BP 2019 Records
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Province, City, Municipality Total and Barangay Population AURORA
2010 Census of Population and Housing Aurora Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population AURORA 201,233 BALER (Capital) 36,010 Barangay I (Pob.) 717 Barangay II (Pob.) 374 Barangay III (Pob.) 434 Barangay IV (Pob.) 389 Barangay V (Pob.) 1,662 Buhangin 5,057 Calabuanan 3,221 Obligacion 1,135 Pingit 4,989 Reserva 4,064 Sabang 4,829 Suclayin 5,923 Zabali 3,216 CASIGURAN 23,865 Barangay 1 (Pob.) 799 Barangay 2 (Pob.) 665 Barangay 3 (Pob.) 257 Barangay 4 (Pob.) 302 Barangay 5 (Pob.) 432 Barangay 6 (Pob.) 310 Barangay 7 (Pob.) 278 Barangay 8 (Pob.) 601 Calabgan 496 Calangcuasan 1,099 Calantas 1,799 Culat 630 Dibet 971 Esperanza 458 Lual 1,482 Marikit 609 Tabas 1,007 Tinib 765 National Statistics Office 1 2010 Census of Population and Housing Aurora Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Bianuan 3,440 Cozo 1,618 Dibacong 2,374 Ditinagyan 587 Esteves 1,786 San Ildefonso 1,100 DILASAG 15,683 Diagyan 2,537 Dicabasan 677 Dilaguidi 1,015 Dimaseset 1,408 Diniog 2,331 Lawang 379 Maligaya (Pob.) 1,801 Manggitahan 1,760 Masagana (Pob.) 1,822 Ura 712 Esperanza 1,241 DINALUNGAN 10,988 Abuleg 1,190 Zone I (Pob.) 1,866 Zone II (Pob.) 1,653 Nipoo (Bulo) 896 Dibaraybay 1,283 Ditawini 686 Mapalad 812 Paleg 971 Simbahan 1,631 DINGALAN 23,554 Aplaya 1,619 Butas Na Bato 813 Cabog (Matawe) 3,090 Caragsacan 2,729 National Statistics Office 2 2010 Census of Population and -
Lrt Line 2 East Extension Project
Roadmap for Transport Infrastructure Development for Metro Manila and Its Surrounding Areas (Region III and Region IV-A) Main Points of the Roadmap Technical Assistance from the Japan International Cooperation Agency (JICA) Roadmap Study Objective Study Period To formulate “Transportation March 2013 – March 2014 Infrastructure Roadmap” for sustainable development of Metro Manila and its surrounding areas Stakeholders Consulted (Region III and IV-A) NEDA DPWH Outputs DOTC MMDA Dream plan towards 2030 Others (donors, private sectors, etc.) Roadmap towards 2016 and 2020 Priority projects 2 Significance of the study area: How to ensure sustainable growth of Metro Manila and surrounding regions. Study Area Nueva Ecija Aurora Tarlac GCR: MManila, Region III, Region IV-A Region III 100km Mega Manila: MManila, Bulacan, Rizal, Laguna, Cavite Metro Manila : 17 cities/municipality Pampanga Metro Manila shares 36% of GDP GCR shares 62% of GDP (Population :37%) Bulacan 50km Popuation Population growth rate (%/year) GRDP Metro (000) (Php billion) Rizal (1) GRDP by sector; growth rate (%/year), Manila 25,000 (2) 4,000 (3) sector share (%) 6.3% 2.0% 20,000 1 18 1.5% 3,000 15,000 Cavite 1.8% 3.1% Laguna 2,000 2.4% 6.1% 10,000 6 2.6% 81 2.1% 32 4.6% 63 17 1,000 Batangas 5,000 17 31 28 41 42 31 51 41 Region IV-A 0 0 MetroMetro Region IIIIII RegionRegion IV-A IV Visayas Mindanao ManilaManila Growth rate of population & GRDP is between 2000 and 2010 3 Rapid growth of Metro Manila, 1980 - 2010 1980 2010 2010/’80 Population (000) 5,923 11,856 2.0 Roads (km) 675 1,032 1.5 GRDP @ 2010 price (Php billion) 1,233 3,226 2.6 GRDP per Capita (Php 000) 208 272 1.3 No. -
Stage 1 Stage 1
STAGE 1 STAGE 1 STAGE MAP Quezon City - Palayan City | 157.15 km Sunday | 20 May 2018 Maria Aurora San Jose City COURSE FEATURES TYPE Science City SPRINT Baler of Muñoz START Rizal DRINK START Bongabon FEED ZONE Guimba FINISH Talaberaalavera San Luis GeronaKOM COURSE COURSE PALAYAN CITY NEUTRAL ZONE Cabanatuan Tarlac City City Dingalan 3 Capas Gapan City Mabalacat San Miguel Angeles 2 San Fernando Baliuag General Nakar Malolos 1 City of Balanga Manila Bay QUEZON CITY Manila Makati Parañaque 24 Untitled-1 24 17/05/2018 7:31 PM STAGE 1 STAGE 1 PROFILE Quezon City - Palayan City | 157.15 km Sunday | 20 May 2018 ELEVATION KM 131.42 1 KM 53.13 2 KM 101.65 3 Elevation (m) 1 KM 29.29 King of the Mountain Sprint 0 km RACE ACTIVITIES 5 km 5 km to finish 4:30 a.m. Race facilities crew on site 5:30 a.m. Security on site STAGE PROFILE 6:30 a.m. Race staff on site 6:45 a.m. Public address on 157.15 km 7:00 a.m. Teams arrive 0800H 7:10 a.m. Signing on opens Liwasang Aurora Fountain Quezon City 7:30 a.m. Signing on closes 1230H 7:40 a.m. Riders assemble on start line KM Post 130, 8:00 a.m. Le Tour de Filipinas departs Nueva Ecija-Aurora Road Palayan City, Nueva Ecija 8:30 a.m. Road closure ends 25 Untitled-1 25 17/05/2018 7:31 PM STAGE 1 STAGE 1 SCHEDULE START LOCATION : Liwasang Aurora, Quezon City Memorial Park FINISH LOCATION : Plaza Concepcion, Palayan City, Nueva Ecija NEUTRALIZED ZONE : 9.61 km DEPARTURE : 08:00:00 RACE DESCRIPTION FROM TO FEATURE INSTRUCTION DESCRIPTION ESTIMATED TIME OF ARRIVAL (kph) START FINISH 35 40 45 0.00 9.61 START GANTRY -
52083-002: Malolos-Clark Railway Project (PFR 1)
Environmental Monitoring Report Semi-annual Environmental Monitoring Report No. 1 March 2020 PHI: Malolos-Clark Railway Project – Tranche 1 Volume II September 2019 – March 2020 Prepared by the Project Management Office (PMO) of the Department of Transportation (DOTr) for the Government of the Republic of the Philippines and the Asian Development Bank. CURRENCY EQUIVALENTS (as of 30 March 2020) Currency unit – Philippine Peso (PHP) PHP1.00 = $0.02 $1.00 = PHP50.96 ABBREVIATIONS ADB – Asian Development Bank BMB – Biodiversity Management Bureau Brgy – Barangay CCA – Climate Change Adaptation CCC – Climate Change Commission CDC – Clark Development Corporation CEMP – Contractor’s Environmental Management Plan CENRO – City/Community Environment and Natural Resources Office CIA – Clark International Airport CIAC – Clark International Airport Corporation CLLEx – Central Luzon Link Expressway CLUP – Comprehensive Land Use Plan CMR – Compliance Monitoring Report CMVR – Compliance Monitoring and Validation Report CNO – Certificate of No Objection CPDO – City Planning and Development Office DAO – DENR Administrative Order DD / DED – Detailed Design Stage / Detailed Engineering Design Stage DENR – Department of Environment and Natural Resources DepEd – Department of Education DIA – Direct Impact Area DILG – Department of Interior and Local Government DOH – Department of Health DOST – Department of Science and Technology DOTr – Department of Transportation DPWH – Department of Public Works and Highways DSWD – Department of Social Welfare and Development -
Store Store Business Address Business Center Location Inside
Business Center Location Store Store Business Address inside Robinsons Department Store 1 RDS RP Ermita Robinsons Place, M. Adriatico St., Ermita, Manila 1000 Midtown Wing Level 1 near Ladies Shoes Section RDS Tutuban 2 Tutuban Center, Loop Road West, C.M. Recto, Tondo, Manila 1012 Level 2 beside Luggage Section Center Mall RDS Festival Mall 3 Filinvest Alabang, Muntinlupa City Level 2 beside Snacks and Toys Section Alabang 4 RDS RP Pioneer EDSA corner Pioneer St., Mandaluyong City Level 2 beside Intimate Apparel Section 5 RDS RP Magnolia UG, Level 2 &3, Aurora Boulevard, New Manila, Q.C. Upper Ground Floor Near Men’s Furnishing Section RDS Victoria Mall 6 3rd Floor Galeria Victoria Bldg JP Rizal Balanga City, Bataan Level 3 beside Toys and Infants’ Wear Section Bataan 7 RDS RP Santiago Maharlika Hi-way, Brgy Mabini, Santiago City, Isabela Level 1 beside Luggage section 8 RDS RP Imus Aguinaldo Highway, Imus, Cavite Level 2 near Luggage and Mens Accessories Section RDS RP Level 1 near West Entrance, Gapan-Olangapo Road Brgy. San Jose, San 9 Level 1 near West Entrance Pampanga Fernando Pampanga Robinsons Town Mall, Lopez Avenue, Batong Malake, Los Baños, Laguna 10 RDS RP Los Banos Level 2 beside gift-wrapping section 4030 RDS Nepomall 11 St. Joseph Cor Dona Teresa St Sto Rosario Angeles City, Pampanga Level 2 beside Athletic Shoes Section Angeles 12 RDS RP Lipa Mataas na Lupa, Lipa City Level 1 near Luggage Area and Plasticware Section RDS RP 13 Km 111 Maharlika Highway, Cabanatuan City Level 2 beside Luggage Section Cabanatuan RDS RP Ilocos 14 Brgy. -
Malolos-Clark Railway Project Department SERD/SETC /Division Country Philippines Executing Agency Department of Borrower Republic of the Philippines Transportation 2
Report and Recommendation of the President to the Board of Directors Project Number: 52083-001 April 2019 Proposed Multitranche Financing Facility Republic of the Philippines: Malolos–Clark Railway Project Distribution of this document is restricted until it has been approved by the Board of Directors. Following such approval, ADB will disclose the document to the public in accordance with ADB’s Access to Information Policy. CURRENCY EQUIVALENTS (as of 25 March 2019) Currency unit – Philippine Peso (₱) ₱1.00 = $0.0190 $1.00 = ₱52.56 ABBREVIATIONS ADB – Asian Development Bank ASEAN – Association of Southeast Asian Nations BBB – Build, Build, Build CIA – Clark International Airport CPS – country partnership strategy DOTr – Department of Transportation EIA – environmental impact assessment EMP – environmental management plan FAM – facility administration manual GDP – gross domestic product ha – hectare IPIF – Infrastructure Preparation and Innovation Facility JICA – Japan International Cooperation Agency km – kilometer LRT – Light Rail Transit MFF – multitranche financing facility MRT – Metro Rail Transit NAIA – Ninoy Aquino International Airport NCR – National Capital Region NEDA – National Economic and Development Authority NSCR – North–South Commuter Railway O&M – operation and maintenance PDP – Philippine Development Plan PMO – project management office PNR – Philippine National Railways RAP – resettlement action plan RIPPF – resettlement and indigenous peoples planning framework TA – technical assistance NOTES (i) The fiscal year (FY) -
Uimersity Mcrofihns International
Uimersity Mcrofihns International 1.0 |:B litt 131 2.2 l.l A 1.25 1.4 1.6 MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF STANDARDS STANDARD REFERENCE MATERIAL 1010a (ANSI and ISO TEST CHART No. 2) University Microfilms Inc. 300 N. Zeeb Road, Ann Arbor, MI 48106 INFORMATION TO USERS This reproduction was made from a copy of a manuscript sent to us for publication and microfilming. While the most advanced technology has been used to pho tograph and reproduce this manuscript, the quality of the reproduction Is heavily dependent upon the quality of the material submitted. Pages In any manuscript may have Indistinct print. In all cases the best available copy has been filmed. The following explanation of techniques Is provided to help clarify notations which may appear on this reproduction. 1. Manuscripts may not always be complete. When It Is not possible to obtain missing pages, a note appears to Indicate this. 2. When copyrighted materials are removed from the manuscript, a note ap pears to Indicate this. 3. Oversize materials (maps, drawings, and charts) are photographed by sec tioning the original, beginning at the upper left hand comer and continu ing from left to right In equal sections with small overlaps. Each oversize page Is also filmed as one exposure and Is available, for an additional charge, as a standard 35mm slide or In black and white paper format. * 4. Most photographs reproduce acceptably on positive microfilm or micro fiche but lack clarify on xerographic copies made from the microfilm. For an additional charge, all photographs are available In black and white standard 35mm slide format.* *For more information about black and white slides or enlarged paper reproductions, please contact the Dissertations Customer Services Department. -
List of Licensed Covid-19 Testing Laboratory in the Philippines
LIST OF LICENSED COVID-19 TESTING LABORATORY IN THE PHILIPPINES ( as of November 26, 2020) OWNERSHIP MUNICIPALITY / NAME OF CONTACT LICENSE REGION PROVINCE (PUBLIC / TYPE OF TESTING # CITY FACILITY NUMBER VALIDITY PRIVATE) Amang Rodriguez 1 NCR Metro Manila Marikina City Memorial Medical PUBLIC Cartridge - Based PCR 8948-0595 / 8941-0342 07/18/2020 - 12/31/2020 Center Asian Hospital and 2 NCR Metro Manila Muntilupa City PRIVATE rRT PCR (02) 8771-9000 05/11/2020 - 12/31/2020 Medical Center Chinese General 3 NCR Metro Manila City of Manila PRIVATE rRT PCR (02) 8711-4141 04/15/2020 - 12/31/2020 Hospital Detoxicare Molecular 4 NCR Metro Manila Mandaluyong City PRIVATE rRT PCR (02) 8256-4681 04/11/2020 - 12/31/2020 Diagnostics Laboratory Dr. Jose N. Rodriguez Memorial Hospital and (02) 8294-2571; 8294- 5 NCR Metro Manila Caloocan City PUBLIC Cartridge - Based PCR 08/13/2020 - 12/31/2020 Sanitarium 2572 ; 8294-2573 (GeneXpert)) Lung Center of the 6 NCR Metro Manila Quezon City PUBLIC rRT PCR 8924-6101 03/27/2020 - 12/31/2020 Philippines (LCP) Lung Center of the 7 NCR Metro Manila Quezon City Philippines PUBLIC Cartridge - Based PCR 8924-6101 05/06/2020 - 12/31/2020 (GeneXpert) Makati Medical Center 8 NCR Metro Manila Makati City PRIVATE rRT PCR (02) 8888-8999 04/11/2020 - 12/31/2020 (HB) Marikina Molecular 9 NCR Metro Manila Marikina City PUBLIC rRT PCR 04/30/2020 - 12/31/2020 Diagnostic laboratory Philippine Genome 10 NCR Metro Manila Quezon City Center UP-Diliman PUBLIC rRT PCR 8981-8500 Loc 4713 04/23/2020 - 12/31/2020 (NHB) Philippine Red Cross - (02) 8790-2300 local 11 NCR Metro Manila Mandaluyong City PRIVATE rRT PCR 04/23/2020 - 12/31/2020 National Blood Center 931/932/935 Philippine Red Cross - 12 NCR Metro Manila City of Manila PRIVATE rRT PCR (02) 8527-0861 04/14/2020 - 12/31/2020 Port Area Philippine Red Cross 13 NCR Metro Manila Mandaluyong City Logistics and PRIVATE rRT PCR (02) 8790-2300 31/12/2020 Multipurpose Center Research Institute for (02) 8807-2631; (02) 14 NCR Metro Manila Muntinlupa City Tropical Medicine, Inc. -
Store Business Address Business Center Location Inside Robinsons
Business Center Location inside Robinsons Department Store Store Business Address Regular Store Hours (Daily / Weekdays / Sat / Sun) Store 1 RDS RP Ermita Robinsons Place, M. Adriatico St., Ermita, Manila 1000 Midtown Wing Level 1 near Ladies Shoes Section SN-TH (10:00 AM - 9:00 PM) F-ST (10:00 AM - 10:00 PM) 2 RDS Festival Mall Alabang Filinvest Alabang, Muntinlupa City Level 2 beside Snacks and Toys Section 10:00 AM - 9:00 PM 3 RDS RP Pioneer EDSA corner Pioneer St., Mandaluyong City Level 2 beside Intimate Apparel Section 10:00 AM - 9:00 PM 4 RDS RP Magnolia UG, Level 2 &3, Aurora Boulevard, New Manila, Q.C. Upper Ground Floor Near Men’s Furnishing Section M-TH (11:00 AM - 9:00 PM) F-SN (10:00 AM - 10:00 PM) 5 RDS RP Santiago Maharlika Hi-way, Brgy Mabini, Santiago City, Isabela Level 1 beside Luggage section 10:00 AM - 9:00 PM 6 RDS RP Imus Aguinaldo Highway, Imus, Cavite Level 2 near Luggage and Mens Accessories Section M-SN (10:00 AM - 9:00 PM) 7 RDS RP Pampanga Level 1 near West Entrance, Gapan-Olangapo Road Brgy. San Jose, San Fernando Pampanga Level 1 near West Entrance 10:00 AM - 9:00 PM 8 RDS RP Los Banos Robinsons Town Mall, Lopez Avenue, Batong Malake, Los Baños, Laguna 4030 Level 2 beside gift-wrapping section SN-TH (10:00 AM - 8:00 PM) F-ST (10:00 AM - 9:00 PM) 9 RDS Nepomall Angeles St. Joseph Cor Dona Teresa St Sto Rosario Angeles City, Pampanga Level 2 beside Athletic Shoes Section 10:00 AM - 9:00 PM 10 RDS RP Lipa Mataas na Lupa, Lipa City Level 1 near Luggage Area and Plasticware Section 10:00 AM - 9:00 PM 11 RDS RP Cabanatuan Km 111 Maharlika Highway, Cabanatuan City Level 2 beside Luggage Section 10:00 AM - 9:00 PM 12 RDS RP Ilocos Norte Brgy. -
Malolos Oil Field: Nuevo Malolos‐1 Deepening ‐ Update Service Contract 44: Onshore North Cebu, Philippines
ASX Market Announcements 9th December 2019 MALOLOS OIL FIELD: NUEVO MALOLOS‐1 DEEPENING ‐ UPDATE SERVICE CONTRACT 44: ONSHORE NORTH CEBU, PHILIPPINES Gas2Grid Limited (“GGX”) advises that following the Rig‐2 move onto the Nuevo Malolos‐1 well in November the operations completed to date include re‐entering the cased section of the well and drilling out the two cement plugs. A significant amount of gas had accumulated below the lower cement plug and the gas was circulated out of the hole. The well was cleaned out to a depth of 1,913.7 metres (6,287.5 feet) from ground level (GL) and the drilling assembly was being pulled out of the hole. The casing shoe is at 1,934.2 metres (6,345.7 feet) GL. A metal “pry” bar accidentally dropped in the hole before pulling the drilling assembly to surface. The pry bar has wedged against the drilling assembly while pulling it out of the hole with the drill bit at a depth of 837 metres (2,746 feet GL). The drilling assembly has become stuck at this depth. It comprises a drill bit, drill collars and 2 7/8” tubing. Attempts to free the drilling assembly over the last few days have been unsuccessful. Lack of necessary oil field operations equipment and consumables within the Philippines has made remedial operations challenging. To be able to continue with drilling operations, the forward actions are to determine the program to further attempt to free the drilling assembly, source the required equipment which may need to be imported and assess the cost. -
Bureau of Animal Industry ANIMAL FEEDS VETERINARY DRUGS and BIOLOGICS CONTROL DIVISION (AFVDBCD)
Bureau of Animal Industry ANIMAL FEEDS VETERINARY DRUGS AND BIOLOGICS CONTROL DIVISION (AFVDBCD) FEED PRODUCT REGISTRATION INGREDIENT MANUFACTURER June 2018 MfgImporterName MfgImporterAddress Region BAI Reg. No. FeedProduct Brand Name CFPRNo Valid Until Unit 905 Antel Global Corporate Ctr., Julia MYCO PRIME HYDRATED SODIUM RNSV CORPORATION NCR FM-285 Myco Prime FA-166 Dec. 31, 2018 Vragas Ortigas Pasig City CALCIUM ALUMINOSILICATE NECO PHILIPPINES, INC. 1181 G. Masangkay St., Tondo, Manila NCR FM-279 NECO GREEN APPLE Neco FAL-115 Dec. 31, 2018 NECO PHILIPPINES, INC. 1181 G. Masangkay St., Tondo, Manila NCR FM-279 NECO EGG YELLOW Neco FAL-114 Dec. 31, 2018 NECO PHILIPPINES, INC. 1181 G. Masangkay St., Tondo, Manila NCR FM-279 NECO LEMON YELLOW Neco FAL-116 Dec. 31, 2018 NECO PHILIPPINES, INC. 1181 G. Masangkay St., Tondo, Manila NCR FM-279 NECO ORANGE Neco FAL-117 Dec. 31, 2018 NECO PHILIPPINES, INC. 1181 G. Masangkay St., Tondo, Manila NCR FM-279 NECO CHOCOLATE BROWN Neco FAL-120 Dec. 31, 2018 NECO PHILIPPINES, INC. 1181 G. Masangkay St., Tondo, Manila NCR FM-279 NECO RED #3 Neco FAL-118 Dec. 31, 2018 NECO PHILIPPINES, INC. 1181 G. Masangkay St., Tondo, Manila NCR FM-279 NECO STRAWBERRY RED Neco FAL-119 Dec. 31, 2018 First Bulacan Industrial City, Brgy. Santor, CARGILL PHILIPPINES, INC. 3 FM-17-404 NEOPIGG BOOSTER MASH Neopigg S-18-758 Dec. 31, 2018 Malolos, Bulacan First Bulacan Industrial City, Brgy. Santor, CARGILL PHILIPPINES, INC. 3 FM-17-404 NEOPIGG PRE-STARTER MASH Neopigg S-18-759 Dec. 31, 2018 Malolos, Bulacan First Bulacan Industrial City, Brgy. -
Malolos-Clark Railway Project (PFR 1)
Social Monitoring Report Semi-annual Report September 2019 - March 2020 June 2020 PHI: Malolos-Clark Railway Project (PFR 1) Prepared by Greater Capital Railway for the Department of Transportation and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENTS (as of 17 June 2020) Currency unit – Philippine Peso (₱) P1.00 = $ 0.0199 $1.00 = ₱ 50.1500 ABBREVIATIONS ADB – Asian Development Bank ADRI – agreement to demolish and remove improvement AH – affected household AP – affected person BCDA – Bases Conversion and Development Authority BIR – Bureau of Internal Revenue BLGU – barangay local government unit CAO – City Agriculture Office CBIA – Community-Based Initiative Approach CESO – City Employment Service Office CIA – Clark International Airport CMP – Community Mortgaged Program CP – contract package CPDO – City Planning and Development Office CSWDO – City Social Welfare and Development Office DA – Department of Agriculture DAR – Department of Agrarian Reform DBM – Department of Budget and Management DD – detailed design DepEd – Department of