Asr Phase Ii

Total Page:16

File Type:pdf, Size:1020Kb

Asr Phase Ii NHS GREATER GLASGOW & CLYDE ASR PHASE II NEW SOUTH GLASGOW HOSPITAL, NEW CHILDREN’S HOSPITAL AND NEW LABORATORY BUILD OUTLINE BUSINESS CASE FEBRUARY 2008 1. EXECUTIVE SUMMARY ........................................................................................................ 4 1.1 INTRODUCTION............................................................................................................. 4 1.2 THE CASE FOR CHANGE.............................................................................................. 4 1.3 ACUTE SERVICES REVIEW (ASR)................................................................................ 5 1.4 PROPOSED FUTURE SERVICES.................................................................................. 7 1.5 EXPECTED BENEFITS OF THE PROJECT ................................................................... 8 1.6 OPTION APPRAISAL – SITE AND DESIGN OF NEW SOUTH GLASGOW AND NEW CHILDREN’S HOSPITALS.............................................................................................. 9 1.7 LABORATORY SERVICES........................................................................................... 10 1.8 FINANCIAL ANALYSIS ................................................................................................. 10 1.9 ASSOCIATED CAPITAL WORKS ................................................................................. 11 1.10 PLANNING PERMISSION............................................................................................. 11 1.11 UNIVERSITY – WORKING WITH ACADEMIC PARTNERS ......................................... 11 1.12 FACILITIES, TECHNOLOGY, WORKFORCE............................................................... 11 1.13 REDESIGN OF SERVICES........................................................................................... 12 1.14 PROJECT MANAGEMENT ARRANGEMENTS............................................................ 12 1.15 PARTNERSHIP WORKING .......................................................................................... 12 1.16 COMMUNITY ENGAGEMENT...................................................................................... 12 1.17 GATEWAY REVIEW ..................................................................................................... 13 1.18 TIMETABLE .................................................................................................................. 13 2. PURPOSE AND LAYOUT OF THE OUTLINE BUSINESS CASE....................................... 14 2.1 PURPOSE..................................................................................................................... 14 2.2 LAYOUT OF THE DOCUMENT..................................................................................... 15 2.3 FURTHER INFORMATION ........................................................................................... 17 3. BACKGROUND AND STRATEGIC CONTEXT ................................................................... 18 3.1 OVERVIEW OF NHS GREATER GLASGOW & CLYDE ............................................... 18 3.2 ORGANISATIONAL STRUCTURE ............................................................................... 19 3.3 RESPONSIBILITIES OF NHS GREATER GLASGOW AND CLYDE ............................ 19 3.4 SERVICES AND ACTIVITY........................................................................................... 19 3.5 FINANCIAL PERFORMANCE....................................................................................... 21 3.6 DEMOGRAPHY ............................................................................................................ 21 3.7 HEALTH STATUS AND HEALTH IMPROVEMENT ...................................................... 23 3.8 WORKFORCE............................................................................................................... 26 3.9 UNIVERSITY LINKS – WORKING WITH ACADEMIC PARTNERS .............................. 26 4. THE NEW CHILDREN’S HOSPITAL DEVELOPMENT ....................................................... 28 4.1 CASE FOR CHANGE AND FUTURE STRATEGY........................................................ 28 4.2 DESCRIPTION OF OPTIONS CONSIDERED .............................................................. 29 4.3 DESCRIPTION OF THE CURRENT SERVICE AND FUTURE REQUIREMENTS ....... 30 4.4 DESCRIPTION OF FUTURE SERVICE REQUIREMENTS .......................................... 33 4.5 PROJECT OBJECTIVES .............................................................................................. 36 5. THE NEW SOUTH GLASGOW HOSPITAL DEVELOPMENT (NEW ACUTE ADULT HOSPITAL)............................................................................................................................ 41 5.1 THE CASE FOR CHANGE – ACUTE SERVICES WITHIN GLASGOW ........................ 41 5.2 OVERVIEW OF THE ACUTE SERVICE REVIEW (ASR).............................................. 43 5.3 DESCRIPTION OF THE CURRENT SERVICE AT SOUTHERN GENERAL................. 46 5.4 PROPOSED FUTURE DEMAND - BED MODELLING.................................................. 49 5.5 SERVICE RE-DESIGN.................................................................................................. 51 5.6 PROPOSED FUTURE NEW ADULT HOSPITAL SERVICES (NEW SOUTH GLASGOW HOSPITAL) ................................................................................................................... 54 5.7 PROJECT OBJECTIVES .............................................................................................. 58 5.8 BENEFITS..................................................................................................................... 60 New South Glasgow and New Children’s Hospitals and New Laboratory Build – Outline Business Case i 6. DESCRIPTION OF OPTIONS .............................................................................................. 62 6.1 BACKGROUND TO THE APPRAISAL PROCESS AND FORMAT OF THIS CHAPTER .. ...................................................................................................................................... 62 6.2 GREENFIELD SITE – (RE-PROVISION OF SOUTHERN GENERAL HOSPITAL SERVICES ON ANOTHER GLASGOW SITE) .............................................................. 63 6.3 POSITION OF THE NEW HOSPITALS ON THE SOUTHERN SITE ............................. 64 6.4 BUILD OPTIONS FOR THE NEW HOSPITALS – SEPARATE BUILDINGS OR INTEGRATED BUILDINGS? ......................................................................................... 65 6.5 PREFERRED DESIGN CONFIGURATION OF THE INTEGRATED BUILDING ........... 65 6.6 EXEMPLAR DESIGN .................................................................................................... 69 6.7 DESIGN QUALITY ........................................................................................................ 72 6.8 FUTURE PROOFING.................................................................................................... 72 6.9 SUSTAINABILITY AND ENERGY CONSERVATION ................................................... 72 6.10 OPTIONS FOR DELIVERING THE NEW SOUTH GLASGOW AND CHILDREN’S HOSPITALS AND ASSOCIATED WORKS ON THE SOUTHERN SITE ....................... 74 6.11 BENEFITS APPRAISAL ................................................................................................ 76 7. NEW LABORATORY BUILD ............................................................................................... 77 7.1 SUMMARY OF THE SHORTLISTED OPTIONS ........................................................... 77 7.2 ECONOMIC AND FINANCIAL APPRAISAL.................................................................. 78 8. RISK MANAGEMENT STRATEGY...................................................................................... 80 8.1 INTRODUCTION........................................................................................................... 80 9. FINANCIAL APPRAISAL ..................................................................................................... 81 9.1 VALUE FOR MONEY EVALUATION............................................................................. 81 9.2 AFFORDABILITY APPRAISAL ..................................................................................... 86 9.3 AFFORDABILITY OF PROPOSAL FOR NEW ADULT AND CHILDREN’S HOSPITALS IN CONTEXT OF NHSGG&C 10 YEAR FINANCIAL PLAN........................................... 86 9.4 10 YEAR FINANCIAL PLAN.......................................................................................... 95 10. PROCUREMENT .................................................................................................................. 97 10.1 PROCUREMENT OF BUILDING – PUBLIC FINANCE PROCUREMENT ROUTE ....... 97 10.2 PROCUREMENT OF EQUIPMENT .............................................................................. 97 10.3 PROCUREMENT OF IT ................................................................................................ 98 11. WORKFORCE ISSUES ........................................................................................................ 99 11.1 INTRODUCTION........................................................................................................... 99 11.2 CONTEXT ..................................................................................................................... 99 11.3 THE POPULATION PROFILE ....................................................................................... 99 11.4 WORKFORCE PLANNING ........................................................................................
Recommended publications
  • The Association of James Braid Courses 2012
    THE ASSOCIATION OF JAMES BRAID COURSES 2012 COURSE ADDRESS OF CONTACT GREEN FEE COUNTRY NAME COURSE DETAILS RATE OFFERED 10 Old Jackson Avenue 001 (914) 478 3475 $60/fri $95/ w/e$135 U.S.A The St. Andrews Hastings‐on‐Hudson [email protected] plus $25.50 for a Golf New York, 10706 www.saintandrewsgolfclub.com Buggy (closed Mon.) Forecaddie required Aberdovey 01654 767 493 £32.50 WALES Aberdovey Gwynedd [email protected] [£20.00 Nov‐Mar] LL35 0RT www.aberdoveygolf.co.uk Newton Park 01874 622004 WALES Brecon Llanfaes [email protected] £10.00 Powys, LD3 8PA www.brecongolfclub.co.uk Old Highwalls 02920 513 682 Highwalls Road [email protected] £15.00 WALES Dinas Powis Dinas Powis www.dpgc.co.uk [w/e £20.00] South Glamorgan CF64 4AJ Trearddur Bay 01407762022 WALES Holyhead Anglesey [email protected] £20.00 LL65 2YL www.holyheadgolfclub.co.uk [w/e &B/H £25.00] Langland Bay Road 01792 361721 Winter £17.00 WALES Langland Bay Mumbles [email protected] [w/e £20.00] Swansea www.langlandbaygolfclub.com Summer £30.00 SA3 4QR [w/e £40.00] Golf Links Road 01597822247 Winter £12.00 WALES Llandrindod Wells Llandrindod Wells [email protected] Summer £15.00 Powys www.lwgc.co.uk [Day £15 & £20] LD1 5NY Hospital Road 01492 876450 £20.00[Mon‐Fri, £25 WALES Maesdu Llandudno [email protected] w/ends, Apr – Oct] North Wales www.maesdugolfclub.co.uk £15.00[any day Nov‐ LL30 1HU Mar] Neath Road 01656 812002 /812003 /734106 WALES Maesteg Maesteg manager@maesteg‐golf.co.uk £15.00 Bridgend or [email protected] [£10.00 Nov‐Mar] S.
    [Show full text]
  • Consultation Questions
    Alan Greenlees Consultation Questions The answer boxes will expand as you type. Procuring rail passenger services 1. What are the merits of offering the ScotRail franchise as a dual focus franchise and what services should be covered by the economic rail element, and what by the social rail element? Q1 comments: 2. What should be the length of the contract for future franchises, and what factors lead you to this view? Q2 comments: 3. What risk support mechanism should be reflected within the franchise? Q3 comments: 4. What, if any, profit share mechanism should apply within the franchise? Q4 comments: 5. Under what terms should third parties be involved in the operation of passenger rail services? Q5 comments: 6. What is the best way to structure and incentivise the achievement of outcome measures whilst ensuring value for money? Q6 comments: 7. What level of performance bond and/or parent company guarantees are appropriate? Q7 comments: 8. What sanctions should be used to ensure the franchisee fulfils its franchise commitments? Q8 comments: Achieving reliability, performance and service quality 9. Under the franchise, should we incentivise good performance or only penalise poor performance? Q9 comments: 10. Should the performance regime be aligned with actual routes or service groups, or should there be one system for the whole of Scotland? Q10 comments: 11. How can we make the performance regime more aligned with passenger issues? Q11 comments: 12. What should the balance be between journey times and performance? Q12 comments: 13. Is a Service Quality Incentive Regime required? And if so should it cover all aspects of stations and service delivery, or just those being managed through the franchise? Q13 comments: 14.
    [Show full text]
  • Shieldhall Tunnel Construction of the First Shaft, Service Chamber, Cut and Cover and the Tunnel Boring Machine Launch Chamber at Craigton
    www.WaterProjectsOnline.com Wastewater Treatment & Sewerage Shieldhall Tunnel construction of the first shaft, service chamber, cut and cover and the tunnel boring machine launch chamber at Craigton onstruction of the Shieldhall Tunnel, the biggest investment in the Glasgow wastewater network since Victorian times, is well underway. Once complete, it will improve river water quality and the natural environment of the CRiver Clyde and its tributaries, enable the Greater Glasgow area to grow and develop, alleviate sewer flooding key locations and deal with the effects of increased rainfall and climate change in the area served by the Shieldhall WwTW. The Shieldhall Tunnel will be 3.1 miles long (more than five times as long as the Clyde Tunnel that takes a dual carriageway beneath the river) and 4.70m in diameter, big enough to fit a double-decker bus inside. It will be the biggest wastewater tunnel in Scotland, with a storage capacity equivalent to 36 Olympic-sized swimming pools. ‘Daisy’, the Shieldhall Tunnel TBM - Courtesy of Herrenknecht Section of TBM lowered into Shaft 1 - Courtesy of SNS Section of TBM lowered into Shaft 1 - Courtesy of SNS Planning CVJV have been carrying out preparatory work, including mine The investment follows years of collaboration and studies by the working consolidation, utility diversion work, constructing the Metropolitan Glasgow Strategic Drainage Partnership (MGSDP), first shaft, service chamber, cut and cover and the tunnel boring whose members include Scottish Water, the Scottish Environment machine (TBM) launch chamber at Craigton in advance of Protection Agency (SEPA), Glasgow City Council and Scottish Canals. tunnelling beginning. The improvements are required to meet European directives and Tunnel route SEPA recommendations and will contribute towards the Scottish The tunnel is being launched from a former tram depot site in the Government’s objective to comply with the Urban Waste Water Craigton area of Glasgow, in the south-west of the city.
    [Show full text]
  • Land and Environmental Services Roads Infrastructure
    Land and Environmental Services Roads Infrastructure Status & Options Report 2018 Contents 1. Introduction 2. Footways and Cycleways 3. Carriageways 4. Street Lighting 5. Road Drainage Systems 6. Traffic Signals 7. Traffic, Signs, Lines & Street Furniture 8. Structures 9. Clyde Tunnel 1. Introduction The Annual Status and Options Report is a product of our Road Asset Management Plan. It records the condition of our road assets and provides a means of identifying and prioritising the overall funding needs. This report discusses the status of our road assets in terms of extent, value and condition and presents the projected outcome of a number of investment options. The options and scenarios presented aim to assist with the budget setting process and identify where investment should be prioritised. The cost of replacing all road infrastructure assets is estimated at £4.5bn. The level of investment required to maintain our roads infrastructure in its current condition (steady state) is estimated at £30.1m per year; this equates to an annual investment of 0.67% of the total asset value. The Report contains a section for each road asset that outlines: 1. Asset Overview 2. Asset Condition. 3. Investment Options. The pie charts below illustrate and compares the annual level of investment required to maintain the asset in its current condition against the current level of investment. Steady State Investment - £30.1m Current Investment - £30.5m 1 2. Footways and Cycleways The Council is responsible for the maintenance of 3,126km of footways & 277km of Cycleways. Neighbourhood Footways This year saw the completion of a £5m investment programme that focused on highly pedestrianised neighbourhood thoroughfares.
    [Show full text]
  • Glasgow City Health and Social Care Partnership Health Contacts
    Glasgow City Health and Social Care Partnership Health Contacts January 2017 Contents Glasgow City Community Health and Care Centre page 1 North East Locality 2 North West Locality 3 South Locality 4 Adult Protection 5 Child Protection 5 Emergency and Out-of-Hours care 5 Addictions 6 Asylum Seekers 9 Breast Screening 9 Breastfeeding 9 Carers 10 Children and Families 12 Continence Services 15 Dental and Oral Health 16 Dementia 18 Diabetes 19 Dietetics 20 Domestic Abuse 21 Employability 22 Equality 23 Health Improvement 23 Health Centres 25 Hospitals 29 Housing and Homelessness 33 Learning Disabilities 36 Maternity - Family Nurse Partnership 38 Mental Health 39 Psychotherapy 47 NHS Greater Glasgow and Clyde Psychological Trauma Service 47 Money Advice 49 Nursing 50 Older People 52 Occupational Therapy 52 Physiotherapy 53 Podiatry 54 Rehabilitation Services 54 Respiratory Team 55 Sexual Health 56 Rape and Sexual Assault 56 Stop Smoking 57 Volunteering 57 Young People 58 Public Partnership Forum 60 Comments and Complaints 61 Glasgow City Community Health & Care Partnership Glasgow Health and Social Care Partnership (GCHSCP), Commonwealth House, 32 Albion St, Glasgow G1 1LH. Tel: 0141 287 0499 The Management Team Chief Officer David Williams Chief Officer Finances and Resources Sharon Wearing Chief Officer Planning & Strategy & Chief Social Work Officer Susanne Miller Chief Officer Operations Alex MacKenzie Clincial Director Dr Richard Groden Nurse Director Mari Brannigan Lead Associate Medical Director (Mental Health Services) Dr Michael Smith
    [Show full text]
  • Glasgow City Council Local Air Quality Management Progress Report
    Glasgow City Council Local Air Quality Management Progress Report October 2005 Executive Summary 5 1.0 Background information 6 1.1 Purpose and Role of Progress Report 6 1.2 Air Quality Strategy Objectives & Relevant Public Exposure 6 1.3 Sources of Air Pollution 9 1.4 Summary of Review and Assessment 10 2.0 Summary of monitoring undertaken 12 2.0.1 Automatic Monitoring 12 2.0.2 Non-automatic Monitoring 14 2.1 Monitoring Methodology and Data 17 2.1.1 Nitrogen Dioxide (NO2) 17 2.1.2 Particulate Matter (PM10) 29 2.1.3 Sulphur Dioxide (SO2) 38 2.1.4 Carbon Monoxide (CO) 45 2.1.5 Lead 50 2.1.6 Benzene 52 2.1.7 1, 3-Butadiene 55 2.2 New Monitoring Sites 56 2.2.1 Horiba Mobile Unit (Battlefield) 56 2.3 Unregulated Pollutant monitoring 58 2.3.1 Ozone 58 3.0 New Developments 60 3.1 Industrial Processes 60 3.1.1 Part A installations 60 3.1.2 Part B installations 62 3.2 New Transport Developments 62 3.2.1 New/Proposed Road Developments 63 3.2.1.1 Proposed M74 extension 63 3.2.1.2 East End Regeneration Route (EERR) 65 3.2.1.3 Finnieston Street Road Bridge 67 3.2.2 Significant changes to existing roads 68 3.2.2.1 Pre-LRT Project 68 3.3 New Residential, Commercial and Public Developments 69 3.3.1 Queen’s Dock 2 (QD2) Development 69 3.3.2 Pacific Quay 71 3.3.3 Glasgow Harbour Project 72 4.0 Additional Information 74 4.1 Update on the Air Quality Action Plan 74 4.2 New monitoring equipment 80 4.3 Planning applications and policies 80 4.4 Local Transport Plans and Strategies 80 5.0 Conclusions and Recommendations 82 6.0 References & Useful Websites 83 7.0 Further Information 84 2 List of Tables Page No.
    [Show full text]
  • Taxi School 2021 Section 3 SECTION L INDUSTRIAL ESTATES TAXI SCHOOL
    Taxi School 2021 Section 3 SECTION L INDUSTRIAL ESTATES TAXI SCHOOL Anniesland Netherton Rd Spencer St Atlas Edgefauld Rd Haig St Blochairn Blochairn Rd Seimens St Balmore Glentanner Rd Strathmore Rd Carntyne Carntynehall Rd Myreside St Craigton Barfillan Dr Crosslee St Darnley Woodneuk Rd Nitshill Rd Dawsholm Dalsholm Rd Maryhill Rd Dixon Blazes Lawmoor St Caledonia Rd Drumchapel Dalsetter Ave Garscadden Rd Gt Western Retail Park Gt Western Rd Dunreath Ave Hillington Hillington Rd Queen Elizabeth Ave Kinning Park Paisley Rd Seaward St Museum Business Park Woodhead Rd Wiltonburn Rd Oakbank Garscube Rd Barr St Queenslie Stepps Rd Edinburgh Rd Springburn (St Rollox Industrial Park) Springburn Rd St Rollox Brae Thornliebank Nitshill Rd Speirsbridge Rd Whiteinch South St Dilwara Ave page one SECTION M PUBLIC HALLS & COMMUNITY CENTRES Central Halls Maryhill Rd Hopehill Rd City Halls (Old Fruit Market) Albion St Blackfriars St Couper Institute Clarkston Rd Struan Rd Dixon Halls Cathcart Rd Dixon Ave Henry Wood Hall Claremont St Berkley St Kelvin Hall Argyle St Blantyre St Langside Halls Langside Ave Pollokshaws Rd McLellan Galleries Sauchiehall St Rose St Old Govan Town Hall Summertown Rd Govan Rd Partick Burgh Hall Burgh Hall St Fortrose St Pollokshaws Burgh Hall Pollokshaws Rd Christian St Pollokshields Burgh Hall Glencairn Rd Dalziel Ave Royal Concert Hall Sauchiehall St West Nile St Shettleston Halls (fire damaged) Wellshot Rd Ardlui St Trades House/ Hall Glassford St Garth St Woodside Halls (Capoeira Senzala) Glenfarg St Clarendon St Claremont
    [Show full text]
  • Watson's Directory for Paisley
    FOUNDED BY SIR PETER GOATS, I87O. REFERENCE DEPARTMENT ^'*J-41 2AAAp.c. No Book to be taken out of the Room. ^ -i>X ) O K . P A 1 S I 2 343226 21 \ Digitized by the Internet Archive in 2010 with funding from National Library of Scotland http://www.archive.org/details/watsonsdirecto187475unse PAISLEY PUBLIC LIBRARY. M iiit^n WATSONS DIRECTORY FOR SEITFREW, JOHSTSTOKE, ELDEiESLIE, LmWOOD, QUARRELTON, THORNHILL, BALACLAVA, AND INKERMAN, FOR THE YEAR 1874-75. DP J^ I S L E -ST: PRINTED AND PUBLISHED BY WM. B. WATSON, AT THE "PAISLEY HERALD" OFFICE, 10 HIGH STREET. 1874. CONTENTS. Page Page Paisley Street Guide ... 5 Cowfeeders 142 Omissions and Corrections . 11 Distillers 143 PAISLEY DIRECTORY ,. 13 Drapers and Silk Mercers ... 144 Dressmakers and Milliners ... 145 TRADES AND PKOPESSIONS. Druggists and Chemists ... 147 Accountants « 127 Drysalters l48 Agents and Commission Agents 127 Dyers ... ... ... ••. 148 Architects and Land Surveyors 128 Embroiderer 149 Auctioneers and Appraisers ... 128 Engineers and Machine Makers 149 Bakers , ... 128 Fire Clay Manufacturers ... 149 Bankers 130 Fishmongers and Poulterers ... 150 Belt Makers 130 Fleshers 150 Bill Posters 130 Funeral Undertakers 151 Bleachers, Shawl Washers, &c. 130 Furnished Lodging-House Bookbinders 131 Keepers 151 Booksellers and Stationers ... 131 Furnishers 151 Boot and Shoemakers ... 132 Furniture Dealers ... ... 152 Brassfounders 133 Gardeners ... 153 Brewers ... ... ... 133 Glaziers... ... ... ... 153 Brickmakers and Brickbuilders 133 Grain Merchants 154 Brush and Basket Dealers ... 134 Grocers and Victuallers ... 154 Cabinetmakers... ... ... 134 Hair Dressers ... 160 Calenderers and Finishers ... 135 Ham Curers 160 Calico and Shawl Printers ... 135 Hatters 160 Candlemakers 135 Hosiers ... ... ... ... 160 Card and Print Cutters ... 135 House Factors 161 Carpet Manufacturers 135 Inn and Hotel keepers..
    [Show full text]
  • Annual Status and Options Report 2019
    OFFICIAL Appendix 1 Annual Status and Options Report 2019 Annual Status and Options Report Roads Infrastructure November 2019 OFFICIAL Page | 1 OFFICIAL Appendix 1 Annual Status and Options Report 2019 Contents 1.0 Introduction ......................................................................... 3 2.0 Carriageways ...................................................................... 4 3.0 Footways ............................................................................. 7 4.0 Cycleways ......................................................................... 10 5.0 Road Drainage .................................................................. 12 6.0 Lighting .............................................................................. 14 7.0 Traffic Signals ................................................................... 18 8.0 Traffic Signs, Lines & Street Furniture .............................. 21 9.0 Structures .......................................................................... 23 10.0 The Clyde Tunnel ............................................................ 26 11.0 Summary of Investment Options ..................................... 29 OFFICIAL Page | 2 OFFICIAL Appendix 1 Annual Status and Options Report 2019 1.0 Introduction The Annual Status and Options Report is a product of our Road Asset Management Plan. It records the condition of our road assets and provides a means of identifying and prioritising the overall funding needs. This report discusses the status of our road assets in terms of extent, value
    [Show full text]
  • Queen Elizabeth University Hospital
    Queen Elizabeth Queen Elizabeth LIN D THOUSE DR University Hospital D R R E A R University Hospital S E V N F U B E REW The 14 floor Queen Elizabeth University O L R O G U O H MO AD O T Hospital, Glasgow (adult) building is one of the O B N R D Staff I Walking and cycling guide 2021 R A L O O AL Car Parking A T largest acute hospitals in the UK and home R I D E P GO T S V A A to major specialist services including renal Clinical O N R G H OA D Genetics and Podiatry D R Pathology D medicine, transplantation, neurology, spinal and A A L H O P R Mortuary P vascular surgery, with state-of-the-art Critical EN D S IN AD VER A S E O DRI O V R E H Care, Theatre and Diagnostic Services. There R M G O Car R O U is also Teaching & Learning Centre for Glasgow M Park 1 B G 9 O 3 University. B A7 D A Out of Arrival O Hours GP Square E The adult hospital is integrated with the R V RI E SKIPNESS D T children’s hospital with separate functions and A Westmarc G D Royal Queen E R entrances. Entry to both is via Arrivals Square. Hospital V A Elizabeth I H for Children University R D Hospital Car D There is a physical link for patients and staff Maternity S E A Park 2 T V E KE I Cycle Parking N H NE R from the hospitals into the Maternity and D TH D E D RIV L E E V E D I U U U Neurosciences Institute buildings.
    [Show full text]
  • Helen Fogg Journal - 1926
    1 Helen Fogg Journal - 1926 May 31, 1926 – Paris A most hideous day from whatever point of view it is taken. Last night we decided we must get back to England, so we promptly said that the 11 o’clock train was the one for us to take. But the Papal Palace had to be seen at any cost, although to us it is not a beautiful or in any way an inspiring place. A large group of people were waiting for a guide who appeared at 9 o’clock sharp and with a thump of his cane called us all to attention. And then we began to walk, stopping occasionally to crane our necks at a niche in the walls where there had once been a statue, to look at ceilings which had once been covered with marvelous frescoes, and to gaze at the reproductions of tombs the originals having long since been moved elsewhere. I did feel a certain thrill standing in the window overlooking the courtyard, where the popes gave the benedictions to the masses of people below. When I could disengage myself from the now yawning sightseers, I could imagine the pope and all his attendants sweeping through the vast rooms, and I made them alive for a few moments with life and color. It is a vast place, but it is no wonder when you think of the numbers of retainers necessary for the palace of a pope. There were many who simply tasted the food and the wine that he was going to drink.
    [Show full text]
  • This Is Document “Schedule 7 Part 7” Referred to in This Contract
    3RD GENERATION TERM CONTRACT FOR MANAGEMENT AND MAINTENANCE OF THE SCOTTISH TRUNK ROAD NETWORK SOUTH WEST UNIT This is Document “Schedule 7 Part 7” referred to in this Contract SCOTTISH MINISTERS’ REQUIREMENTS SCHEDULE 7 PART 7 MANAGEMENT AND MAINTENANCE OF STRUCTURES CONTENTS Page No 1 INTRODUCTION 1 1.1 General 1 1.2 Definitions 1 2 MAINTENANCE MANAGEMENT 2 2.1 Management 2 2.2 Trunk Road Bridges Database (TRBDB) 2 2.3 Cyclic Maintenance Schedule 3 2.4 Maintenance and Operations Manuals and Health and Safety Files 3 3 INSPECTION REQUIREMENTS 4 3.1 General 4 3.2 Inspection Types 4 3.3 Weather Resistant Steel Bridge Monitoring 7 4 CYCLIC MAINTENANCE 7 4.1 General 7 4.2 Substructures and Superstructures 8 4.3 Expansion Joints 8 4.4 Drainage Systems 9 4.5 Parapets and Pedestrian Protection on Structures 9 4.6 Bearings and Bearing Shelves 9 4.7 Structures Over or Conveying Watercourses 10 4.8 Sign and/or Signal Gantries High Mast Lighting and Masts 10 4.9 Non-structural Items 11 4.10 Underpasses and Culverts also used by Pedestrians and Cyclists 11 4.11 Retaining Walls 12 5 REQUIREMENTS FOR STRUCTURAL MAINTENANCE 12 5.1 General 12 5.2 Maintenance Programme 13 6 STRUCTURAL ASSESSMENTS 14 6.1 General 14 6.2 Structural Assessment Process 14 6.3 Structural Assessments in Progress 14 7 MANAGEMENT OF SUB-STANDARD STRUCTURES AND STRUCTURES WITH KNOWN DEFECTS 15 7.1 General 15 7.2 Interim Measures and Monitoring 15 7.3 Replacement and Strengthening 16 8 ACCESS SYSTEMS 16 _________________________________________________________________________________________________________________
    [Show full text]