Land at Carlogie, Carnoustie

Total Page:16

File Type:pdf, Size:1020Kb

Land at Carlogie, Carnoustie Additional Information Submitted on Behalf of: ANGUS ESTATES & THE MUIR GROUP – LAND AT CARLOGIE, CARNOUSTIE . PRESENTATION TO CARNOUSTIE COMMUNITY COUNCIL (24 FEBRUARY 2014) . HOUSING LAND SUPPLY IN SOUTH ANGUS HOUSING MARKET AREA 2014 . LETTER FROM THE LOCHHEAD CONSULTANCY (4 SEPTEMBER 2014) . CARNOUSTIE SITES – COMPARATIVE ASSESSMENT . CARLOGIE ROAD – INDICATIVE FRAMEWORK Presentation to Carnoustie Community Council 24 February 2014 Angus Estates Introduction • Purpose of Presentation • Current Position • Indicative Masterplan • Compliance with MIR • Why we Believe Carlogie Road is best Option • Questions & Discussion Angus Estates Local Development Plan • Community Council Statutory Consultee • Two Main sites Identified • Upper Victoria • Carlogie Road • Reaching Final Stages Angus Estates Carlogie Road Current Position • Joint Venture Angus Estates & Muir Group • Master Plan Led • Integrated with Town • Delivers MIR & LDP Ambitions Angus Estates Current Local Plan Angus Estates Indicative Masterplan Angus Estates Indicative Masterplan- Local Plan Angus Estates Proximity to Town Centre Angus Estates Landscape Framework Angus Estates Indicative Framework Plan Angus Estates Why Carlogie Road Should be Preferred Option • Significant area with land owners committed to coordinated masterplan,JV & Investment • Closest to Town Centre • Fully Linked to existing Community • Employment Land already allocated • No archaeological or flooding constraints to site • Complementary Upgraded Sports Facilities delivered • Primary school & Educational sites • Land for temporary parking when Open is on • No topographical problems to prevent linkage to existing community • Minimal visual intrusion Angus Estates Compliance With MIR • Master plan Led • Road Improvements Delivered • Employment land Delivered • Retail Ambition Delivered – retention of expenditure – Closest to High Street • Natural Extension of Town • Provide Affordable Housing Angus Estates Questions & Discussion Angus Estates Employment Land • Application Submitted • Support of Muir Group • Lack of Supply Constraint to Towns Economy • Known Demand • Positive Discussions with Council Housing Land Supply in South Angus Housing Market Area 2014 Strategic Context TAYplan provides the strategic planning guidance for Angus. Policy 5: Housing states that Local Development Plans should: “Allocate land which is effective or capable of becoming effective to meet the housing land requirement up to year 10 from the predicted date of adoption, ensuring a minimum of 5 years effective land supply at all times, and work towards the provision of a 7 years supply of effective housing land by 2015, to support economic growth. Land should be allocated within each Housing Market Area (Proposal 2) through Local Development Plans to provide an effective and generous supply of land to assist in the delivery of in the order of 26,000 units up to year 2024 across TAYplan. Average annual build rates are illustrated. In the period 2024 to 2032 in the order of 17,400 units may be required. To assist the delivery of these build rates, Local Development Plans shall allocate sufficient land to ensure a generous supply of effective housing sites and to provide for flexibility and choice.” For the South Angus Housing Market Area the plan seeks to provide a framework to allow a minimum of 80 houses per annum to be constructed. The plan states that “average build ratese ar illustrated annually to assist the understanding of what the scale of housing is for communities. These are only averages and the period in which these build rates should be achieved is over the first 12 years of the Plan (from 2012), not annually. It is anticipated that within the first 12 year period build rates will be lower than the average in the early period and greater in the later period.” The emerging Angus LDP has two key requirements to fulfil – 1) provide a framework that allows a minimum of 90 houses to be constructed per annum; and 2) ensure a minimum of 5 years supply is available at all times. Angus Housing Land Audit Based on the published Housing Land Audit 2014 prepared by Angus Council the chart below compares the requirements of TAYplan which, directs Angus Council to provide a framework that allows for 80 houses per annum to be completed within the Housing Market Area, and the Councils own forecast of likely completions from the existing supply of housing land. Graph 1 South Angus HMA Actual and Projected Completions 90 80 70 60 50 TAYplan 40 Angus Council Land Audit Completions 30 20 10 0 The first two years (2012/13 and 2013/14) are factual completions. From 2014/15 to 2020/21 the Audit estimates an annual output from the existing supply of housing land. Beyond this period (up to 20025/26) an assumption is made of the likely output of the remaining housing land based on similar assumptions made within the Audit. The LDP is to have a timescale of 10 years from adoption; hence the projection is up to 2026. It is clear that there is a serious lack of effective housing land to allow TAYplan completions to be achieved and provide a minimum of 5 years effective land to be available at all times. The projected completions are shown in table 1. Table 1 South Angus HMA Audit 2014 Projected Completions 12/13 13/14 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26 14 18 48 33 79 55 28 10 10 10 10 10 10 10 By examining the supply each year as we progress through the plan period it is possible to determine what supply is available and to reveal if a 5 year supply of land is provided. As the first two years are factual, the base year of the Audit is used i.e. 2014/15. This is shown in table 2. Table 2 South Angus HMA Supply and Years Supply 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26 Supply 383 335 302 223 168 140 130 120 110 100 90 80 Years Supply 4.8 4.2 3.8 2.8 2.1 1.7 1.6 1.5 1.4 1.2 1.1 1 This can usefully be shown in the form of a graph which compares the 5 year supply target of 400 units (5 X 80) and the actual diminishing supply over the plan period. Graph 2 South Angus HMA Supply and the 5 Year Supply 450 400 5 Years Supply, 350 300 250 200 150 Completions Supply 100 50 0 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26 Future Housing Allocations It is possible, indeed necessary, to translate the lack of a 5 year supply and therefore a lack of a planning framework to allow 80 houses to be constructed every year into a minimum housing number that should be allocated in the emerging LDP. The starting point is in fact the end of the plan period – 2025/26. In order to meet the requirements of TAYplan there must be a minimum 5 year supply of land at this time (land for 400 houses). The plan must allow for a minimum of 80 houses to be completed in each of the 10 preceding years as shown in Table 3. Table 3 South Angus HMA ‐ Meeting the Requirements of TAYplan 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26 1120 1040 960 880 800 720 640 560 480 400 ‐80 ‐80 ‐80 ‐80 0 ‐80 ‐80 ‐80 ‐80 Table 3 reveals that to ensure a minimum 5 year supply of housing land is available at all times throughout the plan period (2016/17 to 2025/26) the LDP must allocate sufficient land to accommodate the construction of 1120 houses. However, according to the Councils Housing Land Audit 2014 there will already be an existing supply of land at the base date of 2016/17. This is estimated to amount to 302 units, leaving the LDP to allocate a minimum of 818 houses within the Housing Market Area. This is an absolute minimum for two reasons. Firstly, TAYplan is clear that the Council should aim (as from 2015) to allocate a 7 years supply to support economic growth. This alone would require an additional allocation of some 160 houses if this ambition of supply were to be achieved. Secondly, the actual and projected completions between 2012/13 and 2015/16 will fall short of the average completions sought by TAYplan by some 207 units thereby requiring an accelerated build rate in the period covered by the Angus LDP. Taking these figures together requires a further 367 units to be added to the supply making a total new allocation of 1,185 to be identified by the LDP if it is to conform to the strategic guidance provided by TAYplan. The above assessment is based on the existing effective supply coming forward for development. There is also a further supply of land identified within the existing adopted Local Plan or with the benefit of planning consent covering 4 sites and amounting to a potential supply of some 267 housing units. It is of note that the largest non‐effective site is Strathmartine Hospital which has an allocation of 40 units in the adopted Local Plan but is considered to have a notional capacity of 200 units within the 2009 Urban Capacity Study and therefore reflected in the latest Audit. The 2014 Audit considers these sites to be non‐ effective and unlikely to make a contribution to supply during the audit period. Even, if all these sites were to come forward for development during the plan period and assuming the hospital site could yield 200 units, and this is considered unlikely, the LDP would still need to find additional land to accommodate 918 houses.
Recommended publications
  • Getting Back from Lockdown Survey Report June 2020
    GETTING BACK FROM LOCKDOWN SURVEY REPORT JUNE 2020 1 Background As Parent to Parent continued to support families and young people during the Coronavirus pandemic, it became apparent, that there was a great deal of anxiety around coming out of ’Lockdown’. Especially returning to school. We decided to gather thoughts, views and what was worrying families using a survey monkey. This was sent out to all the young people the Young Person Advocacy team were supporting, and also posted on our Facebook page. Our idea was to collate a toolkit with ideas and strategies that both parent and child could work on together or jointly over the summer holidays, and use to prepare for returning to school. So we said: Parent to Parent would like to put together a resource toolkit (a collections of ideas/strategies to help you cope with difficult/hard situations) to help parents, children and young people who may be worried about moving out of lockdown and going back to school. We would like your help to identify what would be useful to put in it. If you could tell us a bit about yourself so we can gauge right age/stage, and what is worrying you and your child, and what barriers you think there might be to returning to school: The Government is ensuring that all businesses, and schools will be Covid-19 secure, with risk assessments in place, however we wanted to support you emotionally, and practicably. We received over 55 responses the majority were from the young people themselves, but there were a couple of responses directly from the parents.
    [Show full text]
  • Type 6 Taxi Operator - Saloon Car
    Operators List Type 6 Taxi Operator - Saloon Car Reference No. Name Address Registration No Model Colour Granted Current Renewal Current Renewal Test Date Grant Test Date 1 OP791 Alexander R Adair 81 Hugh Fraser Court SF60 HBK PEUGEOT PARTNER white 01/06/2016 31/05/2017 11/03/2016 07/11/2016 Crookfur Road Newton Mearns Glasgow G77 6JZ 2 OP337 George Adam 15 Ashmore Street SJ58 XGU Skoda Octavia Classic TDi Silver 01/06/2016 31/05/2017 10/01/2017 14/05/2017 Kirkton Dundee DD3 0DS 3 OP25 Derek Adam 2 Lintrathen Street SV61 OGU RENAULT GRAND SCENIC GREY 01/06/2016 31/05/2017 03/08/2016 04/08/2017 Dundee DD3 8EE 4 OP442 Ronald Adams 17 Cowan Place KB07 WHX VAUXHALL VECTRA SILVER 01/06/2016 31/05/2017 02/03/2016 05/11/2016 Dundee DD4 6QL 5 OP141 Ronald Addison 16 Blantyre Place SY62TBU citeron berlingo blue 01/06/2016 31/05/2017 28/09/2016 15/10/2017 Dundee DD3 8RW 6 OP351 Robert F Alexander Midcrossgate Cottages NV66GYY SKODA OCTAVIA Silver 01/06/2016 31/05/2017 14/12/2016 14/12/2017 Inchture PH14 9RN 7 OP221 James J Anderson 37 Lintrathen Gardens MV66 RLX TOYOTA AVENSIS silver 01/06/2016 31/05/2017 19/09/2016 18/09/2017 Dundee DD3 8EJ 8 OP28 David S Balbirnie 48 Dickson Avenue SP65NMK SKODA OCTAVIA red 01/06/2016 31/05/2017 05/09/2016 05/09/2017 Dundee DD2 4EG 9 OP27 Pauline Balfour 101 Hawick Drive SP57 VTX VAUXHALL VECTRA EXCLUSIV SILVER 01/06/2016 31/05/2017 09/03/2012 16/03/2013 Dundee DD4 0TB 10 OP794 Bruce Banks 2 Ardminish Place GJ15ZGZ SKODA OCTAVIA black 01/06/2016 31/05/2017 26/05/2016 26/05/2017 Dundee DD4 0SJ 11 OP92 James Barclay
    [Show full text]
  • A34 Bus Time Schedule & Line Route
    A34 bus time schedule & line map A34 Carnoustie High School - Monikie and Fishers View In Website Mode Depot The A34 bus line (Carnoustie High School - Monikie and Fishers Depot) has 2 routes. For regular weekdays, their operation hours are: (1) Carnoustie: 7:52 AM (2) Pitkerro: 4:00 PM Use the Moovit App to ƒnd the closest A34 bus station near you and ƒnd out when is the next A34 bus arriving. Direction: Carnoustie A34 bus Time Schedule 20 stops Carnoustie Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 7:52 AM Keyline, Pitkerro Tuesday 7:52 AM South Kingennie Road End, Kellas Wednesday 7:52 AM South Kingennie Steadings, Kellas Thursday 7:52 AM Laws Road End, Drumsturdy Friday 7:52 AM Toll, Newbigging Saturday Not Operational B962, Scotland Phone Box, Newbigging Denƒnd Road End, Monikie A34 bus Info Direction: Carnoustie Balhill House, Monikie Stops: 20 Trip Duration: 51 min Line Summary: Keyline, Pitkerro, South Kingennie Balmachie Road End, Muirdrum Road End, Kellas, South Kingennie Steadings, Kellas, Laws Road End, Drumsturdy, Toll, Newbigging, By Pass, Muirdrum Phone Box, Newbigging, Denƒnd Road End, Monikie, A930, Scotland Balhill House, Monikie, Balmachie Road End, Muirdrum, By Pass, Muirdrum, Scryne Road End, Scryne Road End, Scryne Scryne, East Scryne Hall, Easthaven, Bus Shelter, Easthaven, Mcgill Road, Carnoustie, Panbride East Scryne Hall, Easthaven Church, Carnoustie, Guthrie Street, Carnoustie, Maule Street, Carnoustie, Carlogie Road, Carnoustie, Bus Shelter, Easthaven Recycling Centre, Carnoustie, Carnoustie
    [Show full text]
  • 1000 Companies to Inspire Britain 2016
    1000 1000 COMPANIES TO INSPIRE 1000 COMPANIES TO INSPIRE 2016 BRITAIN BRITAIN 2016 Our sponsors www.1000companies.com 1000 COMPANIES TO INSPIRE 2016 BRITAIN London Stock Exchange Group Editorial Board Tom Gilbert (Senior Press Officer); Ed Clark (Press Officer); Alexandra Ritterman (Junior Press Officer) Contents Wardour Led by Claire Oldfield (Managing Director) and Ben Barrett (Creative Director) 72 Marcus Stuttard The team included: Lynn Jones (Art Director); Joanna Lewin (Editor) and Wardour editorial; Forewords 5 Xavier Rolet Head of UK Primary Markets and Head Charlotte Tapp (Project Director); CEO, London Stock Exchange Group of AIM, London Stock Exchange Group John Faulkner and Jack Morgan (Production) 10 Ian Stuart 73 Sherry Coutu CBE Co-Founder, Scale-Up Institute Wardour, Drury House, 34–43 Russell Street, UK and European Head of Commercial Banking, HSBC 81 Terry Scuoler London WC2B 5HA, United Kingdom CEO, EEF The Manufacturers’ Organisation +44 (0)20 7010 0999 12 Stephen Welton CEO, Business Growth Fund 90 Tim Hames www.wardour.co.uk 14 Jim Durkin Director General, British Private CEO, Cenkos Equity & Venture Capital Association 16 Allister Heath 102 Jenny Tooth OBE Deputy Editor and Deputy Director of Chief Executive, UK Business Angels Association Pictures: Getty Images, iStock, Gallerystock Content, The Telegraph 17 Justin Fitzpatrick 113 Carolyn Fairbairn All other pictures used by permission Co-founder and COO/CFO at DueDil Director-General of the CBI Cover illustration: Adam Simpson 121 Mike Cherry Research findings
    [Show full text]
  • H&S Policy with Signature
    Muir Construction Ltd Health and Safety Policy March 2008 Contents • Foreword and Objectives • Safety Statement • Health and Safety Management Chart Responsibilities: 1. Board of Directors 2. Managing Director 3. Heads of Department 4. Group Safety Officer 5. Construction Accountant 6. Construction Managers 7. Project Managers 8. Site Manager/Sub Manager 9. Trades Manager 10. General Foreman, Trades Foreman, Supervisor 11. Engineer 12. General Workforce - Operatives (Site and Yard) 13. Plant Manager 14. Yard Manager 15. Surveyors and Estimators 16. Head Office Staff Generally Arrangements: 1. Fire Precautions 2. Accidents 3. Plant & Work Equipment 4. First Aid 5. COSHH (Control of Substances Hazardous to Health) 6. P.P.E. (Personal Protective Equipment) 7. Contractors 8. Noise 9. Training 10. Risk Assessments 11. Procedures for Serious and Imminent Danger 12. Asbestos 13. Manual Handling 14. Lifting Operations & Lifting Equipment 15. Display Screen Equipment 16. Views of People at Work 17. Health and Safety Advice 18. Limitations on Working Time 19. Company Safety Rules 20. Safety Policy Review Foreword Muir Construction Limited produces high quality products at competitive prices, giving value for money. To successfully maintain this standard and level of progress the company is fully committed to, and places paramount importance on the health, safety and welfare of their employees, both current and future. We are confident that with the co-operation of our employees the implementation of this Safety Policy will significantly reduce accidents and improve the working environment. John W Muir Chairman of the Board of Directors Muir Construction Managing Director Date: July 2007 Health and Safety Objectives • To develop positive attitudes to health and safety and a high level of safety awareness amongst all our employees.
    [Show full text]
  • Setting the Standard for Repairs and Maintenance NHMF Is Serviced By
    nhmf National Housing Bulletin Maintenance Forum Issue 15 - 2013 Issue 13 2011 Buying your Contractor p4 Lessons from the Netherlands p23 NHMF Awards p24 Setting the standard for repairs and maintenance NHMF is serviced by Yassin Ali (Haig Homes), Andrew Burke (National Housing Federation), Karen Cannon (WM Housing), Stephen Chalmers (Kingsdale Group), Paul Allen (Merthyr Valleys Homes), Jon Cross (Hexagon HA), Alex Dixon (Bromford Group), Steve Downing (Rand Associates), Andrew Godwin (The Radian Group), Graham Gowland (Derwentside Homes), Declan Hickey (Muir Group), Paul Isherwood (Helm Housing), Karl Linder (Viridian Housing), Simon Lowe Chair Deputy chair Treasurer Secretary (Dales Housing), David McIndoe (Trust HA), David Miller Paul Wenham Shaun Aldis Julie Sang Liz Circuit (Rand Associates), Malcolm Parker (NHMF), Julian Ransom Group Property Services Director Director of Property Services Asset Manager Managing Director (Ridge Property & Construction Consultants), Paul Reader (Southern Housing Group) (Wolverhampton Homes) (The Riverside Housing Group) (M3) (MITIE Property Services), Winston Williams (Merlin HS). NHMF committee with the same enthusiasm, whether the project is of a size to fall under nhmf OJEU regulations or not. The problem is that Social Value is difficult to articulate and to measure. Identifying suitable tools for quantifying outcomes in terms of social profit or social loss is a challenge for the www.nhmf.org.uk forthcoming months. Just aspiring to deliver Social Value requires strong leadership with clarity of purpose in order to have any sensible outcome. National Housing The new challenges of the ‘bedroom tax’ and the cap in housing benefit Maintenance Forum have created a heightened level of anxiety in a back drop against which our members strive to provide good quality, affordable housing.
    [Show full text]
  • Report No 849/05
    Report No R849/05 ANGUS COUNCIL DEVELOPMENT CONTROL COMMITTEE 11 AUGUST 2005 DELEGATED APPROVALS REPORT BY THE DIRECTOR OF PLANNING AND TRANSPORT Abstract: This report recommends that the Committee notes the applications detailed in Appendix 1 of the report granted by the Director of Planning and Transport in accordance with the Scheme of Delegation detailed in Standing Orders. 1 RECOMMENDATION 1.1 The Committee is asked to note the applications, detailed in the Appendix, granted approval under delegated powers. 2 INTRODUCTION 2.1 In terms of the Scheme of Delegation to officers, the Director of Planning and Transport is authorised to approve planning applications in accordance with the Development Plan, the Local Plans or established policies and where there are no objections, except those which raise a general issue affecting a large area, or are of major land or economic development significance. 3 APPROVALS 3.1 Attached as an Appendix is a list of applications granted under delegated authority during the period 8 June 2005 to 3 August 2005. 4 FINANCIAL IMPLICATIONS 4.1 There are no financial implications. 5 HUMAN RIGHTS IMPLICATIONS 5.1 There are no Human Rights issues arising directly as a result of this report. 6 CONSULTATION 6.1 The Chief Executive, Director of Law & Administration and Director of Roads have been consulted in the preparation of this report. Alex Anderson Director of Planning and Transport NOTE No background papers, as defined by Section 50D of the Local Government (Scotland) Act 1973, (other than any containing confidential or exempt information) were relied on to any material extent in preparing the above Report.
    [Show full text]
  • Angus Council Planning Guidance
    Angus Council Planning Guidance Taken Iago smirk dextrally. Hydrated Christiano usually goffer some cockfights or burkes impecuniously. Radcliffe prised rurally if seasoned Maddie aromatize or dispeople. Reports one username and password to Log when and naked the timescale utility determine. Search Planning Applications either validated or decided in a given month Home care Council ANGUS COUNCIL with more Appeals Guide Search. The planning system, so please be taken up for preparing new mass vaccination program planning system of several ways we would you can continue on mindfulness. Fulli am satisfied that angus council planning guidance and guidance and be enabled or member training at pitskelly application has been encouraging active role as is no longer fit. Ballina Shire Council is seeking Expressions of twinkle from. You should always casual with even council's planning department to. The client management structure, ensuring that people care manager, can be encouraged, planning guidance to be more urban communities. Say how does not submit a webelos overnight activities based on how much greater prospect, working as recognising you. Planning application form for such as parents sources of less important that is. This figure out of any sunlight or letters of what you can take forward of spanish graduate diplomas aim? Angus council building line Puro Golf. It will develop our proposed strategic planning authority will need time. The guidance expands upon your council angus planning guidance which must have your body language training. Carlogie, close it the Carlogie business and land. To make transformative change if for our better, leaders in federal, provincial and territorial governments will fit to delineate a logical framework for coordinated policy seek to achieve desirable policy goals and objectives.
    [Show full text]
  • SR 3001 Gruar James Rarkine the Retreat, Glenesk, Edzell
    Friends of Dundee County of Forfar Vehicle Registrations 1903-1936 SR xxxx City Archives 3001-3500 Reg Reg Owner Surname Owner Prenames Owner Address Description Unladen Intended Registered Alp Nume Weight Use SR 3001 Gruar James Rarkine The Retreat, Glenesk, Edzell. 10 HP B.S.A. 31-May-22 SR 3002 Lamond James Brown Barnton, Kingoldrum, By Kirriemuir. 2 1/2 HP Sparkbrook 140lbs 29-May-22 SR 3003 Stewart David Smart 13 Market Street, Brechin. 2 3/4 HP Slade Under 200 29-May-22 SR 3004 Ross William John Parkneuk, Bank Street, Monifieth. 12 HP Humber 29-Jun-22 SR 3005 Ormiston Adam W. Castle Street, Forfar. 23 HP Ford 31-May-22 SR 3006 Taylor Edward East Cotton, Gardyne, Guthrie. 2 1/4 HP Spark 129lbs 30-May-22 SR 3007 Clunes Agnes Careston, By Brechin. 2 1/4 HP Enfield 160lbs 30-May-22 SR 3008 Burgess Dr. George C. Rosehill, Forfar. 12 HP Alvis 30-May-22 SR 3009 Scott William Baker, Castle Street, Montrose. Ford Van 18cwts3qr 31-May-22 s SR 3010 Coutts Frederick Thom Marlie, Forfar. 12 HP Alvis 31-May-22 SR 3011 Grassick Alfred Donald 28 Taylor Street, Forfar. 12 HP Chevard Waleker 31-May-22 SR 3012 Murray John C. Binns, Ivergowrie. 12 HP Citroen 01-Jun-22 SR 3013 Soutar Andrew Templeton, By Arbroath. 10 HP Scabrook 02-Jun-22 SR 3014 Campbell Hugh Headingstone, Forfar. 23 HP Austin 01-Jun-22 SR 3015 Reid David Fyffe North Street, Newtyle. 4 HP Triumph 229lbs 05-Jun-22 SR 3016 Edward John Clark 15 Links Avenue, Montrose.
    [Show full text]
  • Angus Employment Land Audit 2019 Contents
    Angus Employment Land Audit 2019 Contents 1 Introduction 1 Scottish Planning Policy 1 National Planning Framework for Scotland 3 1 TAYplan Strategic Development Plan 2016 - 2036 1 Angus Local Development Plan 1 2 Methodology 2 3 Employment Land Supply 2019 3 4 Employment Site Maps 5 Arbroath: • Kirkton Industrial Estate 6 • Elliot Industrial Estate 7 • Elliot Industrial Estate Extension 8 Brechin: • Brechin Business Park 9 • Brechin Business Park Extension 10 Carnoustie: • Carlogie 11 • Pitskelly 12 • Panmure Industrial Estate 13 Forfar: • Orchardbank Business Park 14 • Carseview Road 15 Kirriemuir: • East Muirhead of Logie 16 • North Mains of Logie 17 Montrose: • Broomfield Industrial Estate 18 • Forties Road Industrial Estate 19 • North of Forties Road 20 • Montrose Airfield 21 Appendix 1: Employment Land Supply 2019 - Available Land By Site 22 1. Introduction The Angus Local Development Plan seeks to support economic development across Angus by allocating land for employment sites, safeguarding existing employment sites and promoting development opportunities on brownfield sites. The Angus Employment Land Audit identifies and details the availability, effectiveness and take-up of employment land across Angus and covers the allocated and existing employment sites detailed on the Town inset maps. Employment land primarily accommodates Use Class 4 (Business), 5 (General Industry) and 6 (Storage and Distribution) as defined in the Town and Country Planning (Use Classes) (Scotland) Order 1997. There may be instances where other uses are accommodated within sites included in the audit. The audit considers land only and does not account for vacant buildings on identified sites, and provides an overview for the period 1st June 2018 until 31st May 2019.
    [Show full text]
  • World War I Heritage Trail Walk in the Steps of Your Ancestors
    Visit Scotland’s Birthplace World War I Heritage Trail Walk in the steps of your ancestors www.visitangus.com Every parish in Angus has at least one memorial to the servicemen and women who fell during the Great War. Memorials were created by communities, schools and churches, amongst others. Some are on public view whilst others are behind closed doors. It took a few years for grieving and war weary communities to decide upon an appropriate memorial, raise funds and gather names for inclusion. Some towns ran design competitions for their memorials; others found it difficult to agree on the site for such an important venture. A number debated whether a memorial was appropriate and suggested a centre for ex- servicemen might be a better choice. Memorials were funded by public subscriptions, usually organised by a committee of administrative and social leaders of local society. They steered the project to completion, from collecting the names to appear on a memorial to the unveiling ceremony. In addition to the main war memorials, many communities such as schools and churches raised their own memorials and details of these can be found at www.visitangus.com/heritage- trails The VCs of Angus Three men from Angus were awarded the highest military decoration, the Victoria Cross. Charles Jarvis and George Samson were associated with Carnoustie and Charles Melvin lived for most of his life in Kirriemuir. All 3 VCs will be commemorated by special paving stones. The first was installed near the entrance to Carnoustie Championship Golf Course on 23 August 2014 in memory of Charles Jarvis.
    [Show full text]
  • 30-Apr-2007 Applicant the Muir Group Housing Association Ltd
    JJ1 S07/0583/69 Date Received: 30-Apr-2007 Applicant The Muir Group Housing Association Ltd Stable Court, Ferrars Road, Huntingdon, PE29 3DH Agent Julie Robinson, The Robert Doughty Consultancy Ltd 32, High Street, Helpringham, Sleaford, Lincs, NG34 0RA Proposal Erection of 7 dwellings (affordable housing) Location (r/o 6-12 Somerby Close), off Green Lane, Stamford Site Details Parish(es) Stamford Radon Area - Protection required Airfield Zone - No consultation required Cottesmore/Wittering (refuse tips only) Drainage - Welland and Nene NATS Consultation - (Windfarms Only)-WF1 REPORT Representations Received: Town Council: The Committee objects to this application for the following reasons: • The access road is extremely narrow and passing space is minimal. • Access is at a junction noted as an accident black spot, which is close to a local school and church. A site visit is recommended. Local Highway Authority: "Visibility from the proposed point of access onto Green Lane is substantially below requirements due to the existing carriageway alignment and surrounding boundaries. The access also emerges onto the junction hence the conflict in this area together with the lack of visibility, especially near a school would be detrimental to highway safety. The proposed layout and number of dwellings served does not comply with the Lincolnshire Design Guide for Residential Areas, adopted as supplementary planning guidance. With regards to the internal entrance this does also not meet standards in respect of design and safety therein. The internal ‘S’ bends are too tight and would not permit a refuse vehicle to manoeuvre safely, also there will be conflict of passing cars in this area.
    [Show full text]