World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of April 30, 1983) SecM83-482 FROM: Vice President and Secretary May 16, 1983 Page Public Disclosure Authorized I. - Eastern Africa 1 - 14 II. - Western Africa 15 - 30 III. - East Asia and Pacific 31 - 40 IV. - South Asia 41 - 50 v. - Europe, Middle East and North Africa 51 - 64 VI. - Latin America and Caribbean 65 - 76 VII. - New Projects 77 - 79 Hember Country, and Borrower or Amount & Stage of Process Implementing Probable ing and Action on Agency J_/ Lender 1/ Procurement !±I I. EASTERN AFRICA BOTSWANA (WATER UTILITIES 22.0 (R) Water Supply III - Raising of Negotiations substantially CORPORATION) (Bank1 Gaborone dam and expansion of completed. Board presentation Public Disclosure Authorized treatment facilities to meet scheduled for June 21. Gaborone's near-term water (Co~financing with CDC agreed for supply requirements; site $10.8 million.) investigations and preliminary design for two future dams. Procurement: Main contract of Total project cost estimated at about $30 million awarded for $50 million. raising dam. Ministry of Health About (R) Family Health - Improve Appraisal mission scheduled for 11.0 effectiveness of health June. Bank Project Preparation (Bank) services delivery by Facility advance of $480,000 strengthening critical approved to finance specialists components of health systems, and employ project manager to including maternal ·and child help Ministry of Health prepare health and family planning. project and carry out preliminary Total project cost to be deter- study of health organization. mined Botswana Development About (R) DFC II - Line of credit to Appraisal report under Corporation and 12.0 Botswana Development preparation. National Development (Bank) cOrporation and National Bank Development Bank for Public Disclosure Authorized subprojects in various sectors; and technical assistanc.e to strengthen NDB's capacity for promoting small and medium-sized enterprises. Total project cost to be determined. J_! If the Government is the borrower, the name of the department, ministry or agency which is to implement the project is given. If the Government is to relend the proceeds to another entity, the name of that entity is given. If the Government is not the borrower, the borrower's name is given in capital letters in parentheses. 2/ The amount is in millions of u.s. dollars and is approximate and tentative. ]./ The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary. Section VII of the Summary c.ontains a recapitulation of the new projects listed in this issue. · .!J../ This, column contains available information, if any, about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA. Distribution: Public Disclosure Authorized Executive Direc.tors and Alternates President Senior Vice Presidents Senior Management Council Vice Presidents, IFC Directors and Department Heads, Bank and IFC - 2 - Member Country, and Borrower or Amount & Stage of Process Implementing Probable ing and Action on Agency l/ Lender 1_/ Project]./ Procurement !±../ Ministry of About (R) Water Supply II - Feasibility study is underway. Rural 15.0 Rehabilitation of 48 rural IDA Project Preparation Facility Development (IDA) aqueducts. Total project cost advance of $470,000 approved to to be determined. complete preparation. Ministry of 15. 8 (R) Education III - Expansion of Board presentation scheduled for National (IDA) basic education and junior May 10. Education secondary education. Total project cost $19,3 million. Ministry of About Technical Assistance - Appraisal report under Planning 5.0 Improving efficiency of public preparation. (IDA) sector enterprises and project preparation and monitoring capabilities. Total project cost to be determined. Ministry About Agriculture Muyinga - Pilot Project under preparation. of Agriculture 15.0 settlement scheme and (Priority of project to be (IDA) development of coffee and reassessed in context of sector foodcrop production in the review.) Muyinga province. Total project cost to be determined. Ministry of About (R) Agricultural Services. Total Project under preparation. Agriculture 10.0 project cost to be determined. (IDA) Ministry of About (R) DFC I - Line of credit for Negotiations in progress. Finance and 2.3 financing of agroindustry and Plan (IDA) small-scale industry. Ministry of About Rural Development - Land Project under preparation. Production 5.0 conservation and (Co-financing with IFAD agreed.) and Industrial (IDA) reafforestation and Development agricultural development. Ministry of About (R) Population - Health Negotiations in progress. Public Health 2.7 infrastructure and technical (IDA) assistance for population activities. Ministry of About Urban Sites and Services, Project under preparation. An Public Works/ s.o Housing Development, urban IDA Project Preparation Facility District of (IDA) facilities, support for small advance of $500,000 has been Djibouti scale industry, artisanal approved to finance primarily enterprise and training. Total· consultants' services. project cost about $20 million. Ministry of National About Human Resources - Possible P~oject under identification• Education, Youth and 6.0 components include secondary, Sports (IDA) technical education, training, health services, etc. (ADDIS ABABA 15.0 (R) . Addis Ababa Water Supply II - Project processing has been WATER & SEWER (IDA) Further expansion of the water discontinued. AGE AUTHORITY supply system of Addis Ababa. (AAWSA)) Ministry of To be Livestock Development and Preparation report to be revised Agriculture deter- Marketing - sector credit for on completion of Government's mined further livestock development. comprehensive review of livestock (IDA) sector~ See page 1 for footnotes. I' I - 3 - Member Country, and Borrower or Ainount & Stage of Process Implementing Probable ing and Action on Agency l/ Lender 1./ Project]_/ Procurement.!±/ ETHIOPIA (Cont'd) Ministry of 20.0 (R) Urban Development I - Upgrading Board presentation scheduled for Public Works (IDA) of existing settlements in May 17. & Housing Addis Ababa with basic services and house improvement loans and development of new sites for self-help housing construction. (ETHIOPIAN To be Power III - Electric Preparation work underway. IDA ELECTRIC LIGHT deter- transmission and possibly Project Preparation Facility AND POWER mined hydroelectric generation advance of $500,000 has been AUTHORITY (EELPA)) (IDA) facilities. approved to finance consulting services. (ETHIOPIAN 10.0 (R) Roads VIII - Second phase of Negotiations in progress. TRANSPORT (IDA) 1978/82 Road Sector Program. CONSTRUCTION) IDA Project Preparation Facility advance of $500,000 approved to finance consulting services to facilitate an early start-up of the project. Ministry of 60.0 Coffee Processing II and Documents under review. IDA Coffee and Tea (IDA) Marketing - Second phase of the Project Preparation Facility Development ongoing coffee processing advance of $700,000 approved to project. finance consultancy services, the establishment of workshops and other activities designed to facilitate an immediate start of the project. Ministry To be Peasant Agriculture Development Preparation work underway. of deter I - Support for expansion and Agriculture mined intensification of integrated (IDA) agr ic ul tur al services, including construction of rural roads, seed multiplication programs; provision of training facilities in selected areas. Ministry of Mines 1.0 (R) Petroleum Exploration Promotion Negotiations scheduled for and Energy (MME) (IDA) - Geophysical surveys, May/June. IDA Project reprocessing of seismic data; Preparation Facility advance of technical assistance to $1,000,000 approved to finance Minis try of Mines and Energy. exploration, legal and accounting consultants to prepare the project. Ministry of To be Agricultural Research - Project preparation underway. Agriculture deter- Strengthening of the research mined capacity of the Institute of (IDA) Agricultural Research of Ethiopia. Telecommunications To be Telecommunications VI - To Appraisal report being prepared. Services of Ethiopia deter- improve and expand (Co-financing is being sought.) mined telecommunications services. (IDA) Government of To be (R) Technical Assistance - To Project processing has been Ethiopia deter- provide technical assistance discontinued. mined studies and equipment to (IDA) strengthen Government capabilities in macro-ec_onomic management, public administra tion and project preparation and implementation. Government of To be Education VI - Basic education Project preparation underway. Ethiopia deter and teacher training. mined See page 1 for footnotes. - 4 - Member Country, and Borrower or Amount & Stage of Process Implementing Probable ing and Action on Agency lf Lender 1./ Project]_/ Procurement!!/ Ministry of Works 8.0 (R) Urban (Secondary Towns) - Negotiations in early May. and Housing/Ministry (Bank) Extension of urban development of Local Government, 22.0 programs to smaller towns. IDA Project Preparation Facility and Local (IDA) Total project cost estimated at advance of $1.0 million approved Authorities $37,4 million. to finance consultants fees for detailed design and engineering, technical assistance and training. (INDUSTRIAL 20.0 (R) IDB V - Fifth line of credit to Project under preparation. DEVELOPMENT (Bank)