“Retired” Dairy Facilities for Raising Steers Remodeling Options Are

Total Page:16

File Type:pdf, Size:1020Kb

“Retired” Dairy Facilities for Raising Steers Remodeling Options Are Remodeling Options are Endless Remodeling “Retired” Dairy Facilities for Raising Steers David W. Kammel BSE- UW-Madison The Design Process Develop the steer Change the management plan Management Investigate and develop Plan Design Your Facilities to alternative designs Implement Your Management Plan Evaluate alternatives and options Change the Choose the “best” system design Design Troubleshoot and implement the design Farm Resources Develop a Steer Management Plan Define management group and number in group List Needs of Steer Land Space – Comfort Feed • Resting Space – Environment – Nutrition Labor • Outside Lot Space – Health Care • Feed Space – Movement between groups Facilities – Manure Handling • Fence • Water Space List Needs (and wants) of the Owner • Water • Manure Storage Determine features that meet these needs and (wants) • Shelter Prioritize the list of features • Storage 1 Housing Basics Economics Provide animal comfort Minimize Capital Costs • Clean dry hair coat • Housing • Dry bedding Minimize Operational Costs • Adequate Space • Feed • Resting • Feed • Bedding • Water Minimize labor costs • Excellent ventilation • Daily feeding, bedding, observation Efficient use of labor • Periodic cleaning and moving Effectively utilize a farm’s resources Foundation Wall A Feed Alley Planning Information Feed 11'-3" Stalls Gutter Pos t Spac ed @ 7-8' O.C. Center Alley 11'-6" 35'-0" Longitudional (King) Beam Stalls Maternity Milk Pen House 11'-3" Feed Alley 126'-0" Original Barn Plan View A Roof Hay Mow Floor Floor Joists Longitudional Existing Stall Pos t Spac ed (King) Beam @ 7'-8' O.C. Feed Alley Center Alley Stalls Gutter Barn 6'-0" 6'-0" 1'-6" 7'-0" 1'-6" 6'-0" 6'-0" 11'-3" 11'-6" 11'-3" 35'-0" Original Barn Cross Section View Cross Section AA Possible Limitations • Location • Structure • Ceiling Height • Concrete •Posts • Gutter • Water Pipes • Ventilation Existing Stall Barn 2 Calf Barn Remodel Foundation Wall Feed Alley Feed 11'-3" Individual Calf Stalls Gutter Post Spaced @ 7-8' O.C. Center Alley 11'-6" 35'-0" Longitudional (King) Beam Individual Calf Stalls Maternity Milk Pen House 11'-3" Feed Alley 126'-0" Original Barn Plan View Roof Hay Mow Floor Floor Joists Longitudional Pos t Spac ed (King) Beam @ 7'-8' O.C. Feed Alley Calf Center Alley Calf Stalls Stalls Gutter 6'-0" 6'-0" 1'-6" 7'-0" 1'-6" 6'-0" 6'-0" Existing Stall 11'-3" 11'-6" 11'-3" 35'-0" Original Barn Cross Section View Barn C r o s s Sec tion AA Foundation Wall Feed Alley Feed 6'-6" 11'-3" Bedded Platform 6'-0" Alley 10'-0" 11'-6" 35'-0" Bedded Platform Maternity 6'-0" Milk Pen House 11'-3" Feed Alley 6'-6" 126'-0" 12'-0" 12'-0" 7'-3" 87'-6" 7'-3" Original Barn Plan View Bedded Platform 88' x 6' = 528 s.f. 18 head @ 30 s.f. 21 head @ 25 s.f. 26 head @ 20 s.f. Roof Remodeled Hay Mow Floor Floor Joists Longitudional Pos ts Bedded Platform (King) Beam Bedded Feed Center Alley Alley Platform 6'-0" 6'-0" 10'-0" 6'-0" 6'-0" Calf Barn Remodel 11'-3" 11'-6" 11'-3" 35'-0" Remodeled TS with Cross Beams B Foundation Wall Feed Alley Feed 11'-3" Stalls Gutte r Po s t Spac ed @ 7-8' O.C. Center Alley New Cross 11'-6" 35'-0" Be am Longitudional (King) Beam Remove Stalls Maternity Pos t Milk Pen House 11'-3" Feed Alley 126'-0" B Original Barn Plan View Roof Hay Mow Floor Floor Jois ts Longitudional (King) Beam New Cross Remove Post Be am Stalls Feed Center Alley Alley Gutter 6'-0" 6'-0" 1'-6" 7'-0" 1'-6" 6'-0" 6'-0" Bedded Platforms 11'-3" 11'-6" 11'-3" 35'-0" Or ig inal Bar n C r os s Sec tion Vie w Cross Section BB 3 Cross Beams Cross Beams Roden pics stall barn remodel Remodeled Bedded Center Bedded Pen Foundation Wall Feed Alley 6'-6" Feed Fence 11'-3" 6'-0" Bedded Platform 10'-0" 22'-0" 11'-6" 35'-0" Maternity 6'-0" Milk Pe n House Fence 11'-3" Feed Alley 6'-6" 126'-0" 12'-0" 12'-0" 7'-3" 87'-6" 7'-3" Original Barn Plan View Bedded Platform 88' x 22 = 1936 s.f. 48 head @ 40 s.f. 64 head @ 30 s.f. Roof Hay Mow Floor Floor Joists Longitudional Pos ts (King) Beam Feed Bedded Alley Platfor m 6'-6" 22'-0" 6'-6" 11'-3" 11'-6" 11'-3" 35'-0" Inside Feeding Bedded Pen Platform 4 Inside Feeding Remodeled TS with Bedded Pens Platform and Center Feed Alley Foundation Wall Feed 11'-3" Bedded Platform 12'-6" Feed Fence Feed Alley 10'-0" 11'-6" 35'-0" Feed Fence Maternity Milk Pen House 12'-6" Bedded Platform 11'-3" 126'-0" 12'-0" 12'-0" 7'-3" 87'-6" 7'-3" Original Barn Plan View Bedded Platform 2@ 88' x 12' = 2,112 s.f. 52 head @ 40 s.f. 70 head @ 30 s.f. Roof Hay Mow Floor Floor Joists Longitudional Pos ts (King) Beam Bedded Bedded Platform Feed Alley Platfor m 12'-6" 10'-0" 12'-6" 11'-3" 11'-6" 11'-3" 35'-0" BeddedBedded Pen Pen Center Feed AlleyBedded Pen Inside Feeding Inside Feeding 126'-0" 8'-0" 16'-0" 16'-0" 16'-0" 16'-0" 16'-0" 7'-0" Bedded Pen Double Feed Bedded Pen Gates Gate 11'-3" Pos t Personal Double 35'-0" Gates 11'-6" Alley Feed Alley Optionally Bedded Water Maternity Milk Pe n House Pen #1 Pen #2 Pen #4 Pen #5 Pen #6 11'-3" Pen #3 Alternate Water Feed Lane Location Calf Barn Design Plan View Roof Pen Capacity 16'-0" x 11'-3" pen = 180 s.f. 7 head @ 25 s.f./head Optional Bedded 16'-0" x 22'-0"= 352 s.f. 14 head @ 25 s.f./ head Calf Barn Design Cross Section View Ventilation Duct Hay Mow Floor Bedded Pen Feed Alley Bedded Pen Optionally Bedded Feed Lane Water Existing Concrete Inside Feeding Cap Over C u r b , C o w Pla tfo r m, Remov e Ex is itng Curb Old Concrete and Feed Alley and Feed Alley 11'-3" 11'-6" 11'-3" 35'-0" 5 Bedded Pen Bedded Pen Bedded Pen Bedded Pen 126'-0" 8'-0" 16'-0" 32'-0" 32'-0" 7'-0" CalfBedded Housing Pen Feed Bedded Resting Gate Area 11'-9" Pos t 23'-5" Personal Double 35'-0" Alley Gates Alternate 11'-8" Water Location Small Group Fence Fence Opening Opening Fence Maternity Milk Pen Pen #3 House Pen #1 Pen #2 Feed Alley Pen #4 Pens 11'-7" 11'-7" Water Water Drive By Feed Floor or J-Bunk Grower Barn Design Plan View Roof Pen Capacity 16'-0" x 22'-9" pen = 364 square feet Optional 12 head @ 30 s.f. /head = 360 square feet Overhang Ventilation Duct Hay Mow Floor Floor Joists Open Sidewall for Feed Access Bedded Pen Bedded Pen Feed Alley Bedded Pen J Bunk Cap Over New Concrete Old Concrete Remov e Ex is itng C urb Floor and Feed Alley Drive by Feeding 11'-3" 11'-6" 11'-3" 35'-0" Grower Barn Design Cross Section View 6 Feed Bed ded Platfo r m 11'-3" 12'-0" Bedded Pen 10'-0" Alley 11'-6" Lean to Drive By Feeding Maternity Milk Pen House Bedded Platform 12'-0" 11'-3" Water Water Drive By Feed Floor or J Bunk Overhang 12'-0" 12'-0" 102'-0" 126'-0" Bedded Platform 24' x 102' = 2448 s.f. 80 head @ 30 s.f. Roof 98 head @ 25 s.f. 120 head @ 20 s.f. Lean to Cov ering Alley Bedded Pen Hay Mow Floor Floor Jois ts Longitudional Post Spaced (King) Beam @ 7'-8' O.C. Drive By Bedded Bedded Feed Floor Center Alley Platfor m Lean to Drive By Platfo r m Alley or J Bunk 12'-0" 10'-0" 12'-0" 11'-3" 11'-6" 11'-3" Feeding 35'-0" Remodeled Barn Resting Space Remodeled Barn Resting Space Remodeled Barn Resting Space Bedded Pen Lean to Drive By Feeding Remodeled Barn Feeding Platform Remodeled Barn Feeding Platform 7 126'-0" 31'-0" 32'-0" 32'-0" 7'-0" Feed Bed ded Pen 11'-3" Pos t Personal Ac c es s 35'-0" Alley Door 11'-6" Maternity Pen #3 Milk Pe n House Pen #1 Pen #2 11'-3" Alternate Opening Opening Opening Water Location Outside Ya rd Outside Yard Runoff Collection Water Drive By Feed Floor or J-Bunk Water Roof Finishing Barn Design Plan View Pen Capacity 32'-0" x 35'-0"" pen = 1,120 square feet 32 head @ 35 s.f. /head = 1,120 square feet Ventilation Duct Outside Yard Hay Mow Floor Optional Drive By Stee r Feed Floor or J Bunk Bedded Pen Bedded Pen Bedded Pen Stuffer Bedded Pen Outside Water Cap Over Old Concrete Remove Exisitng Curb Lot Feeding and Feed Alley 11'-3" 11'-6" 11'-3" 35'-0" Remodeled Barn Feeding Platform Finis hing Barn Cross Section View Remodeled Barn Resting Space Remodeled Barn Resting Space Bedded Pen Remodeled Barnyard Feeding Platform Outside Feeding Remodeled Barn Resting Space 8 Remodeled Barnyard Feeding Platform Remodeled Barnyard Feeding Platform Remodeled Barnyard Feeding Platform Remodeled Barnyard Feeding Platform ** Remodeled Barnyard Feeding Platform 9 Remodeled Barnyard to Feeding Platform Drive by Feeding Platform Feeding Platform Self Cleaning Floor Remodeled Machine Shed for Beef 120'-0" 40'-0" 60'-0" 60'-0" • Machine Shed 40’ x 100’ with feed pens and picture Manure Bedded Pen Storage 40' x 60' = 2400 s.f.
Recommended publications
  • Cycling Infrastructure Policy June 2017
    Cycling Infrastructure Policy June 2017 Department of Transport and Main Roads Creative Commons information © State of Queensland (Department of Transport and Main Roads) 2015 http://creativecommons.org.licences/by/4.0/ This work is licensed under a Creative Commons Attribution 4.0 Licence. You are free to copy, communicate and adapt the work, as long as you attribute the authors. The Queensland Government supports and encourages the dissemination and exchange of information. However, copyright protects this publication. The State of Queensland has no objection to this material being reproduced, made available online or electronically but only if its recognised as the owner of the copyright and this material remains unaltered. The Queensland Government is committed to providing accessible services to Queenslanders of all cultural and linguistic backgrounds. If you have difficulty understanding this publication and need a translator, please call the Translating and Interpreting Service (TIS National) on 13 14 50 and ask them to telephone the Queensland Department of Transport and Main Roads on 13 74 68. Disclaimer: While every care has been taken in preparing this publication, the State of Queensland accepts no responsibility for decisions or actions taken as a result of any data, information, statement or advice, expressed or implied, contained within. To the best of our knowledge, the content was correct at the time of publishing. Cycling Infrastructure Policy June 2017 - i - Document control options Departmental approvals Refer to the
    [Show full text]
  • ||||IHHHHHHHHHHH USOO512772A United States Patent (19) 11) Patent Number: 5,127,172 Lund Et Al
    ||||IHHHHHHHHHHH USOO512772A United States Patent (19) 11) Patent Number: 5,127,172 Lund et al. 45 Date of Patent: Jul. 7, 1992 4,779,363 10/1988 Boutralis et al. .............. 37/118 RX (54) GUARD RAIL CLEANOUT DEVICE 4,843,743 7/1989. Durieux ................................ 37/103 76) Inventors: Kenneth Lund, 21429 Lofton Ave. 4,945,662 8/1990 Kreye ...... ... 37/17.5 X N.; Thomas W. Boesel, 16360-209th 4,946,392 6/1990 Kitchin .......................... 37/117.5 X St., N., both of Scandia, Minn. 55073 OTHER PUBLICATIONS 21) Appl. No.: 766,980 “Men See Money in Sand, Clean Up," Chris J. Bohrer, 22 Filed: Sep. 27, 1991 Washington County (Minn.) Washline, p. 2, Jun-Jul. 1990. Related U.S. Application Data "Innovative employees Win Awards," Kay Bruchu, 63 Continuation of Ser. No. 575,373, Aug. 28, 1991, aban Washington County (Minn.) Washline, p. 1, May-Jun. doned. 1991. 51) Int. Cl. ................................................ E02F 3/76 Primary Examiner-Randolph A. Reese 52 U.S. C. ................................ 37/117.5; 37/141 R; Assistant Examiner-J. Russell McBee 37/DIG. 12 Attorney, Agent, or Firm-Jacobson & Johnson 58) Field of Search .............. 37/117.5, 118 R, 141 R, 37/103, DIG.3, DIG.12; 172/445. 1, 817 (57) ABSTRACT A device including a set of blades for removing dirt . (56) References Cited from underneath guard rails, with blades extending U.S. PATENT DOCUMENTS outward from the guard rail clean-out device in a canti 1,735,297 11/1929 Pardue . levered fashion to allow a user to extend the blades 2,186,081 1/1940 Slavin .
    [Show full text]
  • Bridging the Gaps in Bicycling Networks an Advocate’S Guide to Getting Bikes on Bridges
    Bridging the Gaps in Bicycling Networks An advocate’s guide to getting bikes on bridges Bridges are important. Whether over rivers, lakes, or built obstacles such as freeways, bridges are critical to bicyclists. Inaccessible bridges can force substantial detours or sever routes entirely, effectively discouraging or eliminating bike travel. As veteran Seattle bike and pedestrian planner Peter Lagerwey says: "If you can't get across the bridges, nothing else matters." In addition to their practical worth, bridges are also often high‐profile, large‐scale projects; the inclusion of bicycle facilities is an important symbolic recognition of the role of bicycling and walking in transportation networks. Bicyclists can expect to see more and more bridges under construction in the coming months and years, creating opportunities (and risks) for bicyclists. According to the Government Accountability Office, one quarter of the 602,977 bridges on the country’s roadways is either structurally deficient and in need of repair, or functionally obsolete and is not adequate for today’s traffic needs. Seventy‐one thousand of them are considered structurally deficient, with a major defect in structure or deck. In some states, more than 20 percent of the bridges fit this description. A 2010 report by the U.S. PIRG Education Fund observes that, “Generally, engineers build bridges in the United States for a useful life of 50 years. The average age of America’s bridges is now 43 years, with 185,000 over 50 years old. By 2030, that number could double.” These overdue bridge repair or replacement projects mean more chances to open up bridges to biking and walking than ever before.
    [Show full text]
  • Ottawa County Road Commission Standards and Specifications for PLAT CONDOMINIUM and PUBLIC ROAD DEVELOPMENT BOARD of COUNTY ROAD
    Ottawa County Road Commission Standards and Specifications For PLAT CONDOMINIUM And PUBLIC ROAD DEVELOPMENT BOARD OF COUNTY ROAD COMMISSIONERS COUNTY OF OTTAWA 1 Regulations pertain to the subdivision of lands located outside the corporate limits of any city or village in the County of Ottawa and to the lands within incorporated areas when such lands are adjacent to public highways under the jurisdiction of the Board of County Road Commissioners of the County of Ottawa. The following Standards and Specifications were adopted by the Board of County Road Commissioners on January 12, 2006 2 CONTENTS I. PURPOSE 1 II. DEFINITIONS 1 lll. DEVELOPMENT REQUIREMENTS 2 A. Preliminary Plans 2 1. Preparation of Plans 2 2. Road Names 2 3. Submission of Preliminary Plans 2 4. Approval of Preliminary Plans 3 B. Right-Of-Way Requirements 3 1. General Requirements 3 2. Width Requirements 3 C. Conformity 3 IV. CONSTRUCTION PLANS AND IMPROVEMENTS 5 A. Road and Drainage Plans 5 B. Drainage Easements 5 C. Drainage Structures 5 1. Crossroad Culverts and Bridges 5 2. Driveway Culverts 5 3. Storm Sewer 6 4. Under drains 6 5. Storm Sewer Accessibility 6 D. Utilities 7 E. Guard Posts, Guard Rail and Barricades 7 F. Clearing, Removal of Trees, Brush, Roots and Topsoil 7 G. Road Improvements 7 1. Typical Road Sections 7 2. Turnaround Section 7 3. Boulevard Section 9 4. Grades and Sight Distance 10 5. Traffic Impact Study 10 6. Intersecting Roadway Improvements 10 7. Existing Road Cleanup 10 8. Material Requirements and Specifications 11 9. Concrete Curb & Gutter 11 10.
    [Show full text]
  • Improving Value of Travel Time Savings Estimation for More Effective Transportation Project Evaluation
    Improving Value of Travel Time Savings Estimation for More Effective Transportation Project Evaluation BDK85 977-21 Final Report December 2011 i Improving Value of Travel Time Savings Estimation for More Effective Transportation Project Evaluation BDK85 977-21 Final Report Prepared for: Florida Department of Transportation Research Center 605 Suwannee Street, MS 30 Tallahassee, FL 32399-0450 Project Manager: Amy Datz Prepared by: Victoria A. Perk Joseph S. DeSalvo, Ph.D. Tara A. Rodrigues Nina M. Verzosa Steven C. Bovino Center for Urban Transportation Research University of South Florida 4202 E. Fowler Avenue, CUT-100 Tampa, FL 33620-5375 December 2011 i DRAFT October 2011 ii DISCLAIMER The opinions, findings, and conclusions expressed in this publication are those of the authors and not necessarily those of the State of Florida Department of Transportation. iii iv Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle 5. Report Date Improving Value of Travel Time Savings Estimation for More December 2011 Effective Transportation Project Evaluation 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Victoria A. Perk, Joseph S. DeSalvo, Tara A. Rodrigues, Nina M. Verzosa, Steven C. Bovino 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Center for Urban Transportation Research University of South Florida 4202 E. Fowler Avenue, CUT-100 11. Contract or Grant No. Tampa, FL 33620 BDK85 977-21 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Florida Department of Transportation Final Report Research Center March 2010 – December 2011 605 Suwannee Street, MS 30 14.
    [Show full text]
  • Planned Residential District Rezoning for Preston Row” Rezoning Package Dated January 3, 2017, Prepared by Gay and Neel, Inc
    PLANNED RESIDENTIAL DISTRICT REZONING FOR PRESTON ROW BLACKSBURG , VIRGINIA January 3, 2017 Prepared For: Broadstreet Partners LLC 148 River Street, Suite 205 Greenville, SC 29601 Prepared by: Job No. 2720.0 Table of Contents APPLICATION .................................................................................................................................. 3-11 PROFFER STATEMENT ..................................................................................................................... 12-14 TRAFFIC IMPACT APPLICATION ..…………………………………………………………………………………………………..15-17 PLANNED RESIDENTIAL DISTRICT ....................................................................................................... 18-23 COMPREHENSIVE PLAN ANALYSIS ...................................................................................................... 24-27 CONCLUSION ..................................................................................................................................... 28 APPENDIX ..................................................................................................................................... 29-51 A. DEED B. ADJACENT PROPERTY OWNERS C. TOWN OF BLACKSBURG EMAIL REGARDING SEWER CAPACITY SERVICE D. EXISTING ZONING MAP & EXISTING LAND USE MAP E. FUTURE LAND USE MAP & MIXED USE AREA C MAP F. UDA AREA MAP G. BT TRANSIT STOPS H. EXISTING SURVEY I. SITE PLAN J. ARCHITECTURAL PLANS AND ELEVATIONS 2 Preston Row APPLICATION 3 DocuSign Envelope ID: 059E2474-F8CC-42F9-9DF8-058DF4F362BA Kattrin Kinder,
    [Show full text]
  • Guardrail and Bridge Rail Recommendations for Very Low-Volume Local Roads in Kansas
    Report No. KS-14-16 ▪ FINAL REPORT▪ December 2014 Guardrail and Bridge Rail Recommendations for Very Low-Volume Local Roads in Kansas Ronald J. Seitz, P.E. Tod Salfrank Kansas Department of Transportation Bureau of Local Projects Division of Operations Bureau of Research This page intentionally left blank. 1 Report No. 2 Government Accession No. 3 Recipient Catalog No. KS-14-16 4 Title and Subtitle 5 Report Date Guardrail and Bridge Rail Recommendations for Very Low-Volume December 2014 Local Roads in Kansas 6 Performing Organization Code 7 Author(s) 7 Performing Organization Report Ronald J. Seitz, P.E., and Tod Salfrank No. 9 Performing Organization Name and Address 10 Work Unit No. (TRAIS) Kansas Department of Transportation Bureau of Local Projects 11 Contract or Grant No. 700 SW Harrison Street 3rd Floor West Topeka, Kansas 66603-3745 12 Sponsoring Agency Name and Address 13 Type of Report and Period Kansas Department of Transportation Covered Bureau of Research Final Report 2300 SW Van Buren Topeka, Kansas 66611-1195 14 Sponsoring Agency Code 15 Supplementary Notes For more information write to address in block 9. The determination of warrants for bridge railing and approach guardrails is a fundamental roadside safety issue. These are specialized roadside safety barriers that are intended to capture and smoothly redirect errant vehicles that leave the roadway either on the bridge itself or on the approach to the bridge. The Federal Highway Administration (FHWA) requires tested bridge rails and approach guardrails on all National Highway System (NHS) Roadways. However, states are given the discretion to develop their own policies for non-NHS roads.
    [Show full text]
  • Guardrails Data Set Summary Data Set Basics Title Guardrails Abstract Displays the Location and Some Attributes of Guardrails Owned and Maintained by SDOT
    ArcGIS Metadata Form Guardrails Data Set Summary Data Set Basics Title Guardrails Abstract Displays the location and some attributes of guardrails owned and maintained by SDOT. Description Guardrails are devices designed to keep pedestrians and motor vehicles from straying off the road into potentially dangerous or off-limit areas of the ROW. To be used in the GIS for mapping, analysis, and tracking purposes. Supplemental Guardrails are freestanding barriers supported by posts as opposed to jersey Information barriers which are not. Update Frequency Weekly Keyword(s) SDOT, Seattle, Transportation, Guardrails, Safety, Streets Contact Information Contact SDOT Traffic Management, Traffic Operations Group Organization Contact Person SDOT GIS Analyst Contact Email [email protected] Attribute Information Attribute Data type, Description length OBJECTID ObjectID ESRI unique identifier COMPKEY Long Primary key of the Guard Rail asset table, assigned by the Hansen asset management system. UNITID Text, 20 Alpha -numeric Hansen unique identifier. Begins with GDR. UNITDESC Text, 255 Structured description of the Guard Rail location MODBY Text, 30 User who last modified record in Hansen MODDTTM Date Date/time record was last updated in Hansen Page 1 of 4 ArcGIS Metadata Form Attribute Data type, Description length CONDITION Text, 10 Guard Rail condition: GOOD = The Guard Rail has not sustained any impacts AND it shows no signs of corrosion. Age: 0-17 years. FAIR = The Guard Rail has cosmetic (i.e., paint transfer) damage, but the structure is not compromised. AND/OR it shows signs of minor corrosion (i.e., minor rust). Age: 17-25 years. POOR = The Guard Rail has sustained an impact such that it needs to be replaced.
    [Show full text]
  • Greenway Criteria and Design Guide West Ashley Greenway in Charleston, S.C
    Greenway Criteria and Design Guide West Ashley Greenway in Charleston, S.C. On the cover: Schuylkill River Trail in Philadelphia. Contents Executive Summary..............................................................................2 Route Vision..........................................................................................4 Where the Greenway Is Built...............................................................7 How the Greenway Is Built..................................................................8 Surfaces.................................................................................................9 Width...................................................................................................16 Grade...................................................................................................17 Crossings..............................................................................................18 Bridges.................................................................................................19 Separated On-Road Facilities.............................................................21 On-Road Designation Exceptions: Context Sensitive Design..........22 Signage...............................................................................................24 Additional Resources.........................................................................28 Appendix: Natural Surface/Crushed Stone....................................30 Glossary & Definitions........................................................................31
    [Show full text]
  • ESC 520 Level Crossings, Version 2.3 Section 5.12 SPG 0724 Level Crossing Protection Equipment – Installation, Section 6.11 Version 1.4
    Technical Note - TN 039: 2017 For queries regarding this document [email protected] www.asa.transport.nsw.gov.au Technical Note - TN 039: 2017 Issued date: 28 September 2017 Effective date: 28 September 2017 Subject: Withdrawn sections of RailCorp standards due to update of infrastructure lighting requirements This technical note is issued by the Asset Standards Authority (ASA) to notify that the sections of the RailCorp documents listed in Table 1 are now withdrawn from use: Table 1 – Withdrawn sections of RailCorp standards RailCorp standard Withdrawn section ESC 520 Level Crossings, version 2.3 Section 5.12 SPG 0724 Level Crossing Protection Equipment – Installation, Section 6.11 version 1.4 The lighting requirements contained in these sections are now superseded by the requirements specified in T HR SS 80001 ST Infrastructure Lighting. Authorisation: Technical content Checked and Interdisciplinary Authorised for prepared by approved by coordination release checked by Signature Date Name Marc Janowski Gary Bayman Jason R Gordon Jagath Peiris Position Principal Engineer Lead Stations and Chief Engineer Director Building Services and Buildings Engineer Network Standards Electrical and Services © State of NSW through Transport for NSW 2017 Page 1 of 1 Engineering Standard Right of Way ESC 520 LEVEL CROSSINGS Version 2.3 Issued July 2010 Reconfirmed 26 June 2019 Owner: Chief Engineer Civil Approved by: John Stapleton Authorised by: Richard Hitch A/Principal Engineer Chief Engineer Civil Technology & Standards Engineering Standard Disclaimer This document was prepared for use on the RailCorp Network only. RailCorp makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems or work or operation.
    [Show full text]
  • Pedestrian Guard Railing: a Review of Criteria for Installation
    Pedestrian Guard Railing: A Review of Criteria for Installation by P. Zheng and R.D.Hall (Transportation Research Group) Contract No: 1505 This report has been produced by the Transportation Research Group (University of Southampton) for Transport for London. Any views expressed are not necessarily those of Transport for London. Pedestrian Guard Railing: A Review of Criteria for Installation FINAL REPORT to Transport for London Contract No: 1505 by P. Zheng and R.D.Hall Transportation Research Group University of Southampton October 2003 Transportation Research Group School of Civil Engineering and the Environment University of Southampton, Highfield, Southampton, SO17 1BJ Tel: 023 8059 2192 Fax: 023 8059 3152 email: [email protected] Web: www.trg.soton.ac.uk Pedestrian Guard Railing – A Review of Criteria for Installation CONTENTS LIST OF TABLES ................................................................................................... ii LIST OF FIGURES ................................................................................................. iii EXECUTIVE SUMMARY........................................................................................ v 1 INTRODUCTION ............................................................................................. 1 2 CURRENT GUIDELINES AND PRACTICE FOR INSTALLATION.................. 2 2.1 Introduction..........................................................................................................2 2.2 Guidelines on Installation.....................................................................................2
    [Show full text]
  • 4We Have to Look at Both Sides'
    HIGHWAY US^R(National Highway Users Conference) •^e'Dtember I1 Director of Public Roads Frank Turner answers some questions about roadside hazards—and explains some of the problems that confront highway officials 4We Have to Look at Both Sides' by Phyllis Dee Lovoca Associate Editor, HIGHWAY USER RANCIS C. TURNER, director of official," he answered. "In the high­ USER interview. Public Roads, came up through the way field, we have added socio-eco­ "Oh yes," he assured us. "I've read Fchairs. He has been in the Bureau of nomic and other considerations to the that, of course." Public Roads for 38 years—ever since engineering approach that we had 15 The conversation continued as fol­ his graduation as a civil engineer from years or so ago. Yes. I think it is a lows: Texas A and M. difficult time." Mr. Turner, what was your reaction He is a gentle appearing, quiet Critical? The August issue of HIGH­ to the interview with Representative spoken public servant. But the Fed­ WAY USER carried an interview with Blatnik? eral Government juggernaut has by no Rep. John A. Blatnik (D., Minn.) on Well, first off, highway officials are means quelled Frank Turner's ability hearings of the House Special Sub­ for safety as much as the Congressman to hold or express strong, individual committee on the Federal Aid High­ is. Maybe more, if that is possible. opinions. He does not speak the way Program, of which the Congress­ It is a fundamental consideration in guarded gobbledegook of many civil man is chairman. In particular, the everything we do.
    [Show full text]