ACT NOW!! Consultant Project Manager Senior Project Engineer Senior Environmental Planner Stantec Consulting Ltd

Total Page:16

File Type:pdf, Size:1020Kb

ACT NOW!! Consultant Project Manager Senior Project Engineer Senior Environmental Planner Stantec Consulting Ltd 4 IN SEARCH OF THE KERR CUP At bottom, the winning team in back from left, Stephen Coates, John Arnone, Frank Stipancic and Chris Forbes, and front, Patrick Niles, Chris Fridge, and Justin Yantho, went 4-0 in the opening round, then continued to win two playoff games for the championship, including the final game (9-6) against friends, the River Oaks Gladiators. They were in search of the Kerr Cup, the coveted trophy in the The First Ontario Credit Union Kerr Village 3-on-3 Road Hockey Tournament. The games, sponosred by the Kerr Village BIA, closed Kerr Street, between Florence Drive and Stewart Street Saturday as the street was transformed with five street hockey rinks, The event, which drew dozens of teams in all age groups, was a fundraiser for the Alzheimer’s Society of Hamilton/Halton and the Mental Wellness Navigator Program at Halton Healthcare Services. At top, the West River Wednesday, May 7, 2014 | 7, May Wednesday, Wrecking Crew’s (in white) goalie, Lucas Williams, makes a save on a shot by the Gladiators (in green). In middle, the view | of the street and its five rinks, in the foreground the Gingerman team (in black) take on The Mermaid and the Oyster team. | photos by Graham Paine – Oakville Beaver (Follow on Twitter @halton_photog or facebook.com/HaltonPhotog) NOTICE OF COMMENCEMENT OAKVILLE BEAVER Detail Design – G.W.P. 2163-10-00 Queen Elizabeth Way (QEW) and Highway 403 Structural Rehabilitation and Replacements from Trafalgar Road to Winston Churchill Boulevard THE PROJECT The Ministry of Transportation (MTO) is undertaking the Detail Design for the rehabilitation and/or replacement of bridge/culvert structures on the QEW and Highway 403 from Trafalgar Road to Winston Churchill Boulevard, a distance of approximately 7 kilometres, in the Town of Oakville and the City of Mississauga. The project also includes illumination, tall wall, barrier/retaining wall, pavement rehabilitation, overhead signs and drainage www.insideHALTON.com | www.insideHALTON.com improvements. The proposed improvements will be divided into separate contracts. The final contract will include the pavement rehabilitation of the QEW lanes and ramps within the project limits. The following structures are included in the project: • QEW westbound and eastbound lanes over the Highway 403 West-North Ramp • QEW at Joshua’s Creek Culvert • Highway 403 Dundas Street Underpasses • Highway 403 West-North Ramp over Ford Drive • QEW westbound and eastbound lanes over Ford Drive • Highway 403 North-West Ramp over Upper Middle Road • Ford Drive Off-Ramp over Highway 403 West-North Ramp • Upper Middle Road over Highway 403 West-North Ramp • Highway 403 North-West Ramp over Ford Drive THE PROCESS The project is being carried out in accordance with the Class Environmental Assessment (EA) for Provincial Transportation Facilities (2000) as a Group ‘B’ undertaking. The MTO completed a Preliminary Design Study for the proposed improvements as part of a larger study that included the future expansion of the highway. The study was documented in a TESR that received environmental clearance in Fall 2013. A separate Design and Construction Report (DCR) will be prepared for each contract included in the project and made available for a 30-day public review period. A Public Information Centre (PIC) for this project is currently anticipated in late Spring 2015 to display and seek input on the proposed improvements and the construction staging/traffic management plan. COMMENTS Comments and information regarding this project are being collected to assist the MTO in meeting the requirements of the Environmental Assessment Act. This material will be maintained on file for use during the | submitted photo project and may be included in project documentation. Information collected will be used in accordance with the Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record. REBATES ARE BACK! If you wish to comment on this project, have your name added to the project mailing list or have any questions about this project, please contact one of the individuals identified below: Mr. Adam Barg, P.Eng. Mr. Moin Khan, P.Eng. Ms. Maya Caron, MCIP, RPP ACT NOW!! Consultant Project Manager Senior Project Engineer Senior Environmental Planner Stantec Consulting Ltd. Ministry of Transportation Stantec Consulting Ltd. RECEIVE UP TO UP TO UP TO UP $ 200-835 Paramount Drive 1201 Wilson Avenue 100-401 Wellington Street TO 2800 $1450 $700 $650 Stoney Creek, ON L8J 0B4 Building D, 4th Floor Toronto, ON M5V 1E7 IN REBATES FACTORY + UNION GAS + OPA tel: 905-385-3234 (call collect) Downsview, ON M3M 1J8 tel: 416-598-7162 (call collect) REBATE REBATE REBATE fax: 905-385-3534 tel: 416-235-5271 fax: 416-596-6680 * e-mail: [email protected] fax: 416-235-3576 e-mail: [email protected] Was e-mail: [email protected] $ $ Per NOW month If you have any accessibility requirements in order to participate in this project, please contact one of 58 Per month ONLY OAC the Project Team members listed above. 29 AIR CONDITIONING & FURNACE Version française disponible en composant le (416) 598-7162, (Maya). DIAGNOSTIC SERVICE CALL NOW, $ QUANTITIES ARE LIMITED! Was $99 ONLY 49 THE FORECAST CALLS FOR *See dealer for details 9 Locations To Serve You Better! 905-849-4998905-632-0505 A+ RATING HEATING & COOLING www.aireone.com • 1-888-827-2665.
Recommended publications
  • Print Directions (.Pdf)
    Coming from Sault Ste. Marie Take Hwy 17 (Trans Canada Highway) through Sudbury to North Bay. Turn North on Highway 11 and follow to New Liskard. Take highway 65 west to the village of Elk Lake. Turn left on Highway 560 west to Gowganda. Just past Gowganda turn left on Auld Reekie Camp Road. Coming from Southern Ontario (Niagara Falls area) Take the QEW (Queen Elizabeth Way) north. The QEW turns east after you go over the big bridge near Hamilton and heads towards Toronto. Drive to Oakville and right by the massive Ford auto plant (1 mile past Trafalgar Road) take the cut-off for Highway 403. Take Highway 403 to highway 401. Go East on the 401 until you reach the cut-off for highway 400 north. Follow the 400 north all the way to the city of Barrie. Just past the city of Barrie the 400 ends. It splits into highway 68 and highway 11. Take highway 11 to North Bay. Follow highway 11 through North Bay to New Liskard. Take highway 65 west to the village of Elk Lake. Turn left on Highway 560 west to Gowganda. Just past Gowganda turn left on Auld Reekie Camp Road. Coming from Ottawa or Montreal If coming from Montreal take Highway 40 across into Ontario and highway 40 to Ottawa becomes highway 417 to Ottawa. Follow 417 past Ottawa and past Kanata. About 4 miles past Kanata 417 takes a sharp turn north and turns into Highway 17 about 40 mile later. Follow highway 17 all the way to highway 11, which is just south of North Bay.
    [Show full text]
  • Planning and Infrastructure Services Committee Item N1 for May 11, 2015
    Nll-l Ihe Region of Peel is theproud recipient of the National Quality Institute Order of IfRegion of Peel Excellence, Quality; theNational Quality Institute Canada Award of Excellence Gold Award, Wotting fe/i i/eu Healthy Workplace; anda 2008 IPAC/Dcloittc Public Sector Leadership ColdAward. R£CR»Y£D Ci.&'rlfOS f.ip.PT. APK I 0 2015 April 24, 2015 Resolution Number 2015-268 Mr. Peter Fay HEtf.KO.: RLE MC: City Clerk City of Brampton Planning and Infrastructure 2 Wellington Street West Services Committee Brampton, ON L6Y 4R2 Dear Mr. Fay: Subject: Ministry of Transportation Southern Highways Program 2014-2018 I am writing to advise that Regional Council approved the following resolution at its meeting held on Thursday, April 16, 2015: Resolution 2015-268 That the comments outlined in the report of the Commissioner of Public Works titled 'Ministry of Transportation Southern Highways Program 2014-2018* be endorsed; And further, that the Ministry of Transportation be requested to advance the planning, design and construction of highway improvements in and surrounding Peel Region listed in the "Planning for the Future Beyond 2018" section of the Southern Highways Program 2014-2018 to within the next five years, including Highways 401, 410, 427, Queen Elizabeth Way, Simcoe Area, GTA West Corridor and Niagara to GTA Corridor; And further, that the Ministry of Transportation be requested to plan for a further extension of Highway 427 to Highway 9; And further, that the Ministry of Transportation be requested to publish a long range sustainable transportation plan for Southern Ontario highways; And further, that a copy of the subject report be forwarded to the Ministry of Transportation, Ministry of Economic Development, Employment and Infrastructure, the Regions of York and Halton, the Cities of Brampton, Mississauga, Toronto and Vaughan, and the Town of Caledon, for information.
    [Show full text]
  • Congestion Charges Volume 1
    Congestion Charges Volume 1 THE PROBLEM OF URBAN CONGESTION IN CANADA The recent CAA study Grinding to a Halt: Evaluating Canada’s Worst Bottlenecks took a new perspective on a problem that Canadians know all too well: urban congestion is a growing strain on our economy and well-being. Canada’s worst traffic bottlenecks are almost as bad as bottlenecks in Chicago, Los Angeles and New York. Bottlenecks affect Canadians in every major urban area, increasing commute times by as much as 50%. This CAA briefing on investments in active transportation is one in a series that explore potential solutions to the problem of urban congestion in Canada. These briefings delve into solutions not only to highway congestion, but also to congestion on urban streets. Taken together the solutions explored in these briefings represent a toolkit to address this problem. The objective is to inform policy makers and the public about options to reduce congestion and key considerations for when and where a particular solution might be the right fit. Congestion charges are direct charges to road users and include traditional tolls, cordon charges and mobility charges (charges based on distance travelled). Congestion charges reduce congestion if they are set high enough to encourage drivers to take an alternate route, carpool, take transit, cycle, walk or forego their trips. Generally, the higher the charge, the greater the reduction in congestion. However, congestion charges can create some challenges: Congestion charges reduce congestion if they • They can be politically difficult to implement, because there can are set high enough to be winners and losers.
    [Show full text]
  • Fact Sheet on the GTA West Multimodal Transportation Corridor
    GTA West Multimodal Transportation Corridor Fact Sheet GTA West Multimodal Transportation Corridor Geography From the Highway 401/407 interchange in Milton (West) to Highway 400 in King City (East) The Route Covering approximately 50 km and 16 interchanges – with plans to introduce a transitway and goods movement priority features Estimate Project Cost $6 billion Plans for a new 400-Series Highway spanning Halton, Construction Timeline Peel and York Regions aim to reduce travel times and Route Planning and Environmental support economic growth and job creation. Assessment Study expected to be complete by the end of 2022 Still in the planning stage, the preferred route is close to being chosen. This route will help better link the Ownership & Operation regions of the Greater Toronto Area (GTA) and support future office and industrial development. Owned and operated by the Province of Ontario © 2021 Avison Young Commercial Real Estate Services, LP, Brokerage. All rights reserved. E&OE: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young. Fact Sheet GTA West Multimodal Transportation Corridor Fact Sheet GTA West Multimodal Transportation Corridor The Corridor Taking Shape Industrial: The proposal calls for several features to prioritize – Longer speed change (merge) lanes Also known as Highway 413, the GTA West Multimodal Transportation Corridor project is intended to alleviate the movement of goods, helping to accommodate ‘just in time’ – Enhanced design to accommodate traffic congestion on Highway 401, The Queen Elizabeth Way (QEW) and Express Toll Route (ETR – Highway 407) delivery (i.e.
    [Show full text]
  • Provincial Transportation Initiatives Update
    The Region ofPeel is the proud recipient ofthe National Quality Institute Order of F Region cf Peel Excellence, Quality; the National Quality Institute Canada Award ofExcellence Gold Award, WllllkilUf fill qllll Healthy Workplace; and a 2008 IPACIDeioitte Public Sector Leadership Gold Award. January 30,2014 Resolution Number 2014-45 Mr. Denis Kelly Regional Clerk Regional Municipality of York 17250 Yonge Street, 4th Fl. Newmarket, ON L3Y 6Z1 ." P~1p Dear Mr. Kelly: Subject: Provincial Transportation Initiatives Update I am writing to advise that Regional Council approved the following resolution at its meeting held on Thursday, January 23, 2014: Resolution 2014-45 That the comments contained in the report of the Commissioner of Public Works, dated December 13, 2013 and titled "Provincial Transportation Initiatives Update" be endorsed and submitted to the Ministry of Transportation as such; And further, that the Ministry of Transportation (MTO) be requested to advance the planning, design and construction of highway improvements in and surrounding Peel Region listed in the "Planning for the Future Beyond 2017" section of the Southern Highways Program 2013-2017 to within the next five years, including Highways 401,410,427, Queen Elizabeth Way (QEW), Simcoe Area, GTA West Corridor and Niagara to GTA Corridor; And further, that the Ministry of Transportation be requested to plan for a further extension of Highway 427 to Highway 9; And further, that the Ministry of Transportation be requested to consider a full 12­ lane core-distributor system
    [Show full text]
  • Niagara to GTA Corridor Planning and Environmental Assessment Study
    Niagara to GTA Corridor Planning and Environmental Assessment Study NNiiaaggaarraa ttoo GGTTAA CCoorrrriiddoorr PPllaannnniinngg aanndd EEnnvviirroonnmmeennttaall AAsssseessssmmeenntt SSttuuddyy TRANSPORTATION DEVELOPMENT STRATEGY EXECUTIVE SUMMARY September 2013 www.niagara-gta.com NGTA Corridor Planning and Environmental Assessment Study Transportation Development Strategy EXECUTIVE SUMMARY The Challenges and Opportunities of Growth The Niagara to GTA study area is located within the Greater Golden Horseshoe (GGH) - one of the fastest growing regions in North America. By 2031, the population of the GGH is expected to increase to 11.5 million people with 5.5 million jobs. To manage this extraordinary growth, the Ontario government released the Growth Plan for the Greater Golden Horseshoe (the Growth Plan) in 2006, which provides a framework for building strong and prosperous communities. The Growth Plan also provides the strategic policy framework for the transportation system in the GGH that provides for more transportation choices, promotes public transit and active transportation and gives priority to goods movement on highway corridors. Under this policy framework, the Niagara to GTA Corridor Planning and Environmental Assessment Study (NGTA study) is designed to explore all modes of transportation for facilitating the efficient inter-regional movement of people and goods. The NGTA study area is in a strategically important location critical to Ontario’s long term economic competitiveness as part of the Ontario-Quebec Continental Gateway and Trade Corridor, ensuring the efficient movement of people and goods between Ontario communities and US markets. Within the NGTA study area, the municipalities of Hamilton, Halton and Niagara expect to add over 445,000 new residents and 195,000 new jobs between 2011 and 2031.
    [Show full text]
  • THE PEN CENTRE St
    THE PEN CENTRE St. Catharines, ON BentallGreenOak (Canada) Limited Partnership, Brokerage bentallgreenoak.com THE PEN CENTRE St. Catharines, ON LOCATION: 221 Glendale Avenue, St Catharines, ON MAJOR INTERSECTION: Glendale Avenue and Highway 406 TYPE: Regional Mall TOTAL GLA: 1,029,683 square feet MAJOR TENANTS: Hudson’s Bay 150,688 square feet Walmart 111, 747 square feet Zehrs 59,909 square feet Sport Chek 27,999 square feet ANCILLARY: 146 stores, services, restaurants and entertainment DEMOGRAPHICS (2023 PROJECTIONS): DRIVE TIME: 40 Min. 60 Min. Total Population: 533,895 1,429,460 MARKET SUMMARY: Total Households: 222,256 563,750 Located in the heart of St. Catharines, The Pen Centre is prominantly situated along Hwy. 406 and just an 8- Household Average Income: $91,814 $111,448 minute drive from Queen Elizabeth Way (QEW). Featuring an onsite transit hub, St. Catharines City Transportation and Niagara Regional Transportation routes make daily stops and transfers at Pen Centre. With Brock University and Niagara College just 10 minutes away, the transportation service is quite popular with the 40,000 students that attend annually. The information contained herein has been obtained from sources deemed to be PROFESSIONALLY LEASED AND MANAGED BY: reliable but does not form part of any future contract and is subject to BENTALLGREENOAK (CANADA) LIMITED PARTNERSHIP, BROKERAGE independent verification by the reader. The property is subject to prior letting, 1875 Buckhorn Gate, Suite 601, Mississauga, Ontario L4W 5P1 withdrawal from the market and change without notice. Tel: 1.866.681.2715 Fax: 905.271.5081 www.bentallgreenoak.com THE PEN CENTRE St.
    [Show full text]
  • Stainless Steel Reinforces Highway 427 Structures
    The Stainless Rebar Standard Kevin Cornell, Editor October 2009 Two-lane bridge with stainless steel deck replaces 1960s bridge over Siuslaw River Construction crew assembles stainless steel rebar mats for poured concrete deck. Photo: Dixon Steel Replacement of the North Fork Siuslaw River Bridge on Highway 126 over the north fork of the Siuslaw River in Oregon was required because the to meet modern design standards for shoulder width, vehicle crash protection barriers and earthquake sustainability standards. Deterioration of the substructure, deck, and girders had been accelerating over the last 15 to 20 years. The old structure was replaced with a new two-lane bridge in a new alignment just south of the old bridge. The new bridge meets all standards for shoulder width, vehicle crash protection barrier, and earthquake sustainability, and sight distance is improved on North Fork Road. 3235 Lockport Road S Niagara Falls S New York S 14305 Telephone: 716-299-1990 S Toll Free Telephone: 1-877-299-1700 S Facsimile: 716-299-1993 S [email protected] www.stainlessrebar.com The Rebar Standard – pa ge 2 Salit Specialty Rebar supplied 169 tons of Type 2205 duplex stainless steel. Duplex steels have a mixed microstructure of austenite and ferrite. Duplex steels have improved strength over austenitic stainless steels and improved resistance to localized corrosion, especially pitting, crevice corrosion and stress corrosion cracking. They are characterized by high chromium (19–28%) and molybdenum (up to 5%) and lower nickel contents than austenitic stainless steels. Currently, Type 2205 is the most commonly used stainless steel rebar in structural applications.
    [Show full text]
  • NY Gateway Connections Improvement Project Tot He US
    NEW YORK GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA Final Design Report/Environmental Impact Statement Final Section 4(f) Evaluation (49 USC 303) APPENDIX G – MISC PAPERS G-1 – Project Planning & Development – U.S. Plaza of the Peace Bridge G-2 – Assessment of Diverting Trucks off the Peace Bridge G-3 – Assessment of Ingress and Egress of Oversize Trucks at the Peace Bridge PIN 5760.80 City of Buffalo Erie County, New York April 4, 2014 ATTACHMENT G-1 Project Planning & Development – U.S. Plaza of the Peace Bridge TABLE OF CONTENTS I. Introduction ........................................................................................................................... 1 II. Purpose of the Project ...........................................................................................................1 III. Interstate System Access Considerations ............................................................................1 IV. Existing Highway Connections with the U.S. Peace Bridge Plaza ....................................... 3 V. Benefits of New Highway Connections with the U.S. Peace Bridge Plaza ............................ 3 VI. Other Projects Affecting the U.S. Plaza ...............................................................................4 VII. Conclusion .......................................................................................................................... 5 G1-i This page left intentionally blank. G1-ii I. Introduction The advancement of the NY Gateway Connections Improvement
    [Show full text]
  • Initiatives by the Ministry of Transportation of Ontario to Reduce the Delay Cost Associated with Major Highway Incidents
    Initiatives by the Ministry of Transportation of Ontario to Reduce the Delay Cost Associated with Major Highway Incidents Rob Pringle P.Eng., Senior Project Manager, WSP|MMM Group Ltd. Goran Nikolic P.Eng. Head, Traffic Planning, Ministry of Transportation, Ontario Paper prepared for presentation at the Goods Movement Session of the 2017 Conference of the Transportation Association of Canada St. John’s, NL ABSTRACT A major incident on a 400-series highway in the Greater Toronto Area has the potential to result in significant costs related to delay with respect to both passenger and commercial travel. Such incidents might involve collisions requiring police investigation or truck roll-overs, fires, or major spills, and could result in partial or full highway closures over multiple hours. In addition, significant delay would be anticipated on “diversion” routes used by drivers to circumvent the incident, as well as delay incurred during the system recovery period once the highway has been re-opened. Since traffic flows on major highways can range from 5,000 vehicles/hour to between 10,000 and 15,000 vehicles per hour over much of the typical day, the total delay cost from a single incident can run into the millions of dollars without even considering the implications for the broader economy. The Ministry of Transportation of Ontario (MTO) is in the process of reviewing response strategies to major incidents in two contexts. First, prior to the 2015 Pan Am/ParaPan Am Games, the Ministry developed traffic management plans to address major incidents affecting the highways accommodating the temporary High-Occupancy Vehicle (HOV) lanes implemented for the Games.
    [Show full text]
  • ENGINEERS WEEK Bridge Work Done Right
    SPECIAL REPORT ENGINEERS WEEK Bridge work done right Lewiston-Queenston makeover was done quickly, efficiently and with minimal traffic disruption Business First of Buffalo - February 20, 2006 by Dale English A law of physics stating that that the lesser can never contain the greater met its match last summer when, thanks to 21st century engineering and construction techniques, a fifth traffic lane was inserted into the majestically arched Lewiston-Queenston Bridge with hardly a ripple of problem. It was done so quickly and efficiently and with such minimal traffic disruption, even during peak summer travel time, that some might be tempted to ask, "What if they rebuilt a bridge and nobody noticed?" And it was done in minimal time-11 months-through winter's cold and summer's heat, snow and wind, in daylight and gloom of night. Workers were double-shifted and for some, "Saturday Night Live" was an eight- or 10-hour date with a jackhammer on the bridge deck. 'Miserable' timetable "It was a miserable timetable," said Tom Garlock, general manager for the Niagara Falls Bridge Commission , the customer on the job costing about $45 million Canadian. Agreed, said two principals in the project, Kenneth Rawe, vice president of Oakgrove Construction Inc. , of Elma, and Bill Snow, construction engineer for Rankin Construction Inc. , of St. Catharines, Ont. Rankin was the prime contractor with Oakgrove, as its subcontractor, handling all work on the American side of the bridge. Both men are professional engineers. The problem was the Lewiston-Queenston Bridge-known as Queenston- Lewiston in Canada - simply wasn't big enough anymore to handle its daily traffic load.
    [Show full text]
  • Ambassador Bridge
    Peace Bridge Crossing Summary Peace Bridge Crossings 180 170 Outbound 160 150 Inbound 140 Overview 130 120 110 The Peace Bridge connects Buffalo, New York with Fort Erie, Ontario and 100 crosses the Niagra River. The bridge links the Queen Elizabeth Way (QEW) in 90 80 Canada and provides with I-190 and other major roadways in the U.S. The QEW 70 60 extends to Toronto, Ontario and also links with Highway 401, one of the major 50 East-West Canadian expressways. I-190 provides a link to I-90, the main artery 40 Volume Per Hour Per Hour 30 of the New York State Thruway, connecting the area to the major population 20 centers on the East Coast. 10 0 0 10 20 30 40 50 60 70 80 90 100 110 120 The Peace Bridge contains only a single, three-lane span. The center lane is Time in Minutes reversible and can be used to ease congestion during peak travel conditions. The bridge was built in 1927 and is 5,800 feet long. The bridge is governed by a ten- member board consisting of five members from New York State and five Typical Inbound Traffic members from Canada. All capital improvements and operating expenses are No Delay Travel Time = 7.32 minutes funded by tolls and rentals of Peace Bridge-owned property and buildings, not Travel Time Volume per Booth Open Booths public funds. While a single organization, the Buffalo and Fort Erie Public 120 4 Bridge Authority manages two tightly linked groups of bridge operators and 110 100 maintenance workers.
    [Show full text]