Section 19 Master Spreadsheet 061119
Total Page:16
File Type:pdf, Size:1020Kb
Appendix A Duty to Investigate Section 19 Investigations Lincolnshire County Council Section 19 Investigations - West Lindsey District Council & City of Lincoln Council Network Area - Area Highways Manager Mike Reed (North) Estimated Risk Management Authorities with Timescales S19 Report Number Of Date of Incident Town / Locality Street / Road Name Description of Flooding Investigation Status Proposed Action/Works Responsibilities and whether they are Promoter Works Status Recommendation / File Properties exercising functions Scheme Reference Completion Flooding was caused by surcharging surface water sewers Further detailed study required into the combined with overland flows. ownership, condition and capacity of the surface water sewer system with a view to Investigation & 4 properties providing a new pipe system to intercept Maple Avenue - DN41 8EN LCC - Yes LCC Feasibility 2020/21 flows from the A18 Barton Street; to 28 June 2012 Keelby Pelham Crescent - DN41 8EW 4 Completed On-going Possible works S19-032 Maple Avenue - 2 Properties reduce flows entering the village, and to Riby Road - DN41 8ER Anglian Water - Yes AW 2023/24. Potential Pelham Crescent - 1 Property upgrade the pipe between Riby Road and Grant In Aid scheme. Riby Road - 1 Property Caddle Beck. Further LCC investigation and design required. Scheme bid submitted for feasibility and works. 1. That all RMA's inspect their respective infrastructure and take any necessary steps to ensure it is working as well as Caldicott Drive possible. Darwin Street Over a period of 60 minutes during the afternoon 43.4mm of rain fell Elsham Walk in Gainsborough, of which 35.6mm fell in 30 minutes (a return period 2. Advice be made available to victims of Hill Crescent of 227 years). The surface water drains and combined sewer flooding with regard to resistance LCC - Yes Limber Close systems were unable to cope with the intense rainfall, the various measures which might be appropriate, for Marshalls Yard Feasibility 2021/22 systems consequently surcharging and the resulting surface water example air brick covers and flood gates. WLDC - Yes 9 June 2014 Gainsborough Priory Close 53 Completed LCC On-going S19-115 runoff entering properties. In all around 53 properties were flooded Rectory Avenue Construction 2024/25 internally. 3. LCC consider improvements to the Severn Trent Water - Yes Silver Street highway surface water drainage where this Spring Gardens 53 properties will offer resistance to flooding from Tower Street surface runoff. Trinity Street Long Wood Road 4. That the LLFA investigate the feasibility Page 15 of overland flood routes to manage the risk of flooding from surface water Customer rang to report that during Monday evenings heavy rainfall their house was flooded due to blocked drains at the bottom of the road. Customer has had to have all the carpets ripped up and the LCC to clean and jet gullies and LCC - Yes LCC 14 September 2015 Lincoln Percy Street - LN2 5ET 1 Completed On-going End 2015 S19-132 back garden was under approx 2 feet of water. connections AW - Yes AW 1 property Flooding into the property due to drainage, water in customers house. 15 June 2016 Cherry Willingham Ancaster Close - LN3 4JF 1 On-going Awaiting report TBC TBC On-going TBC S19-164 1 property Surface water run-off following heavy Surface water run-off following heavy rainfall events. rainfall events. LCC - Yes 9th August 2017 Scotter Eminson Close - DN21 3RG 1 Completed LCC On-going TBC S19-154 Severn Trent Water - Yes 1 property 1 property Surface water run-off from higher ground to the rear of the property following a period of heavy rain caused the property to flood.The drainage system was unable to cope with the volume of water which LCC - Yes 02 April 2018 Blyton High Street - DN21 3LA 1 Completed TBC LCC On-going TBC S19-089 caused the dyke to the side of the property to overflow. Riparian Owner 1 property Surface water flooding. TBC Cherry Willingham Lime Grove - LN3 4BD 1 On-going TBC On-going S19-201 1 property Surface water running up the footway, off the road, into the garden LCC - Yes The flooding was due to a combination of and through the rear door of the property. Witham 3rd IDB - Yes 10 August 2018 Lincoln Percy Street - LN2 5ET 1 Completed blocked surface water drainage and the TBC On-going TBC S19-213 EA - Yes topography of the locality. 1 property AW - Yes Allenby close is not yet adopted by LCC. It appears that the The topography of the estate roads, LCC -Yes condition of the surfae water darinage was such that it could not property threshold levels, kerb heights and Witham 3rd IDB - Yes cope with relatively insignificant rainfall events, which resulted in 10 August 2018 Lincoln Allenby Close - LN3 4RP 1 Completed blockages in the surface water drainage EA - Yes CoLC On-going TBC S19-214 surface water runoff entering the residence. system were all contributory factors in the AW - Yes flooding. CoLC - Yes 1 property Duty to Investigate Section 19 Investigations Lincolnshire County Council Section 19 Investigations - West Lindsey District Council & City of Lincoln Council Network Area - Area Highways Manager Mike Reed (North) Estimated Risk Management Authorities with Timescales S19 Report Number Of Date of Incident Town / Locality Street / Road Name Description of Flooding Investigation Status Proposed Action/Works Responsibilities and whether they are Promoter Works Status Recommendation / File Properties exercising functions Scheme Reference Completion TBC 11 June 2019 Cherry Willingham Lime Grove - LN3 4BD 1 TBC On-going Awaiting report TBC TBC On-going TBC S19-180 1 Primary School 14 June 2019 Skellingthorpe Jerusalem - LN6 4RN TBC 1 TBC On-going Awaiting report TBC TBC On-going TBC S19-232 TBC 14 June 2019 Lincoln High Street - LN5 7AF 1 TBC On-going Awaiting report TBC TBC On-going TBC S19-233 1 Commercial property 18 June 2019 Lincoln Alexandra Terrace - LN1 1JF TBC 1 TBC On-going Awaiting report TBC TBC On-going TBC S19-244 Internal flooding to a domestic property. 27 July 2019 Lincoln Welton Gardens - LN2 2AY 1 On-going Awaiting report TBC TBC On-going TBC S19-251 1 property Internal flooding to 2 domestic properties. 30 August 2019 Brookenby Dale View Road - LN8 6EP 2 TBC On-going Awaiting report TBC TBC On-going TBC S19-253 1 property Internal flooding to a domestic property. 06 September 2019 Lincoln Nettleham Close - LN2 1SJ 1 On-going Awaiting report TBC TBC On-going TBC S19-254 1 property Internal flooding to 2 domestic properties. 25 September 2019 Hainton Louth Road - LN8 6LX 2 TBC On-going Awaiting report TBC TBC On-going TBC S19-255 1 property Page 16 Internal flooding to a commercial property. 27 July 2019 Haddington Old Haddington Road - LN5 9FN 1 On-going Awaiting report TBC TBC On-going TBC S19-258 1 commercial property Internal flooding to a domestic property. 01 June 2019 Waddington Brant Road - LN5 9AF 1 On-going Awaiting report TBC TBC On-going TBC S19-259 1 property Internal flooding to a commercial property. 27 August 2019 Lincoln Sincil Street - LN5 7EJ 1 On-going Awaiting report TBC TBC On-going TBC S19-266 1 commercial property Internal flooding to a domestic property. 15 October 2019 Lincoln Manby Street - LN5 8NW 1 On-going Awaiting report TBC TBC On-going TBC S19-275 1 property Waterford Lane - LN3 4AN Internal flooding to 6 domestic properties. 29 October 2019 Cherry Willingham 6+ TBC On-going Awaiting report TBC TBC On-going TBC S19-287 Fiskerton Road - LN3 4AP 6 properties TBC Internal flooding to a domestic property. 26 October 2019 Blyton Station Road - DN21 3LE 1 On-going Awaiting report TBC TBC On-going TBC S19-289 1 property Appendix A Duty to Investigate Section 19 Investigations Lincolnshire County Council Section 19 Investigations - East Lindsey District Council Network Area - Area Highways Manager Russell Crockford (East) Risk Management Authorities with Estimated Timescales Number Of S19 Report File Date of Incident Town / Locality Street / Road Name Description of Flooding Investigation Status Proposed Action/Works Responsibilities and Promoter Works Status Recommendation / Properties Reference whether they are exercising Scheme Completion functions Whilst the flooding was caused by extreme rainfall and overland flows, LCC has undertaken a CCTV survey of the underground surface water systems. This has revealed a number of condition concerns in relation to a brick culvert system owned by Anglian Water. The report has been passed to Anglian Water Extreme rainfall (estimated to be a 1 in 50 year event) caused overland and in order that they consider future action highway surface water flows to collect at the low area of the Bull Ring and and repairs. LCC has in addition carried Anglian Water - Yes South Street overwhelming the Anglian Water sewer systems; which were 28 June 2012 Horncastle South Street 3 Completed out repairs to gullies and connections in LCC On-going 2018/19 S19-003 also suffering from surcharged outfalls due to high river levels. South Street. LCC has also undertaken LCC - Yes initial modelling work to help understand 3 properties and assess surface water flood risk in Horncastle. A bid for an overall surface water study for Horncastle is being submitted by LCC. Anglian Water works to clear blockages have been completed. Planned Environment Agency works regarding outfall issues and river levels may reduce flood risk. A full drainage survey has been carried out and significant blockages have been removed from both the highway drains Extreme rainfall (estimated to be a 1 in 50 year event) caused significant and Anglian Water's surface water overland flows from the adjacent hillside and agricultural land, which was sewers. The survey has identified a LCC - Yes not contained by the interceptor ditch.