Downloads/File/1388/Peebles

Total Page:16

File Type:pdf, Size:1020Kb

Downloads/File/1388/Peebles Seeing Issues Clearly Peebles Transport Study – STAG Report Final Report for Scottish Borders Council August 2012 Document Control Project Title: Peebles Transport Study MVA Project Number: C3A434-00 Document Type: Report Directory & File Name: D:\Peebles Stag2\July 2012\20120831 Peebles-STAG2-Report-V5.0.Doc Document Approval Primary Author: Scott Leitham Other Author(s): Scottish Borders Council Reviewer(s): Paul McCartney Formatted by: Nicola Milne Distribution Issue Date Distribution Comments 1 11/12/12 Graeme Johnstone / SBC Draft Final Report 2 31/07/12 Graeme Johnstone / SBC Draft Final Report 3 14/08/12 Graeme Johnstone / SBC Draft Final Report 4 31/08/12 Graeme Johnstone / SBC Final Report This report, and information or advice which it contains, is provided by MVA Consultancy Ltd solely for internal use and reliance by its Client in performance of MVA Consultancy Ltd’s duties and liabilities under its contract with the Client. Any advice, opinions, or recommendations within this report should be read and relied upon only in the context of the report as a whole. The advice and opinions in this report are based upon the information made available to MVA Consultancy Ltd at the date of this report and on current UK standards, codes, technology and construction practices as at the date of this report. Following final delivery of this report to the Client, MVA Consultancy Ltd will have no further obligations or duty to advise the Client on any matters, including development affecting the information or advice provided in this report. This report has been prepared by MVA Consultancy Ltd in their professional capacity as Consultants. The contents of the report do not, in any way, purport to include any manner of legal advice or opinion. This report is prepared in accordance with the terms and conditions of MVA Consultancy Ltd’s contract with the Client. Regard should be had to those terms and conditions when considering and/or placing any reliance on this report. Should the Client wish to release this report to a Third Party for that party's reliance, MVA Consultancy Ltd may, at its discretion, agree to such release provided that: (a) MVA Consultancy Ltd's written agreement is obtained prior to such release, and (b) by release of the report to the Third Party, that Third Party does not acquire any rights, contractual or otherwise, whatsoever against MVA Consultancy Ltd and MVA Consultancy Ltd, accordingly, assume no duties, liabilities or obligations to that Third Party, and (c) MVA Consultancy Ltd accepts no responsibility for any loss or damage incurred by the Client or for any conflict of MVA Consultancy Ltd's interests arising out of the Client's release of this report to the Third Party. Contents 1 Introduction 1.1 1.1 Introduction 1.1 1.2 Scottish Transport Appraisal Guidance 1.1 1.3 Overview of this Report 1.2 2 Analysis of Problems and Opportunities 2.1 2.1 Introduction 2.1 2.2 Future Plans for Peebles 2.2 2.3 Transport in Peebles 2.3 2.4 Traffic in Peebles 2.8 2.5 Opportunities 2.16 3 Objective Setting 3.1 3.1 Introduction 3.1 3.2 Transport Planning Objectives 3.1 3.3 Established Policy Directives 3.1 4 Option Generation, Sifting and Development 4.1 4.1 Introduction 4.1 4.2 Consultation 4.1 4.3 Overview of Options 4.5 4.4 Option Sifting 4.8 4.5 Options to be Taken Forward 4.10 5 Part 1 Appraisal 5.1 5.1 Introduction 5.1 5.2 Bridge Options – Time Savings and Traffic Impacts 5.1 5.3 Transport Planning Objectives 5.4 5.4 STAG Criteria 5.9 5.5 Feasibility, Affordability and Public Acceptability 5.3 5.6 Summary of Options 5.4 5.7 Options to be Taken Forward 5.7 6 Developments Since STAG Part 1 6.1 6.1 Introduction 6.1 6.2 Consultation - Public Exhibition 6.1 6.3 Further developments & alternative routes 6.4 6.4 Options Taken Forward 6.6 7 Part 2 Appraisal 7.1 7.1 Introduction 7.1 Peebles Transport Study – STAG Report 1 Contents 7.2 Peebles Traffic Model 7.1 7.3 The Reference Case Scenario 7.7 7.4 Modelled Traffic Impacts of New Bridge Alignments 7.12 7.5 STAG Criteria - Environment 7.16 7.6 STAG Criteria - Economy 7.28 7.7 STAG Criteria - Safety 7.36 7.8 STAG Criteria - Integration 7.37 7.9 STAG Criteria - Accessibility and Social Inclusion 7.38 7.10 Risk and Uncertainty 7.40 7.11 Monitoring and Evaluation 7.41 7.12 Overview of Part 2 Appraisal 7.41 7.13 Overall Assessment of Options 7.46 8 Summary, Conclusions and Next Steps 8.1 8.1 Summary and Conclusions 8.1 8.2 Next Steps 8.1 Tables Table 2.1 Development in Peebles South of Tweed 2.3 Table 2.2 Proportions of ‘strategic’ traffic flow around Peebles 2.10 Table 4.1 Key Consultees 4.2 Table 5.1 Overview of New Bridge Alignment Impacts 5.2 Table 5.2 Estimated impact on Tweed Bridge flows 5.3 Table 5.3 Summary of Impacts Against Transport Planning Objectives 5.8 Table 5.4 Summary of Impacts Against STAG Criteria 5.9 Table 5.5 STAG Part 1 Recommendations 5.5 Table 5.6 Options to be Taken Forward 5.7 Table 5.7 Potential Combinations of Options for STAG 2 5.8 Table 6.1 Revised options for consideration in Part 2 6.6 Table 7.1 Tweed Bridge Traffic 7.5 Table 7.2 Summary of study-specific environmental impacts 7.25 Table 7.3 Overall STAG Assessment - Environment 7.28 Table 7.4 Estimated bridge construction costs (£, 2005 prices) 7.29 Table 7.5 Estimated road construction costs (£, 2005 prices) 7.30 Table 7.6 Estimated junction construction costs (£, 2005 prices) 7.30 Table 7.7 Estimated total construction costs (£, 2005 prices) 7.31 Table 7.8 TEE results - ‘Standard’ Scenario (£’000) 7.32 Table 7.9 TEE results - ‘High Growth’ Scenario (£’000) 7.33 Table 7.10 TEE results - ‘No Growth’ Scenario (£’000) 7.34 Table 7.11 Overall STAG Assessment - Economy 7.36 Table 7.12 Accident reduction benefits (60 years, discounted) 7.37 Table 7.13 Overall STAG Assessment – Safety 7.37 Table 7.14 Overall STAG Assessment - Integration 7.38 Table 7.15 Residents potentially benefitting from improved access to no. 62 7.39 Table 7.16 Overall STAG Assessment – Accessibility and Social Inclusion 7.40 Table 7.17 Performance of Options Against Transport Planning Objectives 7.43 Peebles Transport Study – STAG Report 2 Contents Table 7.18 Performance of Options Against STAG Criteria 7.44 Table 7.19 STAG Part 2 Appraisal Against Transport Planning Objectives & STAG Criteria7.45 Figures Figure 2.1 Location map of Peebles 2.1 Figure 2.2 Peebles Street Map 2.5 Figure 2.3 Typical travel times from Peebles by Public Transport and Car 2.8 Figure 2.4 Tweed Bridge in Peebles 2.10 Figure 2.5 Views of roundabout to the north of Tweed Bridge 2.12 Figure 2.6 Tweed Bridge Northbound Traffic Profiles 2.13 Figure 2.7 Tweed Bridge Southbound Traffic Profiles 2.13 Figure 2.8 High Street Eastbound Traffic Profiles 2.14 Figure 2.9 High Street Westbound Traffic Profiles 2.14 Figure 2.10 Location of Peebles Air Quality Monitoring Sites 2.16 Figure 4.1 Potential Bridge Crossings Location Plan 4.7 Figure 4.2 Existing footbridge and proposed location of crossing B1 (to right) 4.11 Figure 4.3 Existing A72 / A703 roundabout looking south from Edinburgh Road 4.12 Figure 4.4 View south from A72 / A703 roundabout along proposed alignment 4.12 Figure 4.5 Looking west along Kingsmeadows Road with B2 Southern Access on right 4.13 Figure 4.6 Location of B2 Northern Access on A72 4.13 Figure 4.7 Whitestone Park looking South from A72 4.14 Figure 4.8 Looking east - Kingsmeadows Road, B3 Access on Left (from Kingsway) 4.14 Figure 4.9 Looking west along A72 – B3 access on left at cottage 4.15 Figure 4.10 Existing entrance to Cavalry Park business park 4.15 Figure 4.11 Looking west along the A72 – B4 / B5 / B6 Access on left 4.16 Figure 4.12 Proposed southern access point for B6 (looking north west) 4.17 Figure 5.1 Environmental Constraints (B1 & B2) 5.11 Figure 5.2 Environmental Constraints (B4 – B6) 5.12 Figure 5.3 Location of Fatal, Serious and Slight Road Traffic Accidents in Peebles 5.1 Figure 6.1 Importance of traffic and transport issues 6.2 Figure 6.2 Need for a new road bridge crossing 6.2 Figure 6.3 Desire for a new road bridge crossing 6.3 Figure 6.4 Bridge alignment preferences 6.3 Figure 6.5 Indicative Location Plan for Potential Alignments 6.5 Figure 6.6 Northern A72 Access point to Option B8 6.6 Figure 7.1 Model Zone System – Area 7.2 Figure 7.2 Model Zone System – Town 7.3 Figure 7.3 Model Network - Town 7.3 Figure 7.4 Change in Traffic – GB, Scotland and Scottish Borders 7.4 Figure 7.5 Modelled vehicle kilometres, and % change from 2011 7.8 Figure 7.6 Modelled delay (vehicle hours) and % change from 2011 7.8 Figure 7.7 Reference Case Forecast Growth on Peebles Network (AM Peak) 7.9 Figure 7.8 Forecast Traffic Flows on Tweed Bridge – Reference Case 7.11 Figure 7.9 Forecast Changes in Cross River Journey Times 7.11 Figure 7.10 Modelled change in total travel time, % change versus Reference Case 7.13 Figure 7.11 Modelled change in total delay, % change versus Reference Case 7.14 Figure 7.12 Predicted Tweed Bridge traffic flows (12-hour) 7.15 Figure 7.13 Cross river traffic forecasts by bridge (2019, 12-hour) 7.15 Peebles Transport Study – STAG Report 3 Contents Figure 7.14 Cross river traffic forecasts by bridge (2019, %) 7.15 Figure 7.15 Impact of options on key links (2019, 12-hour) 7.16 Figure 7.16 Potential new bridge road alignments 7.17 Figure 7.17 Peebles flood risk map (SEPA website) 7.23 Figure 7.18 Summary of Benefit Cost Ratio results 7.35 Figure 7.19 Estimated change in walk time to access no.
Recommended publications
  • Burnt Mounds, Unenclosed Platform Settlements and Information on Burnt Stone Activity in the River Clyde and Tweed Valleys of South Lanarkshire and Peeblesshire
    Burnt Mounds, Unenclosed Platform Settlements and information on burnt stone activity in the River Clyde and Tweed valleys of South Lanarkshire and Peeblesshire. by Tam Ward 2013 Burnt Mounds, Unenclosed Platform Settlements and information on burnt stone activity in the River Clyde and Tweed valleys of South Lanarkshire and Peeblesshire. PAGE 1 Abstract Throughout the work of Biggar Archaeology Group’s (BAG) projects, burnt stone is shown to have played an important aspect of life in the past. Sometimes deliberately burnt as a method of transference of heat in the case of burnt mounds and where water was heated, and also in pits where dry cooking may have taken place, to co-incidentally being burnt in hearths and fireplaces during all periods from the Mesolithic to Post Medieval times. The recognition of burnt stone in the archaeology of the Southern Uplands of Scotland has been fundamental to interpretations by the Group in their voluntary work. The greatest manifestation of burnt stone appears in burnt mounds (BM), a relatively new class of site for the area of the Clyde and Tweed valleys, albeit now one of the most numerous. The subject of burnt stone in the general archaeology of BAG projects is also considered. Unenclosed Platform Settlements (UPS) are also a numerous site type in the area and perhaps are poorly understood in terms of their spatial distribution, chronology and function, as indeed are the BM. It is regarding these sites (BM & UPS) and their possible relationship with each other that this paper principally seeks to address. Burnt Mounds, Unenclosed Platform Settlements and information on burnt stone activity in the River Clyde and Tweed valleys of South Lanarkshire and Peeblesshire.
    [Show full text]
  • Appraisal Report
    Innerleithen Flood Study - Leithen Water & Chapman's Burn Appraisal Report Final Report December 2018 Council Headquarters Newtown St Boswells Melrose Scottish Borders TD6 0SA JBA Project Manager Angus Pettit Unit 2.1 Quantum Court Research Avenue South Heriot Watt Research Park Riccarton Edinburgh EH14 4AP UK Revision History Revision Ref / Date Issued Amendments Issued to S0-P01.01 / 2018 - Angus Pettit S0-P01 Minor amendments S4-P01 / October 2018 - Scottish Borders Council S4-P02 / December 2018 Post-council review and Scottish Borders Council amendments Contract This report describes work commissioned by Duncan Morrison, on behalf of Scottish Borders Council, by a letter dated 16 January 2017. Scottish Borders Council's representative for the contract was Duncan Morrison. Jonathan Garrett, Hannah Otton and Christina Kampanou of JBA Consulting carried out this work. Prepared by .................................................. Jonathan Garrett BEng Engineer Reviewed by ................................................. Angus Pettit BSc MSc CEnv CSci MCIWEM C.WEM Technical Director Purpose This document has been prepared as a Final Report for Scottish Borders Council. JBA Consulting accepts no responsibility or liability for any use that is made of this document other than by the Client for the purposes for which it was originally commissioned and prepared. JBA Consulting has no liability regarding the use of this report except to Scottish Borders Council. Our work has followed accepted procedure in providing the services but given the residual risk associated with any prediction and the variability which can be experienced in flood conditions, we can take no liability for the consequences of flooding in relation to items outside our control or agreed scope of service.
    [Show full text]
  • Technical Report 2: Site Assessments
    Sites for consideration for development - Assessment form Clydesdale area Cleghorn MAP NOT TO SCALE © Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence number 100020730. Background Site reference CL/16/002 address Hagholm Road Site size Ha 1.46 Current use agriculture Proposed use housing No of units 16 Submitted to previous LP? Locational factors Location (within Edge of settlement settlement/edge/isolated) Brownfield/greenfield greenfield Settlement pattern/coalescence/ribbon Ribbon development along northern side development of Hagholm Road Environmental factors landscape Rolling Farmland and within Special Landscape Area Natural heritage Proximity to the Mouse Water habitat corridor 107 Built heritage none Open space N/A Minerals N/A SEA Does the site accord with SEA? Partly – local landscape issues and potential noise impacts Accessibility Public access No core path routes affected Site access Access over third party land required to achieve visibility splay Road network Reasonable connectivity to classified network Public transport Bus stop >400m. No service on Hagholm Road. Rail station 3km. Access to services Lanark town centre 3km Infrastructure Water and sewerage Possible issues with current sewerage capacity. Any proposals should confirm surface water outfall intentions and future maintenance. Flood risk Watercourse near site. SEPA low risk but possible local issues. Flood Risk Assessment required. Education School capacities to be confirmed. Other Comments The proposed inclusion would create
    [Show full text]
  • Meldon Bridge
    Proc Soc Antiq Scot, 129(1999), 1-118 Meldon Bridge centrthir:a e th df eo millenniu m BCn i Peeblesshire Stephen Speak* & Colin Burgess^ with contributions by T B Ballin, D S Brown, R Coleman-Smith, GreeneT K GriffithsA J , JohnsonM , HodgsonR N , LukeA D , , A MacSween, J Price, J E Roberts, M Savage & J Weyman ABSTRACT Rescue excavations extensivean on cropmark confluence the site Lyneat the of Water Meldonand Burn in the 1970s revealed several episodes of activity. A limited Mesolithic presence is indicated by the stone finds, but more intensive use is attested from the early/mid fourth millennium BC. Widely scattered groups of pits contained Impressed localWarethe of style. Radiocarbon dates chart this activity early/middownthe to third millennium whenBC, massive a timber up long m wall, and 600 tomheight,4 in constructedwas promontory ha shut to 8 offthe between Lynethe Waterand Meldon Burn. A timber avenue led into the enclosure on the north-west; standing posts and stones and settings of posts and stakes were erected; and cremation burials took place in the interior. No cultural material certainlycan associatedbe with this probably phaseit and lasted centurya less.or largeA stockade within mainthe enclosure datedcouldbe not with certainty. disturbedA cist burial, yielding pendant,ajet 'slug' possibleknifeand Food Vessel sherds, havemay been interredof one as the final acts thisin phase. Renewed activity mid/latecamethe in second millennium whenBC, the extensive an usedsite was for cremation cemetery. This involved erecting rows posts,of some standing in pits containing cremations. There was also a burial in a rough cist, and two cremations deposited in Cordoned Urns.
    [Show full text]
  • Land South of the B7062, Cardrona
    Land South of the B7062, Cardrona Representation to the Scottish Borders Local Development Plan 2 Main Issues Report Renwick Country Properties January 2019 2 Contents 1. Introduction 2. Cardrona Context 3. Housing Opportunity 4. Effective Land Supply Criteria 5. Conceptual Masterplan 6. Summary and Conclusions Author: Checked By: Date: TF TJ 30/1/19 Ferguson Planning 3 Introduction 1 Overview Scope and Structure 1.5 This statement reviews the current planning 1.1 We write on behalf of Renwick Country policy context and summarises the design Properties in response to the request for process which has led to the preparation of comments on the Scottish Borders a conceptual masterplan for the site. The Local Development Plan 2 Main Issues remainder of this report is broken down into Report (MIR). the following sections: • Section 2 - Cardrona Context: Provides 1.2 This site representation relates (in part) to background information to Cardrona and the site ACARD001 which, thus far, has been context of the proposed site. excluded from the Main Issues Report. • Section 3 - Housing Opportunity: Considers current proposals for housing land provision 1.3 The site was put forward as a potential set out within the MIR and discusses the housing site at the “Call for Sites” stage. This opportunity for the provision of housing on submission will make reference to the the subject site. Planning Department’s (PD) high level • Section 4 – Effective Land Supply Criteria: the assessment and address why the site is following section outlines the Scottish indeed worthy of allocation (in addition Government’s tests of site effectiveness and and/or instead of some proposed how the proposed Cardrona site meets those sites contained within the MIR).
    [Show full text]
  • Scottish Borders Council Planning and Building Standards Committee
    Item No. 4(a) SCOTTISH BORDERS COUNCIL PLANNING AND BUILDING STANDARDS COMMITTEE MINUTE of MEETING of the PLANNING AND BUILDING STANDARDS COMMITTEE held in the Council Headquarters, Newtown St. Boswells on 4 March 2013 at 10.00 a.m. ------------------ Present: - Councillors R. Smith (Chairman), M. Ballantyne, S. Bell (from para 5), J. Brown (from para 3), J. Campbell, A. Cranston, J. Fullarton, S. Mountford, B. White. Apology:- Councillor N. Buckingham, V. Davidson, D. Moffat. Also Present:- Councillor G. Garvie. In Attendance:- Major Applications, Review and Enforcement Manager, Development Standards Manager, Senior Roads Planning Officer, Managing Solicitor – Commercial Services, Democratic Services Team Leader, Democratic Services Officer (F. Henderson). MINUTE 1. There had been circulated copies of the Minute of the Meeting of 4 February 2013. DECISION APPROVED for signature by the Chairman. APPLICATIONS 2 There had been circulated copies of reports by the Head of Planning and Regulatory Services on applications for planning permission requiring consideration by the Committee. DECISION DEALT with the applications as detailed in the Appendix to this Minute. MEMBER Councillor Brown joined the meeting during consideration of the following item. DANGEROUS ROOF AT SUNNYBRAE LODGE, WALKERBURN 3. With reference to paragraph 4 of the Private Minute of Scottish Borders Council of 27 September 2012, there had been circulated copies of a report by the Head of Planning and Regulatory Services which sought authority to undertake the works required to remove the dangerous roof and make good the wallheads at Sunnybrae Lodge, Walkerburn. The report explained that the slated pitched roof serving the former stables, had deteriorated to the extent that several structural roof timbers had rotted to such a degree that they no longer provided adequate support to the roof and as a result the whole roof structure was in danger of collapse.
    [Show full text]
  • Annex 3 – Peter Mcgowan Associates, “Borders Designed Landscapes Survey: Schedule of Identified Sites”
    Annex 3 – Peter McGowan Associates, “Borders Designed Landscapes Survey: Schedule of Identified Sites” Annex 3: Detailed Survey Reference Site name County Parish Grid reference 1 Baddinsgill Peebles Linton [West] NT 132 549 Notable Characteristics Forms landscape of upper glen of Lyne Water and is very prominent in approach Extensive and varied woods and belts Community woodland Site Description Settlement of Badonsgill is recorded on Blaeu (1654), and of Barronsgill on Roy (c.1750), the latter with a scatter of cultivation riggs around it, and a single, walled and tree-lined enclosure to S. Further planting, seen on OS (1850s), is augmented, possibly around the time of the redevelopment of the house as a shooting lodge in 1890s. A remotely located site at the S of Pentland Hills at top of Lyne Water and end of a no-through road from West Linton, lying below Baddingsgill reservoir. Complex and extensive layout of small woods and broad belts reaching along the valley seen from a distance along the approach. Mature MB with SP and MC in core with MC or conifer monoculture in outer plantations. Community wood with a one- mile walk in core. High impact in locality but not visible further afield. Significance Local, Outstanding 31 August 2009 Page 1 of 195 Reference Site name County Parish Grid reference 2 Lynedale / Medwyn Peebles West Linton NT 141 525 Notable Characteristics Wooded valleys sides providing setting for 19thC houses and newer development Site Description No clear evidence of a substantial house or plantations prior to the building of Lynedale House in the early 19thC, although NSA (1830s) described the felling of a considerable deal of valuable timber about the yards and steadings in the parish about a century before.
    [Show full text]
  • Peebles Flood Study - Soonhope Burn Appraisal Report
    Peebles Flood Study - Soonhope Burn Appraisal Report Final Report January 2019 Council Headquarters Newtown St Boswells Melrose Scottish Borders TD6 0SA JBA Project Manager Angus Pettit Unit 2.1 Quantum Court Research Avenue South Heriot Watt Research Park Riccarton Edinburgh EH14 4AP UK Revision History Revision Ref / Date Issued Amendments Issued to S0-P01.04 / August 2018 - Angus Pettit S0-P01 Minor amendments S4-P01 / September 2018 - Scottish Borders Council S4-P02 / January 2019 - Scottish Borders Council / SEPA Contract This report describes work commissioned by Duncan Morrison, on behalf of Scottish Borders Council, by a letter dated 16 January 2017. Scottish Borders Council's representative for the contract was Duncan Morrison). Barney Bedford, Tasmin Fletcher, Hannah Otton and Christina Kampanou of JBA Consulting carried out this work. Prepared by .................................................. Barney Bedford BSc MSc Analyst Reviewed by ................................................. Angus Pettit BSc MSc CEnv CSci MCIWEM C.WEM Technical Director Purpose This document has been prepared as a Final Report for Scottish Borders Council. JBA Consulting accepts no responsibility or liability for any use that is made of this document other than by the Client for the purposes for which it was originally commissioned and prepared. JBA Consulting has no liability regarding the use of this report except to Scottish Borders Council. Our work has followed accepted procedure in providing the services but given the residual risk associated with any prediction and the variability which can be experienced in flood conditions, we can take no liability for the consequences of flooding in relation to items outside our control or agreed scope of service.
    [Show full text]
  • Underbank Flood Risk Assessment
    Water South Lanarkshire Council July 2014 Underbank Primary School Flood Risk Assessment Water South Lanarkshire Council July 2014 This page is left blank deliberately Prepared by: .............................................................................. Checked: ....................... ....................................... Walter Robison Debbie Hay-Smith Senior Engineer Principal Engineer Approved by: .................................................................................. Dylan Huws Associate Director Underbank Primary School Flood Risk Assessment Rev No Comments Checked by Approved Date by 0 WR DH 15/07/14 1 Tanfield, Edinburgh, EH3 5DA Telephone: 0131 301 8600 Website: http://www.aecom.com Job No 60188970 Date Created: July 2014 This document is confidential and the copyright of AECOM Limited. Any unauthorised reproduction or usage by any person other than the addressee is strictly prohibited. f:\projects\water resources - slc property services frasuds support\auchengray primary school\auchengray_fra.docx This page is left blank deliberately Table of Contents 1 Introduction ....................................................................................................................................................................... 1 2 Flood Risk Assessment .................................................................................................................................................... 5 3 Conclusions and Recommendations ...........................................................................................................................
    [Show full text]
  • The South Lanarkshire (Electoral Arrangements) Order 1998
    Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format. STATUTORY INSTRUMENTS 1998 No. 3252 (S. 208) LOCAL GOVERNMENT, SCOTLAND The South Lanarkshire (Electoral Arrangements) Order 1998 Made - - - - 16th December 1998 Coming into force - - 1st January 1999 Whereas under section 17(1) of the Local Government (Scotland) Act 1973(1), as read with Schedule 5 to that Act(2), the Local Government Boundary Commission for Scotland on 17th September 1998 submitted to the Secretary of State a report on a review together with its proposals for the future electoral arrangements for the area of South Lanarkshire Council; Now, therefore, in exercise of the powers conferred on him by sections 17(2) and 233(3) of, and Schedule 5 to, the said Act and of all other powers enabling him in that behalf, the Secretary of State hereby makes the following Order: Citation and commencement 1. This Order may be cited as the South Lanarkshire (Electoral Arrangements) Order 1998 and shall come into force on 1st January 1999. Interpretation 2. In the Schedule to this Order– (a) a reference to– (i) an electoral ward is a reference to that electoral ward as constituted in this Order; and (ii) a road, footpath, railway line, river, burn or canal shall, where the context so admits, be construed as a reference to the centre line of the feature concerned; and (b) the following abbreviations are used:– “EW” for electoral ward; “NG Ref” for National Grid Reference as published on Ordnance Survey Maps.
    [Show full text]
  • Around Peebles and the John Buchan Way
    around Peebles and The John Buchan Way £2.00 Paths Around Peebles Contents Route 1 5km/3miles Venlaw and Soonhope 8 Route 2 6.5km/4miles Hamilton Hill and Standalane 10 Route 3 6.5km/4miles The Sware Circuit 12 Route 4 11km/7miles Tweed Walk to Lyne 14 Route 5 6.5km/4miles Haystoun, The Cut and Cademuir 18 Route 6 22km/13miles John Buchan Way 20 Route 7 8.5km/5miles Around Cademuir – Forest and 26 (11km/7miles) Forts Route 8 11km/7miles Janet’s Brae, Eshiels CW and 28 Glentress Route 9 9.5km/6miles Tweed Valley Railway Path 30 Route 10 5km/3miles The Barony Loops 32 Route 11 13.5km/8miles The Cloich Loop 34 Route 12 various Cardrona Forest 36 The Donalds Sub-Munro Hill List 38 Peebles Hay Lodge Park 2 Paths Around Peebles 3 3 11 10 11 11 2 2 1 1 8 3 8 2 4 9 4 3 4 9 4 5 8 9 6 7 5 7 5 12 9 6 7 6 7 Paths Around Peebles Hay Lodge Park, the River Tweed with Peebles Parish Church’s crowned belfry in the background Introduction Peebles - past and present This booklet includes 9 routes starting Peebles is first noted as being a royal burgh from Peebles in Central Tweeddale, 2 in 1152 when David I assigned a rent from routes starting from Eddleston and routes the firma burg. However, there is evidence in Cardrona Forest. The area is ideal for of an organised settlement before the 12th walking because the town is surrounded century.
    [Show full text]
  • Vol 1 EIAR Chapter 7 Cultural Heritage and Archaeology
    Heathland Wind Farm Chapter 7 EIA Report Archaeology and Heritage 7 CULTURAL HERITAGE AND ARCHAEOLOGY 7.1 INTRODUCTION 1. This Chapter of the Environmental Impact Assessment Report (EIA Report) evaluates the effects of Heathland Wind Farm (the Development) on the Archaeology and Cultural Heritage resource. This assessment was undertaken by Arcus Consultancy Services Limited (Arcus). 2. This Chapter of the EIA Report is supported by the following Technical Appendix documents provided in Volume 3 Technical Appendices: Technical Appendix A7.1: Heathland Wind Farm Archaeological Desk-Based Assessment (DBA); Technical Appendix A7.2 Consultation Records. 3. This Chapter of the EIA Report is supported by the following figures provided in Volume 2a: EIA Report Figures: Figure 7.1: Study Areas; Figure 7.2: Non-designated Heritage within 1 km Study Area; Figure 7.3: Designated Heritage Assets within 10 km; Figure 7.4: Cumulative Wind Farms within 10 km; Figure 7.5: Wireframe of Wilsontown Ironworks (SM2654); Figure 7.6: Wireframe of Woodmuir Farm, coke ovens and reservoirs 600 m SSE of (SM11227); Figure 7.7: Wireframe of Tashieburn, horse engine platforms 50 m NE of (SM9700); Figure 7.8: Wireframe of Haywood, deserted mining village (SM9684); Figure 7.9: Wireframe of Cleugh House, bell pits and inclined plane 130 m SSW of (SM11234); and Figure 7.10: Wireframe of West Harwood, burial mound 720 m SSE of (SM11210). 4. This chapter includes the following elements: Legislation, Policy and Guidance; Assessment Methodology and Significance Criteria; Baseline Conditions; Assessment of Potential Effects; Cumulative Effect Assessment; Mitigation and Residual Effects; Summary of Effects; Statement of Significance; and Glossary.
    [Show full text]