UW IMP 2018 Vol2.Pdf

UW IMP 2018 Vol2.Pdf

For further information, please contact: Planning Services Engineering & Scientific Services Division Umgeni Water P.O.Box 9, Pietermaritzburg, 3200 KwaZulu-Natal, South Africa Tel: 033 341-1522 Fax: 033 341-1218 Email: [email protected] Web: www.umgeni.co.za PREFACE This Infrastructure Master Plan 2018 describes Umgeni Water’s infrastructure plans for the financial period 2018/2019 – 2048/2049. It is a comprehensive technical report that provides detailed information on the organisation’s current infrastructure and on its future infrastructure development plans. This report replaces the last comprehensive Infrastructure Master Plan that was compiled in 2017. The report is divided into six volumes summarised in Table i and shown schematically in Figure i. Table i Umgeni Water Infrastructure Master Plan 2018/2019 volumes. Focus Area Purpose Volume 1 describes the most recent changes and trends within the primary environmental dictates that influence Umgeni Water’s infrastructure development plans (Section 2). Section 3 provides a review of historic water sales against past projections, as well as Umgeni Water’s most recent water demand projections, compiled at the end of 2017. Section 4 describes Water Demand Management initiatives that are being undertaken by the utility and Section 5 contains a high level review of the energy consumption used to produce the water volumes analysed in Section 3. Section 6 focuses on research into the impacts of climate change and alternative supply options including waste water reuse and desalination. Section 7 provides an overview of the water resource regions and systems supplied within these regions in Umgeni Water’s operational area. Volume 2 describes the current water resource situation and the water supply infrastructure in the Mgeni System (Section 8; shown in orange in the adjacent figure). Included is the status quo with regards supply to the area as well recommendations on the development of infrastructure to meet future needs. i Focus Area Purpose Volume 3 summarises the uMkhomazi System (Section 9; illustrated in purple in the adjacent figure) current water resource situation and water supply infrastructure, the status quo on supply to the area and recommendations on the development of infrastructure to meet future needs. Volume 4 reports on the South Coast System (Section 10; shown in red in the adjacent figure) with regards to the current water resource situation and water supply infrastructure, the status quo on supply to the area and recommendations on the development of infrastructure meet future needs. ii Focus Area Purpose Volume 5 provides a description of the North Coast System (Section 11; illustrated in green in the adjacent figure) water resource situation and water supply infrastructure, the status quo on supply to the area and recommendations on the development of infrastructure meet future needs. Volume 6 describes the wastewater works currently operated by Umgeni Water (shown in pale brown in the adjacent figure) and plans for development of additional waste water treatment facilities. iii Figure i Umgeni Water Infrastructure Master Plan 2018/2019 report structure. iv It is important to note that information presented in this report is in a summarised form and it is recommended that the reader refer to the relevant planning reports if more detail is sought. Since the primary focus of this Infrastructure Master Plan is on Umgeni Water’s existing bulk infrastructure supply network, the water resource infrastructure development plans are not discussed at length. The Department of Water and Sanitation (DWS), as the responsible authority, has undertaken the regional water resource development investigations within Umgeni Water’s area of operation. All of these investigations have been conducted in close collaboration with Umgeni Water and other major stakeholders in order to ensure that integrated planning occurs. Details on these projects can be obtained directly from DWS, Directorate: Options Analysis (East). The Infrastructure Master Plan is a dynamic and evolving document. Outputs from current planning studies, and comments received on this document will therefore be taken into account in the preparation of the next update. v TABLE OF CONTENTS Preface ......................................................................................................................................................... i Table of Contents ....................................................................................................................................... vi List of Figures ............................................................................................................................................ vii List of Tables ............................................................................................................................................... x List of Acronyms ........................................................................................................................................ xii List of Units ............................................................................................................................................... xv 8. Mgeni System ...................................................................................................................................1 8.1 Synopsis of Mgeni System ......................................................................................................1 8.2 Water Resources of the Mgeni System ..................................................................................8 8.2.1 Description of Mgeni System Water Resource Regions ...............................................8 8.2.2 Reserve ...................................................................................................................... 26 8.2.3 Existing Infrastructure and Yields .............................................................................. 27 8.2.4 Operating Rules ......................................................................................................... 36 8.3 Supply Systems .................................................................................................................... 39 8.3.1 Description of the Mgeni System .............................................................................. 39 8.3.2 Status Quo and Limitations of the Mgeni System ..................................................... 80 8.4 Water Balance/Availability .................................................................................................. 99 8.5 Recommendations for the Mgeni System ......................................................................... 100 8.5.1 System Components ............................................................................................... 100 8.5.2 Projects.................................................................................................................... 115 8.6 Management and Operation of uMgungundlovu Water Treatment Plants (WTPs) ......... 150 8.6.1 Appelsbosch WTP .................................................................................................... 152 8.6.2 Lidgetton WTP ......................................................................................................... 154 8.6.3 Mpofana WTP ......................................................................................................... 158 8.6.4 Rosetta WTP ............................................................................................................ 161 References ...................................................................................................................................................I Acknowledgements .....................................................................................................................................II vi LIST OF FIGURES Figure i Umgeni Water Infrastructure Master Plan 2018/2019 report structure. ......................... iv Figure 8.1 General layout of the Mgeni System. ................................................................................. 2 Figure 8.2 Network chart of the Mgeni System. ................................................................................. 3 Figure 8.3 General layout of the Upper Mgeni System. ...................................................................... 4 Figure 8.4 Schematic of the Upper Mgeni System. ............................................................................. 5 Figure 8.5 General layout of the Lower Mgeni System. ...................................................................... 6 Figure 8.6 Schematic of the Lower Mgeni System. ............................................................................. 7 Figure 8.7 General layout of the Mooi/Mgeni Region (DEA and GTI 2015; KZN DoT 2011; MDB 2016; Umgeni Water 2017; WR2012). ...................................................................... 9 Figure 8.8 Groundwater potential in the Mooi/Mgeni Region (KZN DoT 2011; MDB 2016; Umgeni Water 2017; WR2012). ....................................................................................... 12 Figure 8.9 Percentage compliance vs. non-compliance with the Resource Quality Objective for Mgeni Midmar. ........................................................................................................... 14 Figure 8.10 Percentage compliance vs. non-compliance with the Resource Quality Objective for Spring Grove Dam. .....................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    184 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us