Building a Copper Development Company LUMWANA WEST: Advanced Copper-Cobalt Deposit MURDIE and TORRENS: Massive Copper Targets

Total Page:16

File Type:pdf, Size:1020Kb

Building a Copper Development Company LUMWANA WEST: Advanced Copper-Cobalt Deposit MURDIE and TORRENS: Massive Copper Targets OPERATIONAL UPDATE Building a Copper Development Company LUMWANA WEST: Advanced Copper-Cobalt Deposit MURDIE and TORRENS: Massive Copper Targets LINDSAY OWLER, Director/CEO – November 2019 Argonaut Resources NL • ASX:ARE • Level 5, 126 Phillip St, Sydney, 2000 • phone (02) 9299 9690 CORPORATE OVERVIEW ASX Code ARE Capital structure Shares on issue: 1.544 billion Unlisted options: 65 million Market capitalisation: A$8 million Cash A$1.4 million Directors Pat Elliott Non-Executive Chairman Lindsay Owler Director and CEO Andrew Bursill Director and Company Secretary Malcolm Richmond Non-Executive Director OPERATIONAL UPDATE • NOVEMBER 2019 2 COPPER FOCUS South Australian Copper y Murdie Project IOCG y Torrens Project IOCG Massive systems, pedigree geology Zambia Copper Cobalt Lumwana West y Copper Cobalt scoping study New exploration projects y Heart of Zambian gold rush Zambia Copper Cobalt WA Gold Lumwana West Higginsville Higginsville – Gold, WA y Multiple gold and nickel targets Torrens Copper Murdie Copper South Australia OPERATIONAL UPDATE • NOVEMBER 2019 3 LUMWANA WEST, ZAMBIA Large tonnage copper-cobalt sulphide y Low stripping ratio y Saleable concentrate produced y Scoping study progressing y Argonaut 90% OPERATIONAL UPDATE • NOVEMBER 2019 4 LUMWANA WEST, ZAMBIA Project elements Jurisdiction Zambia has a long history of large-scale copper The Nyungu deposit mining. Social and governmental pressures continues to impress favour the development of new mines. with excellent technical Infrastructure Lumwana West is located at major electricity characteristics. and transport corridors. Resource The Nyungu copper-cobalt deposit has predictable geometry and scope for significant growth with continued drilling. Mining Very low stripping ratio of 1.5 tonnes of waste rock from every 1 tonne of ore. Resource drilling to greater depths is warranted. Processing Fast, high copper recovery flotation of both transitional and primary copper ore minerals. Economics Scoping economic study commencing. OPERATIONAL UPDATE • NOVEMBER 2019 5 LUMWANA WEST, ZAMBIA Infrastructure 350,000 mE 400,000 mE Location DEMOCRATIC Mine developments at REPUBLIC OF CONGO ZAMBIA Kansanshi, Lumwana and Sentinel brought essential infrastructure Kansanshi to North Western Zambia. 8,650,000 mN Lumwana Solwezi ZAMBIA Sentinel Road Power transmission Power transmission under construction 22399-HQ-LEL Aircraft facility Processing plant Nyungu Deposit Proposed railway 0 25 Tenement boundary and Targets Mineral deposit kilometres projected to surface Target areas Lumwana12 OPERATIONAL UPDATE • NOVEMBER 2019 6 LUMWANA WEST, ZAMBIA Nyungu Copper-Cobalt Deposit Nyungu 338,000 mE 340,000 mE 342,000 mE 31m at 0.53% Cu & 0.12 Co% from 258m 61m at 0.42% Cu from 184m • NYUNGU CENTRAL: deposit defined 22m at 0.46% Cu from 268m by 48 modern drill holes – significant NYUNGU CENTRAL 20m at 0.53% Cu from 121m mineralised copper-cobalt body. 71m at 0.61% Cu from 30m and 65m at 0.49% Cu from 221m 17m at 0.53% Cu from 92m 47m at 0.57% Cu from 20m 26m at 0.63% & 0.17g/t Au from 227m Demonstrated strike length: 1,700m 14m at 0.73% Cu from 389m 90m at 0.46% Cu from 12m 8,630,000 mN 196m at 0.45% Cu from 69m incl. 38m at 1.00% & 0.11g/t Co from 183m 34m at 0.46% Cu from 26m and * No cut-off grade applied • NYUNGU SOUTH: edge of mineralised body 78m at 0.58% Cu from 217m 176m at 0.55% Cu & intercepted by Argonaut drilling. Vast, 0.043% Co from 51m 14m at 0.65% Cu from 147m undrilled IP anomaly to be tested. 31m at 1.57% Cu from 173m incl. 6m at 5.51% Cu from 174m 24m at 0.54% Cu from 61m • NYUNGU WEST and NYUNGU NORTH: 22m at 0.51% Cu from 143m drilling to date has not accounted for IP anomalies. 8,628,000 mN Major copper-cobalt deposit 24m at 0.62% Cu from 31m NYUNGU SOUTH with potential for large 14m at 0.38% Cu from 107m extensions and repetitions IP chargeability 8,626,000 mN >20ms at -200mRL 0 1000 Drilling OPERATIONAL UPDATE metres Drill hole collar 7 Nyungu_09 LUMWANA WEST, ZAMBIA Nyungu Exploration Target Tonnage Contained Metal Commodity Grade Range Range Range (Mt) (%) (kt) Copper* 130 to 180 0.45 to 0.65 580 to 1,150 Cobalt^ 15 to 20 0.08 to 0.12 12 to 24 * Copper Exploration Target estimation announced to the ASX by Argonaut on 9 April 2013. ^ Cobalt Exploration Target estimation announced to the ASX by Argonaut on 28 March 2017. Exploration Targets have been independently estimated to JORC 2012 standards. The potential quantity and grade of the Exploration Targets are conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource. OPERATIONAL UPDATE • NOVEMBER 2019 8 LUMWANA WEST, ZAMBIA VeryPROJECT Low Stripping SENSITIVITY Ratio TO ECONOMIC FACTORS WhittleWhittle Pits Pits 100% Pit Shell Section A:A A A N North 100% Pit Pit Shell • The pit optimisation has Section B:B y Strippinggenerated a ratiosingle main 1.5:1pit to the to north280m and smaller (whitesatellite pitline) to the south. South 100% Pit • The plan view shows the Pit Shell y Stripping100% Pit shell. ratio • The section views show all B B ofthe 2.3:1 pit shells to >350mfor the North (lightand South blue areas. line) OPERATIONAL UPDATE • NOVEMBER 2019 9 LUMWANA WEST, ZAMBIA Metallurgical testwork 3 Mineralogy Saleable concentrate 3 Comminution produced at 25.6% copper 3 Flotation at 87% recovery. – Leaching – SX/EW y Results indicate that a flotation circuit can achieve high recovery from both: – Transitional zone copper minerals (88% recovery); and – Primary zone copper sulphides (up to 96% recovery). Flotation testwork. OPERATIONAL UPDATE • NOVEMBER 2019 10 LUMWANA WEST, ZAMBIA Next steps Metallurgy y Various oxidation and leaching tests. y Solvent extraction and electro winning (SX/EW). Mining engineering y Mine scheduling scenarios. Scoping economics y Assess processing options for development of process flowsheet. Nyungu deposit concentrates. OPERATIONAL UPDATE • NOVEMBER 2019 11 MWINILUNGA, ZAMBIA New exploration projects 200,000m E 250,000m E 300,000m E 350,000m E 400,000m E Copper Deposits DEMOCRATIC REPUBLIC OF CONGO DEMOCRATIC Cu giant deposit REPUBLIC OF CONGO TANZANIA Cu deposit ANGOLA MALAWI 8,750,000m N Cu occurrence ZAMBIA ZIMBABWE MOZAMBIQUE Major town NAMIBIA ANGOLA Road BOTSWANA SWAZILAND Exploration Licence LESOTHO SOUTH AFRICA Location ZAMBIA 8,700,000m N Mwinilunga Luamata Cheyeza - ARC discovery Kansanshi Solwezi 8,650,000m N Mwinilunga Gold Rush Malundwe Sentinel Kalaba East Kalaba Mine Chimiwungo Kamapanda 23232-HQ-LEL Nyungu 22399-HQ-LEL Lumwana West ZAMBIA 8,600,000m N NORTH WEST PROVINCE MWINILUNGA DISTRICT 0 20 40 Zambian Exploration Licence areas OPERATIONAL kilometresUPDATE • NOVEMBER 2019 19 November 2019 12 Kalaba_East_01 MWINILUNGA, ZAMBIA New exploration projects: Kalaba East 240,000m E 260,000m E 280,000m E 300,000m E Exploration Licence ARC Minerals Licence Newly granted 8,680,000m N Geochemistry - Cu >50ppm Prospect old/new licences adjacent to ARC Minerals’ Cheyeza ZAMBIA discovery. Cheyeza - ARC discovery ARC Minerals Cheyeza West 8,660,000m N West Lunga Kalaba East Lumbeta 0 20 40 kilometres ZAMBIA NORTH WEST PROVINCE MWINILUNGA DISTRICT Kalaba Mine Zambian Exploration 8,640,000m N Kalaba area 19 November 2019 Kalaba_East_02 OPERATIONAL UPDATE • NOVEMBER 2019 13 136° 30' E 137° 00' E 137° 30' E 138° 00' E SOUTH AUSTRALIAN COPPER -30° 00' S Olympic Domain Murdie Project EL 6320 Torrens Project Olympic Dam Andamooka -30° 30' S LAKE TORRENS Roxby Downs 1. The right geological address. Red Dam EL 6320 Acropolis Wirrda Well EL 6407 Torrens Project 2. Massive anomaly with multiple Torrens Island Dam deposit-scale target zones. EL 5945 EL 5937 Murdie 3. Confirmed Iron Oxide-Copper-Gold -31° 00' S Oak Dam West (BHP discovery) West Murdie Project (IOCG) systems. Lake Torrens Khamsin Fremantle Doctor Woomera Carrapateena Gawler Craton EL 6352 -31° 30' S Torrens JV EL Argonaut EL Town Highway Main road Railway Major deposit Significant prospect Prospect SOUTH AUSTRALIA EASTERN GAWLER CRATON -32° 00' S OPERATIONAL UPDATE Location of tenure 0 20 40 14 November 2019 Kilometres Torrens_48 740,000m E 760,000m E Andamooka Island ANDAMOOKA BOSWORTH EL 5614 MURDIE, SOUTH AUSTRALIA Torrens Gravity Targets and T E R 6,580,000m N T I Exploration Domains A R Y A Q U y I Over 50 IOCG gravity targets across three Bosworth F E exploration domains: R Sketching Pile B BOSWORTH White Well » Onshore Murdie Island » Nearshore; and Borehole Well 2 EL 5945 Carrapateena Hill » Offshore 6,560,000m N Sketching Pile A y LAKE TORRENS Priority targets hosted in or on the Carrapateena W margin of Donnington Suite Granite. y Donnington Suite Granite is the host of Sells Bore the nearby Oak Dam and Carrapateena Khamsin Fremantle Doctor IOCG deposits. Smith Hill Carrapateena 6,540,000m N Homestead Lake Torrens National Park Track PERNATTY 0 5 10 Exploration Licence Kilometres Pastoral Lease boundary High Priority Medium Priority Low Priority Noltenius Hill EL 5937 Shore Hill Exploration Domains SOUTH AUSTRALIA OnshoreHorse Well MURDIE PROJECT OPERATIONAL UPDATE Nearshore Exploration Domains Offshore 23 October 2019 Hatch Hill Torrens 44 MURDIE, SOUTH AUSTRALIA Operational Domains and Drilling Techniques DRILLING TECHNIQUES Helicopter Artesian Percussion Supported Groundwater Pre-Collar Onshore No No Yes Nearshore No No Yes Offshore – No Aquifer Yes No No Offshore – Aquifer Yes Yes No Murdie features many excellent IOCG targets plus flexible drilling options. OPERATIONAL UPDATE • NOVEMBER 2019 16 MURDIE, SOUTH AUSTRALIA Permitting Three authorisations are required for nearshore and offshore drilling at Murdie: 1. NATIVE TITLE – granted in 2018. 2. OPERATIONAL – final stage prior to grant. 3. ABORIGINAL HERITAGE – application will be submitted on grant of operational approval.
Recommended publications
  • Introduction - the Trident Project
    Introduction - The Trident Project January 2014 www.first-quantum.com TSX: FM LSE: FQM LuSE: FQMZ TRIDENT PROJECT LOCATION January 2014 2 ABOUT THE TRIDENT PROJECT Trident Project: . Located in the Solwezi District of Northwestern Province, Zambia . Approximately 150km from Solwezi on the T5 main road to Mwinilunga . Comprises five prospecting large scale licences . A number of attractive base metal prospects including the Sentinel deposit and the Enterprise deposit . 5 x large-scale mining licences awarded 20 April 2011 for 25 years tenure . Land use agreement signed 14 July 2011 . EIA approved 8 July 2011 and Addendum 12 August 2013 . Resettlement Action Plan approved 15 October 2013 January 2014 3 TRIDENT PROJECT LAYOUT January 2014 4 SENTINEL MINE IN CONSTRUCTION – COMMISSIONING MID 2014 Updated resource published May 2012: . 514 boreholes for 172,692m defined an NI43-101 resource of: . Total measured & indicated : 1,027Mt @ 0.51% Cu . Inferred : 165Mt @ 0.42% Cu . Cut-off : 0.2% Cu . Mineral Reserve: 774 Mt @ 0.50% Cu . Proved : 476 Mt @ 0.52% Cu . Probable : 298 Mt @ 0.47%Cu. Strip ratio 2.2 : 1 Mine planning: . Grade of 0.5% Cu requires a high throughput of 55 Mtpa to achieve production target of 280 – 300,000t Cu per annum. Sentinel will put Zambia at the forefront of global mining technology January 2014 5 ENTERPRISE MINE IN APPROVAL – EARLY WORKS UNDERWAY Maiden resource published December 2012: . 359 boreholes for 116,000m defined an NI43-101 resource of: . Total measured indicated : 40.1Mt @ 1.07% Ni . Inferred : 7.1Mt @ 0.70% Ni . Cutoff : 0.15% Ni .
    [Show full text]
  • EML Contracts Profile 2017.Cdr
    50 ANNIVERSARY 1965 - 2015 www.eml-eis.com VALUE SERVICE QUALITY LOYALTY PRICE Contracting Reliable Quality Service since 1968 in the field of Electrical Contracting SUPPORT Zambia. COMPANY 2017-8 PROFILE 1 company details Name of the Company: Electrical Maintenance Lusaka Ltd. Address: Head Office Plot 195 Luanshya Road, East End Off Great North End Lusaka, 10101 Zambia Contact Details: +260 211 227824 +260 237014 - FAX [email protected] [email protected] [email protected] website: www.eml-eis.com 50 ANNIVERSARY 1965 - 2015 Contracts Department history 2 HISTORY: FOUNDER AND OWNER Mr George Narder achieved electrical and mechanical engineering qualifications in Italy following which he worked in Switzerland for 6 years. In 1963 he arrived in Zambia as part of a testing and commissioning team for the newly built Kariba Power Station and has lived in Zambia ever since. Mr Narder started an electrical engineering business in 1965, registered as Electrical Maintenance Lusaka LTD (EML). He has managed and run the company as its CEO for more than 50 years. Under his direct entrepreneurial management, EML has grown into one of the largest and most respected electrical and electronic engineering companies in Zambia. The company benefits from more than 60 years of his passion, knowledge and expertise. EML is proud to have participated in many facets of the social and Mr George Narder, Comm economic development of the country ELECTRICAL MAINTENANCE LUSAKA (EML) MOTO “Always with our customers” To continue improving on our 50 years of reliable quality service to the Zambian industry. our vision our mission e strive to remain one of Zambia’s ur added value is to provide quality leading and most diverse electrical products, service and training for all cWontracting, manufacturing, retail and electricalO requirements across the country, training companies.
    [Show full text]
  • Corporate Affairs and Business Development
    CORPORATE AFFAIRS AND BUSINESS DEVELOPMENT ENVIRONMENTAL IMPACT ASSESSMENT THE PROPOSED CONNECTION OF NORTH WESTERN PROVINCE TO THE NATIONAL GRID AT 132kV PREPARED BY THE ENVIRONMENT AND SOCIAL AFFAIRS UNIT 2011 EXECUTIVE SUMMARY In the Northwestern Province (NWP) ZESCO Limited supplies electricity to five districts namely Mwinilunga, Mufumbwe, Kabompo, Zambezi and Chavuma from isolated Diesel Generation Stations located in each district. The older districts (Mwinilunga, Kabompo, and Zambezi) have been on diesel power supply for over forty years now. Solwezi and Kasempa are the only two districts in the province that are supplied from the national hydro power grid. Power supply from the diesel power stations is characterized by high operational costs, inadequate capacity, very low reliability and high emissions. ZESCO Limited has therefore long sought to replace diesel generated power supply with reliable and cost effective power from the national grid by connecting all the diesel power stations to the grid. By the year 2000, ZESCO Limited was operating ten diesel stations country wide, but by 2007, four such stations had been replaced by grid supply while two new stations were installed in two newly designated districts. Despite having great potential for mining and agricultural development, NWP generally remains underdeveloped due to insufficient and unreliable power supply. It is against this background that the Government of the Republic of Zambia through ZESCO Limited, intends to connect the 5 NWP Districts still on diesel, to the National Grid at 132 kilo Volts (kV) through a transmission line network from Kasempa T-Off (Nselauke) to Chavuma and linking Mwinilunga to Lumwana. The main objective of the project is to replace the diesel generated electricity with hydro electricity by constructing a 132kV transmission line network which would be linked to the main national power grid.
    [Show full text]
  • National Investment Plan to Reduce Deforestation and Forest Degradation (2018-2022)
    Republic of Zambia Ministry of Lands and Natural Resources National Investment Plan to Reduce Deforestation and Forest Degradation (2018-2022) November 2017 -i- Executive Summary Zambia has approximately 49.9 million hectares of forest, representing approximately 66 percent of its total land mass and is subsequently one of the most forested countries in southern Africa. However, deforestation is a major problem, with annual rates estimated at around 250,000 to 300,000 hectares. Such numbers amount to the potential loss of 10 million hectares of forest in the next 30 years (IDLO, 2014). The key drivers of deforestation and forest degradation in Zambia are agricultural expansion (commercial and subsistence), heavy reliance on wood fuel – energy demand (charcoal and firewood), unsustainable timber extraction (both legal and illegal) and infrastructure development (e.g., mining and other large infrastructural developments). A study by UN-REDD, (2015) on the economic value of Zambia’s forest ecosystems showed that the direct and indirect values of forests are estimated to make a direct contribution equivalent to about 4.7% of gross domestic product (GDP) or US$957.5 million (using 2010 figures). However, when the multiplier effects of forestry and tourism-related activities on other sectors are considered, the overall or economy-wide contribution of forests to GDP is estimated to be at least 6.3% or US$1,277 million (Table 1). Forests are estimated to provide at least 1.4 million jobs, supporting 60% of rural Zambian households, heavily dependent upon the use of natural resources to supplement or sustain their livelihoods (UN-REDD., 2015).
    [Show full text]
  • Ministry of Health Provincial Health Office, Northwestern Province
    REPUBLIC OF ZAMBIA MINISTRY OF HEALTH PROVINCIAL HEALTH OFFICE, NORTHWESTERN PROVINCE REPORT ON LONG LASTING INSECTICIDE NETS MASS DISTRIBUTION CAMPAIGN 2017 COMPILED BY NSOFWA FRANCIS CHIEF ENVIRONMENTAL HEALTH OFFICER NORTH WESTERN PROVINCE 1 Table of Contents 1.0 INTRODUCTION .............................................................................. 2 2.0 MAIN OBJECTIVE AND MASS CAMPAIGN STRATEGY .................... 4 3.0 STAGES OF THE CAMPAIGN ........................................................... 4 3.1 PLANNING AND PREPARATORY STAGE .......................................... 5 3.2 HOUSEHOLD REGISTRATION, DATA ENTRY AND DATA VALIDATION 5 3.2.1 MOBILIZATION AND SENSITIZATION ........................................... 6 3.3 DISTRIBUTION METHODS .............................................................. 6 4.0 SUCCESSES ................................................................................. 16 5.0 CHALLENGES .............................................................................. 16 6.0 LESSONS LEARNT ....................................................................... 17 7.0 RECOMMENDATIONS ................................................................... 17 8.0 CONCLUSION ............................................................................... 18 1 2 1.0 INTRODUCTION North-Western Province is one of the ten Provinces of Zambia. The Province has a total of eleven Districts that is: Solwezi (provincial capital), Chavuma, Zambezi, Kabompo, Mwinilunga, Mufumbwe, Kasempa, Ikelengi, Manyinga, kalumbila
    [Show full text]
  • Evaluation of the Bank's Country Strategy and Program 2002–2015 - Summary Report IDEV Country Strategy Evaluation, October 2016
    Country Strategy Evaluation Zambia: An IDEV Evaluation of the Bank's Country Strategy and Program 2002–2015 Summary Report October 2016 Evaluation Syntheses IDEV conducts different types of evaluations to achieve its Impact Evaluations Sector Evaluations (Public Sector) strategic objectives Project Performance Evaluations Thematic Evaluations Project Cluster Evaluations Project Performance Evaluations (Private Sector) Corporate Evaluations Regional Integration Strategy Evaluations Country Strategy Evaluation Country Strategy Evaluations Country Strategy Evaluation Zambia: An IDEV Evaluation of the Bank's Country Strategy and Program 2002–2015 Summary Report October 2016 ACKNOWLEDGMENTS Task manager Madhusoodhanan Mampuzhasseril, Principal Evaluation Officer Team members Erika Maclaughlin, Long Term Consultant, Foday Turay, Chief Evaluation Officer, Latefa Camara, Long Term Consultant, James Sackey, Consultant Consultant Agrer S.a. - N.v., Belgium. Paolo Liebl Von Schirach, Team Leader. Members: Baptiste Forquy, Habtom Asmelash, Bernd Drechsler, John Murphy, Charles Haanyika, Vikramdityasing Bissoonauthsing External peer reviewer Bruce Murray, former Director General, Operations Evaluation Department, Asian Development Bank Knowledge management officers Jayne Musumba, Principal Knowledge Management Officer Jerry Lemogo, Junior Consultant, Communications and Knowledge Management Special thanks to Norad – The Norwegian Agency for Development Cooperation Division manager Samer Hachem Evaluator-General Rakesh Nangia © 2016 African Development
    [Show full text]
  • Rp124 Cover.Pmd
    LTC Research Paper Land Tenure, Land Markets, and Instituional Transformation in Zambia edited by Michael Roth with the assistance of Steven G. Smith University of Wisconsin-Madison 175 Science Hall 550 North Park Street Madison, WI 53706 http://www.ies.wisc.edu/ltc/ Research Paper LTC Research Paper 124, U.S. ISSN 0084-0815 originally published in October 1995 LAND TENURE, LAND MARKETS, AND INSTITUTIONAL TRANSFORMATION IN ZAMBIA edited by Michael Roth with the assistance of Steven G. Smith All views, interpretations, recommendations, and conclusions expressed in this paper are those of the authors and not necessarily those of the supporting or cooperating organizations. Andy recommendations or suggestions herein doe not represent the official position of the Government of Zambia. LTC Research Paper 124 Prepared for the Land Tenure Center University of Wisconsin-Madison October 1995 Copyright ® 1995 by the authors. All rights reserved. Readers may make verbatim copies of this document for non-commercial purposes by any means, provided that this copyright notice appears on all such copies. TABLE OF CONTENTS Page Lists of Tables and Figures vii List of Acronyms x Preface xi Chapter 1: Legal Framework and Administration of Land Policy in Zambia 1 I. Introduction 1 A. Issues 1 B. Outline of report 2 II. Colonial policy and settlement 4 III. Agrarian structure 5 IV. Arable land and crop expansion 7 V. Land tenure 14 A. Tenure on State Lands 15 B. Reserve and Trust Land administration 18 C. Urban, housing, and improvement areas 22 D. Agencies responsible for land policy 23 E. Subdivisions 24 VI.
    [Show full text]
  • OP6 SGP Zambia CPS , Baseline Assessment
    1 GEF-SGP OP6 ZAMBEZI LANDSCAPE BASELINE ASSESSMENT REPORT Mulungushi University Kabwe March 2016 1 2 Executive Summary This GEF-SGP OP6 Zambezi Landscape Baseline Assessment report is a response to the call by the United Nations Development Programme Global Environment Facility Small Grants Programme (UNDP GEF SGP) for managing the environment and resources in Zambia. The call aims at supporting the creation of global environmental benefits and the safeguarding the global environment through community and local solutions that complements and adds value to national and global level actions. The baseline report attempts to provide the general environmental outlook of the Zambezi Catchment referred to as Zambezi landscape. Key areas of focus included Biodiversity, International Waters, Climate Change, Land Degradation and Persistent Organic Pollutants (POPs). These were analysed in the Zambezi Landscape covering Mwinilunga in North-Western, Sioma- Nangweshi in Western and Sinazongwe and Chirundu in Southern Provinces. This coverage represents the most parts of the Zambezi river catchment which is very important for cultural, fishery, touristic and hydro power generation for Zambia. Under this study, the landscape was categorised into three parts, Upper Zambezi, Middle and Lower Zambezi Landscapes. The baseline study findings reveal the status of the Landscape. In the upper Zambezi landscape of Mwinilunga district in North Western Province, the biodiversity is rich with thick forests, receiving high rainfall of over 1000 mm annually. There have been no significant variations in the amount of rainfall received over the past decade. Beekeeping is the one of the major livelihood activities with over 5000 beekeepers who largely practice traditional beekeeping by making hives using tree barks.
    [Show full text]
  • An Assessment of the Status of Artisanal Goldmining in Northwestern Province, Zambia
    Resource Insight Issue No 22. February 2021 Improved human conditions through good governance of the region’s resources. An Assessment of the Status of Artisanal Goldmining in Northwestern Province, Zambia Tobias Michelo and Edward Lange Southern Africa Resource Watch Southern Africa Resource Watch. Resource Insight, Issue Number: 22 An Assessment of the Status of Artisanal Goldmining in Northwestern Province, Zambia Table of Contents Acronyms 4 Executive summary 5 This report is published by the Southern Africa Resource Watch. Southern Africa Resource Watch 1. Introduction 8 (SARW) is an independent body that advocates and promotes human rights and environmental 1.1. Background of the study 8 protection in resource extraction activities by monitoring corporate and state conduct in a peaceful 1.2. Objectives of the study 9 and collaborative manner. 2. Methodology of the Study 9 2.1. Data Collection Methods 9 Published: February 2021 2.1.1. Desk review 10 2.1.2. Focus group discussions 10 Southern Africa Resource Watch President Place 2.1.3. Key informant interviews 10 1 Hood Avenue / 148 Jan Smuts Avenue (corner Bolton Road) 2.2. Sampling frame 11 Rosebank 2.3. Data analysis 11 PO Box 678, Wits 3. Limitations of the Research 12 2050 Johannesburg 4. Main Research Findings 12 South Africa 4.1. Mining in Zambia 13 4.1.1. National policy, institutional, and legislative framework 13 www.sarwatch.org 4.1.2. Gold mining in Zambia 14 4.1.3. Gold production in Zambia 15 Charcoal Ink Design and Layout: 4.1.4. Contribution of gold mining to the national economy 16 Cover Photography: Leo Klemm 4.1.5.
    [Show full text]
  • Annual Report 2007
    NATIONAL ROAD NATIONAL ROAD FFUUNNDD AAGGEENNCCYY AANNNNUUAALL RREEPPOORRTT 22000077 A GOOD ROAD NETWORK IS THE CATALYST FOR ECONOMIC EMPOWERMENT Insert Road map of Country Here NATIONAL ROAD FUND AGENCY ANNUAL REPORT 2007 P O Box 50695 33 Fairley Road Lusaka Tel: +260(0)211 253145, 255660, 250823 Fax: +260(0)211 253154, 252731 E-Mail: [email protected] Web Site: http//www.nrfa.org.zm NRFA Annual Report 2007 1 CONTENTS 1 CONTENTS 1 CONTENTS 2 2 VISION, MISSION, GOAL AND VALUES 3 3 CHAIRMAN’S FOREWORD 4 4 DIRECTOR’S REPORT 6 5 CHALLENGES 8 6 NRFA MANAGEMENT TEAM 9 7 CORPORATE GOVERNANCE 10 8 RMI COMMITTEE OF MINISTERS 11 9 RMI COMMITTEE OF PERMANENT SECRETARIES 11 10 BOARD OF DIRECTORS 12 11 FINANCIAL HIGHLIGHTS 13 12 MONITORING AND EVALUATION 19 13 PROCUREMENT 22 14 INTERNAL AUDIT 23 15 ADMINISTRATION 24 16 ANNEX 1: PERFORMANCE REVIEW OF ROADSIP II 27 17 ANNEX 2: STANDING COMMITTEES OF THE BOARD 28 18 ANNEX 3: NRFA ORGANOGRAM 30 19 ANNEX 4: DISBURSEMENTS FROM THE ROAD FUND 31 20 ANNEX 4A: ROAD FUND CONTRACTS FOR 2007 33 21 ANNEX 4B: EU CONTRACTS 34 22 ANNEX 5: ROAD PROJECT INSPECTIONS DURING 2007 35 23 FINANCIAL STATEMENT – ROAD FUND 36 24 FINANCIAL STATEMENT – RRMP IDA 3866 37 25 TABLES LIST 38 26 PICTURES LIST 38 27 ABBREVIATIONS AND ACRONYMS 39 The front and back cover photographs are views of Chembe Bridge, a GRZ funded project currently under construction. NRFA Annual Report 2007 2 VISION, MISSION, GOALS and VALUES 2 VISION, MISSION, GOAL AND VALUES VISION To be a world model in the mobilisation and management of road sector finances.
    [Show full text]
  • Necessity Driving Change and Improvement to the Cleaner Circuit at Lumwana Copper Concentrator
    NECESSITY DRIVING CHANGE AND IMPROVEMENT TO THE CLEANER CIRCUIT AT LUMWANA COPPER CONCENTRATOR *R. Araya1, G. Cordingley2, A. Mwanza2 and L. Huynh3 1Xstrata Technology Canada Level 10- 700 West Pender Street Vancouver, Canada V6C 1G8 (*Corresponding author:[email protected]) 2Barrick Copper Business Unit P.O. Box 110199, Mwinilunga Road Lumwana East, Solwezi, Zambia 3Xstrata Technology Australia Level 10 – 160 Ann Street Brisbane, Australia QLD 4000 ABSTRACT Lumwana is an open pit Copper mine located in the Northwestern Province of Zambia approximately 80 km west from the provincial capital of Solwezi, approximately 300 km northwest from the Copperbelt and 700 km northwest from the national capital of Lusaka. The mine has two major Copper deposits: Malundwe and Chimiwungo. Copper mineralization includes Chalcopyrite, Bornite and Chalcocite. In addition to Copper, these deposits also contain the undesirable element Uranium contained in vein hosted and disseminated Uranite. The processing plant was designed using conventional technologies: semi-autogenous grinding (SAG) and ball mill for grinding, and mechanical cells for rougher and cleaner flotation. Soon after commissioning in early 2009, it was recognised that two stages of conventional cleaning were unable to produce plant final Copper concentrates with the desired Uranium grades. Studies have shown that a significant quantity of liberated and fine Uranium particles (up to 80-90%) is recovered with the concentrate by entrainment. Lumwana Operations sought the use of the Jameson Cell technology after observing successful implementation at other sites in rectifying similar issues. In late 2009, Jameson Cell pilot-plant test work was conducted at the site and this quickly led to the installation of a full-scale B5400/18 model into the existing cleaner circuit.
    [Show full text]
  • Chiefdoms/Chiefs in Zambia
    CHIEFDOMS/CHIEFS IN ZAMBIA 1. CENTRAL PROVINCE A. Chibombo District Tribe 1 HRH Chief Chitanda Lenje People 2 HRH Chieftainess Mungule Lenje People 3 HRH Chief Liteta Lenje People B. Chisamba District 1 HRH Chief Chamuka Lenje People C. Kapiri Mposhi District 1 HRH Senior Chief Chipepo Lenje People 2 HRH Chief Mukonchi Swaka People 3 HRH Chief Nkole Swaka People D. Ngabwe District 1 HRH Chief Ngabwe Lima/Lenje People 2 HRH Chief Mukubwe Lima/Lenje People E. Mkushi District 1 HRHChief Chitina Swaka People 2 HRH Chief Shaibila Lala People 3 HRH Chief Mulungwe Lala People F. Luano District 1 HRH Senior Chief Mboroma Lala People 2 HRH Chief Chembe Lala People 3 HRH Chief Chikupili Swaka People 4 HRH Chief Kanyesha Lala People 5 HRHChief Kaundula Lala People 6 HRH Chief Mboshya Lala People G. Mumbwa District 1 HRH Chief Chibuluma Kaonde/Ila People 2 HRH Chieftainess Kabulwebulwe Nkoya People 3 HRH Chief Kaindu Kaonde People 4 HRH Chief Moono Ila People 5 HRH Chief Mulendema Ila People 6 HRH Chief Mumba Kaonde People H. Serenje District 1 HRH Senior Chief Muchinda Lala People 2 HRH Chief Kabamba Lala People 3 HRh Chief Chisomo Lala People 4 HRH Chief Mailo Lala People 5 HRH Chieftainess Serenje Lala People 6 HRH Chief Chibale Lala People I. Chitambo District 1 HRH Chief Chitambo Lala People 2 HRH Chief Muchinka Lala People J. Itezhi Tezhi District 1 HRH Chieftainess Muwezwa Ila People 2 HRH Chief Chilyabufu Ila People 3 HRH Chief Musungwa Ila People 4 HRH Chief Shezongo Ila People 5 HRH Chief Shimbizhi Ila People 6 HRH Chief Kaingu Ila People K.
    [Show full text]