Sand Proposals of District Sand Monitoring Committee, Dakshina Kannada District

Total Page:16

File Type:pdf, Size:1020Kb

Sand Proposals of District Sand Monitoring Committee, Dakshina Kannada District Proceedings for 162nd Meeting of SEAC held on 6th April 2016 at 12.00 noon Members Present in the meeting: Shri. N. Naganna - Chairman Prof. D.L. Manjunath - Member Dr. S. Manjappa - Member Dr. B. Manoj Kumar - Member Dr. B.S. Jayaprakash - Member Shri. B. Chikkappaiah - Member Dr. N. Krishnamurthy - Member Dr. K.C. Jayaramu - Member Dr. K.B. Umesh - Member Shri. Vijaya Kumar - Secretary The Chairman, SEAC, Karnataka welcomed the members of the Committee and others present. The following proposals listed in the agenda were appraised in accordance of the provision of EIA Notification 2006. The observation and decision of the Committee are recorded under each of the agenda items. Some of the consultants have produced the copy of the stay order in which there is a list of 13 consultants who have obtained stay (W.P. No. 16250-16251/2016) order from Hon’ble High Court of Karnataka to the committee. The committee had discussed regarding the individual stay obtained by Environmental Consultants against the Gazette Notification dated 03.03.2016 issued by MoEF and CC, New Delhi and decided to allow the consultants for making the presentation by the consultants who have obtained stay order from the court and it is hereby brought to the notice of the Authority. Confirmation of the proceedings of 161st SEAC meeting held on 28th and 29th March 2016. The State Expert Appraisal Committee, Karnataka perused the proceedings of 161st SEAC meeting held on 28th and 29th March 2016 and confirmed the same. Sand proposals of District Sand Monitoring Committee, Dakshina Kannada District: 162.1 Removal of Sand from Sand Bar - SB - N6 of Nethravathi River Bed, Arkula Village, Mangaluru Taluk, Dakshina Kannada (4 Ha) of District Sand Monitoring Committee, Dakshina Kannada District. (SEIAA 111 MIN 2016) This is an application submitted by Dakshina Kannada District Sand Monitoring Committee seeking Environmental Clearance for proposed removal of sand from sand bar project at SB-N6, Nethravathi River Bed of Arkula Village, Mangaluru Taluk, Dakshina Kannada District in a area of 4.0 Ha. Representative of the proponent and EIA coordinator from M/s. Metamorphosis Project Consultants Pvt Ltd, Bangalore attended the meeting of SEAC and presented the proposal. The committee appraised the proposal considering the information provided in the statutory application-Form I, Pre Feasibility Report, report prepared by NITK, Suratkal and clarification/information provided during the meeting. The Committee noted that the said proposal has been considered by the State Coastal Zone Management Authority (KSCZMA) during the meeting held on 05.04.2016, the KSCZMA has recommended the proposal to SEIAA in accordance with the CRZ Notification 2011 for EC consideration with a specific condition that the length of the sand bar to be limited to 60%. The Committee after discussion decided to recommend the proposal for issue of EC by imposing the following additional conditions: 1. Removal of sand bar shall be permitted only during the non monsoon season which is breeding season for aquatic fauna. 2. The quality of the material/sand removed from the sand bar shall be verified for its suitability to use in the construction activity. 3. All conditions stipulated by NITK and accepted by the proponent is to be strictly followed. Action: Secretary, SEAC to forward the proposal to SEIAA for further necessary action. 162.2 Removal of Sand from Sand Bar - SB - N2 of Nethravathi River Bed, Jappinamogru Village, Mangaluru Taluk, Dakshina Kannada (19 Ha) of District Sand Monitoring Committee, Dakshina Kannada District. (SEIAA 112 MIN 2016) This is an application submitted by Dakshina Kannada District Sand Monitoring Committee seeking Environmental Clearance for proposed removal of sand from sand bar project at SB-N2, Nethravathi River Bed of Jappinamogru Village, Mangaluru Taluk, Dakshina Kannada District in a area of 19.0 Ha. The committee appraised the proposal considering the information provided in the statutory application-Form I, Pre Feasibility Report, report prepared by NITK, Suratkal and clarification/information provided during the meeting. The Committee noted that the said proposal has been considered by the State Coastal Zone Management Authority (KSCZMA) during the meeting held on 05.04.2016, the KSCZMA has recommended the proposal to SEIAA in accordance with the CRZ Notification 2011 for EC consideration with a specific condition that the length of the sand bar to be limited to 50%. The Committee after discussion decided to recommend the proposal for issue of EC by imposing the following additional conditions: 1. The proposed reduction of length of the sand bar by 50% should be accommodated towards the structure side ie. the bridge. 2. Removal of sand bar shall be permitted only during the non monsoon season which is breeding season for aquatic fauna. 2 3. The quality of the material/sand removed from the sand bar shall be verified for its suitability to use in the construction activity. 4. All conditions stipulated by NITK and accepted by the proponent is to be strictly followed Action: Secretary, SEAC to forward the proposal to SEIAA for further necessary action. 162.3 Removal of Sand from Sand Bar - SB - G5 of Gurupura River, Kunjathbailu Village, Mangaluru Taluk, Dakshina Kannada of District Sand Monitoring Committee, Dakshina Kannada District. (5 Ha) (SEIAA 113 MIN 2016) This is an application submitted by Dakshina Kannada District Sand Monitoring Committee seeking Environmental Clearance for proposed removal of sand from sand bar project at SB-G5, Gurupura River Bed of Kunjathbailu Village, Mangaluru Taluk, Dakshina Kannada District in a area of 5.0 Ha. The committee appraised the proposal considering the information provided in the statutory application-Form I, Pre Feasibility Report, report prepared by NITK, Suratkal and clarification/information provided during the meeting. The Committee noted that the said proposal has been considered by the State Coastal Zone Management Authority (KSCZMA) during the meeting held on 05.04.2016, the KSCZMA has recommended the proposal to SEIAA in accordance with the CRZ Notification 2011 for EC consideration with a specific condition that the length of the sand bar to be limited to 60%. The Committee after discussion decided to recommend the proposal for issue of EC by imposing the following additional conditions: 1. Removal of sand bar shall be permitted only during the non monsoon season which is breeding season for aquatic fauna. 2. The quality of the material/sand removed from the sand bar shall be verified for its suitability to use in the construction activity. 3. All conditions stipulated by NITK and accepted by the proponent is to be strictly followed Action: Secretary, SEAC to forward the proposal to SEIAA for further necessary action. 162.4 Removal of Sand from Sand Bar - SB - G6 of Gurupura River Bed, Kenjar-1 Village, Mangaluru Taluk, Dakshina Kannada (5 Ha) of District Sand Monitoring Committee, Dakshina Kannada District. (SEIAA 114 MIN 2016) This is an application submitted by Dakshina Kannada District Sand Monitoring Committee seeking Environmental Clearance for proposed removal of sand from sand bar project at SB-G6, Gurupura River Bed of Kenjar-1 Village, Mangaluru Taluk, Dakshina Kannada District in a area of 5.0 Ha. 3 The committee appraised the proposal considering the information provided in the statutory application-Form I, Pre Feasibility Report, report prepared by NITK, Suratkal and clarification/information provided during the meeting. The Committee noted that the said proposal has been considered by the State Coastal Zone Management Authority (KSCZMA) during the meeting held on 05.04.2016, the KSCZMA has recommended the proposal to SEIAA in accordance with the CRZ Notification 2011 for EC consideration with a specific condition that the length of the sand bar to be limited to 60%. The Committee after discussion decided to recommend the proposal for issue of EC by imposing the following additional conditions: 1. Removal of sand bar shall be permitted only during the non monsoon season which is breeding season for aquatic fauna. 2. The quality of the material/sand removed from the sand bar shall be verified for its suitability to use in the construction activity. 3. All conditions stipulated by NITK and accepted by the proponent is to be strictly followed Action: Secretary, SEAC to forward the proposal to SEIAA for further necessary action. 162.5 Removal of Sand from Sand Bar - SB - N5 of Nethravathi River Bed, Herekala Village, Mangaluru Taluk, Dakshina Kannada (6.24 Ha) of District Sand Monitoring Committee, Dakshina Kannada District. (SEIAA 115 MIN 2016) This is an application submitted by Dakshina Kannada District Sand Monitoring Committee seeking Environmental Clearance for proposed removal of sand from sand bar project at SB-N5, Nethravathi River Bed of Herekala Village, Mangaluru Taluk, Dakshina Kannada District in a area of 6.24 Ha. The committee appraised the proposal considering the information provided in the statutory application-Form I, Pre Feasibility Report, report prepared by NITK, Suratkal and clarification/information provided during the meeting. The Committee noted that the said proposal has been considered by the State Coastal Zone Management Authority (KSCZMA) during the meeting held on 05.04.2016, the KSCZMA has recommended the proposal to SEIAA in accordance with the CRZ Notification 2011 for EC consideration with a specific condition that the length of the sand bar to be limited to 60%. The Committee after discussion decided to recommend the proposal for issue of EC by imposing the following additional conditions: 1. Removal of sand bar shall be permitted only during the non monsoon season which is breeding season for aquatic fauna. 2. The quality of the material/sand removed from the sand bar shall be verified for its suitability to use in the construction activity. 3. All conditions stipulated by NITK and accepted by the proponent is to be strictly followed Action: Secretary, SEAC to forward the proposal to SEIAA for further necessary action.
Recommended publications
  • Problems of Salination of Land in Coastal Areas of India and Suitable Protection Measures
    Government of India Ministry of Water Resources, River Development & Ganga Rejuvenation A report on Problems of Salination of Land in Coastal Areas of India and Suitable Protection Measures Hydrological Studies Organization Central Water Commission New Delhi July, 2017 'qffif ~ "1~~ cg'il'( ~ \jf"(>f 3mft1T Narendra Kumar \jf"(>f -«mur~' ;:rcft fctq;m 3tR 1'j1n WefOT q?II cl<l 3re2iM q;a:m ~0 315 ('G),~ '1cA ~ ~ tf~q, 1{ffit tf'(Chl '( 3TR. cfi. ~. ~ ~-110066 Chairman Government of India Central Water Commission & Ex-Officio Secretary to the Govt. of India Ministry of Water Resources, River Development and Ganga Rejuvenation Room No. 315 (S), Sewa Bhawan R. K. Puram, New Delhi-110066 FOREWORD Salinity is a significant challenge and poses risks to sustainable development of Coastal regions of India. If left unmanaged, salinity has serious implications for water quality, biodiversity, agricultural productivity, supply of water for critical human needs and industry and the longevity of infrastructure. The Coastal Salinity has become a persistent problem due to ingress of the sea water inland. This is the most significant environmental and economical challenge and needs immediate attention. The coastal areas are more susceptible as these are pockets of development in the country. Most of the trade happens in the coastal areas which lead to extensive migration in the coastal areas. This led to the depletion of the coastal fresh water resources. Digging more and more deeper wells has led to the ingress of sea water into the fresh water aquifers turning them saline. The rainfall patterns, water resources, geology/hydro-geology vary from region to region along the coastal belt.
    [Show full text]
  • Sand Udupi NGT Order.Pdf
    1 BEFORE THE NATIONAL GREEN TRIBUNAL SOUTHERN ZONE, CHENNAI Application No.111 of 2016 (SZ) and M.A.Nos.133, 136 and 138 of 2016 IN THE MATTER OF: 1. Udaya Suvarna, S/o Late MahabalaBangera, Badhragiri, Baikady Village, Brahmavar Post, UdupiTaluk and District, Karnataka-576213. 2. Narayana Sriyan, S/o Late NakraKundar, PaduBaikady, Baikady Village, Brahmavar Post, Udupi Taluk and District, Karnataka-576213. 3. Santhosh Bangera, S/o Late Manjunatha Tholar, Padu Baikady, Baikady Village, Brahmavar Post, Udupi Taluk and District, Karnataka-576213. 4. Suresh Kunder, S/o Late Sri Mohan Suvarna, KiranHokuse, Padu Baiady, Baikady Village, Brahmavar Post, Udupi Taluk and District, Karnataka-576213. ... Applicants AND 1. The Deputy Commissioner/ Chairman District Sand Monitoring Committee, Office of the Deputy Commissioner, “ Rajathadri ”, Manipal, UDUPI-576104. 2 2. The Member Secretary, State Level Environment Impact Assessment Authority- Karnataka, 7th Floor, 4th Gate, M.S Building, Bangalore-560001. 3. The Member Secretary, District Sand Monitoring Committee, and Senior Geologist, Department of Mines and Geology, 1st floor A, Block, “ Rajathadri ”, Manipal, UDUPI-576104. 4. The Regional Director (Environment), Department of Environment and Ecology, Government of Karnataka, 1st Floor, ‘C’ Block, “ Rajathadri ”, District Administrative Centre, Manipal, UDUPI-576104. 5. The Chairman, Karnataka State Coastal Zone Management Authority, 4th Floor, M.S. Building, Bangalore. 6. The Director, Department of Mines and Geology, Khanija Bhavan, Race Course Road, Bangalore-560001. 7. The Secretary, Ministry of Environment, Forests and Climate Change, Indira PayavaranBhavan, Jor Bagh Road, Aliganj, New Delhi-110003. 8. The APCCF, Regional Office, Ministry of Environment & Forests (SZ), Kendriya Sadan, 4th Floor, E& F Wings, 17th Main Road, Koramangal II Block, Bangalore-560034.
    [Show full text]
  • Karnataka Commissioned Projects S.No. Name of Project District Type Capacity(MW) Commissioned Date
    Karnataka Commissioned Projects S.No. Name of Project District Type Capacity(MW) Commissioned Date 1 T B Dam DB NCL 3x2750 7.950 2 Bhadra LBC CB 2.000 3 Devraya CB 0.500 4 Gokak Fall ROR 2.500 5 Gokak Mills CB 1.500 6 Himpi CB CB 7.200 7 Iruppu fall ROR 5.000 8 Kattepura CB 5.000 9 Kattepura RBC CB 0.500 10 Narayanpur CB 1.200 11 Shri Ramadevaral CB 0.750 12 Subramanya CB 0.500 13 Bhadragiri Shimoga CB M/S Bhadragiri Power 4.500 14 Hemagiri MHS Mandya CB Trishul Power 1x4000 4.000 19.08.2005 15 Kalmala-Koppal Belagavi CB KPCL 1x400 0.400 1990 16 Sirwar Belagavi CB KPCL 1x1000 1.000 24.01.1990 17 Ganekal Belagavi CB KPCL 1x350 0.350 19.11.1993 18 Mallapur Belagavi DB KPCL 2x4500 9.000 29.11.1992 19 Mani dam Raichur DB KPCL 2x4500 9.000 24.12.1993 20 Bhadra RBC Shivamogga CB KPCL 1x6000 6.000 13.10.1997 21 Shivapur Koppal DB BPCL 2x9000 18.000 29.11.1992 22 Shahapur I Yadgir CB BPCL 1x1300 1.300 18.03.1997 23 Shahapur II Yadgir CB BPCL 1x1301 1.300 18.03.1997 24 Shahapur III Yadgir CB BPCL 1x1302 1.300 18.03.1997 25 Shahapur IV Yadgir CB BPCL 1x1303 1.300 18.03.1997 26 Dhupdal Belagavi CB Gokak 2x1400 2.800 04.05.1997 AHEC-IITR/SHP Data Base/July 2016 141 S.No. Name of Project District Type Capacity(MW) Commissioned Date 27 Anwari Shivamogga CB Dandeli Steel 2x750 1.500 04.05.1997 28 Chunchankatte Mysore ROR Graphite India 2x9000 18.000 13.10.1997 Karnataka State 29 Elaneer ROR Council for Science and 1x200 0.200 01.01.2005 Technology 30 Attihalla Mandya CB Yuken 1x350 0.350 03.07.1998 31 Shiva Mandya CB Cauvery 1x3000 3.000 10.09.1998
    [Show full text]
  • District Census Handbook, Dakshina, Part XII-A, Series-11
    CENSUS OF INDIA 1991 Series -11 KARNATAKA DISTRICT CENSUS HANDBOOK DAKSHINA KANNADA DISTRICT PART XII - A VILLAGE AND TOWN DIRECTORY SOBHA NAMBISAN Director of Census Operations. Karnataka CONTENTS Page No. FOREWORD v-vi PREFACE vii-viii IMPORTANT STATISTICS xi-xiv ANALYTICAL NOTE xv-xliv Section,·I • Village Directory Explanatory Notc 1-9 Alphabetical List of Villages - Bantval C.O.Block 13-15 Village Directory Statement - Bantvill C.O.Block 16-33 Alphabetical List of Villages - Beltangadi C.O.Block 37-39 Village Directory Statement - Bcltangadi C.D.Block 40-63 Alphabetical List of Villages - Karkal C.D.Block 67-69 Village Directory Statement - Karkal C.D.Block 70-91 Alphabetical List of Villages - Kundapura C.O.Block 95-97 Village Directory Statement - Kundapur C.O.Block 98-119 Alphabetical List of Villages • Mangalore C.O.Block 123-124 Village Directory Statement - Mangalorc C.D.Block 126-137 Alphabetical List of Villages - PuHur C.D.Block 141-142 Village Directory Statement - Pullur C.D.Block 144-155 Alphabetical List of Villages - Sulya C.O.Block 159-160 Village Directory Statement - Sulya C.D.Block 162-171 Alphabetical List of Villages - Udupi C.D.Block 175-177 Village Directory Statement - Udupi C.D.Block 178-203 Appendix I!"IV • I Community Devclopment Blockwise Abstract for Educational, Medical and Other Amenities 206-209 II Land Utilisation Data in respect of Non-Municipal Census Towns 208-209 III List of Villages where no amenities except Drinking Water arc available 210 IV-A List of Villages according to the proportion of Scheduled Castes to Total Population by Ranges 211-216 IV-B List of Villages according to the proportion of Scheduled Tribes to Total Population by Ranges 217-222 (iii) Section-II - Town Din'ctory Explanatory Note 225-21:; Statement .
    [Show full text]
  • 43253-027: Karnataka Integrated Urban
    Resettlement Plan Document Stage: Updated Project Number: 43253-027 April 2020 IND: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) – 24x7 Water Supply Distribution Network for Udupi City Package No: 02UPD01 Prepared by Karnataka Urban Infrastructure Development and Finance Corporation, Government of Karnataka for the Asian Development Bank. CURRENCY EQUIVALENTS (As of March 2020) Currency Unit = Indian Rupee (₹) ₹1.00 = $0.014 $1.00 = ₹72 ABBREVIATIONS ADB — Asian Development Bank AMRUT — Atal Mission for Rejuvenation and Urban Transformation BPL — below poverty line CAPRRC — community awareness, participation, rehabilitation and resettlement consultant CDP — comprehensive development plan CLIP — city level investment plan CMC — city municipal council DC — Deputy Commissioner DLRC — district level resettlement committee DPR — detailed project report ELSR — elevated level storage reservoir GLSR — ground level storage reservoir GoK — Government of Karnataka GRC — grievance redressal committee HSC — House Service Connections IWRM — integrated water resource management KUIDFC — Karnataka Urban Infrastructure Development and Finance Corporation KUWSDB — Karnataka Urban Water Supply and Drainage Board KUIWMIP — Karnataka Integrated Urban Water Management Investment Program LA and R&R — land acquisition and resettlement and rehabilitation MFF — multitranche financing facility NGO — nongovernment organization OBC — other backward castes PIU — project implementation unit PMDSC — project management and design supervision consultant PMU — project management unit RPMU — regional project management unit ROW — right of way SDO — Social Development Officer SPS — Safeguard Policy Statement STP — sewage treatment plant ULB — urban local body WSS — water supply and sanitation WTP — water treatment plant WEIGHTS AND MEASURES ha — hectare kL — kiloliter km — kilometer lpcd — liters per capita per day mld — million liters per day m — meter m2 — square meter NOTE In this report, "$" refers to Unites States dollars.
    [Show full text]
  • Gram Panchayat Spatial Development Plan Dec 2020 for Ministry of Panchayati Raj Government of India
    Gram Panchayat Spatial Development Plan Dec 2020 for Ministry of Panchayati Raj Government of India Shankarnarayana Gram Panchayat Spatial Development Plan-2020 Shankaranarayana ii PROJECT TEAM Manipal School of Architecture and Planning(MSAP), Udupi District, Karnataka Overall Co-ordination: Dr. Deepika Shetty, Director and Professor, MSAP, Manipal Project Team: Dr. Udaya Shankara HN, Professor, Department of Civil Engineering, MIT, Manipal Shri. Lino Yovan, Research Associate, MIT, Manipal Ms. Joicy KJ, Associate Professor, MSAP Shri. Shanta Pragyan Dash, Assistant Professor, MSAP Ms. Ipsitaa Priyadarsini Das, Assistant Professor, MSAP Shri. Amarnath Sharma, Assistant Professor, MSAP Ms. Rituka Kapur, Assistant Professor, MSAP Shri. Satyaprakash Das, Assistant Professor, MSAP Ms. Sanjana Shetty, Assistant Professor, MSAP Ms. Sasmita Chand, Assistant Professor, MSAP Ms. Krutika Madkaiker, Assistant Professor, MSAP Ms. Sharvani Bhat, Student Intern, MSAP Masters students from second year Masters in urban design and development. (M.Arch. MUDD), MSAP Aadityaraj Jain Kotian Gaurav Srinivasa Rahul Menon Sidhartha Sunil Dutt Praveen Kumar R Harnoor Dhillon Pooja Pankajbhai Mehta Kanchi Madhulika R Auna Sando Abhijna Tanya .M. Thimmaiah Aayushman Singh Bhati Gayathrie J R P Harini Sarvani Gundu Pinki Bose Akkamahadevi Aman Kashyap Debjani Das Regional Remote Sensing Centre - South / NRSC / ISRO, Bengaluru Overall Co-ordination: Dr. Sudha R., Scientist ‘SG’ Project Team: Dr. K.S. Ramesh Head, Applications Dr. Rama Subramoniam S. Scientist ‘SF’ Smt. Shivam Trivedi Scientist ‘SE’ Smt. Manjula V. Bhagwat Scientist ‘SD’ RC-North (New Delhi) Team and RC- Hyderabad Team: Provided inputs on satellite datasets and thematic layers (SIS-DP Phase-I), household survey data and results of run-off estimation. Overall Technical Guidance: Dr.
    [Show full text]
  • Karnataka Under Construction AHEC-IITR/SHP Data Base/July 2016
    Karnataka Under Construction Capacity lNo MHS District Company Location Type GO_Nos Allotted Addahole Mandya Nimishamba Energy India Across Bangaradoddi Canal Which takes off CB EE 45 NCE 2005 dated 22-03-2005 (0.3MW) EN 460 NCE 2009 3 Pvt. Ltd. water from Cauvery river, Palahally village, dated 16-10-2009 (3MW) 1 Srirangapatna Taluk, Mandya District. Aniyur Belgaum Glenco Gokak Canal MHS across Ghataprabha CB EN 238 NCE 2013 dt: 16.11.2013 (Corrigendum issued for 0.25 river Gokak Left Bank Canal between 4th & changes in Lat & Long details vide Energy Department letter No. 2 5th KM at Ghataprabha vilalge of Gokak EN 43 NCE 2014 dt: 03.03.2014. Agreement executed on taluk in Belagavi district 08.08.2014 Balganur Belgaum Moodabagil Power Pvt. Ltd. Mugalkhod MHS Mugalkhod LBC at CB EN 197 NCE 2009 dated 29/1/2010 (2.6 MW), Reduced Capacity 3 Mugalkhod village of Raybag Taluk in from 2.6 MW to 1.5 MW) vide GO.No. EN 194 NCE 2014 dt: Belgaum District 31.10.2014. 3 Barapole Belgaum Vara Siddi Vinayaka Malaprabha LBC MHS across Malaprabha CB EN 220 NCE 2007 dated 19/05/2009 & 30/12/2009 3 Energy Pvt. Ltd. Left Bank Canal at Kalloli Village of Belgaum 4 Taluk in Belgaum District. Basavanna(Aidabhavi) Mandya Vijayalakshmi Hydro Power Hebbakavadi MHS across Hebbakavadi CB DE 56 NCE 95 dated 16/02/ 1996 1.25 Pvt. Ltd.(unit -2) Branch Canal of Gopanahalli village of 5 Malavalli Taluk in Mandya District Basaveshwara MHS (Formerly Yadgir Krishna Power Company Kakkera MHS across Kakkera Pick up CB DE 253 NCE 2003 dated 28/11/2003(1 MW,M/s Krishna Power 1 Gaganachukki RBC) Channel at Kakkera Village of Shorapur Company ), EN 253 NCE 2003 dated 09/02/2004(to M/s Krishna 6 Taluk in Gulbarga District.
    [Show full text]
  • KSEEB Class 9 Social Science Part 1 Textbook
    Government of Karnataka SOCIAL SCIENCE (Revised) Part-I 9th NINTH STANDARD (ENGLISH MEDIUM) Karnataka Textbook Society (R.) 100 Feet Ring Road, Banashankari 3rd Stage, Bengaluru - 85 I PREFACE The Textbook Society, Karnataka has been engaged in producing new textbooks according to the new syllabi which in turn are designed on NCF – 2005 since June 2010. Textbooks are prepared in 12 languages; seven of them serve as the media of instruction. From standard 1 to 4 there is the EVS, mathematics and 5th to 10th there are three core subjects namely mathematics, science and social science. NCF – 2005 has a number of special features and they are: • connecting knowledge to life activities • learning to shift from rote methods • enriching the curriculum beyond textbooks • learning experiences for the construction of knowledge • making examinations flexible and integrating them with classroom experiences • caring concerns within the democratic policy of the country • making education relevant to the present and future needs. • softening the subject boundaries- integrated knowledge and the joy of learning. • the child is the constructor of knowledge The new books are produced based on three fundamental approaches namely. Constructive approach, Spiral Approach and Integrated approach The learner is encouraged to think, engage in activities, master skills and competencies. The materials presented in these books are integrated with values. The new books are not examination oriented in their nature. On the other hand they help the learner in the all round development of his/her personality, thus help him/her become a healthy member of a healthy society and a productive citizen of this great country, India.
    [Show full text]
  • Annual Report 2008-09 July 2009
    GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT (MAJOR AND MEDIUM) ANNUAL REPORT 2008-09 JULY 2009 INDEX SL. PAGE CONTENTS NO. NO. 1 INTRODUCTION 5 2 ORGANISATIONAL STRUCTURE 6 3 ACHIEVEMENTS OF WATER RESOURCES DEPARTMENT DURING 2008-09 7 4 ACCELERATED IRRIGATION BENEFIT PROGRAMME 9 5 SPECIAL REHABILITATION PACKAGE 15 6 WATER RESOURCES DEVELOPMENT ORGANISATION 16 7 CENTRAL MECHANICAL ORGANISATION 25 8 KARNATAKA ENGINEERING RESEARCH STATION 28 9 WATER AND LAND MANAGEMENT INSTITUTE (WALMI) 33 NIGAM 10 KRISHNA BHAGYA JALA NIGAM LIMITED 34 10.1 UPPER KRISHNA PROJECT 35 10.2 BAGALKOT TOWN DEVELOPMENT AUTHORITY, BAGALKOT 45 11 KARNATAKA NEERAVARI NIGAMA LIMITED 49 11.1 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 50 (NORTH), BELGAUM 11.1.1 GHATAPRABHA PROJECT 51 11.1.2 HIPPARAGI IRRIGATION PROJECT 52 11.1.3 MARKANDEYA RESERVOIR PROJECT 53 11.1.4 DUDHGANGA IRRIGATION PROJECT 54 11.1.5 LIFTING OF HIRANYAKESHI WATERS INTO G.R.B.C CANAL 55 11.1.6 BELLARYNALA PROJECT 56 11.1.7 SRI RAMESHWARA L.I. SCHEME 57 11.2 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, MALAPRABHA 58 PROJECT ZONE, DHARWAD. 11.2.1 MALAPRABHA PROJECT 59 11.2.2 HARINALA IRRIGATION PROJECT 60 11.2.3 KALASA NALA AND BANDHURNALA PROJECT 61 11.2.4 JAVALUHALLA L.I. SCHEME 62 11.2.5 BENNIHALLA L.I. SCHEME (5 NOS.) 63 11.2.6 KOLACHI L.I. SCHEME 64 11.2.7 KONNUR L.I. SCHEME 65 11.2.8 SHIGGAON L.I. SCHEME 66 11.3 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 67 CENTRAL ZONE, MUNIRABAD 2 SL.
    [Show full text]
  • CHAPTER II Performance Reviews Relating to Government Companies
    CHAPTER II Performance Reviews relating to Government Companies 2.1 Implementation of Accelerated Irrigation Benefit Programme by Karnataka Neeravari Nigam Limited and Krishna Bhagya Jala Nigam Limited. Executive Summary to the extent of 13 per cent, thereby the ultimate This performance review examined the objective of bringing benefit to farmers effectiveness in completion of four out of six remained partly unfulfilled. irrigation projects proposed by the State (between 1996-97 and 2007-08) under Slow progress of works Accelerated Irrigation Benefit Programme (AIBP) launched by Government of India (GOI) During the review period 2003-09, in none of with a view to accelerate irrigation potential the years the budgeted works could be within a short period of four agricultural completed. The actual expenditure incurred on seasons. the budgeted works ranged from 36.51 per cent to 72.65 per cent (UKP Stage-I- Phase III), The six projects included two projects (UKP 50.86 per cent to 82.73 per cent (UKP Stage-II) Stage I - Phase III and UKP - Stage II) and 45.01 per cent to 69.41 per cent executed by Krishna Bhagya Jala Nigam (Ghatprabha-Stage-III). Limited (KBJNL) and four projects (Malaprabha, Ghataprabha, Ganodirinala and The delay was attributable to problems of land Varahi) executed by Karnataka Neeravari acquisition, change in scope of works, extra Nigam Limited (KNNL). The four projects test financial implications during execution, checked by Audit were UKP Stage-I-Phase III, insufficient monitoring, etc. UKP Stage II, Ghataprabha and Varahi for their implementation during the period 2003-09. Non completion of canals / distributaries, non synchronization of works coupled with delay in Under AIBP, the funds were released in the awarding works has also led to delay in form of Central Loan Assistance (CLA) towards potential creation of 0.40 lakh Ha.
    [Show full text]
  • Annual Report 2012-13
    SL. PAGE CONTENTS NO. NO. 1 INTRODUCTION 7 2 ORGANISATIONAL STRUCTURE 8 ACHIEVEMENTS OF WATER RESOURCES DEPARTMENT DURING 3 9 2010-11 4 ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP) 11 5 PRIME MINISTER’S SPECIAL PACKAGE 6 SPECIAL DEVELOPMENT PLAN (SDP) 21 7 WATER RESOURCES DEVELOPMENT ORGANISATION 23 8 CENTRAL MECHANICAL ORGANISATION (CMO) 28 9 KARNATAKA ENGINEERING RESEARCH STATION (KERS, K.R SAGAR) 31 9 WATER AND LAND MANAGEMENT INSTITUTE (WALMI, DHARWAD) 36 NIGAM 11 KRISHNA BHAGYA JALA NIGAM LIMITED (KBJNL) 37 11.1 UPPER KRISHNA PROJECT (UKP) 38 11.2 BAGALKOT TOWN DEVELOPMENT AUTHORITY, BAGALKOT (BTDA) 63 12 KARNATAKA NEERAVARI NIGAMA LIMITED (KNNL) 68 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, 12.1 69 IRRIGATION (NORTH), BELGAUM 12.1.1 GHATAPRABHA PROJECT 70 12.1.2 HIPPARAGI IRRIGATION PROJECT 73 12.1.3 MARKANDEYA PROJECT 75 12.1.4 DUDHGANGA IRRIGATION PROJECT 77 12.1.5 LIFTING OF HIRANYAKESHI WATERS INTO G.R.B.C CANAL. 78 12.1.6 BELLARYNALA PROJECT 80 12.1.7 SRI RAMESHWARA L.I. SCHEME 81 12.1.8 KINAYE 82 12.1.9 MALLIKWADI LIFT IRRIGATION SCHEME (REJUVENATION WORKS) 83 12.1.10 CONSTRUCTION OF SADALAGA BRIDGE-CUM-BARRAGE 83 12.1.11 CONSTRUCTION OF SANGAM BARRAGE 84 12.1.12 FILLING OF SHIRGAON BASAVANNA TANK 84 12.1.13 FILLING OF KADAPUR TANK 84 FILLING OF 18 TANKS OF HUKKERI TQ. & 4 TANKS OF CHIKKODI TQ. 12.1.14 84 (TOTAL 22 TANKS) FROM HIRANYAKESHI RIVER AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, 12.2 84 MALAPRABHA PROJECT ZONE, DHARWAD.
    [Show full text]
  • Component Analysis and Hydrochemical Facies Characterization to Evaluate Groundwater Quality in Varahi River Basin, Karnataka State, India
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by ePrints@Bangalore University Appl Water Sci DOI 10.1007/s13201-015-0287-x ORIGINAL ARTICLE Principal component analysis and hydrochemical facies characterization to evaluate groundwater quality in Varahi river basin, Karnataka state, India 1 1 P. Ravikumar • R. K. Somashekar Received: 7 January 2015 / Accepted: 19 April 2015 Ó The Author(s) 2015. This article is published with open access at Springerlink.com Abstract The present study envisages the importance of for regulating the hydrochemistry of groundwater in the graphical representations like Piper trilinear diagram and study area. Chadha’s plot, respectively to determine variation in hy- drochemical facies and understand the evolution of hy- Keywords Varahi Á Piper trilinear diagram Á Principal drochemical processes in the Varahi river basin. The component analysis (PCA) Á Eigen values Á Scree plot Á analytical values obtained from the groundwater samples Score plot Á Loading plot when plotted on Piper’s and Chadha’s plots revealed that the alkaline earth metals (Ca2?,Mg2?) are significantly dominant over the alkalis (Na?,K?), and the strong acidic Introduction - 2- anions (Cl ,SO4 ) dominant over the weak acidic anions 2- - (CO3 , HCO3 ). Further, Piper trilinear diagram classi- Groundwater is being used for domestic, agricultural and fied 93.48 % of the samples from the study area under industrial purposes across the world since time im- 2? 2? - 2- Ca –Mg –Cl –SO4 type and only 6.52 % samples memorial. As a natural resource, groundwater is required 2? 2? - under Ca –Mg –HCO3 type.
    [Show full text]