3 0 8 4 0 6 P Kajee P 1 L O L 610 O O 8 F Fundukhuphuke O L 4 0 6 Mankonjane 1 F 6 6 95 5 Adult O 3 - 4 1 R L 8 0 0 16 1 A Education 2 L 1 P M O 3 O P s L01 3 n 622 1 9 !. a 1 1 m L sh P Bruntville u 2 Bruntville P B 3 Mount 6 163 1 Victoria P 489 0 Carshalton 3 L Mpofanyana 1 1 69 96 0 9 O 2 1 0 1 P 6 L Highover G Bruntville 4 1 Estates Provincial 0 L CHC O Ncibidwane Lakhanyilanga D Mts 21 4 Mount he 8 za 9 1 na KZN223 6 West P 4 L ulu Zamukwazi Hlatik O L0 83 16 !.30 KwaMkhize 4 Gezwayo JS 7 4 40 O OL0 L 12 L01 1629 D 625 Insonge 43 183 P 413 D 2 75 7 8 - - 1 KZNDMA22 1 P KZN221 Robin LP 11 D P 1 6 KZN222 7 94 f 162 92 o 27 lo rk a K a n a w id ib KZN224 c N Rosetta Local 0 69 5 Authority 4 D Satellite Clinic 2 4 9 5 1 6 L KZN225 53 N 1 3 P 104 Sibonokuhle P -4 34 Rosetta D !.
    [Show full text]
  • 7.3 Mooi System
    7 . 3 MMM OOI SSS Y S T E M 7 . 3 . 1 GGG REATER MMM POFANA BBB ULK WWW ATER SSS UPPLY Planning No. 105.24 Project No. Project Status Detailed Feasibility (as at January 2011) Project Description Sustained housing development and tourism related activities are increasing the water demand at several nodes along the R103 road between Lions River (uMngeni Local Municipality) and Mooi River (Mpofana Local Municipality). This growth is beginning to stress local water resources and water supply infrastructure in the area. It has been identified that a regional bulk water supply scheme is required to ensure that the area has a reliable water supply that will sustain this growth into the future. The proposed scheme ( Figure 7.4) will obtain raw water from the soon-to-be constructed Spring Grove Dam on the Mooi River for a WTP to be situated adjacent to the dam. From here potable water will be pumped to two command reservoirs. The first reservoir will be located at Bruntville in Mooi River. This reservoir will serve the greater Mooi River area and will have the potential to supply the Muden/Rocky Drift area. The Mooi River WTP and Rosetta WTP can then be decommissioned. A link pipeline to supply the Vaalekop community has also been investigated. The second reservoir will be at Nottingham Road which will then supply Balgowan, Lidgetton and possibly Lions River. There is also a link pipeline to Mount West. The scheme is likely to be built in phases to gradually increase the supply area. The scheme together with all the proposed phases is indicated in Figure 7.5.
    [Show full text]
  • Umngeni Resilience Project Annexes
    ANNEXES I. Vulnerability Analysis: Preliminary Prioritisation of Vulnerable Communities for Climate Change Adaptation in the uMgungundlovu District Municipality. II. Stakeholder Consultations Annex II.1 Organisations consulted during the project development period. Annex II.2: Attendance register for meeting to plan Inception Workshop. Annex II.3: Attendance register for Inception Workshop. Annex II.4: Attendance register for workshop to plan field visit itinerary. Annex II.5: Field visit itinerary to identify project interventions sites. Annex II.6: Attendance register for technical agriculture workshop. Annex II.7: Attendance register for built environment and ecological infrastructure workshop. Annex II.8: Attendance register for technical EWS workshop. Annex II.9: List of meetings from 18-22 November 2013. Annex II.10: List of meetings from 6-10 January 2014. Annex II.11: List of meetings from 27-29 January 2014. Annex II.12: List of meetings from 17-18 March 2014. Annex II.12.1: Attendance register from Management Committee meeting. Annex II.12.2: Attendance register from Disaster Management Forum meeting. Annex II.12.3: Attendance register from fire component meeting. Annex II.13: Attendance register from UMDM/DAEA meeting. Annex II.14: Attendance register from DAEA meeting. Annex II.15: Attendance register CoGTA meeting. Annex II.16: Attendance register from Msunduzi Local Municipality meeting. III. Maps of the demonstration sites for the Adaptation Fund project. Figure III.1: Ward 8 of Vulindlela showing position of households and traditional communities (2011). Figure III.2: Ward 8 of Swayimane showing position of households and traditional communities (2011). Figure III.3: Ward 5 of Nhlazuka showing position of households and traditional communities (2011).
    [Show full text]
  • Gowrie Farm Estate HIA.Pdf
    Gowrie Farm Estate PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXPANSION OF THE EXISTING GOWRIE FARM ESTATE, LOCATED ON ERF 1009 AND ERF 1010 OF NOTTINGHAM ROAD, AND PORTION 119 OF WILDE ALS SPRUIT NO. 1085, WITHIN THE UMNGENI LOCAL AND UMGUNGUNDLOVU DISTRICT MUNICIPALITY, NOTTINGHAM ROAD, KWAZULU-NATAL ACTIVE HERITAGE cc. For: Green Door Environmental Frans Prins MA (Archaeology) P.O. Box 947 Howick 3290 [email protected] [email protected] Active Heritage cc for Green Door Environmental i Gowrie Farm Estate www.activeheritage.webs.com 11 February 2018 Fax: 086 76363 Details and experience of independent Heritage Impact Assessment Consultant Consultant: Frans Prins (Active Heritage cc) Contact person: Frans Prins Physical address: 33 Buchanan Street, Howick, 3290 Postal address: P O Box 947, Howick, 3290 Telephone: +27 033 3307729 Mobile: +27 0834739657 Fax: 0867636380 Email: [email protected] PhD candidate (Anthropology) University of KwaZulu-Natal MA (Archaeology) University of Stellenbosch 1991 Hons (Archaeology) University of Stellenbosch 1989 University of KwaZulu-Natal, Honorary Lecturer (School of Anthropology, Gender and Historical Studies). Association of Southern African Professional Archaeologists member Frans received his MA (Archaeology) from the University of Stellenbosch and is presently a PhD candidate on social anthropology at Rhodes University. His PhD research topic deals with indigenous San perceptions and interactions with the rock art heritage of the Drakensberg. Frans was employed as a junior research associate at the then University of Transkei, Botany Department in 1988-1990. Although attached to a Botany Department he conducted a palaeoecological study on the Iron Age of northern Transkei - this study formed the basis for his MA thesis in Archaeology.
    [Show full text]
  • The Hills Above Pietermaritzburg: an Appreciation
    THE HILLS ABOVE PIETERMARITZBURG: AN APPRECIATION P.G. Alcock May 2014 The residents of Pietermaritzburg are well-aware that the hills overlooking the city define Pietermaritzburg in a scenic context, and give it a particular sense of place. The optimum vantage point for viewing these hills is from the southern and eastern parts of the city, looking across the bowl-shaped Msunduzi River Valley.1 It is rather surprising that not much attention has been paid to the hills of Pietermaritzburg in articles and books about the city.2 A partial exception was a chapter in a volume published to commemorate the 150th anniversary of Pietermaritzburg in 1988.3 Specific details regarding the higher-lying land above the city are again sparse in this book, excluding maps showing the general topography, the suburbs and the natural vegetation. The book incorporates some early paintings of the settlement (circa the mid-1850s) with various hills in the background. These paintings reveal an appreciation of the terrain which does not appear to have been carried forward to more recent times.4 The hills have a special resonance, given the contrasting climates to the north and to the south of Pietermaritzburg. Many of the northern slopes are cool and well-watered with spectacular views and with remnants of verdant indigenous vegetation (although dominated by commercial forests) whereas the southern slopes are hot and dry and have limited ambience. Two commonly-touted names for Pietermaritzburg are the “The City of Choice” and perhaps more appropriately “The Green City”. In keeping with an environmental theme are the names “The City of Flowers” as well as “The Garden City”, and in a different context “The Heritage City”.
    [Show full text]
  • Southern Drakensberg & Midlands Tourist Map – Accommodation
    To Warden/JHB To Warden R57 FREE STATE To Bethlehem N5 Platberg 46km Nature Reserve Kestel To Newcastle To Glencoe ..De Beers Pass 1:8 To Dundee . Biggarsberg .. 24km 31km Swinburne R19 Montrose R602 31km R74 Van Reenen Wasbank Golden Gate N11 R712 . .. Van Reenens Reserve R57 .. Pass 1:16 9km Driefontein 21km . R602 .. .. Besters To Clarens To Reitz . Middledale Pass 18km T The Lost Valley FREE T Sterkfontein STATE Dam R103 N3 25km . .. D45 Nambiti .. KWAZULU-NATAL Game Reserve Oliviershoek Qedusize Dam To Tugela Ferry Pass 1:12 D44 R74 17km R616 N11 LESOTHO R600 Woodstock Dam 35km Spioenkop Dam Nature Reserve 32km Southern Drakensberg &R74 Midlands Tourist Map – Accommodation/Reservations 036 468 1241 24km Tugela River R103 22km 24 African Loom 25 Steve Bull Gallery 26 Winterton Country 27 Drakensberg Cave Lodge 28 Antbear Drakensberg Lodge Lodge @ Rose Cottage SimmiesR74 082 804 3774 Driel Dam 6 14km River Exit 207 loukrans Open 7am –7pmDrakensberg Ballooning B 7 days a week including public036 468holidays 1241 Winterton Simmies Ok shop 036 488 1828 no 26 t re 11km Pig and Plough 036 488 1542 R74 co For all of your daily requirements m 31km 20 Jo Photo & Print 074 894 4515 m 22km Butcherye | Bakery | Fresh Produce | Groceries | Ice 23 Chris’s Biltong & Braai 072 288 2437 N3 30 n km d e Winterton Museum d ATMs Spoil yourself. Stay in a “Luxury Cave” in the Drakensberg Mountains.R7 The4 cave Relax in the Drakensberg. Intimate, romantic and artisticly styled, the thatched is beautifully private and makes for the perfect honeymoon experience or accommodation overlooks the Bushmans River Valley and Giants Castle.
    [Show full text]
  • Early History of South Africa
    THE EARLY HISTORY OF SOUTH AFRICA EVOLUTION OF AFRICAN SOCIETIES . .3 SOUTH AFRICA: THE EARLY INHABITANTS . .5 THE KHOISAN . .6 The San (Bushmen) . .6 The Khoikhoi (Hottentots) . .8 BLACK SETTLEMENT . .9 THE NGUNI . .9 The Xhosa . .10 The Zulu . .11 The Ndebele . .12 The Swazi . .13 THE SOTHO . .13 The Western Sotho . .14 The Southern Sotho . .14 The Northern Sotho (Bapedi) . .14 THE VENDA . .15 THE MASHANGANA-TSONGA . .15 THE MFECANE/DIFAQANE (Total war) Dingiswayo . .16 Shaka . .16 Dingane . .18 Mzilikazi . .19 Soshangane . .20 Mmantatise . .21 Sikonyela . .21 Moshweshwe . .22 Consequences of the Mfecane/Difaqane . .23 Page 1 EUROPEAN INTERESTS The Portuguese . .24 The British . .24 The Dutch . .25 The French . .25 THE SLAVES . .22 THE TREKBOERS (MIGRATING FARMERS) . .27 EUROPEAN OCCUPATIONS OF THE CAPE British Occupation (1795 - 1803) . .29 Batavian rule 1803 - 1806 . .29 Second British Occupation: 1806 . .31 British Governors . .32 Slagtersnek Rebellion . .32 The British Settlers 1820 . .32 THE GREAT TREK Causes of the Great Trek . .34 Different Trek groups . .35 Trichardt and Van Rensburg . .35 Andries Hendrik Potgieter . .35 Gerrit Maritz . .36 Piet Retief . .36 Piet Uys . .36 Voortrekkers in Zululand and Natal . .37 Voortrekker settlement in the Transvaal . .38 Voortrekker settlement in the Orange Free State . .39 THE DISCOVERY OF DIAMONDS AND GOLD . .41 Page 2 EVOLUTION OF AFRICAN SOCIETIES Humankind had its earliest origins in Africa The introduction of iron changed the African and the story of life in South Africa has continent irrevocably and was a large step proven to be a micro-study of life on the forwards in the development of the people.
    [Show full text]
  • Marketing Constraints Faced by Communal Farmers in Kw Azulu-Na Tal, South Africa: a Case Study of Transaction Costs Maliem Pierr
    MARKETING CONSTRAINTS FACED BY COMMUNAL FARMERS IN KW AZULU-NA TAL, SOUTH AFRICA: A CASE STUDY OF TRANSACTION COSTS By MALIEM PIERRE MA TUNGUL SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY (AGRICULTURAL ECONOMICS) IN THE SCHOOL OF AGRICULTURAL SCIENCES AND AGRIBUSINESS F ACUL TY OF SCIENCE AND AGRICULTURE UNIVERSITY OF NATAL PIETERMARITZBURG 2002 The financial assistance received from the NRF Agricultural Policy Research U nit and TOTAL South Africa towards this research is hereby acknowledged. Opinions expressed and conclusions arrived at, are those of the author and not necessarily to be attributed to the sponsors. I hereby certify that, unless specifically indicated to the contrary in the text, this dissertation is the result of my own original work. Maliem Pierre Matungul A Mamie Ursule et Jesse Tavun, je dedie ce travail. ABSTRACT Farmers engaged in small-scale agriculture in Africa generally have limited access to factors of production, credit and information. Empirical studies throughout the African continent have shown the extent to which high transaction costs constrain or prevent access to information and markets, especially for small-scale farmers. Despite these constraints, farmers in two communal areas of KwaZulu-Natal (Impendle and Swayimana) have managed to produce food for both own consumption and marketing. This study draws heavily on the New Institutional Economics, and particularly Transaction Cost Economics, which have demonstrated the important role of transaction costs in constraining economic activity, and of institutions developed to lower these costs. Transaction costs are the costs of exchange, including costs of information, negotiation, monitoring, coordination and enforcement of contracts.
    [Show full text]
  • Greater Mpofana Bulk Water Supply Scheme
    GREATER MPOFANA BULK WATER SUPPLY SCHEME IMPLEMENTATION READINESS REPORT OCTOBER 2016 PREPARED BY Umgeni Water Telephone N° : 033 341 1203 Fax N° : 033 341 1218 Email Address : [email protected] P O Box 3235 Pietermaritzburg, 3200 310 Burger Street Pietermaritzburg, 3201 EXECUTIVE SUMMARY Context This project involves a potable bulk water supply scheme located in the Midlands area of the KwaZulu-Natal province. It is referred to as the Greater Mpofana Bulk Water Supply Scheme (GMBWSS). The Greater Mpofana Region (described in this report as the area from Mooi River to Lidgetton) does not have a reliable water supply. Much of the area relies on boreholes and run of river abstraction. With increasing demands, the future supply is not considered sustainable. Phase 1 of the project is currently under construction and will provide a sustainable bulk water supply to the towns of Mooiriver, Rosetta and Nottingham Road. Phase 2 of the project is in the final feasibility stage and will provide a sustainable bulk water supply to the towns of Lidgetton and Lions River including the rural hinterland surrounding the abovementioned towns in KwaZulu Natal. The Scheme will provide bulk water supply to large areas within the uMgungundlovu WSA boundary and will include the rural areas of Bruntville, Lidgetton, Lions River and Msinga. The scheme will also supply economic activities in the areas of Mooiriver, Nottingham Road and Rosetta and will reinforce the supply to these towns. This Implementation Readiness Report (IRS) for the GMBWSS is a prerequisite for RBIG funding so that potable water is made available to both the developing and backlog areas of Mooi River and Rosetta in the Mpofana Local Municipality and Nottingham Road, Mount West, Balgowan and Lidgetton in the uMngeni Local Municipality.
    [Show full text]
  • Msunduzi Co-Operative Development Strategy
    MSUNDUZI MUNICIPALITY __________________________________________ CO-OPERATIVE DEVELOPMENT STRATEGY Final Development Strategy Issue Date: September 2017 Revision No.: 02 Project No.: 14511 Date: September 2017 Document Title: Final Co-operative Development Strategy Author: Leon Katambwe Revision Number: 02 Checked by: Kavi Soni Approved by: Kavi Soni Signature: For: SiVEST SA (PTY) LTD MSUNDUZI MUNICIPALITY CO-OPERATIVE DEVELOPMENT STRATEGY TABLE OF CONTENTS 2. INTRODUCTION ........................................................................................................................... 1 2.1. BACKGROUND ....................................................................................................................... 1 2.2. OVERALL OBJECTIVE OF THE STUDY .................................................................................................. 2 2.3. SCOPE OF THE STUDY .................................................................................................................... 2 2.4. URBAN-ECON’S APPROACH: THE THEORY OF CHANGE OR OUTCOMES APPROACH .................. 3 2.5. METHODOLOGY ........................................................................................................................... 5 2.6. ACTION STEPS ............................................................................................................................. 6 2.7. REPORT OUTLINE .......................................................................................................................... 8 3. CO-OPERATIVE
    [Show full text]