MONTHLY OPERATIONAL SUMMARY

OF BANK AND IDA PROPOSED PROJECTS (As of April 30, 1983) SecM83-482 FROM: Vice President and Secretary May 16, 1983

Page Public Disclosure Authorized I. - Eastern Africa 1 - 14 II. - Western Africa 15 - 30 III. - East Asia and Pacific 31 - 40 IV. - South Asia 41 - 50 v. - Europe, Middle East and North Africa 51 - 64 VI. - Latin America and Caribbean 65 - 76 VII. - New Projects 77 - 79

Hember Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency J_/ Lender 1/ Procurement !±I

I. EASTERN AFRICA

BOTSWANA

(WATER UTILITIES 22.0 (R) Water Supply III - Raising of Negotiations substantially CORPORATION) (Bank1 Gaborone dam and expansion of completed. Board presentation Public Disclosure Authorized treatment facilities to meet scheduled for June 21. Gaborone's near-term water (Co~financing with CDC agreed for supply requirements; site $10.8 million.) investigations and preliminary design for two future dams. Procurement: Main contract of Total project cost estimated at about $30 million awarded for $50 million. raising dam.

Ministry of Health About (R) Family Health - Improve Appraisal mission scheduled for 11.0 effectiveness of health June. Bank Project Preparation (Bank) services delivery by Facility advance of $480,000 strengthening critical approved to finance specialists components of health systems, and employ project manager to including maternal ·and child help Ministry of Health prepare health and family planning. project and carry out preliminary Total project cost to be deter- study of health organization. mined

Botswana Development About (R) DFC II - Line of credit to Appraisal report under Corporation and 12.0 Botswana Development preparation. National Development (Bank) cOrporation and National Bank Development Bank for Public Disclosure Authorized subprojects in various sectors; and technical assistanc.e to strengthen NDB's capacity for promoting small and medium-sized enterprises. Total project cost to be determined.

J_! If the Government is the borrower, the name of the department, ministry or agency which is to implement the project is given. If the Government is to relend the proceeds to another entity, the name of that entity is given. If the Government is not the borrower, the borrower's name is given in capital letters in parentheses. 2/ The amount is in millions of u.s. dollars and is approximate and tentative. ]./ The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary. Section VII of the Summary c.ontains a recapitulation of the new projects listed in this issue. · .!J../ This, column contains available information, if any, about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA.

Distribution:

Public Disclosure Authorized Executive Direc.tors and Alternates President Senior Vice Presidents Senior Management Council Vice Presidents, IFC Directors and Department Heads, Bank and IFC - 2 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 1_/ Project]./ Procurement !±../

Ministry of About (R) Water Supply II - Feasibility study is underway. Rural 15.0 Rehabilitation of 48 rural IDA Project Preparation Facility Development (IDA) aqueducts. Total project cost advance of $470,000 approved to to be determined. complete preparation.

Ministry of 15. 8 (R) Education III - Expansion of Board presentation scheduled for National (IDA) basic education and junior May 10. Education secondary education. Total project cost $19,3 million.

Ministry of About Technical Assistance - Appraisal report under Planning 5.0 Improving efficiency of public preparation. (IDA) sector enterprises and project preparation and monitoring capabilities. Total project cost to be determined.

Ministry About Agriculture Muyinga - Pilot Project under preparation. of Agriculture 15.0 settlement scheme and (Priority of project to be (IDA) development of coffee and reassessed in context of sector foodcrop production in the review.) Muyinga province. Total project cost to be determined.

Ministry of About (R) Agricultural Services. Total Project under preparation. Agriculture 10.0 project cost to be determined. (IDA)

Ministry of About (R) DFC I - Line of credit for Negotiations in progress. Finance and 2.3 financing of agroindustry and Plan (IDA) small-scale industry.

Ministry of About Rural Development - Land Project under preparation. Production 5.0 conservation and (Co-financing with IFAD agreed.) and Industrial (IDA) reafforestation and Development agricultural development.

Ministry of About (R) Population - Health Negotiations in progress. Public Health 2.7 infrastructure and technical (IDA) assistance for population activities.

Ministry of About Urban Sites and Services, Project under preparation. An Public Works/ s.o Housing Development, urban IDA Project Preparation Facility District of (IDA) facilities, support for small­ advance of $500,000 has been Djibouti scale industry, artisanal approved to finance primarily enterprise and training. Total· consultants' services. project cost about $20 million.

Ministry of National About Human Resources - Possible P~oject under identification• Education, Youth and 6.0 components include secondary, Sports (IDA) technical education, training, health services, etc.

(ADDIS ABABA 15.0 (R) . Addis Ababa Water Supply II - Project processing has been WATER & SEWER­ (IDA) Further expansion of the water discontinued. AGE AUTHORITY supply system of Addis Ababa. (AAWSA))

Ministry of To be Livestock Development and Preparation report to be revised Agriculture deter- Marketing - sector credit for on completion of Government's mined further livestock development. comprehensive review of livestock (IDA) sector~

See page 1 for footnotes.

I' I - 3 -

Member Country, and Borrower or Ainount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 1./ Project]_/ Procurement.!±/

ETHIOPIA (Cont'd)

Ministry of 20.0 (R) Urban Development I - Upgrading Board presentation scheduled for Public Works (IDA) of existing settlements in May 17. & Housing Addis Ababa with basic services and house improvement loans and development of new sites for self-help housing construction.

(ETHIOPIAN To be Power III - Electric Preparation work underway. IDA ELECTRIC LIGHT deter- transmission and possibly Project Preparation Facility AND POWER mined hydroelectric generation advance of $500,000 has been AUTHORITY (EELPA)) (IDA) facilities. approved to finance consulting services.

(ETHIOPIAN 10.0 (R) Roads VIII - Second phase of Negotiations in progress. TRANSPORT (IDA) 1978/82 Road Sector Program. CONSTRUCTION) IDA Project Preparation Facility advance of $500,000 approved to finance consulting services to facilitate an early start-up of the project.

Ministry of 60.0 Coffee Processing II and Documents under review. IDA Coffee and Tea (IDA) Marketing - Second phase of the Project Preparation Facility Development ongoing coffee processing advance of $700,000 approved to project. finance consultancy services, the establishment of workshops and other activities designed to facilitate an immediate start of the project.

Ministry To be Peasant Agriculture Development Preparation work underway. of deter­ I - Support for expansion and Agriculture mined intensification of integrated (IDA) agr ic ul tur al services, including construction of rural roads, seed multiplication programs; provision of training facilities in selected areas.

Ministry of Mines 1.0 (R) Petroleum Exploration Promotion Negotiations scheduled for and Energy (MME) (IDA) - Geophysical surveys, May/June. IDA Project reprocessing of seismic data; Preparation Facility advance of technical assistance to $1,000,000 approved to finance Minis try of Mines and Energy. exploration, legal and accounting consultants to prepare the project.

Ministry of To be Agricultural Research - Project preparation underway. Agriculture deter- Strengthening of the research mined capacity of the Institute of (IDA) Agricultural Research of Ethiopia.

Telecommunications To be Telecommunications VI - To Appraisal report being prepared. Services of Ethiopia deter- improve and expand (Co-financing is being sought.) mined telecommunications services. (IDA)

Government of To be (R) Technical Assistance - To Project processing has been Ethiopia deter- provide technical assistance discontinued. mined studies and equipment to (IDA) strengthen Government capabilities in macro-ec_onomic management, public administra­ tion and project preparation and implementation.

Government of To be Education VI - Basic education Project preparation underway. Ethiopia deter­ and teacher training. mined

See page 1 for footnotes. - 4 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency lf Lender 1./ Project]_/ Procurement!!/

Ministry of Works 8.0 (R) Urban (Secondary Towns) - Negotiations in early May. and Housing/Ministry (Bank) Extension of urban development of Local Government, 22.0 programs to smaller towns. IDA Project Preparation Facility and Local (IDA) Total project cost estimated at advance of $1.0 million approved Authorities $37,4 million. to finance consultants fees for detailed design and engineering, technical assistance and training.

(INDUSTRIAL 20.0 (R) IDB V - Fifth line of credit to Project under preparation. DEVELOPMENT (Bank) IDB and Commercia·l Bank. BANK) 20.0 (IDA)

Ministry of 40.Q Cooperative Credit - Components Project preparation underway. Agriculture (IDA) to be identified.

(KENYA POWER 12.0 Power IV (Olkaria) - Third 15 Approved by the Executive COMPANY) (Bank) MW unit for the geothermal Directors on February 8. power station at Olkaria, with (Project being co-financed with associated auxiliaries and CDC $9.0 million equivalent and other necessary civil works. EIB $8.8 million equivalent.) Total project cost estimated at about $41,3 million.

(TANA AND ATHI About (R) Power V (Kiambere) - Civi1 Negotiations in early May. RIVERS DEVELOPMENT 116.0 works including powerhouse with (Substantial co-financing AUTHORITY) (Bank) two 70 MW units and associated required.) mechanical and electrical equipment. Total ·project cost Bank Project Preparation Facility estimated at $548,1 million. advance of $250,000 approved to finance consultants fees to update and revise project cost estimates and retain a panel of experts to provide independent technical advice until the project is approved and effective.

Ministry of 15.0 (R) National Extension: Extension Negotiations in early May. Agriculture (IDA) Services would be reorganized (IFAD expected to provide co­ in accordance with Training and financing.) Visit System. Total project cost estimated at $28,6 IDA Project Preparation Facility million. advance of $1.0 million approved to finance critical start-up activities and technical assistance.

(E.A. OIL About (R) Energy - Engineering Studies: Project processing postponed at REFINERY) 6,1 Engineering and feasibility request of Government. (Bank) studies for refinery conversion. Total project cost estimated at $12.6 million.

(E.A. OIL About Energy II (Refinery) - Refinery Project preparation awaiting REFINERY) so.a Conversion: Installation of outcome of engineering studies (Bank) secondary processing facility. mentioned above. (Co-financing and IFC participation being sought.)

Ministry of Energy About (R) Energy Engineering (Geothermal) Prepara.tion work underway. 10.0 - Exploration, development (Bank) drilling, and geothermal studies for several sites.

See page 1 for footnotes. - 5 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender ']J Project]_/ Procurement f!/

KENYA (Cont'd)

Ministry of 27.0 (R) Highways Sector II: Road Project under preparation. Transport and (Bank) maintenance, construction, Communications 63.0 training and pilot program to (IDA) develop private domestic construction capability and traffic enforcement.

Ministries of Works, About (R) Highways IV - Resurfacing and Appraisal mission tentatively and Transport and 17 .o rehabilitation of about 150 km scheduled for September. Communications (IDA) of paved roads not designed for (Co-financing with AfDB current levels of traffic. tentatively agreed.) Continued technical assistance for labor-intensive road IDA Project Preparation Facility construction and maintenance. advance of $300,000 approved for Total project cost estimated at consultants to undertake $32 million. engineering studies required to complete project preparation.

Lesotho National About (R) DFC III - Third line of Credit Project to be defined. Development 10.0 to Lesotho National Development Corporation (IDA) Corporation. Total project cost to be determined.

Ministry ·of Health About (R) Population/Health/Nutrition - Appraisal mission tentatively and Social Welfare 3.0 Technical assistance to scheduled for July. (IDA) strengthen planning, financial ·management, and manpower development in the sector. Total project cost to be determined.

Ministry of About (R) Education IV - Provision of Appraisal mission tentatively Education 10.0 primary school classrooms scheduled for June. (IDA) mainly in poorly-served areas; training in educational management; upgrading of vocational and technical teaching. Total project cost to be determined. MADAGASCAR

Ministry of About Rural Development Fund to Project under preparation by Agriculture 12.0 finance village-level Government, with assistance from Production (IDA) infrastructure, such as RMEA. irrigation systems, feeder roads, collective storage facilities, and village water supply systems; training; and establishment of central project management unit.

Directorate General About Urban I - Technical and Appraisal mission scheduled for of Planning and 15.0 financial strengthening of end-May. Municipalities of (IDA) municipalities; demonstration Antananarivo and upgrading in Antananarivo and IDA Project Preparation facility Toamasina. Toamasina; employment and advance of $150,000 approved to income generation; traffic assist in the further preparation management. Total project cost of the project. estimated at about $18 million.

Ministry of 18.o Lac Alaotra II - Intensifica­ Approved by the Executive Agriculture (IDA) tion of cultivation in Lac Directors on March 22. Production Alaotra area (mainly rice). (Co-financing agreed with FAC, Includes seed production, $4.4 million, and with CCCE, marketing, irrigation main­ $10. 0 million.) tenance, extension, and assistance 'to SOMALAC. Total IDA Project Preparation Facility project cost estimated at $38.4 advance of $1.0 million approved million. to finance construction and equipment.

Ministry of Public About Highways VI - Resurface and Appraisal report being reviewed. Works 45.0 rehabilitate paved roads and (Co-financing with AfDB, U.K., (IDA) strengthen the Ministry of Austria, and EDF, being Works maintenance capability. explored.) Total project cost estimated at $100 million.

See page 1 for footnotes. - 6 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1./ Lender Jj Project]_/ Procurement !!_I

MADAGASCAR (Cont'd)

Ministry of About Irrigation Rehabilitation - Project under preparation. Agriculture 20.0 Strengthening of national Production (IDA) system for operation and maintenance of efficient network, and rehabilitation of networks.

(BANKIN' NY About (R) DFC II - Second line of credit Appraisal mission scheduled for INDOSTRIA (NATIONAL 15.0 to Bankin' NY Indostria (BNI). early June. INDUSTRIAL (IDA) DEVELOP!IENT BANK (BNI))

Ministry of About Cotton - Smallholder cotton Appraisal report being prepared. Agriculture 15. 7 development and ginnery (Co-financing with CCCE being Production (IDA) modernization. explored.)

MALAWI

Ministry of Health 6.8 (R) Health - Improve health Approved by the Executive (IDA) services, with particular Directors on April 26; Credit attention to administrative, signing on May 20. heal th planning, and drug distribution. Total project cost estimated at $7. 5 million.

Ministry of To be Structural Adjustment Credit Appraisal mission scheduled for Finance deter­ II. May. mined (IDA)

Ministry of 10.6 (R) National Rural Development Approved by the Executive Agriculture and (IDA) Program IV - Expansion of NRDP Directors on April 5; Credit Natural Resources concept into new developing signing on May 20. areas - Dedza Hills and Lilongwe North-East. Total project cost estimated at $12.5 million.

Ministry of 34.0 (R) Education V - Primary teacher Credit signing on May 5. Education (IDA) training, secondary school education, accountancy and management training. Total project cost estimated at $42.0 million.

Ministry of Works About (R) Highways V - Highway mainten­ Appraisal report under and Supplies 15. 0 ance, road construction; third preparation. (Co-financing with (Bank) phase of District Roads ODA and AfDB being explored.) 26.9 Improvement and Maintenance (IDA) Program. Total project cost estimated at $88.2 million.

Viphya Pulp and 15.0 (R) Wood Industries Project - Appraisal mission scheduled for Paper Corporation (Bank) Construction of a sawmill and September/October. (Co-financing wood panel mill, including with KfW and GTZ, Germany, and associated infrastructure; ODA being explored.) technical assistance and train­ ing, and studies of alternative uses of the forestry resources. Total project cost estimated at $41. 9 million.

Ministry of Finance About (R) Urban I - To strengthen system Project preparation underway. 15.0 of housing finance and provide (IDA) low-cost urban housing. Total project cost to be determined.

Ministry of 5.0 (R) Fertilizer Credit - To increase Approved by the Executive Agriculture (IDA) the production of smallholders Directors on April 26. Credit sub-sector through improvements signing on May 5. (Co-financing

in the supply of fertilizer and with 1IFAD agreed for $10.28 through strengthening of the million.) institutions supporting the subsector. Total project cost estimated at $30.0 million.

See page 1 for footnotes. - 7 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 11 Project 11 Procurement !±I

MALAWI (Cont'd)

(INDEBANK) About (R) Second line of credit to Project identification underway. 15 ,0 INDEBANK for financing of (IDA) agricultural diversification projects. Total project cost to be determined. MAURITIUS

Ministry of Public About Road Maintenance and Appraisal report being reviewed. Works 14,0 Rehabilitation - Total project Bank Project Preparation Facility (Bank) cost estimated at $19,0 advance of $246,000 has been million, approved to finance engineering and economic studies.

Ministry of About (R) Education III - Post-primary Identification mission in Education and 15,0 technical schools and end-April, Cultural Affairs (Bank) vocational education.

(IRRIGATION About Northern Plains Irrigation - Project being prepared. AUTHORITY) 15,0 Irrigation infrastructure for (Financing of approximately $9,0 (Bank) about 2,500 ha; provision of million by AfDB already agricultural services and provided,) inputs for about 1,200 small farmers growing sugar cane and foodcrops.

Ministry of Finance About Second Structural Adjustment President's Report being 40,0 Loan - Second program of prepared. (Bank) support for economic reforms (SAL II),

Ministry of Finance About Technical Assistance - To be President's Report being 5,0 processed concurrently with the prepared. (Bank) SAL II to provide support through studies and consultant assistance for structural adjustment.

RWANDA

Ministry of Public 13,0 (R) Water Supply - Renovation and Approved by the Executive Works and Equipment (IDA) extension of water supply Directors on April 12, systems in five secondary centers. Total project cost estimated at $16,8 million,

(BANQUE RWANDAISE DE 7,0 (R) BRD III - Third line of Credit Approved by the Executive DEVELOPPEMENT (BRD)) (IDA) to the Development Bank of Directors on April 5. Rwanda to finance industrial development.

Ministry of About (R) Agricultural Research - Project under preparation. Agriculture 10,0 Implementation of an (IDA) agricultural research program, including institutional support, and technical assistance for agriculture policy analysis, Total project cost to be determined.

Ministry of Public About (R) Health/Population, Total Reconnaissance mission Health 13,0 project cost to be determined. scheduled for May/June, (IDA)

Ministry of Post and About (R) Communications Services - Project under preparation. Communications 5,0 Improvement ·and expansion of (IDA) telecommunications and postal services. Total project cost estimated at $32,1 million,

See page 1 for footnotes. - 8 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency ll Lender 1=_/ Project ll Procurement !,_I

SEYCHELLES

Ministry of Planning About Ports/Land Reclamation - Project under preparation. Bank 6.0 Reclamation of land, Project Preparation Facility (Bank) improvement of fishing and advance of $300,000 approved to commercial ports, and complete project preparation. development of industrial (Co-financing with AfDB, BADEA, site. Total project cost CCCE and Kuwait Fund being estimated at $25.0 million. explored.)

SOMALIA

(SOIIALI DEVELOPMENT 10.0 DFC II - Assistance to the Project preparation underway. BANK) (IDA) Somali Development Bank.

Government of To be (R) Fisheries - Support for small Appraisal report being prepared. Somalia deter- fisheries development, IDA Project Preparation Facility mined including financing of advance of $550,000 approved to (IDA) infrastructure and processing complete project preparation. facilities; financial and (Co-financing being explored.) technical assistance to artisanal fisheries. Government of Somalia 10.0 Petroleum Exploration II - Project preparation underway. (IDA) Exploration of petroleum and (Co-financing being explored.) gas resources and further Project Preparation Facility technical assistance to artvance of $1,000,000 approved to Ministry of Mineral Resources. complete project prepar.ation.

Government of 3.0 Technical Assistance - Second Project preparation underway. Somalia (IDA) Credit for technical assistance to Ministry of Planning and Ministry of Finance.

Government of To be N.w. Agriculture II - Project preparation underway. Somalia deter- Continuation of ongoing project mined which is assisting in the (IDA) development of the North-West Region through soil and water conservation, and other measures to increase agricul­ tural production.

Government of To be Education V - To be defined Project identification underway. Somalia. deter- mined (IDA)

SUDAN

Ministry of 80.0 (R) Gezira Rehabilitation - Trials, Negotiations completed. IDA Irrigation and (IDA) studies and rehabilitation of Project Preparation Facility Gezira Board capital investments aimed at advance of $600,000 approved to improving Gezira production. complete project preparation. (Co-financing is being sought.)

Government of Sudan To be Sugar Rehabilitation - Credit Appraisal mission scheduled for deter- would provide assistance for July/August. (Co-financing mined rehabilitation of sugar required.) (IDA) industry and would support policy changes in the subsector generally. Government of Sudan 16.0 (R) Highways III - Technical Negotiations substantially (IDA) assistance and training in completed. (Co-financing of $8.3 maintenance for the Roads and million agreed with USAID.) Bridges Public Corporation (RBPC) and the Southern Region Ministry of Communications, Transport a,1d Roads (SRMCTR); and consulting services for planning.

See page 1 for footnotes. - 9 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1_! Lender 1/ Procurement !!_I

SUDAII (Cont'd)

Government of Sudan .To be Petroleum - Petroleum IDA Project Preparation Facility deter- development and distribution. advance of $10o;ooo approved to mined finance consultancy services for (IDA) distribution study.

Government of Sudan 25.0 (R) Railways V - Technical This project is no longer in the (IDA) assistance, training and lending program and reporting communications. will be discontinued.

Government of Sudan To be (R) Power IV - Expansion of power Appraisal mission scheduled for deter- generation and transmission July/August. (Co-financing mined facilities. required,) (IDA)

Government of Sudan To be. Cotton Marketing - Project identification underway. deter- Rehabilitation of Ginneries and mined strengthening of cotton (IDA) production and marketing policy institutions.

Government of Sudan 20.0 (R) Education III -Engineering and Appraisal mission scheduled for (IDA) vocational training; textbook May, production; and institutional development.

Government of Sudan so.a (R) Agriculture Rehabilitation Negotiations ·in progress. (IDA) Credit II - Support to the irrigation sub-sector through provision of foreign exchange for farm inputs and technical assistance.

Government of Sudan To be Agricultural extension/research Project preparation underway. deter- - To be defined. mined (IDA)

TANZANIA

Ministry of 40.0 (R) Harbours I - Improvements to Appraisal report being prepared. Communications and (IDA) Dar-es-Salaam Port. Total (Co-financing meeting May 30/31), Transport project cost estimated at $86 million, with foreign exchange component of about $64 million.

Ministry of 20.0 Education VIII - Secondary Further preparation underway. Education (IDA) education. IDA Project Preparation Facility advance of $340,000 approved to finance detailed survey of schools considered for rehabilitation under th~ proposed project.

Tanzania Electric 35.0 (R) Power IV - Construction of an Negotiations in progress. Supply Co. Limited (IDA) 80 MW hydrostation and asso­ (Co-financing expected from (TANESCO) ciated works at Mtera, and France, KfW Germany, Italy, rehabilitation of the Ubundo Kuwait Fund, NORAD and SIDA), diesel station in Dar-es-Salaam. Total project cost estimated at $275.6 million, with a foreign exchange component of $147.3 million.

See page 1 for footnotes. - 10 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender Jj Project 11 Procurement !ii

TANZANIA (Cont'd)

Ministry of 50.0 Highways VI - Rehabilitation/ Project being prepared. Communication and (IDA) strengthening of the Tan Zam Transport Highway, and road maintenance.

Ministry of Minerals 6.3 Coal Engineering - Negotiations substantially (IDA) Engineering services for completed. Board presentation possible development of coal scheduled for May 19. deposits in southern Tanzania. Total project cost estimated at $7.0 million,

Ministry of 20.0 (R) Sugar Rehabilitation I - Project preparation underway. Agriculture (IDA) Rehabilitation of sugar (Co-financing possibilities being production facilities, explored,.) incorporating both estate and smallholder operations. Total project cost estimated at $110.0 million, with a foreign exchange component of $100 million,

Ministry of Industry 18.0 (R) Mufindi Pulp and Paper II - Negotiations substantially National Development (IDA) Technical assistance for completed. Board·presentation Corporation start-up of mill; and energy scheduled for May 19. conversion facilities. Tota1 (Co-financing expected from SIDA project cost estimated at $45.0 and the Federal Republic of million, with a foreign Germany.) exchange component of $35.0 million.

30.0 (R) Roads III - Rehabilitation of Appraisal report being prepared. (IDA) trunk roads; re-equipping of Ministry of Works maintenance unit, technical assistance; some upgrading, and construction of vital links under consideration.

Ministry of Power, 22.0 (R) Telecommunications - Negotiations completed. Board Posts and (IDA) Rehabilitation of postal presentation scheduled for May Telecommunications services and telecommunica­ 17. tions.

Ministry of Planning To be (R) Technical Assistance II - Appraisal report being prepared. and Economic deter- Second line of credit to Development mined finance services for project (IDA) preparation, feasibility studies, training institution building.

GECAMINES About Gecamines II - Rehabilitation, Awaiting outcome of technical 70.0 maintenance and expansion of assistance project. (IDA) existing mining facilities. Total project cost to be determined.

Department of 25.0 Ports; (ONATRA) - Rehabilita­ Credit signed on April 28, Transportation (IDA) tion of Matadi and Kinshasa (ONATRA) Ports; total project cost esti­ (Co-financing arranged with AfDB mated at $90.0 million. $21 million; CCCE $5 million; FAC $1 million.)

Procurement: Bid invitations were issued in January.

See page l for footnotes. - 11 -

Member Country, and Borrower or Ainount & Stage of Process­ Implementing Probable ing and Action on Agency lf Lender 1) Procurement i/

ZAIRE (Cont'd)

Department of 13,0 NE Rural Development Ituri II - Credit signed on April 28. Agriculture (IDA) Improvement of productivity of farmers' livestock and agri­ (Co-financing arranged with cultural holdings through pro­ Canada, $3.Q million, and France, vision of inputs and extension $10,0 million.) services. Total project cost estimated at $30,0 million.

Department of To be Integrated Rural Development Identification underway. Agriculture deter- Project in Kivu Region. Total mined project cost to be determined. (IDA)

Department of About (R) Railways II - Track Rehabilita­ Identification mission Transportation 68,0 tion, additional wagons, tele­ tentatively scheduled for (IDA) communications and technical September. assistance training. Total project cost to be determined.

GECAMINES 7,0 Gecamines TAS. Provision of Approved by the Executive (IDA) consultant assistance to Directors on March 22. strengthen company's manage­ ment. Total project cost estimated at $9,3 million.

Department of Energy About (R) Petroleum Exploration - Negotiations scheduled for 3,5 Technical Assistance. Total end-May. (IDA) project cost to be determined.

Department of About (R) Education Training/Technical Project preparation underway. Primary and 10,0 Assistance - Technical Secondary Education (IDA) assistance for training and improvement of planning; financial management and project implementation; studies relating to education policy and the Reform of Primary and Secondary Education. Total project cost to be determined.

Department of To be Research/Seeds - Support for Project preparation underway. Agriculture deter- development of priority mined agriculture research programs (IDA) and seed production capability. Total project cost to be determined.

Department of To be Maize II - Development of Maize Project preparation underway. Agriculture deter- production through improved mined input supply systems and (IDA) infrastructure support. Total project cost to be determined.

SOCIETE FINANCIERE To be SOFIDE VII - Line of credit to Project being prepared, DE DEVELOPPEMENT deter- SOFIDE to meet capital (SOFIDE) mined investment requirements of (IDA) subprojects in the agriculture, transportation and industrial sectors.

Department of About (R) SNCZ Rail Technical Appraisal mission scheduled for Transportation 20,0 Assistance - Assistance for early June. (Co-financing with (IDA) management and training, provi­ AfDB, CCCE and FAC identified,) sion of equipment for track renewal and spare parts. Total project cost to be determined.

Ministry of About (R) Rural Water Supply - Provision Negotiations completed. Board Agriculture and 16,0 and extension of water supply presentation scheduled for May Water Development (IDA/IDA in six rural districts and 12. Special institution building. Total Fund) project cost estimated at $20,0 million.

See page 1 for footnotes. - 12 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency )j Lender ]j Project ]./ Procurement !!../

ZAMBIA (Cont'd)

Zambia Forestry and About (R) Forestry III - Strengthening Negotiations tentatively Forestry Industries 22.0 management of IPD, and scheduled for July. (Co-financing Corporation, Ltd. (Bank) improving its logging and tentatively agreed with FINNIDA (ZAFFICO) transport activities; and .and being explored with BADEA.) rehabilitation and expansion of sawmilling capacity. Total Bank Project Preparation Facility project cost estimated at advance of $450,000 approved to $64.4 million, finance preparation of detailed engineering designs and bidding documents for wood processing and handling facilities.

Ministry of Lands About (R) Fisheries - Improvement of fish Appraisal mission in the field. and Natural 7.0 production systems and market­ (Co-financing with FINNI!lA being Resources (IDA) ing channels. Total project explored.) cost estimated at $20.0 million.

Ministry of About (R) Copper Mining - Rehabilitation Appraisal report being prepared. Mines 10.0 of copper mining facilities; (Co-financing with Italian Aid (Bank) exploration and training Agency being explored.) programs, technical assistance. Total project cost to be determined.

Development Bank of About (R) DFC III - Third Line of Credit Re-appraisal mission scheduled Zambia 20,0 to Development Bank of Zambia. for May. (Bank) Total project cost to be 10.0 determined. (IDA)

Zambia Railways 20,0 (R) Railways IV - Training, Project preparation underway. (IDA) technical assistance, track (Co-financing to be explored.) improvement, telecommunica­ tions, rolling stock, maintenance facilities. Total project cost to be determined.

Ministry of Mines 2.0 (R) Petroleum Exploration Project to be defined. (IDA) Development - Financing exploration activities. Total project cost to be determined.

Ministry of Mines 4.3 (R) Maamba Coal - Technical Credit signing tentatively (IDA) assistance for a technical and scheduled for May, economic study of feasibility of reorganizing and rehabili­ tating Maamba Collieries Ltd. (MCL) mining complex, including examination of coal pricing and marketing and MCL's training needs; provision of critic al spare parts and equipment; and training. Total .project cost estimated at $6-1 million,

Ministry of About (R) Agricultural Services - Project preparation underway. Agriculture 15. 0 Agricultural research and (IDA) extension service support for Ministry of Agriculture. Total project cost to be determined.

Ministry of Roads 26,4 (R) Highways I - Construction of 85 Board presentation scheduled for and Road Traffic (Bank) km of Fort Victoria-Birch May 17. (Co-financing with BADEA Road; 400 km of gravel roads; agreed for about $10 million.) training and studies. Total project cost estimated at $77,4 million.

See page 1 for footnotes. - 13 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender],_/ Procurement !!_/

ZIMBABWE (Cont'd)

Ministry of About (R) Agricultural Sector Planning Project preparation underway. Agriculture 16.0 Project Technical Assistance. (Bank) ,Total project cost to be determined.

Ministry of Industry About (R) DFC I - Line of credit to a Project identification underway. and Energy 30.0 development bank which is to be (Bank) established. Total project cost to be determined.

Ministry of Local About (R) Urban I - Urban infrastructure Appraisal mission scheduled for. Government and 25.0 and housing development; and July. Physical Planning (Bank) technical assistance. Total project cost to be determined.

Ministry of Natural About (R) Rural Afforestation - Support Negotiations completed. Board Resources 7.3 for rural afforestation. Total presentation scheduled for May (IDA) project cost estimated at $10.9 17. million.

Ministry of About (R) Technical Assistance (Staffing Negotiations scheduled for Transport 40.0 and Training) - Technical late May. (Bank) Assistance and Training for the National Railways of Zimbabwe. Bank Project Preparation Facility Total project cost estimated at advance of $0.2 million approved $50. 7 million. for updating manpower -s·tudy.

Ministry of About (R) National Extension and Research Negotiations completed. Agriculture 13.0 Project. Total project cost (Bank) estimated at about $177.2 million.

Ministry of About (N) Agriculture Sector - Project preparation underway. Agriculture 20.0 Agriculture services and (Bank) marketing; input supply, with particular reference to REGIONAL communal areas.

(SOCIETE 45.0 (R) Ruzizi II - Cons.true tion of a Board presentation scheduled for INTERNATIONALE DES 27 MW hydroelectric power May 24. (Co-financing with FED, PAYS DES GRANDS LACS station to serve ,Burundi, EIB and Italy is under (SINELAC)) Rwanda and Zaire. Total discussion.) project cost estimated at $84.0 million. Three advances from the IDA Project Preparation Facility totalling $240,000 were approved to finance a review of the design criteria, tender preparation, verification of cost estimates, environmental studies, engineering studies and completion of legal documents pertaining to the creation of SINELAC.

See page 1 for footnotes. - H - - 15 -

Member Country, and Borrower or Atnount & Stage of Process­ Implementing Probable ing and Action on Agency Jj Lender 1./ Project 11 Procurement !!_I

II, WESTERN AFRICA

Government of Benin 20,0 Second phase of Seme oilfield Project under preparation. (IDA) development. (Co-financing will be sought,)

Government of Benin 3,0 (R) Technical assistance for Appraisal mission scheduled for (IDA) economic planning, financial June/July, management and project preparation.

Government of Benin 10,0 (R) Forestry - Project to Appraisal report being prepared. (IDA) strengthen the forestry services, management and extension of the teak plantation for timber, poles and fuelwood.

Governmemt of Benin 11,0 Feeder Roads III - To finance Appraisal mission scheduled for (IDA) rehabilitation and construction May, of feeder roads in Benin, and, as an interim measure, provide for the maintenance of about 2,000 km of feeder roads; provide training for equipment operators and mechanics.

Government of Benin To be (R) State Enterprises - Provide Appraisal mission scheduled for deter- studies, line of credit, July, mined technical assistance and (IDA) training to certain key state enterprises.

CAMEROON

Ministere de 20,0 Urban Development I - Squatter Approved by the Executive l'Urbanisme et de (Bank) settlements upgrading in Directors on March 15. ! 'Habitat Douala; community facilities in (Co-financing with Switzerland of Yaounde; technical assistance about $5,5 million,) and training.

To be determined 32,0, Wood Processing Industries. Project preparation underway. (Bank) Total cost about $37,0 million plus $10,0 million for infrastructure.

Office National du 22,5 Ports III - Extension of Approved by the Executive Port (Bank) general cargo facilities, with Directors on March 31. provision for banana handling and floating craft, .and Procurement: Bid evaluation extension of data processing report for civil works has been system. Total project cost finalized, about $33,0 million,

Ministere de 45,0 Manpower Development - Preparation underway. !'Education (Bank) Expansion of teacher training nationale for primary and techhical education, and establishing a comprehensive system of vocational training and upgrading, Strengthening of key institutions responsible for education planning and administration.

See page 1 for footnotes. - 16 -

Member Country, and Borrower or Ainount & Stage of Process­ Implementing Probable ing and Action on Agency lf Lender Jj Project]_/ Procurement !!_I

CAMEROON (Cont'd)

Ministere de 22.0 (R) Western Province Rural Develop-· Negotiations scheduled for June. l'Agriculture, and (Bank) ment Project Follow-up - (Co-financing tentatively agreed Union Centrale des Increasing rural incomes and with IFAD for $15,0 million.) Cooperatives du Cafe living standards through Agricol de L'Ouest integrated development (UCCAO) emphasizing foodcrop produc­ tion, improved ~offee process­ ing, and rural infra- structure. Extension of development services initiated during the Western Highlands I Project (Cr. 784) with particular emphasis on improved farmers' cooperative organiza­ tion and training as means of reaching major part of provin­ cial population. Total project cost estimated at $57.3 million.

Government of 20.0 (R) Second Special Rural Develop­ Appraisal mission in May. Cameroon (Bank) ment Fund (FSAR II) - To extend Government's efforts for accel­ erating rural construction and development. 11le proposals include: a village water supply component; a line of credit for small-scale high priority rural activities, studies, infrastructure, and specific production support. Total project cost about $50,0 million.

General Delegation 25.0 (R) Agricultural Research - Pre-Appraisal mission in the for Scientific and (Bank) Improving scope and application Field. Technical Research of national agricultural (DGRST) research through institution building involving DGRST and crop and livestock research institutes. Particular emphasis on training, organization, evaluation and building pre-extension linkages to regional research and development. Total project cost about $60.0 million.

CAPE VERDE

Banco de Cabo Verde 5.0 (R) Line of credit for assistance Preparation mission scheduled for (IDA) to small and medium-sized September. enterprises, and technical assistance. CENTRAL AFRICAN REPUBLIC

Ministere de 10.4 (R) Cotton Areas Integrated Rural Board presentation scheduled for l'Agriculture et de (IDA) Development - Five-year agri­ end-May. (Cofinancing confirmed l'Elevage cultural development program with FAC $3.9 million, FED $5.8 aimed at rehabilitating and million, CCCE $8.5 million, BADEA improving the production of $3,7 million and BDEAC $1.9 cotton and food crops; million). strengthening SOCADA, the proposed executing agency. Total project cost estimated at $51.Z million (of which $23.6 million in foreign exchange), including recurrent expendi­ tures.

See page 1 for footnotes. - 17 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency ]J Lender l) Procurement !!_/

CENTRAL AFRICAN REPUBLIC (Cont'd)

Ministere de 11.0 (R) Education II - Reorganization Board presentation on May 10. l'Education (IDA) and strengthening of the School IDA Project Preparation Facility Nationale Construction and Repair and advance of $300,000- approved to Maintenance Unit to enable it finance specialist services and to build, repair and maintain related logistical support to school buildings. Rehabilita­ prepare architectural,· tion of about 300 primary procurement and financial aspects schools in rural areas; provi­ of the project. A second PPF sion of educational materials request for $500,000 approved to for the rehabilitated schools; finance further preparation: strengthening of planning and completion of surveys to select evaluation capacities of the construction sites, building of Ministry of Education; evalua­ warehouses to store project tion of impact.of improved construction materials, and facilities on student achieve­ preparation of bidding documents. ment. Total project cost estimated at $12.2 million.

Presidency 30.0 (N) Economic Rehabilitation Program Appraisal mission scheduled for (IDA) - Financing of imports to June/July. assist the Government in reconstruction of government buildings and reconstitution of administrative functions, and to strengthen public enterprises; establishing line of credit and associated technical assistance for small and medium scale enterprises.

CONGO , PEOPLE' S REPUBLIC OF THE

Ministere des Eaux 12.0 (R) Wood Processing Project - Board presentation scheduled for et Forets (Bank) Establishment of logging, end-May. (Co-financing with AfDB sawmilling and vefleer produc­ and private partners probable.) tion complex in northern Congo, and technical assistance to Bank Project Preparation Facility improve forestry sector manage­ advance of $500,000 approved to ment. Total project cost esti­ finance detailed engineering for mated at $40.0 million, of sawmill and veneer plant. which $28. 0 million in foreign exchange.

Ministere des 11.0 (R) Technical Assistance Project - Board presentation scheduled ~or Finances/Ministere (Bank) Technical services to help May 19. de l'Interieur/ upgrade public finance and Ministere des external debt management; Travaux Publics assistance to properly plan and execute urban infrastructure investments. Total project cost estimated at $14.7 million.

Societe Nationale de 17.0 (N) Water Engineering and Project in early stage of distribution d'eau (Bank) Rehabilitation Project - Pointe preparation. Bank Project (SNDE) Noire Water distributions Preparation Facility advance of network rehabilitation; and $300,000 approved to finance technical assistance to SNDE to preparatory studies. upgrade organization, staff skills and management systems.

EQUATORIAL GUINEA

Ministerio de 10.6 (R) Rehabilitation of cocoa and Appraisal mission in May. Agricultura, (IDA) coffee. Project prepared with financing Ganaderia y Pesca from IDA Project Preparation Facility advance of $200,000.

See page 1 for footnotes. - 18 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender],_/ Project 11 Procurement !±I

THE GAMBIA

Ministry of 8,0 (R) Agricultural Development Appraisal report- being prepared. Agriculture (IDA) Project - Second phase of IDA Project Preparation Facility Rural Development Project advance of $670,000 to finance (Credit 644) would include services of a cooperative support for: traditional advisor and financial advisor; farmers, including extension, and detailed architectural and input supply and marketing engineering designs and services on a country-wide preparation of tender documents basis; the national seed for the buildings, (Possible multiplication scheme and co-financier: IFAD $5,0 million; research into irrigated and other co-financiers yet to be upland food crops. Total identified,) project cost estimated at $40,6 million, of which about $34,5 million in foreign exchange.

Ministry of Economic 10,0 Urban Management and Appraisal report being prepared. Planning and (IDA) Development: (i) preparation Industrial of 700 plots serviced with IDA Project Preparation Facility DeveloJ)ment basic infrastructure and advance of $300,000 approved to facilities (roads, water, finance the costs of staffing and sanitation, electricity); (ii) consul tan ts services for upgrading of two existing feasibility studies, basic settlements near project equipment, technical assistance cities; (iii) support to and preliminary detailed municipal management. engineering work needed to facilitate project preparation.

Ministry of Works & 12,0 (R) Urban development including Project preparation completed. Housing, or a new (IDA) upgrading in Accra and support Government in process of agency to the Accra Municipality for re-examining project in order to rehabilitation and mainten­ determine its priority in the ance. Total cost estimated at lending program. $24,2 million at pre-appraisal, of which about $12, 6 million was the foreign exchange component. Cost figures will be revised at appraisal.

To be determined 20,0 Cocoa III - Replanting and Decision on project preparation (IDA) rehabilitation of existing by FAO/CP to be deferred until cocoa areas; technical Export Rehabilitation Credit is assistance for training and finalized, institution building,

Ghana Water and 13,0 (R) Water Supply Technical Credit signed on April 26, Sewerage Corporation (IDA) Assistance and Rehabilitation - (GWSC) Managerial, financial, An IDA Project Preparation operational assistance to Ghana Facility advance of $400,000 Water and Sewerage Corporation approved for first phase of and rehabilitation of the technical assistance. Kpong-Accra pipeline and water supply facilities in the. Accra-Terna area; project preparation assistance. Total cost about $29,1 million, of which $18,8 million in foreign exchange.

Ghana Highway 35,0 Fourth Highway - Rehabilitation Feasibility and engineering Authority (IDA) of bridges and main roads, studies now being completed under and technical assistance. IDA Project Preparation Facility advance of $1,0 million, (Co-financing wili be required,)

Ministry of Fuel and 11,0 (R) Petroleum Exploration Promotion Board presentation scheduled for Power (IDA) - Technical assistance, May 24. Project preparation strengthening petroleum financed by IDA Project institutions, and energy Preparation Facility advances o·f planning assistance. TOtal $340,000 and $375,000, cost estimated at $12,0 million of which $11,0 million in foreign exchange.

See page 1 for footnotes. - 19 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender Jj Procurement !±I

GHANA (Cont'd)

To be determined To be (R) Public Administration Technical Further processing awai_ting deter­ Assistance to assist the review of project scope. (The mined Government of Ghana in Commonwealth Fund and UNDP have (IDA) strengthening the management of confirmed their interest in the civil service and improving co-financing.) its strategy for the state ~nterprises and increasing their efficiency. Total cost about $11,5 million of which $7,9 million in foreign exchange.

Ghana Oil Palm 19. 5 Oil Palm II - Consolidation of Project to be re-appraised in Corporation (GOPC) {IDA) activities undertaken under the October/November. completed Oil Palm I project through continued provision of technical assistance, management support and training. Extension of existing outgrower planting program and provision for research activities. Total cost about $42,3 million of which about $13.0 million in foreign exchange.

Electric Corporation To be {R) Fourth Power Distribution - Re-appraisal mission scheduled of Ghana (ECG) deter- Rehabilitation of ECG's for May, {Co-financing will be mined distribution network, system needed). {IDA) maintenance, technical assistance and training.

State Coal Mining To be {R) Export Rehabilitation Credit. Re-appraisal mission scheduled CorM CoCoa deter- Spare parts and foreign input for May. (Co-financing will be Marketing Board; mined requirements of cocoa, needed.) Ghana Port Authority {IDA) forestry, gold mining sectors, ports, and technical assistance.

Bank of Ghana 40,0 (R) Reconstruction Import Credit­ President's Report being (IDA) Provision of quick-disbursing prepared. Negotiations scheduled assistance to cover spare for May. (Co-financing will be part~, materials, equipment and needed). other urgent inputs in the agricultural and transport sectors.

GHAIP Oil Refinery To be {N) Oil Refinery Technical Appraisal report being prepared. deter­ Assistance Studies to mined rehabilitate and rationalize the refinery, and to improve the product distribution systems.

Ministry of Mines so.a {Rl Nimba Iron ore mining and Technical partner and manager a,nd Geology (Bank) beneficiation with evacuation agreed. Feasibility studies are via existing facilities in being revised. Liberia.

Ministry of 13.0 (R) Port of Conakry - Rehabilita­ Negotiations completed. Board Transport {IDA) tion of port facilities, provi­ presentation scheduled for June. sion of cargo handling equip­ (Co-financing of project by ment, technical assistance to Federal Republic of Germany and improve port administration and AfDB identified,) operations. Total cost about $38,0 million, An IDA Project Preparation Facility advance of $600,000 approved for work necessary prior to negotiations and to speed project implementation.

Procurement: All bid documents received and being evaluated,

See page I for footnotes. - 20 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 1/ Project]./ Procurement !!_I

GUINEA (Cont'd)

Ministry of Higher u.o (R) Education II - Conatruction of Credit signed on April 26. Education, Ministry (IDA) facilities and provision of (Co-financing arranged with AfDB of Pre-University equipment, technical assistance $11.7 million and Saudi Fund $4.1 Education and fellowships for 3 existing million.) industrial vocational schools; 2 primary teacher training An IDA Project Preparation colleges and the pedagogical Facility advance of $700,000 institute; curriculum develop­ approved for completion of ment and textbook production bidding documents and to for primary education; strengthen institutional strengthening of' educational capacity. and manpower planning; equip­ ment, technical assistance and fellowships for project imple­ mentation. Total cost esti­ mated at $30.2 million.

Ministry of Public 15.0 Highways III - Rehabilitation Appraisal report being prepared. Works (IDA) and strengthening of Conakry­ (Possible co-financiers: AfDB Mamou Road. Periodic resealing and USAID.) . and regravelling of trunk roads. Preparation of a trans­ Procurement: Prequalification port plan. Technical assist­ process of contractors for the ance to Ministry of Public Conakry-Mamou works ($31.3 Works. Total cost about $80.0 million) has resumed. million, of which $57.0 million in foreign exchange.

Ministry of Planning 10.0 Technical Assistance - Planning Appraisal report being prepared. and Statistics, (IDA) and investment programming; IDA Project Preparation Facility Ministry of State project identification, advance of $200,000 financed Control, and the preparation and evaluation. project preparation. Central Bank Revision of accounting plans. External debt management.

Ministry of Mines 10.0 (R) Oil and Mineral Exploration - A Petroleum exploration component and Geology (IDA) geological field survey, a was appraised in March. seismic survey in the near Preparation of mineral component offshore, a mineral exploration underway. IDA Project program, and technical Preparation Facility advance of assistance to the Ministry of $220,000 approved. Mines and Geology and the National Oil Company for promotion of oil and mineral exploration.

Ministry of Housing, 10.0 (R) Conakry Urban Development - Appraisal mission in the field. Urban Development (IDA) Rehabilitation of existing, and and Domains construction of new, drainage IDA Project Preparation Facility networks; urban road advance of $250,000 approved to maintenance and training to finance feasibility study. improve municipal service management and urban development planning.

GUINEA-BISSAU

Ministry of 16.0 (R) Rehabilitation and expansion of Negotiations substantially Transport (IDA) Bissau Port; reconstruction of completed. Board presentation river ports and technical scheduled for June. assistance for port management (Co-financing arranged with BADEA and operations. Total cost $10 million, Kuwait Fund $10 estimated at $47.5 million. million, Saudi Fund $8.5 million, and OPEC Fund $3 million.

Ministry of Public 7.0 Rehabilitation of 500 km. of Appraisal report being prepared. Works (IDA) paved and laterite roads; establishment and equipment of three maintenance districts; modernization of ferry services. Estimated total cost $13.5 million•

See page I for footnotes. - 21 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency )j Lender If Procurement !!_I

GUINEA-BISSAU (Cont'd)

Various Ministries To be (R) Technical assistance for Appraisal mission scheduled for and Bank of deter­ macroeconomic management, September. Guinea-Bissau mined public administration and state (IDA) enterprises.

IVORY COAST

Regie Abidjan-Niger 30.0 Railways II - Realignment Appraisal processing will follow (RAN) (Bank) Petionara-Tafire; track renewal agreement on RAN' s overall in Ivory Coast and Upper Volta; investment program and financial locomotive maintenance rehabilitation. facilities; railway equipment, consulting services and training.

Energie Electrique 69.0 (R) Soubre Hydroelectric Project. Negotiations scheduled for June. de la Cote d'Ivoire (Bank) Construction of dam on (Co-financing will be required Sassandra River; powerhouse, and is being discussed with civil works, equipment, associ­ official sources of finance and ated transmission, consulting export credit institutions.) and training services, and maintenance machine tools, Procurement: Retroactive resettlement and engineering. financing of $1.5 million to be 328 MW capacity to meet growing recommended for consul ting and demands in Ivory Coast. Total training services, and machine project cost in January 1982 tools. prices estimated at $518.4 million.

Government, SAPH, 32.2 (R) Rubber Development IV - Board presentation scheduled SOGB and IRCA (Bank) Supporting small-scale and for June. ( Co-financing arranged estate rubber production with CCCE $21.2 million and CDC activities, including main­ $14 million.) tenance of immature rubber, provision of processing facili­ ties and establishment of a further 3,900 ha of small-scale outergrower rubber and 2,000 ha. of estates, and for research; 1,000 h~. of estate and 500 ha. of experimental planting. Total project cost estimated at $85.0 million, of which $39.3 million in foreign exchange.

Ministry of 40.0 (R) Rural Development III (CIDT) - Project under preparation. Agriculture (Bank) North and North-West Savannah and/or CIDT Rural Development project emphasizing cotton and foodcrops, increased farm participation in marketing, input supply and credit. Complementary activities include farm modernization, spread of animal traction, and project monitoring and evaluation.

Government of Ivory 200.0 (R) Loan to support program of Negotations in mid-May. Coast (Bank) structural adjustment.

Government and 35.0 (N) Forestry II - Land clearing, Appraisal mission scheduled for SODEFOR (Bank) planting and maintenance of September. 20,000 ha; maintenance of 20,000 ha planted under the first forestry project; research and pilot developments.

See ,page l for footnotes. - 22 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1./ Lender·],_/ Procurement !i_/

Ministry of Public 7,0 Highways V - Road maintenance; Appraisal report being prepared, Works (IDA) technical assistance and (Co-financing is required; USAID fellowships, and operating and Kuwait Fund have expressed costs for Ministry of Public interest in co-financing,) Works. Total cost estimated at $20,5 million of which $15,7 Technical assistance will be million in foreign exchange, started with an advance of $340,000 from the IDA Project Preparation Facility,

Liberian Bank for 4,0 Credit for rehabilitation of Preparation underway. Development and (IDA) industrial and related Investment enterprises.

Ministry of 10, 7 Bong Agriculture Development II Appraisal report being prepared, Agriculture (IDA) - Expansion of existing project (Co-financing being sought,) activities in Bong County. Total cost estimated at $22,5 million.

Ministry of Planning 10,0 Program to (a) provide techni­ Project preparation underway, and Economic Affairs {IDA) cal assistance to monitor and IDA Project Preparation Facility evaluate the performance of advance of $500,000 approved. public sector corporations; (b) rehabilitate and introduce maintenance programs in four public sector enterprises; and (c) help tne Government privatize some corporations now in the public sec tor.

Office du Niger 6, 7 (R) Two broad components (a) Gasohol Negotiations in mid-May, (IDA) Production of ethyl alcohol Studies on feasibility of from surplus molasses, introducing gasohol, financed by modification of existing IDA Project Preparation Facility distillation facilities and advances of $50,000, have been provision of infrastructure to completed. handle and store ethyl alcohol for eventual blending with gasoline; and {b) financing for a Rehabilitation Task Force to prepare a program of technical, financial and administrative rehabilitation of entire agency. Total cost estimated at $7,2 million of which $6,3 million in foreign exchange.

Ministere d'Etat 8,5 (R) Rural Water Supply (in the Appraisal report being prepared, charge'de (IDA) Western Region) to be executed IDA Project Preparation Facility l'Industrie et de in parallel with IDA Health advance of $440,000 approved; l'Equipement/Direc­ Project. Components include consultants appointed to assist tion Nationale (i) drilling boreholes; (ii) in the preparation of tender d'Hydraulique et de preparing well-sites; (iii) documents, (Co-financing will be l 'Energie du Mali installing hand pumps; and (iv) required,) (EdM) strengthening national water directorate. Total cost estimated at $13,7 million of which $11,8 million in foreign exchange.

Compagnie Malienne 25,9 Mali Sud II - (i) extension of Appraisal report being prepared, pour le (IDA) production of cotton, maize and (Co-financing with CCCE for $11,3 Developpement des rice; (ii) development of million; FAC for $4,2 million; Textiles livestock and (iii) strengthen­ IFAD for $13,0 million; and the ing of public health services, Netherlands for $4,1 million Total cost estimated at $84,0 envisaged,) million of which $59,9 million in foreign exchange.

See page 1 for footnotes. j

- 23 -

Member Country, and Borrower or Ainount & Stage of Process­ Implementing Probable ing and Action on Agency JJ. Lender Jj Project]./ Procurement !ii

MALI (Cont'd)

Minis tere de la 16. 7 (R) Rural Health, comprising (i) ·Appraisal report being prepared. Sante (IDA) training, (ii) basic health IDA Project Preparation Facility program, (iii) drug supply and advance of $1. 0 million has been (iv) applied research. Total approved to help preparation of cost estimated at $17.6 million the project. of which $8.l million in foreign exchange.

Ministere de 17.0 (R) Education III - (a) Institution Appraisal report being prepared. !'Education (IDA) building bf the Ministry of (Co-financing being sought.) Nationale Education through strengthening of educational and manpower planning capabilities; and reorganizing technical educa­ tion directorate;(b) improve­ ment of basic education through education reform, teacher training and adult functional literacy; and (c) livestock and agricultural junior technicians training. Total cost estimated at $15.Q million, of which $10.5 million in foreign exchange.

Ministere de 15.0 (R) Mopti Area Development and Appraisal mission in the field. l'Agriculture; and (IDA) Livestock - (i) Agricultural (Co-fina.ncing with CCCE and DIGIS Ministere du credit; (ii) animal traction; envisaged, and additional Developpement Rural (iii) improved grazing and co-financing will be needed.) animal traction; (iv) seed production; (v) applied IDA Project Preparation Facility research; and (vi) crop advance of $152,000 approved to protection. Will also include assist in preparing the project. livestock component to follow on from on-going livestock project. Total project cost estimated at $32.0 million.

MAURITANIA

SONADER; Ministere 8.1 (R) Technical Assistance to the Board presentation tentatively du Developpement (IDA) Rural Sector. Services of scheduled for September/October. Rural permanent and short-term (Co-financing with FAC for $1.5 consultants. Office, million.) laboratory and workshop 9.0 buildings for SONADER. Total IDA Project Preparation Facility (IDA) project cost estimated at $10.5 advance of $750,000 to assist in million of which $6.5 million financing the continuation of the in foreign exchange. activities of an ongoing Technical Assistance project to the Borrower, SONADER, until the credit for the proposed project becomes effective.

SONADER 23.6 (R) Small-Scale Irrigation - Appraisal report being prepared. (IDA) Development of 1,500 ha of small irrigated perimeters. Total cost estimated at $11. 4 million, of which $6.l million in foreign exchange.

Ministere des Highways IV - Strengthening and Negotiations substantially Travaux Publics resealing of bitumen roads, completed. Board presentation road construction, training of tentatively scheduled for June road maintenance personnel. 28. (Co-financing with Italy for Total cost estimated at $49.9 $13.8 million envisaged.) million (net of taxes), of which $28.5 million in foreign exchange.

See page l for footnotes. - 24 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender Jj Procurement !!/

NIGER (Cont'd)

Ministere du Plan 7.4 Technical assistance to Appraisal report being prepared. (IDA) strengthen planning, monitor­ Financing to help preparation was ing, and evaluation capabili­ provided by an advance of ties of Ministry of Plan and $705,000 from the IDA Project technical ministries.Total Preparation Facility. project cost estimated at $8.0 million, of which $7.0 million in foreign exchange.

Ministere du 27.5 (R) Irrigation Rehabilitation Appraisal mission tentatively Developpement Rural (IDA) Project - To rehabilitate scheduled for June. existing irrigation works; (Co-financing being sought.) procure equipment for maintenance and operation of Financing to help preparation was irrigation works; supply provided for by an advance of agricultural inputs; train $900,000 from the IDA Project project staff, cooperative Preparation Facility. managers and farmers.

Ministere de 6.5 Water Supply - Technical Approved by the Executive l'Hydraulique (IDA) Assistance and Rehabilitat.ion. Directors on December 14. Total cost estimated at $8.2 (Co-financing with UNDP for $1.05 million, of which $7.5 million million approved.) in foreign exchange. IDA Project Preparation Facility advance of $330,000 was approved to finance start-up activities necessary to insure rapid project implementation.

Ministere du 10.0 Small Rural Operations - Preparation underway. Financing Developpement Rural (IDA) Small-scale irrigation an

Ministere des Mines 7.5 (R) Power Sector Planning: Study Mission in the field to complete et de 1" Industrie (IDA) of development of power system, appraisal. technical assistance and training.

Federal Ministry of 105.0 (R) Kaduna State Agricultural Negotiations tentatively Agriculture (Bank) Development would include a scheduled for July. statewide package of basic agricultural services to farmers, and a feeder road and rural water program. Total cost estimated at $223 million, of which less than half in foreign exchange.

Federal Ministry of 41.0 (R) Small and medium-scale Following negotiations, the Industries (Bank) enterprise: pilot project. Federal Government, NBCI and the Total cost estimated at $72. 7 Bank agreed to introduce some million, of which $41.0 million changes in the project in foreign exchange. implementation proposals. These are now being worked out.

Federal Ministry of 100.0 (R) Fertilizer Manufacturing Project scope is currently under Industries (Bank) Nitrogen complex at Onne. review. If findings are Total cost estimated at $817 .o positive, the project will be million, of which $615.0 appraised in August. million in foreign exchange. (Co-financing of $336.5 million with US and Japan EXIMBANKS.)

Federal Ministry of 37.0 Second Urban Development - Imo Board presentation awaiting Housing (Bank) State. Total cost estimated at agreement with Government on $87.4 million, of which $37.0 arrangements for counterpart million in foreign exchange. funding.

Procurement: Retroactive financing of $2 million proposed to cover project start-up costs from September 1, 1980.

See page I for footnotes. - 25 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency lf Lender Jj Procurement !±_/

NIGERIA (Cont'd)

Kano State Water ll5.0 Kano State Water Supply IV - Further processing of 'project Resources (Bank) Expansion of water supply awaiting State Government action Engineering and facilities in Greater Kano. on outstanding project matters. Construction Agency Provision and/or expansion of water supplies in several semi-urban centers. Total cost estimated at $210.0 million, of which $ll5.0 million in foreign exchange.

Federal Ministry of 50.0 Benue Urban Development. Total Appraisal mission tentatively Housing (Bank) cost estimated at $60 million scheduled for July. of which about half in foreign exchange.

Federal Ministry of 52.0 Mambilla - Agricultural Project deferred pending Agriculture (Bank) Development - To develop Government's action on land seasonal and permanent crops, tenure and other project related livestock and forestry by issues. smallholders in a high-potential highland area through farmer services, general infrastructure and land reform. Total cost estimated at $114.5 million, of which $59,5 million in foreign exchange.

Federal Ministry of 82.0 (R) Southern Barno Agricultural Negotiations tentatively Agriculture (Bank) Development - To strengthen the scheduled for June. existing Ministry of Agriculture and Natural Resources to provide technical advice and support to farmers. Total cost estimated at $138.0 million of which $79.5 million in foreign ex.change.

Borno State Water 80.0 (R) Barno State Water Supply - Appraisal mission in mid-May. Board ·(Bank) Improvement and expansion of water supply facilities in Maiduguri and other centers. Total cost estimated at $124. 0 million of which $83.0 million in foreign exchange.

Federal Ministry of 50.0 (R) Irrigation I - To provide Project preparation report by Agriculture (Bank) supplementary irrigation infra­ FAO/CP under review. structure and other support services for smallholder irrigated agriculture along the Hadejia-Jamaare river system in Kano, Bauchi and Borno States.

Federal llinistry of 36.0 Sakata Health - Construction, Appraisal report being prepared. Health (Bank) and upgrading of about 180 rural health clinics in Sokoto State; technical assistance f.or staff development, child immunizations, and project management and monitoring; technical assistance to strengthen the institutional capacity of the Sako to State and the Federal Ministries of Health.

Federal Ministries 10.0 (R) Technical Assistance for Negotiations tentatively of Finance and (Bank) monitoring external debt, scheduled for August. Planning exchange control and plan implementation, and for strengthening the Federal Office of Statistics.

(NIGERIAN INDUSTRIAL 120.0 {R) NIDB IV - Line of Credit for Board presentation DEVELOPMENT BANK (Bank) various sub-projects, mainly in scheduled for June 2. LIMITED) the areas of the building (Co-financing of about $70 materials, agro and million expected with EIB and intermediate goods in~ustries, private banks.) and technical assistance for NIDB to undertake sector studies. Total cost estimated at $300 million of which $185 million in foreign exchange.

See page 1 for footnotes. - 26 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency Jj Lender 1./ Project 3/ Procurement !!_I

NIGERIA (Cont'd)

Lagos State 100.0 (R) Lagos Solid Waste llanagement l!egotiations tentatively Government Solid (Bank) and Drain Rehabilitation scheduled for July. Waste Disposal Board Project - To upgrade and expand refuse collection/disposal and Procurement: Retroactive improve the city wide storm financing totalling about $2.5 water drainage system for million is proposed for storm Metropolitan Lagos. The cleaning, construction during the project would also include dry season. Also construction of technical assistance to some depots, maintenance strengthen Local Government facilities and a transfer Council financial operations. station. Total cost estimated at $172.0 million, of which $114.0 million in foreign exchange.

Federal Ministry of so.o Forestry II - The project will Project preparation report under Agriculture (Bank) (1) support an afforestation review. program; (2) establish pulpwood and timber plantations; and support to forest management in three middle belt states.

Federal Government 250.0 (R) Fertilizer Import Loan.- To Appraisal report being prepared. of Nigeria (Bank) finance part of Nigeria's Negotiations tentatively foreign exchange costs of scheduled for June. fertilizer imports and to assist Federal Government in improving the management of the fertilizer sector, including organizational and operational aspects. Total cost estimated at $360 million.

Nigerian National 30.0 (R) Gas Engineering and Technical Appraisal report being prepared. Petroleum (Bank) Assistance Project - Design Negotiations tentatively Corporation (NNPC) engineering for a proposed scheduled for June, Eseravos-Lagos gas pipeline (ELP) project. Preparation of future natural gas and liquified petroleum gas projects. Technical assistance to NNPC. Total cost estimated at $31.5 million, of which $25.0 million in foreign exchange.

Office des Postes 20.0 Telecommunications II - Preparation underway. et des (Bank) Extension of Dakar telephone Telecommunications exchanges; extension of transmission network to the South and East of country; technical assistance.

Societe 15.0 Irrigation IV - Rehabilitation Preparation underway. (Possible d'Amenagement et (IDA) of 5,870 ha of irrigation co-financing with CCCE, IFAD, d'Exploitation du perimeters in the Senegal River Kuwait Fund and Saudi Fund.) Delta (SAED\ delta; electrification of pumping stations at Rong and Boundoum; construction of a power line. Estimated total cost $72.0 million, of which $46.0 million in foreign exchange.

See page 1 for footnotes. - 27 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 1./ Project]_/ Procurement fi/

SENEGAL (Cont'd)

Government of 5.2 Regional Management School - Appraisal report being reviewed. Senegal (IDA) Construe tion and equipment of facilities and technical assistance to facilitate the transformation of the Senegalese Management School into a Regional Management Training School for CEAO member states. Total project cost estimated at $6.2 million.

Government of 15.0 Water Supply II - Extension and Appraisal report being prepared. Senegal (Bank) reinforcement of water supply Additional rehabilitation 6.6 in eleven secondary centers. component under discussion. (IDA) Studies for sewerage (Co-financing arranged with CCCE improvement and technical $9.2 million.) assistance. Estimated total cost: $58.4 million.

Government of 15.0 (R) Dakar Port III - Container Appraisal mission in the field. Senegal (Bank) terminal facilities at Port of (Possible co-financing with CCCE Dakar with ancillary services. and Kuwait Fund.) Estimated total cost $38. 0 million.

Government of 11.0 (R) Technical Assistance to Negotiations in mid-May. Senegal (IDA) Parapublic Sector ·11 - Continuation of technical IDA Project Preparation Facility assistance activities financed advance of up to $500,000 under the first project, approved to finance technical together with modifications in advisors to prepare comprehensive light of actual experience. enterprise plans and to initiate a cycle of audits and accounting assistance to companies to be assisted under the proposed project.

Societe de 18.5 (R) Eastern Senegal Rural Negotiations in mid-May. Developpement des (IDA) Development - Development of (Co-financing arranged with FAC Fibres Textiles cotton, food crops and for $2.9 million, CCCE for $17.5 ( SODEFITEX) livestock. Other components million, and Saudi Fund for $3.2 are feeder roads, farmers' million.) organization, village water supply, functional literacy, An IDA Project Preparation maize processing program, Facility advance of $400,000 has primary health program, been approved to finance training and applied research. consulting services for preparing Total project cost estimated at feasibility study for rural $49,l million, of which $28.3 development in East Senegal million in foreign exchange. Region, and to complete a project preparation report.

Government of 10.0 (R) Highway V (Maintenance) - Appraisal documents being Senegal (IDA) Support to the Road Fund to reviewed. ensure adequate maintenance of the network. Estimated total cost: $54.0 million.

Government of 7.7 (R) Phosphate Industry Development Board presentation on May l O. Senegal (IDA) Engineering - Tests on phosphate slime recovery and An IDA Project Preparation studies on long-term Facility advance of $800,000 development of phosphate approved to finance pilot tests sector. Estimated total cost and studies. $9,6 million. SIERRA LEONE

National Power 35.0 Power (Hydro) V - Development Pre-appraisal report being Authority, (IDA) of Bumbuna hydro plant on Seli considered. (Co-financing will river. Total project cost be required. Co-financing estimated at $280.0 million, of meeting tentatively scheduled for which $180,0 million in foreign fourth quarter 1983.) exchange.

See page 1 for footnotes. - 28 -

Member Country, and Borrower or Ainount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 2) Procurement i/

SIERRA LEONE (Cont'd)

Ministry of 17 .o (R) Agriculture Sector - Support Appraisal mission and policy Agriculture and (IDA) for policy and institutional discussion with Government Forestry reforms; technical assistance scheduled for May. Sector report to reorganize and strengthen being prepared. (!FAD and ADF Ministry's ability to deliver considering co-financing.) services to farmers.

Ministry of 20.0 (R) Education III - Primary school Board presentation on May 3. Education (IDA) construction, primary teacher (Co-financing expected to be training, textbook procurement provided by British ODA.) and distribution; training of administrative staff; strengthening of Ministry of Education planning unit and project evaluation. Total project cost estimated at $27.3 million of which $10.0 million in foreign exchange.

Government of Togo 40.Q (R) Credit to support program of Board presentation scheduled for (IDA) structural adjustment. May 17.

Regie Nationale des 12.0 (R) Lome Water Supply Project - Board presentation on May 3. Eaux du Togo (IDA) Support to expansion of ground­ (Co-financing agreed with Caisse water production installations Centrale $4.1 million, OPEC Fund and distribution system in $4.0 million, and BOAD $3.5 Lome; includes studies and million.) technical assistance. Total project cost estimated at $27.6 IDA Project Preparation Facility million of which $20.0 million advance of $441,000,approved to in foreign exchange. finance consultants' work for final design and preparation of tender documents for project waterworks.

Office Togolais des To be Phosphoric acid plant. Pre-feasibility study awaited. Phosphates deter­ (Co-financing will be needed.) mined (Bank)

UPPER VOLTA

Regie Abidjan-Niger s.o Railways II - IDA funds would Appraisal processing will follow (RAN) (IDA) help finance Upper Volta's agreement on RAN"'s overall share of RAN railway project. investment program, and financial Total project cost estimated at rehabilitation. $50.6 million of which $39.6 million in foreign exchange.

Ministere des 25.0 (R) Kompienga Hydroelectric First stage appraisal mission has Travaux Publics (IDA) Project. Construction of 14 MW returned. Receipt of bid hydroelectric station on the documents expected in May. Kompienga River and 300 km of Appraisal to be completed in transmission line to June after receipt of bids and Ouagadougou. Total cost calculation of economic rate of estimated at $107.0 million return. (Co-financing agreed in with $89.0 million in foreign principle with: CIDA $16 exchange. million; FED $9.5 million; FAC/CCCE $15 million, KfW Germany $17 million, Saudi Fund $12 million, AfDB $26 million, and possibly Islamic Development Bank up to maximum of $25 million.)

See page 1 for footnotes. - 29 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1/ Lender 2,/ . Procurement !ii

UPPER VOLTA (Cont'd)

Ministeres du Plan, 10.0 (R) Technical Assistance - Estab­ Preparation mission tentatively et de l 'Economie et (IDA) lishment of Development Invest­ scheduled for April 1984, once des Finances ment Budget to strengthen agreement is reached with investment budgeting and moni­ Government regarding toring development expendi­ . implementation organization. tures. Total project cost estimated at $10.0 million.

Ministere du 21.0 (R) Food and Fertilizer Credit - Appraisal mission tentatively Developement Rural (IDA) Improve the supply and pricing scheduled for June. of cereal fertilizer; (Co-financing with CCCE for $5 strengthen the Ministry of million, and Germany, GTZ, for $2 Rural Development and develop million is envisaged.) its ability to better assist and supervise the ORDs. Studies to strengthen the regional development organizations, and to determine the possibility of reducing fertilizer cost by cheaper formulations or greater use of local rock phosphate are also included.

Ministere de la 20.0 (R) Health I - Developing a primary Appraisal mission scheduled for Sante Publique (IDA) heal th care network, and May. address long-term issues such as implementation of an effective rural health care delivery system, provision of drugs, cost recovery measures. It would extend immunization programs, provide training and rehabilitate rural health care facilities.

Ministere de 20.0 Education III - Provide support Pre-appraisal report being !'Education (IDA) for (a) the expans,ion and prepared. Appraisal mission Nationale quality improvement of primary scheduled for October. education, (b) the strengthening of educational planning and administration required to implement the sector strategy and (c) improve the quality of the agricultural training centers of rural youth.

Ministere du 5.5 Mining exploration and Appraisal mission scheduled for Commerce, de (IDA) technical assistance project May. l'Industrie, et des would provide Government with Mines an extensive evaluation and delineation of the Perkoa massive sulfide deposit that could attract potential foreign investors; establish feasibility of small-scale gold mining at Dori-Yalogo, and .provide technical assistance to strengthen project preparation activities.

Ministere des 20.0 (N) Highways V - Paving of the Appraisal mission to be scheduled Travaux Publics et (IDA) Ouagadougou-Kaya road and once agreement is reached with de l'Urbanisme improving the Kaya-Dori road to Government on rail extension all weather standards. Total issue. (Co-financing with costs are estimated at $60.6 Germany (KfW) and possibly Saudi i million • Fund is envisaged.) .I See page 1 for footnotes. - 30 -

Member Country, and Borrower or Alnount & Stage of Process­ Implementing Probable ing and Action on Agency 1/ Lender ?J Procurement !±../

To be determined 25,0 Air Traffic Safety Agency Project preparation work being (Bank) (ASECNA) - Aviation Regional carried out by ASECNA, Project. To finance a part of (Co-financing with other agencies ASECNA's 1982-86 investment envisaged,) plan of over $110,0 million, comprising air navigation improvements, radio aids, meteorological equipment, telecommunications equipment, field lighting approach, navigational aids, and technical assistance.

BOAD 6,1 BOAD II - Financing of regional Approved by the Executive (Bank) and national development Directors on March 8. 14,0 projects. (IDA)

CIMAO 15,0 CIMAO II - To strengthen finan­ Approved by the Executive (IDA). cial structure of the regional Directors on February 24. cement clinker plant and to (Co-financing with EIB for $7,0 provide technical assistance million and CCCE for $12,8 for plant operations. million).

Communaute 30,0 (R) . Nangbeto Hydropower Development Appraisal report being Electrique (IDA) - Construction on Mono River in prepared. (Substantial du Benin (CEB) Togo of dam, 63 MW power house, co-financing required,) and associated transmission to meet new demand in Togo and Benin; resettlement; engineer­ ing and other consulting services, and training. Total project cost, including financial charges, estimated at $173, 0 million.

See page 1 for footnotes. - 31 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1/ Lender Jj Procurement !!_I

III. EAST ASIA AND PACIFIC

Ministry of 100.a (R) Zhongyuan-Wenli u Petroleum - Loan signed on April 15. Petroleum (Bank) Exploration and development of the oilfield.

Ministry of 35.3 (R) Heilongjiang Agriculture - Approved by the Executive Agriculture, Animal (Bank) Development of 200,000 ha of Directors on April 19. Husbandry and 45.0 uncultivated land to grow Fishery (IDA) wheat, soybeans and corn.

Ministry of Water 150.4 (R) Lubuge Hydropower - Technical mission in the field; Resources and (Bank) Construction of a rockfill dam, pre-negotiation scheduled for Electric Power tunnels, and a 600 MW July-August. (Co-financing underground powerhouse in sought.) Yunnan Province.

Ministry of Coal 240.0 (R) Luan/Jincheng Coal - Project preparation mission in (Bank) Development of two the field. (Co-financing being fully-mechanized longwall sought.) underground mines of up to 4 mtpa each in Shanxi Province.

Ministry of 85.0 (R) Polytechnic/TV University Negotiations scheduled for July. Education (IDA) Project - Strengthening of post-secondary education by support of polytechnic and the Television University.

Ministry of 220.0 (R) Railways I - Construction, Appraisal report being prepared, Railways (Bank) upgrading and electrification of track in Henan, Shandong and Shanxi PrQvinces, primarily to transport\coal for export, and assistance to electric locomotive factory for produc.tion of locomotives to be used on these lines.

Ministry of 100.0 (R) Rubber Development - Replanting Appraisal report being prepared. Agriculture, Animal (IDA) and new planting of 35-40,000 Husbandry and ha in Guangdong Province. Fishery

Agricultural Bank of 50.0 (R) Rural Credit - Provision of Project preparation mission China (ABC) (IDA) credit through ABC for in the field. agricultural and other rural activities in selected provinces and institutional development of ABC.

Ministry of Health 85.0 (R) Medical Education and Rural Pre-appraisal mission scheduled (IDA) Health - Strengthening of for July. teaching in medical colleges and of rural health services in selected provinces.

Ministry of 100.0 (R) Universities Development II - Report of identification missfon Education (IDA) Strengthening selected being prepared. technical universities to expand the quantity and improve the quality of science and technical graduates.

Ministry of 120.0 (R) Second Ports Project - Further project preparation Communications (IDA) modernizing and improving cargo mission tentatively scheduled for handling facilities in selected September. ports.

Ministry of Finance To be (R) Technical Assistance Credit-~ President's Report being deter­ To provide technical assistance prepared. mined for the preparation of projects proposed for Bank financing, and for .other related activities •

See page l for footnotes. - 32 -

Member Country, and Borrower or Ainount & Stage of Process­ Implementing Probable ing and Action on Agency lf Lender ],_/ Project 11 Procurement !!_I

Ministry of 15.0 (R) Tree Crops - To develop a Appraisal mission in the field. ~griculture (Bank) variety of export crops in various regions of the country.

INDONESIA

Ministry of Public 30.6 (R) First East Java Water Supply - Board presentation on ?fay 3. Works (Bank) Assistance for urban and rural water systems in East Java.

Ministry of 240.6 (R) Maritime Transport III -To Project preparation underway. Communications (Bank) develop selected ports, and (Co-financing is envisaged.) related infrastructure.

Ministry of Manpower 101.0 (R) Transmigration III - Loan signed on April 18. and Transmigration (Bank) Development of transmigration schemes in South Sumatra, and screening and evaluation of future transmigration site.

Ministry of 55.0 Watershed Development I - Project Preparation Facility Agriculture (Bank) Integrated program of advance of $463,000 approved to reforestation, soil finance consultants and mapping conservation, and related services to advance the development in Java. preparation of this project.

Ministry of Industry 100.0 Central Java Pulp and Paper - A Project preparation under way. (Bank) pulp and paper complex in (Co-financing is envisaged.) Central Java. It will include a pulp and paper plant and mechanical wood industries.

Ministry of Public 30.0 (R) Public Works Manpower Loan signed on April 18. Works (Bank) Development Project.

Ministry of Public so.a Urban V - Urban services and Appraisal mission scheduled for Works (Bank) infrastructure improvement in mid-June. East Java cities.

Ministry of 10.0 Nucleus Estates Sugar - To Appraisal report being reviewed. Agriculture (Bank) establish 12,600 ha of nucleus estate and smallholders sugar cane plantations in South Kalimantan, and construct processing facilities with capacity of about 4-5,000 tons of cane per day.

Ministry of Public 10.0 Swamp Reclamation II - Appraisal report being prepared. Works (Bank) Development of 30,000 ha of low-lying lands on the south Sumatra coast to settle about 11,000 families from Java/Bali, and related program support.

Bank Pembangunan 208.9 (R) BAPINDO V - Provision of credit Board presentation on May 10. Indonesia (Bank) to and institutional strengthening of BAPINDO - State Development Bank.

Ministry of 45.0 Non formal Education II: Appraisal report being prepared. Education and (Bank) Second phase - To strengthen Culture the government agency responsible for out-of-school education.

See page 1 f?r footnotes. - 33 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender]) Project]_/ Procurement !±./

INDONESIA (Cont'd)

Ministry of Mining 279.Q (R) Power XIII - Construction of Negotiations completed. Board and Energy (Bank) 500 MW Cirata hydroelectric presentation scheduled for June power facility, including 2. (Co-financing is envisaged.) ancillary construction; technical assistance, studies and related equipment for Government's energy sector program.

Ministry of 107.4 (R) Polytechnic II - Second phase Negotiations completed. Board Education (Bank) of investments on polytechnic presentation scheduled for May education. 26.

Ministry of 60.0 Nucleus Estates and Smallholder Project preparation underway. Agriculture (Bank) Cotton.

Ministry of 59.0 (R) Agricultural Training III - To Negotiations in early May. Agriculture (Agency (Bank) upgrade provincial agricultural for Agricultural development schools, aTI.d expand Education, Training, in-service training centers and Extension) under management of AAETE.

Ministry of Manpower 63.5 (R) Transmigration IV (East Board presentation scheduled for and Transmigration (Bank) Kalimantan) - Development of May 24. transmigration schemes in East Kalimantan.

Ministries of Public 150.0 Kedung Ombo Dam - Works Project preparation underway. Works and Mining and (Bank) (including coffer dam, Energy diversion tunnel and main dam construction) for Kedung Ombo dam.

Ministries of Public 150.0 (R) Second Provincial Irrigation - Appraisal report being prepared Works and !lining and (Bank) Development of capabilities of Energy selected provincial irrigation services to implement construction of small systems and accelerate rehabilitation works.

Ministry of Public 150.0 Highway VI - To upgrade parts Appraisal mission scheduled for Works (Bank) of arterial and col lee tor road mid-May. network.

Ministry of 120.0 Secondary Education I - Project preparation underway. Education and (Bank) Improvement of secondary Culture education through in-service upgrading of teachers, improvement of examination systems and provision of laboratory equipment.

Ministry of Public 40.0 w. Tarum Canal Enlargement - Project preparation undE!:r way. Works (Bank) Expansion of capacity of canal for raw water supply to Jakarta and for irrigation.

KOREA

Ministry of To be Ports III - To provide Project under preparation by Transportation/Korea deter- additional capacity, especially Government and consultants. Maritime and Port mined container handling capacity. (Co-financing is envisaged.) Authority (Bank)

Ministry of 122.0 (R) Cement and Coal Distribution - Approved by the Executive Transportation (Bank) To finance part of the foreign Directors on April 26 and signed exchange needed to improve the on April 29. (Co-financir.g is efficiency of coal and cement envisaged.) distribution in Korea.

See page 1 for footnotes. - 34 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 1/ Procurement !!I KOREA (Cont'd)

Ministry of 80.0 Jeonju Regional Development - Appraisal report being prepared. Construction (Bank) To help further develop economic growth, employment and urban infrastructure in the region's major urban areas of Jeonju, Gunsan and Iri.

Ministry of Finance 255.0 (R) Industrial Finance - Assistance Negotiations in early May. (B~nk) to the Government to reform the financial system; and provision of line of credit to the major development banks for term lending to industrial enterprises.

Ministry of Home 125.0 (R) Highway Subsector - To assist Pre-appraisal mission in the Affairs (Bank) the Government in implementing field. road investment plans, including those for provincial and county roads.

Ministry of 300.0 Second Structural Adjustment Project under preparation by Finance/Economic (Bank) Loan - To help the Government Government and consultants. Planning Board in further implementing its structural adjustment program which commenced under SAL I.

Ministry of 120.0 Second Water Supply Loan - Project under preparation by Construction (Bank) Construction of a barrage for Government and consultants. Busan source development, and assistance to the Government on planning and implementation of national environmental and water supply management programs.

LAO PEOPLE'S DEMOCRATIC REPUBLIC

To be determined 10;0 (R) Agricultural Production Support Negotiations in progress in the (IDA) - Essential inputs and equip­ field. (Co-financing is ment and technical assistance envisaged.) in the agricultural sector.

To be determined 30.Q Laos Electrification - Discussions with Government in (IDA) Generation, transmission, progress. and distribution of electricity in selected provinces.

To be determined To be Industrial Rehabilitation - Discussions with Government in deter­ ~revision of equipment, progress. mined improved management practices, (IDA) and training to improve industrial efficiency and encourage export growth.

To be determined To be Agricultural Development - To Discussions with Government being deter­ assist in developing scheduled. mined agricultural support services (IDA) and the production of crops for export.

Government ss.o Small-Scale Enterprise Project being prepared by (Bank) (Industries I) - Assistance for Government. manufacturing and institutional development.

See page 1 for footnotes. - 35 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 1J Procurement !±./

MALAYSIA (Cont'd)

Government 86,22 {R) Transport Development Negotiations completed. (Bank) Sabah-Sarawak Road - Board presentation scheduled for Strengthening the planning and May 26. construction capability of the road construction industry, technical assistance and training, as well as financing for road construe tion and maintenance.

Ministry of 50,0 Western Johore II - Integrated Project being prepared by Agriculture (Bank) Development - Construction of Government. farm roads and drainage facilities, and provision of agricultural support services.

Government 40,0 (R) Bengkoka Reforestation - The Appraisal mission in May. (Bank) project will cover planting of 90,000 acres with fast growing hardwood, institutional strengthening of SAFODA, road construction, employment for tribal people, as well as housing and social infrastruc­ ture.

Government 68,0 (R) Industrial Training - Appraisal report being prepared. (Bank) Improvement of manpower planning and management by strengthening planning and management capability and by financing staff training, advisory services of public institutions; constructing and equipping two additional industrial training institutes and three additional polytechnics,

Government 65,0 Rural Electrification II - Project being prepared by the (Bank) Transmission for grid Government. augmentation and distribution in rural areas in the states of Kedah, Kelantan, Pahang, Trengganu and Johore for the three-year period 1985-87,

PAPUA NEW GUINEA

Department of Works 31,0 (R) Road Improvement (Transport Loan approved by the Executive and (Bank) Development) - Construction and Directors on April 19 and signed Supply /Department of improvement of primary and on April 27, (Possible Transport and tertiary roads and transport co-financing with Kuwait Fund,) Communications system studies.

Department of 14, l (R) Agricultural Support Services - Board presentation on May 3. Primary Industry (Bank) Improvement of·agriculture research and extension services.

Papua New Guinea 100,0 {R) Agricultural Credit III - The Appraisal mission scheduled for Development Bank (Bank) project will provide funds to May, (PNGDB) the Development Bank for term lending in tree crop development, poultry and agro-processing. It will also provide training to strengthen the Development Bank and technical assistance on the crop diversification program.

Department of 24,0 Secondary Education - Appraisal mission in the field, Education (Bank) Improvement of the quality of (Co-financing is envisaged.) lower secondary education (grades 7-10),

See page l for footnotes. - 36 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1/ Lender 11 Procurement !!_/

PAPUA NEW GUINEA (Cont'd)

Department of 15.0 (N) Nucleus Estate and Smallholder Project being prepared. Primary Industry (Bank) Tree Crop Project I - To (Commonwealth Development develop a combination of Corporation is expected to several derelict commercial co-finance.) estates and vacant areas of Government land in the Milne Bay Province into a viable oil palm and cocoa nucleus estate, together with the peripheral development and support of small-scale smallholder plantings of these crops.

PHILIPPINES

National Economic 67.0 Urban IV (Regional Cities) - Approved by the Executive and Development (Bank) Investments in 4 cities Directors on March 31. Authority including selected primary infrastructure, transport, municipal services and facilities, sanitation and shelter to support regional urban economic development. Total project cost estimated at $109.S million, with foreign exchange cost of about $41. 4 million.

Ministry of Agrarian 70.0 Rural Development IV (Land Appraisal report being prepared. Reform (Bank) Settlement II) - Further assistance for planning and execution of Government's land settlement program. 1

National 60.Q Rural Electrification II - To Project being prepared by Electrification (Bank) finance expansion of Government. (Co-financing is Administt"ation Government's on-going rural envisaged.) electrification program.

Ministry of Public 141,0 (R) Highways V - Construction, Appraisal report being prepared. Works and Highways (Bank) maintenance and rehabilitation (MPWH) of national roads and bridges, and institutional strengthening of MPWH.

Land Bank of the 40,0 (R) Small Farmer Development (Land Appraisal mission scheduled for Philippines (LBP) (Bank) Bank II) - Further credit, May. support services and minor infrastructure assistance for land reform beneficiaries.

Ministry of 50.Q (R) Rainfed Agricultural Project being prepared by Agriculture (Bank) Development II (Mindanao) - FAO/CP and Government. Support services and (Co-financing is envisaged.) infrastructure to promote diversified rainfed and upland crop/livestock systems in Mindanao region.

To be determined 26.2 Central Visayas Regional Appraisal report being prepared. (Bank) Project - Integr~ted program of Bank Project Preparation Facility agro-forestry, onfarm advance of $1,000,000 approved to development, rural finance consultancy services, infrastructure and research in incremental costs in connection Central Visayas. with recruitment of staff, and procurement of vehicles and equipment.

Ministry of 125.0 (R) Telecommunications I - To Appraisal mission tentatively Transportation and (Bank) finance part of the 1984-90 scheduled for October. Communications national inveStment program for (Co-financing is envisaged.) (MOTC) telecommunications, including reconstruction and expansion of Bank Project Preparation Facility network installations and advance of $500,000 approved to institutional support for MOTC. finance the provision of consultancy services for studies on the integration and regulatory strengthening of the sector and engineering studies.

See page 1 for footnotes. - 37 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on ~)j Lender],_/ Project ]_/ Procurement !.±./

PHILIPPINES (Cont'd)

To be determined 100. 0 (R) Agricultural Credit - To help Identification mission to be (Bank) finance part of the agricul­ scheduled. tural credit program.

Ministry of Trade 302.3 (R) Structural Adjustment II - To Approved by the Executive and Industry (Bank) support the second phase of Directors on April 26 and signed industrial and trade policy on April 27. Loan became reforms, and initial policy effective on April 28. reforms in the energy sector.

National Housing 120.0 Urban V - Support to the Project being prepared by Authority (lffiA l (Bank) Government's zonal improvement Government. (Co-financing will program involving mainly slumt be sought.) upgrading in Metro Manila and upgrading of basic services. Total project cost estimated at $200 million with foreign exchange cost of about $80 million.

Central Bank of the 200.0 Industrial Finance II - To Project being prepared by Philippines (Bank) finance industrial development Government. (Co-financing is through local development envisaged.) finance companies. Total foreign exchange requirement estimated at $350 million.

Ministry of Trade 100.0 Metalworking Industry - Project being prepared by the and Industry (Bank) Financial and institutional Government. (Co-financing may be support to the restructuring of sought.) the metalworking sec tor.

To be determined 130. 0 (R) Power VIII - Support for the Project being prepared by the (Bank) Government's program of hydro­ Government. (Co-financing may be electric power development. sought.)

To be determined 100.0 Manila Water Supply III - Project being prepared by the (Bank) Provision of basic Government. (Co-financing from infrastructure in source various sources will be development for M~tro Manila sought.) water supply, including headworks, treatment plant, distribution system and construction suspension. Total cost estimated at $900 million, of which about $400 million in foreign exchange.

Philippine National 40.0 Geothermal II - Support for the Project being prepared by the Oil Company (Bank) Government's program of Government. (Co-financing is geothermal power development. envisaged.)

To be determined 100.0 Balog-Balog llul ti purpose - Project being prepared ~y (Bank) Expansion of Tarlac Irriga­ Government. tion System. Total cost estimated at $160 million.

To be determined so.o Watershed Management II - Project being prepared by (Bank) Protection of Magat Watershed. Government. Total cost estimated at $100 million.

To be determined so.o Central Visayas Regional Project being prepared by (Bank) Project II: E'rnphasis on urban Government. development supporting upgrading of municipal infrastructure, managerial enterprises, transportation, traffic management, maintenance and training. Total project cost estimated at $100 million.

See page 1 for footnotes. - 38 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1.f Lender Jj Project :J./ Procurement A/

SOLOMON ISLANDS

Government of 2.0 Lungga Hydroelectric Power IDA consideration of project Solomon Islands, (IDA) Project - Total project cost deferred indefinitely, subject to Electricity estimated at $55 million. further review of project by Authority Asian Development Bank.

Ministry of so.a (R) Irrigation XIII (Medium Scale Appraisal report being prepared. Agriculture and (Bank) Irrigation) - Strengthening of Cooperatives the Royal Irrigation Department and support for its irrigation development program.

Ministry of 40.0 Forestry I - Forest protection, Project preparation under way. Agriculture and (Bank) wood lot development, Cooperatives industrial plantations, forest villages and research, extension and training for Royal Forestry Department.

Ministry of 95. 0 Rural Roads - Construction of Project preparation under way. Interior (Bank) rural roads country wide. (Co-financing being explored.)

(PETROLEUM AUTHORITY 80.0 Energy III (Sirikit Oil Field Project preparation under way. OF THAILAND (PTT)) (Bank) Development) - Possible. investment related to onshore oil field development.

(ELECTRICITY 170.0 Nam Choan Hydroelectric - 187 m Scheduling of Board presentation GENERATING AUTHORITY (Bank) high rockfill dam with four pending Government decision on OF THAILAND (EGAT)) generating units of 145 MW environmental issue. (Parallel each; switchyard, 230 Kv financing from bilateral, export transmission lines and credit and commercial sources engineering services. Total totalling $185 million, out of cost estimated at $540 million foreign financing requirement of of which $280 million in about $355 million, being foreign exchange. considered.)

(STATE RAILWAY OF 107.Q (R) Railways VI - To support SRT's Negotiations substantially THAILAND (SRT)) (Bank) rail service expansion program completed. (Parallel financing in the FY83-86 period. Total with French/German suppliers' project cost estimated at credits of about $21 million, $330.1 million with foreign $114 million of bilateral exchange component of $262.4 credits, and $59 million of local million. private borrowings being considered.)

(PROVINCIAL 30.6 (R) Provincial Power Distribution Negotiations substantially ELECTRICITY (Bank) (Power XV) - To support half of completed. (OECF Japan will AUTHORITY (PEA)) 2-3 year time slice of PEA's finance the other half of the normal rural electrification program.) program. Total cost about $50.8 million of which $30.6 million in foreign exchange.

See page 1 for footnotes. - 39 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency lf Lender Jj Project ]./ Procurement !!_/

THAILAND (Cont'd)

(BANK FOR AGRICUL­ 70.0 (R) Agricultural Credit II - Negotiations substantially TURE AND AGRICUL­ (Bank) Provision of agricultural term completed. (Co-financing of $20 TURAL COOPERATIVES) lending through the Bank for million from IFAD likely.) Agriculture and Agricultural Cooperatives (BAAC). Procurement: Retroactive financing of up to $7 million for sub-loans, extended from April 1, 1983, to be recommended.

Ministry of Interior 30.0 Land Titling - Acceleration of Project preparation under way. (Bank) cadastral surveying and issuance of land titles in rural areas, and strengthening of land registration and administration System.

To be determined 90.0 Basic Education - Educational Project identification under way. (Bank) improvements at the primary level.

Ministry of Finance 175.S (R) Second Structural Adjustment (Bank) Loan - To help the Government Loan agreement signed on April implement the next phase of its 27. structural adjustment policies related to agriculture, industry, energy, fiscal policy and institutional reform.

Ministry of Finance so.a (R) Refinery - Possible rehabilita­ Project identification report (Bank) tion of Bangchak oil refinery. being reviewed.

Ministry of Finance so.o (R) Regional Cities - Urban (Bank) services and infrastructure Appraisal mission in the field. improvement in five regional cities.

Ministry of 60.0 Agricultural Support Services - Agriculture & (Bank) Strengthening the Ministry's Project preparation under way. Cooperatives overall capabilities, focusing particularly on improving three of its departments ( land development, fish and livestock).

To be determined 135.0 (R) Industrial Credit - Delivery of Project preparation under way. (Bank) term finance and technical (Co-financing from various sources assistance through an apex to be sought. mechanism.

Ministry of 120.0 (R) Provincial Roads II - Negotiations in progress. Communications (Bank) Construction and improvement of about 1100 km of provincial roads; strengthening of about 1500 km of existing paved roads; and technical assistance.

National Economic 40.0 (R) Rural Development I - Appraisal mission in the field. and Social (Bank) Assistance in funding the Development Board Government's national rural (NESDB) development program.

(ELECTRICITY n.o (R) Mae Moh Lignite II - Expansion Appraisal report being prepared, GENERATING AUTHORITY (Bank) of lignite mining capacity from OF THAILAND (EGAT)) 2. 8 mtpy to 5. 0 mtpy to supply Procurement for mining equipcent No. 6 and 7 generating units of to start mid-1983. 150 MW capacity each.

Electricity ss.o (N) ERV Transmission - Construction Pre-appraisal mission in mid-May. Generating Authority (Bank) of 500 Kv transmission line of Thailand (EGAT) from the North to serve Bangkok. Total cost estimated at $120 million with a foreign exchange component of $55 million.

See page 1 for footnotes. - 40 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency lf Lender ]j Project 11 Procurement !!_I

THAILAND (Cont'd)

Telephone 100.0 (N) Telecommunications V - Project identification under way. Organization of (Bank) Expansion of telephone Thailand (TOT) facilities, particularly in rural and provincial areas. Total cost estimated at $1,630 million with a foreign exchange component of $830 million.

Ministry of Finance 190.0 (N) Third Structural'Adjustment Project preparation to begin in (Bank) Loan - To help the Government October/November. implement the next phase of its structural adjustment policies related to agriculture, industry, energy, fiscal policy and institutional reform.

Ministry of To be Coal Expansion I - Development Project processing in abeyance. Electricity and Coal deter­ of a coal mine in Quang Ninh mined Province. Total project costs (IDA) tentatively estimated at $112 million.

Viet Nam Bank for To be Industrial Rehabilitation Project processing in abeyance. Industry deter­ Project - Rehabilitation and mined expansion of textile, pulp and (IDA) paper, and food processing industries. Total project cost tentatively estimated at $50 million.

Ministry of Water To be Nghe Tinh Agricultural Project processing. in abeyance. Conservancy deter­ Rehabilitation and Development mined - Repair of flood damage on (IDA) irrigation and drainage works in northern part of Viet Nam heavily damaged by typhoons and floods in 1978, and construe tion of salinity and flood control works. Total project cost estimated at $128 million.

Ministry of To be Transport Rehabilitation - Project processing in abeyance. Transport deter­ Rehabilitation of port, roads mined and railways facilities and (IDA) inland waterways. Ministry of Water Conservancy To be Agricultural rehabilitation and Project processing in abeyance. deter­ cievelopment in provinces with mined high food production potential. (IDA)

See page 1 for footnotes. - 41 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender Jj Pi-ocurement 4/

IV. SOUTH ASIA

BANGLADESH

Ministry of Ports, Up to Inland Water Transport III - To Project preparation underway. Shipping and Inland 40.0 assist Bangladesh Inland Water Water Transport/ (IDA) Transport Authority (BIWTA), BIWTC/BIWTA Bangladesh Inland Water Transport Corporation (BIWTC) and Ministry of Ports, Shipping and Inland Waterways (MPSI).

Ministry of Roads, About {R) Highway Rehabilitation and Identification missiOn in the Highway~ and Road 40.0 Improvement - Strenthening of field. Transport (IDA) maintenance organization through training, provision of equipment and materials and technical assistance, possibly including selective rehabilitation of existing primary roads.

Bangladesh Sugar & About {R) Sugar - Mill rehabilitation, Negotiations substantially Food Corporation 20.0 improvement in mill farms, and completed. Board presentation (BSFIC) (IDA) transportation in mill zones, tentatively scheduled for July. strengthening of extension activities, technical assistance, and training.

Dhaka Water and About Dhaka WASA III - Extensions to Preparation report being Sewerage Authority 40.0 water supply and sewerage prepared. (WASA) (IDA) systems.

Water Development About {R) WDB Sector Credit - Small Appraisal mission scheduled for Board (WDB) 45.0 irrigation/drainage/flood June. (IDA) control projects.

Water Development About Barisal Patuakhali - Project preparation has been Board, (WDB) 25.0 Irrigation, drainage and flood _delayed. (IDA) control works in Barisal and Patuakhali districts in southwest Bangladesh.

Water & Sewerage About District Town Water Supply - Preparation report being Authorities (to be 40.0 Water supply systems for Khulna prepared. established) (IDA) and Rajshahi.

(PETROBANGLA) 23.0 (R) Petroleum Exploration Promotion .Negotiations substantially (IDA) - Project components include: completed. seismic surveys and technical assistance.

Ministry of Local About {R) Rural Development II - Negotiations underway. ·Board Government, Rural 80.0 Extension of Integrated Rural presentation scheduled for June Development and (IDA) Development Program (IRDP). 14. (CIDA, ODA, and UNDP are Cooperatives co-financiers.)

Estabilishmen t 12. 5 {R) Public Administration - Approved by the Executive Division of the (IDA) Improvement of the public Directors on April 19. Cabinet Secretariat administration training.

See page 1 for footnotes. - 42 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender Jj Project 11 Procurement !!I

BANGLADESH (Cont'd)

National Committee 8.1 (R) Agricultural Training II - Negotiations substantially on Rural Training (IDA) Includes (a) facilities and completed. Board presentation and llinistry of equipment for agriculture rescheduled for May 31, Agriculture extension training institutes and a regional academy of rural development; (b) experimental facilities to try new modes of extension in t·rial areas; ( c) in-service training for present extension staff; and (d) technical assistance.

Fisheries Department About (R) Fisheries II - To be Preparation report being 15,0 identified, prepared, (IDA)

Bangladesh Chemical Up to Phosphate Gypsum - To Decision whether to proceed with Industries 25,0 manufacture cement clinker and the project will depend on Corporation (BCIC) (IDA) recover sulphur dioxide. results of consultant study. Gypsum washing facilities, calcination and storage equipment, cement kiln and ancillary facilities will be included,

Ministry of Local About Rural Roads & Marketing - Study by consultants underway. Government, Rural 30,0 Rehabilitation of rural roads, Development, and (IDA) rural markets and construction Cooperatives of small-scale storage.

Ministry of About Agricultural Research II - To Appraisal report being prepared, Agriculture 25,0 support and develop (IDA) agricultural research over a five-year period,

Ministry of About (R) Secondary Roads - To Preparatio~ mission in the field. Transport and 30,0 rehabilitate and/or build about Communications (IDA) 200 miles of all-weather roads in foodgrain surplus areas.

Bangladesh Bank 65,0 (R) Agricultural Credit II - To Project preparation underway. (IDA) support further reform of agricultural credit system, including provision of credit to farmers for on-farm investments.

Ministry of Energy 28,5 (R) Energy Efficiency and Refinery Negotiations completed. Board Resources (IDA) Rehabilitation - Including presentation on May 10. quick-yielding refinery debottlenecking and energy savings modifications, feasibility studies for additional future refinery modernization, energy audits for major oil and gas users, studies for future gas utilization.

Ministry of Finance 25,0 (R) Technical Assistance V - Board presentation scheduled for (IDA) Technical assistance and May 31, training subprojects, to be selected by mutual agreement, in the fields of policy, pre-investment planning, feasibility or engineering studies, or strengthening institutions responsible for project preparation and implementation. - 43 -

Member .Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency lf Lender Jj Procurement .!!/

BANGLADESH (Cont'd)

Ministry of Finance 150.0 (R) Imports Program XII - Provision Appraisal mission in the field. and Planning (IDA) of foreign exchange for procurement of industrial raw materials and spare parts required to improve utilization of existing capacity, and for importation of agricultural inputs.

Bangladesh Textile 45.0 (R) Textile BMR II - Balancing, Preparation/pre-appraisal mission Mills Corporation (IDA) modernization and replacement in the field. of machinery mainly for private sec tor textile mills.

To be determined 75.0 Industrial Sector Credit - Project preparation underway. (IDA) Provision of term finance to private sector industry through financial institutions to be selected.

Ministry of About (R) Technical Education - Pre-appraisal mission findings Education and 26.0 Strengthening the technical being reviewed. Religious Affairs (IDA) education system.

Ministry of 30.0 (R) Ashuganj Fertilizer/Operations Appraisal report being prepared. Industries (IDA) and Maintenance - Continued plant operations assistance, Procurement: Equipment damaged staff training, spare parts and during the initial operation of replacement of some equipment the plant needs to be replaced damaged during commissioning, expeditiously. (Retroactive and initial operations of the financing may be recommended for newly constructed Ashuganj expenditure after February 1983.) (Zia) Fertilizer Urea Factory.

Government 3.0 Technical Assistance - To help Negotiations scheduled for (IDA) prepare a pipeline of high early June. priority projects suitable for financing by the Government and external do~ors. Funds for technical assistance for pre-investment planning, feasibility and engineering studies, consulting and advisory services, setting up of planning and preparation units, and training of personnel.

Ministry of To be Arakan Pulp and Paper - To Project preparation underw.ay by Industry II deter­ construct a pulp and paper mill Government, with assistance from mined with a capacity of 100 tons per consultants financed by an (IDA) day of printing and writing advance of $150,000 from the IDA paper produced from a mixture Project Preparation Facility. of bamboo and indigenous hard­ woods. The project also includes associated infrastruc­ ture facilities.

Ministry of 14.0 (R) Groundwater (Tubewells) - To Negotiations substantially Agriculture and (IDA) increase agriculture completed. Forests productivity in the Central Dry Zone, through installation of tubewells and provision of agriculture support facilities.

Ministry of 15.0 Wood Industries II - To further Appraisal report being prepared. Agriculture and (ID{') improve the supply of wood (Co-financing being explored.) Forests products to the domestic market.

See page 1 for footnotes. - 44 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender ]J Procurement !!I

BURMA (Cont'd)

Ministry of 9,0 (R) Rubber Rehabilitation II - New Negotiations completed. Board Agriculture and (IDA) plantings and replantings in presentation scheduled for Forests about 10,000 acres, expand mid-June. reprocessing facilities, staff training and technical assistance.

Ministry of 22.0 Textiles - To implement a Appraisal report being prepared. Industry I (IDA) finishing plant to serve the (Co-financing being explored.) Lower Burma area. The plant would complement the spinning and weaving .facilities under implementation at Shwedaung. The project also includes a technical assistance component for rehabilitating and improving productivity in the sector.

Ministry of 20.0 Irrigation Rehabilitation - To Project preparation under way. Agriculture and (IDA) rehabilitate existing gravity Forests irrigation systems in the Central Dry Zone of Burma. Main component would comprise: major civil work including repairs to and remodelling of major structures, canal desilting and land development; provision of equipment and vehicles and agricultural support services.

Ministry of 50.0 (R) Ports III - Rehabilitation of Board presentation scheduled for · Transport (IDA) Rangoon Port to enable the port May 24. to handle the anticipated increase in tonnage. Works would include the improvement of port lighting, service vessels and marine facilities. In addition, the project would provide new cargo handling equipment, spare parts, open and covered storage facilities, technical assistance and engineering services.

Ministry of 20.0 Transport/Distribution - Project identification underway. Transport (IDA) Multimodal transport project to minimize bottlenecks in transporting timber and other key export products: includes provision of storage; telecommunications; navigational and other facilities.

Ministry of 15.0 Seeds - Develop viable seed Project identification underway. Agriculture and (IDA) program covering Burma's major FOrests crops including seed multipli­ cation and distribution for paddy, cotton, and other crops. Strengthen research, seed testing and quality control. Technical assistance and training.

See page 1 for footnotes. - 45 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1/ Lend.er ]J Procurement !±../

To be determined 30.0 Rainfed Agriculture Project - Appraisal report being prepared. (IDA) Development of rainfed agricultural system in selected State(s).

Government of 46.2 (R) Himalayan Watershed Development - Negotiations substantially (Bank) To ameliorate the deterioration completed. Board presentation of the Himalayan ecosystem scheduled for May 31, caused by deforestation, overgrazing, etc., and to carry out integrated area development schemes, including reforestation and fodder production, livestock and horticulture development, soil conservation and agricultural extension.

Government of Uttar 120.0 Upper Ganga Irrigation - Project preparation underway. Pradesh (IDA) Modernization of irrigation systems in Uttar Pradesh State.

Ministry of Shipping 285.0 (R) Nhava Sheva Port - Construction Revision to project scope under and Transport/Nhava (IDA) of a new port facility to consideration. Sheva Port Trust relieve serious overcrowding and delays at Bombay Port.

To be determined 300.0 Petrochemicals - Production of Appraisal report under (Bank) petrochemicals based on Bomb?Y preparation. High natural gas and/or production of basic aromatics and selected derivatives.

Government of Tamil 50.0 Tamil Nadu Water Supply and Appraisal report being prepared. Nadu (IDA) Sanitation Project: Water supply for three large towns, and about 60 middle-sized towns, and low-cost sanitation for I 5 small toWI'l;S.

Government of 50.0 Chambal (Rajasthan) Irrigation Awaiting confirmation from Rajas than (IDA) II Project - Modernization of GOI/GOR on project scope to irrigation and drainage and complete preparation of appraisal command area development report. covering about 230,000 ha in the valley in Rajasthan.

Government of Orissa 156.4 (R) Upper Indravati Hydro-Electric Board presentation on May 10. (Bank) Project - Construction of a 600 170.0 MW hydro-electric generating (IDA) station together with associated dams, channels and tunnels in Orissa State.

National Thermal 250.7 (R) Central Power Transmission Negotiations completed. Board Power Corporation (Bank) Project - Construction of a presentation scheduled for May (NTPC) network of 400 kv transmission 19. lines and associated sub-stations linking regional grids for three Regions.

See page 1 for footnotes. - 46 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on ~JJ Lender 2,./ Procurement !±_/ (Cont'd)

Government of West so.o Haldia Water Supply and Project preparation underway. Bengal (IDA) Sewerage Project - Construction of 225 million liters/day treatment plant, 4 pumping stations and a 90 km long water transmission main to serve the Haldia Development Authority, 2 towns and rural communities en route.

Government of Bihar so.o Bihar Water Supply - Provision Project preparation underway. (IDA) of piped water supply to about 3 towns in the State of Bihar.

Goverllmen t of Madhya 24.0 (R) Madhya Pradesh Urban Negotiations in mid-May. Pradesh (Bank) Development Project - Shelter and infrastructure investments in several medium-sized cities in the State of Madhya Pradesh.

Government of West 136,3 (R) Third Calcutta Urban Negotiations completed. Board Bengal (IDA) Development Project - Expansion presentation scheduled for May and improvement of urban 19. service systems and institutional capabilities in the Calcutta Metropolitan District.

National Fertilizer 200,0 (R) . Madhya Pradesh Fertilizer - Appraisal report being prepared • Ltd. (Bank) Construction of one ammonia unit of 1,350 tons per day and two urea units of 1,100 tons per day each.

Government of 300.0 (R) Narmada Gujarat I - Appraisal report being prepared. Gujarat (IDA) Construction of Sardar Sarovar Further field appraisal in May. Dam, hydroelectric power stations of 1,400 MW, the Narmada main canal and a large network of canals and minor channels, to serve about 2 million ha.

Government of 100.0 Bombay Urban Development - Project preparation underway. Maharashtra (IDA) Program of slum upgrading and shelter renovation and construction for the Bombay Metropolitan Region.

Indian Railways (IR) 200.0 Railways Electrification - Post-appraisal issues under (Bank) Assistance to Indian Railways discussion. in its ongoing rail electrification program.

Government of Madhya 150.0 (R) Bodhghat Hydro-electric Project Preparation/pre-appraisal mission Pradesh (Bank) - Construction of a 600 MW scheduled for June. hydro-electric generating station together with associated dams, channels and tunnels in Madhya Pradesh State.

To be determined 200.0 Thermal Power Plant Identification mission to be (Bank) Rehabilitation Project - scheduled following Government Selected investments to decision on project components increase capacity utilization and timing of proposal to Bank. in existing power plants.

Oil & Natural Gas 170.0 (R) Cambay Basin Petroleum Project Identification mission in the Commission (ONGC) (Bank) - Assistance to increase field. onshore production rates in Gujarat.

Government of Orissa 103,0 (R) Second Orissa Medium Irrigation Negotiations in mid-May. (IDA) Project - Continuation of assistance to State in upgrading irrigation network.

See page 1 for footnotes. - 47 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency lf ~?j Procurement i/

INDIA (Cont'd)

Tata Electric 200.0 Trombay IV (Thermal Power) - Appraisal report being prepared. Company (Bank) Installation of 500 MW unit.

Government of 53.0 (R) Maharashtra Water Utilization - Negotiations in early May. Maharashtra (IDA) Upgrading of minor distribution and field channels covering about 95,000 hectares.

National Thermal 165.0 (R) Farakka Thermal Power - Appraisal mission tentatively Power Corporation (IDA) Installation of three 500 MW scheduled for August/September. units, as the second stage of development of the Farakka plant in West Bengal.

Coal India, Ltd. 200.0 (R) Coal - Assistance to GO! in Appraisal report being prepared. (IDA) expanding domestic production of steam and coking coal.

Governments of 167.0 (R) Sutlej- Link Canal - Project preparation in abeyance Haryana and Punjab (IDA) Completion of a 112 km link at request of the Government of canal and introduction of a India. Reporting will be sophisticated water management discontinued. system for the waters of the Indus river system.

Government of Punjab 150.0 (R) Sutlej (Punjab) Irrigation - Project preparation in abeyance (IDA)' Irrigation of approximately at request of the Government of 120,000 ha of land located India. Reporting will be adjacent to the Sutlej-Yamuna discontinued. 1 Link Canal in Punjab, together with two powerhouses. Ministry of 100.0 National Agrtcultural Extension Project preparation underway. Agr ic ult ure (IDA) Project - Assistance to the Directorate of Extension in strengthening extension systems in various states through the introduction of the training and visit system.

Government of Madhya 200.0 Narmada (Madhya Pradesh) I - Project preparation underway •. Pradesh (IDA) Construction of the Narmada Sagar Dam, hydro power stations and a large network of canals covering about 2.8 million ha.

Government of 30.0 Karnataka Social Forestry Appraisal report being prepared. Karnataka (IDA) Project - Afforestation of (Co-financing with the United wasteland and degraded forests, Kingdom is likely.) primarily to produce fuelwood and other forest products for use by local villages.

Ministry of Health so.a (R) Third Population Project - To Appraisal mission in the field. and Family Welfare (IDA) support implementation of an integrated family welfare program designed primarily to improve infant and maternal health and to lower birth rate.

To be determined 100.0 Cement Energy Savings - Assis­ Project preparation underway. (Bank) tance, through a financial intermediary, to several cement plants to convert from wet to dry process.

See page 1 for footnotes. - 48 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender ]J Procurement A/

Ministry of Water Up to Marsyangdi Hydroelectric - Appraisal report under Resources 90.0 Hydroelectric power station in preparation. (Co-financing with (IDA) Central with 78 MW Federal Republic of Germany, installed capacity, Kuwait Fund, Saudi Fund, Japan transmission to central grid, and ADB being considered. Need and con~ultancy services. for additional co-financing.)

Ministry of Works Up to (R) Transport III - Completion of Appraisal report being prepared. and Transport 33.0 the East/West Highway; road (Co-financing required; sources (IDA) maintenance; and technical including Saudi Fund, Kuwait assistance. Fund, and U.K. ODA being approached.)

Nepal About Telecommunications IV - Project components being Telecommunications 22.0 Follow-up for expansion of identified. (Co-financing may Corporation (IDA) local and international be sought.) services.

Ministry of Forests 18.0 (N) Second Forestry Project - Appraisal report under Organization and management of preparation. reforestation programs, forestry research, monitoring and evaluation, and planning.

Ministry of Forests (N) Second Technical Assistance Board presentation scheduled for Project - Includes financing of June 2. engineering and feasibility studies, consultancy services and training. Total cost estimated at $6.0 million, all in foreign exchange.

Ministry of Water 11.0 (N) Karnali Preparation - Phase I - Project documents under Resources (IDA) Includes preparation of final preparation. feasibility studies for the Chisapani multipurpose project; preliminary feasibility studies of a smaller upstream hydro-electric project; and consultancy services.

Ministry of 22.0 (N) Babai Irrigation - Includes Appraisal report under Water · (IDA) construction of weir and preparation. Resources head works on Babai River, construction of irrigation and drainage facilities on about 13,000 ha of land, and strengthening of agricultural extension services in·the area. PAKISTAN

Karachi Development 25.0 (R) Karachi Water Supply - Board presentation scheduled for Authority; Karachi (IDA) Expansion of Bulk Water Supply May 26. Water and Sewerage System and improvement of Board sewerage system in Karachi.

Water and Power 65.0 (R) Fourth Drainage Project - Negotiations substantially Development (IDA) Improved drainage and completed. (Co-financing Authority (WAPDA) reclamation of saline/alkaline expected with UK $13.5 million land. and Netherlands $3.5 million.)

Oil & Gas 32. 5 (R) Oil and Gas II - Including Negotiations scheduled for early Development (Bank) further development of Toot May. Project being divided into Corporation field, gas exploration, two separate projects: Second technical assistance, and Toot Oil and Gas Development; and training. Petroleum Exploration. (Co-financing being sought with commercial banks.)

Procurement: Advance contracting for oil field services and retroactive financing of up to $3.25 million recommended.

Lahore Development 16.0 (R) Lahore Urban Development Approved by the Executive Authority (IDA) Project - Including upgrading Directors on April 19. of low-income areas, sites and services,' and solid waste disposal.

See page 1 for footnotes. - 49 -

Member Country, and Borrower or Alnount 6: Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 1_/ Procurement !;_/

PAKISTAN (Cont'd)

Sui Northern Gas 41.5 (R) Pipelines SNGPL V - Expansion Negotiations substantially Pipelines Ltd. (Bank) of capacity of SNGPL's gas completed. (Co-financing being (SNGPL) transmission system and sought with commercial banks.) associated facilities. Procurement: Retroactive financing of up to $4.0 million and advance contracting for Stage I of pipeline recommended.

Government of 18.0 (R) Population - To assist the Approved by the Executive Pakistan (IDA) Government of Pakistan in Directors on April 26. implementing its population (Co-financing with USAID $3.4 program. Priority will be million, and UK $2.7 million.) given to intensifying services and information, education and communications.

Government of 7.0 (R) Coal Engineering - Exploration, Board presentation on May~- Pakistan (IDA) feasibility studies and technology evaluation for Procurement: Retroactive coal-fired thermal power financing of up to $150,000 stations in Baluchistan. recommended.

Water and Power 10.2 (R) Reservoir Maintenance Facility Loan signed on April 12. Development (Bank) - To supplement WAPDA's efforts Authority (WAPDA) to build and equip operation and maintenance organization to necessary level at Tarbela, Mangla and Chashma, including warehouses, machine shops, equipment, training and technical assistance.

State Petroleum 50.0 Refinery Conversion - To Project preparation Refining and (Bank) support the construction of a Petrochemical hydrocracker project in Corporation Limited Pakistan.

Water and Power 49.0 Power WAPDA IV - To support the Project preparation Development (Bank) construction of a thermal Authority (WAPDA) power station.

Government of 30.0 Command Water Management - To GOP preparing project report. Pakistan (IDA) improve water management in subproject areas located in the four provinces.

Government of 10.0 (R) Fifth Agricultural Development Negotiations substantially Pakistan (Bank) Bank of Pakistan Project - To completed. Board presentation 47.8 assist ADBP's lending program scheduled for June 7. (IDA) in the years 1984-86, with (Co-financing expected with IFAD emphasis on on-farm $30 million, and with Italian development. Government $20 million.)

Government of 10.0 Rural Development - To support Project preparation underway. Pakistan (IDA) crop and other development in hill areas.

Government of 36.5 DFC - Assistance to private Project preparation underway. Pakistan (IDA) investors through financial intermediaries.

Government ·of 140.Q SAL II - To support Initiating memorandum under Pakistan, Ministry (Bank/IDA) Government's Structural preparation. of Finance Adjustment Programs in the areas of Agriculture, Industry and Energy.

See page 1 for footnotes. - 50 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency ]J Lender J_/ Procurement !±.I

PAKISTAN (Cont'd)

Oil & Gas 51.5 (N) Petroleum Exploration - To Negotiations in mid-May. Development (Bank) support the Government's (Co-financing being sought with Corporation efforts to increase exploration commercial banks.) of natural gas and enhance the chances of joint-venture exploration by foreign and domestic private oil companies. The project will consist of: (i) drilling of six exploratory wells on gas prospects; (ii) regional seismic surveys and basin studies; and (iii) promotion of potentially oil-prone areas to the private oil industry.

SRI LANKA

National Development Up to (R) Industrial Investment Credit - Appraisal report being prepared. Bank (NDB)/Develop- 25.0 A credit line to NDB and DFCC ment Finance Corpo- (IDA) for onlending to private and rations (DFCC) public sector projects, and technical assistance to .improve industrial efficiency.

Ministry of Plan 23.0 (R) Third Rural Development Negotiations completed. Board Implementation (IDA) Project - Provision for inputs presentation on May 12. and services for directly pro­ ductive sectors; rehabilitation and improvement of'economic infrastructure, inclUding irrigation and transport; fisheries and livestock; social infrastructure improvement, including health and education.

. Department of Up to Irrigation Rehabilitation Project preparation underway. Irrigation 35.0 Project - Rehabilitation and (IDA) modernization of a number of major irrigation tanks.

Department of Up to Second Road Maintenance Project Project preparation underway. Highways 20.0 (R) - Rehabilitation of road (IDA) segments, and bridges, and improved maintenance for road network.

Ministry of Mahaweli 49.0 Mahaweli IV Project - Project preparation underway. Development (Bank) Downstream development work in Up to System B: Secondary and 30.0 tertiary canals; economic and (IDA) social infrastructure for settlement.

Ministries of State Up to Third Tree Crops Rehabilitation Project preparation underway. Plantations, and 26.0 - Rehabilitation of tree crops Janatha Estate (IDA) --tea and rubber--plantations Development in the estate sector.

See page 1 for footnotes. - 51 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender Jj Procurement!±/

V. EUROPE, MIDDLE EAST AND NORTH AFRICA

AFGHANISTAN

Progress reports on the Afghanistan program are being discontinued until circumstances permit renewed project preparation.

Ministry of Post's About (R) Telecommunications - Project Negotiations in mid-May. and 128.0 would consist of elements Telecommunications (Bank) included in a three year Procurement: Advance tranche of the telecommunica­ contracting, under ICB, and tions investment plan. according to Bank Guidelines for 5 contracts, totalling about $11. 2 million equivalent. Possible retroactive financing of about $1.8 million equivalent.

Ministry of To be Water Supply in greater Further processing dependent on Hydraulics deter­ ·Algiers - Expected to include resolution of remaining project mined works needed to help alleviate and sec tor issues. (Bank) the critical water shortage in that area, and water supply/ Procurement: Project involves sewerage studies in small and advance contracting, with award intermediate cities. of a single contract for major civil works, and the possibility of retroactive financing of a small portion.

SONELGAZ To be Power III - Project would Preparation underway by deter­ include rural electrification. Governnient. mined (Bank)

Ministry of About (R) Southern Conveyor Water Appraisal mission in the field. Agriculture 12.0 Resources Development Project. (Co-financing will be required.) (Bank)

Ministry of Commerce 10.2 (R) Project for energy conservation Board presentation scheduled for and Industry -(Bank) measures and renewable energy May 19. Electricity applications on a pilot basis. Authority of Cyprus Procurement: Retroactive financing of $300,000 is recommended to finance consultants contracted for project preparation and energy plan.

Ministry of 16.0 (R) Khrysokhou watershed Irrigation Board presentation on May 12. Agriculture (Bank) Development - Phase I to supply irrigation for 2,000 ha. Procurement: Government has Includes construction of initiated, with Bankrs consent, Evretou dam, conveyance prequalification of contractors pipeline, storage ponds and for construction of Evretou dam irrigation network. on which work is scheduled to start January 1984.

EGYPT, ARAB REPUBLIC OF

Egyptian Public To be Fifth Drainage Project - Project to be prepared by EPAD Authority for deter- Continued support for Egyptrs and Ministry of Health. Drainage Projects mined field drainage and bilharzia (EPAD) and Ministry (Bank) control program. of Health

Arab Republic of 132.0 (R) El-Dikheila Port Project - Loan signed on May 4. Egypt (Bank) Construction of additional port capacity.

See page 1 for footnotes. - 52 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender ]j Project 11 Procurement .!±/

EGYPT, ARAB REPUBLIC OF (Cont'd)

Arab Republic of 165 .3 (R) El Dikheila Reinforcing Bar - Board presentation on May 12. Egypt (Bank) Direct Reduction/Electric Furnace Plant to produce rebars Procurement: Bids on civil and and light sections. building works received May 5. Technical proposals on bar mill submitted April 30. Invitation to bid on rod mill issued April 30. Prequalification for remaining packages well underway.

Arab Republic of 81.2 (R) Second Agro-Industries - Loan signed on April 4. Egypt (Bank) Provision of agricultural credit through local financial institutions for agro­ industries development.

Arab Republic of 41.5 (R) Irrigation Pumping Stations Approved by the Executive Egypt (Bank) Rehabilitation - Improve water Directors on April 26. control in existing major irrigation systems. Procurement: Retroactive financing of up to $2 million, from May l, 1983.

Egyptian Electricity To be Fourth Power Project - Project being prepared by EEA. Authority (EEA) deter­ Transmission. mined (Bank)

Arab Republic of 38.0 (R) Vocational Training I Approved by the Executive Egypt (Bank) Expansion and upgrading of Directors on April 19. vocational training, in industrial and construction trades.

To be determined To be Gas Development V - Dev.elopment Project to be prepared by deter- and distribution of natural Egyptian General Petroleum mined gas. Corporation (EGPC). (Bank)

To be determined To be (R) Construction Industry Sector - Appraisal mission scheduled for deter- Assistance to Egypt's end-May, mined construction industry through (Bank) lines of credit and technical assistance.

Arab Republic of To be Vocational Training II - Project to be prepared by Egypt deter- Continued support for Government. mined vocational training in Egypt. (Bank)

Egyptian Iron and To be HADISOLB II - Stage two of Consul tan ts are preparing a Steel Complex deter- program to support HADISOLB to feasibility report on which (HADISOLB) mined rehabilitate and balance its preliminary discussions are (Bank) present facilities. scheduled for June.

Arab Republic of To be Regional Water Supply/Sewerage Appraisal mission scheduled for Egypt deter- Engineering Loan - Provincial May. mined water supply and sanitary (Bank) engineering.

Arab Republic of 24.0 (R) Road Maintenance - Road Negotiations in mid-May. Egypt (Bank) rehabilitation and maintenance. Procurement: Advance contracting of up to $18 million and retroactive financing of up to $3 million recommended.

See page 1 for footnotes. - 53 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1./ Le;,der Jj Procurement !±.I

(NATIONAL BANK OF About (R) Industry I - Energy Negotiations substantially HUNGARY) 109.0 conservation and interfuel completed. (Co-financing likely (Bank) substitution in selected to be sought.) industries, and transfer of technology. Procurement: Retroactive financing of about $3.1 million for project start-up activities, expected to be recommended.

(NATIONAL BANK OF About (R) Agriculture - National grain Negotiations in progress •. HUNGARY) 130.4 storage and agricultural (Co-financing likely to be (Bank) mechanization project. sought.)

(NATIONAL BANK OF To be (R) Industrial restructur"ing and Appraisal mission in the field. HUNGARY) deter- export generation. mined (Bank)

(NATIONAL BANK OF To be Petroleum I - Enhanced oil Project preparation underway. HUNGARY) deter- recovery/deep drilli_ng for (Co-financing likely to be mined oil/gas. sought.) (Bank)

National Bank of To be (R) Transport I - Railways, roads, Project under preparation. Hungary deter- road transport, and possibly an (Co-financing likely to be mined inland waterway component. sought.) (Bank)

JORDAN

Jordan Valley To be Construction of a multi-purpose Further project processing Authority deter- dam on the Yarmouk River at suspended at Government's mined Maqarin and improvement of request, pending progress on (Bank) irrigation facilities in Jordan international riparian· issues. Valley.

(ARAB POTASH About (R) Dead Sea Chemica!s - Processing Completion of feasibility· study COMPANY) 25.0 by-products of the potash on potassium sulphate expected (Bank) refinery. mid-May. Appraisal mission tentatively scheduled for July. (Co-financing likely to be required.)

Ministry of 18.8 (R) Education V - Construction and Loan signed on April 11. Education; (Bank) equipping of vocational second­ (Co-financing expected with Saudi Vocational Training ary schools and centralized Development Fund $22.1 million Institute secondary schools. Total cost and U.K. ODA $3.2 million.) estimated at $89 million of which foreign exchange is about $45 million.

Ministry of About (R) Education VI - Construction/ Appraisal report being prepared. Education 30.0 equipping of primary and (Co-financing likely to be (Bank) general secondary schools and required.) school laboratories, and technical assistance.

Amman Water Supply To be Waste water evacuation and Preparation under way by Authority (AWSA) deter­ treatment in Amman Region. Government. (Co-financing likely mined to be required.) (Bank)

To be determined About (R) Amman Transport and Municipal Negotiations under way. 25.Q Development - To include (Co-financing being arranged.) (Bank) upgrading and rehabilitation, traffic engineering, road maintenance. and signaling equipment, solid waste disposal, and technical assistance. Total cost estimated at $56 million of which foreign exchange $33 million.

See page 1 for footnotes. - 54 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1/ Lender 1./ Procurement!!/

JORDAN (Cont'd)

Water Supply To be (R) Water supply rehabilitation and Preparation under way by Corporation (WSC) deter- sewerage in seven cities. Government. mined (Bank)

To be determined To be (N) Energy Development, including Preparation under way by deter- power distribution, oil Government. mined exploration, renewable energy, (Bank) and energy audits.

To be determined To be Fisheries - Development of Preparatory studies under way. deter- fishing fleet and related port mined infrastructure, support (Bank) services to fishing industry, and marketing facilities.

To be determined To be Sewerage - Rehabilitation and Preparation underway by deter- extension of sewer network for Government and consultants. mined Casablanca-Mohammedia region. (Bank)

Ministry of Public To be Family Health Program including Preparation underway by Health deter- basic health services, Government • mined training, health education, (Bank) environmental sanitation, and Bank Project Preparation Facility technical assistance to advance of $75,000 approved to Ministry of Public Health. finance consultant services, logistical support, and additional surveys for the preparation of the proposed health project, to test a new outreach system for the delivery of basic health services in Morocco.

Fonds d'Equipement 16.0 (R) Municipal and Village Loan Approved by the Executive Communal ( FEC) (Bank) Fund - Support for FEC's Directors on April 26. program to assist local authorities to identify, prepare, and finance communal infrastructure and production projects.

Ministry of 30.0 Agricultural development on Approved by the Executive Agriculture (Bank) about 330,000 ha in the Oulmes Directors on December 14. Rommani Regions, including: crop, forage and livestock Procurement: Retroactive development on rainfed lands; financing for an amount not rehabilitation and extension of exceeding $1 million approved for small-scale irrigation; and project start-up activities. soil conservation measures.

Government of About (R) Power IV - Construction of Appraisal report being prepared. Morocco 88.0 Dchar el Oued multi-purpose dam (Co-financing will be required.) (Bank) and power plant. Procurement: Retroactive financing for an amount not exceeding $500,000 for project start-up activities is proposed.

Ministry of 85.0 Highway IV - Pavement Approved by the Executive Transport (Bank) strengthening and improvement, Directors on March 29. reconstruction of bridges, improvement of provincial roads, completion of Casablanca-Rabat Expressway, program of road maintenance, studies and technical assistance.

See page 1 for footnotes. - 55 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1./ Lender]) Project]_/ Procurement _!j_/

MOROCCO (Cont'd)

Government of To be Telecommunication project - Preparation underway by Morocco deter- Expansion of the existing Government. mined telecommunication~ systems. (Bank)

Government of 60.0 (R) Third Urban Development - Loan signed on April 11. Morocco (Bank) Construction and financing of low cost housing through Credit Immobilier et Hotelier (CIH).

Government of 25.0 Electro-mechanical Industries Government reactions awaited on Morocco (Bank) Project - Line of credit to key project issues and scope. Treasury, to be on-lent through Banque Nationale pour le Bank Project Preparation Facility Developpement Economique (BNDE) advance of $200,000 approved to and commercial banks to help set up an Industrial electrical, mechanical, and Planning and Policy Unit. metallurgical industries, as well as financing through Office de Developpement Industrie (ODI) of participa­ tions in such industries; institutional strengthening, technical assistance.

Government of 42.0 Development of small and medium Approved by the Executive Morocco (Bank) irrigation perimeters. Directors on March 29.

Office Cherifien des To be Establishment of about 10 Preparation underway by Phosphates (OCP) deter- fertilizer blending and Government. mined distribution centers. (Bank)

ONAREP 75. 2 (R) Petroleum Exploration - Approved by the Executive (Bank) Follow-up to ongoing explora­ Directors on April 26. tion project to support con­ tinuation of drilling in Procurement: Advance contracting Essaouira and preparation of likely for several project market and engineering studies. components: technical assistance, airborne survey, seismic surveys, well services, consumables and equipment. Total estimated foreign exchange value of these contracts $20 million equivalent. Retroactive financing would be needed for all these contracts to the extent of about $7 million.

Ministry of About (R) Beni Amir Irrigation - Appraisal report being prepared. Agriculture 43.0 Rehabilitation of 13,000 ha and (Bank) construction of new system on 5,400 ha.

Caisse Nationale About CNCA V - Line of short- and Appraisal report being prepared. Credit Agricole 100.0 medium-term credit to CNCA over (Co-financing being sought.) (CNCA) (Bank) 1984-86.

Kingdom of Morocco To be Education VI - Strengthening of Preparation under way by deter- vocational training. Government. mined (Bank)

To be determined To be (R) Casablanca Port - Preparation underway by deter- Rehabilitation and extension of Government; pre-appraisal mined Casablanca Port; technical completed in March. (Bank) assistance to improve efficiency of port operations.

See page 1 for footnotes. - 56 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency lf Lender ]J Project ]./ Procurement !±I

MOROCCO (Cont'd)

Office National Eau To be (N) Fourth Water Supply - Identification/preparation under Potable (ONEP) deter­ Construction of regional water way by Bank and ONEP. .mined supply systems in Settat - (Bank) Casablanca area and in rural centres of the Ouarzazate Province; house connection programs, and line of credit to ONEP.

To be determined About Textiles - Line of credit to I.nstitutional arrangements for so.o finance modernization and project under discussion with (Bank) restructuring of textiles Government. (Co-financing likely enterprises. to be required.)

To be determined To be Fisheries development project. Government prepared fisheries deter­ Components to be defined. master plan under review. mined (Bank)

Republic of Portugal About Agro-industry - Credit for Preparation underway. 40.0 expanded production and (Co-financing likely to be (Bank) processing of fruits, required.) vegetables, wine, and dairy products.

Republic of Portugal 40.3 (R) Small and Medium-size Industry Approved by the Executive (Bank) ( SMI) II - Second line of Directors on April 19. credit for small-and medium-size private enterprises.

To be determined To be Mechanical Industries II - Preparation underway. deter­ Support to enterprises in (Co-financing likely to be mined mechanical and engineering required.) (Bank) industry for rehabilitation and modernization.

To be determined About Industrial Technology - Technical studies under review. so.o Upgrading of technological (Bank) support facilities for industry in light of needs for EEC entry.

Republic of Portugal About (R) HouSing - Possibly a general Preparation under way. so.a line of credit to provide (Bank) housing finance for low-income groups through a housing development bank.

Republic of Portugal To be (N) Sines Coal Port - Construction Preparation under way. deter- of coal handling and general (Co-financing likely to be mined cargo facilities at Sines. required.) (Bank)

(INVESTMENT BANK) To be Industry XII (Galati Steel) - Appraisal mission postponed at deter­ Construction at Galati steel the Government's request, pending mined enterprise of a cold reduction finalization of overall (Bank) mill and tinning line. development program.

(INVESTMENT BANK) To be Industry XI (Energy Saving Completion of techno-economic deter­ Project and Process Improvement studies delayed, pending mined in Steel Sub-sector and/or finalization of overall (Bank) coking coal plant) - Project development program. components to be determined. (Co-financing likely to be sought.)

(AGRICULTURAL BANK) About Agricultural Credit Negotiations postponed at the 66.0 (Transylvania) - Regional Government's request, pending (Bank) development project, including finalization of overall financing of agricultural and development program. agro-industrial investment in (Co-financing likely to be Transylvania Region. sought.)

See page 1 for footnotes. - 57 -

Member Country, and Borrower or Alnount & Stage of Process­ Implementing Probable ing and Action on Agency lf Lender lJ Procurement !±I

ROMANIA (Cont'd}

(AGRICULTURAL BANK) To be Agricultural Credit (Oltania) - Project preparation underway. deter- A line of credit through BAFI (Co-financing likely to be mined for agricultural development in sought,) (Bank) the Oltania Region,

(AGRICULTURAL BANK) To be Irrigation IX - Drainage, land Appraisal mission delayed at deter- reclamation and other related the Government's request, mined works on a sectorwide basis pending finalization of overall (Bank) within the context of the development program. Five-Year Plan. (Co-financing likely to be sought,)

(INVESTMENT BANK) To be Power V - Time slice investment Appraisal mission postponed at de.ter- for second half of 1981-85 the Government's request, pending mined Plan, finalization of overall (Bank) development program.

(INVESTMENT BANK) To be South Constanta - Agigea Port - Appraisal mission postponed at deter- deep sea port and inner barge the Government's request, pending mined basin and other related finalization of overall (Bank) structures and equipment. development program. (Co-financing likely to be sought),

(AGRICULTURAL BANK) To be National Grain Storage - A line Appraisal mission postponed at deter- . of credit for expansion, the Government's request, p~nding mined rehabilitation and modernization finalization of overall (Bank) of national grain storage development program. facilities, (Co-financing likely to be sought),

(INVESTMENT BANK) To be Highways I - Construction of Completion of project studies deter- 200 km of North-South delayed, pending finalization of mined Trans-European Highway overall development program. (Bank) (Bucharest-Constanta Section), and National Road Rehabilitation and Training.

(INVESTMENT BANK) To be Industry. - Utilization of methane Completion of techno-economic deter- as chemical feeQstock. studies delayed, pending mined finalization of overal~ (Bank) development program.

(INVESTMENT BANK) To be Petroleum II - Onshore deep Completion of techno-economic deter- exploration and field studies delayed, pending mined development. finalization of overall (Bank) development program.

(AGRICULTURAL BANK) To be Livestock V - Possible line of Completion of project studies deter- credit for production, delayed, pending finalization of mined processing and storage of major overall development program. (Bank) livestock products.

SYRIAN ARAB REPUBLIC

To be determined To be Sewerage I - Sewerage Awaiting Government decision on deter- facilities for Hama and Homs, institutional arrangements. mined and institution-building in (Co-financing arranged with (Bank) sub-sec tor. Arab Fund,)

Syrian To be Telecommunications II - Awaiting Government decision on Telecommunications deter- Expansion of telecommunication project scope and financing. Establishment (STE)· mined services in selected urban and (Bank) rural areas.

To be determined To be Highways IV - Priority roads in Feasibility study underway, deter- NE Syria, maintenance operations mined and training, (Bank)

See page l for footnotes. - 58 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender Jj Procurement !!_I

SYRIAN ARAB REPUBLIC {Cont'd)

To be determined To be Sewerage II - Secondary Awaiting Government decision on deter­ treatment works, main institutional arrangements. mined interceptors and secondary (Co-financing will be sought.) (Bank) collection system for Aleppo sewerage facilities.

To be determined To be Education III - Extension of Identification mission in the deter­ vocational education and field. mined training. (Bank)

Office National de 34.0 Urban Sewerage III - Rehabili­ Approved by the Executive l'Assainissement (Bank) tation and expansion of sewerage Directors on March 29. (ONAS) systems in about 30 towns. Procurement: Project involves advance contracting, and retroactive financing of about $300,000 for final studies of the sewage system and preparation of bid documents.

Societe de Fonderie 16.8 Industry IV - Rehabilitation and Negotations substantially et de Mecanique (Bank) expansion of foundry to help meet completed. Board presentation (SOFOMECA) the growing local demand for scheduled for early June. foundry products, and improve the quality and cost effectiveness of Bank Project Preparation Facility castings thus creating also a advance of $600,000 approved to sound basis for exports. 'Ihe complete preparation and finance project will consist of (1) the engineering for the project. modernization of SOFOMECA's existing iron and steel foundry and reorganizing the productive facilities and installing new equipment; (ii) installation of a new fully-equipped foundry for mechanical castings; and (111) construction of a sand treatment plant to supply Tunisian foundries and other industrial users with high-quality sand.

To be determined To be Irrigation Rehabilitation III - Project under preparation by deter- National Irrigation: Operation Government. mined and maintenance improvement (Bank) project.

To be determined About (R) Energy Development - Possible Identification mission scheduled 35.0 focus on onshore or off-shore for late 1983. (Bank) gas development.

To be determined To be Development of national Preparation by Government and deter- research and extension master FAO/CP underway. mined plans through integrated (Bank) cereal-livestock production project for Northern Tunisia.

To be determined To be Small Scale Industry II - Line Preparation by Gover~ment deter- of credit to Government to be underway. mined used by commercial banks for (Bank) lending to small-scale industries.

To be determined To be Highways VI - Maintenance Project under preparation by deter- Project (follow up to Highways Government and consultants. mined IV). (Bank)

See page 1 for footnotes. - 59 -

Meinber Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender Jj Project]/ Procurement !±./

TUNISIA (Cont'd)

To be determined To be (R) Nationwide Rural Water Supply Appraisal report being prepared. deter- Project. mined (Bank)

Gafsa Phosphate Co. 11.2 (R) Technical Assistance to Mining Appraisal report being prepared. and Ministry of (Bank) Sec tor to help improve and National Economy expand operations of Gafsa Phosphate Company and investigate feasibility of establishing a potash industry.

Ministry of About (R) Sfax Flood Protection Project - Board presentat'ion scheduled for Equipment 25.0 Consists of rehabilitation of May 24. (Bank) existing water courses and extension of dikes; Procurement: Retroactive construction of a belt canal in financing of about $600,000 for Sfax and minor flood protection detailed designs and bid works in neighboring villages; documents. is expected to be provision of maintenance recommended. equipment; staffing, equipping and operation of a unit to maintain and repair flood protection works; and provision of consulting services for related design and construction supervision.

To be determined To be (R) Urban Transport II - Appraisal mission tentatively deter- Investments in highway scheduled for September/October. mined infrastructure and traffic (Bank) management; strengthening of sector institutions.

Ministry of Health To be Extension of integrated primary Pre-appraisal mission scheduled deter- health care system (follow-up for June. mined to 1981 project). (Bank) Tunisian Electricity To be (N) Power IV - Continuation of Project being prepared by STEG. and Gas Company deter- ongoing program of rural (STEG) mined electrification. (Bank)

To be determined To be (N) Export Industries - Line of Preparation under way by local deter- credit for development of development banks and Government. mined industries mainly oriented (Bank) towards export markets.

Agricultural Bank of 150,4 (R) Agricultural Credit II - Negotiations substantially Turkey (TCZB) (Bank) Provision of agricultural completed. credit through TCZB.

State Pulp and Paper To be Paper Rehabilitation: Phase I Appraisal ,:eport being prepared. Enterprise (SEKA) deter­ - Rehabilitation of AKSU and mined Caycuma Mills; technical Bank Project Preparation Facility (Bank) assistance to improve advance of $500,000 provided to operations. finance consultants' services· for completing details for rationalizing, and energy saving at existing mills.

Republic of Turkey To be (R) Livestock Products Development Consultants' proposals being deter­ - Modernization of extraction evaluated. mined and processing of livestock (Bank) products from slaughtering stage onwards, for both export and domestic markets; and rationalization and expansion of milk and milk. products industry.

See page 1 for footnotes. - 60 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency Jj Lender 1./ Project 11 Procurement i/

TURKEY (Cont'd)

Republic of Turkey 115.3 (R) IAEE Irrigation: Completion of Negotiations in progress. (Bank) on-going irrigation and on-farm works; strengthening of Procurement: Retroactive extension services. financing up_ to $4 million likely to be recommended for contracts signed after January 1, 1983.

Republic of Turkey; To be (R) Development of selected lignite Appraisal mission tentatively TKI deter­ field(s) to expand production; scheduled for June. mined confirmation of lignite local (Bank) deposits and related technical Project Preparation Facility assistance. advance of $950,000 provided to help finance foreign exchange costs of preparation work.

Republic of Turkey About (R) Structural Adjustment Loan IV - Negotiations in early May. 300.0 To support structural (Bank) adjustment in key areas.

To be determined To be Paper Rehabilitation - Phase Timing dependent upon progress of deter- II. Furthei rehabilitation of Phase I project. mined existing paper mills and (Bank) technical assistance to improve operations.

To be determined To be Export-Oriented Industries II - Timing dependent upon progress of deter- Balancing or expansion of earlier loan for export-oriented mined carefully selected industries. (Bank) export-oriented private enterprises.

To be determined To be Small & Medium Industries - Identification mission scheduled deter- Assistance to small and medium for July. mined scale industries through Halk (Bank) Bank and/or SYKB.

To be determined To be (R) Thrace Gas Development - Appraisal mission planned for deter- Development of Thrace gas field July. mined for either power generation (Bank) and/or fertilizer production.

To be determined To be Agricultural Extension and Government completing preparation· deter- Applied Research - To report. Appraisal mision mined strengthen and reorganize tentatively planned for June. / (Bank) provincial agricultural extension and applied research services in a few selected provinces.

To be determined To be (R) Industrial Training - Develop­ Appraisal mission scheduled for deter- ment of in-service and end-May. mined pre-service industrial training (Bank) of supervisors, technicians and engineers.

Turkish Electricity About (R) TEK Power Transmission - To Negotiations in early May. Authority (TEK) 150.0 support the construction of (Bank) about 1500 km of 380 kv transmission lines to accommodate new generating capacity from plants being commissioned between 1983 and 1986; technical assistance.

Republic of Turkey To be Highways II - Rehabilitation of Preparation underway. deter­ selected roads; .provision of mined equipment for roadworks and (Bank) highway safety; technical assistance and transport sector studies.

See page 1 for footnot~s. - 61 -

Member Country, and Borrower or Ainount & Stage of Process­ Implementing Probable ing and Action on Agency 1/ Lender J:./ Project 11 Procurement !!.I

TURKEY (Cont'd) .J Turkish Petroleum About (R) Thrace Basin Gas Exploration - Negotiations in mid-May. Corporation 55.2 Appraisal of recently dis­ (Bank) covered gas field and explora­ tory work to establish gas reserve potential of Thrace Basin.

Republic of Turkey About Technical Assistance to Appraisal report being prepared. 10.0 selected state economic (Bank) enterprises.

YEMEN ARAB REPUBLIC

Ministry of To be Wadi Jawf - Agricultural Preparation underway. Agriculture deter- development. Agriculture and (Co-financing likely to be mined rural development, including required: · Islamic Bank and (IDA) credit, feeder roads, extension Saudi Fund have expressed and livestock. interest.)

Yemen General 19.0 (R) Power III - Regional Board presentation on May 10. Electricity (IDA) Electrification Phase II - To (Co-financing agreed with Islamic Corporation (YGEC) assis·t YGEC in extending its Bank for $9.0 million.) service, at least cost, in the urban and rural areas, An IDA Project Preparation facilitate better utilization Facility advance of $800,000 of its generation and financ~d consultants' services to transmtssion facilities, and complete preparation. strengthen its staffing, management, planning and finances.

Ministry of To be (R) Central Highlands Agricultural Appraisal mission scheduled for Agriculture deter- Development - Agricultural July. (Co-financing under mined development of Anis area in the discussion with various (IDA) Central Highlands, including agencies.) minor irrigation, extension and credit.

Ministry of 10.0 Education V - Construction in Approved by the Executive Education (IDA) rural areas of primary teacher Directors on March 22. training institutes and (Co-financing agreed with USAID district training centers, and for $1.2 million.) provision of technical assistance.

Highway Authority About (R) Highways V - Construction of Negotiations in mid-May. u.o about 31 km of high priority (IDA) secondary roads and continuation of support for highway maintenance to Highway Authority.

Ministry of To be Rural Water Supply - PreParation underway .. Electricity, Water deter- Engineering rehabilitation and (Co-financing likely to be and Sewerage mined maintenance of rural water required.) (IDA) supply systems.

Ministry of To be (R) Urban II - Slum upgrading,.and Appraisal mission in mid-May. Municipalities and deter- sites and services components (Co-financing will be required.) Housing mined in Hodeidah. (IDA)

Ministry of u .o Supplemental Credit: Ibb and ·preparation underway. (Original Electricity, Water (IDA) Dhamar Water Supply and cofinanciers: Germany, 'Ihe and Sewerage Sewerage Project; and house Netherlands and Arab Fund have connections in project areas. expressed interest.)

See page 1 for footnotes. - 62 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1./ Lender :?,_/ · Project]_/ Procurement !±./

YEMEN ARAB REPUBLIC (Cont'd)

Ministry of About (N) Education VI - Construction in Appraisal report being prepared, Education 12,0 rural areas of primary teacher (IDA) training institutes and district training centers, and provision of technical assistance.

YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF

Ministry of 9,0 (R) Wadi Hadramawt II - Follow-up Approved by the Executive Agriculture (IDA) project to Wadi Hadramawt I to Directors on April 12 and signed increase crop production on April 28, (Co-financing through groundwater development expected from Arab Fund $12,0 and irrigation.improvement. million, Kuwait Fund $10,6 million, and UNDP $0,2 million,)

Public Water 7,0 (R) Water Supply II - Water supply Negotiations substantially Corporation (IDA) for Greater Seiyun, and completed, (Co-financing likely assistance to Public Water to be required.) Corp, (PWC) on sec tor investment priorities,

Ministry of 7, 6 (R) Health Development I - Board presentation scheduled for Health (IDA) Strengthening of primary health May 31, (Co-financing arranged services, health manpower with WHO $0.6 million and UNICEF development, and technical $0.4 million,) assistance to Ministry of Health,

Ministry of 6,0 (R) Education IV - Financing of Appraisal report being prepared. Education (IDA) vocational instructor training {Co-financing likely to be institute, rural extension required,) · training center, educational materials production center, An IDA Project Preparation school maintenance program, and Facility advance of $220,000 technical assistance for each, approved to help establish a national coordinating unit for vocational and technical training.

Ministry of To be Highways IV - Tentatively, Project preparation underway. Construction deter­ procurement of road maintenance (Co-financing likely to be mined equipment; technical assistance required,) (IDA) and training for Highway Department.

Ministry of To be Agriculture Research and Project scope being identified, Agriculture and deter­ Extension - To strengthen Agrarian Reform mined national agricultural research (IDA) and extension.

YUGOSLAVIA

(JUGE~) 120,0 Power Transmission III - Negotiations substantially (Bank) Financing of investments for completed, (Substantial national transmission network co-financing required for digital and control system. data processing equipment: hardware and software.)

Community of About (R) Railway VI - To finance a Negotiations in mid-May. Yugoslav Railways 100,0 portion of the 1981-85 (Co-financing likely to be (Bank) Development Plans of the required for rolling stock and Railway Transport other railway equipment,) Organizations: Belgrade (Serbia), Novi Sad (Vojvodina), Sarajevo (Bosnia-Herzegovina), and Skopje (Macedonia),

See page 1 for footnotes.

'------63 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 2,./ Project 11 Procurement !!I

YUGOSLAVIA (Cont'd)

Udruzena Beogradska 136.0 (R) Serbia Regional Development - Board presentation scheduled for Banka (UBB) (Bank) Regional development primarily June 9. focussing on agriculture and agro-industries in less­ (Efforts being made by Borrower developed areas of Serbia. to secure about $50 million co-financing from commercial banks abroad.)

Procurement: Retroactive financ­ ing of up to $2.8 million will be recommended for preparing final designs and bidding documents for drainage; and for primary production.

To be determined To be (R) Montenegro Regional Appraisal mission in mid-May. deter­ Development - Regional mined development primarily focussing (Bank) on agriculture and agro-industries in less-developed areas of Montenegro.

Kosovska Banka About (R) Kosovo Regional Development - Board presentation scheduled for Pristina 79.0 Regional development primarily June 9. (Bank) focussing on agriculture and agro-industries in less­ Procurement: Retroactive developed areas of Kosovo. financing of up to $6.0 million will be recommended for preparation of rural roads.

To be determined About Highways XII - To assist Project preparation underway. 100.0 financing of construction of (Co-financing will be sought.) (Bank) priority roads including sections of the Trans-Yugoslav Highway.

Kosovoska Banka About (R) Industrial Credit VII - Line of Negotiations substantially Pristina; 10.0 credit primarily for labor completed. (Co-financing likely Investiciona Banka (Bank) intensive and export oriented to be required.) Titograd projects in Kosovo and Montenegro.

Privredna Banka About Bosnia Forestry - Development Awaiting Borrower's agreement on Sarajevo 10.0 of forest roads and project scope. (Suppliers' and (Bank) plantations, and provision of export credits may be utilized logging equipment. for road construction, logging and forestry equipment.)

To be determined About Lonjsko Polje Drainage Awaiting Government decision on 90.0 (Previously reported as part of institutional arrangements. (Bank) Sava Drainage II.) - Provision of drainage to about 49,000 ha in Croatia. Will include pumping stations, on-farm development, construction and farm equipment.

UDRUZENA About (R) Structural Adjustment Loan - To Negotiations in mid-May. BEOGRADSKA 250.0 help Government address BANKA (Bank) medium-term adjustment issu~s, especially in areas of investment, foreign trade, relative prices and energy. Funds to be disbursed through an export development fund to finance imports of raw materials, spare parts and capital goods for exporting industries.

See· page 1 for footnotes. - 64 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender ],_/ Procurement !ii YUGOSLAVIA (Cont'd)

ELEKTROPNREDA BOSNE About (R) Middle Neretva Hydropower - Negotiations scheduled for late I HERCEGOUINE­ 61.Q Supplementary Financing­ May. SARAJEVO (Bank) construction of dam at Mortar, and power plant downstream, of recently completed 205 MW Salakovac hydropower dam on Neretva River (under Loan 1561-YU),

See page 1 for footnotes. - 65 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 1_/ Project]_/ Procurement!!_!

VI, LATIN AMERICA AND CARIBBEAN

ARGENTINA

Ministry of Commerce 155,0 Ports I - Expansion and Economic reassessment of project and Maritime Affairs (Bank) modernization of Bahia Blanca and final design still pending, port facilities for grain exports. Total project cost estimated at $180 million of which about $130 million in foreign exchange.

Ministry of Public Up to Water Supply and Sewerage - Awaiting Government decision on Works, Sub-Ministry 195, 0 Improvements and extensions to Central Coordinating Office. of Hydraulic (Bank) water supply and sewerage Resources, Direccion systems in the provinces of Provincial de Obras Mendoza and .Santa Fe, including Sanitarias (DIPOS) technical assistance for and Obras Sanitarias institutional improvement. de Mendoza (DSM)

Ministry of 100,0 (R) Highway Sector - Improvements Negotiations substantially Public Works and (Bank) and construction of sections of completed. Board presentation Services the national highway network in scheduled for May 31, FY1983-86 and provincial investment program. Total program cost estimated at $930 million of which $350 million in foreign exchange.

(YACIMIENTOS 100,0 Oil and Gas Development II. Appraisal report being prepared, PETROL IF EROS (Bank) FISCALES (YPF))

Ministry of Finance 12,0 Structural Adjustment Loan - To Proposal under consideration. (Bank) support Government economic program.

Ministry of Finance 10,5 (R) Industrial Credit - Financing Loan approved by the Executive (Bank) industry and tourism projects Directors on April 12 and signed by making term resources avail­ on April 22, able to financial intermedi­ aries through a discount facil­ ity at the Central Bank.

Ministry of Works 5,3 (R) Road Maintenance and Board presentation on May 3. (Bank) Rehabilitation - Rehabilitation of primary and secondary roads, Bank Project Preparatign Facility provision of equipment and advance of $210,000 approved for strengthening of maintenance detailed engineering and organization. Total project technical assistance. cost estimated at $7, l million of which $5,3 million in Procurement: Retroactive foreign exchange. financing of up to $165,000 for spare parts and workshop improvement.

Ministry of Energy To be Power I - Rehabilitation and Project preparation under way. and Communications deter­ expansion of transmission and mined distribution facilities; energy (Bank) studies, institutional strengthening. Total project cost estimated at $42 million of which $31 million in foreign exchange.

See page l for footnotes. - 66 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender l_/ Project 11 Procurement !!.I

BOLIVIA

(EMPRESA NACIONAL DE 35.0 Power V - Central Oriental Further processing depends on ELECTRICIDAD (ENDE)) (Bank) interconnection system, fourth reaching agreement with unit for Santa Isabel, and Government on actions needed to study of ENDE's and DINE's resolve current economic problems. organizational expansion, and a national tariff study. Total Procurement: Advance contracting project cost estimated at $57.3 under ICB satisfactory tp Bank· million of which $45 million in for about $2.8 million; retroac­ foreign exchange. tive financing of $0.2 million.

Ministry of Rural 10.0 Santa Cruz Agricultural Further processing depends on and Agricultural (Bank) Development - Credit, technical reaching agreement with Affairs assistance and social infra­ Government on actions needed to structure for settlement con­ resolve current economic solidation in Northern Santa problems. IDA Project Prepara­ Cruz. Total project cost tion Facility advance of $50,000 estimated at $16.9 million of approved for technical studies. which $5.7 million in foreign exchange.

Ministry of Rural Up to Agricultural Credit II - Credit Further processing depends on and Agricultural 15.0 and technical assistance for reaching agreement with Affairs (Bank) crop and livestock development. Government on actions needed to resolve current economic problems.

{YACIMIENTOS 64.Q Oil and Gas Development - Further processing depends on PETROL IF EROS (Bank) Liquids condensate extraction reaching agreement with FISCALES BOLIVIANOS and gas recycling at Vuelta Government on actions needed to {YPFB)) Grande gas condensate field and resolve current economic secondary oil recovery at problems. Monteagudo oil fields. Total project cost estimated at $74 Procurement: (a) Project million of which $60 million in Preparation Facility advance of foreign exchange. $1 million approved for gas recycling simulation study, detailed design and preparation of bidding documents; (b) advance contracting under ICB satisfac­ tory to Bank for up to $24 million and retroactive financing of up to $6 million for drilling under consideration.

Ministry of Finance 30.0 (R) BISA III - Assistance for small Further processing depends on (Bank) and medium mining operations reaching agreement with through local financial Government on actions needed to intermediaries, Banco implement project and resolve Industrial and Banco Minero. current economic problems.

(YACIMIENTOS 40.0 Gas Pipeline Engineering - President's report being PETROL IFEROS (Bank) Engineering studies for prepared. FISCALES BOLIVIANOS construction of natural gas (YPFB)) pipeline from Bolivia to Brazil.

Institute Nacional 75.0 (R) Northwest Region Development Appraisal report being prepared. de Colonizacao e (Bank) Program III - New settlement. Reform.a Agraria Total project cost estimated at (INCRA) $262 million of which $65 million in foreign exchange.

State of Sao Paulo Up to (R) Sao Paulo Health - Development Negotiations planned for June. 40.0 of primary health services in (Bank) State of Sao Paulo. Total project cost estimated at $113.6 million of which $40 million in foreign exchange.

See page 1 for footnotes. - 67 -

Member Country, and Borrower or Alnount & Stage of Process­ Implementing Probable ing and Action on Agency 1./ Lender J:./ Project]_/ Procurement A/

BRAZIL (Cont'd)

Sec re taria de 67.8 (R) Bahia Rural Development II - Loan approved by the Executive Planejamento da (Bank) Integrated rural development in Directors on April 26. Presidencia da northeast Bahia to assist small Republica farmers through provision of improved support services, land redistribution and infrastruc­ ture development. Total project cost estimated at $173.6 million of which $25.6 million in. foreign exchange.

Ministry of Up to (R) Education V - Strengthening of Post-appraisal mission scheduled Education and so.o Brazil's secondary agricultural for June. Culture (Bank) school system through provision of training, equipment, furni­ ture, curriculum development and other technical assist­ ance, and assistance to second­ ary technical schools.

Federative Republic 400.0 (R) Agro-Industries·III - Credit Loan approved by the Executive of Brazil (Bank) for Agro-industries through the Directors on April 26. Central Bank of Brazil. Total project cost estimated at $1,140 million of which $400 million in foreign exchange.

Federative Republic 233.0 (R) Rural Electrification - Appraisal report being reviewed. of Brazil (Bank) Connection to 140,000 rural consumers in the states of Minas Gerais and Parana. Total project cost estimated at $639 million of which $233 million in foreign exchange.

Federative Republic 52.7 (R) Parana Market Towns - Municipal Negotiations completed. of Brazil (Bank) infrastructure and public services for minor urban centers. Total project cost estimated at $150.2 million of which $52.7 million in foreign exchange.

Ministry of 40.0 (R) Education VI - Primary Post-appraisal mission scheduled Education and (Bank) Education in the North and for September. Culture Center-West areas.

Ministry of .100.0 (R) Education VII - Support for Post-appraisal mission scheduled Education and (Bank) science education and research for June. Culture development.

Petroleo Brasileiro 200.0 Gas Pipeline - Construction of Project preparation underway. S.A. (PETROBRAS) (Bank) natural gas pipeline from Santa Cruz, Bolivia to Sao Paulo.

Centrais Eletricas Up to ELETROBRAS Distribution II - Appraisal report being prepared. Brasileiras s.A. 2so.o Power distribution in less (Bank) developed areas (Alaghoas, Piaui, Maranhao, Amazonas, Rondonia) and for low-income consumers (Rio and Sao Paulo).

Federative Republic Up to (R) CODEVASF Irrigation - Follow-up Sector policy paper being of Brazil so.a irrigation development in the prepared by FAO/CP. (Bank) Northeast (probably in Sao Francisco river valley); studies; institutional strengthening.

Petrobras Up to (R) Fertilizer/Refinery - Energy Follow-up preparation mission Fertilizantes S.A. 100.0 Conservation - Energy in May. (PETROFERTIL) (Bank) conservation and plant rationalization in the refinery and fertilizer sec tors.

See page 1 for footnotes. - 68 -

Member Country, and ·Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1/ Lender]) Project ]J Procurement !J../

BRAZIL (Cont'd)

Federative Republic Up to (R) Rural Development - Northeast Project preparation underway. of Brazil so.a Region I - Support of selected (Bank) regionwide rural development activities.

Federative Republic Up to (R) Alcohol and Biomass Energy Identification mission report of Brazil 150.Q Development II - Second phase being prepared. (Bank) support for Brazil gasohol program.

Federative Republic 50.Q (R) Road Maintenan~e - Improve Identification mission in May. of Brazil (Bank) capabilities of rural state highway departments in the maintenance of roads.

Federative Republic 350.Q (R) Industrial Sector - Industrial Appraisal report being prepared. of Brazil (Bank) export development focusing on improvement of import program for export production.

Federative Republic Up to Inland Waterways - Ports II - Awaiting information from of Brazil 100.0 Port development and waterways Ministry regarding investment (Bank) improvement. priorities.

Federative Up to (R) Agricultural Sector - Loan Post-appraisal mission in early Republic of 350.0 would support changes in May. Brazil (Bank) Government agricultural credit policies.

Federative Up to (R) Supplemental-Agriculture Appraisal report being prepared. Republic of 100.0 Project Financing - To provide Brazil (Bank) supplemental financing for agriculture projects.

Federative Republic Up to (N) Supplemental - Rural Roads - To Appraisal report being prepared. of Brazil 70.0 provide supplemental financing (Bank) for rural roads projects.

CARIBBEAN REGIONAL

Caribbean 7.0 (R) CDB III - Credit for projects Negotiations completed. Board Develdpment Bank (IDA) in Eastern Caribbean. presentation on May 17. (CDB)

CENTRAL AMERICA REGIONAL

Central American 50.Q Central American regional Project preparation underway. Bank for Economic (Bank) development. Integration

Ministry of Public 128.0 (R) Highways Reconstruction II - Negotiations completed. Board Works and Ministry (Bank) Reconstruction of sections of presentation scheduled for May of Transport and the longitudinal highway and 31- Telecommunications other main roads, major maintenance, planning and studies.

Ministry of 75.Q Agricultural Services and Appraisal mission tentatively Agriculture (Bank) Credit - Line of credit to scheduled for June. finance on-farm investments and incremental working capital, technical assistance and agricultural information services.

Ministry of Housing 75.0 (R) Low-Income Housing - Low-Income Project preparation underway. and Urban Planning (Bank) housing.

See page 1 for footnotes. - 69 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1./ Lender 1./ Procurement !±./

Ferrocarriles Up to Railways VIII - Rehabilitation Project preparation dependent on Nacionales de 140.o and modernization of railways progress of Railways VII. Colombia ( CNR) (Bank) and technical assistan~e; pos­ sibly construction of improved alignments.

CARBONES DE COLOMBIA 8.5 (R) Coal Exploration - Geological Negotiations in progress. (CARBOCOL) (Bank) and other studies on several coal basins: and technical assistance to CARBOCOL. Total project cost estimated at $17.8 million of which $8.5 million in foreign exchange.

(EMPRESA COLOMBIANA Up to (R) Petroleum Development I - Project postponed indefinitely. DE PETROLEOS 150.0 Financing of secondary Reporting will be discontinued. (ECOPETROL)) (Bank) recovery, seismic surveys and follow-up discovery invest­ ments. TotaJ. project cost estimated at $341 million of which $205 million in foreign exchange.

(BANCO DE LA To be Agro-Industries - Credit for Project preparation underway. REPUBLICA (BOR)) deter- large- and medium-scale agro­ mined industries; possible pilot (Bank) credit/technical assistance component for small scale agro-industries; agro­ industrial research.

( CARBONES DE Up to (R) ,El Cerrej on Coal - Coal mining Project dropped from lending COLOMBIA (CARBOCOL)) 300.0 for export (Block B of the program. Reporting will be (Bank) Cerrejon deposit) and port and discontinued. railway construction •.

(EMPRESAS PUBLICAS 29.0 (R) Barranquilla Water - Extension Pre-appraisal mission in early MUNICIPALES DE (Bank) of water supply and sewerage May. BARRANQUILLA) facilities; improvement of solid waste operation and technical assistance.

(EMPRESAS PUERTOS DE To be (R) Ports - Modernization of exist­ Rehabilitation project being COLOMBIA deter- ing ports through rehabilita­ defined by Government. Awaiting (COLPUERTOS)) mined tion and· upgrading of existing information from Ministry of (Bank) facilities. Public Works and COLPUERTOS.

(EMPRESA COLOMBIANA 60.0 (R) Phosphate Fertilizer - Con­ Feasibility study expected to be DE MINAS· (Bank) struction of facilities for completed in August.· (ECONOMINAS)) processing of local phosphate rockf including phosphoric acid, sulfuric acid, TSP and DSP.

Interconexion Up to Power - Hydropower. Project preparation underway. Electrica s.A. (ISA) 300-0 (Bank)

(EMPRESAS PUBLICAS Up to (R) Rio Grande Multipurpose - Pre-appraisal mission scheduled DE MEDELLIN (EPM)) 120. 0 Electricity Generation and for June. (Bank) Water Supply.

( CORPORACION 100.0 (R) CVC Calima III, Distribution/ Project Preparation underway. AUTONOMA DEL VALLE (Bank) Transmission/Generation, sub­ DEL RIO CAUCA (CVC)) stations.

( CORPORACION 300.o Urra Hydroelectric. Project preparation underway. ELECTRICA DE LA (Bank) COSTA ATLANTICA (CORELCA))

(EMPRESAS PUBLICAS 12. 0 Cucuta Wate~ - Expansion of Project preparation underway. MUNICIPALES DE (Bank) water transmission, pumping and CUCUTA (EMC)) production capacity and sewer networks; technical assistance to borrower.

See page 1 for footnotes. - 70 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency )j Lender],_/ Project ]j Procurement !±.I

COLOMBIA (Cont'd)

(BANCO DE LA To be Small-Scale Industry IV - Appraisal mission postponed REPUBLICA) (BR) deter- Lending program by Corporacion pending discussions with BR and mined Financiera Popular (CFP). CFP on possible inclusion of CFP (Bank) in on-going industrial credit project.

Instituto Colombiano 63.4 (R) Agricultural Research - Negotiations substantially Agropecuario (ICA) (Bank) Research to improve competi­ completed. Board presentation tiveness of Colombian agricul­ planned for June. ture and to increase output.

To be determined 30.0 Agricultural Marketing - Project preparation underway. (Bank) Improve efficiency of distribu­ tion of agricultural products from farmgate to the consumer.

Instituto de Fomento To be (R) Ammonia Urea Fertilizer - Con­ Pre-appraisal mission scheduled Industrial (IFI) deter- struction of fertilizer plant for June. mined and ancillary facilities. (Bank)

To be determined 68.0 Agriculture Diversification - Second preparation mission (Bank) Investments to diversify agri­ scheduled for June. culture production from coffee zones, promote agro-indus.try and strengthen marketing systems.

Financiera Electrica 100.0 Power co-financing assistance. B-loan of $150 million Nacional (FEN) (Bank) Financing of electricity envisaged. Appraisal report investment projects through being prepared. sector financial entity (FEN).

(INSTITUTO To be Irrigation Rehabilitation II - Project preparation underway. COLOMBIANO DE deter­ Rehabilitation of irrigation HIDROLOGIA, mined and drainage districts. METEROLOGIA (Bank) Y ADECUACION DE TIERRAS (HIMAT))

COSTA RICA

Instituto de Tierras Up to Development of Coto Sur area. Further processing postponed y Colonizacion 26.5 Total project cost estimated at pending agreement with the (ITCO) (Bank) $49 million of which $26.5 Government on the Bank's future million in foreign exchange. lending program.

Instituto Up to Power VII - Hydroelectric power Further processing postponed Costarricense de 45.0 plant (Palomo or Sandillal), pending agreement with the Electricidad (ICE) (Bank) and transmission distribution Government on the Bank's future expansion program. lending program.

Government 25.2 (R) Credit to promote exports. Board presentation on May 3. (Bank)

Government 75.0 (N) Structural Adjustment Lending. Preparation underway. (Bank)

DOMINICAN REPUBLIC

Ministry of 12.0 (R) Education III - Support and Negotiations scheduled for May. Education (Bank) expansion of rural primary education facilities. Total project cost estimated at $20 million of which $9 million in foreign exchange.

Corporacion 60.0 (R) Thermal plant rehabilitation Project preparation underway. Dominicana de (Bank) and transmission/distribution Electricidad (CDE) system for Santo Domingo.

See page 1 for footnotes. - 71 -

Member Country, and Borrower or Ainount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender 1./ Procurement !±_/

DOMINICAN REPUBLIC (Cont'd)

Corporacion 36.0 (R) Coal Pier - Construction of Completion of appraisal mission Dominicana de (Bank) berth for unloading coal now confirmed for June based on Electricidad (CDE) vessels, and studies for medium engineering, economic and and long-term coal import needs environmental studies to be and required facilities. completed by end-May.

AYUNTAMIENTO DE 7-1 {R) Santo Domingo Municipality: Negotiations completed, and Board SANTO DOMINGO (Bank) Technical Assistance Project. presentation scheduled for May Municipal development for the 26. city of Santo Domingo. Total project cost estimated at $14.3 million of which $6.1 million in foreign exchange.

Corporacion Estatal Up to Petroleum I - Project Project preparation underway. Petrolera so.a components could include water Ecuatoriana (CEPE) (Bank) injection in oil fields.

Ministry of 30.0 Agricultural Credit II. Project preparation in progress. Agriculture and (Bank) Banco Nacional de Fomento

Instituto 70.0 Power Transmission II. Further processing depends on Ecuatoriano de (Bank) adoption by Government of Electrificacion satisfactory measures to improve (INECEL) sector finances.

Republic of Ecuador 20.0 Education IV - Improvement of Further processing depends on Bank rural primary education. firm indication from Government that it wishes to proceed with project.

Ins ti tu to 15.0 {R) Technical assistance to IEOS Preparation mission scheduled for Ecuatoriano (Bank) and BEDE; and works in some August. de Obras secondary cities. Sanitar ias ( IEOS) and Banco de Desarrollo del Ecuador (BEDE)

Autoridad ·1s.o (Rl Ports III - Improvement of port Mission has discussed arrange­ Portuaria (Bank) channel. ments for hydraulic study de Guayaquil necessary for projeCt prepara­ tion.

EL SALVADOR

Banco. Central Up to (R) Export sector - Provision of Elections planned for December 40.Q long-term industrial credit for 1983 will delay negotiations to (Bank) export oriented enterprises. March 1984, to allow new Administration to become involved.

Comision Ejecutiva Up to (R) Po~er VIII - Electrification Project consideration postponed de Desarrollo 40.0 for agriculture and rural at Government's request. Project Hidroelectrico del (Bank) industry; rehabilitation of reporting will be discontinued. Rio Lempa (CEL) distribution for San Salvador; upgrading of Ahuachapan geothermal field; geothermal feasibility studies. Total project cost $68 million of which $47 million in foreign exchange.

See page 1 for footnotes. - 72 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender J,/ Project]_/ Procurement !J./

GUATEMALA

Banco Nacional de la To be (R) Urban Development. Further preparation depends on Vivienda deter- progress in developing sector mined strategy policies. (Bank)

Empresa Guatemalteca 30,0 (R) Communications III - Further Awaiting completion of financial de Comunicaciones (Bank) expansion of telephone network plan, (GUATEL) including cable network, dis­ tribution and long distance Procurement: International facilities, Total project cost tenders, including credit offers estimated at $208,0 million of for the financing of part of the which $146,0 million in foreign equipment, were advertised in exchange. March.

Empresa Electrica de 25,0 (R) Power V - Distribution Appraisal report being prepared. Guatemala (EEG) and (Bank) expansion program of EEGSA Institute Nacional (Distribution company of Procurement: International de Electrificacion Guatemala City) and tenders are expected to be (INDE) pre-investment and training advertised by mid-1983, studies for INDE.

Ministry of 20,0 (R) Education III - Expansion and Negotiations in early May. Education (Bank) improvement of primary education in poor urban areas.

Central Bank 35,0 (R) Industrial Credit - To finance Negotiations in early May, (Bank) investments in small and medium-scale enterprises, and for establishment of export fund to finance imported inputs needed for export diversifica­ tion; technical assistance to public and private sectors.

Guyana Electricity 15 ,0 Power II - Rehabilitation of Appraisal report being prepared. Corporation (GEC) (Bank) generation and distribution plant. Management, technical, and training assistance.

Organisme de Up to (R) Integrated Rural Development of Negotiations tentatively Developpement du 19,1 Northern Plain - Second stage. scheduled for May/June, Nord (ODN) (IDA) Total project cost estimated at $29,2 million of which $14,7 million in foreign exchange.

Electrici te d' 22,0 (R) Power IV - Project description Project preparation underway. Haiti (EDH) (IDA) under review. In order to compensate for limited availability of the Peligre Hydro Plant due to a severe drought, an emergency thermal generating projet is being considered.

San Pedro Sula 15,0 (R) Water supply, sewerage and Appraisal mission in May, Municipal Corp, (Bank) drainage - for San Pedro Sula (Co-financing of $19 million WATER DIVISION and technical assistance to being sought from Commonwealth (DIMA) DIMA, Total project cost Development Corporation and estimated at $44 million of Government of Norway.) which $31,3 million in foreign exchange.

See page l for footnotes. - 73 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1/ Lender]) Procurement.!±/

HONDURAS (Cont'd)

Central Bank 45.0 (R) Agricultural Credit - Primarily Negotiations completed. Board (Bank) long and medium-term presentation scheduled for May development credits to large 19. and small farmers. Total project cost estimated at $72.5 million of which $45 million in foreign exchange.

To be determined 15. 0 (R) Urban Transport - Improvement Appraisal mission in May. (Barik) in infrastructure, traffic management and rolling stock.

To be determined 15.l (R) Industrial Credit - Long-term Negotiations completed. Board (Bank) development credits to export presentation scheduled for May industries, including 26. small-scale industries.

Ministry of 15.l (R) Export Crops - Credit and Negotiations in end-May. Agriculture (Bank) technical support for expansion of export crop production.

Export Credit 30.1 (R) Third Export Development Fund Negotiations completed. Insurance (Bank) ProjeCt. Corporation Procurement: Retroactive financing of $200,000 for technical assistance to be recommended.

Ministry of 15.0 (R) Highway Maintenance - Asphaltic Negotiations completed. Board Construction (Bank) overlay and resurfacing of presentation scheduled for May portion of main road network; 26. maintenance equipment and technical assistance for institutional strengthening and training. Total project cost estimated at $47 million of which $23.5 million in foreign exchange.

Ministry of 60.2 (R) Second Structural Adjustment Negotiations substantially Finance (Bank) Loan - To finance imports of completed. raw materials, intermediate goods, non-luxury consumer goods, capital equipment and spare parts.

Banco Pesquero y Up to Fisheries. Appraisal report being prepared. Portuario (BANPESCA) so.a Priority of project to be (Bank) reviewed with new Government.

Secretaria de Up to Pujal Coy - Irrigation and Project preparation underway. Agricultura y 100.0 agricultural development in the Priority of project to be Recursos Hidraulicos (Bank) Panuco Basin. reviewed with new Government. (SARR)

NACIONAL 115.0 (R) Agricultural Marketing - Loan approved by the Executive FINANCIERA (Bank) Improvement of infrastructure Directors on April 19. (NAFINSA) and services for storage, transport, and sale of perishable agricultural products.

Secretaria de Up to Rural development.· Project identification awaiting Programacion y 200.0 impact evaluation of the PIDER Presupuesto (SPP) (Bank) projects.

See page 1 for footnotes. - 74 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency l/ Lender JJ Procurement !!/ MEXICO (Cont'd)

Banco National de 100.3 (R) Water Supply and Sewerage - Board presentation on May 17. Obras y Servicios (Bank) Construction of water supply Publicos (BANOBRAS) and sewerage system in a number Procurement: International of medium size cities, and tenders are expected to be provision of technical advertised in late 1983. assistance to the beneficiary water companies and to the Sinaloa State Water Company.

Banco Nacional 350.0 (R) Export Sector - Support to Negotiations in mid-May. de Comercio (Bank) export-oriented industries, Exterior including assistance to them to import raw materials and components.

Banco Pesquero y Up to Industrial Ports - Civil works, Project preparation being carried Portuario (BANPESCA) 100.0 equipment and technical out under port development (Bank) assistance for new industrial preparation project financed by ports. the Bank.

Banco Nacional de zs.o Water Pollution Control - Pilot Further processing pending Obras y Servicios (Bank) program aimed at abating and priority assignment by the new Publicos (BANOBRAS) controlling of water pollution Government. in the Middle Lerma River· basin. Total cost estimated at about $60 million of which $25 million in foreign exchange.

Nacional Financiera Up to (R) Medium and Small Industry - Negotiations underway. (NAFINSA) 175.0 Credit for small and medium (Bank) industrial development.

Nacional Financiera Up to Agricultural Credit - Priority Project preparation underway. (NAFINSA) 400.0 long and medium-term (Bank) development credits to farmers. Two agencies likely to be included - FIRA and FIGART.

To be determined Up to Chiapas Highway - Rural roads Project preparation underway. 10.0 construction, improvement and (Bank) maintenance to support an integrated regional development program for the State of Chiapas.

Secretaria de Up to Highway Sector - Continuation Project prepar.ation underway. Comunicaciones 100.0 of modernization initiated y Transportes (SCT) (Bank) under the first sector loan (1671-ME).

NICARAGUA

Instituto 30.0 Expansion of Managua's water Further processing depends on Nicaraguense de Agua (Bank) supply system. agreement being reached with y Alcantarillados Government on a. Bank lending (INAA) program.

Fondo Especial de Up to Line of credit for agricul­ Further processing depends on ' Desarrollo (FED) 15.0 ture - Total project cost agreement being reached with (Bank) estimated at $30.0 million of Government on a Bank lending which about $8.0 million in program. foreign exchange.

Institute Up to Electric Power - Engineering Further processing depends on Nicaraguense de 10.0 studies for hydroelectric and agreement being reached with Energia (INE) (Bank) geothermal projects; study of Government on a Bank lending Managua distribution network; program. financing of training and technical assistance leading to institutional improvements.

See page 1 for footnotes. - 75 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency 1/ Lender],_/ Project]_/ Procurement !!_I

Banco Nacional de 11.0 Livestock III - Livestock Appraisal report being prepared. Panama (BNP) (Bank) Development_. For meat and milk production through provision of credit. Total project cost estimated at $25. 5 million of which $6.9 million in foreign exchange.

Instituto· de Up to (R) Power VI - Distribution Negotiations in early May. Recursos Hidraulicos 32.1 project. To provide power to y Electrificacion (Bank) industry and greater number of (IRHE) households, technical assistance for institution building, improving distribution and reducing system losses. Total project cost estimated at $59.4 million of which $32.0 million in foreign exchange.

Instituto de 31.3 (R) Fortuna Hydroelectric Power Loan signing on May 3. Recurses Hidraulicos (Bank) (300 MW) -- Loan (Co-financing agreed with y Electrificacion 1470-PAN--Supplementary Inter-American Development Bank (IRHE) financing. $60 million, Italy $25 million, Venezuelan Investment Fund $12.3 million, and a total of $76. 7 million from commercial sources.)

Ministry of 40.0 Agricultural development Alto Preparation by Government Agriculture (Bank) Parana - Agricultural exten­ underway. Selection of sion, credit, research, health consultants financed under facilities, and rural roads in pre-investment fund for basic Southeastern Paraguay. studies still in process.

Fondo Ganadero 25.0 (R) Livestock VII - Credit and Appraisal mission in the field. (Bank) technical assistance to large, medium and small-sized specialized livestock producers.

Ministry of 14.0 Education V - Basic education Government has requested Education (Bank) for development and frontier postponement of project zones, including improvements processing. in the management of the education system.

Banco Nacional de 40.0 (R) Agricultural Credit - Negotiations completed. Board Fomento (BNF) (Bank) Investments and incremental presentation planned for June. operation credit for medium and small farmers.

Ministry of To be Vocational Education II - Appraisal report being prepared. Education deter- Expansion of basic skills; mined training services for rural (Bank) population.

Ministry of Health 15.0 (R) Third Rural Water Supply and This project is no longer in the (SENASA) (Bank) Sanitation project. lending program. Reporting will be discontinued.

Banco Agrario del Up to (R) Agricultural Credit VI - Negotiations completed. Peru 130.0 Medium- and long-tenn credit (Bank) for agricultural development.

Ministry of 24.0 Education II - Primary Post-appraisal mission scheduled Education (Bank) education in urban areas. for May.

See page 1 for footnotes. - 76 -

Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on Agency lf Lender 1_/ Procurement _i/

PERU (Cont'd)

To be determined Up to Mining I_I - Unidentified. Project identification so.a discussions u~derway. (Bank)

Ministry of Housing Up to Urban Development II - Project preparation suspended and Banco de la 30.0 Construction of sites and pending receipt of Government Vivienda (BANVIP) (Bank) services, upgrading, housing proposal on sector mortgage settlement, and supervised interest rates. credit.

YUNCAN S.A. 140.0 Power VII - 126 MW Yuncan Appraisal report being prepared. (Bank) hydroelectric plant. (Co-financing being sought.)

Empresa de Servicio so.a Water supply and,sewerage in Preparation underway. Nacional de (Bank) several secondary-sized cities Abastecimiento de and towns. Agua Potable y Alcantarillado (SENAPA)

Ministry of Up to Irrigation Rehabilitation III - Project preparation underway. Agriculture so.a Rehabilitation of drainage and Bank Project Preparation Facility (Bank) irrigation systems in up to advance of $500,000 approved to eight coastal valleys. finance aerial mapping for a pre-feasibility study.

To be determined To be Sugar Rehabilitation - Bank Project Preparation Facility deter- Rehabilitation and improvement advance of $S00,000 to finance mined of management for sugar feasibility study. (Bank) cooperatives.

Municipality 6S.Q (R) Metropolitan Development - Appraisal mission in the field. of Lima (Bank) Especially improvement of urban Second Bank Project Preparation transport. Facility advance of $SOO,OOO made for feasibility and engineering studies for project design.

Up to Structural Adjustment Loan - To Preparation underway. To be determined 200.0 finance priority imports in (Bank) conjunction with a program of economic adjustment.

Prime Minister's 40.0 (N) Selva Central Rural Development Appraisal mission scheduled for Office (Bank) - Agricultural credit, feeder May. roads, land titling, extension services, social infrastruc­ ture.

Administracion SS.O (R) Power VI (Thermal) - Construc­ Further processing dependent on Nacional de Usinas y (Bank) tion of a combined cycle Government policy decision. Transmisiones thermal plant, step-up substa­ (Suppliers•· credits probable.) Electricas (UTE) tion and transmission line. Procurement: Retroactive financing amounting to $700,000 for consultant services to be recommended.

To be determined s.o Public and Business Administra­ Project preparation underway. (Bank) tion - Provision of facilities and technical assistance for training public and private managers.

See page 1 for footnotes. - 77 -

VII. NEW PROJECTS

ADDED IN THIS ISSUE

Amount & Member Probable Country Lender Project Stage of Processing

EASTERN AFRICA

ZIMBABWE About Agriculture Sector - Agriculture Project preparation under way. 20.0 services and marketing; input (Bank) supply, with particular reference to communal areas.

WESTERN AFRICA

CHAD 30.0 Economic Reh~bilitation Program - Appraisal mission scheduled (IDA) Financing of imports to assist the for June/ July. Government in reconstruction of government buildings and reconstitu­ tion of administrative functions, and to strengthen public enter­ prises; establishing line of credit and associated technical assistance for small- and medium-scale enter­ prises.

CONGO , PEOPLE ' S 17.0 Water Engineering and Rehabilitation Project in early stage of REPUBLIC OF THE (Bank) Project - Pointe Noire water distri­ preparation. Bank Project butions network rehabilitation; and Preparation Facility advance of technical assistance to SNDE to up­ $300,000 approved to finance grade organization, staff skills and preparatory studies. management systems.

To be Oil Refinery Technical Assistance - Appraisal report being pre­ deter­ Studies to rehabilitate and rational­ pared. mined ize the refinery, and to improve the product distribution systems.

IVORY COAST 35.0 Forestry II - Land clearing, plant­ Appraisal mission scheduled (Bank) ing and maintenance of 20,000 ha; for September. maintenance of 20,000 ha planted under the first forestry project; research and pilot developments.

UPPER VOLTA 20.0 Highways V - Paving of the Appraisal mission to be (IDA) Ouagadougou-Kaya road and improv­ scheduled once agreement is ing.the Kaya-Dori road to all reached with Government on rail weather standards. Total costs are extension issue. (Co-financing estimated at $60.6 million. with Germany (KfW) and possibly Saudi Fund is envisaged.)

EAST ASIA AND PACIFIC

PAPUA NEW GUINEA 15.0 Nucleus Estate and Smallholder Tree Project being prepared. (Bank) Crop Project I - To develop a combi­ (Commonwealth Development Corpor­ nation of several derelict conunercial ation is expected to co-finance.) estates and vacant areas of Gover·n­ ment land in the Milne Bay Province into a viable oil p~lm and cocoa nucleus estate, together with the peripheral development and support of small-scale smallholder plantings of these crops.

THAILAND 55.0 EHV Transmission - Construction of Pre-appraisal mission in mid-May. (Bank) 500 kv transmission line from the North to serve Bangkok. Total cost estimated at $120 million with a foreign exchange component of $55 million.

100.0 Telecommunications V - Expansion Project identification under way. (Bank) of telephone facilities, particular­ ly in rural and provincial areas. Total cost estimated at $1,630 mil­ lion with a foreign exchange component of $830 million. - 78 -

Amount & Member Probable Country Lender Project Stage of Processing

EAST ASIA AND PACIFIC (cont'd)

THAILAND (cont'd) 190.0 Third Structural Adjustment Loan - Project preparation to begin (Bank) To help the Government implement the in October/November, next phase of its structural adjust­ ment policies related to agriculture, industry, energy, fiscal policy and and institutional reform.

SOUTH ASIA

18.0 Second Forestry Project - Organiza­ Appraisal report under (IDA) tion and management of reforestation preparation. programs, forestry research, monitor­ ing and evaluation, and planning.

6.0 Second Technical Assistance Board presentation (IDA) Project - Includes financing of scheduled for June 2. engineering and feasibility studies, consultancy services and training. Total cost estimated at $6.0 million, all in foreign exchange.

11.0 Karnali Preparation - Phase I - Project documents under (IDA) Includes preparation of final feasi­ preparation. bility studies for the Chisapani multipurpose project; preliminary feasibility studies of a smaller upstream hydroelectric project; and consultancy services.

22.0 Babai Irrigation - Includes con­ Appraisal report under (IDA) struction of weir and headworks on preparation. Babai River, construction of irri­ gation and drainage facilities on about 13,000 ha of land, and strength­ ening of agricultural extension services in the area.

PAKISTAN 51.5 Petroleum Exploration - To support Negotiations in mid-May. (Bank) the Government's efforts to increase (Co-financing being sought with exploration of natural gas and en­ commercial banks.) hance the chances of joint-venture exploration by foreign and domestic private oil companies. The project will consist of: (i) drilling of six exploratory wells on gas pros­ pects; (ii) regional seismic surveys and basin studies; and (iii) promotion of potentially oil-prone areas to the private oil industry.

EUROPE, MIDDLE EAST AND NORTH AFRICA

JORDAN To be Energy Development - Including power Preparation under way by deter- distribution, oil exploration, re­ Government. mined newable energy, and energy audits.

MOROCCO To be Fourth Water Supply - Construction of Identification/preparation deter- regional water supply systems in under way by Bank and ONEP. mined Settat-Casablanca area and in rural centers of the Ouarzazate Province; house connection programs and line of credit to ONEP.

PORTUGAL To be Sines Coal Port - Construction of coal Preparation under way. (Co­ deter­ handling and general cargo facilities financing likely to be required.) mined at Sines. - 79 -

Amount & Member Probable Country Lender Project Stage of Processing

EUROPE, MIDDLE EAST AND NORTH AFRICA (cont'd)

To be Power IV - Continuation of ongoing Project being prepared by Tunisian deter­ program of rural electrification. Electricity and Gas Company. mined

To be Export Industries - Line of credit Preparation under way by local deter­ for development of industries development banks and Government. mined mainly oriented towards export markets.

YEMEN ARAB About Education VI - Construction in Appraisal report being prepared, REPUBLIC 12.0 rural areas of primary teacher train­ (IDA) ing institutes and district training centers, and provision of technical assistance.

LATIN AMERICA AND CARIBBEAN

Up to Supplemental - Rural Roads - Appraisal report being prepared, 70.0 To provide supplemental financing (Bank) for rural roads projects.

COSTA RICA 75.0 Structural Adjustment Preparation under way. (Bank) Lending,

40.0 Selva Central Rural Development - Appraisal mission scheduled (Bank) Agricultural credit, feeder roads, for May, land titling, extension services, social infrastructure.