Annual Report 2008-09 July 2009
Total Page:16
File Type:pdf, Size:1020Kb
GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT (MAJOR AND MEDIUM) ANNUAL REPORT 2008-09 JULY 2009 INDEX SL. PAGE CONTENTS NO. NO. 1 INTRODUCTION 5 2 ORGANISATIONAL STRUCTURE 6 3 ACHIEVEMENTS OF WATER RESOURCES DEPARTMENT DURING 2008-09 7 4 ACCELERATED IRRIGATION BENEFIT PROGRAMME 9 5 SPECIAL REHABILITATION PACKAGE 15 6 WATER RESOURCES DEVELOPMENT ORGANISATION 16 7 CENTRAL MECHANICAL ORGANISATION 25 8 KARNATAKA ENGINEERING RESEARCH STATION 28 9 WATER AND LAND MANAGEMENT INSTITUTE (WALMI) 33 NIGAM 10 KRISHNA BHAGYA JALA NIGAM LIMITED 34 10.1 UPPER KRISHNA PROJECT 35 10.2 BAGALKOT TOWN DEVELOPMENT AUTHORITY, BAGALKOT 45 11 KARNATAKA NEERAVARI NIGAMA LIMITED 49 11.1 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 50 (NORTH), BELGAUM 11.1.1 GHATAPRABHA PROJECT 51 11.1.2 HIPPARAGI IRRIGATION PROJECT 52 11.1.3 MARKANDEYA RESERVOIR PROJECT 53 11.1.4 DUDHGANGA IRRIGATION PROJECT 54 11.1.5 LIFTING OF HIRANYAKESHI WATERS INTO G.R.B.C CANAL 55 11.1.6 BELLARYNALA PROJECT 56 11.1.7 SRI RAMESHWARA L.I. SCHEME 57 11.2 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, MALAPRABHA 58 PROJECT ZONE, DHARWAD. 11.2.1 MALAPRABHA PROJECT 59 11.2.2 HARINALA IRRIGATION PROJECT 60 11.2.3 KALASA NALA AND BANDHURNALA PROJECT 61 11.2.4 JAVALUHALLA L.I. SCHEME 62 11.2.5 BENNIHALLA L.I. SCHEME (5 NOS.) 63 11.2.6 KOLACHI L.I. SCHEME 64 11.2.7 KONNUR L.I. SCHEME 65 11.2.8 SHIGGAON L.I. SCHEME 66 11.3 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 67 CENTRAL ZONE, MUNIRABAD 2 SL. PAGE CONTENTS NO. NO. 11.3.1 SINGATALUR LIFT IRRIGATION SCHEME (SLIS) 67 11.4 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, UPPER TUNGA 68 PROJECT ZONE, SHIMOGA 11.4.1 UPPER TUNGA PROJECT 70 11.4.2 TUNGA LIFT IRRIGATION SCHEME 72 11.4.3 BASAPURA LIFT IRRIGATION SCHEME 73 11.4.4 ITAGI-SASALWAD LIS 74 11.4.5 GUDDADA MALLAPURA LIS 75 11.4.6 UPPER BHADRA PROJECT (STAGE 1 & 2) 76 11.4.7 UBRANI-AMRUTHAPURA MULTIPURPOSE LIS 77 11.4.8 SANYASIKOPPA LIS 78 11.4.9 KALLUVADDAHALLA NEW TANK 79 11.4.10 TILUVALLI LIFT IRRIGATION SCHEME 80 11.5 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, VARAHI PROJECT 81 ZONE, SIDDAPURA. 11.5.1 VARAHI IRRIGATION PROJECT 81 11.6. AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 83 PROJECTS ZONE, GULBARGA 11.6.1 BENNITHORA PROJECT 83 11.6.2 BHIMA LIFT IRRIGATION SCHEME 84 11.6.3 GANDORINALA PROJECT 86 11.6.4 LOWER MULLAMARI PROJECT 88 11.6.5 AMARJA PROJECT 89 12 CAUVERY NEERAVARI NIGAMA LIMITED 91 12.1 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION (S) 92 ZONE, MYSORE 12.1.1 D. DEVARAJA URS CANAL 93 12.1.2 KABINI RESERVOIR PROJECT 94 12.1.3 HARANGI PROJECT 96 12.1.4 TARAKA PROJECT 98 12.1.5 ARKAVATHY PROJECT 99 12.1.6 CHIKLIHOLE PROJECT 101 12.1.7 UDUTHOREHALLA PROJECT 102 12.1.8 IGGALUR BARRAGE PROJECT 103 12.1.9 MANCHANABELE PROJECT 105 12.1.10 MODERNISATION OF KRISHNARAJA SAGAR 106 3 SL. PAGE CONTENTS NO. NO. 12.1.11 NANJAPURA LIFT IRRIGATION SCHEME 107 12.1.12 BANAHALLIHUNDI LIS 108 12.2 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, HEMAVATHY 109 CANAL ZONE, TUMKUR 12.2.1 HEMAVATHY CANAL ZONE, TUMKUR 109 12.3 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, HEMAVATHY 112 RESERVOIR PROJECT, GORUR 12.3.1 HEMAVATHY PROJECT 112 12.3.2 YAGACHI PROJECT 114 12.3.3 HUCHANAKOPPALU LIS 115 12.3.4 KAMASAMUDRA LIS 116 12.3.5 KACHENAHALLI LIS 117 12.3.6 VOTEHOLE PROJECT 118 ZONES 119 13 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 120 PROJECT ZONE, GULBARGA 13.1 KARANJA PROJECT 120 14 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 121 CENTRAL ZONE, MUNIRABAD 14.1 TUNGABHADRA PROJECT 121 14.2 HIREHALLA POJECT 124 14.3 MASKINALA PROJECT 126 14.4 OTHER WORKS (NEW) 128 15 AN OVERVIEW OF PROJECTS UNDER THE ENGINEER-IN-CHIEF, UPPER TUNGA 129 PROJECT ZONE, SHIMOGA 15.1 BHADRA PROJECT 130 15.2 MODERNISATION OF CANAL SYSTEM OF TUNGA ANICUT 131 15.3 HODIRAYANAHALLA DIVERSION SCHEME 132 15.4 MODERNISATION OF CANAL SYSTEM OF AMBLIGOLA RESERVOIR 133 15.5 MADAGA –MASUR TANK 134 15.6 ERM OF BHEEMASAMUDRA TANK 135 15.7 MODERNISATION OF CANAL SYSTEM OF GONDI ANICUT (BHADRA) 136 15.8 KADUVINABYLU LIFT IRRIGATION SCHEME 136 15.9 THIMMAPURA LIFT IRRIGATION SCHEME 136 15.10 ANJANAPURA RESERVOIR PROJECT 136 16 COMMAND AREA DEVELOPMENT PROGRAMME 137 4 1. INTRODUCTION The Annual Report is a document giving details of the annual Programme, Progress and important events that have taken place during the year, in the Water Resources Department. GEOGRAPHICAL AREA The geographical area of Karnataka is 1,91,791 Sq. Km., accounting for 5.83% of the total area of the country. The cultivable command area of the State is 1, 40,598 sq. Km. The net sown area is 1,07,000 sq. Km and the ultimate Irrigation Potential from Major and Medium Irrigation Projects has been estimated as 35,000 sq. Km or 35.00 Lakh Ha. PROGRESS IN BRIEF Presently, the Irrigation Department is known as the Water Resources Department. There are 133 Major and Medium Irrigation Projects in the State, out of which 47 projects are completed, 76 are ongoing. The Water Resources Department has established three special purpose vehicles, namely, Krishna Bhagya Jala Nigama Limited (KBJNL), Karnataka Neeravari Nigama Limited (KNNL) and Cauvery Neeravari Nigam Limited (CNNL), under the companies Act of 1956, to mobilize financial resources for speedy completion of major and medium irrigation projects with-in the targeted period. KRISHNA BHAGYA JALA NIGAM LIMITED (KBJNL): “Krishna Bhagya Jala Nigam Limited” was formed vide G.O. No. ID/25/WBM/95, dated: 6-5- 94, to expedite the works of Upper Krishna Project (UKP). This Nigam is functioning since 19th August 1994. KARNATAKA NEERAVARI NIGAMLIMITED (KNNL): ”Karnataka Neeravari Nigam Limited” was formed vide G.O. No. ID: 201: KBN: 98, dated: 26-11-98, to expedite the works in Krishna Basin, except UKP. This Nigam is functioning since 9th December 1998. CAUVERY NEERAVARI NIGAM LIMITED (CNNL): ”Cauvery Neeravari Nigam Limited” was formed vide G.O. No. WRD: 32: KBN: 2003, Dated: 12.05.2003, to expedite the works in Cauvery Basin. This Nigam is functioning since 3rd June 2003. INDEX 5 1. ORGANISATIONAL STRUCTURE WATER RESOURCES DEPARTMENT HON’BLE MINISTER FOR WATER RESOURCES PRINCIPAL SECRETARY SECRETARY C.E, DIRECT CADA’S KBJNL BOARD KNNL BOARD CNNL BOARD W.R.D.O FIELD OF DIRECTORS OF DIRECTORS OF DIRECTORS OFFICES ADMINISTRATOR MALAPRABHA & CE, REGISTERED REGISTERED GHATAPRABHA, HYDROLOGY CORPORATE CORPORATE REGISTERED CE, IRRIGATION BELGAUM & CMO, OFFICE CORPORATE CENTRAL ZONE, OFFICE BANGALORE OFFICE MUNIRABAD FIELD OFFICES FIELD OFFICES ADMINISTRATOR FIELD C.E, TUNGABHADRA I.S.W.D, OFFICES CE, IRRIGATION PROJECT, BANGALORE CE, O&M ZONE, PROJECT ZONE, MUNIRABAD CE, UTP UKP, GULBARGA ZONE, CE, NARAYANPURA SHIMOGA IRRIGATION (SOUTH), ADMINISTRATOR CE, DAM ZONE, MYSORE CE, UPPER BHADRA, UKP, ALMATTI CE, VARAHI TUNGA SHIMOGA ZONE, PROJECT, SIDDAPURA CE, H.P.Z, SHIMOGA CE, CANAL ZONE- ADMINISTRATOR GORUR 1, UKP, B.GUDI CAUVERY BASIN, CE, IPZ, MYSORE GULBARGA DIRECTOR, CE, H.C.Z, WALMI CE, CANAL ZONE-2, UKP, TUMKUR CE, ADMINISTRATOR KEMBHAVI IRRIGATION UKP, B.GUDI (NORTH), DIRECTOR, K.E.R.S BELGAUM ADMINISTRATOR CE, IRRIGATION MALAPRABHA PROJECT ZONE, PROJECT GULBARGA ZONE, DHARWAD CE, UPPER BHADRA PROJECT, CHITRADURGA 6 3. ACHIEVEMENTS OF WATER RESOURCES DEPARTMENT DURING 2008-09 During 2008-09, 7 Major & medium irrigation projects are completed and irrigation potential of 47201 ha. Is created. The ultimate irrigation potential is 35 lakh Ha from Major & medium irrigation projects. Upto end of March 2009, cumulative irrigation potential of 24.28 lakh ha has been created. Out of the targetted irrigation potential of 6.22 Lakh Ha under Upper Krishna Project, an irrigation potential of 5.88 lakh Ha has been created so for. The balance works of Jewargi Branch Canal, Narayanapur Right Bank Canal, Mulwad Lift Irrigation Scheme, Almatti Right Bank Canal and Almatti Left Bank Canal of Upper Krishna Project are nearing completion. To utilize Krishna waters under Upper Krishna Project, Ramthal (Marol) Lift Irrigation Scheme, Teggi- Siddapura Lift Irrigation Scheme, Thimmapura Lift Irrigation Scheme, Sonna Lift Irrigation Scheme and Rolli-Mannikeri Lift Irrigation Scheme are taken up in the backwaters of Almatti Reservoir and are in progress. During 2008-09, Central Assistance under A.I.B.P. to the tune of Rs. 214.94 Crores for 6 Major & medium irrigation projects has been availed and an expenditure of Rs. 418.87 Crores has been incurred. 17 Major & Medium irrigation projects in six selected districts are posed for assistance under the Hon‟ble Prime Minister‟s Special Rehabilitation Package out of which, 8 projects are dropped. Planning Commission clearance in respect of three projects of Belgaum District is awaited. Up to end of March 2009 a sum of Rs.278.77 Crores is released for 4 projects and total expenditure incurred on all 17 projects is Rs.1074.68 Crores and an irrigation potential of 59,815 Ha is created. To utilize its share of Godavari waters resourcefully, the State has taken up the construction of series of Barrages like Jigrihal, Manikeshwar, Halahalli and Chandapur barrages are in progress. These barrages are being implemented by Krishna Bhagya Jala Nigam Limited. Cauvery Neeravari Nigam Limited has activated the potential oriented works under Cauvery Basin. In order to minimize the advert consequences of the Cauvery water dispute tribunal‟s award, it has been programmed to develop 1252 minor irrigation tanks coming under the command area of major and medium irrigation projects in Cauvery basin.