Chapter Iii Roads and Streets Chapter Contents

Total Page:16

File Type:pdf, Size:1020Kb

Chapter Iii Roads and Streets Chapter Contents CHAPTER III ROADS AND STREETS TOC-III-3 of 3 CHAPTER III ROADS AND STREETS CHAPTER CONTENTS Page No.I...........................................................................................................GENERAL 1 A. Introduction............................................................................................................1 B. Definitions .............................................................................................................1 C. Authorization, Permits ...........................................................................................3 D. Abbreviations.........................................................................................................4 II. DESIGN CRITERIA .......................................................................................................4 A. Pre-Design Meeting ...............................................................................................4 B. Preliminary Considerations....................................................................................4 1. Factors to be Considered in Trafficway Design ........................................4 2. Survey Requirements.................................................................................5 3. Right-of-Way Requirements......................................................................6 4. General Development Plan ........................................................................7 5. Preliminary Studies....................................................................................7 6. Design Speed .............................................................................................7 C. Traffic Studies........................................................................................................8 1. Necessity of Study .....................................................................................8 2. Level of Service Study...............................................................................8 3. Presentation and Use of Results of Study................................................14 D. Horizontal Alignment ..........................................................................................14 1. Selection of General Alignment ..............................................................14 2. Horizontal Curves ....................................................................................15 3. Superelevation and Warping....................................................................16 4. Sight Distance ..........................................................................................16 E. Vertical Alignment ..............................................................................................17 1. Allowable Grades of Trafficways............................................................17 2. Vertical Curves ........................................................................................18 3. Sight Distance ..........................................................................................19 F. Cross-Section Elements .......................................................................................23 1. Use of Typical Sections in Standard Details ...........................................23 2. Pavement Criteria ....................................................................................23 3. Shoulders .................................................................................................24 4. Valley Gutters ..........................................................................................24 5. Sidewalks .................................................................................................24 6. Bikeways..................................................................................................25 7. Guardrail ..................................................................................................25 8. Underdrains..............................................................................................25 Published: 01/01 Revised: TOC-III-3 of 3 9. Gutters and Ditches..................................................................................26 10. Bus Stop Widening ..................................................................................26 11. Street Lighting.........................................................................................27 G. Intersection Design..............................................................................................28 1. Horizontal Alignment and Spacing: ........................................................28 2. Layout of Curbs, Pavement Edges and Property Lines at Intersections..29 3. Intersections With State Highway ...........................................................30 4. Vertical Alignment ..................................................................................30 5. Sight Distance..........................................................................................31 6. Turning/Storage and Merge Lane Design................................................32 7. Signalization Warrants.............................................................................33 8. Traffic Signal Design...............................................................................34 9. Speed Control Devices.............................................................................34 H. Private Entrances.................................................................................................34 1. Location of Driveways - General.............................................................34 2. Commercial/Industrial Entrances............................................................35 3. Residential Entrances...............................................................................37 I. Special Trafficways.............................................................................................38 1. Alleys .......................................................................................................38 2. Cul-de-Sac, Alley Entrances, Driveways ................................................38 3. Tee Turn-Arounds....................................................................................39 J. Construction Affecting Existing Roadways ........................................................39 1. Utility Location and Trench Repair.........................................................39 2. Restoration of Roadways Affected by Excavations ................................39 3. Maintenance of Traffic in Construction Areas ........................................40 III. CONTRACT DRAWINGS AND DOCUMENTS.......................................................40 A. Reports .................................................................................................................40 B. Design Calculations.............................................................................................41 C. Contract Drawings...............................................................................................41 1. Street Names ............................................................................................41 2. Widths of Rights-of-Way, Pavement and Easements ..............................41 3. Topography..............................................................................................41 4. Coordinates, Bearing and Ties.................................................................42 5. Horizontal Curve Information .................................................................42 6. Stationing .................................................................................................42 D. Contract Specifications........................................................................................43 E. Estimates of Quantities and Costs .......................................................................43 F. Cross-Sections .....................................................................................................43 IV. APPENDIX.....................................................................................................................43 A. References............................................................................................................43 B. Road and Street Contract Drawing Check List....................................................50 C. Maximum Degree of Curvature...........................................................................52 Published: 01/01 Revised: TOC-III-3 of 3 D. Superelevation Transitions ..................................................................................53 E. Minimum Length of Speed - Change Lanes........................................................59 F. Ratio of Speed Change Lane Length to Grade ....................................................60 G. Sight Distance on Horizontal Curves...................................................................61 H. Critical Length of Grade......................................................................................63 I. Design Controls For Vertical Curves...................................................................64 J. Sight Distance at Intersections.............................................................................71 K. Horizontal Circular Curve ...................................................................................72 L. Widening Computations ......................................................................................73
Recommended publications
  • Roundabout Planning, Design, and Operations Manual
    Roundabout Planning, Design, and Operations Manual December 2015 Alabama Department of Transportation ROUNDABOUT PLANNING, DESIGN, AND OPERATIONS MANUAL December 2015 Prepared by: The University Transportation Center for of Alabama Steven L. Jones, Ph.D. Abdulai Abdul Majeed Steering Committee Tim Barnett, P.E., ALDOT Office of Safety Operations Stuart Manson, P.E., ALDOT Office of Safety Operations Sonya Baker, ALDOT Office of Safety Operations Stacey Glass, P.E., ALDOT Maintenance Stan Biddick, ALDOT Design Bryan Fair, ALDOT Planning Steve Walker, P.E., ALDOT R.O.W. Vince Calametti, P.E., ALDOT 9th Division James Brown, P.E., ALDOT 2nd Division James Foster, P.E., Mobile County Clint Andrews, Federal Highway Administration Blair Perry, P.E., Gresham Smith & Partners Howard McCulloch, P.E., NE Roundabouts DISCLAIMER This manual provides guidelines and recommended practices for planning and designing roundabouts in the State of Alabama. This manual cannot address or anticipate all possible field conditions that will affect a roundabout design. It remains the ultimate responsibility of the design engineer to ensure that a design is appropriate for prevailing traffic and field conditions. TABLE OF CONTENTS 1. Introduction 1.1. Purpose ...................................................................................................... 1-5 1.2. Scope and Organization ............................................................................... 1-7 1.3. Limitations ...................................................................................................
    [Show full text]
  • Continuous Flow Intersection, Parallel Flow Intersection, and Upstream Signalized Crossover
    Comparison of Three Unconventional Arterial Intersection Designs: Continuous Flow Intersection, Parallel Flow Intersection, and Upstream Signalized Crossover Seonyeong Cheong, Saed Rahwanji, and Gang-Len Chang Abstract— This research is aimed to evaluate and world have adopted many conventional measures, including compare the operational performance of three signal planning and double left-turn lanes, for alleviating this unconventional intersections: Continuous Flow problem [1]. The using of these conventional measures are Intersection (CFI), Parallel Flow Intersection (PFI) and limited as the modifications of intersection design, such as Upstream Signalized Crossover (USC). For this purpose, widening interchanges and building bypasses, are expensive various experimental designs, including traffic conditions, and disruptive [1]. In contrast, the unconventional arterial geometric features and signal plans, were set and the intersection design (UAID) is one of the methods that can average delays were compared for movements of efficiently reduce the congestion with less cost as compare through-only traffic and left-turn-only traffic. From the with the conventional measures. General principles of results of analysis, all three unconventional intersections operation and management strategies of the UAID include: 1) outperformed conventional one and among the emphasis on through traffic movements along the arterial; 2) unconventional intersections, CFI outperformed the reduction in the number of signal phases (e.g. left-turn arrow others except for some traffic conditions. In the balanced phase); and 3) reduction in the number of intersection conflict traffic condition scenario, at the low traffic volume level, points [2]. These principles allow the UAID to reduce the the average delays of through traffic for PFI were smaller traffic congestion at the intersection and improve the traffic than that of CFI and very similar at the moderate traffic safety.
    [Show full text]
  • FHWA Bikeway Selection Guide
    BIKEWAY SELECTION GUIDE FEBRUARY 2019 1. AGENCY USE ONLY (Leave Blank) 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED February 2019 Final Report 4. TITLE AND SUBTITLE 5a. FUNDING NUMBERS Bikeway Selection Guide NA 6. AUTHORS 5b. CONTRACT NUMBER Schultheiss, Bill; Goodman, Dan; Blackburn, Lauren; DTFH61-16-D-00005 Wood, Adam; Reed, Dan; Elbech, Mary 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION VHB, 940 Main Campus Drive, Suite 500 REPORT NUMBER Raleigh, NC 27606 NA Toole Design Group, 8484 Georgia Avenue, Suite 800 Silver Spring, MD 20910 Mobycon - North America, Durham, NC 9. SPONSORING/MONITORING AGENCY NAME(S) 10. SPONSORING/MONITORING AND ADDRESS(ES) AGENCY REPORT NUMBER Tamara Redmon FHWA-SA-18-077 Project Manager, Office of Safety Federal Highway Administration 1200 New Jersey Avenue SE Washington DC 20590 11. SUPPLEMENTARY NOTES 12a. DISTRIBUTION/AVAILABILITY STATEMENT 12b. DISTRIBUTION CODE This document is available to the public on the FHWA website at: NA https://safety.fhwa.dot.gov/ped_bike 13. ABSTRACT This document is a resource to help transportation practitioners consider and make informed decisions about trade- offs relating to the selection of bikeway types. This report highlights linkages between the bikeway selection process and the transportation planning process. This guide presents these factors and considerations in a practical process- oriented way. It draws on research where available and emphasizes engineering judgment, design flexibility, documentation, and experimentation. 14. SUBJECT TERMS 15. NUMBER OF PAGES Bike, bicycle, bikeway, multimodal, networks, 52 active transportation, low stress networks 16. PRICE CODE NA 17. SECURITY 18. SECURITY 19. SECURITY 20.
    [Show full text]
  • Analysis of Traffic Capacity on Mountainous Two Lane Highway Adding Climbing Lane
    MATEC Web of Conferences 81, 04009 (2016) DOI: 10.1051/matecconf/20168104009 ICTTE 2016 Analysis of Traffic Capacity on Mountainous Two Lane Highway Adding Climbing Lane Yunwei Meng1,2 , Hailing Li2, Hejun Chai2 and ZonglingYan 2 1The Key Laboratory of Road and Traffic Engineering, Ministry of Education, Tongji University, 201804,Shanghai, China 2China Merchants Chongqing Communications Technology Research & Design Institute Co., LTD, 400067,Chongqing, China Abstract. During the construction of mountainous double lane highway, climbing lane plays a certain role for enhancing the traffic capacity. In order to explore traffic capacity improvement effect for different conditions of climbing lane, 20 representative models are chosen, which contain various combinations of alignment and traffic parameters. The changes of traffic capacity, average speed, delays, and saturation in models are obtained before and after the use of a climbing lane by means of numerical simulation. The results show that the use of a climbing lane could improve traffic capacity, average speed, while reducing delays and saturation. The improvement effect is different according to different combinations of alignment and traffic parameters. The research could provide a reference for mountainous climbing lane construction intend. 1 Introduction found that it is possible to generate traffic bottlenecks in the lane separation and convergence position. It can Because of the limitation of geology, topography and effectively ease traffic congestion by extending the length engineering investment, two-way two lane highway is of the transition section [4]. Setting up a reasonable common form in mountainous area of China. Two lane climbing lane, it can slow down the occurrence of traffic highways in mountain area is the main artery, assuming congestion [5].
    [Show full text]
  • Maricopa County Department of Transportation MAJOR STREETS and ROUTES PLAN Policy Document and Street Classification Atlas
    Maricopa County Department of Transportation MAJOR STREETS AND ROUTES PLAN Policy Document and Street Classification Atlas Adopted April 18, 2001 Revised September 2004 Revised June 2011 Preface to 2011 Revision This version of the Major Streets and Routes Plan (MSRP) revises the original plan and the 2004 revisions. Looking ahead to pending updates to the classification systems of towns and cities in Maricopa County, the original MSRP stipulated a periodic review and modification of the street functional classification portion of the plan. This revision incorporates the following changes: (1) as anticipated, many of the communities in the County have updated either their general or transportation plans in the time since the adoption of the first MSRP; (2) a new roadway classification, the Arizona Parkway, has been added to the Maricopa County street classification system and the expressway classification has been removed; and (3) a series of regional framework studies have been conducted by the Maricopa Association of Governments to establish comprehensive roadway networks in parts of the West Valley. Table of Contents 1. Introduction........................................................................................................................1 2. Functional Classification Categorization.............................................................................1 3. Geometric Design Standards..............................................................................................4 4. Street Classification Atlas..................................................................................................5
    [Show full text]
  • Planning and Design Guideline for Cycle Infrastructure
    Planning and Design Guideline for Cycle Infrastructure Planning and Design Guideline for Cycle Infrastructure Cover Photo: Rajendra Ravi, Institute for Democracy & Sustainability. Acknowledgements This Planning and Design guideline has been produced as part of the Shakti Sustainable Energy Foundation (SSEF) sponsored project on Non-motorised Transport by the Transportation Research and Injury Prevention Programme at the Indian Institute of Technology, Delhi. The project team at TRIPP, IIT Delhi, has worked closely with researchers from Innovative Transport Solutions (iTrans) Pvt. Ltd. and SGArchitects during the course of this project. We are thankful to all our project partners for detailed discussions on planning and design issues involving non-motorised transport: The Manual for Cycling Inclusive Urban Infrastructure Design in the Indian Subcontinent’ (2009) supported by Interface for Cycling Embassy under Bicycle Partnership Program which was funded by Sustainable Urban Mobility in Asia. The second document is Public Transport Accessibility Toolkit (2012) and the third one is the Urban Road Safety Audit (URSA) Toolkit supported by Institute of Urban Transport (IUT) provided the necessary background information for this document. We are thankful to Prof. Madhav Badami, Tom Godefrooij, Prof. Talat Munshi, Rajinder Ravi, Pradeep Sachdeva, Prasanna Desai, Ranjit Gadgil, Parth Shah and Dr. Girish Agrawal for reviewing an earlier version of this document and providing valuable comments. We thank all our colleagues at the Transportation Research and Injury Prevention Programme for cooperation provided during the course of this study. Finally we would like to thank the transport team at Shakti Sustainable Energy Foundation (SSEF) for providing the necessary support required for the completion of this document.
    [Show full text]
  • Study on Mixed Traffic Flow Behavior on Arterial Road
    Special Issue - 2018 International Journal of Engineering Research & Technology (IJERT) ISSN: 2278-0181 RTCEC - 2018 Conference Proceedings Study on Mixed Traffic Flow Behavior on Arterial Road Lilesh Gautama Jinendra Kumar Jainb a Research Scholar, Department of Civil Engineering, b Associate Professor, Department of Civil Engineering, MNIT Jaipur, Rajasthan, India MNIT Jaipur, Rajasthan, India Abstract- Arterials in metropolitan cities are expected to dynamics using macroscopic functions (such as a speed- provide flexibility to the high volume of traffic. A realistic density relationship). understanding of traffic flow behaviour for such essential urban roads is necessary for traffic operation planning and The relationships among traffic flow characteristics (flow management for ensuring the desired level of service. Metro (q), speed (v), and density (k)) are typically represented politan cities in India carry different types of vehicles with different static and dynamic characteristics with a majority of graphically and referred to as fundamental diagram. The two wheelers. In the present study, the traffic characterization fundamental diagram plays an effective role in traffic flow on a dynamic scale is carried out by considering two-wheeler theory and transportation engineering [3,4]. Among the and car as reference vehicles. Speed, flow, density relationships three pair-wise‟ relationships” (e.g., speed-density, flow- are developed. density, and speed-flow), the speed-density relationship appears to be fundamental. Some of the popular The present case study is an examination of the behaviour of macroscopic models are Green shield's Model, Greenberg’s mixed traffic flow speed and flow rate on an access controlled Model, Drake Model, Underwood Model, Pipe's generalized in six-lane divided Jaipur city in Rajasthan state of India.
    [Show full text]
  • Arterial Road
    Glossary of Terms Arterial Road – a high capacity urban road. The primary function of an arterial Improvement Alternative – a transportation alternative that addresses the road is to deliver tra!c from collector and local roads to freeways. needs along the I-70 corridor. These alternatives include roadway improvements, wider shoulders, interchange con#guration improvements, Auxiliary Lane – an extra lane constructed between on and o" ramps interchange consolidations, etc. which allows drivers a safe way to merge into tra!c while also preventing bottlenecks caused by drivers attempting to enter or exit the freeway. Interchange Spacing – the distance between two grade-separated interchanges. Guidelines call for having them at least one mile apart within Bottleneck – section of road that experiences congestion at a speci#c point; urban areas. it can be caused by curves, reduced number of lanes, merging tra!c, or areas where the number of vehicles exceeds the capacity of the roadway. Kansas City Scout – a system used to monitor and respond to tra!c incidents and provide roadway information to motorists in the metropolitan area. This is primarily done with changeable message boards that provide real-time information to the motorists along major facilities. Congestion along I-70 at the Jackson Curve Environmental Impact Statement (EIS) – a document required by NEPA for certain actions “signi#cantly a"ecting the quality of the human environment” that describes the positive and negative impacts of a proposed action. First Tier EIS – covered a large corridor area and addressed overall corridor strategies that was divided into subsequent Second Tier environmental studies. The limits of this First Tier EIS were approximately Changable Message Board 18 miles along I-70 just east of the Future of I-70 of Future Missouri/Kansas state line to east of Lane Balance – number of through lanes at an exit ramp is equal to the the I-470 interchange.
    [Show full text]
  • US 64 from West of NC 281 at Lake Toxaway to Indian Creek Transylvania County WBS No
    US 64 From West of NC 281 at Lake Toxaway to Indian Creek Transylvania County WBS No. 34428.2.2 T.I.P. No. R-2409C EXECUTIVE SUMMARY 1. FEDERAL HIGHWAY ADMINISTRATION This is a Federal Highway Administration (FHWA) Administrative Action Categorical Exclusion. 2. CONTACTS The following individuals may be contacted for additional information concerning this Proposal: Mr. John F. Sullivan, III, P.E. Mr. Edward A. Green, P.E., Division Engineer Division Administrator Highway Division 14 Office Federal Highway Administration North Carolina Department of Transportation 310 New Bern Avenue, Suite 410 253 Webster Road Raleigh, North Carolina 27601 Sylva, NC 28779 Telephone: (919) 856-4346 Telephone: (828) 586-2141 3. OTHER GOVERNMENTAL ACTIONS REQUIRED The proposed action will require permits pursuant to Sections 401 and 404 of the Clean Water Act of 1977, as amended. A 401 Water Quality Certification from the Water Quality Section of the North Carolina Department of Environment and Natural Resources (NCDENR), Division of Water Quality will be needed for fill activity in adjacent wetlands and surface waters. A Section 404 permit issued by the US Army Corps of Engineers will be required to discharge and place fill materials into wetlands. 4. PROPOSED ACTION The North Carolina Department of Transportation (NCDOT) and FHWA propose transportation improvements to US 64 from 0.3 mile west of NC 281 at Lake Toxaway to Indian Creek, Transylvania County. The proposed project is included in the NCDOT 2012-2020 State Transportation Improvement Program (STIP) as project number R-2409C. The project consists of upgrading this 1.5-mile, two-lane roadway to improve geometric design conditions and add a climbing lane.
    [Show full text]
  • DN-GEO-03031 June 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS
    Rural Road Link Design DN-GEO-03031 June 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing and improving the country’s national road and light rail networks. About TII Publications TII maintains an online suite of technical publications, which is managed through the TII Publications website. The contents of TII Publications is clearly split into ‘Standards’ and ‘Technical’ documentation. All documentation for implementation on TII schemes is collectively referred to as TII Publications (Standards), and all other documentation within the system is collectively referred to as TII Publications (Technical). Document Attributes Each document within TII Publications has a range of attributes associated with it, which allows for efficient access and retrieval of the document from the website. These attributes are also contained on the inside cover of each current document, for reference. TII Publication Title Rural Road Link Design TII Publication Number DN-GEO-03031 Activity Design (DN) Document Set Standards Stream Geometry (GEO) Publication Date June 2017 Document 03031 Historical NRA TD 9 Number Reference TII Publications Website This document is part of the TII publications system all of which is available free of charge at http://www.tiipublications.ie. For more information on the TII Publications system or to access further TII Publications documentation, please refer to the TII Publications website. TII Authorisation and Contact Details This document
    [Show full text]
  • The Undisputed Market Leader in Design-Build
    THE UNDISPUTED MARKET LEADER IN DESIGN-BUILD PROJECTS PROJECT LOCATION OWNER DESIGN-BUILD TEAM or CONTRACTOR Glenn Highway Improvements Anchorage, AK Alaska DOT Kiewit Infrastructure West Co. SR202L South Mountain Freeway Project Phoenix, AZ Arizona DOT Connect 202 Partners, LLC Loop 202 Widening Phoenix, AZ Arizona DOT Kiewit + Sundt + URS I-10 INA Road GMP 2 Tucson, AZ Arizona DOT Sundt/Kiewit JV Metro Orange Line Extension Chatsworth, CA LACMA Brutoco Engineering + Mc Lean & Schultz + Wildan Engineering I-15 & I-235 Devore Interchange Devore, CA CALTRANS Atkinson Contractors, LP BART Warm Springs Extension Fremont, CA CALTRANS Warm Spring Constructors CA High Speed Rail-1 DB Fresno, CA California High Speed Rail Authority Tutor Perini/Zachry/Parsons, A Joint Venture SR-99 Realignment-CMGC Fresno, CA CALTRANS MSE Retaining Systems, Inc. Fresno Braided Ramps Fresno, CA CALTRANS R & L Brosamer, Inc. SR-58 Kramer Junction CMGC Hinkley, CA CALTRANS Kiewit Infrastructure West Co. Inglewood Stadium Inglewood, CA TURNER HUNT LA NFL JOINT VENTURE Kiewit Infrastructure West Co. I-405 Sepulveda Pass Design Build Los Angelos, CA CALTRANS Kiewit Infrastructure West Company SDRBDT Mid-Coast Corridor Transit Project San Diego, CA SAN DIEGO Assoc. of Govts. (SANDAG) Mid-Coast Transit Constructors Smugglers Gulch Wash Tunnel San Diego, CA USACE Kiewit + Simon Wong Engineering + HNTB COSMIX Colorado Springs, CO CDOT SEMA Construction + CH2M Hill T-REX Denver, CO CDOT + RTD Kiewit + Parsons Transportation Group RTD West Corridor (Fastracks)* Golden, CO RTD Herzog + Stacey Witbeck JV + David Evans & Assoc. I-25 Trinidad Phase B Trinidad, CO CDOT Slaton Brothers, Inc. Rehab of Frederick Douglas Bridge Washington, DC DC Dept.
    [Show full text]
  • Urban Arterial Road Optimization and Design Combined with HOV Carpooling Under Connected Vehicle Environment
    Hindawi Journal of Advanced Transportation Volume 2019, Article ID 6895239, 11 pages https://doi.org/10.1155/2019/6895239 Research Article Urban Arterial Road Optimization and Design Combined with HOV Carpooling under Connected Vehicle Environment Lina Mao ,1 Wenquan Li ,1 Pengsen Hu,1 Guiliang Zhou ,2,3 Huiting Zhang,2 and Xuanyu Zhou2 1School of Transportation, Southeast University, Nanjing 210096, China 2Jiangsu Key Laboratory of Trac and Transportation Security, Huaiyin Institute of Technology, Huaian 223003, China 3School of Automotive and Trac Engineering, Jiangsu University, Zhenjiang 212013, China Correspondence should be addressed to Wenquan Li; [email protected] and Guiliang Zhou; [email protected] Received 3 February 2019; Accepted 16 August 2019; Published 19 December 2019 Academic Editor: Jose E. Naranjo Copyright © 2019 Lina Mao et al. is is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. e HOV carpooling lane oers a feasible approach to alleviate trac congestion. e connected vehicle environment is able to provide accurate trac data, which could optimize the design of HOV carpooling schemes. In this paper, signicant tidal trac ow phenomenon with severe trac congestion was identied on North Beijing road (bidirectional four‐lane) and South Huaihai road (bidirectional six‐lane) in Huai’an, Jiangsu Province. e historical trac data of the road segments were collected through the connected vehicle environment facilities. e purpose of this study is to investigate the eect of adopting two HOV schemes (regular HOV scheme and reversible HOV carpooling scheme) on the urban arterial road under connected vehicle environment.
    [Show full text]