Pdf | 18.24 Kb

Total Page:16

File Type:pdf, Size:1020Kb

Pdf | 18.24 Kb Current Humanitarian & Rehabilitative Programs in Samtskhe-Javakheti Compiled by OCHA with information provided by the respective agencies, March 2001 (version 1.1) ORGANISATION ACTIVITY LOCATION OF NUMBER OF TOTAL FUNDING TOTAL EXPECTED DONORS ACTIVITY BENEFICIARIES 2000 (US$) LEVEL 2001 (US$) BILATERAL DONORS USAID 1. Emergency loan Samtskhe- 1. 2,450 1. 150,000 1. 200,000 United States Agency program for drought- Javakheti 2. 2,000 farming 2. 249,983 2. Not available for International affected farmers households Development 2. Drought relief UN AGENCIES UNICEF 1. Introduction of the Georgia-wide 1. N/A 1. 40,000 Not available UNICEF, USAID, United Nations active learning 2. 186,000 2. 634,700 German Natcom Children’s Fund methodology 2. Immunization OCHA 1. Humanitarian advocacy Georgia-wide N/A 336,140 599,159 PRM United Nations Office 2. Facilitating co- Switzerland for the Coordination ordination of Humanitarian 3. Information exchange Affairs 4. Resource mobilization UNV 1. Confidence building Ninotsminda N/A 1. 1,500 Not confirmed Bridge funding United Nations 2. Regional rehabilitation 2. 2,000 Volunteers UN WFP Emergency food assistance Samtskhe-Javakheti 46,200 N/A 544,779 WFP donor countries World Food Program to drought-affected population INTERNATIONAL ORGANISATIONS International 1. Community 1. Borjomi 1. Georgia-wide 1. 438,353 N/A 1. USAID development for IDPs 2. Akhaltsikhe 8,000 2. 14,970 2. PRM Federation 2. Population Movement 3. Borjomi 2. Georgia-wide 3. 198,802 3. SDS International 3. Rehabilitation of water 4. Samtskhe- 2,500 4. N/A 4. WFP Federation of Red sanitation in collective Javakheti 3. Georgia-wide Cross & Red Crescent centers for IDPs 4,900 Societies 4. Food distribution for 4. 46,200 drought-affected population INTERNATIONAL NON-GOVERNMENTAL ORGANISATIONS CARE 1. Small Farmer Support 1. Adigeni, 1. 20,000 households 1. 195,000 Not available 1. USDA 2. Drought Relief Initiative Akhaltsikhe, 2. 2,400 households 2. 250,000 2. USAID via Save 3. Water Resource Aspindza, 3. 7,670 households 3. 1,400,000 for the the Children Management 2. Adigeni, 4. N/A period of 1997- 3. USDA 4. Towards Sustainable 3. Akhaltsikhe & 2000 4. DFID Livelihoods in Adigeni Aspindza 4. Not available 4. Akhaltsikhe, Adigeni, Aspindza 5. Adigeni district N/A = not applicable (distinct from not available, where the information does not exist or was not made available to OCHA) Current Humanitarian & Rehabilitative Programs in Samtskhe-Javakheti Compiled by OCHA with information provided by the respective agencies, March 2001 (version 1.1) ORGANISATION ACTIVITY LOCATION OF NUMBER OF TOTAL FUNDING TOTAL EXPECTED DONORS ACTIVITY BENEFICIARIES 2000 (US$) LEVEL 2001 (US$) IOCC 1. Food distribution Samtskhe- 1. 6,300 1. App.408,798 from Not Available 1. USDA International 2. Social & agricultural Javakheti 2. N/A monetisation 2. USDA Orthodox Christian infrastructure 3. App. 3,020 project & 253,248 3. USDA, USAID via Charities rehabilitation from direct Save the Children 3. Micro-credit & small financing business development 2. 16,832 3. 350,000 (SC) 4. app. 350,000 (USDA) Mercy Corps East Georgia Community Akhaltsikhe App. 180 elderly N/A N/A USAID Mobilization Initiative 150 children (EGCMI) NI-CO Georgia governance & civil Samtskhe- N/A App. 1,836,000 over N/A DFID Northern Ireland society project Javakheti & Shida two & a half years. Kartli Company LOCAL NON-GOVERNMENTAL ORGANISATIONS receiving support from the international community CIPDD 1. Research of Conflict Samtskhe- N/A App. 15,000 App. 50,000 1. National The Caucasian potential Javakheti Endowment for Institute for Peace, 2. Ongoing Monitoring of Democracy (USA) Democracy & conflict potential 2. UNDP & OCHA, Development 3. Workshops / round- through Forum table discussions on for Early Warning development of civil & Early Response society & on (London), 3. EU, OSCE sensitive issues of the region Horizonti NGO development & Akhaltsikhe N/A N/A N/A USAID Foundation capacity building PAROS Nursery & kindergarten Ninotsminda App. 50 children 3,337 Not confirmed UNV Union of Consumers Legal-Consultative Center Ninotsminda N/A 19,500 N/A USAID through the of Samtskhe- Eurasia Foundation Javakheti Produced by OCHA Georgia, in conjunction with humanitarian agencies. For more information, please contact Ms. Nino Zhvania, Field Officer Tel/Fax: 995-32-959516, Tel: 995-32-943163; e-mail: [email protected] N/A = not applicable (distinct from not available, where the information does not exist or was not made available to OCHA).
Recommended publications
  • Distribution: EG: Bank of Jandara Lake, Bolnisi, Burs
    Subgenus Lasius Fabricius, 1804 53. L. (Lasius) alienus (Foerster, 1850) Distribution: E.G.: Bank of Jandara Lake, Bolnisi, Bursachili, Gardabani, Grakali, Gudauri, Gveleti, Igoeti, Iraga, Kasristskali, Kavtiskhevi, Kazbegi, Kazreti, Khrami gorge, Kianeti, Kitsnisi, Kojori, Kvishkheti, Lagodekhi Reserve, Larsi, Lekistskali gorge, Luri, Manglisi, Mleta, Mtskheta, Nichbisi, Pantishara, Pasanauri, Poladauri, Saguramo, Sakavre, Samshvilde, Satskhenhesi, Shavimta, Shulaveri, Sighnaghi, Taribana, Tbilisi (Mushtaidi Garden, Tbilisi Botanical Garden), Tetritskaro, Tkemlovani, Tkviavi, Udabno, Zedazeni (Ruzsky, 1905; Jijilashvili, 1964a, b, 1966, 1967b, 1968, 1974a); W.G.: Abasha, Ajishesi, Akhali Atoni, Anaklia, Anaria, Baghdati, Batumi Botanical Garden, Bichvinta Reserve, Bjineti, Chakvi, Chaladidi, Chakvistskali, Eshera, Grigoreti, Ingiri, Inkiti Lake, Kakhaberi, Khobi, Kobuleti, Kutaisi, Lidzava, Menji, Nakalakebi, Natanebi, Ochamchire, Oni, Poti, Senaki, Sokhumi, Sviri, Tsaishi, Tsalenjikha, Tsesi, Zestaponi, Zugdidi Botanical Garden (Ruzsky, 1905; Karavaiev, 1926; Jijilashvili, 1974b); S.G.: Abastumani, Akhalkalaki, Akhaltsikhe, Aspindza, Avralo, Bakuriani, Bogdanovka, Borjomi, Dmanisi, Goderdzi Pass, Gogasheni, Kariani, Khanchali Lake, Ota, Paravani Lake, Sapara, Tabatskuri, Trialeti, Tsalka, Zekari Pass (Ruzsky, 1905; Jijilashvili, 1967a, 1974a). 54. L. (Lasius) brunneus (Latreille, 1798) Distribution: E.G.: Bolnisi, Gardabani, Kianeti, Kiketi, Manglisi, Pasanauri (Ruzsky, 1905; Jijilashvili, 1968, 1974a); W.G.: Akhali Atoni, Baghdati,
    [Show full text]
  • Tour to Georgia 10 Days /9 Nights
    TOUR TO GEORGIA 10 DAYS /9 NIGHTS Day 1: Arrival at Tbilisi Meeting at the airport, transfer to the hotel. Free time. Overnight at the hotel in Tbilisi. Day 2. Tbilisi (B/L/-) Breakfast at the hotel. Tour of the historic part of the city, which begins with a visit to the Metekhi Temple, which is one of the most famous monuments in Tbilisi. This temple was honored in the 13th century, on the very edge of the stony shore of the Kura and the former fortress and residence of the Georgian kings. The first Georgian martyr, Queen Shushanika Ranskaya, was buried under the arches of the Metekhi temple. Inspection of the Tbilisi sulfur baths, which are built in the style of classical oriental architecture. These are low, squat buildings, covered with semicircular domes with large glass openings in the center, serving as windows that illuminate the interior, as the baths themselves are below ground level. In the old days, people here not only bathed, but also talked, lingering until dawn, and the city matchmakers arranged special days on special days. In the baths gave dinner parties, concluded trade deals. Walk on the square Maidan, which was the main shopping area of the city and along small streets known under the common name "Sharden". Narikala Fortress, which is the most ancient monument, a kind of "soul and heart of the city." The date of construction of the fortress is called approximately IV century AD, so it stands from the foundation of the city itself. Later, the fortress was expanded and completed several times.
    [Show full text]
  • Economic Prosperity Initiative
    USAID/GEORGIA DO2: Inclusive and Sustainable Economic Growth October 1, 2011 – September 31, 2012 Gagra Municipal (regional) Infrastructure Development (MID) ABKHAZIA # Municipality Region Project Title Gudauta Rehabilitation of Roads 1 Mtskheta 3.852 km; 11 streets : Mtskheta- : Mtanee Rehabilitation of Roads SOKHUMI : : 1$Mestia : 2 Dushet 2.240 km; 7 streets :: : ::: Rehabilitation of Pushkin Gulripshi : 3 Gori street 0.92 km : Chazhashi B l a c k S e a :%, Rehabilitaion of Gorijvari : 4 Gori Shida Kartli road 1.45 km : Lentekhi Rehabilitation of Nationwide Projects: Ochamchire SAMEGRELO- 5 Kareli Sagholasheni-Dvani 12 km : Highway - DCA Basisbank ZEMO SVANETI RACHA-LECHKHUMI rehabilitaiosn Roads in Oni Etseri - DCA Bank Republic Lia*#*# 6 Oni 2.452 km, 5 streets *#Sachino : KVEMO SVANETI Stepantsminda - DCA Alliance Group 1$ Gali *#Mukhuri Tsageri Shatili %, Racha- *#1$ Tsalenjikha Abari Rehabilitation of Headwork Khvanchkara #0#0 Lechkhumi - DCA Crystal Obuji*#*# *#Khabume # 7 Oni of Drinking Water on Oni for Nakipu 0 Likheti 3 400 individuals - Black Sea Regional Transmission ZUGDIDI1$ *# Chkhorotsku1$*# ]^!( Oni Planning Project (Phase 2) Chitatskaro 1$!( Letsurtsume Bareuli #0 - Georgia Education Management Project (EMP) Akhalkhibula AMBROLAURI %,Tsaishi ]^!( *#Lesichine Martvili - Georgia Primary Education Project (G-Pried) MTSKHETA- Khamiskuri%, Kheta Shua*#Zana 1$ - GNEWRC Partnership Program %, Khorshi Perevi SOUTH MTIANETI Khobi *# *#Eki Khoni Tskaltubo Khresili Tkibuli#0 #0 - HICD Plus #0 ]^1$ OSSETIA 1$ 1$!( Menji *#Dzveli
    [Show full text]
  • ELKANA/FAO Workshop on EFFECTIVE COMMUNICATION
    ELKANA/FAO Workshop on EFFECTIVE COMMUNICATION AND INFORMATION MANAGEMENT AMONG AGRICULTURAL RESEARCH, EXTENSION AND FARMERS FOR RURAL DEVELOPMENT IN GEORGIA organized by the Biological Farming Association “ELKANA”, Georgia and the Food and Agriculture Organization of the United Nations 1-3 February 2005 Tbilisi, Georgia TABLE OF CONTENT EXECUT IVE S UMM ARY ...................................................................................................... 4 ACKNO WLEDG EM ENTS ..................................................................................................... 6 1. INTRODUCTION AND BACKGROUND................................................................... 7 2. PRESENTATIONS........................................................................................................ 7 2.1 Participants............................................................................................................. 7 2.2 Programme of the workshop .................................................................................. 7 2.3 Summary of presentations and discussions............................................................ 9 2.4 SWOT Analysis.................................................................................................... 11 2.5 Developing ideas for cooperation......................................................................... 13 2.6 Session A. Drafting a project outline by group representatives........................... 13 2.7 Conclusions and Recommendations of the Workshop........................................
    [Show full text]
  • Evaluation of the Hepatitis C Care Cascade in the Country of Georgia: Monitoring Progress Towards Elimination
    IVHEM 2019. November 22-23, 2019, Amsterdam EVALUATION OF THE HEPATITIS C CARE CASCADE IN THE COUNTRY OF GEORGIA: MONITORING PROGRESS TOWARDS ELIMINATION Tengiz Tsertsvadze,1,2 Amiran Gamkrelidze,3 Nikoloz Chkhartishvili,1 Akaki Abutidze,1 Lali Sharvadze,2,4 Maia Butsashvili,5 David Metreveli,6 Lia Gvinjilia,7 Shaun Shadaker,8 Muazzam Nasrullah,8 Tamar Gabunia, 9 Ekaterine Adamia,9 Stefan Zeuzem,10 Nezam Afdhal,11 Sanjeev Arora,12 Karla Thornton,12 Francisco Averhoff8 1Infectious Diseases, AIDS and Clinical Immunology Research Center, Tbilisi, Georgia; 2Ivane Javakhishvili Tbilisi State University, Tbilisi, Georgia; 3National Center for Disease Control and Public Health, Tbilisi, Georgia; 4Hepatology clinic HEPA, Tbilisi, Georgia; 5Health Research Union, Tbilisi, Georgia; 6Medical Center Mrcheveli, Tbilisi, Georgia; 7CDC Foundation, Tbilisi, Georgia; 8Centers for Disease Control and Prevention, Division of Viral Hepatitis National Center for HIV, Hepatitis, STD&TB Prevention, Atlanta, USA; 9Ministry of IDPs, Labour, Health and Social Affairs of Georgia, Tbilisi, Georgia; 10Goethe University Hospital, Frankfurt, Germany; 11Beth Israel Deaconess Medical Center Liver Center, Boston, USA; 12University of New Mexico, Albuquerque, USA Infectious Diseases, AIDS and Clinical Immunology Research Center Disclosure No relevant financial relationship exists Infectious Diseases, AIDS and Clinical Immunology Research Center 12 COUNTRIES WORLDWIDE ON TRACK TO ELIMINATE HEPATITIS C INFECTION BY 2030 Georgia’s HCV elimination program builds on delivering
    [Show full text]
  • Assessment of Citizen Engagement Practices in the Municipalities of Batumi, Kutaisi and Akhaltsikhe
    Assessment of Citizen Engagement Practices in the Municipalities of Batumi, Kutaisi and Akhaltsikhe The assessment has been conducted by the Institute for Development of Freedom of Information (IDFI), within the framework of the project “New E-Governance Initiatives to meet OGP Commitments in Georgia”, funded by the Good Governance Initiative (GGI) in Georgia project of the United States Agency for International Development (USAID) and the Ministry of Foreign Affairs of Estonia. The study has been prepared by the Institute for Development of Freedom of Information (IDFI) and the opinions expressed herein do not necessarily reflect those of the United States Agency for International Development (USAID), the Good Governance Initiative (GGI) in Georgia project, the United States government or the Ministry of Foreign Affairs of Estonia. Author: Saba Buadze Editor: Levan Avalishvili Reviewed by: Mamuka Abuladze March 2017 Tbilisi 1 Contents Introduction ................................................................................................................................................... 3 General Context & Legal Framework ........................................................................................................... 4 Main Observations ..................................................................................................................................... 7 Public Participation Practices in Batumi .................................................................................................. 8 Public
    [Show full text]
  • Kenneth D. Walsh, Ph.D. Dean, SDSU-Georgia
    SDSU 031-04-15 April 15, 2015 MaGda MaGradze Chief Executive Officer Millennium ChallenGe Account – GeorGia 52 Uznadze Street 0102 Tbilisi, GeorGia Dear Ms. MaGradze, Please find enclosed herewith the documents for the Quarter 3 Report for the Provision of DeGree Accreditation and Institutional Support Initiative for Science, TechnoloGy, EnGineerinG, and Mathematics, as required per the contract dated July 28, 2014. The specific documents attached include: • Report on Execution of Q3 Work Plan and Q4 Plan Updates (note, this merGes two separate deliverables per the list in AGreement, for better narrative flow) • Status Report on EnGlish/Stem Institute • Report on GeorGian faculty traininG at SDSU • Discussion of articulation plan proGress • DesiGn ProGress Report for New Construction packaGes Per the terms of the aGreement, please provide review comments within 10 business days. An invoice for the associated payment amount will accompany the revised version once comments are incorporated. Please feel free to contact me if you have any questions. Sincerely, Kenneth D. Walsh, Ph.D. Dean, SDSU-Georgia San Diego State University Address: Ivane Javakhishvili Tbilisi State University 1 Ilia Chavchavadze Avenue, Building 2, Room 101 Tbilisi 0179, Georgia Office: +995 32 229 08 20 Mobile: +995-558-174-414 Email: [email protected] THE CALIFORNIA STATE UNIVERSITY· BAKERSFIELD· CHICO· DOMNIGUEZ HILLS· FRESNO· FULLERTON· HAYWARD· HUMBOLDT· LONG BEACH· LOS ANGELES· MARITIME ACADEMY MONTEREY BAY · NORTHRIDGE · POMONA · SACRAMENTO · SAN BERNARDINO · SAN DIEGO · SAN FRANCISCO · SAN JOSE · SAN LUIS OBISPO · SAN MARCOS · SONOMA · STANISLAUS 1 Annex 1 – Report on Execution of Q3 Work Plan and Q4 Plan Updates The rest of this page is left intentionally blank.
    [Show full text]
  • World Bank Document
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 66462-GE PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT IN THE AMOUNT OF SDR 25.8 MILLION Public Disclosure Authorized (US$40.00 MILLION EQUIVALENT) AND A PROPOSED LOAN IN THE AMOUNT OF US$30 MILLION TO GEORGIA Public Disclosure Authorized FOR THE SECOND SECONDARY AND LOCAL ROADS PROJECT (SLRP-II) FEBRUARY 21, 2012 Sustainable Development Department South Caucasus Country Unit Europe and Central Asia Region Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective January 1, 2012) Currency Unit = Georgian Lari (GEL) GEL 1.66 = US$ 1.00 US$1.551 = SDR 1.00 FISCAL YEAR January 1 – December 31 ABBREVIATIONS AND ACRONYMS AADT Average Annual Daily Traffic MCC Millennium Challenge Corporation ADB Asian Development Bank MENR Ministry of Environment and Natural Resources CPS Country Partnership Strategy MESD Ministry of Economy and Sustainable Development EA Environmental Assessment MRDI Ministry of Regional Development and Infrastructure EIB European Investment Bank NBG National Bank of Georgia EIRR Economic Internal Rate of Return NCB National Competitive Bidding EMP Environmental Management Plan NPV Net Present Value ESMF Environmental and Social Management Framework ORAF Operational Risk Assessment Framework FA Financing Agreement PAD
    [Show full text]
  • Urban Development in Georgia
    Key facts and figures relating to housing and urban development in Georgia Nino Gventsadze Head of spatial planning department Ministry of regional development and infrastructure of Georgia Housing in Georgia Current conditions Housing in Georgia is characterized with long and deep systematic crisis which are caused by the following reasons: non- existent policy, non-sufficient legislative base and non-adequate institutional set-up. Georgian government still doesn’t have a well-defined, clear policy in the field of Housing, also not a single office directly governs and works on Housing issues neither on legislation or enforcement level. Estimated future plan in Housing • To define short, medium and long term priorities Short term priority – should focus on how to fix homelessness, clearly define the terminology, exact identification of beneficiary groups and setting criteria for people who will receive the support, launching an institution, drafting legislation etc. Medium and long term - should focus on large number of people who will be able to afford the Housing (affordable Housing), provide an adequate Housing, improve policy making in regard of construction and urban development, solving demographic issues in the country etc. Improvements In 2018, Government of Georgia has taken a duty in implementing a “Housing policy documentation and strategic plan”, for that reason in 2019, April a special committee was established who will define a strategic plan. So far consultations are taking place. It is planned to make an amendments in legislation (In Georgian legislation there is the only law, which is dedicated to housing and needs a great deal of revise and improvement) The Ministry of Internally Displaced Persons from the Occupied Territories and Refugees of Georgia has realized several projects: • Ministry purchased 300 accommodations from the Chinese company “Hualing” • Throughout the country, ministry purchased several accommodations from developers, reconstructed, built new constructions etc.
    [Show full text]
  • Review of Fisheries and Aquaculture Development Potentials in Georgia
    FAO Fisheries and Aquaculture Circular No. 1055/1 REU/C1055/1(En) ISSN 2070-6065 REVIEW OF FISHERIES AND AQUACULTURE DEVELOPMENT POTENTIALS IN GEORGIA Copies of FAO publications can be requested from: Sales and Marketing Group Office of Knowledge Exchange, Research and Extension Food and Agriculture Organization of the United Nations E-mail: [email protected] Fax: +39 06 57053360 Web site: www.fao.org/icatalog/inter-e.htm FAO Fisheries and Aquaculture Circular No. 1055/1 REU/C1055/1 (En) REVIEW OF FISHERIES AND AQUACULTURE DEVELOPMENT POTENTIALS IN GEORGIA by Marina Khavtasi † Senior Specialist Department of Integrated Environmental Management and Biodiversity Ministry of the Environment Protection and Natural Resources Tbilisi, Georgia Marina Makarova Head of Division Water Resources Protection Ministry of the Environment Protection and Natural Resources Tbilisi, Georgia Irina Lomashvili Senior Specialist Department of Integrated Environmental Management and Biodiversity Ministry of the Environment Protection and Natural Resources Tbilisi, Georgia Archil Phartsvania National Consultant Thomas Moth-Poulsen Fishery Officer FAO Regional Office for Europe and Central Asia Budapest, Hungary András Woynarovich FAO Consultant FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS Rome, 2010 The designations employed and the presentation of material in this information product do not imply the expression of any opinion whatsoever on the part of the Food and Agriculture Organization of the United Nations (FAO) concerning the legal or development status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. The mention of specific companies or products of manufacturers, whether or not these have been patented, does not imply that these have been endorsed or recommended by FAO in preference to others of a similar nature that are not mentioned.
    [Show full text]
  • Ten-Year Development Plan for Georgian Gas Transmission Network 2018-2027
    Ten-Year Development Plan for Georgian Gas Transmission Network 2018-2027 October 2017 1 The document represents a 10-year Georgian gas transmission and related infrastructure development plan. It was prepared on the basis of 2016 and 2017 year editions of “10-Year Development Plan for Georgian Gas Transmission Infrastructure)’’, considering the actual situation of current period. The 10-year Gas Network Development Plan was discussed with the Georgian Gas Transportation Company, presented to the Ministry of Energy of Georgia, the Georgian National Energy Regulatory Commission and other stakeholders. Consultations regarding the information used in and information on the project implementation of the 10-year Gas Network Development Plan can be obtained from GOGC Strategic Planning and Projects Department. Head of the Department: Teimuraz Gochitashvili, Dr. Sci, professor, Tel: +(995 32) 2244040 (414); E-mail: [email protected] 2 Contents Abbreviations ...........................................................................................................................4 Executive summary ..................................................................................................................5 1. Introduction .....................................................................................................................7 1.1. General provisions............................................................................................................ 7 1.2. Formal and methodological basis for preparing the plan ..............................................
    [Show full text]
  • ADVISORY ASSISTANCE to the MINISTRY of ENERGY of GEORGIA “Power Trip”
    “Power Trip” Campaign ADVISORY ASSISTANCE TO THE MINISTRY OF ENERGY OF GEORGIA “Power Trip” Campaign The film “Power Trip” by Paul Devlin was broadcasted on the TV Channel Rustavi 2 and shown on three regional town hall meetings in: Kutaisi, Akhaltsikhe and Zugdidi. October 2005 This publication was produced for review by the United States Agency for International Development. It was prepared by CORE International, Inc. 1 Advisory Assistance to the Ministry of Energy of Georgia, Public Outreach Strategic Plan Implementation Success Story – “Power Trip” Campaign Activity Date: Summer-Fall, 2005 Contact By: P. Ballonoff, B. Tsirekidze CORE - “Advisory Assistant to the Ministry of Energy” a USAID Project Method: Regional Town Hall Meetings, dedicated to broadcast the film, produced by Paul Devlin “Power Trip”. CORE - “Advisory Assistant to the Ministry of Energy” a USAID Project, Organization/Company P. Ballonoff - Chief of Party Name: B. Tsirekidze – Communication and Public Participation Expert Address: 10 Lermontov Str. 0105 Tbilisi, Georgia Tel/Fax: + 995 32 439020/+995 32 439022 E-Mail: [email protected] Cooperation In terms of organization of regional broadcasting of the film, CORE cooperated with/Participant/Speaker: with following organization: Name: (i). Ministry of Energy of Georgia (ii). Head office and Akhaltsikhe regional representation of Liberty Institute; (iii). Head office and regional representations of UEDC; (iv). Local governments in Kutaisi and Zugdidi REPORT In the scope of “Power Trip” campaign, it was planned to broadcast the film “Power Trip” by Paul Devlin on TV Channel Rustavi 2 and at three specially organized regional town hall meetings in Kutaisi, Akhaltsikhe and Zugdidi.
    [Show full text]