AIP) Supports Investment in Alaska Airports

Total Page:16

File Type:pdf, Size:1020Kb

AIP) Supports Investment in Alaska Airports How the Federal Airport Improvement Program (AIP) Supports Investment in Alaska Airports • 155 airports in Alaska have identified $1.5 billion in unfunded improvements needed over the next five years that would be eligible for AIP grants. • There are 4,796 aircraft based at these airports, with 4.7 million enplanements each year. • Over the last decade, Alaska airports have received 545 grants worth a total of $2.4 billion through the AIP. • 70 percent of that funding—$1.7 billion—has gone towards projects that included the construction, repair, upgrade or rehabilitation of airport runways, aprons or taxiways. AIP Grants for Alaska Airports, by FFY $350 $300 $289.0 $235.6 $250 $226.2 $229.2 $233.3 $215.0 $199.0 $144.7 $198.6 $201.7 $200 $39.8 $53.4 $50.0 $190.4 $93.9 $28.4 $41.5 $72.2 $80.9 $150 $66.5 in millions in $100 $170.6 $186.4 $175.8 $183.3 $144.3 $141.7 $157.1 $142.8 $123.9 $120.8 $50 $0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Projects that include runway, taxiway or apron repair/construction work Other projects Total AIP Grants by Type of Airport, AIP Construction-Related Grants by FFY 2007-2016 Type of Airport, FFY 2007-2016 Other, Commercial Commercial $87.6, 6% Service, Service, Other, $199.0, 13% $215.9, 10% $437.0, 20% General General Aviation, Aviation, $238.6, 15% $268.4, 12% Primary, Primary, $1,021.7, $1,296.8, 66% 58% © 2017 The American Road & Transportation Builders Association (ARTBA). All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission of ARTBA. All data from the Federal Aviation Administration . Airport Improvement Program Funds at Alaska Airports (in thousand $) Value of AIP Grants % of AIP Funds Identified Value of AIP for Projects That Number of Used for Projects Airport Development needs Airport Grants, 2007 Include Runway, Aircraft Housed Type of Service at Airport With Construction Enplanements Eligible for AIP to 2016 Taxiway or Apron at Airport Improvements Grants, 2017 to 2021 Improvements Adak $0.0 $0.0 0.0% 2,194 0 $15,500.0 General Aviation Akhiok $0.0 $0.0 0.0% 1,243 0 $9,842.1 General Aviation Akiachak $0.0 $0.0 0.0% 3,771 0 $0.0 Commercial Service Akiachak (Proposed GA) $25,733.4 $0.0 0.0% n/a n/a $0.0 n/a Akiak $0.0 $0.0 0.0% 2,226 0 $818.6 General Aviation Akutan $10,541.4 $0.0 0.0% 2,051 0 $0.0 General Aviation Akutan (Proposed GA) $42,500.0 $0.0 0.0% n/a n/a $0.0 n/a Akutan Seaplane Base $0.0 $0.0 0.0% 23 0 $0.0 General Aviation Alakanuk $0.0 $0.0 0.0% 5,042 0 $343.2 Commercial Service Alakanuk (Proposed CM) $23,535.0 $6,574.7 27.9% n/a n/a $0.0 n/a Aleknagik/New $0.0 $0.0 0.0% 19 0 $0.0 General Aviation Allakaket $700.0 $700.0 100.0% n/a n/a $0.0 Commercial Service Allakaket $10,000.0 $10,000.0 100.0% 1,851 0 $0.0 General Aviation Ambler $26,460.8 $26,460.8 100.0% 2,120 1 $0.0 General Aviation Anaktuvuk Pass $0.0 $0.0 0.0% 3,796 0 $315.8 Commercial Service Anchorage Float Plane Basin $94.3 $0.0 0.0% n/a n/a $0.0 n/a Angoon $0.0 $0.0 0.0% 1,670 0 $0.0 General Aviation Angoon (Proposed GA) $6,700.0 $0.0 0.0% 0 0 $31,399.9 n/a Aniak $5,700.0 $5,700.0 100.0% 12,955 19 $61,585.3 Primary Anvik $0.0 $0.0 0.0% 817 0 $0.0 General Aviation Arctic Village $0.0 $0.0 0.0% 1,707 0 $0.0 General Aviation Atka $21,647.4 $21,647.4 100.0% 292 0 $0.0 General Aviation Atmautluak $0.0 $0.0 0.0% 2,959 0 $1,221.8 Commercial Service Atqasuk Edward Burnell Sr Memorial $980.2 $980.2 100.0% 2,004 0 $23,000.0 General Aviation Barter Island LRRS $0.0 $0.0 0.0% 2,925 0 $0.0 Commercial Service Beaver $0.0 $0.0 0.0% 946 0 $6,830.1 General Aviation Bethel $33,859.1 $26,611.7 78.6% 155,936 233 $25,910.5 Primary Bettles $0.0 $0.0 0.0% 2,035 12 $12,293.8 General Aviation Big Lake $400.0 $0.0 0.0% 0 65 $1,160.4 General Aviation Birch Creek $0.0 $0.0 0.0% 261 0 $963.4 General Aviation Birchwood $1,407.1 $1,255.1 89.2% 0 273 $4,266.7 General Aviation Bob Baker Memorial $0.0 $0.0 0.0% 3,388 0 $18,263.2 Commercial Service Boundary $0.0 $0.0 0.0% 5 0 $0.0 General Aviation Brevig Mission $0.0 $0.0 0.0% 1,948 0 $0.0 General Aviation Buckland $0.0 $0.0 0.0% 4,009 1 $657.1 Commercial Service Central $0.0 $0.0 0.0% 12 0 $0.0 General Aviation Airport Improvement Program Funds at Alaska Airports (in thousand $) Value of AIP Grants % of AIP Funds Identified Value of AIP for Projects That Number of Used for Projects Airport Development needs Airport Grants, 2007 Include Runway, Aircraft Housed Type of Service at Airport With Construction Enplanements Eligible for AIP to 2016 Taxiway or Apron at Airport Improvements Grants, 2017 to 2021 Improvements Chalkyitsik $0.0 $0.0 0.0% 762 0 $14,890.3 General Aviation Chandalar Lake $0.0 $0.0 0.0% 47 0 $0.0 General Aviation Chandalar Shelf $0.0 $0.0 0.0% 0 0 $2,666.7 General Aviation Chefornak $0.0 $0.0 0.0% 4,590 0 $948.4 Commercial Service Chefornak (Proposed CM) $21,692.3 $0.0 0.0% n/a n/a $0.0 n/a Chenega Bay $0.0 $0.0 0.0% 0 0 $184.0 General Aviation Chevak $193.8 $0.0 0.0% n/a n/a $0.0 n/a Chevak $0.0 $0.0 0.0% 5,690 0 $326.9 Commercial Service Chicken $493.4 $0.0 0.0% 26 0 $0.0 General Aviation Chignik $0.0 $0.0 0.0% 247 0 $860.4 General Aviation Chignik Lagoon $0.0 $0.0 0.0% 257 0 $0.0 General Aviation Chignik Lake $0.0 $0.0 0.0% 576 0 $1,000.0 General Aviation Chisana $0.0 $0.0 0.0% 91 0 $0.0 General Aviation Chistochina (Proposed GA) $450.0 $0.0 0.0% n/a n/a $0.0 n/a Chitina $0.0 $0.0 0.0% 20 2 $1,605.1 General Aviation Chuathbaluk $0.0 $0.0 0.0% 399 0 $602.3 General Aviation Circle City $0.0 $0.0 0.0% 406 0 $1,578.9 General Aviation Circle Hot Springs $0.0 $0.0 0.0% 15 0 $0.0 General Aviation Clarks Point $0.0 $0.0 0.0% 495 1 $4,266.7 General Aviation Clear $0.0 $0.0 0.0% 2 3 $0.0 General Aviation Coffman Cove $0.0 $0.0 0.0% 138 0 $0.0 General Aviation Cold Bay $30,149.1 $26,894.5 89.2% 8,172 0 $486.9 Commercial Service Coldfoot $7,620.4 $7,620.4 100.0% 5,962 3 $0.0 Commercial Service Cordova Municipal $0.0 $0.0 0.0% 0 22 $0.0 General Aviation Council $0.0 $0.0 0.0% 0 0 $0.0 General Aviation Craig $0.0 $0.0 0.0% 2,869 0 $0.0 Commercial Service Crooked Creek $0.0 $0.0 0.0% 404 0 $25,297.7 General Aviation Dahl Creek $0.0 $0.0 0.0% 14 0 $0.0 General Aviation Deadhorse $37,407.4 $25,418.4 68.0% 56,001 10 $29,370.7 Primary Deering $0.0 $0.0 0.0% 1,571 0 $1,621.3 General Aviation Dillingham $31,208.5 $27,901.4 89.4% 39,414 41 $16,301.6 Primary Diomede $0.0 $0.0 0.0% 0 0 $1,526.3 General Aviation Eagle $0.0 $0.0 0.0% 596 1 $2,026.7 General Aviation Edward G. Pitka Sr $1,775.5 $0.0 0.0% n/a n/a $0.0 Commercial Service Edward G. Pitka Sr $17,261.6 $17,261.6 100.0% 12,349 13 $21,922.2 Primary Eek $0.0 $0.0 0.0% 3,857 0 $761.5 Commercial Service Airport Improvement Program Funds at Alaska Airports (in thousand $) Value of AIP Grants % of AIP Funds Identified Value of AIP for Projects That Number of Used for Projects Airport Development needs Airport Grants, 2007 Include Runway, Aircraft Housed Type of Service at Airport With Construction Enplanements Eligible for AIP to 2016 Taxiway or Apron at Airport Improvements Grants, 2017 to 2021 Improvements Egegik $0.0 $0.0 0.0% 1,168 0 $0.0 General Aviation Ekwok $1,640.6 $0.0 0.0% 190 0 $0.0 General Aviation Elfin Cove $0.0 $0.0 0.0% 546 0 $0.0 General Aviation Elim $1,815.5 $1,815.5 100.0% n/a n/a $0.0 Commercial Service Elim $0.0 $0.0 0.0% 2,145 0 $429.3 General Aviation Emmonak $2,518.7 $0.0 0.0% 9,447 1 $1,246.7 Commercial Service Emmonak $11,647.3 $11,647.3 100.0% n/a n/a $0.0 Primary Excursion Inlet $0.0 $0.0 0.0% 37 0 $0.0 General Aviation Fairbanks International $84,360.9 $50,743.7 60.2% 459,769 570 $39,221.5 Primary False Pass $0.0 $0.0 0.0% 361 0 $0.0 General Aviation Flat $0.0 $0.0 0.0% 2 0 $0.0 General Aviation Fort Yukon $15,550.3 $15,550.3 100.0% 7,148 0 $0.0 Commercial Service Funter Bay $0.0 $0.0 0.0% 6 0 $0.0 General Aviation Galbraith Lake $0.0 $0.0 0.0% 466 0 $0.0 General Aviation Gambell $0.0 $0.0 0.0% 3,420 0 $10,423.3 Commercial Service Girdwood $0.0 $0.0 0.0% 0 16 $0.0 General Aviation Golovin $11,222.5 $11,222.5 100.0% 1,873 0 $290.0 General Aviation Goodnews $16,602.5 $16,602.5 100.0% 1,410 0 $0.0 General Aviation Goose Bay $0.0 $0.0 0.0% 0 0 $0.0 General Aviation Grayling $18,700.0 $18,700.0 100.0% 972 0 $495.0 General Aviation Gulkana $2,318.2 $2,318.2 100.0% 0 13 $775.2 General Aviation Gustavus $10,716.0 $10,010.3 93.4% 9,484 0 $16,315.8 Commercial Service Haines $1,384.3 $1,384.3 100.0% 8,368 0 $12,800.0 Commercial Service Haines $0.0 $0.0 0.0% 0 0 $0.0 General Aviation Healy River $0.0 $0.0 0.0% 10 6 $842.1 General Aviation Hollis Clark Bay $0.0 $0.0 0.0% 1,326 0 $0.0 General Aviation Holy Cross $0.0 $0.0 0.0% 1,323 0 $10,886.7 General Aviation Homer $7,110.6 $2,378.5 33.5% 38,862 93 $17,813.0 Primary Hoonah $0.0 $0.0 0.0% 9,849 0 $429.3 Commercial Service Hoonah $0.0 $0.0 0.0% 0 0 $0.0 General Aviation Hoonah $6,044.1 $6,044.1 100.0% n/a n/a $0.0 Primary Hooper Bay $31,300.4 $31,300.4 100.0% 5,460 0 $544.4 Commercial Service Hope $0.0 $0.0 0.0% 0 9 $0.0 General Aviation Hughes $0.0 $0.0 0.0% 966 0 $9,286.1 General Aviation Huslia $7,800.0 $7,800.0 100.0% 3,269 1 $1,350.7 Commercial Service Hydaburg $0.0 $0.0 0.0% 32 0 $0.0 General Aviation Airport Improvement Program Funds at Alaska Airports (in thousand $) Value of AIP Grants % of AIP Funds Identified Value of AIP for Projects That Number of Used for Projects Airport Development needs Airport Grants, 2007 Include Runway, Aircraft Housed Type of Service at Airport With Construction Enplanements Eligible
Recommended publications
  • June 30 Final DOT Layout.Indd
    Alaska Department of Transportation and Public Facilities 2010 Department Overview June 30, 2011 THE MISSION of the Department of Transportation and Public Facilities is to provide for the safe and effi cient movement of people and goods and the delivery of state services. Table of Contents Letter from Commissioner Luiken . 3 Introduction . 4 Challenges in Alaska Transportation . .5-7 Long Range Transportation Policy Plan . 8 Statewide Transportation Improvement Plan (STIP) . 9-11 Budget . 12 Divisions and Responsibilities . 13 Statewide Aviation . 13 International Airports . 14 Marine Highway System . 15 Surface Transportation . 16 Transportation Operations . 17-18 Bridge Section . 19 Ports and Harbors . 20 Resource Roads. 21 Transportation Safety . 22 Statewide Systems . 23 Bicycle and Pedestrian Program . 24 Data Services . 25 Buildings and Facilities . 26 Measurement Standards . 27 The Road Ahead . 28 The 2010 Department Overview was produced by the Alaska Department of Transportation and Public Facilities in Juneau, Alaska, at a cost of $9.96 per copy. Cover and inside cover photos (Kodiak roads), back cover (M/V Columbia, Auke Bay), and this page (Dutch Harbor bridge), by Peter Metcalfe 2 Waterfront construction, Kotzebue, by Peter Metcalfe June 30, 2011 Dear Fellow Alaskan, As the Commissioner of the Department of Transportation and Public Facilities, it is my pleasure to present the 2010 Department Overview. All Alaskans use the state’s transportation system, whether they are driving to work, headed for the outdoors, meeting the ferry, or catching a fl ight at the local airport. We use these transportation systems daily, and often take them for granted, unaware of the effort that happens behind the scenes to keep the systems working.
    [Show full text]
  • Notice of Adjustments to Service Obligations
    Served: May 12, 2020 UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. CONTINUATION OF CERTAIN AIR SERVICE PURSUANT TO PUBLIC LAW NO. 116-136 §§ 4005 AND 4114(b) Docket DOT-OST-2020-0037 NOTICE OF ADJUSTMENTS TO SERVICE OBLIGATIONS Summary By this notice, the U.S. Department of Transportation (the Department) announces an opportunity for incremental adjustments to service obligations under Order 2020-4-2, issued April 7, 2020, in light of ongoing challenges faced by U.S. airlines due to the Coronavirus (COVID-19) public health emergency. With this notice as the initial step, the Department will use a systematic process to allow covered carriers1 to reduce the number of points they must serve as a proportion of their total service obligation, subject to certain restrictions explained below.2 Covered carriers must submit prioritized lists of points to which they wish to suspend service no later than 5:00 PM (EDT), May 18, 2020. DOT will adjudicate these requests simultaneously and publish its tentative decisions for public comment before finalizing the point exemptions. As explained further below, every community that was served by a covered carrier prior to March 1, 2020, will continue to receive service from at least one covered carrier. The exemption process in Order 2020-4-2 will continue to be available to air carriers to address other facts and circumstances. Background On March 27, 2020, the President signed the Coronavirus Aid, Recovery, and Economic Security Act (the CARES Act) into law. Sections 4005 and 4114(b) of the CARES Act authorize the Secretary to require, “to the extent reasonable and practicable,” an air carrier receiving financial assistance under the Act to maintain scheduled air transportation service as the Secretary deems necessary to ensure services to any point served by that air carrier before March 1, 2020.
    [Show full text]
  • APPENDIX a Document Index
    APPENDIX A Document Index Alaska Aviation System Plan Document Index - 24 April 2008 Title Reference # Location / Electronic and/or Paper Copy Organization / Author Pub. Date Other Comments / Notes / Special Studies AASP's Use 1-2 AASP #1 1 WHPacific / Electronic & Paper Copies DOT&PF / TRA/Farr Jan-86 Report plus appendix AASP #2 DOT&PF / TRA-BV Airport 2 WHPacific / Electronic & Paper Copies Mar-96 Report plus appendix Consulting Statewide Transportation Plans Use 10 -19 2030 Let's Get Moving! Alaska Statewide Long-Range http://dot.alaska.gov/stwdplng/areaplans/lrtpp/SWLRTPHo 10 DOT&PF Feb-08 Technical Appendix also available Transportation Policy Plan Update me.shtml Regional Transportation Plans Use 20-29 Northwest Alaska Transportation Plan This plan is the Community Transportation Analysis -- there is 20 http://dot.alaska.gov/stwdplng/areaplans/nwplan.shtml DOT&PF Feb-04 also a Resource Transportation Analysis, focusing on resource development transportation needs Southwest Alaska Transportation Plan 21 http://dot.alaska.gov/stwdplng/areaplans/swplan.shtml DOT&PF / PB Consult Sep-04 Report & appendices available Y-K Delta Transportation Plan 22 http://dot.alaska.gov/stwdplng/areaplans/ykplan.shtml DOT&PF Mar-02 Report & appendices available Prince William Sound Area Transportation Plan 23 http://dot.alaska.gov/stwdplng/areaplans/pwsplan.shtml DOT&PF / Parsons Brinokerhoff Jul-01 Report & relevant technical memos available Southeast Alaska Transportation Plan http://www.dot.state.ak.us/stwdplng/projectinfo/ser/newwave 24 DOT&PF Aug-04
    [Show full text]
  • Alaska Region (AAL) Runway Safety Plan, FY 2020
    COMMITTED TO CONTINUOUSLY IMPROVING SURFACE SAFETY. Alaska Region (AAL) Runway Safety Plan FY20 2019-2020 RUNWAY SAFETY COUNCIL (RSC) #45 www.faa.gov Executive Summary The Federal Aviation Administration’s (FAA) top data, development of new safety metrics, and priority is maintaining safety in the National leveraged organizational capabilities in support TABLE Airspace System (NAS). The goal for runway of meeting this goal. safety is to improve safety by decreasing the OF CONTENTS FAA Safety Management System (SMS) 4 number and severity of Runway Incursions (RI), In support of the NRSP, and in support of Runway Excursions (RE) and serious Surface Air Traffic Organization (ATO) Safety and Incidents. FAA’s 2018- 2020 National Runway Technical Training (AJI) FY2018 Business Plan, the Alaskan Region (AAL) has developed this Regional Runway Safety Plan (RRSP) Methodology Safety Plan (NRSP) outlines the FAA’s strategy 6 to adapt its runway safety efforts through Regional Runway Safety Plan (RRSP) to provide enhanced collection and integrated analysis of a roadmap with regional emphasis for FY2020. 7 FY20 RRSP Initiatives 8 Safety Assurance 10 Safety Risk Management (SRM) 12 Safety Policy 16 Safety Promotion 4 Alaskan Region (AAL) Runway Safety Plan FY20 Alaskan Region (AAL) Runway Safety Plan FY20 5 FAA Safety Management FY18-FY20 NRSP Objectives System (SMS) SAFETY FAA is employing and evolving a Safety The National Runway Safety Plan 2018-2020 ASSURANCE Identify Operating Hazards Management System (SMS), which provides a aligns our strategic priorities with established Program Data formalized and proactive approach to system Safety Risk Management principles. The plan Remain the global leader in assuring Voluntary Safety Reporting safety in order to find, analyze and address defines how the FAA, airports, and industry runway safety enhancement initiatives Investigations risk in the NAS.
    [Show full text]
  • Alaskan Region AAL-5 701 C St
    January 26, 1981 81-3 Public Affairs Office FAA -Alaskan Region AAL-5 701 C St . , Box 14 Anchorage, AK 99513 (907) 271 - 5296 Alaskan US Deportrnenl of Tronsporlahon Federal Avlollon Intercom Administration NATIONAL HONORS 2 COVER STORY Though we're a bit late in publishing Pacific Contractors and NANA have moved tnese photos, we just got them--and we in more double-wide trailers for two have a new opportunity to pay additional camps to house 120 more men each. crazy tribute to the accomplishments of Horse Camp at Deadhorse has reopended and Joan M. Gillis and Frank Babiak, shown will house 150 men. ARCO and SOHIO each receiving Departmental national honors at plan to build new 500 man camps in the the 13th Annual DOT Awards Ceremony in area. Washington. Making the presentations was former Secretary of Transpor tation Increased activity has already been borne Neil Goldschmidt. The awards were for out by Fairbanks relief specialists outstanding performance in the region. already being put on standby by Wien for Babiak, Manager of the Anchorage Airway January flights, even though reservations Facilities Sector, was honored for are made a month in advance. Additional exceptional effort in the EEO field. flights are planned by Wien. Gillis, Administrative Assistant at the Anchorage _ Sector was given a special The Fairbanks FSS is care fully watching commendation for helping to set the this buildup in order to anticipate a office in order following its almost need for increased watch coverage due to total destruction in a fire in January traffic increases. o f 1979.
    [Show full text]
  • Sitka Seaplane Base Updated Siting Analysis
    Updated Siting Analysis SITKA SEAPLANE BASE November 2016 UPDATED SITING ANALYSIS SITKA SEAPLANE BASE SITKA, ALASKA Prepared for: City and Borough of Sitka 100 Lincoln Street Sitka, Alaska 99835 Prepared by: DOWL 4041 B Street Anchorage, Alaska 99503 (907) 562-2000 W.O. 62147 November 2016 Updated Siting Analysis Sitka, Alaska Sitka Seaplane Base November 2016 TABLE OF CONTENTS Page 1.0 INTRODUCTION ...........................................................................................................1 2.0 PURPOSE AND NEED .......................................................................................................1 3.0 INVENTORY ..................................................................................................................2 4.0 AVIATION FORECAST UPDATE.....................................................................................5 4.1 Historical Aviation Data ....................................................................................................5 4.2 Previous Sitka SPB Forecasts ............................................................................................6 4.3 Updated Sitka SPB Forecast Data ......................................................................................7 4.4 Updated Socioeconomic Data ...........................................................................................7 4.5 Forecast Methods ............................................................................................................11 4.5.1 Comparisons With Other Local and
    [Show full text]
  • DOTPF Alaskan Airports, AIP, APEB
    Northern Region Airport Overview -------------------------------------------- DOT&PF Town Hall Meeting October 22, 2010 Jeff Roach, Aviation Planner Northern Region, DOT&PF Topics • Northern Region Airports • Northern Region Aviation Sections • Aviation Funding • Types of Projects • Anticipated Future Funding Levels • Anticipated Northern Region Projects Northern Region 105 Airports 40% of the State’s airports are in the Northern Region • One International Airport • Seaplane Bases • Community Airports • Public, Locally Owned Airports Northern Region Aviation Organization • Planning • Design • Construction • Airport Leasing • Maintenance and Operations (M&O) Aviation Planning • Identify project needs, develops project packages for APEB scoring • Develop project scopes • Conduct airport master plans Project Needs Identification Rural Airports Needs List Development Project needs collected from: • Public, aviation interests, community representatives, DOT&PF and FAA staff, Legislature • DOT&PF Staff (Design, M&O, Leasing) • Needs identified in airport master plans • Regional transportation plans Project Scoping: DOT&PF Regional staff evaluate potential projects to develop preliminary project scope, cost estimate and other supporting information for APEB project evaluation State AIP Project Scoring (APEB) Aviation Project Evaluation Board (APEB): • The APEB is a six-member airport capital project review and evaluation group composed of DOT&PF’s Deputy Commissioner, three Regional Directors (SE, CR, NR), Statewide Planning Director, and State
    [Show full text]
  • Air Passenger and Cargo Transportation in Alaska
    PROPERTYOF ISER , FILECOPY DoNot Remove REVIEW OF BUSINESS AND ECONOMIC CONDITIONS A UNIVERSITY OF ALASKA, INSTITUTE OF SOCIAL, ECONOMIC AND GOVERNMENT RESEARCH VOL. VI, NO. 2 AIRPASSENGER ANDCARGO TRANSPORTATION IN ALASKA The air transportation industry in Alaska is undergoing March that they were beginning an Alaskan Service Inves­ dramatic changes, which are likely to further strengthen tigation . In an announcement to the airlines and other in­ its economic value to the state. New technology and trans­ terested parties, the CAB stated; "The board has decided port needs are increasing carrier competitiveness, while to undertake a comprehensive review of major route pat­ rising equipment and operating costs are lowering profit terns serving Alaska. margins. These conditions, plus growing reluctance on the " It has been over ten years since the board completed part of the federal government to subsidize less efficient an extensive examination of intra-Alaska air transporta­ operations, have resulted in attempts to increase efficiency tion requirements and almost four years since we last ex­ through airline mergers . amined the need for realignment and rievision of the four­ In 1967, Western Airlines International, plagued by an carrier air route complex between the Pacific Northwest announced profit squeeze on its western continental U.S. and Alaska. Significant changes in recent years suggest and Mexican routes, purchased Seattle based Pacific that the time is now ripe for a broad-scale investigation Northern Airlines and expanded operations into Alaska. into Alaskan air transportation requirements. A sound air Alaska Airlines in the past two years acquired Cordova transportation system is vital to the Alaskan economy and Airlines ( the former Coastal and Ellis_Airlines), extending the board intends to examine the entire Alaskan air route its routes throughout Southeastern Alaska and into Dawson, structure to determine what changes are necessary to pro­ Y.T., Canada.
    [Show full text]
  • Remote Desktop Redirected Printer
    %208% %208% Page 1 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 66 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2018 Nenana Little Goldstream 202(23) Lump 1 21,500.00 48,055.56 76,000.00 936,532 01 Bridge Replacement Removal of Existing Sum 65,000.00 21,500.00 52,000.00 30,000.00 (#2080) (45491//5517) Bridge No. 2080 3.98% 2.30% 5.51% 3.00% 9 Bids Tendered 2018 Nenana Little Goldstream 202(23) Square 942.0 22.82 51.01 80.68 936,532 01 Bridge Replacement Removal of Existing Foot 69.00 22.82 55.20 31.85 (#2080) (45491) Bridge No. 2080 (Alt) 3.98% 2.30% 5.51% 3.00% 9 Bids Tendered 2014 Haines Ferry Terminal 208(1) Each 21 1,000.00 6,612.50 9,950.00 14,979,745 05 Improvements GROUND ANCHORS 5,000.00 8,500.00 9,950.00 7,000.00 (39251/68433/0) 1.08% 1.19% 1.30% 0.91% 4 Bids Tendered 2016 Skagway - Replace 208(1) Linear 2,100 158.22 249.64 390.00 18,907,426 12 Captain William Henry Stabilization - Rock Foot 355.00 158.22 200.00 200.00 Moore Bridge Bolt 5.44% 1.76% 2.08% 1.94% (46281//1432) 5 Bids Tendered 2017 Haines Highway 208(1) Linear 3,885 55.00 66.50 80.00 36,149,513 11 Reconstruction Milepost Stabilization - Rock Foot 160.00 80.00 76.00 55.00 3.9 to 12.2, Phase 1 Bolt 1.68% 0.86% 0.80% 0.53% (47539//0) 4 Bids Tendered 2016 Skagway - Replace 208(2) Linear 875 158.22 248.44 359.00 18,907,426 12 Captain William Henry Stabilization - Foot 415.00 158.22 225.00 200.00 Moore Bridge (46281//0)
    [Show full text]
  • FAA Capstone Program, Phase II Baseline Report Southeast Alaska
    FAA Capstone Program, Phase II Baseline Report Southeast Alaska Prepared by: Matthew Berman Wayne Daniels Jerry Brian Alexandra Hill Leonard Kirk Stephanie Martin Jason Seger Amy Wiita prepared for: Federal Aviation Administration Alaskan Region April 2003 Institute of Social and Economic Research University of Alaska 3211 Providence Drive Anchorage, Alaska 99508 This page intentionally left blank EXECUTIVE SUMMARY FAA CAPSTONE PROGRAM, PHASE II BASELINE REPORT • SOUTHEAST ALASKA Why This Study? This report describes air safety and aviation infrastructure in southeast Alaska as of December 31, 2002. It establishes a baseline to enable the University of Alaska Anchorage (UAA) to evaluate how the Capstone program affects aviation safety in the region. The Federal Aviation Administration (FAA) contracted with UAA’s Institute of Social and Economic Research and Aviation Technology Division to do a variety of training and evaluation tasks related to the Capstone program. That program is a joint effort of industry and the FAA to improve aviation safety and efficiency in selected regions of Alaska, through government-furnished avionics equipment and improvements in ground infrastructure. The name “Capstone” is derived from the way the program draws together concepts and recommendations in reports from the Radio Telecommunications Conference of America, the National Transportation Safety Board, the Mitre Corporation’s Center for Advanced Aviation System Development, and representatives of the Alaskan aviation industry. The first phase of the program began in southwest Alaska in 1999. Phase II began in March 2003. The Phase II area–the Capstone Southeast Alaska region– includes all of southeast Alaska and extends west along the Gulf of Alaska to Cordova.
    [Show full text]
  • AVIATIONLEGENDS MAGAZINE 2014 AVIATOR LEGENDS Stories of Extraordinary Adventure from This Year’S Thirteen Honorees
    AVIATIONLEGENDS MAGAZINE 2014 AVIATOR LEGENDS Stories of extraordinary adventure from this year’s thirteen honorees. A special publication of BE A SPONSOR ! Over 200,000 Attendees — 28% of State! Arctic Thunder — Still the Largest Single Event in Alaska ! Thanks to all Past Sponsors Be Part of it! Alaska Air Show Association an Alaska 501(c) 3 Non-profit All Donations Tax Deductible — AASA Mission — Provide Aviation Education, Inspiration, and Advocacy AASA Provides Scholarships Space Camps, UAA Pilot Training AASA is Civilian Partner to JBER Supporting Arctic Thunder AASA supports Air Events Statewide Arctic Thunder 2016 Starts Now! — Be a Sponsor — Receive Statewide Print, Radio, Internet and TV Exposure plus Day of the Event Seating and pre- and post-event recognition Email : [email protected] Want to Help Advance Aviation? — Join our all Volunteer Board Contents Lake Hood, Photo by Rob Stapleton 5 EDITOR’S LETTER 16 WIllIAM “BIll” DIEHL 36 RON SHEARDOWN Aviation Pioneers Aircraft Manufacturer Polar Adventurer and Rescue Legend 7 WALT AUDI 20 GARLAND DOBSON 40 WARREN THOMPSON Pilot of the Far North Dedicated Serviceman and Pilot Rescue Mission Legend and Teacher 11 ALBERT BAll, SR. 24 JOYCE GAlleHER 43 NOel MERRIll WIEN This year’s Alaska Aviation Legend program Life of Adventure in Rural Alaska Diversified and Experienced Pilot is dedicated to Albert Ball, Sr. and his adventurous spirit. 28 ROYCE MORGAN 47 KENNETH GENE ZERKel Airline Entrepreneur and Doctor Experienced Pilot and Aviation 12 DICK AND LAVelle BETZ Entrepreneur Longtime Alaska Guides 32 PAUL SHANAHAN True Alaskan Bush Pilot 4 EDITOR’S Letter Aviation Pioneers BY ROB STAPLETON n your hands is documentation of hun- abbreviations.
    [Show full text]
  • Siting Analysis SITKA SEAPLANE BASE June 2012 SITING ANALYSIS
    Siting Analysis SITKA SEAPLANE BASE June 2012 SITING ANALYSIS SITKA SEAPLANE BASE SITKA, ALASKA Prepared for: City and Borough of Sitka 100 Lincoln Street Sitka, Alaska 99835 Prepared by: DOWL HKM 4041 B Street Anchorage, Alaska 99503 (907) 562-2000 W.O. 60581 June 2012 Siting Analysis Sitka, Alaska Sitka Seaplane Base June 2012 TABLE OF CONTENTS Page 1.0 INTRODUCTION ...............................................................................................................1 2.0 PURPOSE AND NEED .......................................................................................................1 3.0 INVENTORY ......................................................................................................................2 4.0 AVIATION FORECAST UPDATE ....................................................................................4 4.1 Historical Aviation Data ...................................................................................................4 4.2 Previous Sitka SPB Forecasts ...........................................................................................5 4.3 Updated Sitka SPB Forecast Data .....................................................................................5 4.4 Updated Socioeconomic Data ...........................................................................................6 4.5 Forecast Methods ..............................................................................................................7 4.5.1 Comparisons With Other Local and Regional Aviation Forecasts
    [Show full text]