Summary of Representation and Proposed Modifications to the IBP 2020 – 2025 APPENDIX 1
Total Page:16
File Type:pdf, Size:1020Kb
Summary of representation and proposed Modifications to the IBP 2020 – 2025 APPENDIX 1 Authority/or Representations Recomme ganisation nded changes following consultatio n WSCC PROW Indicative project delivery could be: IBP/787 Pagham to South Mundham Route – as this scheme is reliant on reserved matters and occupations as well as permission IBP/787, being granted and built out on other sites that contribute to this scheme, a realistic indicative delivery could be 22/23 and 23/24 IBP/789, (we will adjust this if required – forward or back). IBP/580, &/IBP/352 IBP/789 Thornham Lane to Cot Lane – This could be relatively soon. Considering the IBP is setting priorities for the coming 5 will be years, the next financial year we can add this project to would therefore be 20/21 and 21/22, obviously depending on a viable updated scheme and full funding. as requested. TELECOMMUNICATIONS IBP/580 Project has now completed across the County and should be removed from the list as part of this update to the IBP. The County Council supports the projects selected for CIL funding in table 11 of the IDP with some amendments indicated below. HIGHWAYS AND TRANSPORT The following improvements from the emerging Local Plan transport strategy are not included in the IBP document, it is for CDC to determine how these should be updated considering how this links to the work on the Local Plan Review. Chichester City Junctions 5 and 6 are individual improvements within the Northgate Gyratory at Northgate/Orchard St and Churchside/Broyle New Road respectively and although not individually listed in the IBP may be considered to be subsumed within the larger projects Northgate Gyratory scheme included at IBP/352. Contributions against J5 and 6 from the study may be placed towards IBP/352. IBP/837, IBP/838,IB Junction 7 A286 New Park Road / A286 St Pancras Road Project cost estimate £387,400 + 61% Optimism Bias (IBP/837) P/839 are associated Junction 9 Stockbridge Road / Terminus Road Range of options Costs up to approx. £300K + 61% Optimism Bias (IBP/838) with the Local Plan Chichester Wider Area Review Junction 2 B2145/B2201 (Sidlesham Common) Project costs £372,500 + 61% Optimism Bias (IBP/839) and will be Cost estimates exclude: included Options and Development Phase Costs within the Land costs Local Plan Statutory Undertakers Costs Review Employers Agent Supervision Costs IDP rather Non-Recoverable VAT Allowances than this Inflation beyond Q3 2018 IBP. Portfolio Risks Portfolio Risks IBP/840 and Land Contamination and Remediation costs IBP/841 will be The A27 schemes included in the IBP do have the updated costs from the PBA study. The study update and highway feasibly included in work may change these costs in the spring. the IBP IBP/344 – project completed so remove from IBP. IBP/344 will be IBP/346, 670 359, 658, 356, 357– reference projects as medium term not short term recorded as IBP/349 – Feasibility work is currently being undertaken to consider the A286 Birdham Road/B2201 (Selsey Tram Roundabout) completed junction. It is considered that costs will increase and, an estimated cost range for the scheme is between £400k - £600k. The request for CIL funding will increase, taking account of the increased received and allocated S106 funding available (c£160k). IBP/346, IBP/670, IBP - 350/679/680/681/682 IBP/359, Reg 123 lists limited collection of any funds through S106 for these projects as listed under CIL. Part of the sustainable transport IBP/658, strategy for the District to mitigate the planned development in the Local Plan. CDC to determine how best for these projects to be IBP/356, funded and come forward to mitigate development in the adopted Local Plan following removal of Reg123 lists. IBP/357, IBP/349, IBP 353 – Westhampnett sustainable corridor, move back the £500,000 CIL allocation to 20/21. IBP/353, IBP/364 IBP 364 – We request that there is reference to the Barnham to Chichester cycle scheme be added into the IBP364 project will be description for clarity as would link to this scheme. Feasibility work is currently being undertaken on the wider route, but it amended considered that the Tangmere to Chichester section would link tothe Barnham section and so become one route from Barnham to as Chichester. The Barnham to Chichester cycle route is project 192 in the WSCC Cycling and Walking Strategy. suggested The Chichester to Barnham cycle route is in the initial stages, with a feasibility study currently being undertaken (A29 to A27) skirting the proposed development at Tangmere. The project consideration and funding allocation has been considered through IBP/350, the WSCC LTIP process. The s106 funds currently held in Tangmere (alongside some contributions from development in Arun) IBP/679, have been allocated to the cycle scheme in LTIP (from Barnham to Chichester), and will be approved formally once the scheme IBP/680, moves into the WSCC Annual Delivery Programme. IBP/681 & IBP/682 will be removed from the IBP as the BikeIt project is promotion rather than infrastruct ure. & therefore not suitable for stand alone projects. IBP/372 – Air Quality Action Plan measures. Should this project detail be updated to reference the CDC 2018 monitoring reports: IBP/372 CDC to replace some of its fleet vehicles with electric vehicles, raise awareness of facts around poor air quality and how to reduce no change pollution (focus on benefits of active travel and reduce exposure), enable air quality impact from new development considerations required at using new Local Plan policy, commence work on LCWIP, deliver a new air quality monitoring station in Chichester on this stage Westhampnett Road? IBP/540, 541, 542, 543 – reference as medium term IBP/540, IBP/541, IBP/659 – Manhood school access improvements, move back a year to 21/22. IBP/542, IBP 543, IBP/665, 655 and 654 IBP/659, The Road Space Audit is expected to be completed in two phases. Therefore,please change the projects to be 2 rather than 3 IBP/669 projects as currently in the IBP.The first phase would be expected to be completed in in 2020/21, the second phase the following will be year so 2021/22. The figures would remain the same so £500K for phase one and £250K for phase two. updated as IBP/669 – reference as medium to long term, delivery not expected before 2027. requested. IBP/787, 789– it is requested that these projects be prioritised for funding in table 11. IBP/654 will be New Project (IBP/840) - College Lane / Spitalfield Road Junction improvements. The project is looking to widen the existing deleted footways each side of the junction to make suitable for shared use and an improvement to the traffic island in this junction to again and make it suitable for shared use. Estimated delivery would be 21/22 with a cost estimate of £60k to be fully funded by CIL. This IBP/665 would link to schemes to improve the northern side of Oaklands Way and Oaklands Way roundabout. and IBP/655 New Project (IBP/841) - Chidham Sustainable Transport Improvements. The basis of the scheme is to widen existing footways to will be accommodate shared use and to potentially re-align the junctions of Broad Road and the A259 and Chidham Lane and the A259 updated to accommodate the shared path and make crossing of the A259 safer for walkers and cyclists. This project will help alleviate as heavy congestion outside the Primary School that exists and will inevitably get worse due to recent new development on Broad requested. Road and planned development at the northern end of Broad Road. Estimated scheme cost of 1.8m – 2.0m with estimated start IBP/787 & date of 22/23. There is £162k S106 funding received and allocated to scheme. Request for 500k of CIL funding based on new IBP/789 development in Chidham since CIL was implemented. will be considere Education d for IBP/328 – add in ‘(Considering the Neighbourhood Plan Vision for one school, Master Planning of the site is including land for funding at provision of a 3 form entry school)’ to the scheme details column. the appropriat IBP/593 – reference as short term. e time next May. IBP/330 – remove planning reference to SB/14/02800/OUT, this should be on IBP 331. In responses to IDPs and discussions with WSCC developers we reference only the upper cost estimates for projects. Therefore, we would prefer the cost range for projects to be need to removed, with only the upper cost in the document. identify the year in Library Provision which IBP/335 and 336 - Change cost range from £75,000 - £100,000 to £100,000, remove words ‘new’ and ‘school’ from the these descriptions so ‘library provision as part of a community centre for…..to include shelving and self-service terminal’ also reference projects to CIL in funding sources column for both library provision entries. are to be delivered. Waste Management. IBP/710 – remove ‘rebuilding’ in title for all references to IBP 710. Should read as ‘Reconfiguration/improvement of Westhampnett IBP/328, transfer station/household waste recycling site. We also request to add in additional wording to the IBP/593, justification column ‘Additional capacity required to handle materials from the kerbside collections i.e. separately collected food IBP/330, waste, small WEEE (Waste Electronic and Electrical Equipment), textiles’. IBP/331, IBP/335, Flood and Drainage IBP/336, There are a number of projects that have been discussed with CDC engineers, it will be for CDC to decide if projects should be IBP/710 revised, remain or be removed such as IBP/288, 289, 291, 14, 50, 595, 100, 135, 721, 178, 164, 290, 570, 287, 711, 396.