Experts: Uranium Mining at Kyzyl Ompol Is Hazardous to Environment, Economically Unviable
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Gulzana KURMANALIEVA
Gulzana KURMANALIEVA E-mail: [email protected] Work experience Part Time Teaching Assistant (2013 – present) Naryn State University named after S.Naamatov (Naryn/Kyrgyzstan) Focus on land management and agriculture economics Manager/Director (2013 – 2015) EDU – Education Centre (Naryn/Kyrgyzstan) Management of academic affairs Marketing of EDU academic programs Assistant to Manager of Academic Affairs (2011 – 2013) University of Central Asia (Naryn/Kyrgyzstan) General management of the educational process Preparation of reports on academic programs Outreach Coordinator (2008 – 2011) University of Central Asia (Naryn/Kyrgyzstan) General management of outreach of academic programs Coordination and monitoring of the Program activities in Naryn region Education Doctoral Studies, Naryn State University, Kyrgyzstan (2013 December – present) Economics and Natural Resource Management Title of the doctoral thesis: ‘Pasture Resource Conflict and Cooperation: Explaining the Coexistence of Conflict and Cooperation in Pastoral Border South Kyrgyzstan and Tajikistan’ Diploma, Kyrgyz National University n.a. J.Balasagyn (2007 – 2009) Economics and Management Diploma, Kyrgyz National University n.a. J.Balasagyn (2000 – 2005) Linguistics Language skills Kyrgyz (native) Russian (fluent) English (fluent) German (basic) Fellowships and awards Fellow of the EUCACIS PhD Support Programme since October 2016; Visiting researcher within Designing Social Institutions in Transition: Promotion of Institutional Development for Common Pool Resource -
Measuring the Impact and Financing of Infrastructure in the Kyrgyz Republic
ADBI Working Paper Series MEASURING THE IMPACT AND FINANCING OF INFRASTRUCTURE IN THE KYRGYZ REPUBLIC Kamalbek Karymshakov and Burulcha Sulaimanova No. 988 August 2019 Asian Development Bank Institute Kamalbek Karymshakov is an assistant professor at the Finance and Banking Department, Central Asian Research Center of the Kyrgyz-Turkish Manas University in Bishkek, Kyrgyz Republic. Burulcha Sulaimanova is an assistant professor at the Economics Department also of the Kyrgyz-Turkish Manas University. The views expressed in this paper are the views of the author and do not necessarily reflect the views or policies of ADBI, ADB, its Board of Directors, or the governments they represent. ADBI does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequences of their use. Terminology used may not necessarily be consistent with ADB official terms. Working papers are subject to formal revision and correction before they are finalized and considered published. The Working Paper series is a continuation of the formerly named Discussion Paper series; the numbering of the papers continued without interruption or change. ADBI’s working papers reflect initial ideas on a topic and are posted online for discussion. Some working papers may develop into other forms of publication. In this report, “$” refers to United States dollars. The Asian Development Bank refers to “Kyrgyzstan” as the Kyrgyz Republic. Suggested citation: Karymshakov, K. and B. Sulaimanova. 2019. Measuring the Impact and Financing of Infrastructure in the Kyrgyz Republic. ADBI Working Paper 988. Tokyo: Asian Development Bank Institute. Available: https://www.adb.org/publications/measuring-impact-and-financing- infrastructure-kyrgyz-republic Please contact the authors for information about this paper. -
Investment Profile of KARAKOL CITY КАРАКОЛ Karakol City
Investment Profile of KARAKOL CITY КАРАКОЛ Karakol City Brief presentation of the city Karakol is the fourth-largest city in Kyrgyzstan and is located near the eastern tip of Lake Issyk-Kul, about 150 km west of the Chinese border and 380 km east of the capital, Bishkek. It is the administrative capital of the Issyk-Kul Region in the country’s far east. Karakol’s untapped potential offers investors a variety of investment opportunities at affordable costs, with municipally owned land available for greenfield investments. Thanks to a mild climate and beautiful scenery, the city is known world-wide for its abundant recreational opportunities: Lake Issyk-Kul, skiing, hot springs, and suitable conditions for extreme sports such as paragliding, mountain biking, and mountaineering. It attracts investors from all over the world thanks to rich investment potential in areas such as hotels and restaurants, mountain tourism, honey production, animal breeding, dairy production, and cultivation and processing of fruits and vegetables. 2 КАРАКОЛ Karakol City General Information about Karakol City • Area: 52,000 sq. m. • Population: 75,100 as of January 1, 2018. • 39,900 people within an hour’s drive eastward (Ak-Suu district) • 34,775 people within an hour’s drive on the lake’s north shore (Tyup district) • 69,589 people within an hour’s drive on the lake’s south shore (Jeti-Oguz district) • Location: Karakol sits at the foot of the Teskei-Ala-Too mountain range, downstream of Karakol River, 12 km from the shore of Lake Issyk-Kul, and at 1690-1850 m above the sea level. -
World Bank Document
Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: PAD1963 INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT Public Disclosure Authorized IN THE AMOUNT OF SDR 19.70 MILLION (US$27.50 MILLION EQUIVALENT) AND A PROPOSED GRANT IN THE AMOUNT OF SDR 19.70 MILLION (US$27.50 MILLION EQUIVALENT) TO THE Public Disclosure Authorized KYRGYZ REPUBLIC FOR THE THIRD PHASE OF THE CENTRAL ASIA REGIONAL LINKS PROGRAM (CARS‐3) SEPTEMBER 18, 2018 Transport Global Practice EUROPE AND CENTRAL ASIA Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective August 31, 2018) Currency Unit = Kyrgyz Som (KGS) KGS69.020 = 1 US$ US$0.015 = KGS 1 Special Drawing Currency Unit = Rights (SDR) SDR0.714 = 1 US$ US$1.401 = 1 SDR FISCAL YEAR January 1 ‐ December 31 Regional Vice President: Cyril E Muller Country Director: Lilia Burunciuc Senior Global Practice Director: Jose Luis Irigoyen Practice Manager: Binyam Reja Task Team Leader(s): Cordula Rastogi; Aidai Bayalieva ABBREVIATIONS AND ACRONYMS AADT Average Annual Daily Traffic IPIG Investment Project Implementation Group ADB Asian Development Bank ISA International Standards on Auditing ANS Air Navigation System JICA Japan International Cooperation Agency ATC Air Traffic Control JSC Joint Stock Company ATM Air Traffic Movement KAI -
Jehovah's Witnesses Respectfully Request the Government of Kyrgyzstan To
Enclosed information material is submitted by the European Association of Jehovah's Witnesses European Association of Jehovah's Witnesses KYRGYZSTAN RELIGIOUS FREEDOM ISSUES STATEMENT BY THE EUROPEAN ASSOCIATION OF JEHOVAH’S WITNESSES O S C E H u m a n Dimension Implementation M e e t i n g , W a r s a w 16–27 SEPTEMBER 2019 K y r g y z s t a n There are some 5,300 of Jehovah’s Witnesses in Kyrgyzstan, and they are generally free to meet for worship and to share their faith with others. They obtained national registration in August 1998. However, Jehovah’s Witnesses have two prinCipal ongoing ConCerns: Problems with registering loCal religious organisations (LROs) in the southern regions of the country. Without registration of LROs, local authorities view the Witnesses’ religious activity as illegal, thus leaving them vulnerable to police harassment. Draft amendments to the 2008 Law on Freedom of Religion and Religious Organizations (Religion Law) that if enacted would severely restrict religious freedom. Jehovah’s Witnesses have met with government ofcials in Kyrgyzstan 3 to address these concerns and to express appreciation to the govern- ment for being open to dialogue. Abuses and Restrictions of Religious Freedom RESTRICTIVE DRAFT AMENDMENTS TO THE RELIGION LAW On 27 June 2018, the State Commission on Religious Afairs (SCRA) pre sented draft amendments to the current law “On Freedom of Worship and Religious Associations.” While some provisions were less restrictive than in earlier drafts, two proposed amendments are of serious concern to Jeho- vah’s Witnesses: A ban on “house to house dissemination of religious conviCtions.” —Proposed amendment to Article 5 (4). -
Sdjr06020 Summary
Integrated Development Plan of the Issyk-Kul Zone Summary 8 ENVIRONMENTAL ASSESSMENT AND MANAGEMENT Environmental Capacity and Pollutant Loads For the integrated regional development plan of the Issyk-Kul zone, the strategic environmental assessment (SEA) has been applied to evaluate overall pollutant loads to be caused by changes in land use and development projects envisaged under the moderate growth scenario. As discussed previously, the most sensitive is the pollution of water quality in the Issyk-Kul Lake. Under the moderate growth scenario, the lake water quality will be degraded to some extent as predicted in the table below. The extent of pollutant loads in terms of BOD, total nitrogen (NH4-N, NO2-N and NO3-N) and total phosphorus (PO4-P) appears to be permissible in the light of international standards for lake water quality. Table S.10 Predicted Water Quality under Moderate Growth Scenario (mg/l) Current Moderate Growth Scenario Permissible (2002) 2010 2025 Level BOD 0.61 0.66 0.75 1 T-N 0.15 0.16 0.18 0.2 T-P 0.0011 0.0012 0.0014 0.005 Source: JICA Study Team Quality of river water flowing into the Issyk-Kul Lake should also be assessed and monitored. The available data, though limited as they are, indicate that river water flowing through agricultural lands has been degraded to some extent. Table S.11 Water Qualities of Major River Inflows into Lake Issyk-Kul (Average of 1988~1992) (mg/l) Djyr Djeti Cholpon Chon River Name Tyup Karakol Tamga Ton Akk-Sai -Galan Oguz -Ata AK Suu BOD5 1.70 1.99 1.90 1.60 2.10 1.10 0.56 0.79 0.83 T-N 1.17 1.14 1.02 1.10 0.91 1.22 0.91 0.91 0.81 T-P 0.016 0.017 0.013 0.011 0.016 0.014 0.013 0.011 0.009 Source: JICA Study Team Emission of air pollutants from stationary sources will not be a serious concern as far as the industrial proposals are controlled individually. -
42399-023: CAREC Transport Corridor I (Bishkek-Torugart Road
Completion Report Project Number: 42399-023 Loan Number: 2755 Loan Number: 3204 Grant Number: 0418 March 2019 Kyrgyz Republic: CAREC Corridor 1 (Bishkek– Torugart Road) Project 3 This document is being disclosed to the public in accordance with ADB's Access to Information Policy. CURRENCY EQUIVALENTS Currency Unit – som (Som) At Appraisal Additional Financing At Project Completion (25 April 2011) (30 October 2014) (31 December 2017) Som1.00 = $0.0213 $0.0177 $0.0145 $1.00 = Som46.916 Som56.508 Som69.140 ABBREVIATIONS ADB – Asian Development Bank CAREC – Central Asia Regional Economic Cooperation CPS – country partnership strategy EIA – environmental impact assessment EIRR – economic internal rate of return EMP – environment management plan ICB – international competitive bidding ICS – individual consultant selection IPIG – Investment Projects Implementation Group IRI – international roughness index KJSNR – Karatal-Japaryk State Nature Reserve LARP – land acquisition and resettlement plan MOTR – Ministry of Transport and Roads NLA – normative legal act PBM – performance-based maintenance PCR – project completion review PRC – People’s Republic of China SDR – special drawing right TOR – terms of reference VOC – vehicle operating cost NOTES (i) The fiscal year (FY) of the Government of the Kyrgyz Republic and its agencies ends on 31 December. “FY” before a calendar year denotes the year in which the fiscal year ends, e.g., FY2017 ends on 31 December 2017. (ii) In this report, “$” refers to United States dollars. Vice-President S. Chen, Operations 1 Director General W. E. Liepach, Central and West Asia Regional Department (CWRD) Director C. McDeigan, Kyrgyz Resident Mission, CWRD Sector Director D. S. Pyo, Transport and Communications Division, CWRD Team leader M. -
50176-002: Issyk-Kul Wastewater Management Project
Social Monitoring Report Project number: 50176-002 July-December 2020 March 2021 Kyrgyz Republic: Issyk – Kul Wastewater Management Project Prepared by Prepared by the Department of Drinking Water Supply and Sewerage Development (DDWSSD) under the State Agency for Water Resources under the Government of the Kyrgyz Republic in consortium with Temelsu International Engineering Inc., Design and Supervision Consultant for the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Issyk – Kul Wastewater Management Project Semi-Annual Social Safeguard Monitoring Report No.2 TABLE OF CONTENTS 1. INTRODUCTION ...................................................................................................... 4 1.1. Project Description ................................................................................................ 5 1.1.1. Description of Balykchy sub-project ................................................................... 5 1.1.2. Description of Karakol sub-project ..................................................................... 6 1.1.3. Sanitary Protection -
Poverty Alleviation Through Sustainable Development of Local Communities
UNITED NATIONS DEVELOPMENT PROGRAMME IN THE KYRGYZ REPUBLIC “ENVIRONMENT PROTECTION FOR SUSTAINABLE DEVELOPMENT” PROGRAMME POVERTY ALLEVIATION THROUGH SUSTAINABLE DEVELOPMENT OF LOCAL COMMUNITIES Bishkek 2008 UDK 364 BBK 66.3(2) П 72 Coordination group: Mira Djangaracheva Talaybek Makeev Zhyldyz Uzakbaeva Ular Mateev Aigul Bolotova Authors: Elvira Ilibezova Larisa Ilibezova Elena Selezneva Rustam Toktosunov Gulsina Bigeldieva Bakyt Moldokmatov Editor: David Hutton POVERTY ALLEVIATION THROUGH SUSTAINABLE DEVELOPMENT OF LOCAL COMMUNITIES Design: Murat Sagimbaev Proof in sheets: Vitaly Lyan Format 60х84 1/16. Offset printing. Volume 10,25 Circulation 1000 c. Poverty alleviation through sustainable development of local communities. П 72 Bishkek.: 2008. - 204 p. ISBN 978-9967-24-854-0 UDK 364 П 0803010200-08 BBK 66.3(2) ISBN 978-9967-24-854-0 © UNDP, 2008 LIST OF ABBREVIATIONS AC Administrative Code ADB Asian Development Bank APR JK KR Assembly of People’s Representatives of the Jogorku Kenesh of the Kyrgyz Republic CBD Convention on Biological Diversity CDM Clean Development Mechanism CDS Country Development Strategy CIDA Canadian International Development Agency CIS Commonwealth of Independent States DFID Department for International Development of the UK Goverment EDS Environment Development Strategy FCCC Framework Convention on Climate Change FGD Focus Group Discussions GDP Gross Domestic Product GEC Global Environmental Conventions GEF Global Environment Facility Gosregistr State Agency for the Registration of Rights to Immovable Property -
(DREF) Kyrgyzstan: Floods and Mudflows
Disaster relief emergency fund (DREF) Kyrgyzstan: Floods and mudflows DREF operation n° MDRKG008 GLIDE n° FL-2012-000043-KGZ 4th May 2012 The International Federation of Red Cross and Red Crescent (IFRC) Disaster Relief Emergency Fund (DREF) is a source of un-earmarked money created by the Federation in 1985 to ensure that immediate financial support is available for Red Cross and Red Crescent emergency response. The DREF is a vital part of the International Federation’s disaster response system and increases the ability of National Societies to respond to disasters. CHF 110,430 has been allocated from the IFRC’s Disaster Relief Emergency Fund (DREF) to support the National Society in delivering immediate assistance to some 1,001 families (approximately 5,005 beneficiaries). Unearmarked funds to repay DREF are encouraged. Summary: Kyrgyzstan experienced the harshest winter with unusually low temperatures, heavy snowfalls throughout 2011 and 2012 and high precipitation, which exceeded the annual average by 2 – 2,5 times according to the Hydro Meteo Service of Kyrgyzstan. Snow melting and heavy rains caused mudflows and flash floods across Kyrgyzstan. Food stocks, home properties, livelihoods and Kulundu village of Leilek district, Batken oblast. Photo made by RCSK infrastructure have been heavily damaged. Series of mudflows occurred on the territory of Naryn, Osh, Jalalabad and Batken regions including remote districts throughout April. The most destructive flash floods were in Osh, Batken and Jalalbad during the period of April 23 to April 29, 2012. According to the Ministry of Emergency Situations a total of more than 2,300 households were affected in Osh, Batken, Jalalabad and Naryn1. -
Analysis of the Situation of Children's Residential Institutions in the Kyrgyz Republic
ANALYSIS OF THE SITUATION OF CHILDREN'S RESIDENTIAL INSTITUTIONS IN THE KYRGYZ REPUBLIC ANALYSIS OF THE SITUATION OF CHILDREN’S RESIDENTIAL INSTITUTIONS IN THE KYRGYZ REPUBLIC Analysis of the situation of children’s residential institutions in the Kyrgyz Republic – B.: 2012. – p.115 This publication is a product of a national study on children in child care residential institutions in the Kyrgyz Republic, which was carried out by Public Fund “My Family” upon the initiative and support of the United Nations Children’s Fund (UNICEF) in cooperation with the Ministry of Education and Science of the Kyrgyz Republic and the Ministry of Social Development of the Kyrgyz Republic during the period from September 2010 to January 2012. This research report fills current gaps in national data on children in child care residential institutions in the Kyrgyz Republic and provides an analysis of the situation in the institutions. It sheds light on the perspectives of children and caregivers and provides recommendations for improving the situation of these children. The findings of the report provide a foundation for the elaboration of further strategic programmes and action plans on child care system reform in the Kyrgyz Republic. The opinions expressed in this document do not necessarily reflect the policies or views of the United Nations Children’s Fund and the organization does not bear any responsibility. ©UNICEF, 2012 2 TABLE OF CONTENTS ACKNOWLEGMENTS…………………………………………………………………………. 4 ABBREVIATIONS……………………………………………………………..………………… 4 GLOSSARY…………………………………………………………………………….……… 5 EXECUTIVE SUMMARY……………………………………………………………………… 7 1. INTRODUCTION……………………………………………………………………..……… 10 2. AIMS AND TASKS OF THE RESEARCH……………………………………………….. 14 3. RESEARCH METHODOLOGY…………………………………………………………….. 15 4. CLARIFYING THE DATA ON THE NUMBER OF CHILDREN’S RESIDENTIAL INSTITUTIONS IN OPERATION IN THE KYRGYZ REPUBLIC…………….……………. -
Price Monitoring for Food Security in the Kyrgyz Republic
Issue 31|16 – 30 December 2020 Price Monitoring for Food Security in the Kyrgyz Republic This issue of the Price Monitoring Bulletin is prepared based on the operational daily food price data collected by the National Statistics Committee from 18 markets across the country and disaggregated at province level as the average value (Chuy province - Tokmok, Kara-Balta; Osh province - Osh, Uzgen, Kara-Suu and Nookat; Talas province - Talas and Manas; Naryn province - Naryn and Chaek; Batken province - Batken and Isfana; Jalal-Abad province - Jalal-Abad, Toktogul and Kerben; Yssyk-Kul province - Karakol and Balykchy; and Bishkek city). This is a secondary data analysis. Highlights SITUATION UPDATE: Since March 2020, the COVID-19 global pandemic and its resulting negative impacts on the global economy have led to a recession in the economies of many countries, including the Kyrgyz Republic. In addition, the recent political instability has further contributed to the deterioration of the economy. The situation in regard to COVID-19 remained stable with 119 COVID-19 cases on 30 December. Compared to the same period last year, the Kyrgyz Republic’s GDP decreased by 8.1 percent totaling 511 billion Kyrgyz soms from January to November 2020. Negative trends were observed in the construction, wholesale and retail trade economic sectors. The highest share of GDP accounted for industry (21.3 percent), manufacturing industry (17.8 percent), trade (15.2 percent) and agriculture (14.8 percent). Compared to the same period last year, the Consumer Price Index, which measures price inflation, increased by 6 percent for all goods and services and by 11 percent for staple foods (cereals, meat, fish, milk and dairy products, fruits and vegetables).