Listed below are the designated areas for the planned maintenance work as for September, 2019:

Bil. Day & Date Time Location Work Description Affected Areas for Outages

Monday Replacement of Overhead Lines Cable to Low Voltage 1 9.00 am to 3.00 pm Sub-Station In-Front of Jepun Embassy Spg. 122 Kg. Kiulap and the surrounding areas. 23rd September 2019 ABC Cable

Monday Simpang 298 to Simpang 360, Kampong Mentiri and the 2 8.00 am to 4.00 pm Kampong Mentiri Replacement of Distribution Feeder Pillar 23rd September 2019 surrounding areas.

Tuesday Replacement of Overhead Lines Cable to Low Voltage 3 9.00 am to 3.00 pm Sub-Station 118-12 Kiulap Spg. 118 Kg. Kiulap and the surrounding areas. 24th September 2019 ABC Cable

Jalan Jerudong, Simpang 544-22, Jalan Pulau Kubu and Tuesday Jln Jerudong, Jln Pulau Kubu, Jln Junjungan & Kg. the surrounding areas. 4 8.30 am to 11.30 am Maintenance of Overhead Lines 24th September 2019 Kuala Lurah Jalan Junjungan, Spg. 1958, Spg. 60 and Spg. 132, Kg. Kuala Lurah and the surrounding areas.

Tuesday Replacement of Overhead Lines Cable to Low Voltage Spg. 265-396 to Spg. 265-424, Kampong Jerudong and the 5 8.30 am to 12.00 noon Kampong Jerudong 24th September 2019 ABC Cable surrounding areas.

Tuesday Maintenance of Underground Cable and Replacement of Spg. 247, Jalan Subok, Kampong Subok and the 6 8.30 am to 12.00 noon Kampong Subok 24th September 2019 Line Tape surrounding areas.

Tuesday Replacement of Overhead Lines Cable to Low Voltage Spg. 545 Kg. Dato Gandi Jalan Kota Batu and the 7 9.00 am to 3.00 pm Main Intake Station Pelambayan 24th September 2019 ABC Cable surrounding areas.

Wednesday Replacement of Overhead Lines Cable to Low Voltage 8 9.00 am to 3.00 pm Sub-Station 118-12 Kiulap Spg. 118-12 Kg. Kiulap and the surrounding areas. 25th September 2019 ABC Cable

Wednesday Replacement of Overhead Lines Cable to Low Voltage Spg. 500 to Spg. 526 Kg. Pelambayan and the surrounding 9 9.00 am to 3.00 pm Sub-Station Kg. Pelambayan Spg. 482 25th September 2019 ABC Cable areas.

Wednesday From Spg. 1069 ro Spg. 1145, Kampong Pengkalan Batu 10 8.30 am to 11.30 am Kampong Pengkalan Batu Maintenance of Overhead Lines 25th September 2019 and the surrounding areas.

Thursday Kampong Kulapis from Spg. 60 to Spg. 110 and the 11 8.30 am to 11.30 am Kampong Kulapis Maintenance of Overhead Lines 26th September 2019 surrounding areas.

Thursday 12 9.00 am to 5.00 pm Sub-Station Industri Beribi Ringan #3 Maintenance of Distribution Transformer Kg. Gadong Estate and the surrounding areas. 26th September 2019

Thursday Replacement of Overhead Lines Cable to Low Voltage 13 9.00 am to 5.00 pm Sub-Station 486 Lumapas Spg. 486 Kg. Lumapas and the surrounding areas. 26th September 2019 ABC Cable

Thursday 8.30 am to 11.30 am From Spg. 512 Kg. Parit-Batong until Spg. 850 Kg. Panchor 14 Kg. Parit - Batong ke Kg. Panchor Murai Maintenance of Overhead Lines Pole 26th September 2019 2.00 pn to 4.30 pm Murai and the surrounding areas.

Saturday 15 9.00 am to 5.00 pm Sub-Station Industri Anggerek Desa #1 Maintenance of Distribution Transformer Kg. Gadong Estate and the surrounding areas. 28th September 2019

Saturday Replacement of Overhead Lines Cable to Low Voltage 16 9.00 am to 4.00 pm Spg. 118 Kg. Kiulap Spg. 113 & Spg. 115 Kg. Kiulap and the surrounding areas. 28th September 2019 ABC Cable

Saturday Replacement of Overhead Lines Cable to Low Voltage 17 9.00 am to 4.00 pm Spg. 247 Kg. Subok Spg. 287 Kg. Subok and the surrounding areas. 28th September 2019 ABC Cable

Monday 18 9.00 am to 2.00 pm Main Intake Station 6 way Feeder Pillar Kg. Sg. Akar Transfer of Overhead Lines Cable Spg. 40-9 Kg. Sg. Akar and the surrounding areas. 30th September 2019

Monday 8.30 am to 11.30 am Simpang 2055 and Opposite Spg. 1958, Jalan Junjungan 19 Jalan Junjungan Maintenance of Overhead Lines Pole 30th September 2019 2.00 pm to 4.30 pm and the surrounding areas.

Listed below are the designated areas for the planned maintenance work as for October, 2019:

Bil. Day & Date Time Location Work Description Affected Areas for Outages

Tuesday 1 9.00 am to 5.00 pm Sub-Station Spg. 287-23 Kg. Subok Maintenance of Distribution Transformer Spg. 287-23 Kg. Subok and the surrounding areas. 01st October 2019

Tuesday Replacement of Overhead Lines Cable to Low Voltage 2 9.00 am to 3.00 pm Sub-Station 267 Subok Spg. 287 Kg. Subok and surrounding areas. 01st October 2019 ABC Cable

Tuesday Replacement of Overhead Lines Cable to Low Voltage 3 9.00 am to 2.00 pm Sub-Station Masjid Subok Spg. 415 Kg. Subok and the surrounding areas. 01st October 2019 ABC Cable

Simpang 1159, Kg. Pengkalan Batu and the surrounding Tuesday areas. 4 8.30 am to 11.30 am Kg. Pengkalan Batu and Jalan Sengkurong A Maintenance of Overhead Lines 01st October 2019 From Spg. 273 to Spg. 324, Jalan Sengkurong A and the surrounding areas

Page 1 Tuesday 5 9.00 am to 3.00 pm Kg. Subok Replacement of Mini Feeder Pillar Spg. 287-23, Kg. Subok and the surrounding areas. 01st October 2019

Tuesday Spg. 443 to 487, Kg. Sungai Besar and the surrounding 6 9.00 am to 3.30 pm Kg. Sungai Besar Transfer of Overhead Lines 01st October 2019 areas.

Tuesday 7 8.00 am to 4.00 pm Jalan Maharajalela, Muara Kem Replacement of Overhead Lines Jalan Maharajalela, Muara Kem and the surrounding areas. 01st October 2019

Wednesday 8.30 am to 11.30 am From Spg. 512 until Spg. 850, Kg. Batong, Kg. Panchor 8 Kg. Batong & Kg. Panchor Murai Maintenance of Overhead Lines 02nd October 2019 2.00 pm to 4.30 pm Murai and the surrounding areas.

Thursday 9 9.00 am to 5.00 pm Sub-Station Spg. 564 Bandaran Subok Maintenance of Distribution Transformer Spg. 564 Kg. Subok and the surrounding areas. 03rd October 2019

Thursday Replacement of Overhead Lines Cable to Low Voltage Spg. 507 to Spg. 509 Kg. Subok and the surrounding 10 9.00 am to 4.00 pm Sub-Station 510 Subok 03rd October 2019 ABC Cable areas.

Kg. Selayun, Spg. 38 include Spg. 38-56 and the Thursday surrounding areas. 11 8.30 am to 11.30 pm Kg. Selayun and Kg. Wasan Maintenance of Overhead Lines 03rd October 2019 From Spg. 191 to Spg. 264 Kg. Wasan and the surrounding areas.

Thursday Replacement of Overhead Lines Cable to Low Voltage Spg. 29 and Spg. 35, Jalan Ban 5 and the surrounding 12 8.30 am to 4.30 pm Jalan Ban 5 03rd October 2019 ABC Cable areas.

Thursday Replacement of Overhead Lines Cable to Low Voltage 13 9.00 am to 4.00 pm Sub-Station 512 Lumapas Spg. 512 Kg. Lumapas and the surrounding areas 03rd October 2019 ABC Cable

Saturday Replacement of Overhead Lines Cable to Low Voltage Inline Spg. 35 Jalan Kasat Putat and the surrounding 14 9.00 am to 4.00 pm Main Intake Station Buang Sakar 05th October 2019 ABC Cable areas.

Simpang 544-46 Jln Mejawa Pulau Kubu Jerudong include Saturday 8.30 am to 11.30 am Jln Mejawa Pulau Kubu Jerudong & Bertumpu Ladang Luagan Ali Bakri and the surrounding areas. 15 Maintenance of Overhead Lines Pole 05th October 2019 2.00 pm to 4.30 pm Masin Simpang 472, Spg. 525, Spg. 525-72, Bertumpu Masin Area and the surrounding areas

Saturday Simpang 589 to Simpang 611, Kampong Sungai Besar and 16 8.00 am to 4.30 pm Kampong Sungai Besar Replacement of Overhead Lines 05th October 2019 the surrounding areas.

Saturday Replacement of Overhead Lines Cable to Low Voltage 17 9.00 am to 3.00 pm Package Unit Spg. 309 Kg. Subok Spg. 322 Kg. Subok and the surrounding areas. 05th October 2019 ABC Cable

Monday Replacement of Overhead Lines Cable to Low Voltage 18 9.00 am to 4.00 pm Sub-Station Lupak Luas Inline Spg. 44 Kg. Lupak Luas and the surrounding areas. 07th October 2019 ABC Cable

Monday 8.30 am to 11.30 am From Spg. 628 until Simpang 941 Kampong Batong, 19 Kampong Panchor Murai Maintenance of Overhead Line Pole 07th October 2019 2.00 pm to 4.30 pm Kampong Panchor Murai and the surrounding areas.

Tuesday 20 9.00 am to 5.00 pm Main Intake Station Cable Yard Maintenance of Distribution Transformer Kg. Gadong Estate and the surrounding areas. 08th October 2019 Tuesday 21 8.00 am to 4.00 pm Jalan Maharajalela, Muara Kem Replacement of Overhead Lines Jalan Maharajalela, Muara Kem and the surrounding areas. 08th October 2019

Jalan Sinarubai after Spg. 80 until Spg. 158 and the Tuesday surrounding areas. 22 8.30 am to 11.30 am Jalan Sinarubai and Tanjong Nangka Maintenance of Overhead Line Pole 08th October 2019 Tanjong Nangka after Spg. 1761-52 until Spg. 1761-72 and the surrounding areas.

Wednesday 8.30 am to 11.30 am From Spg. 37 until Spg. 273, Kilanas and 23 Kampong Bebatik Kilanas Maintenance of Overhead Line Pole 09th October 2019 2.00 pm to 4.30 pm the surrounding areas.

Wednesday Simpang 52-74, Kampong Mata-Mata, Jalan Gadong and 24 9.00 am to 3.00 pm Kampong Mata-Mata Replacement of Mini Feeder Pillar 09th October 2019 the surrounding areas.

Thursday 25 9.00 am to 5.00 pm Sub-Station Seri Lambak Spg. 400 Milimewah Maintenance of Distribution Transformer Kg. Lambak and the surrounding areas. 10th October 2019

Jalan Kecil Kampong Masin from Spg. 616-40 until Spg. Thursday 616-41-47 and the surrounding areas. 26 8.30 am to 11.30 am Kampong Masin and Kampong Mulaut Maintenance of Overhead Line 10th October 2019 Kg. Mulaut from Simpang 199 until Simpang 238 and the surrounding areas.

Thursday Simpang 52-80, Kampong Mata-Mata, Jalan Gadong and 27 9.00 am to 3.00 pm Kampong Mata-Mata Replacement of Mini Feeder Pillar 10th October 2019 the surrounding areas.

Saturday 28 9.00 am to 5.00 pm Sub-Station Taman Tasek #1 Maintenance of Distribution Transformer Taman Tasek and the surrounding areas. 12th October 2019 Saturday Kg. Jerudong from Simpang 265-200 until Simpang 265- 29 8.30 am to 11.30 am Kg. Jerudong Maintenance of Overhead Line Pole 12th October 2019 278 and the surrounding areas.

9.00 am to 5.00 pm (For info, Department of Electrical Services will Thursday 30 supply temporary electricity to the affected Sub-Station Spg. 265-396 Kg Jerudong Maintenance of Distribution Transformer Spg. 265-396 Kg. Jerudong and the surrounding areas. 17th October 2019 areas through mobile generator services at the substation)

Page 2 9.00 am to 5.00 pm (For info, Department of Electrical Services will Tuesday Kompleks Hj Mohammed Yussof include First Emperium 31 supply temporary electricity to the affected Sub-Station Kompleks Hj Mohammed Yussof Maintenance of Distribution Transformer 22nd October 2019 Batu Satu and the surrounding areas. areas through mobile generator services at the substation)

9.00 am to 5.00 pm (For info, Department of Electrical Services will Thursday 32 supply temporary electricity to the affected Spg. Industri Anggerek Desa #1 Maintenance of Distribution Transformer Industry Anggerek Desa #1 and the surrounding areas. 28th October 2019 areas through mobile generator services at the substation)

Page 3 Bahasa Melayu

Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan September, 2019:

Bil. Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Terjejas Pemotongan Bekalan Elektrik

Hari Isnin Penggantian Kabel Kawat Atas ke Kabel ABC Voltan 1 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik Depan Kedutaan Jepun Spg. 122 Kg. kiulap dan kawasan sekitarnya. 23hb September 2019 Rendah

Hari Isnin Simpang 298 hingga Simpang 360, Kampong Mentiri dan 2 8.00 pagi hingga 4.00 petang Kampong Mentiri Penggantian "Distribution Feeder Pillar" 23hb September 2019 kawasan sekitarnya.

Hari Selasa Penggantian Kabel Kawat Atas ke Kabel ABC Voltan 3 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik 118-12 Kiulap Spg. 118 Kg. Kiulap dan kawasan sekitarnya. 24hb September 2019 Rendah

Jalan Jerudong, Simpang 544-22, Jalan Pulau Kubu dan Hari Selasa Jln Jerudong, Jln Pulau Kubu, Jln Junjungan & Kg. kawasan sekitarnya. 4 8.30 pagi hingga 11.30 pagi Penyelenggaraan Talian Kawat Atas 24hb September 2019 Kuala Lurah Jalan Junjungan, Spg. 1958, Spg. 60 dan Spg. 132, Kg. Kuala Lurah dan kawasan sekitarnya.

Hari Selasa Spg. 265-396 hingga Spg. 265-424, Kampong Jerudong dan 5 8.30 pagi hingga 12.00 tengah hari Kampong Jerudong Penukaran "Overhead Conductor" ke ABC 24hb September 2019 kawasan sekitarnya.

Hari Selasa Pemeliharaan Kabel Bawah Tanah dan Penggantian Spg. 247, Jalan Subok, Kampong Subok dan kawasan 6 8.30 pagi hingga 12.00 tengah hari Kampong Subok 24hb September 2019 "Line Tape" sekitarnya.

Hari Selasa Spg. 545 Kg. Dato Gandi Jalan Kota Batu dan kawasan 7 9.00 pagi hingga 3.00 petang Stesen Utama Elektrik Pelambayan Penggantian Kawat Atas ke Kabel ABC Voltan Rendah 24hb September 2019 sekitarnya.

Hari Rabu Penggantian Kabel Kawat Atas ke Kabel ABC Voltan 8 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik 118-12 Kiulap Spg. 118-12 Kg. Kiulap dan kawasan sekitarnya. 25hb September 2019 Rendah

Hari Rabu Penggantian Kabel Kawat Atas ke Kabel ABC Voltan Spg. 500 sehingga Spg. 526 Kg. Pelambayan dan kawasan 9 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik Kg. Pelambayan Spg. 482 25hb September 2019 Rendah sekitarnya.

Hari Rabu Dari Spg. 1069 hingga Spg. 1145, Kampong Pengkalan 10 8.30 pagi hingga 11.30 pagi Kampong Pengkalan Batu Penyelenggaraan Talian Kawat Atas 25hb September 2019 Batu dan kawasan sekitarnya.

Hari Khamis Kampong Kulapis dari Spg. 60 hingga Spg. 110 dan 11 8.30 pagi hingga 11.30 pagi Kampong Kulapis Penyelenggaraan Talian Kawat Atas 26hb September 2019 kawasan sekitarnya.

Hari Khamis 12 9.00 pagi hingga 5.00 petang Stesen Kecil Elektrik Industri Beribi Ringan #3 Pemeliharaan "Distribution Transformer" Kg. Gadong Estet dan kawasan sekitarnya. 26hb September 2019

Hari Khamis 13 9.00 pagi hingga 5.00 petang Stesen Kecil Elektrik 486 Lumapas Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 486 Kg. Lumapas dan kawasan sekitarnya. 26hb September 2019

Hari Khamis 8.30 pagi hingga 11.30 pagi Dari Spg 512 Kg. Parit-Batong hingga ke Spg. 850 Kg. 14 Kg. Parit - Batong ke Kg. Panchor Murai Penyelenggaraan Tiang Kawat Atas 26hb September 2019 2.00 petang hingga 4.30 petang Panchor Murai dan kawasan sekitarnya.

Hari Sabtu 15 9.00 pagi hingga 5.00 petang Stesen Kecil Elektrik Industri Anggerek Desa #1 Pemeliharaan "Distribution Transformer" Kg. Gadong Estet dan kawasan sekitarnya. 28hb September 2019

Hari Sabtu 16 9.00 pagi hingga 4.00 petang Spg. 118 Kg. Kiulap Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 113 & Spg. 115 Kg. Kiulap dan kawasan sekitarnya. 28hb September 2019

Hari Sabtu 17 9.00 pagi hingga 4.00 petang Spg. 247 Kg. Subok Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 287 Kg. Subok dan kawasan sekitarnya. 28hb September 2019

Hari Isnin Stesen Utama Elektrik 6 way Feeder Pillar Kg. Sg. 18 9.00 pagi hingga 2.00 petang Pemindahan Kabel Kawat Atas Spg. 40-9 Kg. Sg. Akar dan kawasan sekitarnya. 30hb September 2019 Akar

Hari Isnin 8.30 pagi hingga 11.30 pagi Simpang 2055 dan berdepanan Spg. 1958, Jalan Junjungan 19 Jalan Junjungan Penyelenggaraan Tiang Kawat Atas 30hb September 2019 2.00 petang hingga 4.30 petang dan kawasan sekitarnya.

Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan Oktober, 2019:

Bil. Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Terjejas Pemotongan Bekalan Elektrik

Hari Selasa 1 9.00 pagi hingga 5.00 petang Stesen Kecil Elektrik Spg. 287-23 Kg. Subok Pemeliharaan "Distribution Transformer" Spg. 287-23 Kg. Subok dan kawasan sekitarnya. 01hb Oktober 2019

Hari Selasa 2 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik 267 Subok Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 287 Kg. Subok dan kawasan sekitarnya. 01hb Oktober 2019

Hari Selasa 3 9.00 pagi hingga 2.00 petang Stesen Kecil Elektrik Masjid Subok Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 415 Kg. Subok dan kawasan sekitarnya. 01hb Oktober 2019

Simpang 1159, Kg. Pengkalan Batu dan kawasan Hari Selasa sekitarnya. 4 8.30 pagi hingga 11.30 pagi Kg. Pengkalan Batu dan Jalan Sengkurong A Penyelenggaraan Talian Kawat Atas 01hb Oktober 2019 Dari Spg. 273 hingga Spg. 324, Jalan Sengkurong A dan kawasan sekitarnya.

Page 4 Hari Selasa 5 9.00 pagi hingga 3.00 petang Kg. Subok Penggantian "Mini Feeder Pillar" Spg. 287-23, Kg. Subok dan kawasan sekitarnya. 01hb Oktober 2019

Hari Selasa Spg. 443 hingga 487, Kg. Sungai Besar dan kawasan 6 9.00 pagi hingga 3.30 petang Kg. Sungai Besar Pemindahan Kawat Atas 01hb Oktober 2019 sekitarnya.

Hari Selasa 7 8.00 pagi hingga 4.00 petang Jalan Maharajalela, Muara Kem Penggantian Kawat Atas Jalan Maharajalela, Muara Kem dan kawasan sekitarnya. 01hb Oktober 2019

Hari Rabu 8.30 pagi hingga 11.30 petang Dari Spg. 512 hingga ke Spg. 850, Kg. Batong, Kg. Panchor 8 Kg. Batong & Kg. Panchor Murai Penyelenggaraan Talian Kawat Atas 02hb Oktober 2019 2.00 petang hingga 4.30 petang Murai dan kawasan sekitarnya.

Hari Khamis 9 9.00 pagi hingga 5.00 petang Stesen Kecil Elektrik Spg. 564 Bandaran Subok Pemeliharaan "Distribution Transformer" Spg. 564 Kg. Subok dan kawasan sekitarnya. 03hb Oktober 2019

Hari Khamis Spg. 507 hingga Spg. 509 Kg. Subok dan kawasan 10 9.00 pagi hingga 4.00 petang Stesen Kecil Elektrik 510 Subok Penggantian Kawat Atas ke Kabel ABC Voltan Rendah 03hb Oktober 2019 sekitarnya.

Kg. Selayun, Spg. 38 termasuk Spg. 38-59 dan kawasan Hari Khamis sekitarnya. 11 8.30 pagi hingga 11.30 pagi Kg. Selayun dan Kg. Wasan Penyelenggaraan Talian Kawat Atas 03hb Oktober 2019 Dari Spg. 191 hingga Spg. 264 Kg. Wasan dan kawasan sekitarnya.

Hari Khamis 12 8.30 pagi hingga 4.30 petang Jalan Ban 5 Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 29 dan Spg 35, Jalan Ban 5 dan kawasan sekitarnya. 03hb Oktober 2019

Hari Khamis 13 9.00 pagi hingga 4.00 petang Stesen Kecil Elektrik 512 Lumapas Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 512 Kg. Lumapas dan kawasan sekitarnya. 03hb Oktober 2019

Hari Sabtu 14 9.00 pagi hingga 4.00 petang Stesen Utama Elektrik Buang Sakar Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Sebaris Spg. 35 Jalan Kasat Putat dan kawasan sekitarnya. 05hb Oktober 2019

Simpang 544-46 Jln Mejawa Pulau Kubu Jerudong termasuk Ladang Luagan Ali Bakri dan kawasan Hari Sabtu 8.30 pagi hingga 11.30 pagi Jln Mejawa Pulau Kubu Jerudong dan Bertumpu 15 Penyelenggaraan Tiang Kawat Atas sekitarnya. 05hb Oktober 2019 2.00 petang hingga 4.30 petang Masin Simpang 472, Spg. 525, Spg. 525-72, Kawasan Bertumpu Masin dan kawasan sekitarnya.

Hari Sabtu Simpang 589 hingga Simpang 611, Kampong Sungai Besar 16 8.00 pagi hingga 4.30 petang Kampong Sungai Besar Penggantian Kawat Atas 05hb Oktober 2019 dan kawasan sekitarnya.

Hari Sabtu 17 9.00 pagi hingga 3.00 petang Package Unit Spg. 309 Kg. Subok Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 322 Kg. Subok dan kawasan sekitarnya. 05hb Oktober 2019

Hari Isnin 18 9.00 pagi hingga 4.00 petang Stesen Kecil Elektrik Lupak Luas Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Sebaris Spg. 44 Kg. Lupak Luas dan kawasan sekitarnya. 07hb Oktober 2019

Hari Isnin 8.30 pagi hingga 11.30 pagi Dari Simpang 628 hingga ke Simpang 941 Kampong 19 Kampong Panchor Murai Penyelenggaraan Tiang Kawat Atas 07hb Oktober 2019 2.00 petang hingga 4.30 petang Batong, Kampong Panchor Murai dan kawasan sekitarnya.

Hari Selasa 20 9.00 pagi hingga 5.00 petang Stesen Utama Elektrik Cable Yard Pemeliharaan "Distribution Transformer" Kg. Gadong Estate dan kawasan sekitarnya. 08hb Oktober 2019

Hari Selasa 21 8.00 pagi hingga 4.00 petang Jalan Maharajalela, Muara Kem Penggantian Kawat Atas Jalan Maharajalela, Muara Kem dan kawasan sekitarnya. 08hb Oktober 2019

Jalan Sinarubai selepas Spg. 80 hingga ke Spg. 158 dan Hari Selasa kawasan sekitarnya. 22 8.30 pagi hingga 11.30 pagi Jalan Sinarubai dan Tanjong Nangka Penyelenggaraan Talian Kawat Atas 08hb Oktober 2019 Tanjong Nangka selepas Simpang 1761-52 hingga ke Simpang 1761-72 dan kawasan sekitarnya.

Hari Rabu 8.30 pagi hingga 11.30 pagi Dari Simpang 37 hingga ke Simpang 273, Kampong 23 Kampong Bebatik Kilanas Penyelenggaraan Tiang Kawat Atas 09hb Oktober 2019 2.00 petang hingga 4.30 petang Bebatik Kilanas dan kawasan sekitarnya.

Hari Rabu Simpang 52-74, Kampong Mata-Mata, Jalan Gadong dan 24 9.00 pagi hingga 3.00 petang Kampong Mata-Mata Penukaran "Mini Feeder Pillar" 09hb Oktober 2019 kawasan sekitarnya.

Hari Khamis Stesen Kecil Elektrik Seri Lambak Spg. 400 25 9.00 pagi hingga 5.00 petang Pemeliharaan "Distribution Transformer" Kg. Lambak dan kawasan sekitarnya. 10hb Oktober 2019 Milimewah

Jalan Kecil Kampong Masin dari Spg. 616-40 hingga ke Hari Khamis Spg. 616-41-47 dan kawasan sekitarnya. 26 8.30 pagi hingga 11.30 pagi Kampong Masin dan Kg. Mulaut Penyelenggaraan Talian Kawat Atas 10hb Oktober 2019 Kg. Mulaut dari Simpang 199 hingga ke Simpang 238 dan kawasan sekitarnya.

Hari Khamis Simpang 50-80, Kampong Mata-Mata, Jalan Gadong dan 27 9.00 pagi hingga 3.00 petang Kampong Mata-Mata Penukaran "Mini Feeder Pillar" 10hb Oktober 2019 kawasan sekitarnya.

Hari Sabtu 28 9.00 pagi hingga 5.00 petang Stesen Kecil Elektrik Taman Tasek #1 Pemeliharaan "Distribution Transformer" Taman Tasek dan kawasan sekitarnya. 12hb Oktober 2019

Hari Sabtu Kg. Jerudong dari Simpang 265-200 hingga ke Simpang 29 8.30 pagi hingga 11.30 pagi Kg. Jerudong Penyelenggaraan Tiang Kawat Atas 12hb Oktober 2019 265-278 dan kawasan sekitarnya.

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Khamis sementara bekalan tenaga elektrik ke kawasan 30 Stesen Kecil Elektrik Spg. 265-396 Kg. Jerudong Pemeliharaan "Distribution Transformer" Spg. 265-396 Kg. Jerudong dan kawasan sekitarnya. 17hb Oktober 2019 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Page 5 9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Selasa sementara bekalan tenaga elektrik ke kawasan Kompleks Hj Mohammed Yussof termasuk First Emperium 31 Sub-Station Kompleks Hj Mohammed Yussof Pemeliharaan "Distribution Transformer" 22hb Oktober 2019 yang terlibat melalui Perkhidmatan Janakuasa Batu Satu dan kawasan sekitarnya Bergerak [Genset] di stesen elektrik yang dimaksudkan)

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Khamis sementara bekalan tenaga elektrik ke kawasan 32 Spg. Industri Anggerek Desa #1 Pemeliharaan "Distribution Transformer" Industri Anggerek Desa #1 dan kawasan sekitarnya. 28hb Oktober 2019 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Page 6