Book TAM HOVING.Indb

Total Page:16

File Type:pdf, Size:1020Kb

Book TAM HOVING.Indb Pinas Drawings Table 4. Key to parts shown Ship compartments: I cable tier on the plans of the pinas A hold J forecastle (see plan drawings 1–5 B forepeak K forecastle deck or forecastle head following table). C protective bulwark for the pumps L upper deck D powder room M steering stand E cheese and bread room N captain’s cabin F peak O quarterdeck G gunroom (also called the tiller P forward compartment of the cabin fl at) Q aft compartment of the cabin H lower deck or main deck R poop deck Note: All dimensions in the Thick and Wide columns are in centimeters. The listed parts are shown on drawing 2 unless a different drawing is indicated in the Drawing column. Number Part Thick Wide Drawing General 1 keel (L = 29.43 m) 42 57 2 2 stem 35 70 2 3 sternpost 35 110 2 4 sternpost knee 16 35 2 5 keelson 23 67 2 6 wing transom 35 38 5 7 fashion piece 21 62 5 8 rabbet 8 9 2 9 broekstuk 18 100 2 10 transom 24 35 5 11 bottom planks 10 50 2 12 bilge planks 10 50 2 13 side planking 8 50 2 14 tingel 2162 15 wale 17 34 3 16 wale 16 34 3 17 wale 12 25 3 18 wale 10 25 3 19 sheer rail 10 22 3 20 fi lling strakes 6 3 2 21 upper-works plank 4 50 3 22 washstrake 4 50 3 23 rail 4 13 2 24 hance 4 13 2 25 fore channel 8 42 3 26 main channel 9 44 3 27 mizzen channel 7 23 3 28 chesstree 20 21 3 A: Hold 29 fl oor timber 23 24 2 30 bilge futtock 23 24 2 31 futtock 16 23 2 265 BBookook TTAMAM HHOVING.indbOVING.indb 226565 11/17/12/17/12 44:41:41 PMPM Appendix Table 4. (continued) Number Part Thick Wide Drawing 32 top timber 16 23 2 33 bilge stringer 12 49 2 34 lower deck clamp 14 65 2 35 ceiling plank 10 50 2 36 breasthook, rider fl oor 20 25 2 37 bilge rider 20 25 2 38 knee on the broekstuk 20 20 2 39 foremast step 26 71 2 40 stemson 26 — 2 41 lower deck beam (camber 21 cm) 31 34 2 42 binding strake 12 44 2 43 waterway 16 49 2 44 ledge 9 9 2 45 carling 10 10 2 46 deck plank 7 50 2 47 hanging knee 20 25 2 48 rider 26 30 2 B–F: Storeroom and Peak 49 post 10 10 2 50 plank 3 50 2 G: Gunroom 51 chock 10 10 2 52 rudder 26 75 2 53 tiller 5 15 2 54 whipstaff 10 10 2 55 sweep 12 12 2 56 mizzenmast step 21 36 2 57 wing transom knee 28 28 2 58 transom knee 20 20 2 59 spirketing 9 39 2 60 beam clamp 8 47 2 61 ceiling plank 8 42 2 62 hanging knee 18 21 2 63 deck beam (camber 14 cm) 23 26 2 64 ledge 7 9 2 65 carling 9 9 2 66 waterway 8 42 2 67 binding strake 8 36 2 68 deck plank 5 50 2 69 spirketing 7 26 2 H: Lower Deck 70 upper deck clamp 8 47 2 71 ceiling plank 7 50 2 72 hanging knee 8 21 2 73 upper deck beam (camber 23 cm) 21 23 2 266 BBookook TTAMAM HHOVING.indbOVING.indb 226666 11/17/12/17/12 44:41:41 PMPM Pinas Drawings Number Part Thick Wide Drawing 74 ledge 7 9 2 75 carling 9 9 2 76 waterway 10 49 2 77 binding strake 12 44 2 78 plank 5 50 2 79 capstan step 21 36 2 80 main knight 43 46 2 81 bitt 26 28 2 82 galley plank 4 50 2 83 galley post 7 8 2 84 butlery plank 4 50 2 85 butlery post 7 8 2 86 mast partner 16 131 2 87 hatch coaming 10 10 2 88 hatch 3 — 2 89 bulwark post 10 10 2 90 bulwark plank 4 50 2 I: Cable Tier 91 spirketing 7 26 2 92 beams clamp 9 47 2 93 deck beam (camber 18 cm) 23 26 2 94 hanging knee 21 21 2 95 ledge 7 9 2 96 carling 9 9 2 97 waterway 12 57 2 98 binding strake 8 36 2 99 plank 5 50 2 J: Forecastle 100 spirketing 8 47 2 101 beam clamp 4 25 2 102 ceiling 4 50 2 103 deck beam (camber 31 cm) 13 21 2 104 ledge 5 5 2 105 carling 5 5 2 106 waterboard 10 26 2 107 binding strake 5 20 2 108 plank 4 50 2 109 hanging knee 13 16 2 110 foremast partner 12 100 2 111 bitt 39 42 2 112 bolster 30 40 2 113 bitt knee 26 50 2 114 hatch coaming 6 20 2 115 bulkhead stanchion 10 10 2 116 bulkhead plank 4 50 2 267 BBookook TTAMAM HHOVING.indbOVING.indb 226767 11/17/12/17/12 44:41:41 PMPM Appendix Table 4. (continued) Number Part Thick Wide Drawing K: Forecastle Head 117 fore knight 39 41 2 118 bitt standard 26 26 2 119 bolster 14 14 2 120 hatch coaming 10 21 3 121 ledge 4 5 3 122 batten 2 10 3 123 forecastle head rail 21 24 3 124 stanchion 5 8 2 125 rail 4 13 2 126 pinrail 11 21 3 L: Upper Deck 127 ceiling or inwale 7 — 2 128 gunwale or capping rail 4 8 2 129 hatch coaming 14 26 2 130 ledge 5 6 2 131 carling 2 10 2 132 kevel 8 28 2 133 pin rail 8 14 2 134 bitt 14 18 2 135 capstan partner 10 64 2 136 capstan — 52 2 M–N: Steering Stand and Captain’s Cabin 137 spirketing 7 26 2 138 deck clamp 4 25 2 139 ceiling 4 50 2 140 deck beam (camber 31 cm) 13 21 2 141 hanging knee 13 16 2 142 ledge 5 5 2 143 carling 6 6 2 144 waterboard 8 42 3 145 binding strake 5 18 3 146 deck plank 5 50 2 147 mizzenmast partner 11 70 2 148 stanchion 10 10 2 149 plank 3 50 2 O: Quarterdeck 150 rail 4 13 2 151 stanchion 5 18 2 152 mizzen knight 21 26 2 153 kevel 5 14 2 154 pinrail 10 21 2 268 BBookook TTAMAM HHOVING.indbOVING.indb 226868 11/17/12/17/12 44:41:41 PMPM Pinas Drawings Number Part Thick Wide Drawing P: Forward Compartment of the Cabin 155 ceiling 5 50 2 156 deck beam (camber 34 cm) 13 21 2 157 ledge 5 5 2 158 waterboard 5 24 3 159 plank 3 50 2 160 hanging knee 10 13 2 Stern Gallery 161 counter timber 12 14 3 162 fi rst hackebord 10 35 3 163 fi rst cover 5 34 3 164 second hackebord 5383 165 second cover 5 35 3 166 third cover 5 26 3 167 third hackebord 10 50 3 168 cross of the fl at of stern 6 14 3 169 post 9 12 3 170 central stanchion 16 18 3 171 stern timber 15 28 3 172 plank 3 50 2 173 cornice 7 21 3 174 herm fi gures 25 25 3 175 quarter console 40 40 3 176 statues in the side 21 26 3 177 pediment of the quarter gallery 5 17 2 178 cover 5 25 3 179 quarter gallery architrave 5 26 3 180 lodging knee 10 14 3 Beakhead 181 lower beakhead spur 36 44 2 182 upper beakhead spur 26 36 2 183 beakhead knee 14 33 2 184 beakhead top knee 11 25 2 185 cheek 15 28 2 186 kam 8 25 2 187 es 26 38 2 188 lion 53 — 2 189 fi rst headrail 11 37 2 190 second headrail 11 31 2 191 third headrail 3 31 2 192 cathead 21 26 3 193 cathead bracket 26 28 2 194 crosspiece 14 15 2 195 beam 6 7 2 269 BBookook TTAMAM HHOVING.indbOVING.indb 226969 11/17/12/17/12 44:41:41 PMPM Appendix Table 4. (continued) Number Part Thick Wide Drawing 196 batten 3 4 2 197 rib 14 19 2 Masts and Spars: Mainmast 198 top 9 283 5 199 trestletree 12 20 5 200 rim 6 13 5 201 border 1 9 5 202 lubber’s hole 147 — 5 203 knee 7 10 5 204 masthead 39 198 (L) 4 205 mainmast 57 2264 (L) 4 206 main-topmast 37 1443(L) 4 207 crosstree and trestletree 6 10 5 208 topmast masthead 10 85 (L) 4 209 topgallant mast 14 623 4 210 crosstree 3 5 4 211 topgallant masthead 35 184 (L) 4 Foremast 212 top 8 255 5 213 crosstree and trestletree 11 18 5 214 rim 6 13 5 215 border 1 9 5 216 lubber’s hole 119 — 5 217 knee 6 9 5 218 fore masthead 35 184 (L) 4 219 foremast 51 1981 (L) 4 220 fore topmast 30 1160 (L) 4 221 crosstree and trestletree 5 9 4 222 fore top masthead 20 99 (L) 4 223 fore-topgallant mast 13 509 (L) 4 224 crosstree and trestletree 3 5 4 225 fore-topgallant masthead 9 35 (L) 4 Bowsprit 226 bowsprit 57 1698 (L) 4 227 top 6 127 5 228 crosstree and trestletree 5 9 5 229 knee for the spritsail topmast 13 — 4 230 rim 6 12 5 231 border 1 9 5 232 knee 4 5 5 233 spritsail topmast 13 566 (L) 4 234 crosstree and trestletree 3 5 4 235 spritsail topmasthead 10 57 (L) 4 270 BBookook TTAMAM HHOVING.indbOVING.indb 227070 11/17/12/17/12 44:41:41 PMPM Pinas Drawings Number Part Thick Wide Drawing Mizzenmast 236 mizzenmast 57 1698 4 237 top 6 127 5 238 crosstree and trestletree 5 9 5 239 rim 6 12 5 240 border 1 9 5 241 lubber’s hole — 63 5 242 knee 4 5 5 243 mizzen masthead 38 127 (L) 4 244 mizzen topmast 14 736 (L) 4 245 crosstree and trestletree 3 5 4 246 mizzen top masthead 10 85 (L) 4 Flagpoles 247 fl agpole 12 736 4 248 fl agpole 12 712 4 249 fl agpole 11 582 4 250 fl agpole 7 614 4 251 fl agpole 7 426 4 Yards 252 main yard 41 1953 4 253 main topsail yard 23 1019 4 254 main-topgallant yard 14 623 4 255 foreyard 37 1714 4 256 fore topsail yard 17 906 4 257 fore-topgallant yard 13 453 4 258 mizzen yard 24 1755 4 259 crossjack yard 13 1019 4 260 mizzen topsail yard 13 538 4 261 spritsail yard 23 1274 4 262 spritsail topsail yard 14 566 4 Standing Rigging (Drawing 4) anchor cable 11 2 1 mainstay 11 2 2 forestay 8 2 3 mizzen stay 4 2 4 main-topmast stay 4 2 5 fore topmast stay 3 2 6 mizzen topmast stay 1 2 7 main-topgallant stay 1 2 8 fore-topgallant stay 1 2 9 sprit topmast backstay 2 2 10 main shroud 5 2 11 main-topmast shroud 3 2 12 main-topgallant mast shroud 2 2 271 BBookook TTAMAM HHOVING.indbOVING.indb 227171 11/17/12/17/12 44:41:41 PMPM Appendix Table 4.
Recommended publications
  • Appropriate Sailing Rigs for Artisanal Fishing Craft in Developing Nations
    SPC/Fisheries 16/Background Paper 1 2 July 1984 ORIGINAL : ENGLISH SOUTH PACIFIC COMMISSION SIXTEENTH REGIONAL TECHNICAL MEETING ON FISHERIES (Noumea, New Caledonia, 13-17 August 1984) APPROPRIATE SAILING RIGS FOR ARTISANAL FISHING CRAFT IN DEVELOPING NATIONS by A.J. Akester Director MacAlister Elliott and Partners, Ltd., U.K. and J.F. Fyson Fishery Industry Officer (Vessels) Food and Agriculture Organization of the United Nations Rome, Italy LIBRARY SOUTH PACIFIC COMMISSION SPC/Fisheries 16/Background Paper 1 Page 1 APPROPRIATE SAILING RIGS FOR ARTISANAL FISHING CRAFT IN DEVELOPING NATIONS A.J. Akester Director MacAlister Elliott and Partners, Ltd., U.K. and J.F. Fyson Fishery Industry Officer (Vessels) Food and Agriculture Organization of the United Nations Rome, Italy SYNOPSIS The plight of many subsistence and artisanal fisheries, caused by fuel costs and mechanisation problems, is described. The authors, through experience of practical sail development projects at beach level in developing nations, outline what can be achieved by the introduction of locally produced sailing rigs and discuss the choice and merits of some rig configurations. CONTENTS 1. INTRODUCTION 2. RISING FUEL COSTS AND THEIR EFFECT ON SMALL MECHANISED FISHING CRAFT IN DEVELOPING COUNTRIES 3. SOME SOLUTIONS TO THE PROBLEM 3.1 Improved engines and propelling devices 3.2 Rationalisation of Power Requirements According to Fishing Method 3.3 The Use of Sail 4. SAILING RIGS FOR SMALL FISHING CRAFT 4.1 Requirements of a Sailing Rig 4.2 Project Experience 5. DESCRIPTIONS OF RIGS USED IN DEVELOPMENT PROJECTS 5.1 Gaff Rig 5.2 Sprit Rig 5.3 Lug Sails 5.3.1 Chinese type, fully battened lug sail 5.3.2 Dipping lug 5.3.3 Standing lug 5.4 Gunter Rig 5.5 Lateen Rig 6.
    [Show full text]
  • Mast Furling Installation Guide
    NORTH SAILS MAST FURLING INSTALLATION GUIDE Congratulations on purchasing your new North Mast Furling Mainsail. This guide is intended to help better understand the key construction elements, usage and installation of your sail. If you have any questions after reading this document and before installing your sail, please contact your North Sails representative. It is best to have two people installing the sail which can be accomplished in less than one hour. Your boat needs facing directly into the wind and ideally the wind speed should be less than 8 knots. Step 1 Unpack your Sail Begin by removing your North Sails Purchasers Pack including your Quality Control and Warranty information. Reserve for future reference. Locate and identify the battens (if any) and reserve for installation later. Step 2 Attach the Mainsail Tack Begin by unrolling your mainsail on the side deck from luff to leech. Lift the mainsail tack area and attach to your tack fitting. Your new Mast Furling mainsail incorporates a North Sails exclusive Rope Tack. This feature is designed to provide a soft and easily furled corner attachment. The sail has less patching the normal corner, but has the Spectra/Dyneema rope splayed and sewn into the sail to proved strength. Please ensure the tack rope is connected to a smooth hook or shackle to ensure durability and that no chafing occurs. NOTE: If your mainsail has a Crab Claw Cutaway and two webbing attachment points – Please read the Stowaway Mast Furling Mainsail installation guide. Step 2 www.northsails.com Step 3 Attach the Mainsail Clew Lift the mainsail clew to the end of the boom and run the outhaul line through the clew block.
    [Show full text]
  • Mainsail Trim Pointers, Reefing and Sail Care for the Beneteau Oceanis Series
    Neil Pryde Sails International 1681 Barnum Avenue Stratford, CT 06614 203-375-2626 [email protected] INTERNATIONAL DESIGN AND TECHNICAL OFFICE Mainsail Trim Pointers, Reefing and Sail Care for the Beneteau Oceanis Series The following points on mainsail trim apply both to the Furling and Classic mainsails we produce for Beneteau USA and the Oceanis Line of boats. In sailing the boats we can offer these general ideas and observations that will apply to the 311’s through to the newest B49. Mainsail trim falls into two categories, upwind and downwind. MAINSAIL TRIM: The following points on mainsail trim apply both to the Furling and Classic mainsail, as the concepts are the same. Mainsail trim falls into two categories, upwind and downwind. Upwind 1. Upwind in up to about 8 knots true wind the traveler can be brought to weather of centerline. This ensures that the boom will be close centerline and the leech of the sail in a powerful upwind mode. 2. The outhaul should be eased 2” / 50mm at the stopper, easing the foot of the mainsail away from the boom about 8”/200mm 3. Mainsheet tension should be tight enough to have the uppermost tell tail on the leech streaming aft about 50% of the time in the 7- 12 true wind range. For those with furling mainsails the action of furling and unfurling the sail can play havoc with keeping the telltales on the sail and you may need to replace them from time to time. Mainsail outhaul eased for light air upwind trim You will find that the upper tell tail will stall and fold over to the weather side of the sail about 50% of the time in 7-12 knots.
    [Show full text]
  • U.S. Navy Ships-Of-The-Line
    U.S. Navy – Ships-of-the-line A Frigate vs A Ship-of-the-Line: What’s the difference? FRIGATE: A vessel of war which is: 1) “ship” rigged, i.e. – with at least three masts (fore, main, & mizzen) & each mast carries the horizontal yards from which the principle sails are set; 2) this “ship-rigged vessel of war” is a FRIGATE because it has one covered, principle gun deck – USS Constitution is therefore a FRIGATE by class (illus. left) SHIP-OF-THE-LINE: A vessel of war which is: 1) “ship” rigged (see above); 2) this “ship-rigged vessel of war” is a SHIP-OF-THE-LINE because it has two or more covered gun decks – HMS Victory is therefore a SHIP-OF-THE-LINE by class (illus. right) HMS Victory (1765); 100+ guns; 820 officers Constitution preparing to battle Guerriere, & crew; oldest commissioned warship in the M.F. Corne, 1812 – PEM Coll. world, permanently dry docked in England Pg. 1 NMM Coll. An Act, 2 January 1813 – for the construction of the U.S. Navy’s first Ships-of-the-line USS Independence was the first ship-of-the-line launched for the USN from the Boston (Charlestown) Navy Yard on 22 June 1814: While rated for 74-guns, Independence was armed with 87 guns when she was launched. USS Washington was launched at the Portsmouth Navy Yard, 1 October 1814 USS Pennsylvania – largest sailing warship built for the USN USS Pennsylvania – rated for 136 guns on three covered gun decks + guns on her upper (spar) deck – the largest sailing warship ever built.
    [Show full text]
  • Sailing Course Materials Overview
    SAILING COURSE MATERIALS OVERVIEW INTRODUCTION The NCSC has an unusual ownership arrangement -- almost unique in the USA. You sail a boat jointly owned by all members of the club. The club thus has an interest in how you sail. We don't want you to crack up our boats. The club is also concerned about your safety. We have a good reputation as competent, safe sailors. We don't want you to spoil that record. Before we started this training course we had many incidents. Some examples: Ran aground in New Jersey. Stuck in the mud. Another grounding; broke the tiller. Two boats collided under the bridge. One demasted. Boats often stalled in foul current, and had to be towed in. Since we started the course the number of incidents has been significantly reduced. SAILING COURSE ARRANGEMENT This is only an elementary course in sailing. There is much to learn. We give you enough so that you can sail safely near New Castle. Sailing instruction is also provided during the sailing season on Saturdays and Sundays without appointment and in the week by appointment. This instruction is done by skippers who have agreed to be available at these times to instruct any unkeyed member who desires instruction. CHECK-OUT PROCEDURE When you "check-out" we give you a key to the sail house, and you are then free to sail at any time. No reservation is needed. But you must know how to sail before you get that key. We start with a written examination, open book, that you take at home.
    [Show full text]
  • Sunfish Sailboat Rigging Instructions
    Sunfish Sailboat Rigging Instructions Serb and equitable Bryn always vamp pragmatically and cop his archlute. Ripened Owen shuttling disorderly. Phil is enormously pubic after barbaric Dale hocks his cordwains rapturously. 2014 Sunfish Retail Price List Sunfish Sail 33500 Bag of 30 Sail Clips 2000 Halyard 4100 Daggerboard 24000. The tomb of Hull Speed How to card the Sailing Speed Limit. 3 Parts kit which includes Sail rings 2 Buruti hooks Baiky Shook Knots Mainshoat. SUNFISH & SAILING. Small traveller block and exerts less damage to be able to set pump jack poles is too big block near land or. A jibe can be dangerous in a fore-and-aft rigged boat then the sails are always completely filled by wind pool the maneuver. As nouns the difference between downhaul and cunningham is that downhaul is nautical any rope used to haul down to sail or spar while cunningham is nautical a downhaul located at horse tack with a sail used for tightening the luff. Aca saIl American Canoe Association. Post replys if not be rigged first to create a couple of these instructions before making the hole on the boom; illegal equipment or. They make mainsail handling safer by allowing you relief raise his lower a sail with. Rigging Manual Dinghy Sailing at sailboatscouk. Get rigged sunfish rigging instructions, rigs generally do not covered under very high wind conditions require a suggested to optimize sail tie off white cleat that. Sunfish Sailboat Rigging Diagram elevation hull and rigging. The sailboat rigspecs here are attached. 650 views Quick instructions for raising your Sunfish sail and female the.
    [Show full text]
  • Opti - Wet Feet Instructor Manual and Resources
    Canadian Yachting Association Association canadienne de yachting Opti - Wet Feet Instructor Manual and Resources Written and Illustrated by: Tine Moberg-Parker Jenn Grierson of ACKNOWLEDGEMENTS e purpose of this manual is to help sailing instructors conduct a Learn to Sail Wet Feet program. e Wet Feet program was designed with the intent to help introduce young athletes to sailing. One of the main objectives of this program is to breakdown the fundamental skills required for sailing into their distinct components. is will help to reinforce proper form at a very young age, and help ensure that they don’t develop bad habits. Development Team Tine Moberg-Parker (2008), Executive Director of the British Columbia Sailing Association Jenn Grierson (2008), Master Learning Facilitator, &Learn to Race Evaluator Publisher: Canadian Yachting Association Portsmouth Olympic Harbour 53 Yonge Street Kingston, Ontario K7M 6G4 [email protected] www.sailing.ca ISBN 978-0-920232-41-5 Canadian Yachting Association Association canadienne de yachting Sailing for Gold Sailing for Life Long Term Athlete Development’s Fundamental Stage TABLE OF CONTENTS 1. Introduction ....................................................................................................................5 Preparing for the Session 5 Setting up the Learning Environment 5 2. Day 1 ..................................................................................................................................7 Getting to Know the Boats 7 Safety 7 This is Your Tiller 7 Sailing Fully
    [Show full text]
  • Setting, Dousing and Furling Sails the Perception of Risk Is Very Important, Even Essential, to Organization the Sense of Adventure and the Success of Our Program
    Setting, Dousing and Furling Sails The perception of risk is very important, even essential, to Organization the sense of adventure and the success of our program. The When at sea the organization for setting and assurance of safety is essential dousing sails will be determined by the Captain to the survival of our program and the First Mate. With a large and well- and organization. The trained crew, the crew may be able to be broken balancing of these seemingly into two groups, one for the foremast and one conflicting needs is one of the for the mainmast. With small crews, it will most difficult and demanding become necessary for everyone to know and tasks you will have in working work all of the lines anywhere on the ship. In with this program. any event, particularly if watches are being set, it becomes imperative that everyone have a good understanding of all lines and maneuvers the ship may be asked to perform. Safety Sailing the brigantines safely is our primary goal and the Los Angeles Maritime Institute has an enviable safety record. We should stress, however, that these ships are NOT rides at Disneyland. These are large and powerful sailing vessels and you can be injured, or even killed, if proper procedures are not followed in a safe, orderly, and controlled fashion. As a crewmember you have as much responsibility for the safe running of these vessels as any member of the crew, including the ship’s officers. 1. When laying aloft, crewmembers should always climb and descend on the weather side of the shrouds and the bowsprit.
    [Show full text]
  • 420 Tuning Hints
    420 Tuning suggestions College of Charleston 2012 Boat Setup on land: 1) Before sailing check that your shroud pin/ring dings are taped and secure, your tiller extension universal is solid, there’s no wiggle in your pintles and your hiking straps knots secure. 2) Tie your main halyard to the head of your main with a figure eight through the headboard grommet and then a half hitch back around the halyard. (see picture) 3) Hoist your jib and tension the rig tightly by placing a foot on the bow and pulling on the head stay while your team mate tensions the jib halyard. Don’t be afraid to over tension at this point as you’ll double check and most likely reset the tension once on the water. It’s easier to loosen once sailing than to tighten it! 4) Hoist your main and tension the halyard tightly. Use the 2:1 purchase to sock it up tight to the top of the mast. Again, it’s much easier to set it up tight on the dock than to rehoist once sailing! Set up on the water, before the start: 1) Trim your sails and head upwind. 2) Watch/study your leeward shroud as it is your guide to proper rig tension (through jib halyard tension). 3) Ideally the leeward shroud will just start to slacken to the point a slight wiggle (not more than ½”) is visible when the main is sheeted to maximum trim for the breeze/conditions at that time. Note: The advantage of using the “leeward shroud wiggle” is that you can gauge the amount of tension based on a given condition.
    [Show full text]
  • OPPI Rigging Guide 3/2008
    OPPI Rigging Guide 3/2008 McLaughlin Boat Works optistuff.com Thanks for purchasing OPPI, the most durable and F-U-N sailboat available. Rigging your OPPI is easy and the following pictures make it a breeze (pun intended!). - Tools you may need: two 9/32” (7mm) wrenches or adjustable wrenches (for assembly of tiller/rudder). 1. Check that your OPPI package includes: hull, tiller and extension, spars (mast, boom and sprit), rudder, multi-color sail in bag, line and block pack, mast extender, and daggerboard. - Open line pack and check for: a. mainsheet 19’ x 3/8” braided line b. sprit adjuster 65” x 5/16” line c. boom vang 40” x 5/16” line d. outhaul 46” x 1/4” line e. boom bridle 20” x 5/32” and 1” stainless steel ring. f. mainsheet upper and lower block w/ trigger shackle If anything is missing or seems damaged please call us right away at 800-784-6478. 2. Install mast extender. Your spars were constructed for alternate use in the Optimist Dinghy, which has a deeper cockpit than the OPPI. The mast extender raises the sail and boom allowing an additional 4” of headroom (and that’s a good thing!). Remove the end plug in the top of the mast (the largest spar), by tapping it out with a screwdriver. Apply a heavy coating of silicone sealant to mast extender in an effort to make a watertight seal with mast and to keep it attached. Slide together and wipe off excess silicone. 3. Rig sail. Slide mast, extender first, all the way into luff sleeve.
    [Show full text]
  • HERMIONE N March 10, 1780, the Marquis De Lafayette Boarded Ohermione on His Way to the Coasts of North America
    HERMIONE n March 10, 1780, The Marquis de Lafayette boarded OHermione on his way to the coasts of North America. Frigate of the American War He left to announce the arrival of royal troops to fi ght of Independence the English occupier on the side of the insurgents. The 1779 - 1793 crossing was accomplished in the record time of 48 days. A 1/48 SCALE MONOGRAPH This performance was due to Hermione’s excellent nautical qualities. In fact, Hermione was a new-generation frigate The book includes all timbering plans built before the revolution. Started on the ways in December Jean-Claude Lemineur 1778, she benefi ted from important advances that were Patrick Villiers brought about by a new concept developed during the second half of the 18th century that translated into seagoing capabilities well beyond those of vessels built according to older designs. Like the other frigates of her generation she allied speed and fi repower, allowing her to rival those of the Royal Navy. But what did Hermione look like? Surprisingly, nothing specifi c remains concerning her, except for the information that she was constructed on the same plans as Concorde, built in 1777. As it turns out, Concorde’s lines were taken off by the Royal Navy after her capture in 1783, and the plans were kept at the NMM in Greenwich. It is fair to believe that Hermione is similar. However, the plans reveal some peculiarities specifi c to Concorde, which is and not present on Hermione. Her battery is pierced for 14 gunports to each side, not counting the chase ports.
    [Show full text]
  • Building Outrigger Sailing Canoes
    bUILDINGOUTRIGGERSAILING CANOES INTERNATIONAL MARINE / McGRAW-HILL Camden, Maine ✦ New York ✦ Chicago ✦ San Francisco ✦ Lisbon ✦ London ✦ Madrid Mexico City ✦ Milan ✦ New Delhi ✦ San Juan ✦ Seoul ✦ Singapore ✦ Sydney ✦ Toronto BUILDINGOUTRIGGERSAILING CANOES Modern Construction Methods for Three Fast, Beautiful Boats Gary Dierking Copyright © 2008 by International Marine All rights reserved. Manufactured in the United States of America. Except as permitted under the United States Copyright Act of 1976, no part of this publication may be reproduced or distributed in any form or by any means, or stored in a database or retrieval system, without the prior written permission of the publisher. 0-07-159456-6 The material in this eBook also appears in the print version of this title: 0-07-148791-3. All trademarks are trademarks of their respective owners. Rather than put a trademark symbol after every occurrence of a trademarked name, we use names in an editorial fashion only, and to the benefit of the trademark owner, with no intention of infringement of the trademark. Where such designations appear in this book, they have been printed with initial caps. McGraw-Hill eBooks are available at special quantity discounts to use as premiums and sales promotions, or for use in corporate training programs. For more information, please contact George Hoare, Special Sales, at [email protected] or (212) 904-4069. TERMS OF USE This is a copyrighted work and The McGraw-Hill Companies, Inc. (“McGraw-Hill”) and its licensors reserve all rights in and to the work. Use of this work is subject to these terms. Except as permitted under the Copyright Act of 1976 and the right to store and retrieve one copy of the work, you may not decompile, disassemble, reverse engineer, reproduce, modify, create derivative works based upon, transmit, distribute, disseminate, sell, publish or sublicense the work or any part of it without McGraw-Hill’s prior consent.
    [Show full text]