County by County Allocations

Total Page:16

File Type:pdf, Size:1020Kb

County by County Allocations COUNTY BY COUNTY ALLOCATIONS Conference Report on House Bill 5001 Fiscal Year 2014-2015 General Appropriations Act Florida House of Representatives Appropriations Committee May 21, 2014 County Allocations Contained in the Conference Report on House Bill 5001 2014-2015 General Appropriations Act This report reflects only items contained in the Conference Report on House Bill 5001, the 2014-2015 General Appropriations Act, that are identifiable to specific counties. State agencies will further allocate other funds contained in the General Appropriations Act based on their own authorized distribution methodologies. This report includes all construction, right of way, or public transportation phases $1 million or greater that are included in the Tentative Work Program for Fiscal Year 2014-2015. The report also contains projects included on certain approved lists associated with specific appropriations where the list may be referenced in proviso but the project is not specifically listed. Examples include, but are not limited to, lists for library, cultural, and historic preservation program grants included in the Department of State and the Florida Recreation Development Assistance Program Small Projects grant list (FRDAP) included in the Department of Environmental Protection. The FEFP and funds distributed to counties by state agencies are not identified in this report. Pages 2 through 63 reflect items that are identifiable to one specific county. Multiple county programs can be found on pages 64 through 67. This report was produced prior to the veto process; the items contained herein are authorized by the Legislature, but still not officially approved by the Governor. Other information pertaining to the budget can be obtained via the House website: www.Myfloridahouse.gov, under Documents → Appropriations County Allocations Contained in the Conference Report for House Bill 5001, 2014-2015 General Appropriations Act* Project Program County Amount 0 0 Alachua Apiary Research & Extension Laboratory Agricultural Research Center Alachua 2,500,000 UF Campus Greenway from Gale Lemerand Dr to SR 24 (Archer Rd) Arterial Highway Constr Alachua 1,436,410 UF Campus Greenway from SR 121 (SW 34th St) to Gale Lemerand Dr. Arterial Highway Constr Alachua 1,656,875 University of Florida (College of Medicine) Autism Program Alachua 1,094,613 I-75 (SR 93) from N. of SR 25/US 441 to Santa Fe River Construct Inspect Consult Alachua 1,309,388 I-75 (SR 93) from S. of SR 222 to N. of SR 25/US 441 Construct Inspect Consult Alachua 1,995,110 SW 8th Avenue from: SW 143rd Street to: SW 122nd Street County Transportation Programs Alachua 2,427,683 Acrosstown Repertory Theatre Workshop, Inc. Cultural and Museum Grants Alachua 2,230 Arts Association of Alachua County, Inc. Cultural and Museum Grants Alachua 10,500 City of Gainesville Cultural and Museum Grants Alachua 150,000 Dance Alive, Inc. Cultural and Museum Grants Alachua 45,300 Gainesville Chamber Orchestra, Inc. Cultural and Museum Grants Alachua 17,673 Gainesville Youth Chorus, Inc. Cultural and Museum Grants Alachua 19,559 Santa Fe College Cultural and Museum Grants Alachua 150,000 The Hippodrome State Theatre, Inc. Cultural and Museum Grants Alachua 150,000 Gainesville Environmental Film and Arts Festival, Inc. Culture Builds Florida Alachua 25,000 Cinema Verde Environmental Film and Arts Festival Shands Teaching Hospital and Clinics, Inc. Culture Builds Florida Alachua 25,000 Artists in Residence Program The Education Foundation of Alachua County, Inc. Culture Builds Florida Alachua 12,445 Culture Builds Hawthorne University of Florida Culture Builds Florida Alachua 21,350 Come Home; Selections from the Collection of Hector Puig Gainesville Correctional Institute Homeless Shelter - Capital Improvements Economic and Self-Sufficiency Alachua 300,000 Santa Fe College - Construct EMT, Law Enforcement Labs & Library -Kirkpatrick Education Fixed Capital Outlay Alachua 8,100,000 University of Florida - Chemistry/Chemical Biology Building Education Fixed Capital Outlay Alachua 20,000,000 University of Florida - Newell Hall - Student Learning Commons Education Fixed Capital Outlay Alachua 10,000,000 Santa Fe College Florida College System Lottery Alachua 8,057,017 Santa Fe College Florida College System Program Fund Alachua 27,727,122 University of Florida Florida Diagnostic and Learning Resources Alachua 450,000 Centers Hal Brady Recreation Complex FRDAP Alachua 48,575 Holly Hills Tot Lot Park FRDAP Alachua 50,000 Alachua County Organization for Rural Needs (ACORN) Health Alachua 750,000 McKnight Brain Institute - Brain Tumor Registry Program Health Alachua 500,000 Historic Haile Homestead Restoration and Renovation Historic Preservation Grants Alachua 11,750 University of Florida - Racing Laboratory / Replacement of Laboratory Equipment Pari-mutuel Racing - DBPR Alachua 360,000 University of Florida Lastinger Center - Online Early Learning Professional Partnership for School Readiness Alachua 2,000,000 Development System Performance Adjustments to School Districts Performance Adjustments to School Districts Alachua 51,292 2 * This report lists projects that are identifiable to specific counties. The FEFP and money distributed to counties by state agencies are not included. County Allocations Contained in the Conference Report for House Bill 5001, 2014-2015 General Appropriations Act* Project Program County Amount I-75 (SR 93) at SR 121 Preliminary Engr Consult Alachua 1,000,000 I-75 at SR 24/ Archer Rd Preliminary Engr Consult Alachua 1,000,000 WUFT-FM, Gainesville (University of Florida) Public Broadcasting Alachua 100,000 WUFT-TV, Gainesville (University of Florida) Public Broadcasting Alachua 307,447 Gainesville Rts State Block Grant Operating Funds Public Transit Dev/Grants Alachua 1,807,516 I-75 (SR 93) from N. of SR 25/US 441 to Santa Fe River Resurfacing Alachua 11,381,432 I-75 (SR 93) from S. of SR 222 to N. of SR 25/US 441 Resurfacing Alachua 16,635,509 SR 121 from: SR 24 to: NW 5th Avenue Resurfacing Alachua 3,193,000 SR 200 (US 301) from: Marion C/L to: CR 325 Resurfacing Alachua 2,163,000 SR 200 (US 301) from: South of C & G to: North of C & G Resurfacing Alachua 2,729,500 SR 26 (Newberry Rd) Fr: West of NW 80th Blvd. to: SW 38th St. Resurfacing Alachua 4,738,000 School Readiness Program School Readiness Program Alachua 9,487,859 University of Florida Universities - Grants and Aids Alachua 662,413,812 University of Florida - IFAS (Institute of Food and Agricultural Science) Universities - Grants and Aids Alachua 151,250,141 University of Florida Health Center Universities - Grants and Aids Alachua 147,912,002 Adults with Disabilities Vocational Rehabilitation Alachua 42,500 Adults with Disabilities Vocational Rehabilitation Alachua 52,765 Voluntary PreKindergarten Program Voluntary PreKindergarten Program Alachua 4,404,465 Archer Wastewater Collection, Treatment and Agriculture Reuse Project Water Projects Alachua 750,000 Tumblin Creek Regional Stormwater Treatment Facility Water Projects Alachua 393,357 Workforce Development Workforce Development Alachua 197,339 0 0 Baker Baker County Faith And Character-Based Re-Entry Corrections Baker 100,000 Baker Re-entry Center Corrections Baker 3,676,769 Baker County School District/Culture Builds Baker Culture Builds Florida Baker 25,000 SR 10 (US 90) from: Columbia C/L to: Sanderson Resurfacing Baker 4,120,000 SR 2 from Columbia C/L to Georgia S/L Resurfacing Baker 5,235,888 School Readiness Program School Readiness Program Baker 1,047,528 CR 125 from: CR 127 to: CR 250 Sm County Outreach Program Baker 1,659,600 Adults with Disabilities Vocational Rehabilitation Baker 137,099 Voluntary PreKindergarten Program Voluntary PreKindergarten Program Baker 805,962 Macclenny Sewer System Replacement Water Projects Baker 1,000,000 Workforce Development Workforce Development Baker 132,141 0 0 Bay CR 2312 Baldwin Road from SR 390 St Andrew Blvd to Minnesota Ave Arterial Highway Constr Bay 2,640,132 Earl Gilbert Park Boat Ramp Boating Improvement Bay 169,929 Mexico Beach Canal Park Marina Boating Improvement Bay 1,622,912 St. Andrews Marina Boating Improvement Bay 250,029 SR 30 (US 98) @ SR 368 23rd Street Intersection Phase I & II Construct Inspect Consult Bay 7,935,938 Bay Arts Alliance, Inc. Cultural and Museum Grants Bay 60,300 Martin Theatre, Inc. Cultural and Museum Grants Bay 27,085 Gulf Coast State College - Construct STEM Bldg - Main (pc)-part Education Fixed Capital Outlay Bay 5,000,000 3 * This report lists projects that are identifiable to specific counties. The FEFP and money distributed to counties by state agencies are not included. County Allocations Contained in the Conference Report for House Bill 5001, 2014-2015 General Appropriations Act* Project Program County Amount Gulf Coast State College Florida College System Lottery Bay 4,875,934 Gulf Coast State College Florida College System Program Fund Bay 16,779,858 SR 30A (US 98) 15th from W of Jenks Avenue to SR 389 East Avenue Hiway Safety Constr/Grants Bay 1,184,500 St. Andrews State Park Inlet Management Bay 2,220,000 SR 30 (US 98) @ SR 368 23rd Street Intersection Phase I & II Intrastate Highway Constr Bay 82,134,384 Community Action Treatment (CAT) Teams - Life Management Center Mental Health and/or Substance Abuse Bay 750,000 Performance Adjustments to School Districts Performance Adjustments to School Districts Bay 81,369 Gulf Coast Parkway from CR 2315 Star Avenue to SR 30A (US 98) Preliminary Engr Consult Bay 1,023,583 SR 22 Wewa Hwy from SR 30 (US 98B) to CR 2315 Star Avenue
Recommended publications
  • Alachua County
    FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2022 - 2026 (12/02/2020 15.48.40) ALACHUA COUNTY Item No Project Description Work Description Length 2022 2023 2024 2025 2026 Highways: State Highways Item No Project Description Work Description Length 2022 2023 2024 2025 2026 4135171 D2-ALACHUA COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT TRAFFIC CONTROL DEVICES/SYSTEM .000 1,103 OPS 1,157 OPS 4358891 SR120(NW 23 AVE) & SR25(US441)(NW 13 ST) TRAFFIC SIGNAL UPDATE .005 94 ROW 214 ROW 165 ROW 762 CST 4437011 SR20 EAST ON-RAMP IN HAWTHORNE RR CROSSING #625010J RAILROAD CROSSING .146 432 RRU 4395331 SR20 FROM: EAST OF US301 TO: PUTNAM C/L LANDSCAPING 1.399 85 PE 1,229 CST 4436951 SR20 W ON-RAMP IN HAWTHORNE RR CROSSING NUMBER 927690S RAILROAD CROSSING .118 362 RRU 4432581 SR20(SE HAWTHORN ROAD) FROM: CR325 TO: WEST OF US301 RESURFACING 5.340 8,528 CST 4355641 SR200(US301) @SR24 CSXRR BR.NO260001 & SR25(US441) PED OVRPS BR.260003 BRIDGE - PAINTING .097 919 CST 4470321 SR222 (39TH AVE) FROM NW 92ND CT TO NW 95TH BLVD RESURFACING 3.293 719 PE 6,995 CST 4373771 SR226(SW 16TH AVE) AT SW 10TH TERRACE PEDESTRIAN SAFETY IMPROVEMENT .004 354 CST 4479641 SR24 FROM SR222 TO SR200(US301) RESURFACING 10.706 2,414 PE 16,633 CST 4358911 SR25(US441) @ SR24(SW ARCHER RD) TRAFFIC SIGNAL UPDATE .006 552 PE 37 ROW 261 ROW 848 CST 4344001 SR25(US441) @ SW 14TH DRIVE TRAFFIC SIGNAL UPDATE .037 1,037 CST 4470331 SR25(US441) FROM SR331(WILLISTON ROAD) TO SR24(ARCHER ROAD) RESURFACING 2.032 4,377 CST 2078502 SR26 CORRIDOR
    [Show full text]
  • We Need Your Artwork... HOLIDAY CHEER for SOLDIERS
    Mostly Sunny COMPLETE COVERAGE 5% rain chance PREP FOOTBALL PLAYOFFS! | Find out who, where and when PAGE 8A 65 43 SPORTS For details, see 2A PALATKA DAILY NEWS FRIDAY, NOVEMBER 14, 2014 www.mypdn.com $1 Weekend Happenings HOLIDAY CHEER FOR SOLDIERS State DEP Glow Fun Run 5K completes 7:15 p.m. Friday, Putnam Community Medical Center, 611 Zeagler Drive, Palatka. series of Bring glow bands and glow body paint. $25 per person. Proceeds go to Putnam First Cancer Fund. Presented by water use Nurse On Call home health care. 19th Annual workshops BY ASIA AIKINS Holiday House Palatka Daily News Gala Night State Department of Environmental Protection 5-9 p.m. Friday, Tilghman officials wrapped up a series of House, 324 River St., public workshops regarding Palatka. Music, snacks and the expansion of reclaimed wine tasting. Christmas in water, stormwater and excess Putnam ornament on sale. surface water use on Thursday, but are still taking public comment until Dec. 5. Sleek In Concert Photos by CHRIS DEVITTO / Palatka Daily News Officials from DEP held the Connie Westberry, center, a teacher at James A. Long Elementary School in Palatka, works with students Mia Perry, last of five statewide public 7 p.m. doors open, 7:30 Daniell Bennett and Maranda Collins to fill packages that will be sent to soldiers serving overseas. workshops regarding Senate p.m. Saturday, Larimer Arts Bill 536 at St. Johns River Center, 216 Reid St., Water Management District Palatka. $7 at the door. headquarters in Palatka on J.A. Long kids put together packages of goodies Thursday afternoon.
    [Show full text]
  • 2045 MTP | Preliminary Needs | Map Figure Descriptions
    MetroPlan Orlando | 2045 MTP | Preliminary Needs | Map Figure Descriptions Map Figure Legend Label Description Existing Priorities Includes projects derived from the following datasets: 1. PPL_2021to2040_Point.shp; 2. PPL_2021to2040_Line.shp; 3. PDF Review of PPL and TIP. Includes needs and projects derived from the following datasets: 1. Data Model output: Top 100 corridors for widening. corridors which have been identified as a need and have a potential to widen beyond existing Widening segment; 2. Orange County Transportation Initiative - Additions.shp; 3. Orange County Transportation Initiative - LOS_ALL_Needs_2045.shp; 4. PPL_2021to2040_Point.shp; 5. PPL_2021to2040_Line.shp; 6. Roadway Needs Central Florida Expressway Authority - Lake_Orange_Express.shp, OsceolaCo_Loop.shp Includes needs and projects derived from the following datasets: 1. Data Model output: Top 100 corridors for complete streets. Constrained corridors which score high in access & connectivity, health & Complete Streets environment, or investment & economy; 2. PPL_2021to2040_Line.shp; 3. Widening projects from existing plans which go beyond roadway constraints (2 and 4 lane roadways) Includes needs and projects derived from the following datasets: 1. Data Model Output, Freight Congestion Needs - Top 25 freight bottlenecks as identified within the Statewide Plan; 2. Data Model Output, Freight Freight Parking Needs - Includes corridors which serve freight activity centers; 3. PPL_2021to2040_Point.shp Existing Priorities Includes projects derived from the following datasets: 1. PPL_2021to2040_Point.shp; 2. PPL_2021to2040_Line.shp; 3. PDF Review of PPL and TIP; 4. FDOT Routes of Significance Includes needs and projects derived from the following datasets: 1. Data Model output: Top 100 corridors with a safety need. Corridors which score high on safety goal criteria. Corridors may duplicate other project Safety categories.
    [Show full text]
  • Online Flight Tracking System
    ONLINE FLIGHT TRACKING SYSTEM WebTrak is the community tool of the Airport Noise & Operations Management System (ANOMS) that allows individuals to watch the movement of flights and air traffic patterns within the Jacksonville area. This flight tracking system includes specific information about flights (excluding military and law enforcement aircraft) from Jacksonville International Airport (JAX), Cecil Airport, Jacksonville Executive at Craig Airport (JAXEX) and Herlong Recreational Airport. Information available through the WebTrak system includes an aircraft’s type, altitude, origin/destination airports and flight identification. Additionally, residents can report an online noise event that will be sent directly to the airport staff. Logging into WebTrak Go to: http://www.flyjaxex.com OR http://webtrak.bksv.com/crg Click the “WebTrak Community Web Replay” icon on the home page, OR Click the “Noise Abatement” tab at the top of the page. Then select “Online Monitoring System.” Accept the agreement terms (for first time users). Overview of System Quick Start Guide Each tab gives a quick overview of certain aspects of the system and its features. Note: The “Library” tab is under construction. This tab will contain reports and other information that the public can download. Enter your address using the “address lookup” tab. Accept results and the house icon will be positioned to your address location on the map. OR Drag the house icon on the Pan and Zoom bar to your address location on the map. WebTrak is automatically set up to show current flights. However, by selecting the historical mode (under the flights tab) past flights can be located. Displayed information includes the aircraft’s beacon code, altitude, and the point of closest approach to a designated address.
    [Show full text]
  • And Bridge Overloads
    FINAL REPORT Development of Risk Models for Florida's Bridge Management System (Reuters) Contract No. BDK83 977-11 John O. Sobanjo Florida State University Department of Civil and Environmental Engineering 2525 Pottsdamer St. Tallahassee, FL 32310 Paul D. Thompson Consultant 17035 NE 28th Place Bellevue, WA 98008 Prepared for: State Maintenance Office Florida Department of Transportation Tallahassee, FL 32309 June 2013 Final Report ii Disclaimer The opinions, findings, and conclusions expressed in this publication are those of the authors and not necessarily those of the Florida Department of Transportation (FDOT), the U.S. Department of Transportation (USDOT), or Federal Highway Administration (FHWA). Final Report iii SI* (MODERN METRIC) CONVERSION FACTORS APPROXIMATE CONVERSIONS TO SI UNITS SYMBOL WHEN YOU KNOW MULTIPLY BY TO FIND SYMBOL LENGTH in Inches 25.4 millimeters mm ft Feet 0.305 meters m yd Yards 0.914 meters m mi Miles 1.61 kilometers km SYMBOL WHEN YOU KNOW MULTIPLY BY TO FIND SYMBOL AREA in2 Square inches 645.2 square millimeters mm2 ft2 Square feet 0.093 square meters m2 yd2 square yard 0.836 square meters m2 ac acres 0.405 hectares ha mi2 square miles 2.59 square kilometers km2 SYMBOL WHEN YOU KNOW MULTIPLY BY TO FIND SYMBOL VOLUME fl oz fluid ounces 29.57 milliliters mL gal gallons 3.785 liters L ft3 cubic feet 0.028 cubic meters m3 yd3 cubic yards 0.765 cubic meters m3 NOTE: volumes greater than 1000 L shall be shown in m3 SYMBOL WHEN YOU KNOW MULTIPLY BY TO FIND SYMBOL MASS oz ounces 28.35 grams g lb pounds 0.454 kilograms
    [Show full text]
  • VALKARIA AIRPORT IS GA AIRPORT of the YEAR! by Liesl King, Airport Administration/Aviation Paralegal
    News from the Florida Department of Transportation Aviation Office www.fdot.gov/aviation FALL 2019 VALKARIA AIRPORT IS GA AIRPORT OF THE YEAR! by Liesl King, Airport Administration/Aviation Paralegal uilt in 1942, Valkaria Airport (X59) is located in east- Cape Canaveral Air Force Station and Kennedy Space Center. In central Florida within the community of Grant-Valkaria 1959, the United States Department of Defense and the General in Brevard County. Brevard County boasts 71 miles of Services Administration conveyed that part of the Valkaria facility coastline in one of the most historical places on earth, the not dedicated to MISTRAM to the county government of Brevard B Space Coast. The airport sits on 660 acres of land and is County, Florida for use as a public airport. flanked by a championship golf course to the south. Taking off to the east, flyers get an immediate breathtaking view of the Indian River and RECENT IMPROVEMENTS Atlantic Ocean beyond. To the north, Cape Canaveral and Kennedy Over the past several years, Airport Director Steve Borowski’s vision Space Center are only a short drive, and an even shorter flight! Pilots for X59 and the general aviation community has become a reality with can request a flyover of the former space shuttle landing area and get grant assistance from the Federal Aviation Administration (FAA) and a birds-eye view of what shuttle astronauts saw when touching down. Florida Department of Transportation (FDOT). From new hangars and a new terminal building, to an instrument approach for runway 14/32, SERVING THE COMMUNITY the airport has gone from 16,000 annual operations several years ago Valkaria Airport is owned by Brevard County and is a public-use to 65,000 annual operations.
    [Show full text]
  • Discussion Orange Blossom Express Rail
    US-441 Corridor (Orange Blossom Express) Rail Alternatives Analysis Local Matching Funds Board of County Commissioners February 15, 2011 Presentation Outline • Background • Cost Allocation • Requested Action Presentation Outline • Background • Cost Allocation • Requested Action Background • Proposed 35-mile Commuter Rail • Downtown Orlando to Eustis/Tavares • Existing Florida Central Railroad Corridor • Feeder to SunRail Background • Feasibility Study Completed – 2001 • Included in MetroPlan Orlando Cost-Feasible LRTP - 2009 • Alternatives Analysis is next step in Federal Funding process • Commissioner Brummer request to pursue Federal Funding – Jan 2010 • FDOT Submitted Federal Grant Application in 2010 – not selected for funding Background Presentation Outline • Background • Cost Allocation • Requested Action Cost Allocation • FDOT pursued Federal Grant in 2010 – 80% Federal – 10% State – 10% Local – Application not selected for funding • FDOT now committing 75% of Funding – 75% State – 25% Local • MetroPlan MPO Area (50%) • Lake-Sumter MPO Area (50%) Cost Allocation • Cost Sharing Methodology – Station Location – Passenger boarding estimates in Feasibility Study • Orlando MPO Area Funding Partners – Orange County – City of Orlando – City of Apopka Cost Allocation Funding Partner Percentage Amount State 75% $1,275,000 Local 25% $425,000 MetroPlan Orlando Area 12.5% $212,500 City of Orlando 6.25% $106,250 Orange County 3.13% $53,125 City of Apopka 3.13% $53,125 Lake-Sumter MPO Area 12.5% $212,500 Lake County 6.25% $106,250 Lake County Municipalities 6.25% $106,250 Total 100% $1,700,000 Presentation Outline • Background • Cost Allocation • Requested Action Requested Action • Approval of a conditional commitment of matching funds to the Florida Department of Transportation (FDOT) in the amount of $53,125 for the US- 441 Corridor/Orange Blossom Express (Downtown Orlando to Eustis/Tavares Area) Alternatives Analysis, subject to approval of a subsequent agreement between Orange County and FDOT.
    [Show full text]
  • T.J. Fish, AICP Executive Director Creating New Trails in Central Florida
    T.J. Fish, AICP Executive Director Creating new trails in Central Florida Close the Gaps 6/21/2013 Heart of Florida “Mt. Dora “Heart of Bikeway” Florida Loop” Coast to Coast Spurs Van Fleet State Trail Gap 6/21/2013 5 South Sumter Connector Trail New trail alignment for study in Sumter 6/21/2013 6 Lake & Seminole Gap 6/21/2013 7 Lake & Marion Gap 6/21/2013 8 Mount Dora Bike Way Gap 6/21/2013 9 What is our Transit future going to look like? ChamberLake County – Alliance TDP Major Update of Lake County 5-30-201310 October 10, 2012 Where do we go from here, in the next ten years? Maintain or expand the types of transportation service Paratransit service / demand response Demand Response – general public Flexibly routed / deviated routes Fixed route Express routes Bus Rapid Transit Rail service What are the priorities for projects? ChamberLake County – Alliance TDP Major Update of Lake County 5-30-201311 October 10, 2012 Rapid UZA Growth Between 2000 – 2010 Between 2000 and 2010 the population of the Lady Lake UZA grew from 50,721 to 112,991 people (+ 123%)…Orlando +32%...Leesburg +35% 2000 2010 Partially due to an increase in the UZA size from 50 to 71 square miles = 1,000 people ChamberLady County Transit Alliance Developmen oft Plan Lake (TDP) Major County Update 125-30-2013May 22, 2012 LakeXpress Service Oct 2009- Oct 2010- Oct 2011- Percent LakeXpress Route Sept 2010 Sept 2011 Sept 2012 Change Route 1: Lady Lake/Eustis via US441 128,959 136,147 161,873 25.52% Route 2: City of Leesburg 45,056 46,679 55,110 22.31% Route 3: City of Mount
    [Show full text]
  • Statewide Aviation Economic Impact Study Update
    FLORIDA Statewide Aviation Economic Impact Study Update TECHNICAL REPORT AUGUST 2014 FLORIDA STATEWIDE AVIATION ECONOMIC IMPACT STUDY UPDATE August 2014 Florida Department of Transportation Aviation and Spaceports Office This report was prepared as an effort of the Continuing Florida Aviation System Planning Process under the sponsorship of the Florida Department of Transportation. A full technical report containing information on data collection, methodologies, and approaches for estimating statewide and airport specific economic impacts is available at www.dot.state.fl.us/aviation/economicimpact.shtm. More information on the Florida’s Aviation Economic Impact Study can be obtained from the Aviation and Spaceports Office by calling 850-414-4500. Florida Department of Transportation – Aviation & Spaceports Office Statewide Aviation Economic Impact Study Update August 2014 TABLE OF CONTENTS CHAPTER 1: EXECUTIVE SUMMARY INTRODUCTION .....................................................................................................................1-1 OVERVIEW OF AVIATION’S ECONOMIC IMPACT IN FLORIDA ............................................1-1 TYPES OF AVIATION ECONOMIC IMPACT MEASURED ......................................................1-2 APPROACH TO MEASURING AVIATION ECONOMIC IMPACT IN FLORIDA ........................1-2 AIRPORT ECONOMIC IMPACTS ............................................................................................1-2 VISITOR ECONOMIC IMPACTS .............................................................................................1-3
    [Show full text]
  • Imprisoning the Innocent: the "Knowledge of Law" Fiction
    Liberty University Law Review Volume 12 Issue 2 Article 6 January 2018 Imprisoning the Innocent: The "Knowledge of Law" Fiction Phillip D. Kline Follow this and additional works at: https://digitalcommons.liberty.edu/lu_law_review Recommended Citation Kline, Phillip D. (2018) "Imprisoning the Innocent: The "Knowledge of Law" Fiction," Liberty University Law Review: Vol. 12 : Iss. 2 , Article 6. Available at: https://digitalcommons.liberty.edu/lu_law_review/vol12/iss2/6 This Article is brought to you for free and open access by the Liberty University School of Law at Scholars Crossing. It has been accepted for inclusion in Liberty University Law Review by an authorized editor of Scholars Crossing. For more information, please contact [email protected]. ARTICLE IMPRISONING THE INNOCENT: THE “KNOWLEDGE OF LAW” FICTION Phillip D. Kline† I. THE PRESENT PROBLEM OF PUNISHING THE MORALLY INNOCENT Disorientation alarmed him. Ocie Mills was accustomed to deciding his direction and defining his purpose. But today, Monday, May 15, 1989, Ocie and his son Cary were reporting to prison, adjudged felons by the country they loved.1 *** Tension between individual liberty and the state, and the inherent metaphysical mysteries of that tension,2 are at least as old as humankind’s earliest discovered written stories. In The Epic of Gilgamesh, written from circa. 2150-1400 BC and considered the most ancient example of literature, † B.A. Central Missouri State University (1982); J.D., University of Kansas (1987). Phill Kline is an Associate Professor at Liberty University School of Law where he teaches Evidence, Bioethics and Law and Trial Practice. He served as a member of the Kansas House of Representatives (1993-2001), Kansas Attorney General (2003-2007) and Johnson County District Attorney (2007-2009).
    [Show full text]
  • Florida Statewide Aviation Economic Impact Study
    FLORIDA DEPARTMENT OF TRANSPORTATION STATEWIDE AVIATION Economic Impact Study 3 2 5 7 1 4 6 Technical Report 2019 Contents 1. Overview ............................................................................................................................................... 1 1.1 Background ................................................................................................................................... 4 1.2 Study Purpose ............................................................................................................................... 4 1.3 Communicating Results ................................................................................................................ 5 1.4 Florida’s Airports ........................................................................................................................... 5 1.5 Study Conventions ...................................................................................................................... 10 1.5.1 Study Terminology .............................................................................................................. 10 1.6 Report Organization .................................................................................................................... 12 2. Summary of Findings ........................................................................................................................... 13 2.1 FDOT District Results ..................................................................................................................
    [Show full text]
  • December 2019 Progress Report
    PERFORMANCE OF EXISTING ABC PROJECTS: INSPECTION CASE STUDIES (ABC-UTC-2016-2-FIU02) Quarterly Progress Report For the period ending November 30, 2019 Submitted by: Armin Mehrabi Affiliation: Department of Civil and Environmental Engineering Florida International University Miami, FL Submitted to: ABC-UTC Florida International University Miami, FL 1. Background and Introduction Accelerated Bridge Construction (ABC) employs prefabricated bridge elements moved to the bridge location and installed in place. Accordingly, ABC reduces many uncertainties associated with construction processes and performance during service life. It also improves the life cycle cost by reducing construction time and traffic interruptions, better control over schedule, and normally by the higher quality of elements resulting in better life-cycle performance. Nevertheless, prefabricated elements need to be made continuous using cast-in-place joints. ABC “closure joints” connecting deck elements to each other and to the bridge girders have greater exposure to degrading environmental effects, and often there is more focus on their evaluation. These joints, expected to become serviceable quickly can therefore be viewed as critical elements of the ABC bridges. Instances of defective (leaky) joints have been reported, and concerns have been raised about the long-term durability of the joints. The long-term deflections and environmental loading can only exacerbate this situation. These may overshadow the many advantages of ABC specifically as life-cycle performance and costs are concerned. Hence, there have been questions on the long-term performance of ABC bridges. There have been limited investigations by some states to monitor the ABC bridges for determining their performance. ABC-UTC, through a collaborative effort by partner universities, is planning to embark on a coordinated and extensive inspection program to inspect several bridges in various states.
    [Show full text]