4 IN SEARCH OF THE KERR CUP At bottom, the winning team in back from left, Stephen Coates, John Arnone, Frank Stipancic and Chris Forbes, and front, Patrick Niles, Chris Fridge, and Justin Yantho, went 4-0 in the opening round, then continued to win two playoff games for the championship, including the final game (9-6) against friends, the River Oaks Gladiators. They were in search of the Kerr Cup, the coveted trophy in the The First Ontario Credit Union Kerr Village 3-on-3 Road Hockey Tournament. The games, sponosred by the Kerr Village BIA, closed Kerr Street, between Florence Drive and Stewart Street Saturday as the street was transformed with five street hockey rinks, The event, which drew dozens of teams in all age groups, was a fundraiser for the Alzheimer’s Society of Hamilton/Halton and the Mental Wellness Navigator Program at Halton Healthcare Services. At top, the West River Wednesday, May 7, 2014 | 7, May Wednesday, Wrecking Crew’s (in white) goalie, Lucas Williams, makes a save on a shot by the Gladiators (in green). In middle, the view | of the street and its five rinks, in the foreground the Gingerman team (in black) take on The Mermaid and the Oyster team. | photos by Graham Paine – Oakville Beaver (Follow on Twitter @halton_photog or facebook.com/HaltonPhotog) NOTICE OF COMMENCEMENT OAKVILLE BEAVER Detail Design – G.W.P. 2163-10-00 Queen Elizabeth Way (QEW) and Highway 403 Structural Rehabilitation and Replacements from Trafalgar Road to Winston Churchill Boulevard THE PROJECT The Ministry of Transportation (MTO) is undertaking the Detail Design for the rehabilitation and/or replacement of bridge/culvert structures on the QEW and Highway 403 from Trafalgar Road to Winston Churchill Boulevard, a distance of approximately 7 kilometres, in the Town of Oakville and the City of Mississauga. The project also includes illumination, tall wall, barrier/retaining wall, pavement rehabilitation, overhead signs and drainage www.insideHALTON.com | www.insideHALTON.com improvements. The proposed improvements will be divided into separate contracts. The final contract will include the pavement rehabilitation of the QEW lanes and ramps within the project limits. The following structures are included in the project: • QEW westbound and eastbound lanes over the Highway 403 West-North Ramp • QEW at Joshua’s Creek Culvert • Highway 403 Dundas Street Underpasses • Highway 403 West-North Ramp over Ford Drive • QEW westbound and eastbound lanes over Ford Drive • Highway 403 North-West Ramp over Upper Middle Road • Ford Drive Off-Ramp over Highway 403 West-North Ramp • Upper Middle Road over Highway 403 West-North Ramp • Highway 403 North-West Ramp over Ford Drive THE PROCESS The project is being carried out in accordance with the Class Environmental Assessment (EA) for Provincial Transportation Facilities (2000) as a Group ‘B’ undertaking. The MTO completed a Preliminary Design Study for the proposed improvements as part of a larger study that included the future expansion of the highway. The study was documented in a TESR that received environmental clearance in Fall 2013. A separate Design and Construction Report (DCR) will be prepared for each contract included in the project and made available for a 30-day public review period. A Public Information Centre (PIC) for this project is currently anticipated in late Spring 2015 to display and seek input on the proposed improvements and the construction staging/traffic management plan. COMMENTS Comments and information regarding this project are being collected to assist the MTO in meeting the requirements of the Environmental Assessment Act. This material will be maintained on file for use during the | submitted photo project and may be included in project documentation. Information collected will be used in accordance with the Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record. REBATES ARE BACK! If you wish to comment on this project, have your name added to the project mailing list or have any questions about this project, please contact one of the individuals identified below: Mr. Adam Barg, P.Eng. Mr. Moin Khan, P.Eng. Ms. Maya Caron, MCIP, RPP ACT NOW!! Consultant Project Manager Senior Project Engineer Senior Environmental Planner Stantec Consulting Ltd. Ministry of Transportation Stantec Consulting Ltd. RECEIVE UP TO UP TO UP TO UP $ 200-835 Paramount Drive 1201 Wilson Avenue 100-401 Wellington Street TO 2800 $1450 $700 $650 Stoney Creek, ON L8J 0B4 Building D, 4th Floor Toronto, ON M5V 1E7 IN REBATES FACTORY + UNION GAS + OPA tel: 905-385-3234 (call collect) Downsview, ON M3M 1J8 tel: 416-598-7162 (call collect) REBATE REBATE REBATE fax: 905-385-3534 tel: 416-235-5271 fax: 416-596-6680 * e-mail: [email protected] fax: 416-235-3576 e-mail: [email protected] Was e-mail: [email protected] $ $ Per NOW month If you have any accessibility requirements in order to participate in this project, please contact one of 58 Per month ONLY OAC the Project Team members listed above. 29 AIR CONDITIONING & FURNACE Version française disponible en composant le (416) 598-7162, (Maya). DIAGNOSTIC SERVICE CALL NOW, $ QUANTITIES ARE LIMITED! Was $99 ONLY 49 THE FORECAST CALLS FOR *See dealer for details 9 Locations To Serve You Better! 905-849-4998905-632-0505 A+ RATING HEATING & COOLING www.aireone.com • 1-888-827-2665.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-