WB Loans Integrated Economic

Public Disclosure Authorized Development of Small Towns Project

Yueshan Waste Water Treatment Plan

Public Disclosure Authorized Environmental Impact Assessment (EIA)

Public Disclosure Authorized Consigned by: WB Loan Project Management Office of Hunan

Provincial Development and Reform Commission

Compiled by: Changsha Environmental Protection Career

Technical College

December, 2011 Public Disclosure Authorized Table of Contents

1 GENERAL ...... 5

1.1 General Background of the Project ...... 5 1.1.1 Origin of the Project ...... 5 1.1.2 Significance of the Project Construction...... 6 1.1.3 Target of the Project...... 7 1.1.4 Contribution of the WB...... 7 1.1.5 Organizational Structure of the Project...... 8

1.2 Overview of EIA Report...... 9 1.2.1 Purpose of Assessment ...... 9 1.2.2 Type of EIA ...... 9 1.2.3 Preparation of the Environomental Impact Report ...... 10 1.2.4 Keys of Assessment ...... 10

1.3 Grading, Scope and Periods of the Assessment and Target of Environmental Protection (Sensitive Points)...... 11 1.3.1 Grading and Scope of the Assessment ...... 11 1.3.2 Periods of the Environmental Assessment ...... 13 1.3.3 Target of Environmental Protection (Sensitive Points) ...... 13

1.4 Environmental impact Factors and Assessment Factors ...... 15 1.4.1 Identification of Environmental impact Factors...... 15 1.4.2 Environmental Impact and Selection of Assessment Factors ...... 17

2 Policies, Laws and Regulations and Administration Framework...... 21

2.1 Environmental Policies, Laws and Regulations...... 21 2.1.1 Overview...... 21 2.1.2 Laws and Regulations on Environmental Protection...... 21 2.1.3 Regulations and Requirements and Local Laws in Relation with Environmental protection ...... 22 2.1.4 Technical Guidelines for Environmental Impact Assessment and the Provisions ...... 23 2.1.5 Environment Quality Standards ...... 23 2.1.6 Pollutant Discharge or Emission Standards ...... 24 2.1.7 Safeguard Policies of WB...... 24 2.1.8 Documents Related to the Project...... 25

2.2 Environment Administration Organizations and Functions ...... 25

3 Description and Analysis of the Project ...... 28

3.1 Project Name and Composition ...... 28

3.2 Construction Proposal of the Project...... 29 3.2.1 Construction Content and Scale...... 29 3.2.2 Main Equipment of the Project ...... 31 3.2.3 Technological Introduction ...... 33 3.2.4 General Layout of Plant Site...... 38 3.2.5 Service Scope and Wastewater Discharge Forecast ...... 40 3.2.6 Designed Inflow and Outflow Water Quality ...... 47

3.3 Pipe Network and Pumping Stations...... 48

3.4 Analysis of the Pollution Sources of the Project ...... 49

3.5 Associated Works with the Project...... 50

3.6 Project Investment Estimate ...... 50

3.7 Schedule of the Project Implementation Progress ...... 52 3.7.1 Construction Period ...... 52 3.7.2 Scheduling ...... 53

4 Profile of the Project Location Environment ...... 55

4.1 Natural Environment Profile ...... 55 4.1.1 Geographic Location and Traffic...... 55 4.1.2 Geological Features...... 55 4.1.3 Weather and Climate ...... 55 4.1.4 Hydrology...... 55 4.1.5 Ecological Environment ...... 56

4.2 Social Environment Profile...... 57 4.2.1 Administrative Division...... 57 4.2.2 Economic Status ...... 57 4.2.3 Infrastructure...... 58

4.3 Status Quo of Quality of the Project Area Environment...... 58 4.3.1 Atmospheric Environment...... 58 4.3.2 Environment of Surface Water...... 60 4.3.3 Acoustic Environment ...... 62

4.4 Basic Information for Major Concern on Safeguard Policies of the WB ...... 63

5 Environmental Impact Assessment ...... 64

5.1 Analysis on Impact of the Project to Human Health ...... 64 5.1.1 Environmental Benefits Brought by Implementation of the Project ...... 64

II

5.1.2 Analysis on Impact to Human Health...... 65

5.2 Analysis on Impact to Environment in Construction Period ...... 65 5.2.1 Analysis on Dust Pollution Source and Environmental Impact...... 65 5.2.2 Analysis on Impact of Construction Wastewater ...... 66 5.2.3 Analysis on Impact of Noise...... 68 5.2.4 Analysis on Impact of Solid Waste...... 69 5.2.5 Impact Analysis of Water Loss and Soil Erosion ...... 70 5.2.6 Ecological Impact Analysis ...... 71 5.2.7 Impact on the Traffic ...... 72 5.2.8 Health and Safety Impact ...... 73

5.3 Analysis on Impact on the Environment during the Operation Period ...... 73 5.3.1 Impact of the Project on Water Conditions ...... 73 5.3.2 Solid Waste...... 82 5.3.3 Impact on Air Quality...... 89 5.3.4 Impact on the Acoustic Environment ...... 90

6 Countermeasures ...... 92

6.1 Countermeasures during the Construction Period ...... 92 6.1.1 Waste Gas ...... 92 6.1.2 Noise...... 93 6.1.3 Wastewater ...... 94 6.1.4 Solid Waste...... 95 6.1.5 Ecological Environment ...... 95 6.1.6 Social Environment...... 96

6.2 Countermeasures during the Operating Period...... 97 6.2.1 Waste Gas ...... 97 6.2.2 Wastewater ...... 98 6.2.3 Noise...... 99 6.2.4 Solid Waste...... 99 6.2.5 Ecological Environment ...... 101

7 Environmental Risk Analysis and Mitigation Measures ...... 103

7.1 Environmental Risk Identification...... 103

7.2 Impact Analysis on Potential Environmental Risk Accidents of the WWTP...... 103 7.2.1 Sudden Accidents ...... 103 7.2.2 Equipment Failure...... 103 7.2.3 Inflow Water Quality Impact...... 104 7.2.4 Risk Accidents during Normal Operation...... 104

7.3 Risk Mitigation Measures ...... 105

III

7.3.1 Equipment Security Measures...... 105 7.3.2 Protection of Abnormal Wastewater Discharge ...... 106 7.3.3 Emergency Measures for Sudden Waste Water Discharge Risk Accident ...... 108 7.3.4 Staff Personal Security Measures...... 108 7.3.5 Protective Measures for the Impact of Sludge Discharge on Environment...... 109 7.3.6 Preventive Measures for the Impact of Flood to the WWTP ...... 110

7.4 Emergency Authorities and Assignment of Responsibilities of the WWTP...... 110

8 Comparison and Selection of Alternative Proposals...... 112

8.1 Comparison and analysis of Zero Proposal ...... 112

8.2 Comparison and analysis of Pipe Network Proposals ...... 113 8.2.1 Principles for Determining the Pipe Network Proposal...... 113 8.2.2 Wastewater Pipe Network Proposal of the Project...... 114

8.3 Comparison and analysis of the WWTP Site ...... 114 8.3.1 Principles for Site Selection ...... 114 8.3.2 Proposal for Site Selection ...... 115 8.3.3 Comparison and Determination of the Site Selection Proposals...... 115

8.4 Comparison and analysis of Wastewater Treatment Process Proposals...... 119 8.4.1 Selection Criterion of Wastewater Treatment Process ...... 119 8.4.2 Wastewater Treatment Process Proposal ...... 119 8.4.3 Comparison and Determination of Process Proposals...... 127

8.5 Comparison and Analysis of Disinfection Proposals...... 129 8.5.1 Brief Introduction to Disinfection Methods...... 130 8.5.2 Comparison and Determination of Disinfection Methods ...... 131

8.6 Selection and Comparison of Sludge Treatment Proposals...... 132 8.6.1 Comparison and Determination of Wastewater Treatment Processes...... 132 8.6.2 Comparison and Determination of Sludge Treatment Processes ...... 134

9 Analysis of Gains and Losses of Environment and Economy ...... 137

9.1 Environmental Benefit...... 137 9.1.1 Pollutant Load Cut ...... 137 9.1.2 Improved Water Quality ...... 137 9.1.3 Improvement Benefit of Environmental Management Capability ...... 137 9.1.4 Provision of Good Environmental Conditions for Regional Social and Economic Development...... 137

9.2 Social Benefits ...... 138

IV

9.2.1 Improvement of Healthy Level of Domestic Citizens and Living Quality in the River Basin ...... 138 9.2.2 Addition of Employment Chances...... 138 9.2.3 Improvement of Residents' Environmental Awareness ...... 138 9.2.4 Provision of Base Data for Abatement of District Pollution...... 139

9.3 Economic Benefits ...... 139 9.3.1 Economic Benefits from Pollution Control ...... 139 9.3.2 Benefits from Revenue Increase ...... 139

9.4 Conclusions ...... 140

10 Public Participation ...... 141

10.1 Implementation Arrangement...... 141

10.2 Survey Results and Discussions of Public Participation...... 142

10.3 Information Disclosure ...... 146

11 Migration and Social Impacts ...... 150

11.1 General Situations ...... 150

11.2 Project Impacts ...... 150

11.3 Law and Policy Framework...... 154 11.3.1 Major Law and Policy Criteria...... 154 11.3.2 Main principles ...... 156

11.4 Compensation Standard for Land Acquisition ...... 157

11.5 Land Recovery Proposal...... 158 11.5.1 Compensation and Arrangement for Permanent Land Acquisition ...... 158 11.5.2 Recovery of Livelihood of the Farmers Affected By Land Acquisition...... 159 11.5.3 Resettlement and Recovery of Affected Vulnerable Groups...... 159

11.6 Vulnerable Groups ...... 160

11.7 Institutional Arrangement ...... 160

11.8 Complaint Settlement Mechanism ...... 161

11.9 Monitoring and Evaluation...... 162 11.9.1 Internal Monitoring ...... 162 11.9.2 External Monitoring ...... 163

11.10 Financing and Implementation Plans ...... 165

V

12 Environment Management Plan...... 169

12.1 Environment Management System...... Error! Bookmark not defined. 12.1.2 Environmental Protection Organization during the Construction Period ...... Error! Bookmark not defined. 12.1.3 Environment Management Organization during the Operation Period ...... 177

12.2 Implementation of Environment Management Plan...... Error! Bookmark not defined. 12.2.1 Detailed Tasks of Implementation of Environment Management Plan ...... Error! Bookmark not defined. 12.2.2 Contract Requirements for Environment Management ...... 181 12.2.3 Information Communication and Solution of Unconformities ...... 182 12.2.4 Training—Necessary Capability Construction and Method Construction...... 183

12.3 Environment Monitoring Plan ...... Error! Bookmark not defined. 12.3.1 Monitoring Objective ...... Error! Bookmark not defined. 12.3.2 Environment Monitoring Institution ...... 187 12.3.3 Detailed Environment Monitoring Requirements ...... 191

12.4 Environment Management Expenses Estimate and Source of Funds ...... 191 12.4.1 Budget Allocation ...... 191 12.4.2 Source of Funds and EMP Budget ...... 191

12.5 Information Management of Environment Management Plan ...... 192 12.5.1 Information Communication...... 192 12.5.2 Record Mechanism...... 192 12.5.3 Report Mechanism...... 193

13 Conclusions of Environmental Assessment ...... 195

VI List of Appendixes

Appendix 1 Environmental Standards for the Project

Appendix 2 Odor Prediction Model and Results

Appendix 3 Materials Related to Public Participation

Appendix 4 Planning and Detailed Budget of Project Environmental Monitoring

Appendix 5 Project Associated Works (Environmental Monitoring Plan of Quanhu Garbage Disposal Plant, Xiangxaing City)

Appendix 6 Summary of Project Environmental Management Plan

List of Figures Figure 1 Geographic Location of Hunan Province in China Figure 2 Geographic Location of the Project Figure 3 Geographic Location of the WWTP Figure 4 Layout Plan of the Project Area Figure 5 Pipe Network of the WWTP Figure 6 Transportation Route Diagram of the Project

ABBREVIATIONS

CEA Consolidated Environmental Assessment CSE Construction Supervision Engineer 监监 CSEE Construction Supervision Environmental Engineer CSEMP Construction Site Environmental Management Plan DI Design Institute EA Environmental Assessment EIA Environmental Impact Assessment

EMC Environmental Manager Coordinator

监监监监监 EMP Environmental Management and Monitoring Plan EMS Environmental Monitoring Station EPB Environmental Protection Bureau IA Implementation Agency

2

PO Project Owner PMO Project Management Office PRC The People’s Republic of China SE Supervision Engineer WB World Bank WWTP Wastewater Treatment Plant HNPMO Hunan Project Management Office CSEPCTC Changsha Environmental Protection Career Technical College CURRENCIES & OTHER UNITS

MU Area Unit 1MU 0.0667ha 1 0.0667ha RMB Chinese Yuan Renminbi USD United States Dollar Conversion rate 1 USD 6.3RMB 1 6.3 CHEMICAL ABBREVIATIONS

ABR Anaetobic Bafflted Reactor

3

A²/O Anaerobic-anoxic-oxic biologic phosphorus & nitrogen - -

BOD 5 Biochemical Oxygen Demand 5 days 5 CASS Cyclic Activated Sludge System 监监 COD Chemical Oxygen Demand

NH 3-N Ammonia Nitrogen SBR Sequencing Batch Reactor Processing SS Suspended Solids TN Total Nitrogen TP Total Phosphorus TSP Total Suspended Particulates UASB Up-flow Anaerobic Sludge Bed

4

1 General

1.1 General Background of the Project

1.1.1 Origin of the Project As the social and economic development of Yueshan Town, its urbanization development is further quickened and the township construction takes on a new look. However, there are still some problems required to be solved immediately, including the underdevelopment of township economy, the small size of economic aggregate, the lagging of township basis and public facilities, the sluggish flow rate of people and goods, the week effect of attraction, the rather serious environmental pollution, the shortage of construction funds and so on. The waste water from production and domestic uses, in particular, are discharged randomly without previous treatment and directly into surrounding channels through no discharge pipe, the results of which are rather serious pollution to waters and the surrounding areas and a huge impact on the life of the surrounding urban residents and further the gradual degrading of urban residential environment quality. Therefore, to further promote the healthy sustainable development of social economy of Yueshan Town, to improve township residential environment quality and to change the insufficient status of funds for basic facilities, Yueshan Town decides, according to the purpose of World Bank (“WB”) Loans “to improve the environment and to keep sustainable development”, to use the WB loans to quicken the construction of Hunan Integrated Economic Development Demonstration Town Project and to practically promote the fast development of social economy of Yueshan Town, on the base of reality and upon the site survey carried out by the development and reform departments of the province, the city and the town and by experts. In December2010, Yueshan Town initially finished a discrimination report of Integrated Economic Development Demonstration Town Project Utilizing WB Loans. In January2011, to further quicken the development of the Project, the People’s Government of Yueshan Town consigned Hunan International

5

Engineering Consulting Center to compile “ The Feasibilities Study Report of Integrated Economic Development Demonstration Town Project Utilizing WB Loans ”. In February2011, an expert team came and made a site survey and, according to the reality of the Yueshan Town, discussed with the People’s Government of Yueshan Town, studied and settled down a construction proposal and the content thereof which is to utilize the WB loans on launching contraction projects including the construction of a WWTP (WWTP) and the supporting engineering thereof, the industry development study of a small town, the administration study of a small town, the personnel training and so on. Currently, the preparatory work successfully proceeded. Geographic location of Hunan Province in China is shown in Figure 1, of the Project in Figure2, and of the WWTP of the Project in Figure 3. 1.1.2 Significance of the Project Construction The construction and implementation of the Project are full of below meanings: (1) The construction of the Project can improve local environment, which is of benefit to the construction of a livable town. The construction of the Project will improve the residential environment of Yueshan Town and complete the basic facilities. The construction of a WWTP and the supporting engineering thereof will effectively prevent pollutions; greatly improve people’s living conditions; protect surrounding water sources; beautify the surrounding environment; construct a more comfortable and beautiful living environment; improve and raise residential environment; quicken the construction of a livable town; and lay a better environmental foundation for quickening urban development. (2) The construction of the Project is of benefit to improving the livelihood of the people and optimizing the soft environment necessary for development. The implementation of the Project is aimed at optimizing regional soft environment necessary for development and putting forth effort to raise the livelihood of the people. On the base of the reality of Yueshan Town, via the

6

construction of the WWTP and the supporting engineering thereof, Yueshan Town will exert its effort to increase the taste of the town, to optimize the soft environment, to accelerate the continuous strengthening of town functions and to improve the quality of people’s life so as to further generate a powerful cohesion and strong driving force, effect and attraction to accelerate related industry cluster; to boost investment invitation and capital introduction; to promote regional industrialization, urbanization and agricultural industrialization; to quicken the steps of pushing regional economic development and building a better-off society in an all-around way; to drive economy and all social undertakings to develop in an all-around, healthy and harmonious way; and to strive for the construction of a modern livable town of a new type. 1.1.3 Target of the Project General Target: The construction of the Project aims at raising the level of urban basic facilities of Yuehsan Town, strengthening public service function, improving investment environment, boosting swift economic growth of Yueshan Town and ensuring people living and working in peace and contentment, so as to lay a sound foundation for the all-around, harmonious, sustainable and steady development of social economic environment of Yueshan Town. Detailed Target: (1) To reinforce the pollution prevention and environmental protection of Xinqiaohe River, to implement a complex pollution prevention and reduction measure through controlling the pollution from the source, to control the pollution load on the river and to increase the number of people participating wastewater treatment so as to improve environmental monitoring, monitoring frequency and the quality; and (2) To raise the level of urban basic facilities of Yuehsan Town and to enhance the living standard and the taste of the urban inhabitants, which are favorable to achieving investment invitation and capital introduction.

7

1.1.4 Contribution of the WB The WB actively contributes to the improvement of city environmental basic facilities and the urbanization level. The Project is to utilize the loans and technical support of the WB of about USD 5,000,000 to build a WWTP in Yueshan Town, Xiangtan City, Hunan Province. It will increase a wastewater treatment capacity of 3,000m 3/d, and reform and complete the urban wastewater collection network at the meantime. Via the implementation of the Project, the basic facilities and environmental conditions of the Project site can be effectively improved so as to make new contributions to the realization of the outline target of the “20 th five-year plan”. 1.1.5 Organizational Structure of the Project Please refer to bellow for the Organizational Structure of the Project.

WB The People’s Government of Hunan Province

Provincial Project Leader Team The People’s Government of City

International En gineering Consulting Center Provincial PMO Project Team Leader of Xiangxiang City

Xiangxiang City PMO The People’s Government of Yueshan Town

Project L eader Team of Yueshan Town Yueshan Town PMO

Remark: a real line shows direct Own relationship. A broken line shows indirect relationship.

8

Figure 1-1 Sketch Map of the Organizational Structure of the Project

1.2 Overview of EIA Report

1.2.1 Purpose of Assessment The purpose of the Environmental Impact Assessment (“the EIA”) is to assess the positive environment influence brought by the implementation of the Project, to identify, sieve, predict and analyze the possible negative environmental impacts, to advance effective mitigation measures and environmental management plans for the major negative environmental impacts which are unavoidable, to provide a base for the independent assessment by the WB to the Project and to provide decision and management guidance for the governmental integrated management and the environmental management departments, according to the provisions of Environmental Impact Assessment Law of the PRC , Regulations on the Administration of Construction Project Environmental Protection and Notification on Strengthening the Administration of Environmental Impact Assessment for Construction Projects Funded by the Loan from International Finance Corporations , the requirements of Safeguard Policies of the WB and the environmental impact assessment procedures of China and the WB. 1.2.2 Type of EIA According to the provisions of Notification on Strengthening the Administration of Environmental Impact Assessment for Construction Projects Funded by the Loan from International Finance Corporations (Huanjian [1933] No. 324 Document) issued by bureaus including the State Environmental Protection Administration and the provisions of OP4. 01 Environmental Assessment of Safeguard Policies of the WB and as per the identification and sieving result of the environmental assessment factors of the Project, the environmental assessment type of the Project is determined as Type B, that is “a construction project, of which the scale and degree of negative impact possibly caused to the environment is limited and can be effectively mitigated

9

via the adoption of advanced techniques and mature preventive measures, and generally, which is required of an environmental impact assessment specially made according to the major engineering and environmental factors rather than made according to all aspects” (Huanjian [1933] No. 324 Document ) . Therefore, the EIA of the Project is compiled according to the content and scope of Type B. 1.2.3 Preparation of the Environmental Impact Report The People’s Government of Yueshan Town consigns Changsha Environmental Protection Career Technical College to complete the environmental impact assess of the Project, according to Environmental Impact Assessment Law of the PRC , Regulations for the Environment Management of Construction Projects issued by the State Council and the related provisions of Notification on Strengthening the Administration of Environmental Impact Assessment for Construction Projects Funded by the Loan from International Finance Corporations (Huanjian [1933] No. 324 Document) jointly issued by State Environmental Protection Administration, State Development Planning Commission, Ministry of Finance and People’s Bank of China. After accepting the consignment, under the great support from the owner, the institute has compiled and completed Environmental Impact Assessment of Hunan Integrated Economic Development Demonstration Town Project (Yueshan Town Subprojeoct, Xiangxiang City) Utilizing WB Loans (the EIA), according to relation national laws and regulations, guideline of environmental assessment and relation requirements of World Bank Operation Manual- Environmental assessment , on the base of field investigation, site survey and investigation of public participation, inspection of environmental quality status and information collection. 1.2.4 Keys of Assessment

10

According to the national Technical Guidelines for Environmental Impact Assessment and the requirements of Safeguard Policies of the WB, the EIA of the Project give a special report on below questions: (1) The engineering features of the major environmental problems possibly to be caused by the Project (2) The feasibility of site selection and major environmental protection targets of the Project (the sensitive points); (3) The positive environmental benefits and negative environmental impacts possibly to be brought by the Project; (4) The countermeasures adopted to mitigate the negative impacts possibly to be brought by the Project; (5) The analysis of alternative proposals; and (6) The environment management plan (EMP)

1.3 Grading, Scope and Periods of the Assessment and Target of

Environmental Protection (Sensitive points)

1.3.1 Grading and Scope of the Assessment (1) Atmospheric Environmental According to the policies of assessment grading determination of HJ2.2-2008 Technical Guidelines for Environmental Impact Assessment: Atmospheric Environment , the Institute determines that the atmospheric environmental impact of the Project is Grade III, which means it’s possible not to carry out atmospheric environmental impact prediction but directly take the calculation result of an estimation mode as the base of prediction and analysis. With the consideration of the reality of the Project, the assessment scope of the WWTP of the Project is determined to be a circle taking the discharge source as the center with a radius of2. 5km and the atmospheric environmental assessment scope of the supporting pipeline construction to be an area taking the pipeline as the centerline and extended200m outward from both sides.

11

(2) Water Environment According to the policies of assessment grading determination of HJ2.2-2008 Technical Guidelines for Environmental Impact Assessment: Water Environment , the Institute determines that the water environmental impact of the Project is Grade III. With the consideration of the reality of the Project, the assessment scope of the water environment of the Project is determined to be the area extended from the wastewater outlet to Xinqiaohe River. (3) Acoustic Environment According to the policies of assessment grading determination of HJ2.2-2009 Technical Guidelines for Environmental Impact Assessment: Acoustic Environment , the Institute determines that the acoustic environmental impact of the Project is Grade III. With the consideration of the reality of the Project, the assessment scope of the acoustic environment of the Project is determined to be an area extended 100mm outward from the boundaries of the WWTP and of the supporting pipeline construction to be an area taking the pipeline as the centerline extended 50m outward from both sides. (4) Ecological Environment The permanent land occupation is 12. 8Mu (or 0. 85376 Ha). The land to be occupied is normal farm land with a major crop of rice at present and is beyond the sensitive ecological environment. According to the requirements of Technical Guidelines for Environmental Impact Assessment: Ecological Environment of Nature Source (HJ19-2011), the ecological environmental assessment is determined as Grade III since the land occupied is larger than2Km 2 but less than2. Km 2. Refer to Table 1-1 for grading base of ecological environmental assessment: Table 1-1 Grading Base of Ecological Environmental Assessment

Sensitivity Land Occupation Grade of

12

Grade of Regional Area ≥20km 2 Area:2km 2-20km 2 Area ≤2km 2 Ecological Or Length ≥100km Or Length: 50km-100km Or Length ≤50km Environment Special Ecological Grade I Grade I Grade I Sensitive Area Important Ecological Grade I Grade II Grade III Sensitive Area Normal Area Grade II Grade III Grade III With consideration to the reality of the Project, the assessment scope of the ecological environment of the Project is determined to be an area extended 500mm outward from the boundary of the Plant. 1.3.2 Periods of the Environmental assessment The EIA of the Project mainly analyze and assess2 periods of the Project, namely construction period and operation period. 1.3.3 Target of Environmental protection (Sensitive points) According to the requirements of national laws and regulations on environmental impact assessment and Safeguard Policies of the WB, the target of environmental protection (or sensitive points) concerned in the environmental assessment of the Project are mainly: areas of social concern including high-population-density areas, cultural and educational areas, central office areas, hospitals, etc. The Project is located in Yingxiongling Group, Xinqiao Village, Yueshan Town, Xiangxiang City, with pipe network mainly placed within the town. Figure1-2 provides a General of the surrounding of the WWTP of the Project, and Table 1-2 and 1-3 are separately show the environmental protection targets during the construction of the WWTP and the pipe network.

13

Duck - feeding North Household

Xinqiaohe River

A Ditch Xinqiao Village (6 Bridge Families) Bailong Village 150m (3 Families) 130m 100m Sludge Grain Treatment The Project Depot River 15m 200m

150m Inter-communication highways of Xiangtan

A broken line Hongyan shows the distance from the g Village sludge area. (3 A real line shows the distance from the plant boundary.

Figure 1-2 General of the Surrounding of the WWTP of the Project

Table 1-2 Environmental Protection Targets of the Surrounding of the WWTP Descripti Located at the side of the No. Distance Function on Plant Bailong 1 West Side 130 Village Village Hongyan 2 South-east Side 150 Village g Village Xinqiao 3 North-east Side 100 Village Village

14

Table 1-3 Environmental Protection Target of the Pipe network No. Description Function Area of social 1 Central Hospital of Yueshan Town concern Area of social 2 Xianfeng Middle School concern The first row of buildings of the residential area and Area of social 3 administrative organizations concern 1.4 Environmental impact Factors and Assessment Factors

1.4.1 Identification of Environmental impact Factors The implementation of the Project can further facilitate the pollution mitigation of Xinqiaohe River, improve the basic facilities of Yueshan Town, and is meaningful to promoting the sustainable development of environment and social economy of Yueshan Town in an all-around way. Meanwhile, the implementation of the Project may also bring some negative impacts to the social and the ecological environment and the environment quality during its construction and operation periods. The design period mainly centers on such works as site selection, comparisons among technical proposals and the study of feasibility. Therefore, this period generally will not cause impacts to the environment. Impacts brought during the construction and operation periods are mainly including: (1) Social Environmental impact: impacts on the social economy within the construction areas definitely will be caused to some degreed by the Project, which are expropriations mostly. The Project will permanently affect 11 families or 46 people. And 12.8 Mu (or 0. 85376 Ha) of collectively-owned land will be expropriated for long. And the expropriation caused will affect the daily life of the local people and reduce their the means of production and subsistence, while the construction of the pipe network will make a difference to the traveling and safety of the people living along the pipelines and the traffic conditions along the pipelines.

15

(2) Ecological Environmental impact: the land occupation of the Project will reduce the quantities of cultivated lands and vegetation cover, change the features of land use, and alter the local agro ecosystem. During the construction, the Project will destroy the vegetation of the site, and the impropriate protection against roads deeply dug and the excavation, filling and temporary stacking of earth and stones will cause the loss of water and the erosion of soil easily; (3) Environment Quality Impact: waters around the construction site will be polluted by oil leaked, reeked and dripped from construction machines during the construction period, the domestic wastewater of the construction people and so on; heavy dust and ashes possibly emitted during the transportation and mixing of construction materials will pollute the air; the noises caused by the machines will impact the daily life and work of the people living around the construction site and along the pipelines; and the frequent coming and going of the construction trucks and cars will break the current traffic order. Wastewater discharge, waste gas emitted, solid wastes and machine noise caused during the operation period will pollute the surrounding environment to some degree. To sum up, the major impact factors existing during the construction and operation periods are: (1) Social Environment: land expropriation, traffic, city appearance, etc; (2) Ecological Environment: change of land use, destroy vegetation and loss of water and erosion of soil, etc; (3) Water Environment: domestic and production wastewater during the construction period and tail water at the end of operation period and domestic wastewater during the operation period; (4) Acoustic Environment: noise from the construction machine and transportation during the construction period and machine noise during the operation period;

16

(5) Atmospheric Environment: dust during the construction period and waste gas of traffics during the construction period and odor emitted from the WWTP during the operation period; and (6) Solid Wastes: garbage and earth and stones left after excavation and filling during the construction period and sludge and domestic waste generated during the operation period. 1.4.2 Environmental Impact and Selection of Assessment Factors According the above analysis, an environmental impact identification matrix is built as Table 1-4 in the light of the types and features of the Project, and the identification result of environmental impact factors is shown in Table 1-5.

Table 1-4 Environmental impact Identification Matrix Construction Operation Period Period Period Atmosphere -L -M Natural Water -S +L Environment Acoustic -L -S Environment Land Use -L -S Water and Soil -M +S Ecologic Conservation Impact Factors Environment Vegetation -L +S Animal -S -S Appearance -L +M Employment +S +M Income of +S +M Social Residents Environment Local Economy +S +M Quality of Life -S +L Remark: S is equal to light impact, M to middle impact and L to serious impact; “+” means positive impact and “-” means negative impact.

17

Table 1-5 Identification Result of Environmental impact Factors Actions Destruction and Affecting Benefits to the Period Environment Base of Environmental Analysis Natural or Social Resources Environment and Values Effects to the Production Loss of Production Land Occupation System Capacity Type of Production/ Unit Income Site (Agriculture) Selection Destruction to Destruction to Vegetation Area/Type/Value the Area with Vegetation Production Impact to Surface Hydrological Parameters and Monitoring Values Water Environment Values of Water Quality Construction Removal of Destruction to Type/Are/Value of Vegetation Destroyed Period Vegetation Cultivated Land Land Erosion and Stones and Earth Excavated, Filled and Loss of Grating Disposed and Engineering Site Residue Solid Wastes Temporary Generated Location, Scope and Purpose of Occupation and from Occupation Destruction Earthworks Location of, Distance to, Wind Direction Emission of such against the Residential Area and the Particles as Dust Engineering Construction Schedule Transportation of Particles and Material Size, Traffic Amount and Construction Noise, Traffic and Transportation through Environment Material and Transportation Sensitive Areas Engineering Safety Equipment Employment of Local Labor Force No. of People to be Employed and the able to Bring Direct No. and Rate of the Local Staff Effect to the Local Residents Sanitary and Employment Safety Impacts to No. of People possibly to be Affected of Construction and Health Statistics Including the Construction People and Statistics of Local Infectious and People Surrounding Epidemic Diseases Residents Pollution to the Surrounding Quality of Surface Water, Standard of Surface Water by Environment Quality and Discharge Domestic Standard Wastewater Necessary Construction Equipment, Impact of Noise Construction Plans, Distance to the Utilization of and Waste Gas to Nearest Residential Areas and the Construction Surrounding Pollution Density thereof, Wind Direction Equipment Residents and Speed and Standards of Noise and Waste Gas Emitted

18

Types and Quantity of Wastes including Generation of Pollution to Earth Domestic and Construction Wastes and Solid Wastes and River Earth Residua Site and Area Cleaning the The Constructor Responsible for Temporarily Used Site upon Preparing a “Site Recovery Plan upon and Equipment Construction Construction Completion” with Recover Possibly Used and Completion Cost Specified in the plan. Wastes Generated Pollution Caused Generation of by Impropriate Quantity and Composition of Sludge and Sludge by the Management and Whereabouts and Treatment thereof WWTP Treatment of Sludge Odor Caused by Generation of Generation of Odor and the Preventive Operation Impropriate Waste Gas by measures and Health protection Period Management of the WWTP distance Sludge Operation Noise of the Source and Source Strength of the WWTP and Noise Noise, Preventive measures and Wastewater Emission Standard Pump room On the base of environmental impact identification, environmental assessment factors are sieved out as Table 1-3 Principles for sieving environmental assessment factors are: (1) Regular pollution factors; (2) Those factors which have larger impacts to the environments and are special pollutants to the Project; and (3) Those factors with specified limits in national and local environmental standards. Table 1-6 Sieving Result of Environmental assessment Factors of the Project Environmental Assessment Factors Impact Degree Ecologic Atmospheric Surface Acoustic Construction Operation Solid Wastes Environment Environment Waters Environment Period Period Earth Noise within Residua and COD, the WWTP, garbage Land Use TSP, PM10, BOD , 5 Construction during the and NH3, H2S NH -N, -J +Y 3 Noise and Construction, Vegetation and Odor TP, TN, Noise from Sludge and and SS Pump room Domestic waste Remark: J is equal to larger impact and Y to normal impact and “+” means positive affect and “-” means negative impact.

19

2 Policies, Laws and Regulations and Administration

Framework

2.1 Environmental Policies, Laws and Regulations

2.1.1 General Through the comprehensive analysis of project type and scope, site selection, environmental sensitivities and the features and size of the possible environmental impact, the policies, law and regulations as well as standards mainly based on and related to by the EIA include: (1) Laws and regulations on environmental protection; (2) Regulations and requirements and local laws in relation with environmental protection; (3) Technical Guidelines for Environmental Impact Assessment and the provisions; (4) Environment quality standards; (5) Pollutant discharge or emission standards; and (6) Safeguard Policies of the WB. The above policies, laws and regulations construct the framework guiding and standardizing the environmental assessment of the Project. Besides, the environmental assessment of the Project also takes such files, which shows and implement the above laws and regulations in detail, as Terms of Reference of Environmental Assessment (TOR), feasibility study report and administrative examination and approval documents as one of the base of the environmental assessment. 2.1.2 Laws and Regulations on Environmental Protection (1) E nvironmental Protection Law of the PRC , 1989. 12.26 (2) E nvironmental Impact Assessment Law of the PRC , 2003. 9. 1 (3) L aw of the PRC on the Prevention and Control of Water Pollution , 2008. 6. 1

20

(4) L aw of the PRC on the Prevention and Control of Atmospheric Pollution , 2000. 9. 1 (5) L aw of the PRC on Prevention and Control of Pollution from Environmental Noise , 1997. 3. 1 (6) L aw of the PRC on Prevention and Control of Environmental Pollution by Solid Waste , 2005. 4. 1 (7) Detail Rules for the Implementation of the Law of the PRC on the Prevention and Control of Water Pollution , 2000. 3.20 (8) Detail Rules for the Implementation of the Law of the PRC on the Prevention and Control of Atmospheric Pollution , 1991. 5. 8 (9) Water Law of the PRC , 2002. 10. 1 (10) Water and Soil Conservation Law of the PRC , 2011. 3. 1 (11) L and Administration Law of the PRC , 2004. 8.28 (12) Urban and Rural Planning Law of the PEC , 2008. 1.1 (13) L aw of the PRC on the Protection of Cultural Relics , 2007. 12.29 2.1.3 Regulations and Requirements and Local Laws in Relation with Environmental protection (1) Guiding Catalogue for Structural Adjustment of Industry (2011 Version) (Document N0. 40 of State Development and Reform Commission ) , 2011. 6. 1; (2) R egulations on the Administration of Construction Projects Environmental Protection , 1998. 11.29; (3) P rovisional Measure for Public Participating in Environmental Impact Assessment , 2006. 02.22; (4) Disclosure of Environmental Information (Provisional) ; 2007. 04.21; (5) Notification on Strengthening the Administration of Environmental Impact Assessment for Construction Projects Funded by the Loan from International Finance Corporations , 1993. 06.21; (6) Notification on Strengthening Classified Approval on Environmental Impact Assessment , 2004. 12. 02;

21

(7) Notification on Strengthening the Supervision and Management of Environmental Impact Assessment of Urban Construction Project , 2008. 9. 18; (8) Categorized list of Environmental impact assessment of urban Construction Project , (Announcement No.2 of Ministry of Environmental Protection of the PRC); (9) Notification on Strengthening Sludge Pollution Prevention and Treatment of Urban WWTPs (Huanban [2010] Document No. 157) issued General office of Ministry of Environmental Protection of the PRC, 2010. 11.26; (10) T echnical Policies for Sledge Treatment and Disposal for Urban WWTPs (Provisional ), 2009.2. 18; (11) T echnical Policies for Urban Wastewater Treatment and Pollution Prevention (Chengjian [2000] Document No. 124), 2000. 5.29; and (12) Notifications on Further Strengthening Construction Management of Provincial Urban Wastewater Treatment Facilities (Xiangjiancheng [2008] Document No. 160) issued by Hunan Provincial Construction Department 2.1.4 Technical Guidelines for Environmental Impact Assessment and the Provisions (1) Technical Guidelines for Environmental Impact Assessment : General Principles HJ/T2. 1-1993; (2) Technical Guidelines for Environmental Impact Assessment : Atmosphere Environment , HJ/T2.2-2008; (3) Technical Guidelines for Environmental Impact Assessment : Surface Water Environment , HJ/T2. 3-1993; (4) Technical Guidelines for Environmental Impact Assessment : Acoustic Environment , HJ/T2. 4-2009; (5) Technical Guidelines for Environmental Impact Assessment : Ecological Environment of Nature Source , HJ19-2011 and (6) T echnical Guidelines for Environment Risk Assessment on Project Construction , HJ/T169-2004.

22

2.1.5 Environment Quality Standards (1) Ambient Air Quality Standard (GB3095-1996) Grade II; (2) E nvironmental Quality Standards for Surface Water (GB3838-2002), Type IV; (3) Acoustic Environment Quality Standard (GB3096-2009), Type II; and (4) Industrial Corporation Sanitary Standard (TJ36-79). 2.1.6 Pollutant Discharge or Emission Standards (1) Monitoring concentration threshold of fugitive emission of Integrated Emission Standard of Air Pollutants (GB16297-1996) is carried out during the construction period; (2) Emission densities of nitrogen, sulfurated hydrogen and odor comply with Type II standard (for new, rebuild and extension projects) of Emission Standard for Odor Pollutants (GB14554-93) during the operation period; (3) Tail water discharge complies with Primary standard - standard B of Pollutants Discharge Standard for Urban WWTPs (GB18918-2002) during the operation period; (4) Noise emission complies with the limit regulations of Noise Limits for Construction Sites (GB12523-90) during the construction period; (5) Noise emission complies with Type II standard of Noise Limits for Industrial Corporation Sites (GB12348-2009) during the operation period; and (6) Standard for Pollution Control on the Storage and Disposal Site for General Industrial Solid Wastes (GB18599-2001) 2.1.7 Safeguard Policies of WB (1) OP/BP4.01 Environmental Assessment; (2) OP/BP4.04 Natural Habitats; (3) OP4.09 Pest Management; (4) OP4.37 Safety of Dams; (5) OP4.11 Physical Cultural Resources; (6) OP/BP4.12 Involuntary Resettlement; (7) OD4.20 Indigenous Peoples;

23

(8) OP7.50 Projects on International Waterways; (9) BP17.50 Information Disclosure. (Information Disclosure). The safety guarantee policies of the WB with respect to the Project consist of items (1), (6) and (9). 2.1.8 Documents Related to the Project (1) Feasibilities Study Report on Hunan Integrated Economic Development Demonstration Town Project (Yueshan Town Subprojeoct, Xiangxiang City) Utilizing WB Loans (2011. 10) compiled by Hunan International Engineering Consulting Center; (2) R esettlement Plan for Hunan Integrated Economic Development Demonstration Town Project (Yueshan Town Subprojeoct, Xiangxiang City) (2011. 10); (3) General Planning of Yueshan Town, Xiangxaing City (2006-2020) (2009. 8); and (4) Feasibility Study Report of Renovation Demonstration of Continuous Rural Environment of Yueshan Town, Xiangxiang City (2010. 8).

2.2 Environment Administration Organizations and Functions

The Central Government of PRC and each province (or municipality directly under the jurisdiction of the Central Government or autonomous regions) and each of its cities (or autonomous prefectures) and Counties (or districts) all establish an environment administration organization according to the law to carry out relation functions. And the environment administration organizations related to the Project mainly include: Xiangtan City Environmental Protection Bureau and Xiangxaing City Environmental Protection Bureau. (1) Xiangtan City Environmental Protection Bureau Xiangtan City Environmental Protection Bureau, established in the year of 1975, is the government department responsible for the city environmental protection works. Its major functions include: to implement national environmental protection policies, laws and regulations, to put in effect the

24

related laws and regulations, policies and institutions of the principal government and the provincial environmental protection department, to set down environmental protection rules and policies of the city and to monitor the implement thereof, to be responsible for the prevention and control environmental protection from the sources and to take responsibilities for environment destruction, to take charge of achieving emission reduction targets of the city, environment supervision and enforcement of the environmental protection laws and regulations, to prevent and handle environmental pollution of the city, to direct, cooperate and monitor the ecological environmental protection of the city, to monitor and manage nuclear safety and radiation safety; to take care of environment monitoring and information disclosure, to carry out technological works about environmental protection, to organize, direct and cooperate the promotion and education of environmental protection within the city, to set down, organize and implement the promotion and education planning of environmental protection of the city, to deal with promotion and education works related to ecological civilization construction and friendly social construction, to drive the participation of the public and social organizations into environmental protection, to carry on the international cooperation and communication of environmental protection, to advance advice about the problems coming up during the international cooperation and communication, to carry out international information exchange of environmental protection, to participate foreign environmental protection affairs and to undertake other items instructed by the people’s government of the city. (2) Xiangtan City Environmental Protection Bureau The major functions of Xiangtan City Environmental Protection Bureau are: to implement national environmental protection policies, laws and regulations, to put in effect the related laws and regulations, policies and institutions of the principal government and the provincial environmental protection department, to monitor and execute the environmental protection policies and regulations

25

of Xiangxiang City; to be responsible for the prevention and control environmental protection from the sources and to take responsibilities for environment destruction, to take charge of environment supervision and enforcement of the environmental protection laws and regulations, to handle prevention and treatment of environmental pollution of the city, to direct, cooperate and monitor the ecological protection of the city, to take care of environment monitoring and information disclosure, to carry out technological works about environmental protection, to organize, direct and cooperate the promotion and education of environmental protection within the city, to drive the participation of the public and social organizations into environmental protection and to undertake other items instructed by the people’s government of Xiangxiang City.

26

3 Description and Analysis of the Project

3.1 Project Name and Composition

Project name: Hunan Integrated Economic Development Demonstration Town Project (Yueshan Town Subproject, Xiangxiang City) Utilizing WB Loans. Construction nature: new construction. Construction unit: Yueshan Town Government, Xiangxiang City. Construction site: lies at Yingxiongling Group, Xinqiao Village, Yueshan Town, Xiangxiang City. Project investment: total project investment is RMB 41,046,900, among which, the construction unit plans to apply for World Bank loans of USD 5 million, and the remaining capital will be self financed by auxiliary and project units at provincial, municipal and county levels. Project composition: the Project, to be constructed in two phases, covers an area of 8,529 m 2 (equivalent to 12.8mu), with a design scale of 6,000m 3/d. The construction scale for this phase is determined to be 3,000m 3/d, with auxiliary wastewater pipe network of 13,520m, which can meet the requirement on development plan of Yueshan Town, Xiangxiang City. The underground DEST (Oligodynamic bio-membrane process as full name, hereinafter referred to as DEST) is adopted in the design. The main economic and technical indexes of the Project are shown in Table 3-1.

Table 3-1 Main Economic and Technical Indexes of the Project

No. Index Unit Quantity Remarks

Total Floor Coverage Reserved Land Scale 1 m2 8,529 Area 3,000m 3/d

2 Construction Scale m3/d 3,000 /

Urban Wastewater 3 m 13,520 / Pipeline

4 Greening Rate % 32.7 Greening Area 2,793m 2

5 Total Investment of the Ten Thousand 4,104.29 / Project Yuan

27

Manpower of the Whole 6 Person 13 / Plant Actual Annual Calendar 7 Day 365 / Days From July 2012 to June 8 Construction Period Year 5 2017

3.2 Construction Proposal of the Project

3.2.1 Construction Content and Scale The Project covers an area of 8,529m 2 (equivalent to 12.8mu), and the construction scale for this phase is 3,000m 3/d, and auxiliary wastewater pipe network 13,520m. The main construction content and scale of the Project are shown in Table 3-2 and Table 3-3.

Table 3-2 Project Construction Status

Design Estimation Discharge System Discharge Direction Term of Design Service Quantity of Construction Scale Populatio n Wastewater Status Sub-Phase (m 3/d) Status Quo Post-Completion Post-Completion (Person) in Service Quo Area (m 3/d) Short Tem 15,600 2,941 3,000 Incomplete 2013 Xinqiaohe Confluence Separate Xinqiaohe River River Long Term 25,500 5,880 6,000 System 2020 Note: the construction content of the year of 2020 in the long term in the Table belongs to Phase II, beyond the scope of this assessment.

Table 3-3 Main Construction Content and Scale of the Project No. Name Unit Quantity Remarks 1 Construction Scale m3/d 3,000 Reserved Land Scale 3,000m 3/d Urban Wastewater 2 m 13,520 / Pipeline Area of Road and Turn Off-Site Road including 3 m2 1,840 Round Pad Enclosing Wall 4 Sidewalk Area m2 76 / 5 Greening Area m2 2,793 Greening Rate 32.7% 6 Solidification Area m2 440 / 7 Pavage Site m2 820 / 8 Complex Building m2 324 Second Floor, 21.6×7.5×6m 9 Air Blower Room m2 75.6 12.6×6×3.5m 10 Dewatering Room m2 135 15×9×4.5m 11 Power Distribution Room m2 75.6 12.6×6×3.5m

28

12 Grating Well m2 20 8×2×4m 13 Pump Room m2 29.6 7×4×4m 14 Collecting Well m2 29.6 7×4×6m 15 DEST Tank m2 632.8 35.5×17.6×6.8m 16 Sludge Storage Tank m2 9.9 3×3×3m Ultraviolet Disinfecting 17 m2 19.3 3×5×2m Tank From Table 3-2 and Table 3-3, it can be concluded that: (1) The WWTP of the Project is to be constructed in short-term and long-term phases, and its design scale shall be determined based on status quo and growth rate of the population. To ensure effective treatment of domestic wastewater, the treatment scale of the WWTP shall be designed to be more than or equivalent to the predicted wastewater production. Meanwhile, auxiliary construction shall be carried out in respect of interceptor sewer, wastewater main pipe, discharge pipe, storm sewer, recession pipe, etc., which shall in line with the stipulation that ‘Determine the ultimate scale for construction of urban wastewater treatment facilities in accordance with the long-term plan, and determine the short-term scale on the basis of status quo of water quantity' indicated in (Chengjian [2000] Document No. 124) T echnical Policies for Urban Wastewater Treatment and Pollution Prevention . (2) With implementation of the Project, the discharge direction will change from current way of direct discharging into surface water body to such way that prior to be discharged to surface water body, the discharge will be first collected by pipe network and then disposed by urban WWTP until up to standard. This move will greatly reduce total pollutant amount entering into surface water body, which will be conducive to the improvement of water environmental quality. 3.2.2 Main Equipment of the Project The main equipment of the Project is shown in Table 3-4.

29

Table 3-4 Main Equipment List of the WWTP

Installation SN. Name of Performance Unit Quantity Remarks Position Equipment Parameters Square Gate 1 600×800 N=1.1kw Set 2 / and Hoist

Rotary Drum B=600mm, b=4mm, 2 Set 2 / Grating Cleaner N=1.5kw Submersible Q=125 m 3/h, H=8m, 3 Set 2 / Wastewater N=5.5kw Pretreatment Pump Electric System 4 DN150 Set 2 / Butterfly Valve

5 Check Valve DN150 Set 2 / Rotational Flow Pulp Board Mixer, 6 Set 1 Sand deposit N=0.55 kw Spiraltank Grit 7 1 / Water Q=12L/s, N=0.37kw Set Se parator Mixed liquor Q=100m 3/h, H=4.5m, One 1 Set 4 Reflux Pump N=2.2kw Backup for Warehouse 2 Atmolysis Bag / Piece 2 / 3 Gate Valve DN150 Piece 11 DEST Tank Electromagnetic 4 DN32 Piece 10 Valve

5 I-Steel 110×6 Meter 180 / 6 Round Steel Ø12 L=5,400 Piece 690 / Q=5.2m 3/min, 1 Air Blower Pressure 58.8Kpa, Set 3 / N=11kw Air Blower Electric Room 2 DN100mm Set 3 / Butterfly Valve

3 Check Valve DN100mm Set 3 /

Sludge B=1,000mm, 1 Thickening and Set 1 / N=1.5kw Dewatering Set Sludge 2 Band Conveyor B=500mm L=5m, Set 1 / Dewatering N=1.5kw Room 3 Static Mixer DN100×500mm Set 1 /

Sludge Feed Q=6m 3/h Pressure 4 Set 2 / Pump 0.4MPa N=2.2kw Sludge Submersible Impeller Diameter 1 Set 1 / Storage Mixer 320mm, n=904r/min Tank N=2.2kw Disinfecting 1 UV Light Tube N=4kw Set 1 / Tank

30

COD Online 1 1 General Monitoring Set Layout Instrument Pipeline 2 Continuous / 1 / Online Set Monitoring 5T (Self Transportation 1 1 Vehicle Lighting Transport Vehicle Equipment Type) 2 Van 1 Vehicle /

3.2.3 Technological Introduction 3.2.3.1 Process Flow Sheet

Transportati Transportation Blower

Waste Gratings Inflow Sand DEST Tank Disinfection Discharge water Pump Deposit Tank to

Entry of Residual sludge

Table 3-1 DEST Process Flow Sheet 3.2.3.2 Process Design (1) Grating Chamber

Taking the interception ratio: n 0=1.0 into account, we will build the grating chamber together with the collecting tank, and complete both at once according to the long-term scale of 6,000m 3/d. The grating adopts rotary drum grating cleaner, which integrates pollutant interception, tine harrow deslagging, spiral hoisting, and squeeze dewatering into one. The grating is automatically started or stopped according to the time interval and water head between fore-grating and rear-grating, with main parameters as follows: Design flow: drought flow: Q=6,000m 3/d =250m 3/h; confluence flow: Q=12,000m 3/h =500m 3/h; Grating bar clearance: b=4mm

31

Flow velocity through grating: v=1m/s Fore-grating water depth: h=0.5m Grating obliquity: α=35º Diameter of rotary drum: 600mm Main equipment: 2 rotary drum grating cleaners, with single power of 1.5kW Auxiliary equipment: 2 square gates, and 2 hoists, with single power of 1.1kW Plan view size: 8×2m (2) Pump Room

Taking the interception ratio: n 0=1.0 into account, we will build the pump room together with the grating chamber, complete the civil engineering at once according to the long-term scale of 6,000m 3/d, and install equipment according to the short-term scale of 3000m 3/d. The pump room, which adopts submersible pump with automatic coupling installation, is equipped with electric hoisting equipment and the corresponding valves. Control on the pump room can be realized by PLC and on-site mode, with main design parameters as follows: Auxiliary design: drought flow Q=3,000m 3/h=125m 3/h; Confluence flow: Q=6,000m 3/h =250m 3/h Capacity of collecting tank: effective capacity 120m 3 Main equipment: 2 submersible pumps, with single flow Q=125m 3/h, pumping head of 8m, and power of 5.5kW. In dry season, both operating pump and backup pump will be put into operation. 2 submersible pumps will be added in Phase II. Auxiliary equipment: 2 electric butterfly valves, with single power of 0.1kW, and another 2 electric butterfly valves will be added in Phase II; 2 check valves, and another 2 will be added in Phase II; 1 set of water-level controller;

1 hand-drive hoist; and 1 set of H 2S monitoring and alarming device. (3) Rotational Flow Sand deposit tank

Taking the interception ratio: n 0=1.0 into account, we will adopt steel structure equipment in sand deposit tank, and equip it with auxiliary equipment

32

according to the short-term scale of 3,000m 3/d, and design to adopt rotational flow sand deposit tank, which features the advantages of small space demand, low operating cost, convenient installation and service, etc. Transcendent functions are taken into account in the course of design, to facilitate equipment maintenance, with main design parameters as follows: Design flow: 250m 3/h Quantity: 1; and another 1 will be added in Phase II. Diameter of sand deposit tank: D=1.63m Depth of sand deposit tank: H=1.12m Diameter of sand hopper: D=0.91m Depth of sand hopper: H=1.52m Surface loading of hydraulic power: q=120m 3/m 2•h Auxiliary equipment: one set of pulp board mixer, with single power of 0.55kW, and another 1 will be added in Phase II; 1 spiral grit water separator, with single power of 0.37kW.

(1) DEST Tank DEST tank includes anoxia and anaerobic tanks, contact oxidation tank and vertical flow grating residue tank which constitute a group of processing structures. a) Anoxia and Anaerobic Tank The wastewater with the process of de-slagging and sand deposit enters into the anoxia and anaerobic tank and mixes with the return wastewater, which begins the anaerobic biochemical reaction and de-nitrification. The anaerobic phase includes anaerobic fermentation, anaerobic corrosion and anaerobic biochemical filtration. Anaerobic tank adopts the water the horn-shaped distributor to distribute water equably which makes full use of Effective capacity.

3 3 Design scale: 3,000m /d =125m /h

Grating (tank) number: 9

Single grating size: 5.6×5.6×6.5m with a mean depth of 5.95m

33

3 Effective capacity: 1679m

Retaining period for waterpower: 13.4h

3 Filler number: 1,200m with the polyethylene elasticity plastic filler of Ø150 b) Aerobic Tank Through the anoxia and anaerobic process, quantities of BOD and CODcr are wiped off from the wastewater which then is processed by the “nitration” and phosphorus removal mainly in the aerobic tank where a further step is made to remove the organic load. The aerobic tank is biological treatment equipment that relies mainly on biofilm process, combining the activated sludge one. The microorganism absorbs the phosphorus forcefully from the phase of anaerobic process to aerobic one.

3 3 Design scale: 6,000m /d =125m /h

Grating (tank) number: 6

Single grating size: 5.6×4.3×6.5m with a mean depth of 5.78m

3 Effective capacity: 835m

Retaining period for waterpower: 6.68h

3 Filler number: 612m with the polyethylene elasticity plastic filler of Ø150 Main equipment: 4 reflux pumps (1 for reserve in the storage) with a flux of 100m 3/h, lift of 4.5m and power of 2.2kW for each one. 3 more shall be added in the phase II. c) Vertical Flow Grating residue Tank Grating residue tank adopts the vertical flow one that is jointly built with DEST biochemical tank. The mixed liquor exhausted from the DEST tank will firstly enter into the water-distributor tube set in the center of the vertical flow grating residue tank, then rise with the density current due to the density difference of the clear water and will be finally discharged into outflow canal by the overflow around when in the upper layer. The residual sludge in the bottom of grating residue tank will be discharged into the deposition tank through the sludge pipe by the gas stripping.

3 3 Design scale: 3,000m /d =125m /h

34

Grating (tank) number: 3

Single grating size: 5.6×8×6.5m

3 2 Surface Load: 0.93m /m •h

Retaining period for waterpower: 5h

(5) Sludge Storage Tank

For disposal of the residual sludge in the DEST tank

3 Effective capacity: 22.5m

Size: 3.0×3.0×3.0m Auxiliary equipment: 1 Diving Mixer with the impeller diameter of 320mm and power of 2.2kw

(6) Blower Room The civil engineering is built in one time on the long-term scale of 6,000m 3/d with single-deck frame construction which is mainly used for the offer of enough air to biological contact oxidation tank. The assorted high-speed centrifugal blower with single stage ensures the effect of nitrogen phosphorus removal through the dissolved oxygen detector to adjust the operation parameter in blower automatically by frequency control device. Following are the main design parameter:

Plan view size: 12.6×6m Main equipment: 3 Roots Blowers (2 for use and 1 for reserve) with flux of 5.2m3/min, wind pressure of 58.8Kpa and power of 11kW. 2 more will be added in the phase II. Auxiliary equipment: 3 Electric butterfly valves, with single power of 0.1kW and another 2 will be added in Phase II; 3 check valves and another 2 will be added in Phase II; 2 air purifiers with both thick and thin ones.

(7) Dewatering Room The civil engineering is built in one time on the long-term scale of 6,000m 3/d, with single-deck brick-concrete structure which is used to dehydrate water of the residual sludge and compress its volume to the minimum. Dewatering room will be equipped with sludge concentration and dewatering machine,

35

belt conveyor, flocculent preparation and addition system with the storage space for flocculent.

Plan view size: 15×9m

Residual sludge Amount: 248kg/d (dry sludge) (the first stage) Main equipment: 1 draper-type dewaterer with the belt of 1.0m wide; 1 board- type dewaterer. None is needed to add in the phase II except the work duration. Auxiliary equipment: 1 drug preparation and delivery system, with single power of 1.5kW; 1 belt conveyor with the belt of 500mm wide, 5m long and the power of 1.5kW; 2 air compressors (1 for use and 1 for reserve), with single power of 1.5kW; 2 sludge treatment pumps (1 for use and 1 for reserve) with the flux of 6m 3/h, lift of 40m and power of 2.2kW; 1 electric traveling crane with the lifting weight of 5t and power of 3kW.

(8) Ultraviolet Disinfecting Tank 1 tank is set in reinforced concrete structure for disinfection before the wastewater drains into Xinqiaohe River.

3 Design scale: 3,000m /d

Plan view size: 3×5m

Auxiliary equipment: ultraviolet tube, with single power of 4kW

(9) Power Distribution Room Power Distribution Room shall be set with power distribution cabinets and transformers, which is jointly built with blower room. Its advantages lies in short layout line, simple and easy installation and convenient operation management, etc.

Plan view size: 12.6×6m

(10) Complex Building The Complex Building assembles the office and laboratory as a whole with 2 layers.

Plan view size: 1.6×7.5m 3.2.4. General Layout of Plant Site

36

3.2.4.1. General Layout Principles General Layout Principles of Plant Site: (1) Connection properly with the general planning of the city and coordinating with the surrounding environment; (2) Clear functionality of each area and compact arrangement striving to use land economically and reduce area; (3) Short and smooth process to avoid circuitous repeat; (4) Well combination and concentration arrangement of short- and long-term structures, forming an integrated whole and giving room for the long-term development; (5) The layout of the buildings facing south-north as much as possible; (6) A certain width of health protection distance between the Plant structures and surrounding buildings to reduce the influence of the WWTP on the surrounding environment; (7) Convenient transportation for flow and logistics, and clear division of primary and secondary roads to meet fire safety requirements; (8) Smooth flow of traffic facilitating the construction and management. In addition to the above mentioned principles, the layout of the Plant site shall be based on the direction of prevailing wind and water inlet, position of water discharge, characteristics of process as well as other factors, such as the Plant site topography, geological conditions etc. and many other factors shall be considered. For example, the process shall be reasonable, easy managing, economic and practical, and the architectural style and plant greening shall be in harmony with the surrounding environment. 3.2.4.2. General Layout The general layout plan of the Project is shown in Figure 4. The land acquisition of the Plant area is disposable for the long-term development, and the total land area is 8,529 m 2 (the effective land area within the walls). Wastewater treatment of the Plant covers an area of 1.42m 2. According to different functions, the Plant is divided into three areas: life and

37

auxiliary production area (front area of the Plant), wastewater treatment area and sludge treatment area (production areas). The front area of the Plant, located in the southeast corner of the Plant, is mainly made up of the Complex Building (with office, laboratory, dormitory, dining hall) and guard house. Between the production area and the front area, a greenbelt area is designed to ensure a good ecological environment for the front area. In accordance with the process, in the west of the production area, the inflow pump room, grit separator, sludge tank and sludge dewatering room are designed to reduce the influence on the front area of the Plant and the surrounding environment; in front of the sludge dewatering room, the terrace designed to meet the requirements of stacking and transportation of sludge; in the area, the disinfecting tank, blower housing and power distribution room arranged from north to south; the DEST reaction tank is arranged in the centre; and the long-term land reserved in south central. 3.2.5. Service Scope and Wastewater Discharge Forecast 3.2.5.1. Design Life and Discharge System of the Plant (1) Design Life According to the General Planning of Yueshan Town, Xiangxiang City (2006- 2020), in combination with the Code for Urban Water Supply Engineering Planning , and in consideration of the town development level and the water supply and discharge facilities and other factors, the design life of the Project is: Short-term: 2013 Long-term: 2020 (belong to the Phase II construction, not within this scope of evaluation) (2) Discharge System The present status of Yueshan Town is that the production and domestic wastewater discharge is free, and there aren’t unified discharge pipes, and the wastewater is drained directly into the surrounding channels. In

38

combination of planning, the center township of Yueshan Town adopts the mixture of rainwater and wastewater system for the short-term, while for the long-term incompletely separate system for rainwater and wastewater is adopted. 3.2.5.2. WWTP Service Scope The service scope of this wastewater treatment project is the center township of Yueshan Town. According to the general planning, the construction land of 2010 is 1.34 square kilometers, and the construction land of 2020 is 3.22 square kilometers. Until the end of 2010, the center township has a built up area of 1.5 square kilometers, which is basically consonant with the planed construction land area. The construction land area mainly expands to the north-east of the existing land, and it is forecasted that the construction land in 2013 is 2.03 square kilometers and 3.22 square kilometers in 2020.So the service scope of the Project is 2.03 square kilometers in the short-term and 3.22 square kilometers in the long-term. The WWTP only accepts domestic wastewaters and similar industrial wastewaters, or industrial wastewaters in line with national discharge standards after pre-treatment and being treated with domestic wastewaters. 3.2.5.3. WWTP Service Population According to the general planning, the population scale of the center township of Yueshan Town is 10,000 in 2010, and 25,500 in 2020.And according to statistics provided by the town government, the population of the center township of Yueshan Town in 2010 is 9,105, slightly less than the planned population. Refer to the forecasted population growth rate described in the General Planning of Yueshan Town, Xiangxiang City . According to the population base of 2010, the average annual natural growth rate of the township population is 0.2%, and the mechanical growth rate is 1. 8%. And taking the population of surplus labor changing to urban population into consideration, the population scale calculated therefrom is 15,600 in 2013, and 25,500 in 2020.The population growth statistics of the center township of

39

Yueshan Town in the latest three years is shown in Table 3-5.

Table 3-5 Statistic Table of the Population Growth of the Center Township of

Yueshan Town in the Latest Three Years Total Population of Floating Net Increase of Annual the Center Population of the Year Population Growth Rate Township Center Township (Person) (%) (Person) (Person) 2005 7295 45 / / 2006 7692 47 397 0.54 2007 8069 48 377 0.49 2008 8434 50 365 0.45 2009 8771 55 347 0.41 2010 9105 59 324 0.37

3.2.5.4. Wastewater Discharge Forecast Wastewater discharge forecast is closely related to the development of the urban economy, the population, the development and construction scale of the planning area, the layout, land area, population density, industrial distribution, etc. Commonly used wastewater forecasting methods are the comprehensive quota method, the sub-item quota method, urban construction land indicator method, etc. The Project adopts the sub-item quota method and urban construction land indicator method to forecast the wastewater discharge. (1) Sub-item Indicator Method

○1 Domestic Wastewater Discharge According to the requirements of national water saving policy and the Technical Specification of Water Supply Engineering for Town and Village (CJJ123-2008), and with consideration of the water supply and discharge sanitary facilities and showers equipped indoor, the daily domestic water consumption indicators (maximum) of Yueshan Town is 130~190L/cap·d. and in combination of the demand of domestic water supply and the domestic wastewater generated of the latest three years, the domestic water consumption indicator of 2013 is 130L/cap·d, and the domestic water consumption indicator of 2020 is 150L/cap·d. The domestic wastewater

40

discharge calculated is shown in Table 3-6; the statistics of demand of domestic water supply in the latest three years is shown in Table 3-7, and the actual domestic wastewater generated in Table 3-8.

Table 3-6 Statistical Table of Demand of Domestic Water Supply in the Latest Three

Years

Aggregate Demand Demand on Demand of Public Demand on Commercial Institutions on Year on Domestic Water Resident Water Water Supply Domestic Water 3 Supply (m 3/d) Supply (m /d) (m 3/d) Supply (m 3/d) 2008 1200 220 230 750 2009 1400 250 250 900 2010 1600 280 290 1030

Table 3-7 Statistical Table of Actual Domestic Wastewater Generated in the Latest

Three Years Commercial Domestic Discharge by Public Domestic Discharge by Year Discharge (m 3/d) Institutions (m 3/d) Residents (m 3/d) 2008 100 120 600 2009 130 150 720 2010 180 180 850

Table 3-8 Domestic Wastewater Discharge Forecast Table No. Indicator 2013 2020 1 Planned Population (Person) 15600 25500 2 Standard of Water Consumption Per Capita (Per 130 150 Day L/cap•d) 3 Forecast Water Consumption (m 3/d) 2028 3825 4 Converted Discharge Coefficient 0.9 0.9 5 Wastewater Collection Rate 90% 95% 6 Wastewater Treatment Amount (m 3/d) 1642 3270

○2 Industrial Wastewater Discharge Industrial water consumption is related to the production process. According to the general planning of Yueshan Town, the central part of the town centers on developing agricultural products processing industry, commerce, tourism the detailed data of theses enterprises is absent, and it is impossible to

41

forecast based on the enterprises category, so the industrial output is used for forecast. In 2010, the total industrial output of Yueshan Town is RMB 229,580,000.According to the development plans, the annual economic growth rate is 10%, so in 2013 the total industrial output is RMB 305,570,000, and in 2020 RMB 595,470,000.And according to the requirements of national water saving policy and with the current situation and developing trends, referring to the wastewater discharge for unit output of towns and counties with similar industries, the average wastewater discharge per thousand RMB output is 15m 3. The forecasted industrial water supply demand is shown in Table 3-9, and the industrial wastewater discharge of wastewater in Table 3- 10.

Table 3-9 Table of Industrial Water Supply Demand Demand of Food Processing Year Demand of Other Industries (m 3/d) Industry (m 3/d) 2008 300 100 2009 420 150 2010 550 200

Table 3-10 Industrial Wastewater Discharge Forecast Table No. Indicator 2013 2020

Industrial Output (RMB Ten 1 30557 59547 Thousand )

Wastewater Discharge for RMB Ten 2 Thousand Output (m 3/RMB Ten 10 10 Thousand )

Forecasted Industrial Wastewater 3 837 1631 Discharge (m 3/d)

4 Wastewater Collection Rate 80% 83% 5 Wastewater Treatment Amount 670 1353

According to the material provided by the environmental protection department of Yueshan Town, Xiangxiang City, there are mainly four polluting

42

enterprises to Xinqiaohe River at present, and the wastewater discharge statistics of the latest five years are shown in Table 3-11.

Table 3-11 Present Status Table of Industrial Waste Water Xiangxiang Name of Enterprise Spring Rea Sea 3 Weaving Total Discharge (m /d) Wood Wood Factory 2006 100 90 60 250 2007 110 90 60 260 2008 120 100 70 290 2009 130 100 70 300 2010 140 100 70 310 Synthesizing Tables 3-9 and 3-11, and in consideration of the water discharge of some small family businesses are not included in the statistics, so the industrial waste water discharge uses the data in Table 3-9.

○3 Total Wastewater Discharge Total Wastewater Discharge = Domestic Wastewater Discharge + Industrial Wastewater Discharge + Public Building Wastewater Discharge + Unforeseen Water Discharge The public building wastewater discharge is 15% of the domestic water consumption, the unforeseen water consumption includes watering the green land and roads, pipeline leakage, etc., and the wastewater discharge generated is equal to 15% of the sum of the industrial wastewater discharge, public building wastewater discharge and domestic wastewater discharge. The prediction results of the total wastewater discharge are shown in Table 3- 12.

43

Table 3-12 Wastewater Treatment Amount Forecast Table No. Indicator 2013 2020 1 Domestic Wastewater Discharge (m 3/d) 1642 3270 Public Buildings Wastewater Discharge 2 246 490 (m 3/d) 3 Industrial Wastewater Discharge (m 3/d) 670 1353 4 Unforeseen Wastewater Discharge (m 3/d) 383 767 5 Total Wastewater Discharge (m 3/d) 2941 5880 (2) Public Institutions Construction Land Comprehensive Water Consumption Indicator Method The public institutions construction land comprehensive water consumption is related with the local industrial structure, residential density and the degree of wastewater collection. Referring to the Code for Urban Water Supply Engineering, the public institutions construction land comprehensive water consumption indicators of the medium and small cities is: 0.4 ~ 0.8 (ten thousand m 3/ km 2·d). In consideration of the water saving ideas and policy, the long-term population scale of the Project is 25,500; considering that the short-term water consumption per unit area is 4,000 m 3/ km 2·d, and the long- term is 4,000 m 3/ km 2·d, the water consumption and wastewater discharge prediction calculated are shown in Table 3-13.

Table 3-13 Wastewater Discharge Forecast Table No. Indicator 2013 2020 1 Effective Land Area 2.03 3. 22 2 Indicators of Water (Ten Thousand 0.4 0.4 3 Maximum Daily Water Consumption 8120 12880 4 Discharge Coefficient 0.8 0.8 5 Wastewater Collection Rate 90% 95% 6 Wastewater Treatment Amount 5846 9788

(3) Construction Scale of the Project According to the results of the prediction of the wastewater discharge and comparing Table 3-12 and Table 3-13, the wastewater discharge land indicators obtained by both prediction methods are slightly higher. Because there is no public institutions construction land comprehensive water consumption indicator data specified in the town and village water supply

44

standard, the indicator referred is the urban water supply indicators, in which the value is relatively higher. This report uses the prediction results of the sub- item indicator method and reserves room for development appropriately. So, the construction scale of the proposed WWTP is determined as Q=6,000m 3/d. The construction is divided in two phases, of which the year 2013 is the first phase with construction scale of Q=3,000m 3/d, and the year 2020 year of the Phase II with the construction scale of Q=3,000m 3/d. 3.2.6. Designed Inflow and Outflow Water Quality 3.2.6.1. Inflow Water Quality of the Designed WWTP According to the Code for Design of Outdoor Sewerage Engineering (GB50014-2006), the designed water quality of urban wastewater water can adopt the following criteria: in general, BOD 5 refers to 25~50g/d per person, SS refers to 40~65g/d per person, TN refers to 5~11g/d per person, TP refers to 0.7~1.4g/d per person. CODcr is analyzed by statistics, common urban wastewater CODcr 2.3 (BOD 5). Wastewaters accepted to the Project WWTP mainly are domestic wastewaters, the ratio of industrial wastewaters is relatively low, and industrial wastewaters must be under appropriate pre- treatment measures to meet the relevant discharge standards before entering the WWTP. After pre-treatment, industrial wastewaters are basically similar to domestic wastewaters. Refer to wastewater water quality of similar towns. The determined designed inflow water quality of the WWTP is shown in Table 3- 14.

Table 3-14 Designed Inflow Water Quality of the WWTP Unit: mg/L

Item CODcr BOD 5 SS TN NH 3-N TP Inflow Water 240 130 200 30 25 2.8 Quality 3.2.6.2. Designed Outflow Water Quality and Removal Rate of the WWTP According to the requirements of the Pollutants Discharge Standard for Urban WWTPs (GB18918-2002), the outflow water quality of the WWTP shall meet the primary standard - standard B. Specific data of outflow water quality and

45

removal rate are shown in Table 3-15.

Table 3-15 Designed Outflow Water Quality and Removal Rate of the WWTP Unit:

mg/L

Item CODcr BOD 5 SS TN NH 3-N TP Inflow Water 240 130 200 30 25 2.8 Quality Outflow Water ≤60 ≤20 ≤20 ≤20 ≤8 ≤1. 0 Quality Removal ≥75 ≥84. 6 ≥90 ≥33. 3 ≥68 ≥64. 3 Rate % 3.3. Pipe Network and Pumping Stations

(1) Laying of Pipe Network The layout of the discharge pipes shall take into consideration the characteristic of topography, road direction, construction conditions and other factors, and the discharge areas shall be reasonable divided; gravity discharge shall be adopted as much as possible to reduce project investment; the Project pipe network horizontal distribution chart is shown in Figure 5. The main pipeline A lies in the north roads of the fire station, and for the diameter of some branch pipes, water amount for the long-term development shall be considered. The pipe diameter is DN300~DN600. The main pipeline B lies in the south roads of the planning land, and the water amount of the reserved alternative land for long-term industrial development in the eastern part of the town flows into the WWTP basically through line B. At this stage, long-term water amount isn’t considered, and it will be taken into account until further construction in the future. The pipe diameter is DN600~DN800. The main pipeline C lies along the north river of the inner river in this town, and for the diameter of some branch pipes, water amount for the long-term development shall be considered. The pipe diameter is DN400~DN500.

Table 3-16 Statistical Table of Pipe Diameters and Pipe Lengths No. Pipe Diameter Unit Length Remarks 1 Wastewater Pipe m 4260 Pre -stressed Concrete

46

D300 Pipe Wastewater Pipe Pre-stressed Concrete 2 m 3980 D400 Pipe Wastewater Pipe Pre-stressed Concrete 3 m 2610 D500 Pipe Wastewater Pipe Pre-stressed Concrete 4 m 1870 D600 Pipe Wastewater Pipe Pre-stressed Concrete 5 m 400 D700 Pipe Wastewater Pipe Pre-stressed Concrete 6 m 400 D800 Pipe 7 Total m 13520 (2) Pumping Stations The layout of the discharge pipes of the Project shall take into consideration the characteristic of topography, road direction, construction conditions and other factors, and the discharge areas shall be reasonable divided; gravity discharge shall be adopted to reduce project investment; no lifting pumping stations.

3.4. Analysis of the Pollution Sources of the Project

Construction Period: (1) Waste gas: dust and vehicle exhaust. (2) Waste water: domestic wastewater and construction waste water. (3) Solid waste: construction waste, cubic meter of earth and stone produced by excavation and fill, domestic waste. (4) Noise: construction vehicle noise, construction machinery noise, etc. Operating period: (1) Waste gas: bad smell from the WWTP. (2) Solid waste: after the running of the adjusting tank, grating residue tank, aeration tank, SBR reaction tank and other structures for some time, the sludge will be produced, which is needed to be cleared; domestic waste. (3) Wastewater: tail water, domestic wastewater and sludge wash water. (4) Noise: when the water pumps, aerators and other pump work, noise will be produced.

47

3.5. Associated Works with the Project

The main associated problem of the Project is the handling of residual sludge. The final disposal of sludge is to deliver the dewatered sludge cake to the waste transfer station, then compress it with urban domestic waste, and at last send it to the Quanhu Garbage Disposal Plant in Xiangxiang City. Therefore, the associated works with the Project is the waste transfer station and the Quanhu Garbage Disposal Plant in Xiangxiang City, the detailed description of which is shown in Chapter 5.

3.6. Project Investment Estimate

The investment estimate of the Project is shown in Table 3-17.

Table 3-17 Project Investment Estimate Table Estimated Value (RMB Ten Thousand ) Name of Project or Purchase Othe No. Instal Cost Construction r Total of lation Equipment Fees 284 2027 I Cost of Project 382.3 440.00 9. . 60 90 112.6 934. 1 WWTP 382.30 440.00 0 90 10.5 71. 1. 1 Pre-treatment System 12.10 48. 70 0 30 158. 1. 2 129. 10 23. 30 6. 10 DEST Tank 50 35. 1. 3 Blower Housing 8. 50 22.30 4. 80 60 Sludge Dewatering 73. 1. 4 19. 60 44. 20 9. 50 Room 30 4. 1. 5 Sludge Storage Tank 1. 00 2.90 0.60 50 26. 1. 6 Disinfecting Tank 2.00 20.00 4. 30 30 65. 1. 7 Complex Building 44. 40 20.30 0.80 50 1. 8 Reception Office 2.50 2.50 Power Supply and 22.1 120. 1. 9 8. 50 90.00 Distribution 0 60 11. 46. 1. 10 Automatic Control 35. 20 30 50 Process Piping and 39. 160. 1. 11 Indoor and Outdoor 121. 10 50 60 Plumbing Ventilation and Air 15. 1. 12 12.00 3. 10 Conditioning 10

48

General Plan and 154. 1. 13 154. 60 Transportation 60 1. 14 Other Projects 191 Urban Wastewater 1915 2 5. Pipes . 00 00 Wastewater Pipe 366. 366. 2.1 D300 40 40 Wastewater Pipe 469. 469. 2.2 D400 60 60 Wastewater Pipe 420. 420. 2.3 D500 20 20 Wastewater Pipe 426. 426. 2.4 D600 40 40 Wastewater Pipe 106. 106. 2.5 D700 00 00 Wastewater Pipe 126. 126. 2.6 D800 40 40 Other Costs of 694. 694. II Project 70 70 Construction Soft Environment 200. 200. 1 Construction Costs 00 00 Land Acquisition and 143. 143. 2 Demolition 80 80 Management Fees of 47. 47. 3 Construction Unit 70 70 Project Preliminary 15. 15. 4 Work Fees 90 90 Survey and Design 131. 131. 5 Fees 10 10 Project Supervision 87. 87. 6 Fees 40 40 Consultation Service 6. 7 Fees about 6. 00 00 Environmental Impact 13. 13. 8 Bidding Fees 90 90 Construction Drawing 9 2.70 2.70 Review Fees Construction Project 1. 10 Transaction Services 1. 80 80 Fees Project Quality 3. 11 3. 40 Inspection Fees 40 Project Insurance 5. 12 5. 30 Fees 30 Project Cost 11. 11. 13 Preparation and 90 90 Review Fees Joint Commissioning Fees and Application 23. 23. 14 Fees for Construction 80 80 Approval 466. 466. III Budget Reserve 80 80

49

Interest and Front- 93. 93. end Fees of the IV 29 29 Construction Period 85. 85. 1 Loan Interest 29 29 8. 2 Front-end Fees 8. 00 00 410 Fixed Assets 2027 1254 V 382.3 440.00 4. Investment . 60 . 79 69 3.7. Schedule of the Project Implementation Progress

3.7.1. Construction Period The Hunan Integrated Economic Development Demonstration Town Project (Yueshan Town Subprojeoct, Xiangxiang City) Utilizing WB Loans has been included in the List of Candidate Projects of World Bank Loan in Fiscal Year 2009 to 2011 in the end of 2008. According to the requirement of World Bank Project construction period, by analysis of the construction content, scale, type and the Project complexity, the construction conditions, the management level and the quality of personnel, etc. of the proposed project, and by referring to the construction schedule of similar projects, the construction period of the Project is intended to be 5 years, that is 60 months. 3.7.2. Scheduling The preliminary work of the Project, Hunan Integrated Economic Development Demonstration Town Project Utilizing WB Loans, was planed to complete in August 2011. The construction period of the Project lasts 5 years, which is from July 2012 to June 2017. Civil construction of the Project is 3 years, 36 months in total, from July 2012 to June 2015. February 2011-August 2011: Preparation and approval of the Project feasibility study report; September 2011: Preliminary design tender; October 2011-December 2011: Preliminary design; January 2012: Construction bidding; February 2012-June 2012: Construction design; July 2012-June 2015: Project construction;

50

July 2012-June 2017: Sub-annual training, inspection and related activities; The end of June 2017: Project acceptance; the schedule of the Project implementation progress is shown in Table 3-18.

51

Table 3-18 Schedule of the Project Implementation Progress Preliminary Project Construction Period Work No Project 2011 2012 2013 2014 2015 2016 2017 . 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2

1 Declaration and Approval

2 Initial Design

3 Construction Design, Approval and Tendering

4 Construction and Equipment Procurement and Installation

5 Training

6 Completion of the Project and Acceptance

7 Production Preparation

52

4. Profile of the Project Location Environment 4.1 Natural Environment Profile 4.1.1 Geographic Location and Traffic Yueshan Town, situated at north-central of Xiangxiang City, is 28Km east of its urban area. As a small-town development superiority area centered on Xiangxiang City, it enjoys prominent economic location advantages. The township is easily accessible, with Fan River to the east, Tanshi to the south, bordered by Yuduan to the north and Baitian to the west, 28km from Xiangxiang City, via Provincial Highway S311 and Huiyu Line passing through. The administrative region of town is easily accessible via Provincial Highway S311 which joins the east to the west, directly to urban area of Xiangxiang City and Yiyang City, and connects Shangrui Highway; the country roads Yuebai Line and Tanyue Line connect such townships as Jinshi, Baitian, Yueshan, Tanshi, etc. The Project is located at Yingxiongling Group, Xinqiao Village, Yueshan Town, Xiangxiang City. 4.1.2 Geological Features Yueshan Town belongs to South China fold system, which is characterized by intra Eurasian plate, ancient and stable stratum, and inactive faulting. However, Yueshan Town, for its loose soil, was once struck by mud-rock flows in some villages such as Qunle and Baolu Villages. 4.1.3 Weather and Climate Yueshan Town of Xiangxiang City belongs to monsoon wet climate area of middle subtropics, featuring four distinct seasons, hot summer and cold winter, abundant rainfall, and long sunshine. In recent years, its annual average temperature is around 17.3°C, an average temperature in January, the coldest month of year, is around 5°C and in July, the hottest month of year, is around 29.5 °C. The annual precipitation is 1100-1400mm, mostly concentrated in spring and autumn. Annual sunshine duration is more than 1300 hours. 4.1.4 Hydrology Upon treatment, the tail water of the Project which is up to standard will be discharged into Xinqiaohe River.

53

Xinqiaohe River originates from the rainwater of hills near Yueshan Town, and merges into Lianshui River in Tanshi Town, with primary functions of irrigation and flood discharge. Lianshui River, as the first level branch of Xiangjiang River, originates from upper stream of Guanyinshan of Xinshao County and Zhadu Town of Xinhua County, for an overall length of 232Km, flowing through , Loudi, Xiangxiang and Xiangtan into Xiangjiang River, with a total catchment area of 7,089Km 2. Xiangxiang City lies in the middle stream of Lianshui River, around 45Km away from the mouth of river. Lianshui River has a trunk stream with overall length of 97Km and a total of 14 tributaries streams within the territory of Xiangxiang City, with catchment area of 1,786Km 2. According to Xiangxiang hydrological station, the hydrological data from actual measurement is as follows: Maximum flow rate: 7,100m 3/s; minimum flow rate: 0.14 m 3/s; Average flow rate: 113 m 3/s; Highest water level: 50.44m; lowest water level: 41.28m; Average water level: 42.31m; Average grating residues transport rate: 39.2%; Average water temperature: 18.8°C; Maximum flow rate over years: 0.68m/s; minimum flow rate over years: 0.1m/s; 4.1.5 Ecological Environment (1) Mineral Resource Xiangxiang City boasts abundant mineral resources. Considerable stone materials are discovered in Shizhu Area and Yueshan Area, and large- quantity and high-content dolomite resources are discovered in Malong Area; however, large scale mining and processing never become reality due to deficiency in infrastructure like road transport and mining technology, etc. (2) Land Resource Yueshan Town, as the largest town in Xiangxiang City, has a total area of 149.8 square kilometers, of which, the cultivated land covers an area of 4,550ha, and the forestry land covers an area of 8,763ha. (3) Tourism Resource Culture tourism resource is also of particular features. Yueshan Town

54

possesses such tourism resources as Baozhong Mountain, known as “No. 1 Mountain in Central Hunan Province”, Hongri Reservoir and Baiyun Temple, etc., which are all in the undeveloped state for lack of auxiliary facilities. 4.2 Social Environment Profile 4.2.1 Administrative Division Yueshan Town covers an administrative region area of over 140 square kilometers, having jurisdiction over 58 administrative villages and 2 neighborhood communities for a total of 70,000 persons, with population density of 465.1 persons per square meter, and urbanization level of 13.07%. 4.2.2 Economic Status In recent years, Yueshan Town has experienced rapid development, substantially accelerated the pace of industrialization, urbanization and agricultural industrialization, and effectively advanced social undertakings. In 2010, its GDP reached RMB 630 million. From 2006 to 2010, it witnessed rapid economic development, with average annual growth rate of around 13.3%, realizing total industrial output of RMB 236.74 million, total agricultural output of RMB 346.09 million, and per capita net income of RMB 4,770. The town highlights the mainstay status of industrial economy, and gives top priority to speed up the development of industrial economy, with a view to realizing rapid development of industrial economy and steady progress of new industrialization. Relying on the advantages of abundant agricultural products and stone materials, the industries and enterprises are expanding on an annual basis. At present, Yueshan Town is home to over 20 enterprises, of which 4 are of large scale. It specializes in derivative industry chain for deep processing of agricultural products like rice industry, forming an industrial cluster. Meanwhile, it vigorously implements the industrial management mode of “leading enterprise+ base+ farmer”, and focuses on processing of agricultural and sideline products in developing agricultural industrialization, and traditional agriculture is keeping a robust growth. In addition, it has gradually shaped the development pattern of tertiary industry dominated by commerce and trade, food and beverage service, and tourism.

55

Table 4-1 National Income of Yueshan Town Total Agricultural Total Industrial Per Capita Net Year Output (RMB Ten Output (RMB Ten Income (Yuan) Thousand) Thousand) 2006 21152 8153 3306 2007 24142 12385 3630 2008 29065 17439 4060 2009 33555 22958 4140 2010 34609 23674 4770 4.2.3 Infrastructure (1) Power Supply There is 110kv Jinping transformer and power station within the Project Area with service area as follows: 19,000 household users distributed in whole area over 59 administrative villages (Qingpi Village of Tanshi) with voltage class of 110kv, annual output power supply volume: 18 million kwh, power supply unit: Yueshan Office of Xiangxiang Electric Power Bureau, annual gateway electric quantity around 18 million kwh, rated power around 6,300kw, the distance between Project Area and transformer station is around 4km, the distance between Project Area and 306 mainline of 10kv Jinxin Line is around 1.2km, and project-use power is guaranteed. (2) Water Supply There is one water plant within the Project Area, with water supply scale of 1,000m 3/d, covering Xinqiao Village, Hongyang Village and Hengjiang Village. The construction of the Plant area and main pipeline has been completed. The water source of the water plant is from Hongri reservoir in Hongri Village, adopting underground pipeline for delivery. The distance between the reservoir and Project Area is 6km. 4.3 Status Quo of Quality of the Project Area Environment 4.3.1 Atmospheric Environment To explain the status quo of environmental quality of the Project Area, we adopt the on-site monitoring data about Xiangxiang City Hutie Hotel and Yangjin Village recorded by Xiangxiang City Environmental Monitoring Station from June 29, 2010 to July 6, 2010 for assessment analogy. (1) Monitoring Time The on-site monitoring time is from June 29, 2010 to July 6, 2010 for consecutive 7 days.

56

(2) Sampling and Analytical Approaches It shall be implemented in accordance with relevant state standard and technical specification. The specific sampling and analytical approaches are shown in the following Table 4-2. Table 4-2 Sampling and Analytical Approaches for Environmental Air Monitoring Project Monitoring Sampling Analytical Sampling and Analytical Project Instrument Instrument Approaches 2031 Type Inhalable Intelligent High- Millipore Filtration Absorption Particles Analytical Balance Flow TSP Gravimetric Method (PM ) 10 (PM10) Sampler 2031 Type Formaldehyde Absorbing- Sulfur Dioxide Intelligent High- 722 Pararosaniline Hydrochloride (SO ) Flow TSP Spectrophotometer 2 Method (PM10) Sampler 2031 Type N (1-naphty1) - Nitrogen Intelligent High- 722 ethylenediamine Dioxide (NO 2) Flow TSP Spectrophotometer Dihydrochloride (PM10) Sampler Spectrophotometric Method (3) Monitoring Result The monitoring result is shown in Table 4-3.

57

Table 4-3 Statistics Table for Monitoring Result of Status Quo of Atmospheric Environment (Unit: mg/m 3) Monitoring Item (mg/m 3) NO SO PM Point 2 2 10 Concentration Range Per 0.021-0.035 0.040-0.056 / Hour Out of Gauge Rate 0 0 / Maximum Times Out of 0 0 / Gauge Average Daily Concentration Hutie Hotel 0.017-0.028 0.027-0.041 0.036-0.052 Range Average Value for Seven 0.019 0.031 0.040 Days Out of Gauge Rate 0 0 0 Maximum Times Out of 0 0 0 Gauge Concentration Range Per 0.003-0.013 0.008-0.026 / Hour Out of Gauge Rate 0 0 / Maximum Times Out of 0 0 / Gauge Yangjin Average Daily Concentration 0.04-0.010 0.012-0.020 0.056-0.125 Village Range Average Value for Seven 0.008 0.017 0.068 Days Out of Gauge Rate 0 0 0 Maximum Times Out of 0 0 0 Gauge Assessment Standard (Average Daily/Hour) 0.12/0.24 0.15/0.50 0.15/ (4) Result Analysis

From Table 4-3, it can be concluded that both hour concentration of SO 2 and

NO 2 and average daily concentration of SO 2, NO 2, and PM 10 at two monitoring points in Hutie Hotel and Yangjin Village meet the requirement of second level standard of GB3095-1996 Ambient Air Quality Standard (AAQS), without out of gauge. The Project is located at Yingxiongling Group of Xinqiao Village, Yueshan Town. Like Yangjin Village, without large scale air pollutant emission enterprises, it has identical environmental quality status quo and analogy. Upon analogy, it shows that the status quo of air quality of the Project Area environment is sound, and there is a certain environmental capacity. 4.3.2 Environment of Surface Water (1) Distribution Points of Monitoring Section Upon disposal by WWTP of the Project, the tail water which meets the primary standard - standard B of Pollutants Discharge Standard for Urban WWTPs (GB18918-2002) will be discharged into Xinqiaohe River. Therefore, 3

58

monitoring sections for surface water are set in this time. The distribution points of the section are shown in Table 5-7.

Table 4-4 Section Distribution Points for Monitoring Status Quo of Water Environment Sectio Rivers Section Positions n 1# 500m above Upper Stream of WWTP Outlet Xinqiaohe 2# 800m below Down Stream of WWTP Outlet River 3# 2,000m below Down Stream of WWTP Outlet (2) Monitoring Frequency and Project Environmental Monitoring Center of Changsha Environmental Protection Career Technical College is entrusted to make a 3-day monitoring on the foresaid sections from October 21, 2011 to October 23, 2011, sampling once a day.

The monitoring project covers pH, ammonia nitrogen, COD, BOD 5, SS, oil type, plant animal oil, total phosphorus, total nitrogen, and fecal coliforms number, as well as water temperature, water depth, river width, flow velocity and flow rate. (3) Monitoring Approach The foresaid indexes shall be implemented in accordance with Environmental Monitoring Technical Specification and Selective and Analytical Approach for Environmental Quality Standard of Surface Water released by State Environmental Protection Administration. (4) Assessment Approach Adopt single gene index approach to make assessment to the status quo of water environmental quality. (5) Monitoring Result and Assessment The monitoring result is shown in Table 4-5.

59

Table 4-5 Monitoring Result for Status Quo of Surface Water Environment Monitored Value (Unit of Fecal Coliforms: one/L, units for any other indexes are mg/L, except for pH) No Monitored 1# 2# 3# . Item 10.2 10.2 10.2 10.2 10.2 10.2 10.2 10.2 10.2 1 2 3 1 2 3 1 2 3 1 pH 6.5~6.7 6.5~6.8 6.5~7.0 2 SS 22 18 18 14 14 17 15 14 12

3 COD Cr 13.2 12.4 16.4 12.6 11.2 12.6 12.2 10.8 11.5

4 BOD 5 3.6 3.2 3.9 3.3 3.3 3.0 3.3 3.1 2.8 Ammonia 5 0.52 0.56 0.57 0.44 0.52 0.48 0.40 0.42 0.40 Nitrogen Total 6 1.12 1.40 1.46 0.95 1.14 1.32 0.89 1.25 1.30 Nitrogen Total 7 Phosphor 0.28 0.29 0.28 0.26 0.28 0.28 0.26 0.26 0.26 us 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 8 Oil Type L L L L L L L L L Animal 9 0.26 0.25 0.25 0.26 0.26 0.22 0.24 0.25 0.22 Plant Oil Fecal 350 380 380 320 360 360 200 300 320 10 Coliforms 0 0 0 0 0 0 0 0 0 Number From the above table, it can be concluded that all monitoring values of pH, ammonia nitrogen, COD, BOD 5, oil type, total phosphorus, total nitrogen and fecal coliforms number at 3 monitoring sections of Xinqiaohe River meet IV class standard of Environmental Quality Standards for Surface Water (GB3838-2002). 4.3.3 Acoustic Environment (1) Monitoring Distribution Points The Project sets one monitoring point respectively at East Plant Boundary, South Plant Boundary, West Plant Boundary, North Plant Boundary, Xinqiao Village, Hongyang Village, Xianfeng Middle School and Township Central Hospital. (2) Monitoring Time and Monitoring Approach The Monitoring Center of Changsha Environmental Protection Career Technical College performed the measure round the clock on October 23, 2011, and implemented the monitoring and analytical approaches in accordance with relevant state standards and technical specifications.

60

(3) Statistics and Assessment on Monitoring Result The monitoring result is shown in Table 4-6. We adopt equivalent consecutive

A sound level L Aeq , and compare the class 2 standard of Acoustic Environment Quality Standard (GB3096-2008), and conclude that the monitoring results of all 8 noise monitoring points meet the standard requirement, which shows sound quality of acoustic environment. Table 4-6 Assessment Result Table for Status Quo of Acoustic Environment (Unit: dB (A) Day and Night Leq (dB) of Day and Night Leq (dB) of Monitoring Monitoring Date Monitoring Date Location 2011.10.23 2011.10.23 East Plant 42.7 36.9 Boundary South Plant 44.1 37.0 Boundary West Plant 44.9 37.4 Boundary North Plant 42.1 36.8 Boundary Xiaoqiao 44.7 37.3 Village Hangyang 43.5 37.1 Village Xianfeng 50.8 38.5 Middle School Township Central 46.1 37.6 Hospital Standard Value 60 50 Assessment Up to Standard Up to Standard Result 4.4 Basic Information for Major Concern on Safety Safeguard Policies of the WB Upon analysis, we find the Project doesn't involve dam safety (OP 4.37), international watercourse (OP 7.50), natural habitat (OP/BP 4.04) and material culture resource (OP 4.11), etc., and therefore we make no corresponding elaboration in the assessment

61

5. Environmental Impact Assessment The implementation of the Project will improve the infrastructure of Yueshan Town, whereas, it will inevitably impose undesirable impact to ambient environment, which are mainly reflected in construction and operation periods. Among those, the Project content which imposes major impact to ambient environment during construction period is the dust and noise from WWTP and auxiliary pipe network construction. While major impact in operation period is the affection of tail water from WWTP to water environment, and disposal of undesirable odor and wastewater sludge. 5.1 Analysis on Impact of the Project to Human Health The primary purposes for making assessment on human health impact lie in analyzing and preventing diseases brought from the Project and putting forward countermeasures to improve hygiene environment. 5.1.1 Environmental Benefits Brought by Implementation of the Project After completion of the Project, the status quo that the raw wastewater of the Project location is directly discharged into adjacent surface water will be changed, and the raw wastewater will be collected, disposed by WWTP until up to standard and discharged, which is in favorable of protecting the quality of receiving water of Xinqiaohe River, and improving the environmental hygiene condition of the Project location to some extent, bettering living quality of local residents, and promoting social progress. The expected environmental benefits of the Project are shown in Table 5-1. Table 5-1 Expected Environmental Benefits of the Project Unit: t/a

Period BOD 5 COD SS NH 3-N TN TP Pre-implementation of the Project 142.35 262.8 219 27.375 32.85 3.066 Post-implementation of the Project 21.9 65.7 21.9 8.76 21.9 1.095 Abatement Quantity 120.45 197.1 197.1 18.615 10.95 1.971 Abatement Rate (%) 85 75 90 68 33 64 With the growing of population, expanding of urban size, and accelerating of urbanization pace, environmental pollution problem of Yueshan Town has evolved into an impediment to the development of social economy and improvement of people’s livelihood. Implementation of the Project will relieve the contradiction between economic development and environmental pollution to some extent, improve the life quality and health level for the people of the

62

Project location, and promote sustainable development of local social economy. 5.1.2 Analysis on Impact to Human Health Some environmental hygiene problems, e.g. offensive odor of WWTP, and spread of aerosol germ, etc. exist in the construction of WWTP project. They will bring adverse impact to human health. Therefore, the environmental assessment puts forward that the following countermeasures shall be adopted to relieve or eliminate these adverse impacts: (1) Eliminate the four pests (mosquito, fly, mouse and cockroach); (2) Remove the wastewater salvage and wreck; (3) Clean the structure in respect of sidewall of tank, guardrail, stairs, sidewalk, air duct and etc. on a periodical basis; (4) Remove domestic waste, and collect, pack and classify the waste; the Environmental Hygiene Department shall clean up and dispose the sanitation trash can filled with waste on a daily basis; (5) Plant high forest around the site for deodorizing; (6) Set up a health protection distance. After calculation in light of relevant state regulations, the WWTP site for the Project is selected at least 50m distance from the resident settlement. 5.2 Analysis on Impact to Environment in Construction Period The environmental impact during the construction period of the Project comes mainly from noise, dust, construction wastewater, construction waste, traffic environmental impact, landscape ecology impact, water loss and soil erosion, and other environmental issues. 5.2.1 Analysis on Dust Pollution Source and Environmental Impact According to relevant research, the dust from construction site mainly comes from running of transportation vehicle, which approximately accounts for 60% of total dust, and is related to the road surface and vehicle running speed. Under normal circumstances, the influence sphere of dust from construction site and road is within 100m under the action of natural wind. In windy day, the dust quantity and influence sphere will somewhat expand. The spoil, sand and lime in construction period, if improper stored or scattered in loading or delivery process, will give rise to dust with influence sphere of around 100m.

63

Another case which will give rise to dust is air storage of earth excavation, with primary feature that the operation will be affected by the speed of wind. In addition, due to the relationship between dust quantity of road and running speed of vehicle, the faster speed of vehicle, the more dust quantity. According to the analog investigation result, it shows that sprinkling water to roads for 4-5 times every day will cut dust by around 70%. Table 5-2 gives the practical measurement results of sprinkling water to suppress dust on construction site. Table 5-2 Measurement Result of Sprinkling Water to Suppress Dust Distance from Construction Source (m) 5 20 50 100 No Water Sprinkling 10.14 2.89 1.15 0.86 TSP (Average Hour/mg. m 3) Water Sprinkling 2.01 1.40 0.67 0.6 From data of the Table, it can be concluded that after adopting the countermeasure of sprinkling water to suppress dust (for 4-5 times every day), we greatly reduce the dust concentration (calculated in TSP), and cut the influence sphere from 5-100m to 5-50m. In light of the identification and screening results of environmental protection target, along two sides of the Project pipe network, there are such sensitive points as school, hospital and residential area, and the spacing distance between the construction site and residential area is 10-100m. Therefore, the impact of construction dust to ambient environment still exists. Although the influence is temporary and dies away with construction period, we have to take effective measure to relieve the adverse impact from construction dust to the sensitive points of ambient environment during construction period. 5.2.2 Analysis on Impact of Construction Wastewater (1) Pipeline Construction Most of pipe network construction for WWTP is underway in the buildup area of Yueshan Town, and the construction people may make use of the existing living facilities around construction site, which does not established within the construction site. Therefore, the construction wastewater is mainly from the industrial wastewater. The industrial wastewater is mainly from the flushing and maintenance water of vehicle and mechanical equipment, with principal pollutants of SS and oil type. If the wastewater is untreated, the direct discharge of raw wastewater

64

will have a certain impact on the quality of surface water. Therefore, we put forward the following disposal requirements on the construction wastewater: To minimize the construction floor area, the chase-digging width shall be subject to the construction range of 5-10m distance along pipe distance line. It is unfavorable to set up grating residue tank within this range to dispose the flushing water of vehicle and mechanical equipment. In view of that, the environmental assessment suggests that the vehicle and mechanical equipment be flushed in a special flushing site instead of in the construction site. Meanwhile, the construction shall avoid rainy season. The construction unit may face oil leakage in mechanical equipment maintenance. In light of National Hazardous Waste List , the waste oil belongs to a hazardous waste (with series No. of HW08). Therefore, the construction unit shall adopt special plastic bucket to collect and recover the leaked oil, pour the collected oil to the waste oil storage tank, then the waste oil procurement department will make onsite acquisition; if the waste oil is dripped to the ground, it shall be wiped it out with cotton yarn in a timely manner. After foresaid measures are taken, the waste oil generated from maintenance of mechanical equipment will have little impact on the external environment. (2) Construction in the Plant area During the building construction period, field cleaning, concrete preparation and maintenance, construction and installation, and implementation of other project will create a certain amount of construction wastewater. In addition, a large number of construction people will create a certain amount of domestic wastewater during construction period. Principal pollutants contained in the construction wastewater consist of suspended substance, oil type and etc., which are, however, in low discharge value. The wastewater grating residue tank will be set up in the construction site for collection and grating residue of various industrial wastewaters, which will be recycled in the site for water sprinkling and dust suppression, instead of being discharged to surface water. The domestic wastewater of construction people will be recycled in the site for water sprinkling and dust suppression upon simple grating residue treatment, instead of being discharged to surface water.

65

5.2.3 Analysis on Impact of Noise (1) Pipeline Construction The construction noise in the course of pipe network construction comes mainly from transportation vehicle and construction mechanical equipment, e.g. excavator, bulldozer, and stirring machine, etc. In light of relevant document, the common noise level of construction mechanical equipment and transportation vehicle are shown in Table 5-3. Table 5-3 List of Noise Level of Construction Mechanical Equipment Name of Equipment Noise Level dB (A) Monitoring Distance (m) Pavement Roller 73-88 15 Scrapper 72-93 15 Bulldozer 67 30 Grader 80-90 15 Paver 82-92 15 Truck 70-95 15 Vibrator 69-81 15 The attenuation changes of noise with distance for principal machinery are shown in Table 5-4. Table 5-4 List of Attenuation Changes of Noise with Distance for Single Principal Construction Machinery

Distance from Nosie source (m) Mechanical Equipment 15 50 100 150 200 Scrapper 72-93 41-62 33-54 29-50 27-48 Grader 80-90 49-59 41-51 37-47 35-45 Vibrator 69-81 38-50 30-42 26-38 24-36 Paver 82-92 51-61 43-53 39-49 37-47 From Table 5-4, it can be concluded that the nose level of single construction machinery from over 100m away, will basically reach the noise limit for the construction site. For the ongoing construction of pipe network Project, the distance between both sides of pipeline and residential area varies from 5 to 100m. Upon the research, the closest distance between residential area and the pipeline is 5m, and the closest school hospital 8m, which are both under great influence of the noise during the construction period. In order to reduce the impact, we put forward the following alleviating measures: arrange the operation time of various construction mechanical equipment on a reasonable basis, avoid large number of equipment of high-noise level put into operation simultaneously, reduce night transport, and forbid night construction (22:00- 6:00). For the construction which has to be carried out in night, the construction unit shall get prior approval from local environmental department concerned and set up noise barrier between sensitive points and the noise

66

source; for the construction in school section, in parallel to making negotiation with the school, and trying to arrange the construction of high-noise level in winter vacation, summer vacation, two-day weekend or after school, the construction unit shall also quicken the pace, shorten the duration, reduce the influence time, and make high-noise construction overtime on two-day weekend, so as to avoid interfering with school academic environment; for the construction in hospital section, the construction unit shall make negotiation with the hospital, and set up movable noise barrier. (2) Construction in the Plant area For the construction in the Plant area, in order to minimize the impact of noise, especially the noise generated from construction machinery and transportation vehicles, the construction unit shall arrange the operating time of construction machinery on a reasonable basis during the construction period, and the high-noise construction is prohibited in night; meanwhile, for various construction stages, the construction unit shall carry out the construction as stipulated in Noise Limits for Construction Sites (GB12523- 90), and adopt such measures as setting fence and using low-noise equipment to strictly control the noise during the construction period. The impact of construction period is temporary and will die away as the construction period ends. After adopting relevant measures, the construction unit may control the noise within acceptable range during the construction period. 5.2.4 Analysis on Impact of Solid Waste The solid waste generated during the construction period mainly consists of muck and macadam, etc. excavated in the course of earthwork; supplies consumed in the delivery course, including sand, stone and concrete, etc.; and domestic waste of the construction people. According to the document provided by the Project Feasibility Report, the excavated volume of stone and earthwork during the pipe network construction period is calculated to be 32,000m 3, earthwork volume 25,000m 3, and residual spoil of 7,000m 3, which can be delivered and used for leveling land of WWTP area. Primary impact of solid waste during the construction period covers: (1) If overloaded, the vehicle will scatter the soil everywhere along the way; the wheels are covered with soil, which will overspreads to the transport

67

highway; a road, which is dusty in a sunny day and sloppy in a rainy day, will affect the passersby and vehicles and environmental quality. (2) If the spoil disposal land is unknown or the spoil is stacked at random, it will affect land utilization, and destroy the natural and ecological environment. (3) The spoil requires a large number of vehicles in terms of transport, if transported in the daytime, it will definitely have an impact to local traffic, giving rise to heavy traffic. (4) If the domestic waste can’t be disposed in a timely manner on a reasonable basis, the environmental hygiene problems will bring negative impact to human health. All delivered spoils from pipe network construction, which are ordinary solid waste without toxic ingredients, may be recycled to fill in the WWTP. Then the construction unit may also consider delivering the spoil to the construction project designated by the municipal administration and planning department for embankment foundation and depression filling, or comprehensively use it for landscaping along river. Therefore, the spoil disposal won’t have adverse impact on the environment; and the domestic wastes, which are collected, packed, and classified by the construction people, will be delivered by the Environmental Hygiene Department for disposal, exerting little influence on ambient environment. 5.2.5 Impact Analysis of Water Loss and Soil Erosion (1) Pipeline Construction In the pipe network construction, the earthwork excavation is adopted and the remaining vegetation is to be eliminated, which will extend negative impact on the existing vegetation in the district. The destruction to the vegetation during the construction period cannot be avoided, causing surface soil bareness in the Project district; the original terrain and landform will be changed in places for excavating earthwork, storing useful wasted soils, and low laying filling, causing soil erosion and water loss and soil erosion in the rainy season. Therefore, the Contract shall strictly carry out the measures for keeping water and soil and tamp the bare surface soil in time during the Project construction period, ensuring not to give rise to water loss and soil erosion. The earthwork shall be stored reasonably in the construction site. The sewer and the watercourse shall be separated for certain distance. Construction materials

68

and wasted earthwork that fail to be carried away shall be covered with tarpaulin in windy and rainy days. There shall be places appropriate for the storage of the wasted earthwork without storage at will after the excavation of the pipe network. With the water and soil conservation scheme and the managerial measures strictly obeyed, the water loss and soil erosion arising from the pipe network construction during the construction period can be within the controllable range. (2) Construction therein Area Water loss and soil erosion in the construction of the WWTP Area mainly reflect in the two aspects below: the vegetation that was destroyed in the surface excavation is flushed and eroded in rains; various temporary structures destroy the original vegetation, worsening the local water loss and soil erosion. For example, the inappropriate management in the raw material plant and the temporary storage plant of wasted earthwork may easily cause sheet erosion and shallow ridge erosion. The construction phase inclined to water loss and soil erosion in the Project is mainly in the construction of the Plant Area. Generally, the experience formula (for not obviously eroded areas) is adopted to estimate the potential water loss and soil erosion amount during the construction period, with the amount to be 232t/a. The engineering construction will destroy the original landform and vegetation, change the natural movement of surface water, reduce the anti-erosion capacity of the surface soil, and increase the surface runoff and washing strength. The water loss and soil erosion arising from the engineering construction, if not prevented in time and appropriately, will cause certain harms. 5.2.6 Ecological Impact Analysis (1) Impact on Landscape Ecology During the pipe network construction, the pipe network laying area will be in a mess due to the earth excavation and earthwork storage, which will always leave people an impression of disorder though it’s separated with fences; the leakage of wasted earthwork during the transportation stains the road and raised dust, which also extends negative impact on the surrounding landscape. Therefore, it’s of great importance to clean the construction site.

69

The negative impact on the landscape during the construction period is short- term and can be recovered. (2) Impact on Temporary Land Occupancy The pipe network construction belongs to the temporary land occupancy. Strict measures shall be taken during the temporary land occupancy construction to protect the surface soil and avoid unrecoverable impact. After the excavation, the surface soil (with a recommended thickness between 30 and 50cm) shall be collected and stored separately, and water loss and soil erosion preventive measures shall be taken. After the completion of the excavation, refill the underground soil, cover the surface soil evenly on the surface, and tamp the site to reduce the impact on the soil quality. With careful planning during the construction period and timely site cleaning and greening after the completion of construction, the negative impact can be controlled effectively. (3) Impact on Permanent Land Occupancy The WWTP belongs to the permanent land occupancy. First, elimination of crops and sod reduces the vegetation cover ratio, and will cause small amount of water loss and soil erosion. Second, the earthwork excavation or filling changes the soil structure, reduces the soil-ripening degree, and affects the soil productivity after reclamation yet without affecting the land utilization modes. Farmland is generally for the permanent land occupancy of various WWTPs, which reduces farmers’ land. The local government has formulated compensation plans to readjust the Planting land, and the land owners shall pay certain economic compensation to the farmers subject to the state stipulations. 5.2.7 Impact on the Traffic The impact extended by the pipe network net construction on the traffic can be obvious. Although the stage construction method is available, some earthworks need to be stored temporarily during the construction, which affects the traffic in the roads along the line. When the pipe network crosses the road, the traffic will be jammed with slotting adopted, which extends relatively large impact on the traffic condition. Therefore, if permitted under the geological and soil conditions, tube type construction may reduce the impact of the road excavation. However, the bearing capacity (supporting power) of

70

the road drops, and cargo trucks shall be prohibited for short term, both of which will affect the urban traffic. It’s estimated that the construction for over 20 days are necessary with pipelines crossing each road, with the impact on the traffic lasting for 20 days or so. Pipeline construction on high streets has obviously impact on the traffic. Therefore, we shall make careful plans, keep a firm grasp on the construction, adopt the pipe-jacking for construction as far as possible, meanwhile, negotiate with the local transportation administration authorities and formulate temporary traffic routes prior to the construction, inform the local residents of the construction impact, set up nameplate on the construction site, and allocate special persons for dredging the traffic. Moreover, further measures for prevention of traffic jam shall be taken to reinforce the management during the construction period and reduce the construction period. The transport of raw materials (sands, cements, etc.) and wasted earth during the construction period will increase the vehicle flow in short term. Therefore, the transport shall avoid the traffic peaks, especially the rush hours. 5.2.8 Health and Safety Impact The Project is with small project amount and construction people. But the poor living conditions and hygiene conditions in the site and large labor intensity may easily cause diseases. In order to ensure the construction safety, the construction people shall have an overall physical inspection, people with communicable diseases are prohibited entering the site, the staff of the canteen shall have regular physical inspection, and people with epidemic diseases shall be treated in time and transferred from the canteen to prevent the spreading. Central water supply devices shall be set up and medical health facilities and medical staff shall be allocated in the construction site. The construction staff shall have labor protection to guard their health and safety and ensure the smoothness of the Project. 5.3 Analysis of Impact on the Environment during the Operation Period Impact on the surrounding environment during the Project’s operation period includes the impact of the WWTP on the water conditions, the treatment of odor and sludge, etc.

71

5.3.1 Impact of the Project on Water Conditions The qualified inflow and outflow water quality of the WWTP under normal and full load is shown in Table 5-5. Table 5-5 List of Inflow and Outflow Water Quality Designed for WWTP

Item CODcr BOD 5 SS TN NH 3-N TP Inflow Water Quality 240 130 200 30 25 2. 8 Outflow Water Quality ≤60 ≤20 ≤20 ≤20 ≤8 ≤1. 0 (1) Tail water According to the expected construction inflow water quality, with the discharge water quality meeting the Standard B in the Pollutants Discharge Standard for Urban WWTPs (GB18918-2002), the business accounting is subject to the full load. The estimate result of load Cut of the WWTP is shown in Table 5-6. Table 5-6 Pollutant Load Cut of WWTP Unit (t/a)

Period BOD 5 COD SS NH 3-N TN TP Water Amount 1095000 Before Treatment 142. 35 262. 8 219 27. 375 32. 85 3. 066 After Treatment 21. 9 65. 7 21. 9 8. 76 21. 9 1. 095 Cut 120. 45 197. 1 197. 1 18. 615 10. 95 1. 971 Cut Ratio (%) 85 75 90 68 33 64 From the above table, it can be concluded that after the operation of the WWTP, the wastewater is treated collectively to the Plant through organized pipe network, and the tail water that has been biochemical treated, deposited, and disinfected is discharged. The pollutant concentration and discharge amount in the Xinqiaohe River will drop largely, which has a favorable effect on the alleviation of the pollution in the river, obviously improves the water environment in the Xinqiaohe River, and extends a positive environmental effect. According to the Document [1999] No. 24 Notification on Development of Pollutant Outlet Standardization and Regulation issued by the State Environmental Protection Administration (SEPA), a signboard shall be set at the wastewater outlet, an automatic monitor and a flow meter shall be installed at the outflow, the standardized wastewater outflow shall be constructed for the convenience of sample collection and daily monitoring and management, the automatic online signal shall be connected to the environmental system of Xiangtan City, and the assessing construction unit shall entrust relevant qualified organizations to formulate the demonstration

72

report on drain outflow setting and submit it to the water administrative authority for approval according to No. 22 Order Measures for the Supervision and Control of Wastewater Outflows on Rivers issued by the Ministry of Water Resources of People’s Republic of China. (2) Analysis of Secondary Pollution Impact of Wastewater during the Operation Period The secondary pollution of wastewater during the operation of the Project mainly includes the industrial wastewater arising from the sludge dewatering equipment and the domestic wastewater in the Plant. According to the feasibility report, the fixed number of staff needed for the Project is 21, and the domestic water is supplied by the deep-well pump in the Plant. The amount of domestic water therein is 3. 1m 3/d with the water yield subject 100L/person · d, and the discharge amount of the whole plant is 1.79m 3/d (i.e. 653.4m 3/a) with the pollutant creation coefficient subject to 0.85. If the sludge dewatering equipment operates twice per day with the water as the tail water treated by the wastewater treatment device and 15m 3 of water per time, the production wastewater discharging amount is 30m 3/d (i.e. 10,950m 3/a). The total wastewater amount is 31.79m 3/d (i.e. 11,603.4m 3/a) which can enter the wastewater treatment equipment through the wastewater pipelines therein and be discharged along with the treated and standard project wastewater. (3) Prediction on the quality of receiving water in Tixinqiaohe river basic conditions of Xinqiaohe River Xinqiaohe River is originated from the hill near Yueshan Town. The water source is rain. Its main function is irrigation and floods discharge. It runs into Lianshui River at Tanshi Town. According to the Environmental Quality Standards for Surface Water GB3838-2002 and its actual function, Xinqiaohe River is confirmed to be IV class by Environmental Quality Standards for Surface Water (GB3838-2002). prediction on section The background section is confirmed by this assessment to be the section at 500m upper reaches of the WWTP outlet (section 1). The prediction sections are at 800m lower reaches (section 2) and 2000m lower reaches of the

73

WWTP outlet (section 3). prediction factors

The factors for the prediction of Honghe water quality are COD, BOD 5 and

NH 3-N. prediction time period It is planned to start prediction in 2017 and in low water period. prediction model According to the prediction river's features in hydrology and pollutants, suitable prediction models for water quality are selected. Xinqiaohe River is a small sized river and can be simplified to be a rectangle and straight river. The waste water of this project is domestic sewage, rich in organic pollutants, and not persistant. The mixing process reach applies two- dimensional stable-state mixing & attenuation model, and the total mixed reach applies one-dimensional stable-state S-P model. The prediction model are as below: See table 5-7 for the schedule of symbols and units in the formula. A two-dimensional stable-state mixing & attenuation model

Discharge at bank

B one-dimensional stable-state S-P model

74

Table 5-7 List for Meaning of Symbols and Units in the Formula

No. Symbol Meaning Unit

1 a Distance from the outlet to the bank m

2 B River width m Pollutant concentration, vertical concentration, section average 3 C mg/L concentration

4 C0 Pollutant concentration at starting point mg/L

5 Ch Pollutant concentration at upper reaches mg/L

6 Cp Pollutant discharging concentration mg/L

7 D Oxygen deficiency mg/L

8 D0 Section oxygen deficiency at starting point mg/L

9 Dh Oxygen deficiency at upper reaches mg/L

2 10 g Acceleration of gravity m/s 11 H Average depth m

12 K1 Oxygen consumption coefficient 1/d

13 K2 Reoxygenation coefficient 1/d 14 My Lateral mixing coefficient m2/s

15 Qp Waste discharging volume m3/s

16 Qh River flow rate m3/s

17 xy Coordinate in cartesian coordinate system m Distance from the oxygen maximum deficiency point to the 18 xc m starting point

19 u Speed at X direction m

selection of prediction parameters Based on the Xinqiaohe River monitoring report from the environment monitoring center of Changsha Environment Protection Vocational College from Oct 21 to Oct 23, 2011, the hydrological parameters are as below: Water temperature: 28.3 speed:0.3m/s flow rate 1.3m3/s water depth 0.5m Water width 6m distance from the outlet to the bank 1m K1=0.6/d K2=0.8/d

75

Pollutant concentration at upper reaches COD 14mg/l BOD 5 3.57mg/l NH 3- N 0.55mg/l See table 5-8 for the selection of the prediction parameters Table 5-8 List for Prediction parameters of the Project Water Environment COD BOD5 Discharging Waste NH 3-N concentration concentration mg/L concentration situation volume t/a mg/L mg/L

In normal 1095000 60 20 8

In accident 1095000 240 130 25

predicted length of the mixing process reach The predicted length of the mixing process reach is referred to the formula stipulated in the Technical Guidelines for Environmental Impact Assessment: Surface Water Environment, HJ/T2. 3-1993, which is as below:

From the above formula, the length of the mixing process reach where the waste water of the project discharges into Xinqiaohe River is around 26m. 30m is taken to facilitate the calculation. prediction results and assessment Take the outlet as the base point, river flow direction as X axis and the river width as Y axis. The hydrological situation in the monitoring period is referred. Two-dimensional stable-state mixing & attenuation model and one- dimensional stable-state S-P model are employed to predict how the COD, BOD5 and NH3-N, which are from the waste water of this project, affect Xinqiaohe River in the mixing process reach and total mixed reach respectively. See table 5-9 and 5-16 for the prediction results.

76

Table 5-9 Impact Value of the Wastewater on Xinqiaohe River on Condition that COD is normal mixing process reach Unit mg/l

y y=0 y=1 y=2 y=3 y=4 y=5 y=6 x x=10 15.0781 15.0824 15.0846 15.0847 15.0828 15.0789 15.0729

x=20 14.7642 14.7658 14.7667 14.7668 14.7661 14.7647 14.7625

x=30 14.6162 14.6171 14.6175 14.6176 14.6172 14.6164 14.6152

Table 5-10 Impact Value of the Wastewater on Xinqiaohe River in Case of COD Accidents mixing process reach Unit mg/l

y y=0 y=1 y=2 y=3 y=4 y=5 y=6 x x=10 18.3368 18.3538 18.3627 18.3633 18.3556 18.3397 18.3157

x=20 17.1055 17.112 17.1154 17.1158 17.1131 17.1074 17.0986

x=30 16.5375 16.5411 16.543 16.5432 16.5418 16.5386 16.5338

Table 5-11 Impact Value of the Wastewater on Xinqiaohe River on Condition that

BOD 5 is normal mixing process reach Unit mg/l

/ y=0 y=1 y=2 y=3 y=4 y=5 y=6

x=10 3.8596 3.8612 3.8621 3.8621 3.8613 3.8597 3.8573

x=20 3.778 3.7786 3.7789 3.779 3.7787 3.7781 3.7772

x=30 3.7393 3.7397 3.7398 3.7399 3.7397 3.7394 3.7389

Table 5-12 Impact Value of the Wastewater on Xinqiaohe River in Case of BOD 5 Accidents mixing process reach Unit mg/l

/ y=0 y=1 y=2 y=3 y=4 y=5 y=6

x=10 5.46 5.4706 5.476 5.4761 5.4709 5.4606 5.4451

x=20 4.937 4.9411 4.9433 4.9435 4.9417 4.9379 4.9322

x=30 4.6932 4.6955 4.6967 4.6969 4.6959 4.6938 4.6907

77

Table 5-13 Impact Value of the Wastewater on Xinqiaohe River on Condition that NH 3-N is normal mixing process reach  Unit mg/l / y=0 y=1 y=2 y=3 y=4 y=5 y=6 x=10 0.6662 0.6668 0.6672 0.6672 0.6669 0.6662 0.6653 x=20 0.6339 0.6341 0.6343 0.6343 0.6342 0.6339 0.6336 x=30 0.6187 0.6189 0.619 0.619 0.6189 0.6188 0.6186

Table 5-14 Impact Value of the Wastewater on Xinqiaohe River in Case of NH 3-N Accidents mixing process reach Unit mg/l

/ y=0 y=1 y=2 y=3 y=4 y=5 y=6 x=10 0.9135 0.9156 0.9166 0.9166 0.9156 0.9136 0.9106 x=20 0.813 0.8138 0.8142 0.8142 0.8139 0.8132 0.8121 x=30 0.7662 0.7666 0.7668 0.7669 0.7667 0.7663 0.7657

Table 5-15 Impact Value of the Wastewater on Xinqiaohe River on Normal Conditions complete mixed reach  Unit mg/l Pollutant COD BOD 5 NH 3-N Distance m

100 15.14 4.01 0.74

200 15.08 3.99 0.74

300 15.03 3.98 0.74

400 14.97 3.97 0.74

500 14.92 3.95 0.73

600 14.86 3.94 0.73

700 14.80 3.92 0.73

800 14.74 3.91 0.72

900 14.69 3.89 0.72

1000 14.63 3.88 0.72

1500 14.35 3.80 0.70

2000 14.08 3.73 0.69

3000 13.5 3.56 0.66

4000 13.03 3.43 0.64

78

5000 12.5 3.30 0.61

Table 5-16 Impact Value of the Wastewater on Xinqiaohe River on Condition of Accident complete mixed reach  Unit mg/l pollutant COD BOD 5 NH 3-N distance m

100 19.85 6.86 1.19

200 19.77 6.83 1.18

300 19.70 6.81 1.18

400 19.62 6.78 1.17

500 19.54 6.75 1.17

600 19.47 6.72 1.16

700 19.40 6.70 1.16

800 19.32 6.68 1.15

900 19.25 6.65 1.15

1000 19.17 6.62 1.15

1500 18.80 6.50 1.12

2000 18.45 6.37 1.10

3000 17.75 6.13 1.06

4000 17.08 5.90 1.02

5000 16.43 5.68 0.98 From the prediction results, it can be found that under the hydrological conditions during the monitoring period, the COD BOD5 and NH3-N concentration in the mixing process and total mixed reaches are all within the IV class standard of Environmental Quality Standards for Surface Water GB3838-2002 after the waste water of this project discharged into the Xinqiaohe River in normal situation; but in accidental situation, the BOD5 concentration of the total mixed reaches exceeds the IV class standard of Environmental Quality Standards for Surface Water GB3838-2002 a little within the 4km scope of the lower reaches of the outlet. impact analysis of the sensitive points at lower reaches

79

According to date collection and on-site inspection, Xinqiaohe River is mainly used for irrigation and discharging floods. There is no central drinking water source and water environment sensitive and protective target, but a few irrigation sources, within 5000m scope of the lower reach of the outlet. From the prediction results, the waste water of the project ensures the Xinqiaohe River water to meet the requirements of Farmland Irrigation Water Standard GB5084-92  in both normal and accidental situations. As a result, the waste water discharging of this project does not change the function of Xinqiaohe River and hardly affects the lower reaches of the outlet. Based on the research, Xinqiaohe River runs into Lianshui River at the lower reaches and is 25km from the outlet of this project. According to the stipulation of Water Environment Function Classification for Human Province Main Surface Water , the water course from the inter section of Lianshui Shuangfeng Town and Xiangxiang to the 1000m upper reaches of Xiangxiang Second Water Plant is for landscaping and recreation and complies with III class standard of Environmental Quality Standards for Surface Water GB3838-2002 . It will not exert significant adverse impact to the Lianshui water or affect negatively to the water quality of the resource of Lianxiang Second Water Plant; the waste water discharged in accidental situation can meet the III class standard of Environmental Quality Standards for Surface Water (GB3838-2002) even at 5000m lower reaches of the outlet, so it will not exert significant adverse impact to the Lianshui water or affect negatively to the water quality of the resource of Lianxiang Second Water Plant. Based on the prediction results and analysis conclusion, the waste water of the project discharged in accidental situation has some adverse impact to the water quality of the lower reaches of Xinqiaohe River, but does not affect the use of the lower reaches water. The construction unit should strengthen the management of construction and operation of the project, maintain the equipment well, make measures for such as emergencies, and take every effort to reduce the accident rate and undesirable effects. 5.3.2 Solid Waste The solid waste during the operation of the Project mainly includes sludge and domestic waste. 5.3.2.1 Sludge

80

The solid waste in the WWTP mainly comprises grating residues, sand deposit tank residues, dewatered sludge, and domestic waste, all of which are easy to decay and odor with microorganism actions in certain temperature and humidity, especially in sultry days. The dewatered sludge has the worst impact on the surrounding environment featuring  high water content ( ≤80%) and easy discharge;  fine and smooth grains and poor water permeability;  potential breeding place for flies, thus, a potential spreading source for diseases; and  potential source of percolate which will pollute the surface water and underground water. (1) Sludge Component Analysis Wastewater collected in the pipe network net of the Project WWTP mainly includes the domestic and industrial wastewater in the town with the latter mainly coming from the Spring Wood, the Rea Sea Wood, and Xiangxiang Weaving Factory. According to the developmental plan of Yueshan Town, the priority lies in the industrial line derived from agricultural deep processing industry such as the crop industry to form an industrial colony. Meanwhile, great efforts are made to push the business operation mode of “leading enterprises+ bases+ farmers”, to develop agriculture industrialization centered with agricultural and sideline product processing, and the traditional agriculture has been on the rise. Moreover, the development trend of the third industry centered with trading, accommodation, and tourism is coming into being. It can be seen that the industrial development in Yueshan Town mainly lies in the agriculture processing and food processing, and the quality of wastewater from enterprises of this kind is relatively simple mainly including organic high-concentration wastewater without heavy meal generally. Therefore, it’s confirmed through analogy that the sludge from the WWTP is generally ordinary industrial solid wastes free of heavy metals which can go for sanitary land fill in the landfill site after stabilization treatment such as concentration, and dewatering. (2) Environmental Impact of the Sludge Treatment Plant  Impact of Sludge Dewatering on the Environment The sludge is generally concentrated prior to dewatering. It odors in the concentration, and there is fluid mud on the tank which is a breeding bed for flies especially in hot summer.

81

The dewatering room may odor in the dewatering of the concentrated sludge; the leakage in the process will cause environmental pollution.  Impact of Sludge Storage on the Environment The dewatered sludge shall be cleaned away in time, and the sludge that fails to be transported in time shall be stored in temporary sites. The dewatered sludge will turn into thick liquid easily if caught in water with high mobility and easy to flow away; with the rain flushing, the leaching water with a large amount of pollutants dissolved will pollute the surface and underground water. Therefore, the dewatered sludge cannot be stored in clutters but in temporary storage sites equipped with impermeable layer specially for the processing and covered with canopy. Moreover, since the dewatered sludge isn’t stabilized completely, it will have anaerobic digestion with a long time of storage with odorants such as H 2S affecting the air quality. The sludge storage site is a breeding bed for flies, which extends negative impact on the environmental sanitation. As for these concerns, the dewatered sludge shall be cleaned away in time rather than being stored in the Plant.  Impact of Sludge Transport on the Environment Currently, the sludge is mainly transported in trucks. If the trucks and wheels are stained with a lot of sludge in the load and unload, or the trucks are with poor sealing performance, the sludge will be leaked on the road along, causing pollution. The dewatered sludge shall be prevented from leaking and scattering in the transport, and the trucks shall be covered and not overloaded to avoid the impact on the road sanitary and surrounding environment. Therefore, closed carrier vehicles for the special purpose shall be used to transport the sludge to the landfill sites regularly. Meanwhile, the sludge transport time shall be controlled strictly with rush hours avoided as far as possible. All in all, the transport of sludge is an issue of great importance. (3) Sludge treatment Method According to the survey, the sludge arising from the WWTP is characterized by:  the water content as high as 99%, large volume, and difficulties in disposal and transport. It shall be treated with decrement for the convenience of transport and follow-up treatment;  high content of organics that are unstable and easy to decay. The content needs to be reduced to stabilize the sludge;  some disease germs and parasitic ovum which are the media of

82

epidemic diseases. They can affect the public hygiene and the health safety, and shall be disposed appropriately;  necessity of avoiding secondary release of phosphorous. All in all, the sludge, if not treated properly, will create secondary pollution and increase the costs of chemical dephosphorization in the filtration liquid. Therefore, the sludge shall be pretreated prior to the final treatment. The sludge in the Project, after going through three pre-treatment procedures of concentration and dewatering, has its water content dropping below 60%, and reaches a stable state in the end. The final disposal of sludge is to deliver the dewatered sludge cake to the waste transfer station, then compress it with urban domestic waste, and at last send it to the Quanhu Garbage Disposal Plant in Xiangxiang City, 28km away from the WWTP, in a sanitary and safe way. The sludge transport route chart is shown in Figure 6. (4) Feasibility and Reliability Analysis of Sludge treatment Methods  Feasibility Analysis of Sludge Stabilization The process for the stabilization of sludge in common use includes: anaerobic digestion, aerobic digestion, heat treatment, heating to dry, heating stabilization, etc. The sludge treatment adopts DEST Process in the Project since the sludge age is long and the residual sludge has been approximately stable. According to the Code for Design of Outdoor Sewerage Engineering GB50014-2006, when the wastewater is treated with biological phosphorous and nitrogen removal, the residual sludge shall be concentrated mechanically without digestion. The sludge dewatering is to further reduce the water content and the sludge. The ways of the dewatering of the sludge are nature air drying, mechanical dewatering, sludge drying, incineration, etc. The widely used way of dewatering in WWTPs at home and abroad is mechanical dewatering with mainly centrifugal dewaterer, belt dewaterer and board-box dewaterer etc. The sludge water content is within 75-85% after the above three treatments, which dose not meet the requirement for landfill and is a prevailing problem in WWTPs at home. At present, some domestic companis, based on the existing dewatering method, have developed the new technology of Deep Dewatering with Sludge Treatment and Board & Frame Compression and Filtration, which is successfully applied in the WWTPs in eatern coastal area (such as

83

Guangzhou, Xiamen, Hangzhou, Wuxi, Shanghai etc.) . The key technics of this technology is to treat the sludge with medicament (such as inorganic or organic substance and active bacteria), break cell membrane, release bound water, absorption water, cell water, and improve the dewatering performance of the sludge, making the sludge water content lower than 60% after treatment. The detail treatment technics is as below:

Treat with the dehydrant Bl Reach the water The sludge with the Reach 80% after (mixed 75% organics e content of water content of belt dewatering and 25% inorganics) around 55% 99.3% n after board & d frame dewatering fo r After deep dewartering treatment, the sludge could be 40% lower in concentration than that treated by traditional mechanic dewatering. It is noted that since the water content of the sludge is reduced to 80% with belt dewaterer, the medical dosage put in the following treatment is less than that in non-dewatering process at a proportion of 3%; the smell value of the sludge is around 3 degrees which is acceptable basically; the quality of the dewatered sludge is quite sturdy and fundamentally stabilised; the lost organics is less than 2%. The above sludge treatment technology is practiced in the Xiaoshan Linjiang WWTP and Qige WWTP in Hangzhou. According to the on-site inspection and research, the above two WWTPs are well operated with the water content of the sludge after treatment kept below 60%, meeting the state and local requirements for landfills. Considered the conditions of the project, incineration is not fit for the project as it needs large investment, easily causes secondary pollution, and demands highly for management; there is no suitalbe farmland found near the project to absorb the sludge, and if managed improperly the sludge recycled to use in the farmland will easily cause earth contamination, therefore the safe and stabilisation treatment of the sludge to use in farmland is not fit for the project too. The technological and operational cost of the deep dewatering technicis with sludge treatment and board & frame compression and filtration is larger than that of the traditional sludge treatment technics. However it has a higher dewateing efficiency and meets the state and local requirements for landfills,

84

moreover there is a landfill near the project. As a result, the measure to employ the deep dewatering technics with sludge treatment and board & frame compression and filtration and then ship to landfill for buring is quite fit for the project.  Feasibility Analysis of the Final Sludge treatment The final disposal of sludge is to deliver the dewatered sludge cake to the waste transfer station, then compress it with urban domestic waste, and at last send it to the Quanhu Garbage Disposal Plant in Xiangxiang City, 28km away from the WWTP, in a sanitary and safe way. According to the Notification on Strengthening Sludge Pollution Prevention and Treatment of Urban WWTPs (Huanban [2010] Document No. 157) issued by General Office of Ministry of Environmental Protection, local environmental protection authorities at all levels shall connect the reality, formulate specific embodiment, reinforce the supervision over the whole process including the sludge creation, transfer, and disposal, strictly strike illegal dumping and disposal, adjust measures to local conditions, push forward the comprehensive utilization of land filling, incineration, building materials, and the current industrial kilns (e. g. utility boilers, cement kilns, etc.), and promote the harmless treatment ratio. Meanwhile, according to the requirements on land filling wastes in the Standard for Pollution Control on the Landfill Site of Municipal Solid Waste (GB16889-2008), the water content in the sludge after treatment shall be less than 60% before being sent to the domestic waste landfill. The scope of services of the Project covers the center township of Yueshan Town with the following objective: The WWTP only accepts domestic wastewaters and similar industrial wastewaters, or industrial wastewaters in line with national discharge standards after pre-treatment and being treated with domestic wastewaters. Therefore, the Project is a domestic WWTP with the sludge components generally identical with those of other plants. According to the Notification on Strengthening Sludge Pollution Prevention and Treatment of Urban WWTPs (Huanban [2010] Document No. 157) and the Standard for Pollution Control on the Landfill Site of Municipal Solid Waste (GB16889-2008), the sludge in the Project, after the pre-treatment, can be sent to the Xiangxiang Quanhu Garbage Disposal Plant for the final treatment

85

with the water content below 60%. Meanwhile, compared with the practical operation experience of Hengshan County WWTP, the sludge arising from the WWTP is to be disposed in the garbage landfill site, which is feasible technically. According to the General Planning of Yueshan Town, Xiangxiang City (2006- 2020) and Project Feasibility Study Report of Rural Environmental Connecting Sectors Regulation Demonstration Area in Yueshan Town, Xiangtan City and Xiangxiang City , the waste transfer station of Yueshan Town is located Yemaotuo Group of Yuntian Village, at the junction of Hongyang Village and Yuntian Village, occupying a total volume of 32m 3 and a total investment of RMB890,000, including a buried horizontal garbage compressor, a vertical garbage compressor, and a garbage transfer truck. The domestic waste is sent to the landfill site after being compressed and dewatered in the transfer station. It is after on-site survey that the waste transfer station, around 7km away from the Project, has been generally built and yet come into use. Xiangxiang Quanhu Garbage Disposal Plant, built for the domestic waste of Xiangxiang residents, is located in Quanhu Village, Longdong Town, Xiangxiang City, around 28km away from the Project. The landfill site is divided into two districts, the District I with a volume of 2,540,000m 3 approaching to the completion and the District II with an investment of RMB 59,800,000, a floor area of 254. 76mu (1mu=667m 2), a volume of 2,540,000m 3, and daily capacity of 400t. The District II adopts harmless disposal including the wastewater treatment system, landfill gas combustion system, the management system, the landfill system, etc. The sludge is planned to be sent for sanitary land fill in the District II after the completion of the Project. To sum up, it is feasible for the sludge arising from the operation of the WWTP, after the pre-treatment in the Plant, to be mixed with the urban domestic waste and compressed in the waste transfer station, and then sent to the Xiangxiang Quanhu Garbage Disposal Plant for sanitary land fill mixing with the urban domestic waste. 5.3.2.2 Domestic waste The fixed number of staff needed in the operation period of the Project is 21, and the domestic waste generated therefrom is 21kg/d, i.e. 7.665t/a. The

86

domestic waste, if not disposed properly, will breed a large amount of flies, leading to epidemic diseases and affecting staff’ hygiene safety and health. 5.3.3 Impact on Air Quality The impact caused by the sludge treatment devices on the air is mainly the odors. In the wastewater treatment, the organics in the sludge resolves to create odors under anaerobic condition with the content related to the temperature. The odor is severe in summer, mainly blending NH 3 and H 2S. It mainly originates from gratings, the sand deposit tank, the gas exposal pond, the sludge dewatering plant, and the sludge storage pond, and the DEST reaction district is in the buried type. Therefore, the unorganized odor discharge mainly originates from the sludge dewatering plant and the sludge pond. The WWTP has a relatively small scale and is the buried type with a small amount of odor. Therefore, the impact on the surrounding environment cased by the odor is not to be predicted but explained by means of setting health protection distance in the EIA. The formula of the health protection distance, the calculating process, and the parameters are shown in Appendix 2.

87

Table 5-17 Calculation Result of the Project’s Health Protection Distance and Its Relation with the Sensitive Points Calculation Meet the Result of Health Protection Distance in Requirements Sensitive Direction and Protection the Respective Plant of the Health Point Distance (m) Distance (m) Boundary (m) Protection Distance or Not East Xinqiao North-east Plant 0 Yes Village Side, 100 Boundary West Bailong West Side, Plant 45 Yes 50 Village 130 Boundary South Hongyang South-east Plant 24 Yes Village Side, 150 Boundary North Plant 37 / / Yes Boundary It has been calculated that the health protection distance of the projected WWTP is 50m. It is in accordance with the “ Urban Wastewater Treatment Project Standards ”, which stipulates that the wastewater and the sludge treatment facilities which create odors “shall be far away from the residential area outside the Plant, and correspond to the relevant regulations. When it can not meet the requirement, the distance between the residential area outside the Plant and the production facility which create odors in the WWTP shall not be less than 50~100m”. Due to the fact that the distance between the WWTP under construction and the main environmental protection targets meets the requirement of the health protection distance, the odor resulting from the operation of the WWTP has less impact on the main protection targets. 5.3.4. Impact on the Acoustic Environment The acoustic source of the WWTP mainly originates from various pumps, which concentrate in the inflow pump room, sludge dewatering room, return sludge pump and air blower housing. The Noise intensity is shown in Table 5- 18.

88

Table 5-18 Analysis of the Noise Impact Noise Intensity (dB (A) ) Name of Equipment Before the Protective After the Protective Measures Measures Wastewater Pump 90~100 80 Sludge Pump 90~100 80 Air Compressor 95~105 85 Transportation vehicle 75~80 / Air Blower 80~90 80 As seen from Table 5-8, if the noise control and noise countermeasures are not taken, the noise intensity can reach 105dB (A). However, the intensity drops to around 20dB (A) after the installation of the silencer and the construction being airtight. The main equipments that cause noise in the project are water pumps, air compressor, air blower, etc. The air blower in the generator room is 80~90 dB (A). After the noise elimination and noise insulation measures have been taken, the noise will reduce to 80dB (A). The pumps are often placed in the Plant, and the noise level is 90~100dB (A). After the noise elimination and noise insulation measures have been taken, the noise will reduce to 80dB (A). After the outdoor and distance attenuation, the noise in the Plant Boundary can meet the “ Emission Standard for Industrial Enterprises Noise at Boundary ” (GB12348-90) Category 2 (daytime: 60dB (A); and night-time: 50dB (A)).

89

6. Countermeasures According to the analysis of the environmental impact, the Chapter describes the countermeasures for two periods, inclusive of the construction period and the operation period respectively. 6.1. Countermeasures during the Construction Period 6.1.1 Waste Gas 6.1.1.1 Construction of the Pipe Network During the process of the wastewater network and pipeline construction, because the construction site is close to the residential area, the construction dust pollution will exist. The following countermeasures may be taken: a. Strengthen the construction management to achieve civilized construction. Load and discharge the construction materials lightly; b. Cover the vehicles which transport lime, sand and stone material, cement, etc. That cause dust easily with tarpaulins; c. Surround and enclose the construction site with colorful steel plates; d. Water and cover the temporary stockpiling place of the earthwork with overlay network to prevent dust. 6.1.1.2 Construction of the Plant Area During the construction of the WWTP, it is inevitable to generate construction dust. So in order to reduce the impact it causes to the surrounding environment, the following countermeasures may be taken: a. Strengthen the transportation management; put ceilings on the vehicles; and make sure that overloading is not allowed; b. Water the road frequently to decrease the dust pollution; c. Prohibit piling up the construction waste, especially discarding them outside the property line; d. Surround and enclose the construction site with colorful steel plates; e. Watered and cover the temporary stockpiling place of the earthwork with overlay network to prevent dust; f. Strengthen the construction management to achieve civilized construction. The construction materials shall be loaded and discharged lightly; g. Do not overload. Make sure that there’s no spatter from the soil loading vehicles. Wipe out the soil before the vehicle leaving the construction site to

90

prevent it from falling along the road; h. Carry out labor protection for construction people. Wear the dusk mask. 6.1.2 Noise 6.1.2.1 Construction of the Pipe Network The noise generated from the process of construction will cause certain impact on the surrounding environment. In order to reduce it, the following countermeasures may be taken: a. Arrange the schedules properly for the various machines. Avoid the simultaneous work of a large number of high-noise equipment, which shall be arranged at day time. Decrease the transportation at night. Prohibit constructing at night (22:00~6:00). For the construction work that must be done at night, obtain the approval from the relevant environmental protection department and set the sound-proof protective screen between the acoustic source and the sensitive points; b. When constructing on the section of the road where a school locates, the construction unit must negotiate with the school to arrange the high-noise construction in winter and summer holidays, weekends or after school time within the construction period. At the same time, pick up the speed to shorten the construction time, thus reduce the influencing time. Carry out the high- noise work intensively to avoid disturbing the study environment; c. When constructing on the section of the road where a hospital locates, the construction unit shall consult with the hospital and set the movable sound- proof screen. 6.1.2.2 Construction of the Plant Area During the construction period, the noise is mainly from the construction machinery and transportation vehicles. In order to reduce the noise impact on the lowest, the following measures may be taken: a. Arrange the working time properly for the various construction machines. Prohibit the usage of high-noise machinery at night. b. For the different construction period, construct in accordance with the regulation of “ Noise Limits for Construction Site ” (GB12523-90). Take the countermeasures of setting the protective screen, choosing the low-noise equipment, etc. To control the noise strictly. c. Choose the low-noise equipment, such as hydraulic machinery instead of 91

fuel machinery. Install silencer to the blender. d. Reduce the noise of the fixed mechanical equipment and earth cutting and moving equipment, like bulldozers, etc. by installing exhaust pipe silencer and isolating engine vibration components. e. Maintain and conserve the power generating machine on a regular basis. 6.1.3 Wastewater 6.1.3.1 Construction of the Pipe Network The Wastewater in the construction of the pipe network period is mainly industrial wastewater, which mainly comes from wash water of vehicles and mechanical equipment as well as the maintenance of the machinery. The major pollutants are SS, petroleum. In order to ease the impact they cause to the surrounding environment, the following measures may be taken: a. On the basis of the physical truth of the construction of the pipe network, the washing of the vehicle and mechanical equipment will not be done in the construction site, but specialized washing site. b. The construction time shall avoid the raining season. c. Recycle the leaking oil using the barrel catching method. Use the special plastic barrel to catch the oil and pour them into the waste oil storage tank. The purchase department will drop by and purchase the waste oil. If the waste oil drops on the ground, use the cotton yarn to rub-up. 6.1.3.2 Construction of the Plant Area During the WWTP construction period, the Wastewater is mainly construction wastewater generated from the site washing, concrete preparation and the process of the maintenance and installation, as well as the constructors’ domestic wastewater. In order to ease the impact it causes to the surrounding environment, the following measures may be taken: a. The Construction of the Plant Area unit shall set the grating residue basin, so the raining wastewater, ponding etc. can be used for washing and watering after processed by grating residue method and reach the standard. b. Build simple and easy domestic installation in the construction site. The kitchen wastewater needs to be oil-removed, sedated and then used for watering. Build temporary pit rest rooms; clean and transport the waste out on a regular basis.

92

6.1.4 Solid Waste The solid waste during the construction period mainly include: the residue soil and gravels dug from the earthwork; the material wastage during transporting, including sandstone, concrete etc.; the construction people’s domestic waste. If they are disposed improperly, the ecological environment will be damaged, and harmful impact will be brought to the human body. The following measures may be taken: a. The domestic waste shall be collected into bags, classified and transported together by the environmental protection department. b. Establish a pit rest room in the construction site of the WWTP. Hollowed them out on a regular basis and transported the excrement out as the fertilizer of the nearby farmland. c. The construction waste shall be classified. Those which may be recycled shall be recycled in time by a specially-assigned person, while those non- recyclable ones shall be used as the refill of the WWTP. d. The construction unit shall dispose the construction waste according to the “City Construction Waste Management Regulation ”. Before disposition, put forward an application to the environmental protection department and transport the waste according to the provided route and time. Reduce the amount of the waste, detoxicate them and made them useful. According to the city construction condition, consult the city construction department and the environmental protection department to use those waste as the preferential refill material. If they can not be disposed fully, they shall be transported out of town and piled up properly. 6.1.5 Ecological Environment (1) Choose the proper waste soil, residue site, and bank them up reasonably. It’s best to use them directly. Carry out each project section in different stages to reduce the impact on the scenery. (2) The digging and refilling of the earthwork shall avoid the raining season. Finish the refill and the side slope disposition before the raining season; (3) Dug discharge ditches around the spoil area to avoid the soil erosion in raining seasons. Cover the temporary stock dump with soil after construction. (4) Set up environmental protection and supervising institute and appoint specially-assigned persons. Strengthen the management and environmental 93

protection publicity to remind people of protecting the environment. Prohibit the deforestation of the construction people. In the contract, the contractor must construct in the boundary of the land and transport the spoil to the appointed location. 6.1.6 Social Environment (1) Inform the residence along the area about the construction of the pipe network in advance. Ask for instructions of the relevant department about the notification of vehicles’ route change due to the construction of the pipe network in advance and inform the residence. (2) If the construction of the pipe network crosses and conflicts with the public facilities of city water supply, electric power, communication, etc., discuss and exchange ideas with the relevant departments and authorities concerned in advance. Draw up construction plans for different sections. Explicate with the construction unit the possibility of the damage of the public facilities as well as avoiding and solving measures. (3) Negotiate with the police officer and the traffic control administrative department the organization of the city transportation. Take the countermeasures of sending specially-assigned persons to assist the traffic control and shortening the construction period to ease the pressure to the fullest (4) Set up the crosswise extraditing board and guardrail to reduce the impact it causes to the traffic. (5) In order to guarantee the city discharge unobstructed, take the diversion and pump using measure. In the section where the condition allowed, use the diversion measure, otherwise use the pump to drain away the water to make sure the discharge unobstructed. (6) Formulate a scientific construction plan; arrange the construction activities properly. Separate the network transformation into sections. Take the scheme of digging a section, recovering a section, which can avoid excavating and reduce the due caused visual pollution, traffic blocking and harmful impact to commercial activities. Get the citizens’ understanding by enhancing the publicity of the construction. Revegetate the area at the end of the construction. (7) Treat the road section that has sensitive point like schools, hospitals, etc. 94

as intensive protection section. Water the road to make the dust fall; prevent the noise and evacuate the traffic. (8) Improve the condition of the temporary occupying of the roads: Optimize the design scheme and construction route; decrease the temporary occupied land as much as possible in the project design; reduce the treading and press of the green belt. Transplant the turfs and trees on the land instead of damage at will. Afforest the surface of the refill land in time. (9) The protection of the material culture resources: If culture relics, ancient tomb, etc. being discovered, stop the site operation temporarily. Inform the relevant Cultural relics department; send specialized personnel to investigate on site to decide whether to save or unearth them. 6.2 Countermeasures during the Operating Period 6.2.1 Waste Gas The mainly waste gas in the operating period is odor. The wastewater treatment measure is land filling. In order to alleviate the impact that the odor caused to the surrounding environment, the following countermeasures may be taken: (1) Take into consideration that the smell is heavy in summer and the characteristic of the prevailing wind direction, optimize the plane layout. Built the main facility like sludge tank, dehydrating room in the down wind direction or side wind direction to keep the health protection distance between those sensitive points. (2) After the completion and operating of the project, strengthen the production management. Control the respective productive technology link that create odors; establish and perfect the system of personnel responsibility and supervising. (3) Safety management. After the completion and operating of the project, carry out the staff accident management training. Maintain the monitoring instruments on a regular basis, so that they can operate normally and fully perform the monitor and control function. If any persons come into the pump room, pay attention to the ventilation to avoid the excessively sedated H2S and NH 3 which cause harm to the human body. (4) Plan well. In accordance with the health protection distance, the planning

95

department shall re-plan the land in those areas; explicitly prohibit the construction of sensitive facilities like new residential area, schools, medical establishment, etc. (5) Strengthen the forestation. It is inevitable that the WWTP has odor, therefore the forestation plan is very important in the improving of the environment quality. The afforest design and construction drawing design shall be completed at the same time. The principal of the forestation is to eliminate the bareness land, plant the flowers and plants on a large scale. Plant arbor, bushes, pine trees, etc. on the both sides of the road; plant tall and big trees like poplar and locust trees on the boundary of the Plant to form a multilayer protective forest and to reduce the impact of the odor pollution. 6.2.2 Wastewater In order to guarantee the effluent index of the WWTP meets the requirement, the following countermeasures may be taken: (1) Before the industrial wastewater flowing into the WWTP, pre-treat them to reach the “Discharge Standard for Municipal Waste Water ” (CJ18-86) and “Integrated Wastewater Discharge Standard ” (GB8978-1996) Third level. In the mean time, the harmful, toxic first category pollutants which can accumulate in the animal body and cause harm to the human body must be confined and processed in the workshop. Only when it reaches the standard, can it be discharged into the WWTP. (2) Before the discharged water flowing into the network of the medical establishment, they must reach the relevant scale pollutant index limit requirement in GB18466 2005 “ Discharge Standard of Water Pollutants for Medical Organization ”. (3) Strengthen the project construction and operating management. Make sure the wastewater treatment facility and efficiency meet the design standard and requirement. Guarantee long term, stable, normal operation and the wastewater reaching the standard before discharging. (4) Establish and perfect the respective environmental management rules and regulations; implement comprehensively the staff professional training plan. (5) Maintain and conserve the equipment carefully. Reduce and get rid of the abnormal circumstances; avoid the discharge that exceed the standard;

96

prevent the accidentally risk discharge. (6) Strengthen the standardized management of the wastewater draining exit. Set the wastewater automatic metering mechanism, automatic ratio sampling apparatus at the terminal exit. Install online monitor device to control the main water quality index like pH, water temperature, COD, etc. (7) Setting up standby equipment; establish an emergency pre-arranged planning to prevent the bad consequence from happening when problems occur. (8) Domestic wastewater and sludge wash water shall follow the wastewater conduit into the wastewater treatment facility. Discharge them along with the construction wastewater after reaching the standard. 6.2.3. Noise It is proposed to take the following control measures for noise during the operation period of the Project: (1) Select low-noise standard products in the production workshops with big noise such as wastewater pump, sludge pump, air blower and dewatering rooms, with noise reduction measures such as shock pad or flexible joint being taken when installing. (2) Conduct noise insulation treatment to the partition between the operating room and equipment room, and to the doors and windows of the equipment room, so as to reduce the impact of direct noise on the human body. (3) Use the acoustic range principle to reduce the noise impact, with the space between acoustic source and building being kept to the maximum in the general layout, so as to provide the staff in the WWTP with a good working environment. (4) In combination with the Project construction, plant tall trees and shrubs which together form the mixed shelter belt to expand the green area therein, so as to achieve the acoustic absorption and noise reduction effect with vegetation. 6.2.4. Solid Waste The solid waste generated during the operation period of the Project mainly includes domestic waste and sludge, among which the domestic waste is collected and transported to the landfill site, while the sludge treatment is conducted in accordance with the Notification on Strengthening Sludge 97

Pollution Prevention and Treatment of Urban WWTPs (Huanban [2010] Document No. 157) issued by General Office of Ministry of Environmental Protection, with the following preventive measures proposed to be taken: (1) The solid waste in the WWTP, especially the sludge, shall not be indiscriminately disposed, but shall be properly collected, stored and transported to the landfill site on a regular basis in a sanitary and safe way. (2) The Project sludge is prohibited to be discharged to the ground water body and non-specialized general solid waste fields such as coast, valley, lowland, karst cave and farmland. (3) Measures to prevent loss and secondary pollution such as the prevention of foundation seepage, of rain eluviation and scouring, and of obnoxious gas from gathering in the shed and sending out concentratively shall be taken in the temporary sludge storage of WWTP. (4) The WWTP shall earnestly fulfill the sludge treatment and disposal responsibility, to conduct the whole process management on the production, transportation, storage, disposal and treatment of sludge, to set up special monitoring department or full-time (part-time) Personnel, to ensure proper disposal and treatment of sludge, and to strictly prohibit unauthorized dumping, stacking, discarding and fly-tipping of sludge. (5) The sludge treatment and disposal shall comply with the principle of reducing amount, stabilizing and harmlessness, with the sludge treatment facilities being planned, constructed and put into operation concurrently with the wastewater disposal facilities. (6) To establish the sludge management ledger and the manifest system. The WWTP shall establish the sludge management ledger, so as to make detailed record on the amount of output, transfer, treatment and disposal, and the place where it goes, and report to Xiangtan City Environmental Protection Bureau on a regular basis; shall establish the sludge manifest system, with the manifest being filled in truthfully and accurately when the WWTP transfers out the sludge. (7) Standardize the sludge transportation. The unit engaged in the sludge transportation shall have relevant road cargo operation qualification, and individual and the units without access to relevant operation qualification are prohibited to engage in the sludge transportation, meanwhile, seal, 98

waterproof, anti-leakage and fly-tipping preventive measures shall be taken for the sludge transportation vehicle. (8) Add a rain shelter on the top of sludge storage hall in the WWTP, make thorough hardening treatment to the storage hall floor, and set cofferdam, discharge ditch and collection well near the storage hall, so as to deliver the water discharge generated during the sludge stockpiling back to the wastewater treatment system for treatment. (9) Closed tanker transportation shall be adopted when transporting the sludge outward. (10) For the measures on reducing the amount of sludge, advanced sludge concentration dewatering techniques shall be selected to dewater the sludge to have the water content below 60%, thus to reduce the output amount of the sludge. (11) Ensure the sludge treatment rate to amount to 100%. (12) After bagging and separate collection, the domestic waste shall be cleaned up and carried away by the Environmental and Personal Health Department. 6.2.5. Ecological Environment (1) Pay attention to the combination of trees, shrubs and vegetation for the greening therein area, which shall be planned according to a certain proportion, and a certain hierarchical structure shall be kept. Try to use native species, and reduce the introduction of foreign species. Take priority to select such species as preferred tree (grass) species when greening. (2) Strengthen management. The Plant site shall send special personnel to do the campus greening and management work, and formulate corresponding rules and regulations to protect the green belt and the ecological environment. (3) After the wastewater pipeline is covered with soil, the hardening treatment shall be conducted within the town range, while timely greening and rush- planting shall be made outdoor, so as to have the vegetation be restored as quickly as possible at the exposed ground surface caused by the pipeline construction. Select local preponderant grass seed for the vegetation. Meanwhile, use the wire netting to enclose key areas, and perform management in a timely manner to prevent from the trample of flocks and herds or intentional destruction. 99

(4) Strengthen the inspection and management on the sludge pipeline, and perform inspection on the sludge pipeline on a regular basis, so as to timely discover and dispose the pipeline leaks to avoid the possibility of ground water pollution caused by the seepage of the sludge pipeline.

100

7 Environmental Risk Analysis and Mitigation Measures 7.1 Environmental Risk Identification According to the characteristic analysis of pollution effects of the Project engineering, the main environmental risk identification results are as follows: (1) In case of any sudden accidents such as power outage and sudden natural disasters, which causes the wastewater treatment facilities to stop operating, and a large amount of wastewater untreated to be directly discharged; (2) As the inflow water quality and amount suddenly change, the wastewater treatment efficiency drops, finally leading to the deteriorative outflow water quality, with the discharge going beyond the discharge standard requirements as specified by the State, and exerting great negative impact on the water environment and ecosystem; (3) The environmental risks caused by the pipeline damage or rupture, and the river water's seepage into the pipeline to dilute the wastewater, resulting in the environmental risk that the WWTP tail water fails to reach the standard. It is mainly that the ground water seepage under the riverbed or the seepage of the river water in the riverway to dilute the wastewater, resulting in low efficient treatment rate of the WWTP. 7.2 Impact Analysis on Potential Environmental Risk Accidents of the WWTP 7.2.1 Sudden Accidents The quality problem or inappropriate maintenance of the wastewater treatment equipment and facilities will cause failure of them, leading to the drop of wastewater treatment efficiency, even the direct discharge without being treated; or some irresistible external reasons such as power outage or sudden natural disasters, will cause the wastewater treatment facilities to stop operating and a large amount of untreated wastewater to be discharged directly, which will be the limit case of the abnormal discharge of the WWTP. When the wastewater treatment facilities fail to operate normally due to power failure, the wastewater may only be discharged to the surface water, which will cause serious pollution to the rivers.

101

7.2.2 Equipment Failure The equipment failure of the wastewater or sludge treatment system will reduce the wastewater treatment capacity, and make the outflow water quality index fail to reach the design requirement, or the sludge’s failure to be condensed or dewatered will cause the sludge to ferment, and the sludge storage pool to be packed, giving out foul smell. 7.2.3 Inflow Water Quality Impact The treatment effect of the urban WWTP is greatly impacted by the change of parameters such as the original wastewater amount or quality. According to the state environmental regulations, the industrial waste water shall reach national standards before being discharged, with the requirements for entering the WWTP being reached. When sudden accidents such as emergency power outage occur to the enterprise WWTP, the wastewater may be discharged to the urban wastewater pipeline without being treated, and to the newly-built WWTP. In case that the waste water into the Plant has excessive impact load, with the pH value exceeding the range of 6~9 and the abnormal conditions such as organic toxicants exceeding standard being difficult to be degradated, which will cause the biochemical microbial activity of the WWTP to drop, even cause the damage of the biological phase and the sludge bulking, finally resulting in that the outflow water quality deteriorates, the discharge standard requirements specified by the state are exceeded, and the great negative impact on the water environment and ecosystem is exerted. 7.2.4 Risk Accidents during Normal Operation Sudden risk of the wastewater treatment system accident will bring great damage to the staff maintaining the system, even threaten the life for serious ones. When the environmental risk accidents occur, the health and safety of the staff in the WWTP are first affected. 7.2.4.1 Risk Impact Analysis on Personnel Poisoning Caused by Toxic Gas When accidents occur to some structure of the wastewater treatment system, they must be eliminated immediately, at such time the maintenance staff needs to access to the wastewater pipeline, water-collecting well or wastewater pool to operate, where high-concentrated toxic gases such as hydrogen sulfide, methane and carbon dioxide are easy to generated and accumulated. Once protective measures are not taken during maintaining, the 102

maintenance personnel will get dizzy or breathing impeded due to poor ventilation and the breathing in of toxic fumes, and even death. It is reported that dozens of accidents occurred to more than 20 domestic urban wastewater pipelines and combined discharge pipelines, including that the maintenance personnel got poisoned or hurt due to toxic gas in the pipeline, and the personal safety was endangered by the explosion caused by the flammable gas methane’s contact with open fire in the pipeline. Therefore, it is essential to prevent toxic gas from causing harm to people by taking personal security measures to operators, and taking ventilation measures to completely dissipate toxic and harmful gases is the most effective way for preventing poisoning. In case of failure to be fully ventilated, it shall be avoided to access to dangerous space, and effective personal protective equipment must be worn when it is required to access to. Personal protective equipment includes gas mask, air supply mask, etc., and detection equipment includes gas detection instrument and detection test paper. 7.2.4.2 Risk Impact Analysis on the Harm of Pathogen-caused Diseases to Personal Health There are various pathogens and parasite ova in the wastewater or sludge, and the mist and steam generated from the wastewater treatment facilities can spread bacteria and viruses, so the staff of the WWTP exposed to the micro organisms of the wastewater and sludge may be infected and got disease. The infection may be caused by direct breathing in of gas or indirectly the waterdrop attached to the skin or clothes. Aeration pool, effluent weir, irrigative spray nozzle, blower room, and dewatering room will condense such gases. At the places with high condensation of water, using gauze-type respirator may reduce the inhalation of toxic substance. Such environmental risks are mainly that the operators may be directly infected by pathogen and get disease, while the probability that people outside are infected and get disease is low. However, if it fails to be controlled and causes the spread of disease, the personal health outside may be threatened. 7.3 Risk Mitigation Measures 7.3.1 Equipment Security Measures The equipment such as mechanical pump, valve, electrical appliance and

103

instrument used in the treatment facilities system, when going wrong, will cause the waste water treatment efficiency to reduce or cause the WWTP to stop operating, with the probability being high. The emergency measures for such accidents are mainly: (1) In the process design, consider to leave a certain backflow treatment buffer capacity and facilities (for example, add corresponding accident handling buffer pool) in the treatment system, and provide considerable treatment equipment (such as return pump, return pipeline, valve and instrument), in case when the equipment failure impacts the normal operation of the treatment system, the system buffer and return equipment shall be enabled to re-handle unqualified outflow water until to satisfy the discharge standard. (2) Multiple spare equipment shall be equipped with for easily-damaged equipment, and enough spare parts shall be ensured for maintenance and update. At least adopt the one-up means for electromechanical equipment in the treatment system. (3) Select high-quality equipment. For various mechanical, electrical and instrumental equipment in the treatment facilities, products with high quality, low fault rate, meeting the design requirement, suitable for long-term operation and facilitating maintenance and service shall be selected. (4) During operation, the on-guard operators shall operate strictly in accordance with the rules and regulations on the treatment facilities, perform patrol inspection to the equipment frequently, timely conduct maintenance and service, and reduce the equipment fault rate. (5) The electrical equipment is as required by the grounding protection specification; and automatic tripping circuit shall be installed, with the operation of main equipment adopting computer data monitoring, timely giving an alarm and recording the location, nature and time of accident, so as to organize people to repair in a timely manner. The installation and protection of all electrical equipment shall satisfy relevant safety rules on electrical equipment. (6) Adopt double-loop power supply to ensure the normal operation of power supply facilities and lines.

104

7.3.2 Protection of Abnormal Wastewater Discharge Take the emergency measures on the water amount’s instability due to various factors into full consideration during design, so as to ease the adverse situation. 1. Regulatory Requirements for Pollution Discharge Enterprises For the enterprises with daily discharge greater than 500m 3 and heavy pollution load, install the on-line monitor meter, and implement the system on irregular sample check and enterprise pollution discharge reporting under the municipal environmental supervision, so as to ensure the waste water to reach national standards before being discharged; national standards shall also be reached for other enterprises’ discharge of waste water; Set accident reservoir for heavy pollution industrial enterprises; In case of unnormal operation of waste water treatment facilities, causing the discharge of waste water to fail to reach the national standards, the problem shall be solved and notified to the WWTP. (1) Operation Technology Management Measures of WWTP Establish the operation management and responsibility system; Train the management and operation personnel, and create technical examination file, with unqualified ones being not allowed to take up the post; Engage professional technicians with rich experience to take charge of the technical management work therein; Select professional technicians to receive technical training at home and abroad; Strengthen the patrol to waterline, and find and solve problems in a timely manner; Strengthen the maintenance and management to the equipment and facilities, with spare ones for key equipment, and ensure the double-loop power supply; Close the doors and windows when the wastewater pump room is working, and ensure the noise at the Plant boundary to meet the standard requirement; In order to reduce the impact of the pump room’s giving out bad smell, the collection well shall be closed, and the wastewater shall be pumped into the wastewater mains and then delivered to the WWTP timely; the grating 105

residues shall be cleaned up promptly after being dewatered; Perform rainwater and wastewater shunting work in the WWTP, so as to prevent the wastewater from overflowing without treatment under heavy rain; Conduct greening around the Plant, choosing the Plants with high efficient purification to odor substance; Visit the residents around the wastewater plant on a regular basis to listen to their opinions. (2) Strengthen the power station management, and ensure the normal operation of the power supply facilities and lines. 7.3.3 Emergency Measures for Sudden Waste Water Discharge Risk Accident Once sudden waste water discharge accident occurs to the WWTP, the following measures shall be taken: (1) Strive to ensure that the grating and sand deposit tank are in normal operation, making the SS and COD in the inflow water be reduced to a certain degree; (2) Locate the reason(s) from main pollution sources in the water catchment system, with the emergency measures being taken by relevant enterprises to control the discharge of toxic substance harmful to micro organism; (3) Irresistible external reasons such as double-loop power outage and sudden natural disasters will result in that, when the wastewater is discharged without treatment, discharge enterprises in part or whole shall be required to stop discharging the wastewater into the pipeline, so as to ensure the safety of water body; (4) During the occurrence and processing of accident, warning signs shall be hanged in the water area near the discharge outlet to remind each side to take precautions. 7.3.4 Staff Personal Security Measures (1) Before the operation of the WWTP, it is necessary to conduct safety education to the operating and management personnel, and formulate safety operation specification and management system, which shall be strictly performed and checked after the operation. (2) Sanitary requirements such as water supply & discharge, heating and ventilation, and lighting illumination shall be considered for the design of 106

buildings, and air-conditioning facilities shall be provided at the places where staff works for long. For some operation places with sealed structure and poor ventilation, mechanical ventilation shall be adopted. (3) The Plant area is equipped with labor protection articles such as life jacket, life buoy, safety belt and safety helmet. It is necessary for the operators conducting inspection or operation to the underground pipeline to wear necessary protective equipment, such as protective clothing, gas mask, air supply mask, gas detection instrument and detection test paper, in case of being poisoning, and there must be at least two people on the spot. (4) The edge of poor body aisle shall be equipped with hand rail and lighting facilities, so as to ensure the safety of pedestrians. (5) The installation and protection of all electrical equipment shall satisfy relevant safety rules on electrical equipment, with the grounding protection work for high-pressure equipment being made well. (6) The dangerous parts of mechanical equipment such as driving belt, gear and abrasion wheel shall be equipped with protective device. (7) It is necessary to strengthen the safety work management, formulate post responsibility system, set warning signs at the striking places of all dangerous areas therein, and build hand rail for the platforms above 1.2m; to provide ventilation equipment at the places where toxic or harmful gases may accumulate, establish safety labor protection agency being responsible for the safety production and labor protection. (8) According the actual need and convenience at each working section, production health rooms (rest room, bathroom, dressing room, etc.) shall be set; in addition to strengthen ventilation and provide shelter at the working sections with bad environment and outdoor operation places, rest rooms shall also be provided. Concentrated bathrooms are provided therein. (9) For the staff directly exposed to wastewater, sludge and domestic waste, physical examination shall be performed and relevant vaccine (hepatitis A, hepatitis B, etc.) shall be injected on a regular basis. 7.3.5 Protective Measures for the Impact of Sludge Discharge on Environment The sludge in the WWTP shall be cleaned up and transported to the waste landfill site after being dewatered, meanwhile, special airtight transportation 107

vehicles shall be used to prevent from giving out bad smell, spilling and polluting the environment, with the specific treatment and disposal referring to Chapter 6.2.4. In addition, once abnormal sludge discharge occurs to the WWTP, the equipment shall be maintained in a timely manner, with efforts being made in good repair to the extent that the sludge pool stores the sludge, and add agent (such as lime) without delay, so as to prevent from the sludge fermentation, and reduce the discharge of obnoxious gas. 7.3.6 Preventive Measures for the Impact of Flood to the WWTP (1)Take the flood impact into full consideration during design, including the impact of design year and check flood according to relevant regulations of the state. (2)Build Flood dike around the WWTP. 7.4 Emergency Authorities and Assignment of Responsibilities of the WWTP The emergency authorities of the WWTP mainly consist of subordinate offices and incident response teams of the Leading Group. Incident response teams include the Rescue Group, the Liaison Group, Logistics Group and Vehicle Group. Their respective responsibilities are shown in Figure 7-1. (1) The Leading Group shall organize and set up the emergency treatment plan, carry it out according to the environmental risks, take charge of overall command work on the spot and coordinate with the external parties. (2) The responsibility of the office is to assist the Leading Group in assigning, supervising and checking the work. (3) Under the unified command of the Leading Group, the Rescue Group takes charge of concrete implementation when handling the perils and maintains relevant equipment. (4) The Liaison Group takes charge of coordinating the work among the Rescue Group, the Logistics Group and the Vehicle Group. (5) The Logistics Group takes charge of assisting in rescuing the poisoned personnel, carrying out corresponding emergency measures, registering for observation and treatment in the hospital, and mustering relevant rescue items. (6) The Vehicle Group takes charge of the redeployment of vehicles, such as

108

transporting the poisoned personnel to the hospital, rescue items and so on.

109

The Leading Group

The Office

Rescue Vehicle Group Logistics Group Liaison Group Group

Figure 7-1 Setup Diagram of Emergency Authorities of the WWTP

110

8 Comparison and Selection of Alternative Proposals The comparison and analysis of alternative proposals of the Project is carried out in these three aspects: 1. Comparison and selection of No-project Proposals; 2. Comparison and selection of the construction site; 3. Comparison and selection of technical proposals. The general principles for analyzing the comparison and selection of alternative proposals: (1) Quantization comparison and selection principle: Try to quantize the impact of the environment where the Project is implemented in every alternative proposal. (2) Comprehensive comparison and selection principle: Do a comprehensive comparative analysis from aspects like environment, technology, economy and society. (3) Conformity comparison and selection principle: the proposal selected shall conform to the related development planning and standard requirement, and adapt to the local conditions. 8.1 Comparison and analysis of Zero Proposal The assessment of the environmental impact of the Project is to be considered from the prospective of environmental profit and loss, as well as social economy. After the comparison and analysis of WWTP proposals, the result is shown in the Table 8-1.

111

Table 8-1 Comparison and analysis of Zero Proposal Category Implementation Plan of the Project No-project Proposal (Zero Proposal) (1) Conform to the National policies with regard to the urban domestic (1) Maintain the current situation, wastewater treatment, pollution such as leaving the vegetation prevention and control technology undestroyed; (2) Conform to the “twelfth five-year” (2) Maintain the land use value (not Major plan of Hunan Province and the occupying any land); and Advantages Xiangxiang City; (3) Do not cause any environmental (3) Be beneficial to protecting the water issue such as vegetation quality of Xinqiaohe Rive; and deterioration and dust-raising during (4)Further improve the city’s the construction period infrastructure. (1) Occupy much land: of 8,529 square meters; (1) Discharge the wastewater directly (2) Cause vegetation deterioration and to surface water, making it seriously Major dust-raising during the construction polluted; and Disadvantages period; and (2) Fail to solve the current outdated (3) Result in negative impacts on wastewater collection system. environment such as equipment noise, sludge and wastewater during operation. Comprehensive From the prospective of society and environment, the implementation of the Analysis Project Plan is better than No-project Proposal. From Table 8-1, it can be concluded that although the No-project Proposal has no environmental issues, wastewater will undoubtedly pollute surface water because it comes directly into the environment without any treatment. The implementation of the Project Plan will unavoidably bring to its surroundings some impacts, among which many ones can be avoided or reduced with corresponding environmental protection, except for the irreversible permanent occupation of land (about 8,529m2). Moreover, the environmental impact is temporary during the construction period. The implementation and operation of the Project will bring long-term benefits to the society and environment, especially for protecting and improving the quality of the water in Xinqiaohe Rive, and improving the city’s infrastructure. So from the prospective of society and environment, the implementation of the Project Plan is better than Zero Proposal, proving the necessity to carry out the Project. 8.2 Comparison and analysis of Pipe Network Proposals 8.2.1 Principles for Determining the Pipe Network Proposal The wastewater pipe network shall be constructed on the basis of the local wastewater control plan as the local terrain and the emission characteristics

112

may be, so as to ensure the wastewater collection efficiency on an economic and affective basis. The following factors shall be taken into consideration: (1) Use gravity flow to the best extent; (2) Try to avoid the environmental protection targets (sensitive points). If the can't be avoided, the countermeasures may be taken; (3) Be beneficial to wastewater collection and transmission; (4) Facilitate the construction and future maintenance overhaul; (5) Reserve the space for expansion; (6) Ensure that the geological environmental conditions are good enough to conform to the requirement of the specifications of pipeline construction; (7) Save investment and operating costs; and (8) Conform to various local plannings. 8.2.2 Wastewater Pipe Network Proposal of the Project The main pipeline A lies in the north roads of the fire station, and for the diameter of some branch pipes, water amount for the long-term development shall be considered. The pipe diameter is DN300~DN600. The main pipeline B lies in the south roads of the planning land, and the water amount of the reserved alternative land for long-term industrial development in the eastern part of the town flows into the WWTP basically through line B. At this stage, long-term water amount isn’t considered, and it will be taken into account until further construction in the future. The pipe diameter is DN300~DN600. The main pipeline C lies along the north river of the inner river in this town, and for the diameter of some branch pipes, water amount for the long-term development shall be considered. The pipe diameter is DN400~DN500. Best consideration shall be given to the pipe network laying of the Project for the need of further development and terrain, reserving some space for expansion. At the same time, the landform features, roads, and construction conditions of Yueshan Town shall be comprehensively considered to rationally divide the discharge areas, trying to apply the gravity discharge, and reducing the cost of the Project. 8.3 Comparison and analysis of the WWTP Site 8.3.1 Principles for Site Selection

113

The selection of the site for urban wastewater treatment shall comply with the general town planning and discharge engineering planning, as well as ensure the site is: (1) In the downstream water and with the leeward of summer prevailing wind direction thereof; (2) Convenient for the water reuse and safety discharge; (3) Convenient for the collective sludge treatment and disposal; (4) With good engineering geological condition; (5) With less removal and rebuilding, less farmland-occupying, and a certain health protection distance; (6) Probable to be expanded; (7) Immune to the influence of flood disasters and with a good discharge condition, with the flood control standards thereof not lower than urban flood control standard; and (8) With convenient traffic, transportation and hydropower conditions. 8.3.2 Proposal for Site Selection According to the General Planning of Yueshan Town, Xiangxiang City (2006— 2020), wastewater will be discharged into Xinqiaohe River after reaching the standard of the concentrated wastewater treatment. The service scope of the WWTP is in the center township of Yueshan Town, with a population scale of 13,500 in 2013 in the short term and of 25,500 in the long run. According to the town construction and the development plan of Yueshan Town, the WWTP site has two proposals available: Proposal I: Xinqiao Town to be selected as the site (Yingxiongling Group), located on the west side of the provincial road Jinzhong Line, west to Xinqiaohe Rive. Proposal II: Hongyang Town to be selected as the site (Maowuwan Group), located on the south side of the provincial road Jinzhong Line, west to Xinqiaohe Rive. 8.3.3 Comparison and Determination of the Site Selection Proposals The Site Selection Proposals are shown in Table 8-2.

114

Table 8-2 Comparison and Selection of Site Selection Proposals Selection Proposal I Proposal (Recommended Proposal II Comparison Results Comparative Proposal) Items The border of Xinqiao Located near Village and Bailong Yangjiawan of Village is the WWTP Hongyang Village, site of town planning, the site has Geographic west to Xinqiaohe Rive, residential houses Proposal I is Location with open terrain on the on both east and preferred. east, south and north north sides and a sides. It is a wide and fishpond in the flat terrain, with no middle. It is a narrow residential houses. field. The main pipeline for The main pipeline for pollution cutting can pollution cutting can directly lead directly lead wastewater into the wastewater into the WWTP; the site is WWTP; the site is next Pollutant-Holding next to Xinqiaohe to Xinqiaohe River and Capacity and the River and the Proposal II is the disposed Discharge disposed wastewater preferred. wastewater can be Direction can be directly directly discharged into discharged into Xinqiaohe River with a Xinqiaohe River with discharge outlet a discharge outlet located in the located in the upstream. downstream The terrain elevation is The terrain elevation 85.5~88.2m, the site is 87.8~89.8m, the site ground level is 85.5m, and the flood ground level is m, 87.8 control conditions and the flood control are not as good as conditions are good. those of the With a flat terrain, it Proposal I. Proposal I is Plant Conditions has a relatively smaller With a fishpond preferred. earthwork volume of therein, it has a 13,000m 3 relatively larger It does not affect the earthwork volume of city development and 21,000 m3. conform to the urban It does not affect planning. the city development and conform to the urban planning. The site is located in The site is located in the urban planned area urban planned area in Yueshan Town with a in Yueshan Town downwind direction of with a downwind Environmental Two proposals are prevailing wind in direction of Impact almost the same. summer. It is within the prevailing wind in planned land for the summer. It is within WWTP, with no the planned land for residential houses the town, with no

115

thereof. residential houses No housing No housing demolition Housing demolition and and relocation in the Two proposals are Demolition and relocation in the width of the health almost the same. Relocation width of the health protection distance protection distance The traffic is The traffic is convenient. Roads convenient. Roads are are unobstructed unobstructed inside, inside, with the with the provincial road provincial road Traffic, Water Jinzhong Line to the Jinzhong Line to the Two proposals are Supply, and east. The water and north. The water and almost the same. Power Supply power supply is power supply is convenient inside, convenient inside, relatively coming from relatively coming the urban pipe network from the urban pipe and substation. network and substation. Work Amount of Proposal I is Main Pipeline For About 13.5 km About 14.2 km preferred. Pollution-Cutting Two proposals are Gross Investment 41.0469 million RMB 41.1232 million RMB almost the same. There are no There are no environmentally Environmentally environmentally Two proposals are sensitive points Sensitive Points sensitive points 100m almost the same. 100m far away from far away from the site. the site.

116

Table 8-3 Comprehensive Analysis Result on Comparison Proposals for the Project Comparison and Selection of Comparison Descriptions on Site Proposals and Selection Name Selection Major Proposal Major Advantages Disadvantages 1. Next to Xinqiaohe Rive and 1. With a convenient for tail relatively higher water discharging; terrain elevation, 2. Without any higher delivery removal and head of the lift rebuilding; pump and 3. With a flat The border of Xinqiao relatively higher terrain, which is Village and Bailong operating cost; convenient for Village is the WWTP 2. With a construction; Xinqiao site of town planning, discharge outlet 4. Of a relatively Proposal I Village west to Xinqiaohe located in the smaller work (Recommende Rive, with open upstream; and amount than d) (Yingxiongl terrain on the east, 3. With individual Proposal II; ing Group) south and north residents in 5. Of a relatively sides. It is a wide and Xinqiao Village, lower work amount flat terrain, with no Hongyang with regards to the residential houses. Village, and main pipeline for Bailong Village pollution-cutting respectively on than Proposal II; the sides of and northeast, 6. southeast and With a less gross west. investment than Proposal II. 1. Next to Xinqiaohe Rive and convenient for tail water discharging; Located near 2. Without any Yangjiawan of removal and 1. A fishpond is in Hongyang Hongyang Village, the rebuilding; the middle of the Village site has residential 3. With a flat site, needing Proposal II houses on both east terrain, which is filling and more (Maowuwa and north sides and a convenient for construction than n Group) fishpond in the construction; Proposal I. middle. It is a narrow 4. With a relatively field. lower terrain elevation, lower delivery head of the lift pump and relatively lower

117

operating cost than Proposal I. 5. With a discharge outlet located in the downstream of Xinqiaohe Rive. From the table 8-2 and table 8-3, it can be concluded, after comparison and selection, that: from the aspects of gross investment, the interior plant terrain conditions, pipeline distance, and flood control condition, Proposal I is better than Proposal II; but from the pollutant-holding capacity, Proposal II is better than Proposal I. From the comprehensive comparison of these conditions, it is determined that the general location conditions of Proposal I in Xinqiao Village (Yingxiongling Group) is better than those of Proposal II in Hongyang Village (Maowuwan Group). Therefore, it is recommended to locate the Project in Xinqiao Village (Yingxiongling Group), as indicated under Proposal I. 8.4 Comparison and analysis of Wastewater Treatment Process Proposals 8.4.1 Selection Criterion of Wastewater Treatment Process The wastewater treatment process in the WWTP shall be selected following the principles below: (1) Safe, reliable, and advanced technology: Advanced technology shall be adopted actively, on the basis of the previous exploration by predecessors, as well as the scientific summarization; (2) Less land occupied: The land resources are precious, so try to save the land. (3) Saved investment: The state and local financial resources are quite limited, so try to give full play to the benefit of investment and apply the most economical process, under the premise of satisfying the demand for good outflow water quality. (4) Convenient management and low operating cost: The local management level and the annual operating cost after the production shall be considered. Convenient-management and low-operating-cost proposal shall be selected. 8.4.2 Wastewater Treatment Process Proposal Selection of wastewater treatment process shall be based on an overall consideration of the quality of the outflow, treatment requirements, land area,

118

project scale and other factors. Appropriate wastewater treatment process can not only reduce the engineering investment, but also facilitate the operation and management of the WWTP and reduce the operating cost of the WWTP to ensure the water quality. According to the urban the WWTP operation experience at home and abroad, activated sludge process is most economic and effective for urban wastewater treatment, thus being widely adopted. Conventional activated sludge process can only be effective in removing

BOD 5, COD and SS, but limited for the removal of nitrogen and phosphorus, with approximately 20~30% of nitrogen removal rate and approximately 12~19% of phosphorus removal rate. According to the wastewater removal rate determined by the Chapter 4, the Project has higher requirements on removal of nitrogen and phosphorus rate, therefore the Project has to adopt enhanced secondary treatment with nitrogen and phosphorus removing function. At present, the commonly used wastewater treatment processes with nitrogen and phosphorus removal in urban the WWTP include A 2/O method, DEST tank, SBR and its improved process, improved oxidation ditch, etc. , and apply to the oxidation ponds and constructed wetlands of small towns. All these processes have their applicability and advantages and disadvantages. According to the Notifications on Further Strengthening Construction Management of Provincial Urban Wastewater Treatment Facilities (Xiangjiancheng [2008] Document No. 160) issued by Hunan Provincial Construction Department, as for the WWTP, the scale of which is below 0. 5~2 m3/d, recommended processes are DEST, sequencing batch reactor activated sludge process and its improved process. Current land of the WWTP is industrial land in the planning and a piece of flat land. Due to the large area of oxidation ponds and constructed wetlands and there ineffectiveness in nitrogen and phosphorus removing, they are not applicable to the Project. Combining the water quality of Yueshan Town and taking into account the safety operation of the WWTP, processing costs, management level and other factors, CASS and DEST apply to the Project, therefore these two proposals are selected for comparison. 8.4.2.1 CASS (1) Technical Principles

119

CASS (Cyclic Activated Sludge System) is the improvement of SBR and a type of Cyclic Activated Sludge Technology (CAST). The process is developed by Professor Coronszy and his colleagues on the basis of SBR technology. Now it has been promoted and applied in the United States, Australia, the United Kingdom, France, Germany, Austria, Canada, Thailand and other countries step by step. CASS refers particularly to batch activated sludge treatment process with biological selector and variable volume reactor which is both the oxygen area and major reacting area, in the mode of sequencing batch aeration - non- aeration and filling - running, completing processing functions of biological degradation and sludge-water separation of organic pollutants in a reactor. Its cyclic operation includes the following four phases: a) Fill – Aeration: During the aeration, inflow is received (limited aeration mode is also applicable) and the sludge of the main rector reflows to the selector. The reflux is 20% of the inflow. b) Fill – Settlement: Stop aeration and settle to separate the sludge and water. Different from SBR, CASS does not stop the inflow water during the settling period. This is because that the stirring brought by the inflow can lead to better settling. c) Decant (Outflow Removal): During the decant phase, CASS reactor stops inflow (or not), and at this time wastewater enters into another reactor. During the decant phase, sludge reflowing continues as usual. During the sludge reflowing, de-nitrification of nitrate nitrogen is completed and phosphorus is relieved, thus then nitrogen and phosphorus are removed. d) Idle practice: During the actual operation, decanting will always be less than 1 hour, and the residual time is designated as IDLE in the reactor and restoring sludge absorption capacity. During the idle phase, sludge reflowing continues as usual. The discharge of residual sludge is at decant and idle phase. (2) Features of CASS Process a) Small area and low investment. In CASS, biological degradation and sludge-water separation of organic pollutants are completed in a reactor with no need to set primary settling tank, secondary settling tank, residual sludge pumping station and other structures, which can save the land covered by

120

these structures and much project investment. b) Good outflow water quality and stable operation. According to biological selection principles, utilizing the separating and integrating of primary reaction zone, the release of phosphorus by the biological selector located in front of the system, the de-nitrification and the rapid adsorption of organic substrate in the inflow, the stability of the system operation is enhanced and the volume utilization is improved. After highly effective treatment, the wastewater can definitely achieve the national Level-1 outflow water quality standard. C) High utilization of oxygen and low operating cost. CASS tank is relatively deep and uses the micro-porous high efficiency aeration device, effectively improving oxygen utilization. At the same time, during the operation, through on-line dissolved oxygen measuring instrument, it uses IPC to allow the oxygenating equipment to work at peak performance, maximizing energy saving and minimizing operating cost. d) Strong shock load resistance. Variable volume increases the adaptability of the system to the change of water quantity and quality and the flexibility of operations. Actual operating experience has shown that CASS tank can run under short-term shock load which is 2 to 3 times of normal load, with very little change of water quality. e) High volume utilization. According to bio-reaction dynamics principle, the adoption of series operation of the tanks allows the overall plug flow of wastewater in the process of the reactor and complex completely-mixed flow patter in different zones, which ensures a stable effect and improves volume utilization. f) Effective removal of nitrogen and phosphorus. Through the control of biological speed, the reactor runs in the sequencing batch of anaerobic- anoxic-aerobic-anoxic-anaerobic, so that it is excellent in removing nitrogen and phosphorus and reducing operating cost. Process Flow Diagram is shown in Figure 8-1.

121

Transportation of Transportation and Blower Grating Residues Disposal of Deposited Sand

Waste Gratings water Inflow Sand CASS Tank Disinfectin Discharge to Pump Deposit g Tank Room Tank Xinqiaohe River

Entry of Residual sludge into the Sludge Treatment System

Figure 8-1 CASS Process Flow Diagram 8.4.2.2 DEST (1) Technical Principles DEST is an improved urban wastewater treatment system developed on the basis of UASB process and characterized by multi hypoxia, anaerobic aerobic tanks. It is a process dominated by anaerobic biochemistry and supported by aerobic biochemistry. The treatment system consists of down-flow anaerobic biological contact tank, up-flow anaerobic biological contact oxidation tank and biological contact oxidation tank. By setting high specific surface area filler in the anaerobic biological contact oxidation tank, the attached biomass is much more than the suspended biomass, dramatically increasing treatment capacity and reducing treatment cycle. It adopts recirculation system, which increases job stability. The wastewater after anaerobic treatment flows into the biological contact oxidation tank. The tank is a biological treatment device dominated by biofilm technology and supplemented by activated sludge process. With the oxygen source provided by the blower, the organic compounds in the device is adsorbed and degraded by microorganisms and further purified the water. Set polyethylene elastic filler inside the biological contact oxidation tank and use perforated pipe for aeration. DEST is dominated by anaerobic and supported by aerobic. The essence of the above anoxic and anaerobic reaction tank consists of a number of

122

relatively independent sludge bed (UASB) systems. Series connection of UASB forms multi-phase anaerobic process in stages. Due to baffling, several independent reaction chambers are formed in anoxic and anaerobic zones, and microbial communities suited to the environmental conditions are cultured in each reaction chamber. In each reaction chamber, the phase of microbial communities is changed along with the process gradually, and the graduation rule is identical with the degradation process of organic compounds so as to ensure that the corresponding microorganisms have the best work activity. With wastewater and returned nitrification liquid in the above work environment, facultative anaerobes in hypoxia area have the priority in getting carbon source, and conduct micro-aerobic or anaerobic respiration with nitrate as electron acceptor and carbon source as electron donor. During the reduction of nitrate nitrogen for N2, a large amount of organic compounds are oxidized to benefit follow-up growing of autotrophic nitrification bacteria in aerobic zone and improve nitrification degree. As anti-nitrification continues, due to the exhaustion of dissolved oxygen and nitrate in the back divisions of ABR biological reactor, the system enters anaerobic stage in the strict sense and phosphorus accumulating organisms is on top. It effectively suppresses the growth of filamentous bacteria and makes the anaerobic entering hydrolytic acidification stage, which hydrolysis macromolecules organic in the wastewater into low molecular fermentation products. Phosphorus accumulating organisms absorb these low molecular fermentation products, and transport them into the cell to assimilate them as carbon energy store property within the cells and release phosphorus. In the anaerobic zone, due to the hydrolysis of organic compounds into low molecular organic compounds absorbed by phosphate accumulating organisms, its concentration will continue to be reduced. The concentration of NH 4-N will also be reduced due to the cell synthesis, while there is no change to the content of NO3-N, the content of P is increased due to the release of phosphate accumulating organisms. Wastewater enters contact oxidation tank by baffling through anoxic and anaerobic biochemical reactions. In contact oxidation tank, using inorganic 2- 3- carbon compounds such as CO 2, and CO 3 , and HCO as carbon sources, autotrophic aerobic microorganisms oxidize the ammonia nitrogen brought by

123

original wastewater and the ammonia nitrogen generated by assimilation 4+ 2- during anti-nitrification process with NH 3, NH and NO for nitrate. At the same time, phosphate accumulating organisms get the energy from the degradation and absorption of dissolved organic compounds to absorb phosphorus, thus removing phosphate from the liquid. The generated phosphate accumulating organism cells are removed in the form of high- phosphorus sludge through emission of residual sludge, thus removing phosphorus from the system and realizing nitrogen and phosphorus removal. In aerobic zone, the organic compounds reduced with the aerobic degradation, the content of NH 4-N and p falls at a fast rate due to de- nitrification and phosphorus absorption of phosphate accumulating organisms, while the content of NO 3-N rises due to nitrification. The above processes repeated so as to achieve the purpose of effective biological nitrogen and phosphorus removal. (2) DEST Process has the following advantages: a) Small area and low investment. DEST process can complete the biological degradation and sludge-water separation in a reacting tank without primary settle tank, which can save the land covered by these structures and much project investment. b) Effective nitrogen removal. The core of the system is biochemical part. The biochemical stages include hypoxia tank, anaerobic tank and aerobic tank and the processes include hydrolysis, nitrification and de-nitrification, forming a reversed A 2/O process on the whole. Apart from removing COD and BOD 5 effectively, the system can adapt to the degradation requirement, which is significantly better than current conventional treatment process. c) Stable operation and convenient management. The oxygen source of the system is provided by the blower, through on-line monitoring and dissolved oxygen detector, fan operation parameters are automatically adjusted so as to achieve good performance. d) Strong shock load resistance. The system has a strong water quantity and quality shock load resistance. The system is connected by a number of relatively independent sludge bed (UASB) in series, forming multi-phase anaerobic process in stages, and it has

124

strong water and organic shock load resistance, especially Ammonia nitrogen shock. Even when the water quality and quantity have large fluctuations, the water quality maintains stable. e) Low operating cost The entire process is dominated by anaerobic and anoxic process. Saving blower aeration is effective in reducing operating cost. f) The tank is a closed structure with small impact on the environment, which reduces the investment in and operating cost of deodorization of the WWTP. (3) DEST process also has disadvantages as follows: a) Sludge recirculation system and inflow system shall be set up, and the control of inflow is complex, which requires higher level of management. b) The tank is a closed structure, so the installation and replacement of metal frame components and filler requires much time and work and the maintaining work load is larger. c) Due to less sludge emission and poor phosphorus removal, chemical phosphorus removal facilities shall be adopted normally at the end. (4) Process Flow Diagram is shown in Figure 8-2.

Transportation Transportation and Blower of Grating Disposal of Residues Deposited Sand

Waste Gratings water Inflow Pump Sand CASS Tank Disinfectin Discharge to Room Deposit g Tank Xinqiaohe Tank River

Entry of Residual sludge into the Sludge Treatment System

Figure 8-2 DEST Process Flow Diagram

125

8.4.3 Comparison and Determination of Process Proposals The comprehensive technical and economical comparison of the two proposals and the comparison of main technical parameters are shown in table 8-4 and 8-5. Table 8-4 Comprehensive Technical and Economical Comparison Table Comparison Proposals No. Item CASS Process DEST Process Content Comparison Quantity of Civil Proposal I 1 440. 3 480. 2 Engineering is preferred. Investment Facilities and Proposal II 2 Ten Thousand 342. 3 228. 6 Instruments is preferred. Yuan Direct Expense Proposal II 3 782. 6 708. 8 of the Project is preferred. Operating 0. 44 Yuan per 0. 28 Yuan per Proposal II 4 / Costs ton ton is preferred. Electricity Proposal II 5 Consumption / 0. 35kw/m 3 0. 2kw/m 3 is preferred. Index Output of Proposal II 6 / 463kg/d 247kg/d Sludge is preferred. Proposal II 7 Covering Area / 9416m 2 8529m 2 is preferred. 8 Process Flow Simple Simple Two proposals 9 Water Quality Good Good are almost the same. Process Nitrogen and Proposal I 10 Effectiveness Phosphorus Good Satisfied is preferred. Removal Two Shock Load proposals 11 Strong Strong Resistance. are almost the same. Automation Proposal II 12 Higher Lower Requirement is preferred. Requirement on Technique of Proposal II 13 Higher Lower Operating is preferred. Operation Personnel Management Usually small Usually large work amount of work amount of Maintenance maintenance but Proposal II 14 maintenance and Management large work load is preferred. high automation of filler degree replacement The odor has The odor has significant impact Environmental small impact on Proposal II 15 Odor on the Impact the surrounding is preferred. surrounding environment environment

126

The blower The blower Two produces noise produces noise proposals 16 Noise to the to the are almost surrounding surrounding the same. environment environment

Table 8-5 Main Technical Parameters Comparison Table

CASS Process DEST Process Technical Parameters WWTP (3000m 3/d)

Quantity of Wastewater Pump (set) 1 set is for the usage and 1set is for the backup. Intake Pump Performance Parameter Q=125m 3/h, H=8m, N=5. 5kW

Amount of Wide Grid (set) 2 (mechanic)

Grid Diameter of Drum (m) 0. 6

Distance between Grids (mm) 4

Amount of Settling Tank 1 set

Diameter (m) 1. 63 Settling Tank

Depth of Settling Tank (m) 1. 12

Sand Hopper Depth (m) 1.52 CASS or DEST Amount 1 set 1 set Reacting Tank

Net Plane Size × Depth of the Tank 40. 6 × 16. 9 × 5. 5 35. 5 × 17. 6 × 6. 5 (m)

Effective Volume (m3) 3000 3266

Residual Sludge Amount (kg/d) 463 247

Maximum Oxygen Demand (kg/d) 398. 5 189. 5

127

2 sets are for the usage 2 sets are for the usage Amount of Fan (set) and 1set is for the and 1set is for the backup. backup.

Air Volume of a Fan (m 3/min) 6. 79 5. 2

Power of a Fan (kw) 15 11

Secondary Amount of Secondary Settling Tank N/A Integrated with DEST Settling Tank (set)

CASS Process DEST Process Technical Parameters WWTP (3000m 3/d) Sterilization Tank Amount of Sterilization Tank (set) 1 1

Plane Size (m) 3 × 5 3 × 5

From the comparison of the above two tables, it can be concluded that both proposals have advantages and disadvantages and they are widely used in domestic wastewater treatment with mature technology, stable process operation and stable and qualified water quality. Comprehensive technical and economic comparison of Table 8-4 has made a comparison of 16 aspects of the two processes. As can be seen from the table, 5 items are basically the same, CASS has 2 items better than DEST process and DEST process has 9 items better than CASS. DEST process is superior to CASS in terms of investment, operating cost and electricity consumption. Merely from the point of view of operating cost, DEST process can save RMB 0.16 Yuan per ton, totaling 175,000 a year. And electricity consumption per ton water can save 0.15kw·h, totaling 164,300kw·h per year. The annual saving of standard coal is 20. 2 ton based on the coefficient of 0. 1229kg standard coal per kw·h electricity. Give comprehensive consideration to the embedded tank of DEST process and three major factors, i. e. small impact on the surrounding environment, low costs of equipment operation and low requirements on the quality of operating personnel, it is recommended to use DEST process for Yueshan Town WWTP.

128

8.5 Comparison and Analysis of Disinfection Proposals According to the regulations of Pollutants Discharge Standard for Urban WWTPs (GB18918-2002), the WWTPs shall be disinfected. 8.5.1 Brief Introduction to Disinfection Methods The common methods of disinfection are chlorination disinfection, CIO, oxidation disinfection, UV disinfection, and so on. (1) Chlorination Disinfection Chlorination works through adding liquid chlorine or chlorine compound. The liquid chlorine is the most common method so far, for its low cost, mature technology, and stable performance. Due to the requirement of chlorination of over 30min contact time, the capacity of the contact tank is big. Since chlorine is highly toxic and dangerous, and the steel cylinder containing chlorine is a high-pressure vessel with potential threat, the build-up of the chlorine reservoir and the chlorination room need to be based on the safety requirement. Chlorination will generate harmful organic chlorides, therefore, the residual chlorine quantity in the outflow water shall be strictly regulated and chlorine take-off equipment shall be built when needed, if there are the fish forages nearby the wastewater outlet. Chlorinated compounds include sodium hypochlorite, bleaching powder, chlorine dioxide, and so on. They have the similar features with liquid chlorine, while they are less dangerous and have less environmental impact with higher operating cost. (2) Oxidation Disinfection Oxidant can be used as the disinfectant of the secondary outflow water, the most common one of which is ozone. The advantages of ozone disinfection are downright sterilization, low lethality, basically no side-effect to environment and shorter contact time than chlorination. The disadvantages are more investment on capital constructions and higher operating cost. Oxidation disinfection is generally used on the disinfection of swimming pool water and drink water right now. (3) UV Disinfection The main advantages of UV disinfection include high efficiency on sterilization, short reactive time, low lethality, and no secondary pollution.

129

There is no need to set up large contact tank instead of disinfection canal, for the time of disinfection is short. Thus, the floor space and the cost of civil engineering are much lower. The disadvantages are high investment on equipment, complicated management and maintenance, no constant ability of sterilization, bad competence of resisting suspended solid interference, and strict requirements of SS concentration in the water. The comparison on disinfection methods above are shown in Table 8-6. Table 8-6 Comparison of Disinfection Methods Nitrogen Dioxide, Liquid Performance Ozone Uv Radiation Chlorine, and Bleaching Powder Bacteria Sterilizing Excellent (HOCL) Excellent Good Virus Sterilizing Excellent (HOCL) Excellent Good Alive Microbe Sterilizing The Second The First / The efficiency of disinfection will Not Sensitive The effect of ph is small. decrease with the increase of ph, to the Effect of PH When ph is small, o left and when ph is 7, it is the right 3 Change of will last longer. time to add chlorine. PH No Need to Add No Need to Surplus Disinfection Yes Chlorine Add Chlorine Byproduct THM Basically No Impossible Impossible Chloride and chlorinated Intermediate products Other Intermediate intermediate products are are aldehyde, aromatic Not Clear Products generated, like chloramine and dicarboxylic acid, chlorinated organics. phthalate, and so on. Domestic Application Widely Not Common Widely General Quantity (Mg/L) 5~10 1~3 / Seconds to about 10 Contract Time 30mins / Mins 8.5.2 Comparison and Determination of Disinfection Methods All the methods above can reach the goal of disinfection. As far, the chlorination is the widely used way to disinfect the outflow water of large WWTPs in our country, while most WWTPs abroad choose UV disinfection which has been employed by more and more WWTPs at home. Chlorine dioxide disinfection and UV disinfection are selected as the alternative proposals of the WWTP in the Project, which will be compared comprehensively in Table 8-7. Table 8-7 Comparison of the Disinfections of Outflow Water Chlorine Dioxide Item UV Disinfection Disinfection Contact Disinfection Tank Main Buildings UV Disinfection Trough and Chlorination Room

130

Chlorine Dioxide Main Equipment UV Disinfection Module Generator Floor Space Big Very Small Automatic Running and Operating Management Maintenance Workload Easy Management Environmental Impact Little No Total Civil Engineering High Low Costs Cost of Equipment Ordinary High Investment Ordinary Ordinary Cost of Reagents High No Electric Charge Low High Cost of Maintenance Low High According to the comprehensive comparison in Table 8-7, UV disinfection has the advantages of small floor space, maturity, stability, no new chlorine-adding workshop, no intermediate product, and so forth. Based on the consideration of all elements, UV disinfection is recommended as the disinfection of the outflow water of WWTPs in the Project. 8.6 Selection and Comparison of Sludge Treatment Proposals WWTPs will extract and generate a plenty of sludge during the process of wastewater treatment. The water content of the sludge is up to 90% and the bulk of sludge is enormous, therefore the management of sludge is very hard. Thus, the sludge needs to be reduced in volume for easier transport and post treatment. The organics in sludge are high in content, unstable and easily rotted, so that it is needed to decrease the content of sludge to stabilize the sludge. Some pathogenic bacterias and parasitic ovum contained in the sludge are the mediums of the infection of epidemic diseases, which will affect the public health and safety, and need to be well handled. Meanwhile the secondary release of phosphorus shall be voided. All in all, the improper management of the sludge will generate the secondary pollution, and increase the cost of chemic phosphorus removal in the filtration liquid. Therefore, the sludge shall be coped with before the final treatment. 8.6.1 Comparison and Determination of Wastewater Treatment Processes (1) Comparison of Sludge Treatment Processes The typical sludge treatment process of urban WWTPs has been showed as

131

follows:

132

Residual sludge Sludge Concentration Sludge Digestion Sludge Dewatering Sludge Cake

Figure 8-3 Typical Sludge Treatment Process The sludge in the Project, after going through three pre-treatment procedures of concentration, digestion, and dewatering, has its water content dropping below 60%, and reaches a stable state in the end. Sludge concentration includes gravity concentration, suspension concentration, and mechanical concentration. The gravity concentration may trigger the second release of phosphorus in the sludge. Since the reinforced biochemical phosphorous removal is adopted in the Project, the phosphorous content is high in the sludge at around 2.5%, if the sludge is concentrated in the concentration tank for a long time, the polyphosphate accumulation bacteria in the sludge will release a large amount of phosphorous in an anaerobic condition, which increases the phosphorous content in the liquid supernatant and the phosphorous removal cost. As a result, the gravity concentration is inappropriate for the residual sludge arising from the biological phosphorous removal. The suspension concentration requires of many devices and operation costs. Moreover, the above two sludge concentrations cover large areas; therefore, the mechanical concentration which covers less space and has favorable effects is adopted in the Project. The process for the stabilization of sludge in common use includes: anaerobic digestion, aerobic digestion, heat treatment, heating to dry, heating stabilization, etc. The sludge treatment adopts DEST Process in the Project since the sludge age is long and the residual sludge has been approximately stable. According to the Code for Design of Outdoor Sewerage Engineering GB50014-2006, when the wastewater is treated with biological phosphorous and nitrogen removal, the residual sludge shall be concentrated mechanically without digestion. The sludge dewatering is to further reduce the water content and the sludge. It includes natural air drying, mechanical dewatering, sludge heat drying and incineration, etc. The ways of the dewatering of the sludge are nature air drying, mechanical dewatering, sludge drying, incineration, etc. The widely used way of dewatering in WWTPs at home and abroad is mechanical dewatering with mainly centrifugal dewaterer, draper- type dewaterer and board-box dewaterer etc. The sludge water content is

133

within 75-85% after the above three treatments, which dose not meet the requirement for landfill and is a prevailing problem in WWTPs at home. At present, some domestic companies, based on the existing dewatering method, have developed the new technology of Deep Dewatering with Sludge Treatment and Board & Frame Compression and Filtration, which is successfully applied in the WWTPs in eastern coastal area (such as Guangzhou, Xiamen, Hangzhou, Wuxi, Shanghai etc.). (2) Determination of Sludge Treatment Process The sludge treatment in the Project is planned to adopt the deep dewatering technology with sludge treatment and board & frame compression and filtration. This tcchnology is practiced in the Xiaoshan Linjiang WWTP and Qige WWTP in Hangzhou. According to the on-site inspection and research, the above two WWTPs are well operated with the water content of the sludge after treatment kept below 60%, meeting the state and local requirements for landfills. 8.6.2 Comparison and Determination of Sludge Treatment Processes (1) Comparison of Sludge Treatment Process Sludge treatment refers to the final disposal of sludge, specific to stably processed sludge. Sludge hygiene is not definitely stipulated by Pollutants Discharge Standard for Urban WWTPs (GB18918-2002), but hygiene issues will has a direct impact on the final destination of sludge. Indiscriminate disposal of sludge without necessary process still will contaminate the surrounding environment. As a result, suitable disposal of sludge is required for its harmlessness. When choosing ways of disposing sludge, people shall combine the actual conditions, considering technical feasibility and development in the future. Now the main sludge treatment methods are as follows: Landfill Landfill, similar to urban waste landfill, is the main technology to dispose of sludge at present in China for its relatively lower operating cost and plentiful management experience on it. Disadvantages: occupying land, a waste of land resources; and causing a secondary pollution if sludge is mishandled. Incineration

134

Incineration is uneconomical for its consuming of large number of heavy oil, and the thermal energy released therefrom is hard to be effectively used because of present technology and equipment. It is also difficult to effectively control the plenty of toxic and harmful substances (such as Dioxin) Released therefrom, which will cause air pollution. Besides, for the reason that industrial wastewaters take a big portion in urban wastewater in our country, and organics takes a small portion in residual sludge, the combustion heat value is low and economic benefit of incineration is bad. Direct Drying Sludge with 80% water content is dried by pneumatic drier with over 100°C temperature, killing all sorts of germs and then be land-filled or reprocessed. The disadvantage is energy consuming and increasing disposal cost. Anaerobic Digestion Anaerobic digestion was adopted for most activated sludge before 1980s, killing microbial bacteria and producing some usable wastewater gas. Three disadvantages of anaerobic digestion: 1. The equipment investment for anaerobic digestion can, wastewater gas recovery and preservation is quite high; 2. Although sludge is stabilized through biochemical reaction of various anaerobes, and the total number decreases by about 25%, landfill is also needed; 3. It requires complex system operation, high demand of operation management, high cost and many hidden dangers. Relative data displays that: construction investment of sludge anaerobic digestion system is about RMB 1-2 million/t dried sludge, including sludge concentration, dewatering, mesophilic digestion, digested sludge re-concentration, dewatering and transport, and its daily operating cost is about RMB 700-850 yuan/t dried sludge. Biological Treatment Biological compost method imports aerobic bacteria and oxygen, to make sludge undertake thermophilic fermentation of aerobic bacteria. High temperature compost was developed by the developed countries at the beginning of the 20 th century, and now in the United Kingdom, America, Germany, Japan, etc, the compost method has been widely used for bio- safety disposal of urban sludge. Since the end of 1980s, some cities in our

135

country have established composting sites, but operations of most of these composting sites have get into difficulties because of low quality of composts and market, etc. The comparison of the common sludge treatment methods is showed in Figure 8-8. Figure 8-8 Comparison of Common Sludge Treatment Methods

No. Methods Advantages Disadvantages With low cost and rich management experience, Waste land resources and cause 1 Landfill employing the main skills secondary pollution if handled for sludge treatment in inappropriately China Incineratio Completely dispose of Have poor economic benefit and 2 n harmful organics easily cause air pollution Kill bacteria before landfill Direct and re-treatment, having Consume energy and increase 3 Drying good environmental cost benefit Have high cost of equipment Kill microbial bacteria and investment, need landfill after Aerobic 4 produce some usable handling, have high requirements Digestion wastewater gas on operation management, high cost and many hidden dangers. With comprehensive Biological utilization, realize the Have low quality of composts, with 5 Treatment safe treatment and insignificant economic benefit recycling (2) Determination of Sludge Treatment Methods According to General Planning of Yueshan Town, Xiangxiang City (2006- 2020) and local actual conditions, The final disposal of sludge is to deliver the dewatered sludge cake, then compress it with urban domestic waste, and at last send it for landfill in a sanitary and safe way. If there is market demand, cooperation with relative technical section can be take into consideration to do biological compost research on sludge to make waste valuable, and reduce the possibility of pollution.

136

9 Analysis of Gains and Losses of Environment and Economy

9.1 Environmental Benefit The Project belongs to an urban WWTP, the most important benefit of which is environmental benefit, including pollutant load cut, water quality improvement benefit, environmental management improvement benefit, etc. 9.1.1 Pollutant Load Cut According to the sludge treatment project, it is possible to effectively reduce the pollutant load of domestic wastewater and industrial wastewater of Yueshan Town, which can protect local environment and play a significant role in protecting the environment of lower reaches. Quantity of pollutants reduced is in Figure 9-1. Figure 9-1 Quantity of Pollutant Reduced in Yueshan Town Unit: t/a

Period BOD 5 COD SS NH 3-N TN TP Amount of 1095000 Water Before Treatment 142.35 262.8 219 27.375 32.85 3.066 After Treatment 21.9 65.7 21.9 8.76 21.9 1.095 Cut 120.45 197.1 197.1 18.615 10.95 1.971 Cut Rate 85 75 90 68 33 64 9.1.2 Improved Water Quality After the implementation of the Project, it is possible to control pollution sources of the river, purify water quality, reserve moisture and enormously reduce pollutants discharged into Xinqiaohe River; as a result, it can weaken the impact of pollutants on local surface water to improve water quality, a fundamental protection of water, making environmental conditions of Yueshan Town improve obviously. 9.1.3 Improvement Benefit of Environmental Management Capability The environmental monitoring and operating project provides strong technical measures and supervision for local environmental protection, promotes healthy development of local environmental efforts, effectively prevents environmental pollution, reduces environmental risks, decreases the pollution of surface water and improves regional environmental conditions to the largest degree in multiple aspects such as management and technology.

137

9.1.4 Provision of Good Environmental Conditions for Regional Social and Economic Development The Project accelerates local urban infrastructure construction, establishes and completes environmental infrastructure network system, further alleviates the conflict between the city development of the river basin and region and environmental constrains, improves environmental quality of the river basin where the Project is implemented, increases functions of water environment, and promotes urban function, providing suitable environmental conditions for sound and fast social and economic development of the local region and the whole province. 9.2 Social Benefits 9.2.1 Improvement of Healthy Level of Domestic Citizens and Living Quality in the River Basin The Project effectively solves issues about backward infrastructure of local environment. On one side, it can purify water and air; on the other side, it also can promote health of citizens and increase living quality by eliminating propagation environment, providing protection and improvement of living conditions, and reducing disease incidence. 9.2.2 Addition of Employment Chances With the commencement of the Project, employment chances will be provided. At first, some short-term and odd jobs can be offered during the construction of the Project; secondly, some long-term and stable jobs can be available when the Project is in the service period, including technical and administrative staff who are directly engaged in the Project; and last but not least, because of the Project, industrial and agricultural development will be accelerated as a result of improving investment environment and attracting funds, at the same time, it will also drive the development of the service sector, adding much more employment chances. 9.2.3 Improvement of Residents' Environmental Awareness Project construction is also a process of profound and active propaganda of environmental protection. Specific environmental protection campaigns can enable people to recognize the importance of environmental protection, and understand the serious consequences of environmental disruption, including

138

economic losses, injuries of health, resource losses etc. Such campaign is more effective than simple propaganda and is more easily accepted by people. Besides, it can also develop into an environmental education demonstration place to propagandize environmental protection knowledge to the public for a long time; this will be of great benefits to improve the public's environmental awareness. 9.2.4 Provision of Base Data for Abatement of District Pollution Implementation of the construction project through environmental monitoring and management can meet the society's increasing demands for environmental monitoring and offer better services for regional economic construction. Besides, it can also provide base data for the further explanation of pollution sources, provide scientific criteria for the integrated abatement policies of district pollution as well as the accurate assessment of regional pollution abatement project, provide effective means for the government functional department to supervise the operation of pollution abatement facilities in accordance with the law, and intensify the management of regional river basin environment. 9.3 Economic Benefits The Project is about the construction of urban WWTP, which is a public welfare project without obvious direct benefit on investment. Its economic benefits are mainly indirect ones, including: 9.3.1 Economic Benefits from Pollution Control It's mainly reflected by reducing the economic losses of society caused by the pollutants in wastewater, from: Industrial enterprises: It can reduce the investment and operation management fees imposed on industrial enterprises to dispose wastewater separately and alleviate enterprise's pressure; Agriculture, animal husbandry, and fishery: water pollution may cause the decline of output and quality of cereal crops, animal products and fishery products and cause economic losses; Health: water pollution may cause the rise of people's incidence, increase people's health expenditures and reduce labor productivity. 9.3.2 Benefits from Revenue Increase

139

With the improvement of urban infrastructures and environment, value of land in urban areas will correspondingly increase, especially land in towns, where part of the loans can be subsidized through the benefits from the land. 9.4 Conclusions The Project is part of the staged proposal to improve the environmental status of Yueshan Town and promote the process of urbanization and implementation of the sustainable development strategy in the whole province. Disposal of town wastewater will bring important impact on the urban infrastructure construction and ecological environmental protection in the Project area and even the national and social economic development. Implementation of the Project is: Instrumental in consolidating the results of environment improvement within the Project area and further improving the quality of local environment; Good for improving the production and living conditions of local residents and improving people's quality of life and health level; Good for facilitating the infrastructure construction and mercerization of management of Yueshan Town and realizing the independent and positive development of urban infrastructure construction through introducing and borrowing domestic and overseas advanced technologies and management experience; Good for promoting the urbanization construction of the whole province, ensuring the sustainable development of society and economy through the sustainable development of environment, and creating favorable conditions for the sustainable development of Hunan province and building of a well-off society in an all-round way. The Project can generate favorable environmental, social and economic benefits, and comply with the state's cause to build a well-off society in an all-round way and WB's purpose to promote China's sustainable development through its China aid strategy.

140

10 Public Participation 10.1 Implementation Arrangement Hunan Integrated Economic Development Demonstration Town Project (Yueshan Town Subprojeoct, Xiangxiang City) Utilizing WB Loans is conducted to improve the residential environment and infrastructures of Yueshan Town. The construction of a WWTP and the supporting engineering thereof will effectively prevent pollutions; greatly improve people’s living conditions; protect surrounding water sources; beautify the surrounding environment; construct a more comfortable and beautiful living environment; improve and raise residential environment; quicken the construction of a livable town; and lay a better environmental foundation for quickening urban development. Project construction and operation may affect the environment of surrounding areas, which is directly involved with the vital interests of nearby residents, so according to the state environmental regulations and regulative statutes as well as WB's safety protection policy (OP4.01), the public is invited to the Project twice. The first time was during the compilation of the Project environmental impact assessment outline and the second time was when the first draft of the environmental impact assessment was completed. The first round was aimed to collect the relevant information about the public's concern of the Project construction. In the second time, the public was organized to discuss the environmental problems and corresponding countermeasures put forward in the first time in the hope of getting the public understanding about the countermeasures taken in the Project. The first round public participation was during the compilation of the environmental impact assessment outline. The first round public participation was mainly conducted through questionnaire survey and collective interview. Participants include both the residents in the affected areas and the government agencies and companies involved with the Project. Participants include people of different ages, sexes, educational background and occupations. During the survey, the environmental assessment unit showed the Project’s general situations, including the major environmental impacts possibly generated during project construction, to the public clearly, so that the public could understand the existing environment of the Project area and

141

the possible negative influence of project construction on neighboring environment; finally, the assessment unit collected participants' opinions and suggestions of project construction and the issues they concern, and organized discussions about the environmental issues cared by the public and corresponding countermeasures in the hope of getting the nearby units and public’s understanding about the Project construction and relevant environmental impacts caused by it, and encouraged them to give suggestions to the Project construction and timely feedback all their suggestions and good ideas, so that the construction proposal can be further improved and the Project’s impact on environment can be reduced to the minimum. The second round public participation was organized when the first draft of the environmental impact assessment was finished; public participation was conducted through informal discussions, interviews and questionnaire survey given by Yueshan Town Government and the environmental assessment unit. Participants were mainly experts, government agencies and representatives of the affected people. The second round public participation was mainly about the feedback of the issues cared by the public, and at the same time, the abridged edition of the environmental impact assessment was placed at an obvious place for the public to read. Such places include the compilation unit of environmental impact assessment, project management office, and office of Yueshan Town etc. Relevant materials about the public's participation is in appendix 3 (including the sign-in Table of informal discussions, meeting minutes, meeting photos and sample form for the questionnaires of these two times). 10.2 Survey Results and Discussions of Public Participation Major issues put forward by the affected crowds during public participation include: Impacts of construction noise, fugitive dust, and material transport noise on living environment as well as treatment and disposal of sludge in the wastewater plant. Besides, compensation on land acquisition is also one of the most concerned issues by the public. During environmental assessment, the environmental assessment unit makes relevant analysis of the issues concerned by the public and gives relevant

142

countermeasures so as to make sure the impact on environment caused by project construction can be reduced to an acceptable level; main measures include: (1) Waste soil at the construction site shall be timely removed and backfill shall be filled timely. In dry seasons, soilmund, soil shovel and transport shall be watered timely so as to keep its surface wet and reduce the amount of flying dust. (2) Strengthen management and dispatch, improve work efficiency, strengthen maintenance of equipment, and try to assemble the noisy machinery to work intensively, and optimize the construction time, so as to shorten the time of construction noise and reduce its influence; Set up movable sound insulated screen barriers at the affected sensitive points near the pipe network and reduce the impact on these points as much as possible. (3) Strengthen the management, planning and dispatch during construction, avoid transporting earth and construction materials at rush hours so as to reduce the possibility of the Project's impact on traffic congestion; (4) During the operation period, sludge shall be dewatered within the Plant and then transported to landfill through closed tank cars and buried cleanly. (5) Local administrative department for environmental protection shall strengthen the supervision of companies, and urge the construction unit to carry out all environmental protection measures during project construction and operation. During project construction, the administrative department shall pay attention to implement the environmental protection measures and make sure all pollution prevention funds are put in the right place. After the Project is put into service, it shall ensure the failure-free operation of environmental protection facilities, discharge pollutants according to the standards after treatment and make sure the river water won't be polluted. (6) Isolate the major pollution sources; build the sludge hovel indoor; dewatered sludge shall be carried away timely; clean the water extractor timely and remove and transport the residues timely; set up 6 8m green isolation belt at the Plant boundary; set the width of health protection distance according to the specifications. (7) Project construction shall be in strict accordance with pertinent state laws

143

and regulations; the construction unit shall make appropriate arrangements for the production and life of affected residents after land procurement and relocation, and give reasonable compensations and can't ignore their livelihood. Table 10-1 is a summary about the Project name, the public participation time and ways, organization unit, participants, main concerned issues and the feedback of environmental assessment about the public's concerned issues.

Table 10-1 Summary of the Public's Participation With Project Environmental Assessment Feedback of Way of Organization Main Issues Time Participants Environmental Participation Unit Concerned Assessment 1st Round: Changsha Government (1) (1) Waste soil at Questionnaire Environmental August officials, Environmental the construction Survey and Protection 2011 technicians problems site shall be timely Interviews Career of including flying removed and

144

Technical competent dust and noise backfill shall be College and authorities, during the filled timely. In dry Yueshan experts, construction seasons, soilmund, Town residents period soil shovel and Government around the (2) transport shall be Plant area Compensations watered timely so and for land as to keep its residents, procurement surface wet and schools and and relocation reduce the amount hospitals (3) Treatment of flying dust. along the and disposal of (2) Strengthen pipelines sludge during management and the operation dispatch, improve period work efficiency, strengthen maintenance of equipment, and try to assemble the noisy machinery to work intensively, and optimize the construction time, so as to shorten the time of construction noise and reduce its influence; Set up movable sound insulated screen barriers at the affected sensitive points near the pipe network and reduce the impact on these points as much as possible. (3) Strengthen the management, planning and dispatch during construction, avoid transporting earth and construction materials at rush hours so as to reduce the possibility of the Project's impact on traffic congestion; (4) During the operation period, sludge shall be dewatered within the Plant and then transported to landfill through closed tank cars and buried cleanly. (5) Local 145 administrative department for environmental protection shall strengthen the

10.3 Information Disclosure According to the regulations of Provisional Measure for Public Participating in Environmental Impact Assessment , Measures for the Disclosure of Environmental Information (for Trial Implementation), World Bank OP/ BP4.01 Environmental Assessment and BP17.50 Information Disclosure , the Project discloses information about environmental assessment through bulletin and notification. Summary of the Project information disclosure is in Table 10-2; summary of the public's participation is in Table 10-3.

Table 10-2 Summary Sheet of Project Information Disclosure Chinese EIA EMP Project (C) Disclosure Disclosure Disclosure Ways (Yes/N (Yes/N Name /English Time Duration and Inquiry Place o) o) (E) Paste up notice in different sensitive points (Xinqiao Hunan Village, Hongyang Integrated Village, Bailong 2011.8.19- Economic 2011-8-18 Village, Town 2011.8.28 Developm Government, ent Xianfeng Middle Demonstra School, Central tion Town Hospital and town Project area) Y N C (Yueshan Paste up notice in Town different sensitive Subprojeo points (Xinqiao ct, Village, Hongyang Xiangxiang Village, Bailong 2011-10- 2011.10.21- City) Village, Town 20 2011.10.30 Utilizing Government, WB Loans Xianfeng Middle School, Central Hospital and town area)

146

Table 10-3 Summary Sheet of Project Participation Feedback of Way of Organization Main Issues Time Participants Environmental Participation Unit Concerned Assessment

147

(1) Waste soil at the construction site shall be timely removed and backfill shall be filled timely. In dry seasons, soilmund, soil shovel and transport shall be watered timely so as to keep its surface wet and reduce the amount of flying dust. (2) Strengthen management and dispatch, improve work efficiency, strengthen maintenance of equipment, and try to assemble the noisy machinery to work intensively, and optimize the construction Environment time, so as to al problems shorten the including time of flying dust construction st noise and 1 Round: Changsha Augus Residents and noise reduce its Bulletin Environmen t 2011 around during the influence; Set and Notice tal the construction up movable Protection Project period sound Career area and insulated Technical residents, screen barriers College and schools at the affected sensitive points Yueshan and near the pipe Town hospitals network and Government along the reduce the pipelines impact on these points as much as possible. (3) Strengthen the 148 management , planning and dispatch during construction,

During the operation period, sludge shall be Treatment dewatered and disposal within the of sludge Plant and during the then operation transported period . to landfill through closed tank cars and buried cleanly. Project construction shall be in strict accordance with pertinent state laws and regulations; the Changsha construction Environmen unit shall tal make Compensatio Protection appropriate 2nd Round: Octob ns for land Career arrangement Bulletin er procurement Technical s for the and Notice 2011 and College and production relocation Yueshan and life of Town affected Government residents after land procurement and relocation, and give reasonable compensatio ns and can't ignore their livelihood.

149

11 Migration and Social Impacts 11.1 General Situations The Project is about the construction of the WWTP and its supporting pipe networks; affected areas include: three Groups, namely, Yingxiongling Group, Pumenkou Group and Xinqiao Group of Xinqiao Village, Yueshan Town, covering 11 households, 46 people in all. 11.2 Project Impacts With the assistance and cooperation of local governments at all levels, administrative Villages, Group cadres, and migration and project design unit, the Project Owner investigates the specific targets one by one according to the preliminary land acquisition area, including populations, housings and appurtenant works, lands, and special facilities which are affected by the Project. Then it rechecks and surveys the specific targets according to the latest feasibility study results. Based on field investigation, the consulting unit and project design unit discuss with the Project Owner to consider the impacts of project construction on local district and economy as much as possible while selecting and optimizing the proposal, and take it as the key factor in proposal optimization and selection. In order to reduce land acquisition and migration as much as possible, the design unit and Owner have taken some effective measures, and try to avoid the population centers in proposal determination and arrangement of other supporting facilities, reduce the number of immigrants and the area of occupied lands, and comply with the local planning and local government's suggestions. Affected areas in the Project include three Groups, namely Yingxiongling Group, Pumenkou Group and Xinqiao Group of Xinqiao Village, Yueshan Town. List of affected areas is shown in Table 11-1; impact on land ownership and relevant units by land acquisition are shown in Table 11-2.

150

Table 11-1 List of Affected Areas

Permanent Land Acquisition Temporary Land Occupation Total Total Total Number of Number of Number of Number of Number of Number of Total Land Commercial Agricultural Commercial Project Area Peasant Peasant Peasant Residents Tenants Acreage Tenants Acquisition Households Relocated Households Households Affected (Mu) Affected Area (Mu) Affected (Household) Affected Relocated (Household) (Household) (Household) (Household) (Household) Xinqiao Village 12.8 11 0 0 0 0 0 0 (Yingxiongling Group)

Table 11-2 Summary of Affected Cases Enterprises State Collective Stores Number of and Relocated Land Land Demolition Affected Households/Persons Project Institutions Households/Persons Occupied Occupied Area (M 2) Temporarily Having Land Name Affected (Household/Person) (Mu) (Mu) (Store) Occupied (Unit) WWTP of 0 12.8 0 0 0 0 11/46 Yueshan Town As shown in Table 11-1 and 11-2, base data of land acquisition in the Project are: Conditions of land acquisition: collective lands 12.8mu, all of which are cultivated lands, having no uncultivated lands; 11 households, 46 persons are affected by land acquisition. (1) According to the survey, the WWTP occupies a land area of 12.8mu; all the lands occupied are rural collective lands, and there are no state lands. All the collective lands occupied are cultivated lands (including fertile lands), having no uncultivated lands. According to the investigation of immigrant's resettlement, 12.8mu collective lands are occupied in the WWTP project of Yueshan Town, and the lands occupied respectively belong to Yingxiongling Group, Pumenkou Group and Xinqiao Group.

151

Table 11-3 Type and Quantity of the Collective Lands Occupied (Mu) Number of Affected Affected Area Households Project Type of Land Occupied Population Village (Mu) Affected (Person) (Household) Dry Land (Cotton and Rape 0 0 0 WWTP Rotation) of Xinqiao Cultivated Land Paddy Field 12.8 11 46 Yueshan Village Fruit Garden 0 0 0 Town Vegetable Plot 0 0 0 Subtotal 12.8 11 46 Uncultivated Land Uncultivated Land 0 0 0 (2) Rural Housings Relocated No rural housings will be demolished and relocated in the Project. (3) Stores Affected No stores will be affected in the Project. (4) Impact on Temporarily Occupied Land In the wastewater treatment project of Yueshan Town, all the temporary facilities are stored within the Project area (planed landscaping area 2,783m2), so there are no temporarily occupied lands. (5) Affected Populations Hunan Integrated Economic Development Demonstration Town Project (Yueshan Town WWTP Project, Xiangxiang City) Utilizing WB Loans directly affects 11 peasant households, 46 populations in all. As to the form of impact, all of them are affected by land acquisition. Direct influence of the Project only refers to the influence on populations by land acquisition, with no reference to demolition and relocation of housings and stores, excluding the affected enterprises and institutions either. Populations directly affected in the Project are shown in Table 11-4.

152

Table 11-4 Populations Affected Directly by the Project Impacts WWTP of Yueshan Town Households 11 Land Acquisition Persons 46 Housings Demolished and Households 0 Relocated Persons 0 Demolition and Relocation Households 0 of Stores Rebuilt By Persons 0 Peasant Housings Households 0 Operation of Stores Persons 0 Demolition of Stands Built Households 0 on Pedestrian Access Persons 0 (6) Vulnerable Groups Affected According to the relevant regulations of WB's business policy OP4.10 Ethnic Minorities,: a. having the intentions to identify itself as a unique cultural group of ethnic minorities and such identification is also accepted by others; b. relying on the residential district or ancestral domains with unique features in the Project area collectively, and relying on the natural resources in these residential districts and domains; c. having traditional cultures, economy, social or political systems different from those of the mainstream society and culture; d. having minor languages different from the state or local official language. Xinqiao Village does not meet the requirements of items b, c and d, and it does not belong to the ethnic minority specified by WB, so WB's policy on ethnic minorities is not applicable to it. All the people in the Project area are of Han nationality. Residents within the Project area have no obvious traditional cultures, economy, and social or political systems different from those of the mainstream society and culture; Residents within the Project area neither think they have the features of ethnic minorities nor have such intentions. Therefore, no ethnic minorities are involved in the Project. Determination of Affected Vulnerable Groups Vulnerable Groups mean the crowds that are most easily affected and have no abilities to adapt to the changes caused by the Project construction among the affected populations. Vulnerable Groups mainly include: ● Lonely old people: the elderly who are single and over 65, and have no legal family supporters. ● Single parent family: the family of which the householder is single and

153

has minor children ● Orphan: children under 16 years old and having no parents ● Poor family: the family having Subsistence Allowances Acquisition Certificate for Rural Populations in Xiangxiang City in urban areas and rural family recognized to be particularly poor ● The handicapped: the people whose certain organs or functions are disabled or lost or abnormal in psychology, physiology or body, or having lost all or part of the abilities to engage in certain activities in a normal way ● Family having other special difficulties Determination of Vulnerable Groups will be based on relevant policies and statues as well as field investigations. During implementation of the Project, the Immigrant Resettlement Department will decide it through indoor investigation, visit to neighbors, confirmation by neighborhood committee etc.  Affected disadvantaged family According to indoor investigation and Villagers' comment, among the affected populations, only one household belongs to disadvantaged group and the family can enjoy the subsistence allowances. List of the disadvantaged family affected by the Project is shown in Table 11-5. Table 11-5 Information about the Affected Disadvantaged Family Number Name of Family Description of Difficulties Source of Income Members 63 years old; divorced; having one All the families are daughter living with him and is married engaged in agriculture; Gan and has a daughter; he is weak and 4 main source of income is Shixiang sick, and can't live on himself; the planting; having no other family is poor. (his family status is poor incomes according to the Villagers' comments) Note: the above stated disadvantaged group is decided through the interview of Village committee and the three Groups (7) Affected Surface Auxiliary Structures and Special Facilities There are no surface auxiliary structures and special facilities in the Project. 11.3 Law and Policy Framework 11.3.1 Major Law and Policy Criteria (1) Central policies ● Law of Land Administration of the People’s Republic of China , implemented in January 1999; revised and put in force on August 28, 2004;

154

● Decision on Intensifying Reform and Strengthening Land Administration ; issued by the State Council on October 21, 2004; ● Notice on Strengthening Land Regulation and Control, issued by the State Council on August 31, 2006; ● Regulations for Government Information Disclosure of the People’s Republic of China ; put in force on May 1, 2008; ● State Council’s Regulations on Intensifying and Reforming Land Administration ; No. 28 decree, 2006; ● Notice of the Ministry of Land and Resources about the Further Management of Land Acquisition , released by the Ministry of Land and Resources on June 26, 2010 (2) Laws and Regulations and Policies Released by Hunan Provincial People’s Government and Relevant Departments ● Land Administration Enforcement Method of Hunan Province (2000) ● Notice on Releasing the Compensation Standard for Land Acquisition in Hunan Province (XZF [2009] No. 43) (2009) ● Subsistence Allowances Method in Rural District of Hunan Province (provincial people’s government No. 21) ● Notice of the General Office of Hunan Provincial People’s Government on Responding the Provincial Labor Security Bureau’s Opinions on the Employment Training and Social Security of Farmers Involved with Land Acquisition ● Notice on Strengthening the Supervision and Administration of the Distribution and Use of Compensation Fees for Land Acquisition of Collective Economic Organizations in Rural District (XZF [2008] No. 15) (3) Laws and regulations and policies released by Xiangtan municipal people’s government and relevant departments ● Notice of Xiangtan municipal people’s government about printing and distributing the Method of Compensation and Resettlement of Land Procurement and Relocation in Xiangtan (XZF [2005] No. 27) ● Notice of the General Office of Xiangtan Municipal People’s Government about Printing and Distributing the Method for Determining the Low Income Families in Urban and Rural Areas of Xiangtan City (Trial Implementation) (XZBF [2011] No. 32)

155

(4) Laws and Regulations and Policies Released By Xiangxiang Municipal People's Government and Relevant Departments ● Notice of the General Office of Xiangxiang Municipal People's Government about Printing and Distributing the Pilot Scheme for Employment Training and Social Security of Farmers Involved with Land Acquisition in Xiangxiang City (XZBF [2010] No. 20) ● Notice of the General Office of Xiangxiang Municipal People's Government about Printing and Distributing the Management Method of Social Security Funds of Farmers Involved with Land Acquisition in Xiangxiang City (XZBF [2010] No. 21) ● Notice of the General Office of Xiangxiang Municipal People's Government about Printing and Distributing the Executive Plan of Employment Training and Social Security of Farmers Involved with Land Acquisition in Xiangxiang City (XZBF [2010] No. 22) ● Follow-up Notice of the General Office of Xiangxiang Municipal People's Government about Implementing Social Security of Farmers Involved with Land Acquisition in Xiangxiang City (XZBF [2010] No. 67) (5) WB's Policy for Settling Involuntary Resettlement ● WB business policy OP4.12 Involuntary Resettlement and its appendixes; executed on January 1, 2002; ● WB business procedure BP4.12 Involuntary Resettlement and its appendixes; executed on January 1, 2002; 11.3.2 Main Principles According to the above policy framework, immigrant resettlement of the Project is aimed to reduce the negative influence caused by land procurement and relocation as much as possible. Property of the persons suffering from negative influence will be compensated based on the replacement price, and assistance will be offered to help them return to or exceed the original living standard; main principles are:  Take measures to reduce the negative influence to the minimum as much as possible;  The compensation proposal can ameliorate the immigrants' living standard or at least help them return to the original living standard;  Discuss seriously with the affected people and give opportunities to

156

participate in the plan and enforcement of the compensation proposal;  All the affected property will be compensated according to the overall replacement cost;  The borrower is responsible for raising the compensation costs, including contingency cost;  Try to build new housings before removal. Before land procurement and relocation, the people involved with land acquisition will get all the compensations for their losses; that's compensations shall be granted to them before land acquisition and use of relevant property. 11.4 Compensation Standard for Land Acquisition The compensation standard for land procurement and relocation listed in this report is formulated upon appropriate consultations with the affected units, individuals and relevant local government departments based on the in-depth survey and investigation, following the relevant laws and regulations of the People's Republic of China and Hunan province as well as WB's business guide for involuntary resettlement, with the purpose to recover and improve the living standard of affected people within a short period after resettlement. (1) Compensation Standard for Acquisition of Rural Collective Lands Compensation costs for acquisition of rural collective lands include compensations for land and taxes and dues paid to the state. During investigation of immigrant resettlement and the establishment of resettlement plan, Yueshan Town Government and land and resources bureau exchanged ideas thoroughly with the Villages affected by land acquisition and discuss the land acquisition compensation base suitable for the Project. A uniform compensation base is made for the occupied land according to the occupied land type, output, land position, agricultural land class, per capita quantity of cultivated land, relation between land supply and demand, local economic development level etc. According to the Notice of the General Office of Xiangxiang Municipal People’s Government on Releasing the Land Acquisition Compensation Standard for Xiangxiang Section of the Passenger Dedicated Line of Shanghai-Kunming High Speed Railway (XZBF [2010] No. 77), upon thorough consultations between Yueshan Town Government and local Villagers,

157

compensations will be made following the standard of paddy fields, which is 31857yuan/mou. (2) Compensations for State Land There is no permanent occupancy of state land in the Project. (3) Compensation Standard for Demolition and Relocation of Rural Residences No rural residence housings will be demolished and relocated in the Project. (4) Compensations for Other Attached Facilities There are no attached facilities in the Project. (5) Compensations for Temporary Land Occupation There is no temporary occupation of land in the Project. 11.5 Land Recovery Proposal 11.5.1 Compensation and Arrangement for Permanent Land Acquisition (1) Analysis of Land Acquisition Impact In the Project, 12.8mu collective lands in Xinqiao Village, Yueshan Town will be occupied permanently, and 11 households, 46 persons in all are involved. Based on field survey, although most of the lands occupied by the Project are cultivated land, most occupied lands are barren, and farmers no long plough these lands, so there is no severe impact on the households involved with land acquisition. Besides, the Project area has achieved a relevantly high state of economic development and its nonagricultural sectors are developed; there are few labors engaged in agricultural production; although the affected persons have agricultural household register, agricultural income is no longer their major source of income, so land acquisition will make no big difference on the income of affected households. (2) Resettlement Proposal In the affected area, there are fewer labors engaged in farm work, so labors affected by land acquisition of the Project have basically solved the problem of employment now. Besides, Yueshan Town and four affected administrative Villages organize expertise training to farmers every year, and provide them with employment information and employment opportunities, which can promote the employment of the labors affected by land acquisition. After the collective lands are occupied, the Owners can enjoy retirement

158

insurance after approved by the land and resource bureau of district level or above. Occupied land of the households in two subprojects of Yueshan Town is about 1mu per capita. Per capita occupied land is above 0.1mu, so according to the Notice of the General Office of Xiangxiang Municipal People's Government about Printing and Distributing the Pilot Scheme for Employment Training and Social Security of Farmers Involved with Land Acquisition in Xiangxiang City (XZBF [2010] No. 20), the Owners need not join in the retirement insurance. 11.5.2 Recovery of Livelihood of the Farmers Affected By Land Acquisition There are 11 farm households that are affected by land acquisition; agricultural income takes up 10% of their gross income; in general, the Project will make no difference on the livelihood of these farmers within a short time; for these farmers whose lands are occupied, Yueshan people's government and Villagers have achieved agreement on the following resettlement methods: (1) After the WWTP of Yueshan Town is completed, it will first of all provide job opportunities for the farmers having their lands occupied; those without special skills and are willing to engage in farm work will be arranged to participate in service jobs of the Project; At present, Xinqiao Village committee and Yueshan people's government have made preliminary agreement on this. (2) Xiangxiang Municipal Government and Yueshan Town Government set up perfect labor service system to give help to the affected Villagers. Before land acquisition, they set up relevant labor service institutions for the immigrants and offer difference assistances with their employment. for example, open up the personnel market free of charge; offer charge-free vocational and technical training and so on. 11.5.3 Resettlement and Recovery of Affected Vulnerable Groups There are 4 persons of one family are recognized as disadvantaged crowd during land acquisition in the construction of WWTP of Yueshan Town. The immigrant resettlement department and basic level government will give special help and cares to this family. Main measures are: As to the disadvantaged family determined in the Project, the Project management office will offer the following guarantee measures:

159

(1) Gan Shixiang, whose family is in distress, is weak and sick, and can't live on himself. His family is poor and can enjoy subsistence allowances. Besides, the Project management office actively discusses with civil administration department to offer him rural cooperative medical service free of charge and give relevant subsidies for his difficulties; (2) After the Project is completed, Yueshan people's government promises to offer job opportunity for poor family members in the WWTP. 11.6 Vulnerable Groups Among the Villages affected by land acquisition, the Project management office will offer special financial and material supports to the crowds weak in economy, including solitary old persons, families whose householder is a woman, and extremely poor families. Among the affected populations, there is only one disadvantaged family. After land acquisition, the standard of living of such farmers (residents) affected by the Project will be ensured not to affected by land acquisition. The populations who have lost the work ability will enjoy living allowance through the social security system; Those with the ability of work will be provided with job opportunity, and receive training of employability skills, so that they can have stable sources of income; Members of disadvantaged family will be recruited to engage in some jobs requiring no special skills. In addition, the government and Owner will also provide subsidies for their difficult life and help them to return to normal living and production standard. After land acquisition, the standard of living of such farmers (residents) affected by the Project will be ensured not to affected by land acquisition. The populations who have lost the work ability will enjoy living allowance through the social security system; Those with the ability of work will be provided with job opportunity, and receive training of employability skills, so that they can have stable sources of income; Members of disadvantaged family will be recruited to engage in some jobs requiring no special skills. In addition, the government and Owner will also provide subsidies for their difficult life and help them to return to normal living and production standard. 11.7 Institutional Arrangement In order to do well in immigrants' resettlement, all levels of governments will

160

first of all ensure the smooth progression of project preparation and immigrants' resettlement by setting up organizations and strengthening abilities. Since November 2010, they have set up relevant organizations for the Integrated Economic Development Demonstration Town Project Utilizing WB Loans formally and defined the responsibilities of all organizations. Major organizations relating to the resettlement of immigrants include: Leading group of Integrated Economic Development Demonstration Town Project (Yueshan Town Subproject) Utilizing WB Loans Office of Integrated Economic Development Demonstration Town Project (Yueshan Town Subproject) Utilizing WB Loans Immigrants’ resettlement department of Integrated Economic Development Demonstration Town Project (Yueshan Town Subproject) Utilizing WB Loans Technical support group of Integrated Economic Development Demonstration Town Project (Yueshan Town Subproject) Utilizing WB Loans External monitoring institution of resettlement of immigrants 11.8 Complaint Settlement Mechanism Although the immigrants are encouraged to participate in the compilation and implementation of the Immigrant Resettlement Plan, there are some problems arising in real jobs more or less. In order to solve these problems timely and effectively and ensure the smooth progression of project construction and land acquisition, besides the current complaint channel through letters in local governments at all levels, another transparent and effective complaint channel is also established for the immigrants in the Project from time to time. In order to solve problems effectively and ensure the smooth progression of project construction and land acquisition, a transparent and effective complaint channel is established for the Project; general complaint channels are as follows: Stage 1 If the immigrants' rights are damaged during land acquisition or resettlement, they can reflect the problem to the Village committee; the Village committee or immigrant can directly consult the township resettlement office or district (county) Resettlement office; when the resettlement office receives the complaint, it shall make a record and solve the problem within two weeks through consultations with the Village committee and immigrant.

161

Stage 2 If the complainant is not satisfied with the decision made in stage 1, he/she can lodge a complaint to the leading group of Integrated Economic Development Demonstration Town Project (Yueshan Town Subproject)

Utilizing WB Loans, which will deal with the complaint within 2 weeks. Stage 3 If the immigrant is still dissatisfied with the decision of the leading group of Integrated Economic Development Demonstration Town Project (Yueshan Town Subproject) Utilizing WB Loans, he/she can lodge a complaint and file an arbitration to the jurisdictional administrative organ level by level according to the Administrative Procedure Law of the People's Republic of

China. Stage 4 If the immigrant is still dissatisfied with the arbitral decision, he/she can institute a suit to the civil court according to the civil procedure law. Immigrant can institute a suit about any aspects of resettlement, including compensation standard. The immigrants will be informed of the above stated complaint channels through meetings or other ways, so that they can fully understand their rights of petition. Besides, relevant information will be propagandized or reported through media, and complaints and suggestions about resettlement will be made into written articles to be studied and dealt with by the resettlement institutions at all levels. Institutions receiving immigrants' complaints will not charge any fees, and relevant expenses incurred by complaint will be deducted by the Project office from the contingency cost. 11.9 Monitoring and Assessment In order to ensure the smooth implementation of the Immigrant Resettlement Plan and fulfill the goal of appropriate resettlement, the Project office will make regular monitoring and assessment of land procurement and relocation according to the requirements of WB business policy OP4.12 Involuntary Resettlement and Guidance on Immigrant Monitoring and Assessment of WB's China Loan Project. The monitoring is divided into two parts, namely, internal monitoring by the resettlement institution and external independent monitoring.

162

11.9.1 Internal Monitoring (1) Method of Internal Monitoring Internal monitoring is the monitoring of the implementation process of resettlement inside the resettlement institution from top to bottom layer; it requires the Project Owner and resettlement institutions at all levels to set up standard and smooth resettlement implementation information management system from top to bottom layer to track and reflect the progress of resettlement in different districts. The land acquisition departments at all levels shall report the progression, funds and results of resettlement using the information management system from bottom to top layers, and take measures and make analysis. (2) Period and report of internal monitoring Internal monitoring is a continual process; overall monitoring activity shall be conducted once a quarter at least; at the critical period of resettlement, frequency of monitoring will be increased. During the preparation of project, internal monitoring institutions will compile regular or irregular internal work report according to WB's review; its format will be different for different projects and stages according to WB's requirements. After implementation, simple weekly report, monthly report, detailed quarterly report, semi-yearly report and annual report shall be made for influential projects; the Projects having small influence only need simple quarterly report and detailed semi-yearly report and annual report. Special report will be made according to the requirements of project management. A concluding report shall be made at the end of project implementation. The internal monitoring report shall be submitted by the immigrant resettlement institutions at all levels to the people's government of the same level and immigrant resettlement department of higher levels, and the Project Owner. The Project Owner shall submit an internal monitoring report to WB semiannually. 11.9.2 External Monitoring (1) External Monitoring Method The external monitoring institution will monitor immigrant’s resettlement by following means:  Establish a database of affected population and carry out regular in-home

163

interview based on the immigrant’s resettlement investigation. The external monitoring institution will make full use of the social and economic investigation materials and the resettlement information management system created by the Project office to perform dynamic management of basic situation of those households involved with land acquisition and keep informed of the immigrant situation. Make use of the situation reflected by the database and carry out face-to-face interview at the affected families to know progress of the resettlement and listen to their complaints, dissatisfaction, and suggestions, as well as promote related national policies, related requirements of the World Bank, and information on engineering construction. The external monitoring institution will carry out the in-home interview independently and obtain the list and information of the affected population from grassroots organization, without accompany by the personnel of local resettlement organization or local administrative personnel. For in-home interview by the external monitoring institution, the interviewer shall be relatively fixed, which means one person shall interview the same affected area as many times as possible, so as to build a mutual trust relationship and be favorable for performance of the work.  Organize forums for affected population irregularly in the regions where affected population gathers. The external monitoring institution will hold forums in regions where affected population gather and listen to the opinions of affected population on major issues affected by the Project. The forum can be either formal or informal; can either invite the personnel of grassroots resettlement organization or not, as the case may be.  Field observation. Personnel of the external monitoring institution will interview the immigrant’s resettlement areas regularly and irregularly and observe immigrant’s resettlement situation on site.  Individual investigation. Give emphasis to the analysis of individual prominent cases during immigrant’s resettlement. Analyze source of the problem, find out the solution, and propose reference opinions.  Questionnaire. Carry out sampling investigation on production and life recovery of the immigrants and opinions on immigrant’s resettlement and analyze the results timely. Solve existing problems and provide references for immigrant’s resettlement of the next year.

164

(2) Reporting System for External Monitoring The external monitoring institution will prepare external monitoring reports based on the materials obtained by observation and investigation. With two main purposes: the first is to present the progress and existing problems of the immigrant’s resettlement objectively to the World Bank and Owner of the Project; and the second is to evaluate the social and economic effect of the immigrant’s resettlement, propose constructive opinions and suggestions, and improve the immigrant’s resettlement work. Intervals for the external monitoring institution to report to the World Bank and Owner of the Projects are as follows: • Submit a interim annual monitoring report of immigrant’s resettlement situation of first half of the year to the World Bank and the Owner every year; • Submit the monitoring report of previous year to the World Bank and the Owner every year; • Submit a comprehensive post immigrant’s resettlement assessment report half a year after completion of all immigrant’s resettlement work. The contents of ordinary monitoring report shall at least include the followings:  monitoring objects of this report;  progress of immigrant’s resettlement work;  main findings of the monitoring institution; main existing problems;  basic assessment opinions and suggestions of external monitoring. Reports of the external monitoring institution shall be submitted to the Project office and immigrant’s resettlement expert of the World Bank in Chinese. Before formal submission, inform related personnel of the immigrant’s resettlement office and ask for their opinions, and communicate on the contents and form of the report. 11.10 Financing and Implementation Plans Expenses of the Project include land expropriation compensation, other expenses related to land expropriation compensation, administrative expenses for immigrant’s resettlement, and unpredictable expenses. In accordance with the compensation standards and statistical numbers affecting the Project, the World Bank loan for immigrant’s resettlement of Yueshan

165

Integrated Economic Development Demonstration Town Project of WWTP and Matching Pipe network Construction is RMB 1,074,082.77. Refer to the Table for specific budgets.

166

Table 11-6 Budget Sheet of Yueshan Town Immigrants Resettlement Compensati Category Unit Quantity on Standard Amount (RMB) (RMB) I. Basic Expenses 1.1 Farmland Expropriation Mu 12.8 31857 407769.6 Charg Compensation es 1.2 Compensation of Mu 12.8 1800 23040 Relat Crops ed to 1.3 Farmland Use m2 8533.3 25 213332.5 Land Tax Expro 1.4 Land Cultivation Mu 12.8 20000 256000 priatio Expenses n 1.5 Land In accordance with XJF No. [2003] 42, Management charge at 4% of total land 16310.78 Expenses expropriation compensation II. Other Expenses Agency Fees for Charge at 1.8% of the basic immigrant 1 Resettlement in 16496.15 expenses Land Expropriation Monitoring and Assessment Estimate at 0.4% of the basic 2 Fees for 3665.81 immigrant expenses Immigrants Resettlement III. Administrative Expenses Administrative Expenses for Charge at 5% of the basic immigrant 1 45822.64 Immigrants expenses Resettlement IV. Unpredictable Expenses Unpredictable Charge at 10% of the basic immigrant 1 91645.29 Expenses expenses Total 1074082.77 The World Bank loan for immigrant’s resettlement of Yueshan Integrated Economic Demonstration Town Project shall be raised by the Urban Construction Fund Office under the control of the people’s government. Funds granting during the immigrant’s resettlement is done by issuing the funds to the compensation objects through exclusive accounts without any intermediate steps to prevent withholding and misappropriation. Transfer of the immigrant’s resettlement fund of the Project shall comply with the following principles: • All expenses related to land expropriation shall be incorporated into general estimate of the Project, and the land expropriation

167

compensation for each sub item shall be approved by implementation unit of the sub item, and the compensation shall be paid by the people’s government directly to related units and persons through exclusive accounts. • Compensations paid to individual families shall be paid to the affected families through exclusive accounts. • Land compensation shall be paid before the expropriation; All the funds must be paid under the supervision and management of internal monitoring institution and monitored by external monitoring institution. Establish financial and supervision organizations of various levels to ensure timely payment of all funds.

168

12 Environment Management Plan 12.1 Environment Management System In accordance with the management authority under the Environmental Protection Law of the People’s Republic of China and Regulations for Management of Environmental Project in Construction Projects , environmental impact assessment report of the Project is to be approved by the Xiangtan City Environmental Protection Bureau. The Xiangtan City Environmental Protection Bureau is the environment management organization of the Project and is responsible for proposing environmental protection requirements based on the contents of the environmental impact assessment report of the Project and coordinating the environmental protection management among different departments, and for organization the “three simultaneousness” acceptance of environmental protection facilities. Under the general administrative organizations of the Project, Hunan World Bank Loan Project Office takes charge of implementation of the whole project under the lead of Hunan Provincial Government. To ensure successful implementation of the environment management of the Project, Hunan Project Office will entrust specialized environment management organization to cooperate with the Project office, owner, contractor, and operator to implement the environment management plan during construction stage and operation stage of the Project. Hunan World Bank Loan Project Office shall be responsible for planning and design of the Project and supervising and managing environmental protection procedures of the Project, and organizing province-wide environment management skill trainings of the Project; Xiangtan City Environmental Protection Bureau is mainly responsible for routine supervision of environment management of the Project; Xiangxiang City Environmental Monitoring Station is entrusted by the Owner to monitor environment quality of the Project Area during construction and operation periods of the Project; the environment supervision engineer entrusted by the Owner shall be responsible for the environment supervision during construction of the Project. The Owner plans to appoint specialized environment management personnel to take charge of the environment management of each stage of the Project;

169

and implement the environmental protection regulations and plans; check the execution of environmental protection measures of the Project; promote advanced applied environmental protection technologies and experiences; and organize environmental protection technology training for related personnel of the Project to improve quality of the personnel. There are great differences in environment management of the construction period and the operation period of the Project, and the two distinguish from each other in time limit, one of which is temporary and the other is long-term. Therefore, the contractor and the operator establish different organizations for different stages and adopt the means of phased management. At the end of the construction period, corresponding management organization shall be dismissed, and the management organization for the operation period starts operating. A certain period of intercrossing is allowed as the case may be. Organization structure is as shown in Figure 12-1. Refer to Table 12-1 for the Project environmental protection supervision plan.

170

World Bank

Hunan Province Hunan Level Environmental Project Protection Bureau of City Level Environmental Protection Xiangxiang Bureau of Project County Level

Owner

L E E L O oc n C n oc w al vi D o vi al ne Enterprise E ro es ns ro en r Level n n ig tr n vi or vi m n uc m ro o ro en U ti en n pe n ta ni o t m ra m l t n su en to en i C pe t r Environment management and execution Environment management and organizations during design and execution organizations during construction periods operation period

Figure 12-1 Schematic Diagram of Project Environmental Protection Organization Structure

171

Table 12-1 Project Environmental Protection Supervision Plan Stage Organization Supervision Contents Supervision Objective 1. Ensure that the environmental impact assessment is overall, with proper topics and Xiangtan City prominent key points; Environmental 2. Ensure that possible Feasibility Protection Review and reply environmental major and potential Research Bureau impact assessment documents problems of the Project a re Stage World Bank reflected; Project Office 3. Ensure that measures for mitigating environmental impact has specific feasible implementation plan. 1. Strictly execute the three-simultaneousness; 1. Rev iew preliminary design of 2. Ensure the compliance environmental protection of these sites w ith the measures; environmental protection 2. Check the reinstatement of requirements; Hunan temporary construction land, 3. Reduce the affect of Provincial recovery of vegetation, and construction on Government, recovery of environment; surrounding environment, Design and Hunan Project 3. Check the dust and noise and execute related Construction Office, pollution control measures and environmental protection Stages Xiangtan City determine the time of regulations and standards; Environmental construction; 4. Reduce the affect of Protection 4. Check the emission of air construction on Bureau pollutants; surrounding environment, 5. Check the discharge and and exe cute related disposal of domestic wastewater environmental protection and construction waste water of regulations and standards; the construction site. 5. Prevent water and soil losses. 1. Check the implement ation of monitoring plan; 2. Check the sensitive points requiring further environmental Hunan Project protection measures (there may 1. Implement the Office, be environment problems monitoring plan; Xiangtan City ignored); 2. Protect the environment; Environmental 3. Check whether environment 3. Strengthen environment Operation Protection quality of the environment management and protect Stage Bureau, sensitive points meets public health; Xiangtan City corresponding quality st andard 4. Ensure that emission of Environmental requirements; the pollutants complies with Protection 4. Strengthen supervision, the emission standard. Bureau prevent accidents and prepare emergency response plans to eliminate dangers timely in case of any accident.

172

12.1.2 Environmental Protection Organization during THE Construction Period 12.1.2.1 Duties and Responsibilities of Environmental Protection Organization Technical level: on technical level of environment management, the Provincial Project Office shall engage experts for project management. Project office level: the Provincial Project Office shall appoint a project environment manager to supervise implementation of the management plan, who will be responsible for all problems of the World Bank in connection with the environment, and in the meantime, the Provincial Project Office shall entrust a specialized environment management organization to cooperate in supervising implementation of the environment management plan. City level: Xiangtan City Environmental Protection Bureau is responsible for the approval of environmental impact assessment document and for routine environment supervision and management. County level: Xiangtan City Environmental Protection Bureau is responsible for routine environment supervision and management of construction period and operation period of the Project and for completion environmental protection acceptance and routine monitoring after completion of the Project; Xiangxiang Project Office shall appoint a project environment manager to supervise implementation of the environment management plan and make records and report to the Project environment manager of the Provincial Project Office of the implementation of environment management plan. Contractor level: appoint 1~2 environment management coordinators to supervise implementation of the environmental protection measures of the construction and negotiation and solve environment problems with surrounding residents, and to communicate with the Project office and environment supervision organizations. Operator level: Each enterprise shall establish an environment management office which is composed of two full-time environmental protection personnel, and ordinary personnel of the company shall provide assistances to these two engineers to accomplish environment management of operation stage of the company. The company shall equip such communication facilities as internet and telephone to keep in touch with the environment management supervision organizations.

173

Environment supervision engineer level: Each Owner shall engage an environment supervision engineer for the Project and supervise on-site environment management during the construction. 12.1.2.2 Posts and Responsibilities of Personnel (1) Technical Environment Experts Technical environment expert is the technical support of Hunan Project Office and shall perform whole process tracking during preliminary stage of the Project and provide regular service for 4 years after implementation of the Project, two weeks for each quarter. The technical environment expert shall ensure that all necessary requirements must be met at beginning of the Project and ensure that the environment management system is fully and effectively implemented in accordance with the environment laws and regulations and the security regulations of the World Bank. A. Provide necessary trainings to environment manager of the Project, environment management personnel of the contractor and operator and the environment supervision engineer. B. Provide expert consultancy to the Project office, owner, contractor, and operator. C. Provide assistances to environment management personnel of the enterprise to organization monitoring activities. (2) Project office: Environment manager The Provincial Project Office shall appoint an environment manager who shall report to the World Bank and supervise environment experts of the Project. The environment manager shall provide assistances to the land management organization and immigrant resettlement organization to prevent the above from holding back implementation plan of the Project, and the responsibilities are as below: A. Provide trainings to the environment management manager with the help of the assistant. B. Establish a monitoring plan with the help of the assistant. C. Communicate with the environment management manager and construction staff by following means: --Provide routine monitoring reports to the Project office and World Bank

174

--In case of the second and third cases, provide special unconformity report --Communicate with personnel of the construction unit and operation unit orally and agree on the solution if any solution is found --Propose correction measures with the environment management engineer and environment management manager in case of any unconformity D. Environment engineer, environment management manager of project office of the company and the construction unit and operation unit shall all attend the meeting. E. Coordinate the communication report of the environment management expert to the World Bank. (3) Owner: Environment manager coordinator EMC The Owner shall appoint a EMC to take charge of environment supervision and report to the Project office and government organizations of the implementation of environmental protection by the construction unit and operation unit. Detailed responsibilities of EMC are: A. To work out detailed environmental protection rules of the construction unit and operation unit, detailed supervision rules and environmental protection procedures of the construction unit and operation unit, and collect the outlines of project management designers with the help of the technical assistant during preliminary stage of the Project. B. To entrust projects requiring special equipments for monitoring, such the atmosphere and water environment quality monitoring. C. To provide monthly monitoring report, project and feasibility study implementation situation and remedial measures to the Project office. Hold meetings with the Project office every month to make report of the Project supervision and discuss compliance of the Project. D. Choose experts and consultants from universities and organizations to consult the training methodology and technical issues. As the case may be. E. Organize special research and public investigation in connection with special construction requirements of the Project or necessary changes. F. Report to environment manager of the Project office and the environment supervision organization on solutions of unconformity of the feasibility research and measures for emergencies. G. Disclose information through conferences and local media.

175

(4) Environment Supervision Engineer The environment supervision engineer shall be responsible for the construction engineering activities of the supervisor and other related activities such as: land occupation and ensuring that the above activities comply with the environmental protection requirements, environmental protection investment, and environmental protection objectives, and shall be responsible for coordinating the land management department on site and the relationship with the environment monitoring department. Main responsibilities of the environment supervision engineer are: A. To ensure that all project licenses and requirements and environment management plans are implemented before commencement of the Project. B. To check that all personnel of the construction unit and operation unit have implemented the environmental protection measures as specified under the contract. C. To prepare standard monthly statement of the monthly rewards obtained by the construction unit and operation unit for their efforts and contributions to environmental protection activities for the Project and in compliance with their qualifications. D. To compile environmental protection monitoring documents. E. To identify the compliance of special research and special activities with the requirements and communicate with the EMC and to implement special measures regularly and effectively. F. To communicate with the construction staff to help explaining site environment requirements; to provide suggestions on remedial measures and provide remedial measures to projects deviating from original intention of the Project; and to issue special official guidelines to the construction unit and operation unit. G. To communicate the construction unit and operation unit and the construction consultant to facilitate communication; to obtain some other opinions about special problems to present the problems during the implementation quickly to the construction management engineer to solve such problems; and to apply for suspension if the Project has potential damage to the sensitive targets or the Project is significantly inconsistent with the Project design.

17 6

H. To communicate with the Project construction supervision engineer and construction staff; to prepare regular weekly monitoring report; and to prepare inconsistency records, and if any inconsistency with the Project design is found, propose remedial measures to the Project designer if necessary. 12.1.3 Environment Management Organization during the Operation Period (1) Responsibilities of the Environment Management Office The Project operator shall establish a special environment management office which shall implement the environment management plan during the operation period. Detailed responsibilities of the environment management office are: a. To manage execution of environmental protection measures of the Project; b. To coordinate with the environment supervision management department and surrounding residents on environment problems; c. To entrust environment monitoring station to perform routine monitoring to the three pollutants discharged by the Project facilities and environment quality of the region; d. To perform environment risk emergency responses in case of any environment accident; e. To report to the Xiangtan City Environmental Protection Bureau and Hunan Project Office of related information on environment management of the enterprise; f. Record and documentation of environment management archives of the enterprise. (2) Environment Management Organization Structure Refer to Table 12-2 and 12-3 for environment management organization structure of the Project.

177

Table 12-2 Arrangement of Management Personnel of the Project Office Organization Environment Manager Environment Expert Hunan Project Office 1 1 Xiangxiang Project Office 1 1 Yueshan Project Office 1 1 Total 3 3

Table 12-3 Personnel Arrangement of Environment Management Organization Construction Contractor Operator Environment Environment Environment Risk Emergency Manager Supervision Management Response Subtotal Coordinator Engineer Personnel Personnel 2 2 2 1 5 12.2 Implementation of Environment Management Plan 12.2.1 Detailed Tasks of Implementation of Environment Management Plan There are environmental impacts from the Project during the construction period and operation period. Corresponding environmental protection measures shall be taken based on the characteristics of environmental impacts of the construction period and operation period to reduce the impacts to an acceptance extent. Environment management and monitoring procedures have been established to ensure effective function of the environment measures. The World Bank Project Office shall track and report the monitoring of environment measures based on performing its project management function. General environment measures and responsibilities of related units are introduced in this chapter. The Project office shall track and report the implementation of various environment monitoring measures in the Project. Refer to Table 12-4 for list of actions for environment measures implementation management and monitoring.

178

Table 12-4 List of Detailed Activities of Environment Management Organization Responsibility Plan Activity Remark Implementation Supervision Source Preliminary Construction Stage Recruit staff, choose an Create an office, environment purchase One management Company PMO PMO/Company transportation year design team equipments, and recruit its and raise members operation expenses Each CSE chooses or One appoints an EMD CSE CSE year environment supervisor Each CSE shall One implement EMD CSE CSE year environment supervisor training Prepare and implement the Carry out part training plans One (TA) Technical of the global to EMD and PMO PMO/Company year assistant training for the PMO Project environment managers Including clear Prepare work roles and plan for EMD One Technical responsibilities and PMO/Company PMO/Company year assistant of EMD and environment environment supervisor supervisor Prepare work documents: Adjust the standard, site mode of the One inspection EMD PIU /PMO PMO/Company original year table, and S document and report forms of adjust it on site different activities Prepare detailed procedures for One any (TA) PIU /PMO PMO/Company year inconsistency S found in the monitoring and report One TA assists EMD PMO/WB PMO/Company year One Prepare EMD Company PMO/Company Report the

179

year entrusting consistency of contract for the process EMD of the implementation monitoring and work plan activities with land use (requiring special monitoring equipments, such as water quality and atmosphere monitoring) Construction Period The environment supervisor One discusses Process year (0 adjustment of EMD/Environment adjustment to PIU /PMO to 3 the Project supervisor S increase months) with EMD and efficiency improve the documents and processes Each project contracting party must appoint a full- time personnel One with year (0 Contracting Approved by environment Contract PIU /PMO to 3 S party the enterprise responsibility months) to work with the environment supervisor and EMD Each project construction unit and The EMD shall operation unit introduce site shall organize One EMD/Environment Contracting management its staff to Contract year supervisor party and study environment elementary problems environment knowledge and measures Work out communication Organize regulations public and process One communication TA assists EMD Company PMO/Company and prepare year and provide postings and supporting presents for materials onsite and offsite safety

180

rules and work out regulations and process to establish communication on broadcasting and TV Standardize the cooperation One Cooperate with with other EMD Company PMO/Company year all projects provincial and city organizations Operation Period Confirm the reporting procedures of Xiangtan City environment Owner Environmental problems Protection Bureau during the operation period Confirm co centralized Owner, Xiangtan City piling and safe environmental Environmental disposal of the sanitation Protection Bureau dirt produced department in the Project Monitor tail Xiangtan City water Operation unit Environmental Operation unit discharged by Protection Bureau the WWTP 12.2.2 Contract Requirements for Environment Management During the Project construction, contractor plays a key role in environment management, pollution control and preventive measures, and therefore the contractor shall comply with the following requirements: (1) Choose a competent contractor to ensure effective execution of the environment management plan; (2) Contractor and construction supervisor must receive trainings on environmental protection and environment management before construction; (3) The above environmental impact mitigation measures during the construction period shall be included in bidding documents of the contractor and incorporated into the construction contract as contract requirements for the Project contractor. (4) The contractor shall monitor its environment activities and provide

181

environment performance record and report once a day or a week. The Project office and construction supervision team shall supervise and review these records. (5) The contractor shall appoint at least one full-time environment personnel for the Project. The environment personnel shall receive the training on the training plan to be competent for their work. (6) During the construction, the contractor shall communicate and negotiate with the public of where the Project is located and erect a bulletin board at each construction unit to notify the public of specific construction activity and construction time. In the meantime, the contact and telephone shall be provided so that the public may complain about and provide suggestions for the construction activities. (7) The contractor shall reserve and estimate a deposit for environment management from the contract price, taking up about 3% of the budget. 12.2.3 Information Communication and Solution of Unconformities The information of environment monitoring shall be disclosed to the site environment supervisor, environment management manager of the enterprise, and the Project office. To enable the management focus on important issues, unconformities of the Project are divided into the following three levels based on their significance. Level I: definition: such unconformities are defined as inconsistencies with the original requirements but will not affect especially important resources in the near future. If no attention is paid to the reoccurrence of level I, level II will be caused. Measures: solve the situations of level I by proper cooperation and regular communication. For example, discuss with the personnel of the construction unit and operation unit to facilitate the implementation of remedial measures. The formal communication means is typically the weekly report made by the environment supervision engineer to the environment management manager and site construction manager of the enterprise. Level II: definition: such unconformities do not cause significant damage and irreversible affect to the sensitive and important resources. However, they must be corrected and solved on site to prevent the above affect. If no attention is paid to the reoccurrence of level II, level III will be caused. Measures: In case of any event of level II is found, it must be reported by the

182

environment management manager of the enterprise to the environment manager and site construction manager of the Project office, so as to agree on remedial measures as soon as possible. Generally, remedial measures shall be proposed within one week after occurrence of the event. Level III: definition: this level includes the damages to sensitive targets with especial concern or predictable and coming damages. Those behaviors forbidden internationally are also classified as level III. Measures: In case of any event of level III is found, it must be reported by the environment management manager to the environment manager and site construction manager of the Project office, so as to agree on remedial measures as soon as possible. Generally, remedial measures shall be proposed within three days after occurrence of the event. Unless more time is required under special cases. If necessary, environment management manager of the enterprise may require the construction manager to stop some special projects to protect the resources before implementation of the remedial measures. 12.2.4 Training—Necessary Capability Construction and Method Construction 12.2.4.1 Training Requirements Main objects of environment capability construction are the environment managers and environment supervisors whose training is part of the technical support of the Project. During implementation of the Project, training courses are also provided to the construction party and staff. Before commencement of the Project, all the construction unit, operation unit, and construction supervisor are required to participate in the compulsory environment, health, and safety training. 12.2.4.2 Training Contents (1) Environment Management Personnel and Environment Supervision Engineer The training shall be organized by the Provincial Project Office to environment manager of the Project office, environment manager coordinator and environment supervision engineer of the Project and executed by environment technical experts. Refer to Table 12-5 for training contents.

183

Table 12-5 Training to Environment Management and Environment Supervision Engineer Topic Training Contents Duration Browse and identify hot keys of word, excel, and Operation PowerPoint quickly; study security policies of the World Capability Bank; establish detailed environmental protection rules for (Environment the construction party to strengthen the study, and each 4 days Manager and detailed rule s shall include monitoring instructions after the Environment technical consultant prepares the detailed environmental Supervisor) protection rules. Study environmental impact of the Project and environment items to be monitored Conformity Monitoring Site monitoring process of the training project includes (Environment organization, communication, roles, and responsibilities, 1 day Manage r and decision-making process, report, and standard observation Environment procedures. Supervisor) Emergency Aid and Medical Aid The process of looking for medical aid under emergencies (Environment and non-emergencies and the process of looking for 1/2 day Manager and related medical aid. (Such as toll telephone, medical Environment consultation) Supervisor) Health and Health and safety problems; health and safety Safety requirements; how to implement health and safety Moni toring and 1 day inspection; and the process of reporting and solving Reporting problems Process Water Quality, Air, and Noise Monitoring and Use of equipments includes standard, testing, method, Analysis sample transshipment, data quality control; monitoring and 1/2 day (Environment reporting requirements Manager and Environment Supervisor) (2) Contractor and Construction Staff Trainings shall be organized by the Project office or construction Owner of the Project at the Project site before implementation of the Project and shall be implemented by environment management experts or trained environment manager of the enterprise. Refer to Table 12-6 for specific training contents and terms.

184

Table 12-6 Training to Construction Personnel Training Mode Training Contents Training Term Introduce environment related environmental impact factors and environmen tal protection measures; Introduce environment sensitive areas and problems within the construction area, and introduce surrounding area inside the construction General Courses to be area; environment held in Yueshan Roles and responsibilities of the environment knowledge of Town for half a management design engineer, environment construction staff day supervisor, and construction supervisor, and key points of environment problems to be reported Wastes management of the construction camp and construction site; Pollution control measures of the construction site; Punishment to violations of laws and regulations; Including means of transmission and protection, prevent HIV/AIDS and STD; No alcohol and drug; The process of looking for medical aid under emergencies and non-emergencies and the Courses to be General health and process of looking for related medical aid. (Such held in Yueshan safety of as STD examination and consultation); Town for half a construction staff General health and safety knowledge includes day some basic processes: traffic safety, electricity safety, explosion, fire; Use personal protection devices; Punishments to violations of laws and regulations; (3) Operator Trainings shall be organized by the Project office or construction Owner of the Project at the Project site before operation of the Project and shall be implemented by environment management experts or trained environment manager of the enterprise. Refer to Table 12-7 for specific training contents and terms.

185

Table 12-7 Training to Environment Management Personnel of the Operator Object Training Contents Training Term World Bank project management procedures; Environment information documentation, disclosure, communication, and Courses to be held for one reporting mechanism; day Environment Management Environment risk emergency Personnel response; Health and safety examination and reporting process Advanced process and Investigation in domestic environment management leading WWTP investigation Use of equipments includes standard, testi ng, method, sample transshipment, data quality control; monitoring and reporting requirements; Environment risk emergency Courses to be held for two Environment Staff response: potential leakage days and overflow, environment and personal impact of leakage and overflow, and the emergency response includ es preferred response, location and use of the response facilities. 12.2.4.3 Expenses Estimate for Personnel Training Refer to Table 12-8 for expenses estimate for project capability construction. Table 12-8 Training Plan of Project Environmental Protection Personnel Expenses (ten Stage Category Number (Person) Time thousand Yuan) Before Project manger 1 implementation 2 training of the Project Before Project Manager 2 implementation 2 Coordinator Construction of the Project Period Environment Before Supervision 2 implementation 2 Engineer of the Project Construction All staff of the Before 30 staff contractor commencement Subtotal 36 Training to full- time environment Operation period Operation Period management 2 4 of the enterprise personnel of the enterprise

186

Skill training to Before operation environment staff 6 6 of the enterprise of the enterprise Subtotal 10 Total expenses 46 12.3 Environment Monitoring Plan 12.3.1 Monitoring Objective Environment monitoring covers the construction period and operation period of the Project, with the purpose to knowing pollution dynamics of the Project all-around and timely and knowing the impact extent and scope of the Project construction on environment quality changes of the area where the Project is located and feeding back such information to the competent authorities to provide scientific basis for environment management of the Project. 12.3.2 Environment Monitoring Institution The Project contactor or operator shall entrust the environment monitoring station of Xiangtan where the Project is located to take charge of environment monitoring during the construction period and operation period, and the entrusted unit shall have national environment quality monitoring certification, complete equipments, sound technologies, and be competent to accomplish the environment monitoring tasks for which it is responsible. According to the results of environmental impact predictions, sensitive points likely to be polluted shall be considered as the monitoring point. Track and monitor the pollution during construction period and operation period of the Project. Monitored items are noise, air environment, and surface water environment which have great impact on the environment. Monitored factors shall be determined in accordance with the characteristic pollution factors of the Project. The monitoring and analysis methods shall be those specified for corresponding items under the Environment Monitoring Technological Specifications issued by the State Environmental Protection Administration. The evaluation standards shall be the national standards confirmed by environmental impact assessment of each sub item. Refer to Table 12-9 for detailed key procedures required for effective monitoring of the construction site and activities.

187

Table 12-9 Monitoring during the Operation Period and Construction Period Responsibility Plan Activity Fund Remark Implementation Supervision Raising Construction Period Prepare the plan within one month after signing the Prepare site contract, One year (1 environment Contracting Contracting complete the EMC/PIU/EPB to 2 months) management party party plan within two plan months, which shall be reviewed and approved by the EMC The construction A map shall be unit and compiled as operation unit of required by the Construction the Project shall Contracting construction unit EMC/PIU/EPB / Period propose party and operation boundary of the unit before Project which implementation shall be of the Project approved After consulting Prepare with concerned pollution control agencies and One year (1 Contracting Contracting plan, air EMC/PIU/EPB residents, being to 3 months) party party pollution and reviewed and noise approv ed by the EMC Air, noise, and Construction water Referred to the special part Period monitoring The pollution control plan and all the pollution control measured mentioned in CSEE shall the CSEMP visit and check must be the implemented, Construction Contracting construction before which EMC/PIU/EPB / Period party camp and the constr uction facilities every unit and day, 2 months operation unit for EMC shall accomplish all mitigation measures and check all construction

188

camps and facilities every week

Environmental protection measures of the The construction suggestions of unit and Construction Contracting CSE is the operation unit EMC/PIU/EPB / Period party basis of final shall be filled in payment by the monthly PIU/PMO report and submitted

Observe and report Level I: EMC unconformities Level II: EMC Co nstruction of the Project Contracting EMC/PIU/EPB / and PIU Period based on the party Level III: EMC, processes and PIU, PMO severity

Decide to delay or refuse to pay th e engineering Construction cost to the Contracting EMC/PIU/EPB / / Period construction party unit and operation unit

Make sure that the land expropriation Construction process meets Contracting POIU / / Period the needs of the party construction plan

Final approval by EMC, the Project construction party must Traffic provide the information latest traffic involved the information Construction Contracting Contracting construction EMC/PIU/EPB which shall be Period party party process must reviewed by be provided CSEE&EMC and the transportation department and finally approved by EMC Construction For temporary Contracting EPB and Contracting The

189

Period interruption of party concerned party construction the utilities, a Agencies party shall notice to submit the reassure the latest plan public shall be which shall be posted at least jointly reviewed three days by concerned beforehand agencies and EMC Site weekly Construction Report every Field site EMC/PIU/EPB / report, SRS Period day inspectors monthly report Report every Site weekly Construction Contracting day, week, and EMC/PIU/EPB / report, SRS Period party month monthly report Report if required by Construction Report every Contracting To PIU / organizations Period season party involved in the Project Construction Report half a Contracting EMC/PIU/EPB / Period year party Reinstate the temporary Completion construction of land, and Contracting Contracting EMC/PIU/EPB / Construction remove all party party Period construction materials and equipments Trees need to Completion be cut for the of Contracting At least plant pipe network Contractor PIUs Construction party one for one cut must be Period replanted Operation Period After completion of the No unconformity construction, is reported, namely one / Operator, EPB PIU / claim for the year after balance reinstatement of payment the temporary construction land Standardize the process and attend the Summarize training course experiences of organized by / Operator, EPB / / the Project for intermediate similar projects agency, and show the results and benefits of the Project

190

12.3.3 Detailed Environment Monitoring Requirements Refer to Appendix 4 for detailed environment monitoring plan and budget of the Project, and refer to Appendix 5 for environment monitoring plan of project associated project Xiangxiang Quanhu Urban Garbage Landfill. 12.4 Environment Management Expenses Estimate and Source of Funds 12.4.1 Budget Allocation The implementation of EMP measures involves in many units, and therefore sources of funds are different. Most environmental protection activities are engineering measures, and so shall be provided by the construction unit and operation unit of the Project and included in the engineering costs which shall be stated and listed in the bid. The expenses in EMP are manly used for environment management during the construction period and operation period, including: Environment monitoring expenses, environment supervision expenses, personnel training expenses, operation expenses of environment management organization, and risk prevention expenses. Activity expenses of EMC, water quality, air, and noise monitoring expenses and the expenses of CSEE shall be included in the PMO project management expenses. The local environment monitoring station as entrusted by the Owner shall monitor the water, air, and noise during operation of the Project at the cost of the owner. If routine monitoring of local environmental protection department is simultaneous with the Project, routine monitoring data of the environmental protection department can be used. 12.4.2 Source of Funds and EMP Budget Table 12-10 is the summary of environment management expenses during construction period and operation period of the Project.

191

Table 12-10 Summary of Environment Management Budget of the Project Annual Expenses Annual Average Exp of the Expenses of the ens Construction Construction Period es Period (ten (ten thousand Yuan) Personn of thousand Yuan) el Total Personnel the PMU Environ Constr Expenses PMU Environmen Ope Nam Operation Env Env Tot Envir mental uction of the tal ratio e Tra iron Tra iron al onm Protectio Period Constructi Protection n Offi nsp me Offi nsp me ent n on Period Training Peri ce orta nt ce orta nt Sal Supe Training Sal od Exp tion Mo Exp tion Mo ary rviso ary (3 ens Exp nito ens Exp nito r year ring ring es ens es ens s) es es WW 101. 170. 3.6 2 2 0.4 3 36 3 69 3.6 3 2 22 10 TP 8 8 Sour ce of PM PM PM PM CMS PM PM PM PM PM PM TAC / PMC PMC Fund C C C C C C C C C C C s In accordance with the term of the Project and with respect to each construction period, the annual budget must be assured. Part of the construction costs in the budget is used as deposit for the construction unit and operation unit to meet related management requirements. The weights of deposits for different activities are listed in Table 12-11 as percentage in the construction contract funds. Table 12-11 Percentages of Expenses Deposits such as for Environment Management in the Budget Required by the Construction Party Requirements of Construction No. Percentage in Project Budget (%) Source of Funds Party Environmental Protection Construction 1 0.5 Management contract fund Labor Organization and Construction 2 Occupational Health 0.5 contract fund Management Construction 3 Public Safety Management 1 contract fund Construction 4 Social Management 1 contract fund

12.5 Information Management of Environment Management Plan 12.5.1 Information Communication The environment management requires necessary information communication

192

among different departments and posts of the Project office, owner, contractor, and operator, as well as disclosing related information to the outside (concerned parties and social public, etc.). Internal information communication can be performed by conferences and brief internal report, etc., however there shall be at least one official conference. All the communication information shall be recorded and documented. External information communication shall be performed once half a year or a year, and information communication with the cooperative unit shall be documented in the form of minutes. 12.5.2 Record Mechanism To enable effective operation of the environment management system, the organization must establish a perfect record system and keep the following records: (1) Requirements of laws and regulations; (2) Permission; (3) Environment factors and related environmental impact; (4) Training; (5) Examination, checking, and maintenance activities; (6) Monitoring data; (7) Validity of correction and preventive measures; (8) Information about concerned parties; (9) Audit; (10) Assessment. Besides, the above records must be properly controlled, including identification, collection, cataloging, documentation, storage, management, maintenance, inquiry, storage term, and disposal of the records, etc. 12.5.3 Report Mechanism The contractor, operation, monitoring unit, environment supervision engineer, and project office shall record the Project progress and EMP execution during implementation of the Project and report to concerned departments timely. Including the following six items: (1) The environment supervision engineer of the Project shall make detailed monthly record of execution of the EMP and submit the weekly and monthly reports, which shall include execution of the environmental protection

193

measures, performance of the environment monitoring, and monitoring data, to the Owner and Xiangtan Project Office timely. (2) The contractor and operator shall make detailed quarterly records of project progress and execution of the EMP and submit the quarterly report to Xiangtan Project Office and copy to the Xiangtan City Environmental Protection Bureau. (3) The monitoring unit shall submit t he monitoring report to the contractor (operator) and environment supervision engineer timely after completing the entrusted monitoring tasks. (4) The Project office shall submit the Project progress report to the Provincial Project Office timely and copy to the Provincial Environmental Protection Bureau. The Project progress report prepared by the Project office (such as the monthly report, quarterly report, and annual report, etc.) must include the progress of EMP, such as execution progress and effective of EMP, especially the environment monitoring results, etc. (5) In case of any violation of regulations with respect to environmental protection, the environment supervision engineer and project office shall report to local environmental protection administration and shall report to the superior level by level. (6) The annual EMP execution report of the Project must be completed and submitted to the World Bank before March 31 of the next year. The EMP execution report may include the following items: a. Implementation of the training plan; b. Project progress, such as the length construction progress of the WWTP and the pipe network. c. Execution of the environmental protection measures of the Project, performance of environment monitoring, and main monitoring results; d. With or without public complaints, and if there is, record the complaint contents, solution, and public satisfaction; e. EMP execution plan of next year.

194

13 Conclusions of Environmental Assessment The following conclusions are made based on the environmental impact assessment of the Project: (1) The Project construction will improve living environment and basic facilities, etc. of Yueshan Town. Construction of the WWTP and the matching projects will change current situation of discharging untreated wastewater into nearby surface water in the place where the Project is located and will collect and treat the wastewater through the WWTP to achieve the discharge standard, which is helpful to protect water quality of the receiving water, Xinqiaohe River, improve environment sanitation of the place where the Project is located and greatly improve living condition of the residents, protect nearby water resources, beautify surrounding environment, establish a more comfortable and better living environment, improve the quality of living environment, facilitate the construction of a livable city, and set up a good environment basis for facilitating urban development. (2) Construction of the Project is in compliance with national laws and regulations and the general urban planning and environmental protection planning of the place where the Project is located, so that implementation of the Project is policy and regulations based. (3) Implementation of the Project may involve in some environmental protection targets (sensitive points), such as residential area, school, and hospital, etc. During the feasibility study, the site shall be reasonably far from the environmental protection targets (sensitive points). During the environment assessment, further reduce and eliminate the adverse impact of the Project on the environmental protection targets (sensitive points) by such means as taking mitigation measures and establishing and implementing environment management plan, and public participation, and enable possible impacts to comply with national environmental protection laws and regulations and standards. (4) Implementation of the Project may also bring some adverse impacts on surrounding environment. Such adverse impacts may be either from the construction period or the operation period. 1) Adverse impacts of the construction period: impact of construction fugitive

195

dust on air quality, impact of the noise of construction vehicles and machines on surrounding environment, impact of construction wastewater, water and soil losses caused by oil taking, oil dumping, excavation, filling, and temporary piling of earthwork and stonework during the construction, and impact of wastewater pipe network laying and construction on the traffic, and vegetation damage by construction, etc. 2) Adverse impacts of the operation period: impact of the odor out from the WWTP on the air, impact of slurry disposal, impact of the noises of machine pump on surrounding environment, and impact of the discharge on Xinqiaohe River, etc. (5) Extent and scope of the adverse impacts caused by the Project can be controlled within the limit allowed by national laws and regulations and standards by taking mitigation measures, implementing environment management plan, and public participation and negotiation, etc. To sum up, implementation of the Project is environmentally feasible after taking such measures as the mitigation measures, environment management plan, and public negotiation proposed in the Project.

196

Appendix 1 Environmental Standards for the Project

Table 1.1 Air Quality Evaluation Criteria Name and Secondary No Standard Number Standard and Pollutant Sample Time . of Environmental Concentration Quality Limit (mg / ) Total Annual 0.20 suspended average GB3095-1996 particles(TSP) Daily average 0.30 1 Ambient Air Repairable Annual Quality Standard 0.10 particles average (PM 10 ) Daily average 0.15 A maximum TJ36-79 Hygienic Ammonia allowable 0.20 Standards for the (NH ) 3 concentration 2 Design of A maximum Industrial Hydrogen allowable 0.0l Enterprises sulfide (H S) 2 concentration

Table 1.2 Water Quality Evaluation Criteria Unit: mg /L(pH excluded) Numbe Evaluation Factor r of p CO BOD NH - T T Oi 3 Fecal Number and Name of H D N N P l 5 Colifor Standards m GB3838- 2002"Environmental 6- 1. 0. 0. 20,000/ 30 6 1.5 Quality Standards for 9 5 3 5 L Surface Water" Class IV

Table 1.3 Acoustic Environmental Quality Standards Time Da Nigh Category of Acoustic Environment Functional Area y t GB3096-2008 "Environmental Quality Standard for Noise" 60 50 Class 2

Table 1.4 Air Pollutant Emissions Evaluation Criteria Item and Standard Limit (mg/ m³) Number and Name of Pollutant Standards Concentration Limits Monitored from Fugitive Emission GBl6297 -1996 "Integrated Particulate Highest Concentration

197

Standard for Emission of Air matter Level outside the Pollutants" Perimeter:1.0 Factory Standard Value for Pollutants Odor Pollutants Class II (new expansion) GBl4554-93 "Odor Emission Ammonia (NH 3) 1.5 Standards" Hydrogen 0.06 sulfide (H 2S) Odor 20 concentration (1) Note: (1) Dimensionless.

Table 1.5 Municipal WWTP Emission Standards (GB18918-2002) Evaluation Factor CO SS BOD NH -N TP TN Type of Pollutants D 5 3 Water pollutants Level (daily 20 60 20 8 (15) 1 20 1-B average mg /L) Maximum Methane Hydroge Odor concentration concentratio Level Ammonia (maximum density n sulfide (dimensionless) n allowable in factory / %) for factory Level emission (mg 1.5 0.06 20 1 2 / m³) Organic Organic Value of Organic Worm Contro matter matter Water fecal matter egg Sludge l degradati degradati content coliform degradation mortality stabilization project on rate on rate (%) bacteria rate (%) (%) control target (%) (%) (per L) Contro > 40 > 40 <65 > 50 > 95 > 0.01 l target

Table 1.6 Noise Emission Standards Unit: dB (A) Number and Name of Da Category Night the Standards y GB12348-2008 "Emission Standard for Class 2 60 50 Industrial Enterprises Noise at Boundary" GBl2523-90 "Noise Construction Main noise Da Night Limits for Construction phase source y Site" Cubic meter Dozers, of earth and excavators, 75 55 stone loaders, etc.

198

Piling Construction Piling 85 machines prohibited Concrete mixer, vibrator, Structure 70 55 power saws, etc. Cranes, lifts, Decoration 65 55 etc.

199

Appendix 2 Odor Prediction Model and Results (1) Computing Model The odor protection distance model for the Project is the one recommended in SCREEN 3, which uses the formula in Technical Methods for Developing Local Air Pollutant Emission Standards . Atmospheric environmental protection distance is calculated based on the recommended model in SCREEN 3 in Environmental Impact Assessment Guidelines - Atmospheric Environment (HJ2.2-2008). Health protection distance is calculated based on GB/T13201-1991 Technical Methods for Developing Local Air Pollutant Emission Standards , and the health protection distances for industries and companies are determined by the following formula:

Q 1 5.0 c = ()BL c + 25.0 r 2 LD Cm A

Where: Cm - standard concentration limits, mg/m³; L - Health protection distance required of industrial enterprises, m; r - Equivalent radius of production unit where the fugitive source of harmful gas emissions is located, m; A , B , C , D - coefficient for health protect distance calculation, with values referred to Table 5 in GB/T13201-1991;

Qc - Achievable control level of fugitive harmful gas emission from industrial enterprises, kg / h. According to GB/T13201-1991, the maximum health protection distance required of industrial enterprises with fugitive emission of several harmful Q Q gases is calculated as per c . When the results of c calculated for two or Cm Cm more of the harmful gases are on the same level, the level of health protection distance for this industrial enterprise shall be raised by one level. Where the health protection distance is within 100 m, the difference between two closest levels is 50 m, and if more than 100 m but less than or equal to 1,000 m, the difference is 100m. (2) Fugitive Emission of Odor

200

Compared WWTPs of similar scale in China, the fugitive emission of obnoxious gas for this project is developed as in Table 2.1, with calculation parameters for health protection distance shown in Table 2.2.

Table 2.1 Fugitive Emissions of Malodorous Gases

Name of pollutants H2S NH 3 Emissions (kg / h) 0.0036 0.006

Table 2.1 Calculation Parameters for Protection Distance Emission Width of Area of Length of Standard Rate (kg / h) Nonpoint Nonpoint Location Nonpoint Values Source Source NH H S Source (m) (mg / m³) 3 2 (m) () Sludge 0.00 0.003 NH : 0.2; treatment 43 13 559 3 6 6 H S: 0.01 area 2 (3) Determining Health Protection Distance  Protection Distance for Atmospheric Environment The protection distance of atmospheric environment is calculated for this project as per the model recommended in SCREEN 3 in " Guidelines for Environmental Impact Assessment - Atmospheric Environment " (HJ2.2-2008). The results are shown in Table 2.3. Table 2.3 Calculated Results of Atmospheric Environmental protection Distance Name of Standard Values (mg / Location Results Pollutants m³) No excessive NH Sludge treatment 3 point NH : 0.2; H S: 0.01 area 3 2 No excessive H S 2 point

Table 3 shows that the NH 3 and H 2S calculated as per the atmospheric environmental protection model exhibit no excessive points. Therefore, no atmospheric environmental protection distance needs to be set.  Health Protection Distance Calculations done as per the formula in GB/T13201-1991 Technical Methods for Developing Local Air Pollutant Emission Standards are shown in Table 2.4.

201

Table 2.4 Calculated Results of Atmospheric Environmental protection Distance Standard Values (mg / Location Name of Pollutants Results m³) NH 3 1.7 Sludge treatment area NH 3: 0.2; H 2S: 0.01 H2S 29.1

After calculation, the health protection distances for the fugitive emissions of

NH 3 and H 2S are 1.7m and 29.1m respectively. According to Technical Methods for Developing Local Air Pollutant Emission Standards , the health protection distance for this project is 50 m. The protection distances for the factory boundaries are shown in Table 2.5.

Table 2.5 Protection Distances for Factory Boundaries Factory East West South North Boundaries Boundary Boundary Boundary Boundary Protection 0 45 24 37 Distance (m)

202

Appendix 3 Materials Related to Public Participation 3.1 Information Disclosure Under the Environmental Impact Assessment Law and the Provisional Measure for Public Participating in Environmental Impact Assessment, the environmental evaluator and the constructor put up the first public notice announcing the Project in sensitive points (Xinqiao Village, Hongyang Village, Bailong Village, Town Government, Xianfeng Middle School, Central Hospital, and the town area) on August 18, 2011 (publicity period: August 19 - 28, 2011). Brochures were handed out on the sites. The photos in Figure 1 show the public notice. Under the Environmental Impact Assessment Law and the Provisional Measure for Public Participating in Environmental Impact Assessment when the Environmental Impact Report was completed, the environmental evaluator and the constructor put up the first public notice announcing the Project in sensitive points (Xinqiao Village, Hongyang Village, Bailong Village, Town Government, Xianfeng Middle School, Central Hospital, and the town area) on October 21, 2011 (publicity period: October 21 - 30, 2011). Brochures were handed out on the sites. The photos in Figure 1 show the public notice.

Figure 3.1 Public Notices on Site

3.2 Meeting Minutes (1) Date: October 20, 2011 (2) Venue: meeting Room, Third Floor, Yueshan Town Government (3) Contents of the meeting: public participation in environmental protection for WB Loans Yueshan Town Project

203

(4) Attendees: 20 people, including members of the relevant stations, offices and institutes, experts from the environmental protection sector, parties secretaries of Xinqiao Village and Hongyang Village committees, villager representatives of Yingxiong Ridge and environmental evaluators. (5) Moderator: Li Bosheng (Mayor of Yueshan Town) (6) Clerk: Peng Xiaohua (Yueshan Town Office) (7) Meeting Agenda: I. Moderator introduces all the participants and hands out simplified versions of the Project report and questionnaires. II. Moderator introduces the Project status. III. Environmental evaluators describe environmental impact and control measures. IV. Participants address the meeting (comments or suggestions on for the feasibility of pollution preventive measures). V. Environmental evaluators and constructors respond to the comments and suggestions raised by the participants and initiate discussions. VI. Meeting concludes. (8) Minutes of the meeting are as follows: The attendees were briefed about the Project status, potential environmental impacts, and environmental protection measures and investment. Discussions were held about the factors that might have impact on the surrounding environment. A summary of the meeting is as follows: First, the participants agreed that the Project 's environmental protection measures to be taken were technically reliable and economically feasible and pollutant discharge in compliance with standards. Participants supported the Project and believed that the Project would help promote local economic and social developments. At the same time, there was also a need to protect the environment and step up control measures during the construction and operations and alleviate adverse impact of the Project on the environment. Second, the participants raised a few questions and suggestions, to which the constructors and environmental evaluators responded as follows: 1. How to Address the Noise Nuisance? Constructors and environmental evaluators explained: noise control measures would be implemented in strict accordance with the relevant provisions

204

through reasonable scheduling of construction to meet the requirements and avoid disturbing the residents. 2. How to Address Construction Dust? Constructors and environmental evaluators explained: construction zones would be demarcated and the sites would be regularly sprinkled with water to suppress the dust. Earth and stone on the dumping site would be removed soon as possible, and construction materials would not be stockpiled for a long time. Works would be suspended on windy days. Roads would be hardened and sprinkled with water to minimize the dust impact. 3. How to Address the Odor during Operation? Constructors and environmental evaluators explained: safety management would be strengthened during operation and the floor plan would be arranged in reasonable way to improve greening to minimize the generation and impact of odor. 4. How to Dispose of the Sludge? Constructors and environmental evaluators explained: in accordance with the relevant national regulatory requirements, sludge would be concentrated and dehydrated before transported to the landfill where it would be buried. 5. The Moderator summarized the points: the Project was a good, tangible thing the government was trying to do for the people. The attendees unanimously supported the Project while the constructors needed to address the environmental concerns of the nearby residents and prevent pollution accidents. Third, during the meeting, the constructors promised to put in place proactive measures of environmental governance, reduce emissions, conserve resources and energy and contribute to the local economic and social developments.

205

Figure 3.2 Meeting Photos

3.3 Public Participation Survey Two rounds of surveys have been conducted through questionnaires. 3.3.1 First Round of Survey In the first round of the survey, 50 questionnaires (40 for individuals and 10 for business entities) were handed out by evaluators and constructors in August 18-19, 2011, to people who were likely to be affected, mainly residents of the villages and entities near the Project . While questionnaires were distributed, respondents were briefed about nature, scale and investment of the Project and the main pollutants resulted from the Project construction and operation, and asked to offer comments and suggestions on prevention and control measures. Respondents were told to complete the questionnaires in their sole discretion. In the survey, 50 questionnaires were distributed and 50 valid questionnaires were collected (40 for individual and 10 for entities). The recovery rate was 100%. Survey statistics are shown in Table 3.1 and Table 3.2.

206

Table 3.1 Overview of the Respondents in the First Survey Responden Proportion of Total Item ts Respondents (%) Male 40 80 Sex Female 10 20 30 years old 15 30 Age 30-50 years old 32 64 50 years old 3 6 Junior high school and 8 16 below Educatio High school or technical 5 10 n school University and above 32 64 Other 5 10

207

Table 3.2 Results and Analysis of the First Survey Responden Ratio Questions Answers ts (%) Yes 28 56 Are you aware of the Project A little 22 44 No 0 0 Get reasonable economic 30 60 Regarding the land acquisition for compensation the Project , I would like to Get some land in return 20 40 Stop the acquisition 0 0 Serious 0 0 Considerable 0 0 The impact of the Project on the Average 23 46 environment is Insignificant 27 54 Uncertain 0 0 Help utilize local 11 22 resources Help protect the local 12 24 environment Improve the quality of The construction of the Project 27 54 life for local people will Reduce the quality of 0 0 life Cause serious pollution of the local 0 0 environment Noise 20 40 Dust 15 30 Land temporarily 0 0 occupied by the Project Traffic congestion During the construction, which of caused by construction 0 0 the following problem (s) will vehicles affect your life? Construction safety 5 10 issues Increased employment 10 20 opportunities Other 0 0 Noise 5 10 When the Project is completed, Exhaust 25 50 which of the following issue (s) Solid waste 20 40 will affect your life? Wastewater 0 0 Environmental health 5 10 Yes 50 100 Will the Project promote regional No 0 0 economic development? I don’t know 0 0 Very much in favor 39 79

208

Very much in favor 39 79 What is your attitude toward the SupportiveAgainst 11 0 21 0 Project ? 3.3.2 Second Round of Survey In the second round of the survey, 50 questionnaires (40 for individuals and 10 for business entities) were handed out by evaluators and constructors in August 18-19, 2011, after the meeting was concluded, to the attendees, people and entities who were likely to be affected. While questionnaires were distributed, respondents were briefed about nature, scale and investment of the Project , the main pollutants resulted from the Project construction and operation, control approaches and treatment, means of discharge and predicted impact on the environment and asked to offer comments and suggestions on prevention and control measures. Respondents were told to complete the questionnaires in their sole discretion. In the survey, 50 questionnaires were distributed and 50 valid questionnaires were collected (40 for individual and 10 for entities). The recovery rate was 100%. Survey statistics are shown in Table 3.3 and Table 3.4.

Table 3.3 Overview of the Respondents in the Second Survey Responden Proportion of Total Item ts Respondents (%) Male 40 80 Sex Female 10 20 30 years old 15 30 Age 30-50 years old 32 64 50 years old 3 6 Junior high school and 8 16 below Educatio High school or technical 5 10 n school University and above 32 64 Other 5 10

Table 3.4 Results and Analysis of the Second Survey Responden Ratio Questions Answers ts (%) Yes 28 56 Are you aware of the Project A little 22 44 No 0 0

209

Serious 0 0 Considerable 0 0 The impact of the Project on the environment is Average 23 46 Insignificant 27 54 Uncertain 0 0 Help utilize local 11 22 resources Help protect the local 12 24 environment Improve the quality of 27 54 The construction of the Project will life for local people Reduce the quality of 0 0 life Cause serious pollution to the local 0 0 environment Are the noise and dust control Yes 50 100 measures feasible during the No 0 0 Project construction? Not sure 0 0 Are the sludge and odor control Yes 50 100 measures feasible after completion No 0 0 and during the operation? Not sure 0 0 Yes 50 100 Will the Project promote regional No 0 0 economic development? I don’t know 0 0 Very much in favor 39 79 What is your attitude toward the Supportive 11 21 Project ? Against 0 0

210

Sample Form of the First Public Participation Survey Public Participation Questionnaire (for individuals) Hunan Integrated Economic Development Demonstration Town Yueshan Town, Project Construction Site Project (Yueshan Town Xiangxiang City Subproject, Xiangxiang City) Utilizing WB Loans Project profile: The Project involves two major parts, the WWTP and supporting facilities and the farmers market in Yueshan Town, Xiangxiang City. T he Project also includes urban software constructions. The proposed site for Yueshan WWTP is in Yingxiong Ridge Group, Xinqiaohe Village, Yueshan Town, Xiangxiang. It covers an area of 1,0193 with designed capacity of 6,000 m³/ d which is to be completed in two phases. This construction delivers 3,000m³/ d, including the WWTP and its supporting networks serving the central areas of Yueshan Town within 2.03 k in the short term and 3.22 k in the long term. The Yueshan Farmers Market is located in Pukou Group, Xinqiao Village and covers an area of 12 mu with a total construction area of 6,000 , including market stalls 3,000 , shops 2,100 , management space 200 and power stations, pump rooms, refuse collection points, public rest rooms and other facilities 500 , in addition to 15 parking spaces. The soft environment mainly includes seminars, exchange of experience, study tours and technical training for farmers. The construction of the Project will have certain impact on the environment and the residents, as there will be emissions, noise and disturbance with the ecology. The waste gas and noise are resulted from construction vehicles and machinery, and their impact will be minimized by installing mufflers and noise reduction and exhaust purification devices. Strict environmental management will put in place during construction to control the noise and dust, and effective measures will be implemented to prevent safety and environmental issues. After completion of the Project , vehicle exhaust, domestic wastewater, wastewater from the market, equipment noise, trading noise, domestic waste, wastewater sludge and market waste. Wastewater will be discharged through

211

the pipelines to the wastewater plant where it will be treated, solid waste will be collected and transported to the urban waste transfer station, sludge will be dewatered and transported out of the town in closed containers, and noise will be minimized with mufflers and other installations. Pollutants generated by the Project can be discharged in compliance with the standards and will not have significant impact on the environment. We would like to know your attitude towards this project as well as your comments. Please make the following choices and leave your comments and suggestions based on your knowledge and opinions. Name Zhou Sex Male Ethnic Han Educ Junio Age 42 Wenf Identit ation r high ei y scho ol Family 3 Number of 2 Occu Agric Cont 1378 Size  Staff patio ulture act 7321 n 029 Addres Yingxiong Group (No.), Xinqiao Village (Street), Yueshan Town s (Township), Xiangxiang County Main  Growing   Industrial   Other source plants Growing companies or Migrant of livestock mining worker income or fish 1. Are you aware of the Project ?  Yes  A  No little 2. Regarding the land acquisition  Get  Get  Stop the for the Project , I would like to: reasonable land in acquisition economic return compensation 3. The impact of the Project on the environment is:  serious;  considerable;  average;  insignificant  uncertain 4. T he Project will:  help utilize local resources;  help protect the local environment;  improve the quality of life for local people;  reduce the quality of life;  cause serious

212

pollution the local environment 5. During the construction, which of the following problem (s) will affect your life?  Noise;  Dust;  Land temporarily occupied by the Project ;  Traffic congestion caused by construction vehicles;  Construction safety issues;  Increased employment opportunities;  Other. 6. When the Project is completed, which of the following issue (s) will affect your life? Noise;  Exhaust;  Solid waste;  Wastewater;  Environmental health. 7. Will the Project promote regional economic development?  Yes;  No;  I don’t know. 8. What is your attitude toward the Project ? (if against, please state why)  Very much in favor;  Supportive;  Against Other suggestions and requests

Operator Li Shuyuan Date of Survey August 28, 2011

213

Public Participation Questionnaire (for entities) Hunan Integrated Economic Yueshan Development Demonstration Town, Project Town Project (Yueshan Town Construction Site Xiangxiang Subproject, Xiangxiang City) City Utilizing WB Loans Project profile: A total investment of 5637.4 yuan is put into building the Project . The construction includes: WWTP in Yueshan Town, Xiangxiang and supporting facilities. The Yueshan WWTP is located in Xinqiaohe Village, Yueshan, Xiangxiang, and covers an area of 10193 (or 15.29 mu), with a capacity of 10,000 m³/ d constructed in two phases. This construction will deliver 5,000 m³/ d supported by 13,520 m of urban wastewater pipelines. This wastewater treatment plan only receives domestic wastewater water, industrial wastewater whose quality is comparable with domestic wastewater water or pretreated industrial wastewater in compliance with national standards and suitable to be treated together with domestic wastewater water. Wastewater will be treated and discharged into the Xinqiaohe River. According to the plan, wastewater from central areas of the Yueshan Town will be collected.  Research in small town industrial development and economic development plan for Yueshan Town will be made.  Programs will be made to enhance project management and monitoring capacity. Project managers will be organized for training and study tours to improve levels of urban management and construction project management. The construction period starts in July 2012 and ends in June 2014. Currently, construction preparations are in progress. The construction of the Project will have certain impact on the environment and the residents, as there will be emissions, noise and disturbance with the ecology. The waste gas and noise are resulted from construction vehicles and machinery, and their impact will be minimized by installing mufflers and noise reduction and exhaust purification devices. Strict environmental management will put in place during construction to control the noise and dust, and effective measures will be implemented to prevent safety and environmental issues. After completion of the Project , vehicle exhaust, domestic wastewater,

214

wastewater from the market, equipment noise, trading noise, domestic waste, wastewater sludge and market waste. Wastewater will be discharged through the pipelines to the wastewater plant where it will be treated, solid waste will be collected and transported to the urban waste transfer station, sludge will be dewatered and transported out of the town in closed containers, and noise will be minimized with mufflers and other installations. Pollutants generated by the Project can be discharged in compliance with the standards and will not have significant impact on the environment. We would like to know your attitude towards this project as well as your comments. Please make the following choices and leave your comments and suggestions based on your knowledge and opinions. Entity Yueshan Rural Credit Cooperative, Xiangxiang (Common Seal) Nature Enterprise Staff 25 Contact of Entity Addres Xinqiao Village, Yueshan Town Telephone 0731- s (township), Xiangxiang County 56540248 1. Are you aware of the Project ?  Yes  A little  No 2. Regarding the land acquisition  Get  Get land in  Stop the for the Project , I would like to: reasonable return acquisition economic compensati on 3. The impact of the Project on the environment is:  serious;  considerable;  average;  insignificant  uncertain 4. T he Project will:  help utilize local resources;  help protect the local environment;  improve the quality of life for local people;  reduce the quality of life;  cause serious pollution the local environment 5. During the construction, which of the following problem (s) will affect your life?  Noise;  Dust;  Land temporarily occupied by the Project ;  Traffic congestion caused by construction vehicles;  Construction safety issues; 

215

Increased employment opportunities;  Other. 6. When the Project is completed, which of the following issue (s) will affect your life? Noise;  Exhaust;  Solid waste;  Wastewater;  Environmental health. 7. Will the Project promote regional economic development?  Yes;  No;  I don’t know. 8. What is your attitude toward the Project ? (if against, please state why)  Very much in favor;  Supportive;  Against Other suggestions and requests

Operator Date of Survey September 1, 2011

216

Sample Form of the Second Public Participation Survey Public Participation Questionnaire (for individuals) Hunan Integrated Economic Development Demonstration Town Yueshan Town, Project Construction Site Project (Yueshan Town Xiangxiang City Subproject, Xiangxiang City) Utilizing WB Loans Project Profile: In order to further promote Yueshan’s healthy and sustainable development of economy and society, improve the quality of living environment in the town and address the insufficient funds for infrastructure construction, in line with World Bank loans’ purpose "to improve the environment and promote sustainable development" and the realities of Yueshan Town, and based on the on-site surveys conducted by experts from provincial, municipal and local development and reform commissions, decisions have been made to step up the construction of integrated economic development demonstration town project to allow continued, fast economic and social developments of Yueshan Town. T he Project aims to improve urban infrastructure, public services and investment environment, enhance fast economic growth, protect people’s well-being, and build a solid foundation for the coordinated, sustained and steady development of Yueshan’s economy and society. With thorough and careful investigations of the town, the Yueshan People’s Government has chosen Xinqiaohe Village, Yueshan Town, Xiangxiang City, as the Project site, which covers an area of 1,0193 (or 15.29 mu), with a total investment of 56.374 million yuan, including a WWTP and supporting pipe networks that serve the urban area of Yueshan Town. The construction of the Project will have certain impact on the environment and the residents, as there will be emissions, noise and disturbance with the ecology. The waste gas and noise are resulted from construction vehicles and machinery, and their impact will be minimized by installing mufflers and noise reduction and exhaust purification devices. Strict environmental management will put in place during construction to control the noise and dust, and effective measures will be implemented to prevent safety and environmental issues.

217

After completion of the Project , vehicle exhaust, domestic wastewater, wastewater from the market, equipment noise, trading noise, domestic waste, wastewater sludge and market waste. Wastewater will be discharged through the pipelines to the wastewater plant where it will be treated, solid waste will be collected and transported to the urban waste transfer station, sludge will be dewatered and transported out of the town in closed containers, and noise will be minimized with mufflers and other installations. Pollutants generated by the Project can be discharged in compliance with the standards and will not have significant impact on the environment. We would like to know your attitude towards this project as well as your comments. Please make the following choices and leave your comments and suggestions based on your knowledge and opinions. Liu Ethnic Technic Nam Se Mal Educatio Jingyan Identit Han al Age 32 e x e n g y school Famil Govern 1387 Number Occupati Mobil y 5 4 ment 3246 of Staff on e Size official 658 Addre Tanmenkou Group (No.), Xinqiao Village (Street), Yueshan Town ss (township), Xiangxiang County Main  Growing   Industrial  Migrant  Other source plants Growin companies or worker of g mining incom livestoc e k or fish 1. Are you aware of the  Yes  A little  No Project ? 2. The harm of the Project causes to the environment is:  serious;  considerable;  average;  insignificant  uncertain 3. T he Project will:  help utilize local resources;  help protect the local environment;  improve the quality of life for local people;  reduce the quality of life;  cause serious pollution the local environment

218

4. Are the noise and dust control measures feasible during the Project construction?  Yes;  No;  I don’t know. 5. Are the sludge and odor control measures feasible after completion and during the operation?  Yes;  No;  I don’t know. 6. Will the Project promote regional economic development?  Yes;  No;  I don’t know. 7. What is your attitude toward the Project ? (if against, please state why)  Very much in favor;  Supportive;  Against Other suggestions and requests When the Project is completed, operating cost and model shall be identified to ensure that the Project functions to improve urban environment and people’s quality of life and promote the town’s economic development. Operator Liu Shuai Date of Survey October 20, 2011

219

Public Participation Questionnaire (for entities) Hunan Integrated Economic Yueshan Development Demonstration Town Town, Project Construction Site Project (Yueshan Town Subproject, Xiangxian Xiangxiang City) Utilizing WB Loans g City Project profile: To further promote the healthy sustainable development of social economy of Yueshan Town, to improve township residential environment quality and to change the insufficient status of funds for basic facilities, Yueshan Town decides, according to the purpose of World Bank (“WB”) Loans “to improve the environment and to keep sustainable development”, to use the WB loans to quicken the construction of Hunan Integrated Economic Development Demonstration Town Project and to practically promote the fast development of social economy of Yueshan Town, on the base of reality and upon the site survey carried out by the development and reform departments of the province, the city and the town and by experts. The construction of the Project aims at raising the level of urban basic facilities of Yuehsan Town, strengthening public service function, improving investment environment, boosting swift economic growth of Yueshan Town and ensuring people living and working in peace and contentment, so as to lay a sound foundation for the all-around, harmonious, sustainable and steady development of social economic environment of Yueshan Town. With thorough and careful investigations of the town, the Yueshan People’s Government has chosen Xinqiaohe Village, Yueshan Town, Xiangxiang City, as the Project site, which covers an area of 12.8 mu), including a WWTP and supporting pipe networks serving the urban area of Yueshan Town. The construction of the Project will have certain impact on the environment and the residents, as there will be emissions, noise and disturbance with the ecology. The waste gas and noise are resulted from construction vehicles and machinery, and their impact will be minimized by installing mufflers and noise reduction and exhaust purification devices. Strict environmental management will put in place during construction to control the noise and dust, and effective measures will be implemented to prevent safety and environmental issues.

220

After completion of the Project , vehicle exhaust, domestic wastewater, wastewater from the market, equipment noise, trading noise, domestic waste, wastewater sludge and market waste. Wastewater will be discharged through the pipelines to the wastewater plant where it will be treated, solid waste will be collected and transported to the urban waste transfer station, sludge will be dewatered and transported out of the town in closed containers, and noise will be minimized with mufflers and other installations. Pollutants generated by the Project can be discharged in compliance with the standards and will not have significant impact on the environment. We would like to know your attitude towards this project as well as your comments. Please make the following choices and leave your comments and suggestions based on your knowledge and opinions. Entity Yueshan Town Central Township (Common Seal) Nature Sta 5 Contact of ff 0 Entity Addres Xinqiao Village, Yueshan Town Mobile 13786226 s 67 1. Are you aware of the Project ?   A little  No Yes 2. The impact of the Project on the environment is:  serious;  considerable;  average;  insignificant  uncertain 3. T he Project will:  help utilize local resources;  help protect the local environment;  improve the quality of life for local people;  reduce the quality of life;  cause serious pollution the local environment 4. During the construction, are the measures to control noise and dust feasible?  Yes;  No;  I don’t know. 5. When the Project is completed, are the measures to control sludge and odor during operations feasible?  Yes;  No;  I don’t know. 6. Will the Project promote regional economic development?

221

 Yes;  No;  I don’t know. 7. What is your attitude toward the Project ? (if against, please state why)  Very much in favor;  Supportive;  Against Other suggestions and requests

Operator Yan Han Date of Survey October 20, 2011

222

Sign-in Sheet for Public Participation Meeting Meeting on Hunan Integrated Economic Development Demonstration Town Project (Yueshan Town Subproject, Xiangxiang City) Utilizing WB Loans Sign-in Sheet Ethnic No Name Sex Identit Education Company (occupation) or Address Contact Signature . y 1 Li Bosheng Male Han University Mayor, Yuanshan People's Government 2 Gao Aichao Male Han Technical Linnian Station, Yueshan 138732337 Li Bosheng School 03 3 Chen Jianjun Male Han High School Xinqiao Village, Yueshan 139732997 Gao Aichao 66 4 Wang Shulin Male Han High School Xinqiao Village, Yueshan 138732212 Chen Jianjun 53 5 Wu Zhongyi Male Han High School Xinqiao Village, Yueshan 156162821 Wang Shulin 81 6 Chen Zhi Male Han High School Xinqiao Village, Yueshan 132373251 Wu Zhongyi 29 7 Liu Jingyang Male Han Junior College Yueshan Urban Planning Office 138732466 Chen Zhi 58

223

8 Male Han Junior College Yueshan Urban Planning Office 137862319 Liu Jingyang 18 9 Male Han High School Xinqiao Village, Yueshan 139732240 78 10 Zhong Mengqi Femal Han High School Xinqiao Village, Yueshan 135740518 e 28 11 Peng Xiaohua Male Han Bachelor’s Town Hall, Yuanshan 137862613 Zhong Mengqi Degree 87 12 Yang Jian Male Han High School Environmental Protection Station, Yueshan 137893233 Peng Xiaohua 90 13 Zhou Zhaohui Male Han High School Qingqiao Village, Yueshan 132013271 Yang Jian 78 14 Liao Zhijun Male Han High School Yueshan Town 158732983 Zhou Zhaohui 75 15 Peng Male Han High School Yueshan Town 130551537 Liao Zhijun Chuanyang 88 16 Male Han Junior College 137893266 Peng 58 Chuanyang 17 Chen Yi Male Han Junior College Farmer, Yueshan Town

224

18 Liu Wenhua Male Han Master’s World Bank Provincial PMO 138731391 Chen Yi Degree 89 19 Tang Guirong Femal Han Master’s Changsha Environmental Protection Career 139758004 Liu Wenhua e Degree Technical College 49 20 Wu Zhongwei Male Han Master’s Changsha Environmental Protection Career 180038139 Tang Guirong Degree Technical College 95 21 22 23 24 25 26 27

225

Appendix 4 Planning and Detail Budget of Project Environmental Monitoring Schedule 4 Planning and Detail Budget of Environmental Monitoring of the WWPT of Yueshan Town Project Distribution of Annual Unit Price Period Monitoring Environmen Monitoring Monitoring Monitoring Cost Total Monitored (RMB/Perio Cost Period tal Factor Stations Item Frequency (RMB/Year (RMB) by d) (RMB) (Quantity) ) 4 Monitoring Stations: Xinqiao Xiangxaing 4 Village, City Constructi Periods/Year, Hongyang Environmen on Period Ambient Air TSP 2 Days/Period, 480 1920 5760 13080 Village, Central tal (3 Years) and 1 Hospital and Monitoring Time/Day Xianfeng Middle Station School I Monitoring Station: 4 Wastewater pH, Periods/Year, Water Collection Poor Suspensions, 1 Day/Period, 130 520 1560 Quality on the Petroleum and 1 Construction Time/Day Spot

226

4 4 Monitoring Periods/Year, Stations: Xinqiao 1 Day/Period, Village, and 2 Hongyang Noise LeqdB (A) Times/Day 480 1920 5760 Village, Central (Once each Hospital and during Xianfeng Middle Daytime and School Night) Subtotal (RMB) 4360 6800 6 Monitoring Stations: Xinqiao 4 Operation Village, Density of Periods/Year, Period Ambient Air Hongyang H2S, NH 3 and 1 Day/Period, 15840 63360 190080 256740 (3 years) Village, and 4 Odor and 4 Boundaries of Times/Day the WWTP 1 Monitoring pH, DO, 3 Periods/Year Station: General COD, BOD , and Once Outlet of the 5 NH3-N, TP, Each during WWTP, the TN, SP, Oil Dry, Wet and Water 800m lower and grease, Normal Water 4620 18480 55440 Quality reaches of the Petroleum, Seasons, 3 outlet, and the Chroma and Days/Period 2000m lower Fecal and 1 reaches of the Coliform Time/Day outlet

227

4 6 Monitoring Periods/Year, Stations: Xinqiao 1 Day/Period, Village, and 2 Noise Hongyang LeqdB (A) Times/Day 720 2880 8640 Village, and 4 (Once each Boundaries of during the WWTP Daytime and Night) 2 1 Monitoring Heavy Metals Pperiods/Year, Station: Sludge Sludge (As, Hg, Pb, 1 Day/Period, 430 860 2580 Discharged from Cr, Cd, Cu) and 1 Sludge Pool Time/Day Subtotal (RMB) 85520 256740 total (RMB) 269820

228

Appendix 5 Project Associated Works (Environmental Monitoring Plan of Quanhu Garbage Disposal Plant, Xiangxaing City) Chart 5 Environmental Monitoring Plan of Quanhu Garbage Disposal Plant, Xiangxaing City Distribution of Annual Monitori Unit Price Period Environmen Monitoring Monitoring Monitoring Monitored Cost Total ng (RMB/Perio Cost tal Factor Stations Item Frequency by (RMB/Ye (RMB) Period d) (RMB) (Quantity) ar) 3 Monitoring 239460 Stations: 1 Spot (Paid by at the upper Drift Particles, the owner Qualified Operatio of the Annual Odor 4 Periods/Year, 1 of the Monitoring n Period Ambient Air Leading Wind and Strength, Day/Period, and 4 12560 50240 150720 garbage Organizatio (3 years) 2 at the down Ammonia, Times/Day disposal ns Wind of the H2S and CH 4 plant and Annual Leading not Wind included in 4 Periods/Year, 1 the project Day/Period, and 2 expenses) Noise with the Times/Day (Once Noise Site Boundary (2 LeqdB (A) 240 960 2880 Each during Spots) Daytime and Night)

229

3 Periods/Year and Once Each At the Wells dug NH -N, pH, 3 during Dry, Wet Ground by the Villagers COD and and Normal Water 5880 17640 52920 Water with Undefined Unionized Seasons, 1 Spots Ammonia Day/Period and 1 Time/Day pH, Organic Matters, Water content, Total Zn, 3 Periods/Year, 1 Sampling within Sludge Total Cu, Day/Period, and 3 2400 7200 21600 the Site Total Pb, Times/Day Total Cd, Total Hg, Total As and Total Cr Chroma, 3 Periods/Year COD, BOD , 5 and Once Each Outlet of the SS, NH -N, 3 during Dry, Wet Leachate Fecal Leachate and Normal Water 1260 3780 11340 Disposal Facility Coliform, TN Seasons, 1 (One) and Day/Period and 1 Hexavalent Time/Day Chromium Subtotal 22340 79820 239460 Total (RMB) 239460

230

Appendix 6 Summary of Project Environmental Management Plan Schedule 6 Summary of Environmental Management Plan of Yueshan Town WWTP Project Environmen tal Possible Execution Executed Monitored Monitoring Monitoring Monitoring Mitigation Measures Managemen Impact Period by by Factors Frequency Station t Budge (RMB) a. According to the real construction of the project pipe network, it’s designed that the washing of trucks and machines are not carried out in the construction site but in special washing places. b. Regarding to expropriation and relocation, related detail plans shall be provided as soon as the confirmation of the design proposal. And immediate negotiation with the local residents so as to reach harmonious Xiangxaing relocation and compensation negotiation; City c. Consideration shall be mainly settled on the The Environmen Design / protection of such sensitive targets as Construct tal / / / / Period surrounding residents against the or Protection construction, and countermeasures about Bureau practical pollution prevention and control shall be provided so as to reduce the interference to sensitivity targets; and d. Earthworks shall be balanced and optimized so as to achieve the balance of excavation and filling. It shall be considered first if Earth and stones abandoned can be circulated on the site or in the WWTP; if not, residue shall be cleaned and removed according to required procedures and 231

delivered to specified disposal location. a. it shall be conducted to strengthen management, to construct in a civilized way and to 4 lightly lift and unload construction Monitoring materials. Stations: b. Tarp shall be covered with on Xinqiao Xiangxaing 4 the trucks delivering such Village, 113080 Pipe City Periods/Ye materials easy to causing dust as The Hongyang (13080 if Waste network Constructi Environmen ar, 2 lime, sand and stone, cement, Construct TSP Village, including Gas Constructi on Period tal Days/Perio etc.; or Central Monitoring on Protection d, and I c. The construction site shall be Hospital Expense) Bureau Time/Day surrounded with colored steel and sheets for closed construction; Xianfeng and Middle d. Temporary earthwork yard shall School be watered and covered with nets so as to avoid dust emission.

232

a. During construction period, transportation management shall be strengthened, with tarp covered on trucks and no overload; B. Roads shall be watered frequently so as to reduce the chances of dust emission and the pollution of dust; c. it’s forbidden to discard construction garbage randomly, especially off the red construction lines; d. The construction site shall be surrounded with colored steel sheets for closed construction; Plant e. Temporary earthwork yard shall Constructi be watered and covered with nets on so as to avoid dust emission; f. it shall be conducted to strengthen management, to construct in a civilized way and to lightly lift and unload construction materials; g. No overload happens during loading and no drop from truck carrying earth during transportation. Before any traffic leaves the site, dirt and dust on the wheels shall be cleaned off first so as to avoid any scattering on the way; and h. Labor protection of the staff shall be well carried out and an anti-dust mask shall be worn. 233

a. According to the real construction of the project pipe network, it’s designed that the washing of trucks and machines I are not carried out in the Monitoring construction site but in special 4 Station: washing places; Pipe pH, Periods/Ye Wastewat b. The construction shall be Wastewat network Suspension ar, 1 er carried out in other times rather er Constructi s, day/Period, Collection than wet season, if possible; and on Petroleum and 1 Poor on c. Oil leaked shall be recycled with Time/Day the buckets, poured into waste oil Constructi tanks after being collected with on Spot special buckets and hand over waste oil reclamation depot; and waste oil dropped on the earth shall be cleaned with cotton.

234

a. Plant construction organization shall build a depositing reservoir during the construction period so that rain drops and accumulated water can be reused for washing and watering after depositing to the required degree; and Plant b. As for temporary domestic Constructi facilities built during the on construction period, kitchen wastewater shall be reused for watering the Plant site after removing oil and depositing, and temporary rest rooms shall be installed with dry latrines, the wastes in which shall be cleaned away regularly.

235

a. Domestic waste shall be packed with bags, separately collected and be collective cleaned away by the environmental protection department for further disposal; b. The construction site of the WWTP shall be provided with dry latrines which shall be cleaned regularly. Shit shall be reused as agricultural fertilizer after collective gathering; c. Construction garbage shall be separately packed, and if recyclable, those garbage shall be recycled by an appointed personnel and those but if not, those garbage shall be reused to fill the construction site of the WWTP; and d. According to Administration Pipe regulations for City Construction network Garbage , the Construction Solid and Site organization shall be responsible / / / Wastes Constructi for the disposal of construction on garbage. Before disposal, the organization shall file application to the environmental sanitation department and deliver the garbage via the required transportation line within the required duration. Earthwork residue shall be minimized, reused and harmlessly treated as possible. According to the 236 engineering construction status of the city, those residues shall be first used to fill other construction sites of the city after discussion

Continue Schedule 6 Summary of Environmental Management Plan of Yueshan Town WWTP Project Environmen tal Possible Execution Executed Monitored Monitor Monitoring Monitorin Mitigation Measures Managemen Impact Period by by Factors Frequency g Station t Budge (RMB)

237

a. During construction, the operation time of construction equipment shall be properly arranged so as to avoid that lots of equipment with high noise may operated at the same time or at night. Night transportation shall be reduced as possible and operation during 2:00-6:00 is forbidden. Construction works required to be carried out at night shall be approved by the related local department first and noise barriers shall be built between the noise source and the sensitive points; b. As for construction on the roads where the school is located, the Pipe construction organization shall network negotiate with the school first to Noise Constructi Constructi The Xiangxaing LeqdB 4 4 arrange construction works with on on Period Construct City (A) Periods/Ye Monitorin high noise carried out during winter or Environmen ar, 1 g and summer vacations, weekends tal Day/Period Stations: or after-school durations in the Protection , and 2 Xinqiao construction period as possible Bureau Times /Day Village, and the construction works shall be (Once Hongyan quickened to shorten construction Each g Village, period and to reduce the during Central interference. Rush construction are Daytime Hospital carried out during weekends so as and Night) and to reduce the disturbance to the Xianfeng teaching of the school; and Middle c. As for the construction on the School roads where the hospital is located, the construction organization shall negotiate with 238 the hospital and set up moveable noise barriers.

A, The operation time of construction equipment shall be properly arranged, and those equipment with high no ise shall not be operated at night; B. Construction works at different periods shall be carried out according to Noise Limits for Construction Sites (GB12523-90) and such measures as setting barriers and using equipment with lower noise shall be taken to strictly control noise during the Plant construction period; Constructi c. Equipment with lower noise shall on be chosen as possible, such as using hydraulic machines instead of diesel machines and installing mufflers to the mixers; d. The noise of fixed equipment and such machines used for digging and moving earth as bulldozers can be reduced via installing mufflers to the vent pipe and separating vibration parts from the engine; and e. The power-generating machinery are regularly maintained and repaired.

239

(1) Yards for discarding earth and residue shall be well selected but it’s better to use up. The engineering is separated into different sections so as to reduce the impact on the sight; (2) Earth digging shall avoid to be carried out in wet season and before the coming of the wet season, the sides formed through digging and filling and by the discarded earth shall be well treated; (3) Drain ditches shall be dug at the surrounding of the yard for discarding earth to avoid water loss and earth eros ion. Temporary Ecological yards shall be well covered after the Environme / / / completion of the construction; and nt (4) Environmental protection and monitoring organizations shall be established and special personnel responsible for environmental protection are appointed to strengthen construction management and promotion of environmental protection, to remind people to protect the environment, and to forbid construction personnel from lumbering in a destructive manner; the construction contract shall require the contractor to carry out construction strictly according to construction and expropriation scope and to stack residue at specified places.

240

(1) In view of the stronger odor and the leading wind in summer, main facilities to cause odor such as sludge pool and sludge dewatering chamber are arranged at the down wind or crosswind of the leading wind in summer, via optimizing plant layout, so as to guarantee the sanitation distance to the sensitive points; (2) When the Project is completed and put into operation, production management shall be strengthened, pollution shall be prevented from the sources, every production process emitting odor shall be well controlled and a complete job responsibility system and a monitoring system shall be set up; (3) Safety management shall be conducted. When the Project is completed and put into operation, the personnel shall be trained on accidence disposal and all monitoring 6 equipment shall be regularly maintained so as Monitorin to make sure successful operation and the g monitor and control of odor. When coming into Xiangxaing 4 Stations: the Pump chamber, the personnel shall pay City Density Periods/Ye Xinqiao attention to the aeration so as to avoid Waste Operation The Environmen of H 2S, ar, 1 Village, excessive accumulation of H 2S and NH 3 which Gas Period Operator tal NH and Day/Period Hongyan 406740 are harmful to the personnel; 3 Protection Odor , and 1 g Village, (256740 if (4) Land use shall be well planned. According Bureau Time/Day and 4 including to the requirements of sanitation protection Boundari Monitoring distance, the planning department shall re- es of the Expense) plan the land within the scope and specified WWTP that the building of such sensitive points as residential areas, schools, hospitals is forbidden; and (5) Greening shall be reinforced. Since the causing of odor is unavoidable to the WWTP, greening engineering is very important to the 241 improvement of environmental quality and the Plant greening design shall be completed with the construction detail design at the same time. Plant greening is to comple tely cover all

(1) Low-noise type of equipment shall be selected for such shops with higher noise as the wastewater pump room, the sludge pump room, the blast fan chamber and the sludge dewatering chamber and de-noising measures including damping cushions or flexible joints 6 4 shall be adopted during the installation; Monitorin Periods/Ye (2) Sound insulation shall be taken to walls, g ar, 1 doors and windows between the operation Xiangxaing Stations: Day/Period room and equipment room so as to reduce the City Xinqiao , and 2 noise impact to the personnel; Operation The Environmen LeqdB Village, Noise Times/Day (3) The design adopts the principle of sonic Period Operator tal (A) Hongyan (Once distance to reduce the impact of noise. In the Protection g Village, Each general layout, the noise source has the Bureau and 4 during farthest distance to the buildings so as to Boundari Daytime provide a good work environment for the staff es of the and Night) of the WWTP; and WWTP (4) To match the engineering construction, high arbors and bushes are planted together to form a mixed shelter belt, greening area within the Plant is widened so as to reach the effect of using vegetation to absorb noise.

242

Appended to Schedule 6 Summary of Environmental Management Plan of Yueshan Town WWTP Project Environment Possible Execution Executed Monitored Monitor Monitoring Monitoring al Mitigation Measures Impact Period by by Factors Frequency Station Management Budge

243

(1) Before flowing into the WWTP, industrial wastewater shall be re-treated to meet the standard of Grade III required in Discharge Standard for Municipal Wastewater (CJ18-86) and Integrated Wastewater Discharge Standard (GB8978-1996). And at the mean time, it must be sure that the treatment of the first class pollutants harmful to human health shall be strictly controlled within the shop and discharged into the WWTP after reaching the standard; (2) Wastewater discharged from medical organizations shall reach the related limits of pollutants required on GB18466-2005 Discharge Standard of Water Pollutants for Medical Organizations ; (3) The project construction and operation management shall be strengthened so as to guarantee that wastewater treatment facilities and the efficiency reach the standards and requirement designed, that the Project run pH, DO, stably and normally in the long-term and that COD, the tail water is discharged after treatment Xiangxaing BOD , NH3- 5 4 Periods/Year and reaching the related standards; City N, TP, TN, 1 Monitoring and 1 Wastewat (4) All environmental management Operation The Environmen SP, Oil and Station: Period/Quarter, er regulations and systems are established and Period Operator tal Grease, General Outlet 3 Days/Period job functional training plans are full executed Protection Petroleum, of the WWTP and I Time/Day for the staff on all posts. Bureau Chroma and (5) Equipment maintenance and repairing are Fecal well done to reduce and eliminate any Coliform malfunction in tim e so as to avoid wastewater discharged beyond standards and to prevent from restful discharge accidents; (6) Outlet is managed in a standardized manner. Auto measurer of wastewater 244 amount and auto proportional sampling machine are set at the end outlet and there shall be online monitoring equipment for measuring such main water quality indexes

(1) Solid wastes in the WWTP, especially sludge, cannot be randomly discarded but properly collected, stocked and regularly delivered to garbage filling yard for sanitation filling; (2) It’s forbidden to discharge sludge of the Project to non-special solid waste yards such as surface water and the banks, valleys, low- lying areas, water-eroded caves and farmland; (3) The temporary stock of sludge in the WWTP must be well protected via foundation anti-seepage measures so as to prevent from such loss and secondary pollution as rain leaching and washing and the enrichment and large emission of odor; (4) The WWTP shall properly take the responsibility of sludge treatment, carry out overall management of the production, transportation, stock, treatment and disposal of sludge, compile and conduct regulations, working process and requirements on environmental protection against sludge, establish a special monitoring department or appoint special (or pluralistic) monitoring personnel, guarantee proper disposal of sludge and strictly forbid the pouring, stacking, discarding and scattering of sludge randomly; (5) Sludge treatment shall be carry out in a minimization, stabilization and harmless manner, and sludge treatment facilities shall be planned, constructed and put into operation at the same time with wastewater disposal facilities; 245 (6) A sludge management accounting system and a transportation duplicate-form Xiangxaing 1 Monitoring system shall be established. The WWTP shall City Heavy Station: 2 Periods/Year, set up a sludge management system to Operation The Environmen Metals (As, Sludge

Continue Schedule 6 Summary of Environmental Management Plan of Yueshan Town WWTP Project Monit Monitorin Environmen Monitori Possible Executio Execute Monitored or g tal Mitigation Measures ng Impact n Period d by by Factor Frequen Managemen Station s cy t Budge (1) Plant greening shall take into consideration the combination of arbors, bushes and grass and keep at a certain layered structure. Local species shall be planted as many as possible to reduce the introduction of foreign species, and shall be the first choice when in selection of tree (or grass) species; (2) Management shall be conducted. The Plant shall appoint special people to well carry out greening and management, and set down related regulations to protect greens and the ecological environment; Xiangxaing (3) When wastewater pipelines are buried, the ground City Ecological The of the pipeline sections within the town shall be Operatio Environmen Environme Operato / / / ossified and the ground of the pipeline sections in the n Period tal nt r field shall be planted with vegetation so as to recover Protection vegetation as much on the bare ground caused by the Bureau pipeline construction. Local major grass species shall be chose as greening species. Meanwhile, the important area shall be surrounded with wire nets for in-time management and protection against destruction by cattle, sheep or people; and (4) The management of wastewater pipeline shall be strengthened and regular inspection shall also be carried out to the wastewater pipeline so as to monitor the leakage of the pipeline for taking in -time treatment

246

and to avoid the possible pollution to ground water by the leakage of the wastewater pipeline. (1) The process design shall spare a certain capacity of reflux treatment and buffering in the treatment system and related treatment equipment shall be installed so as to guarantee that the buffering and reflux equipment of the system will be triggered to retreat unqualified water till reaching the standards before discharge in the case that equipment failure may impact the normal operation of the treatment system; (2) Damageable equipment shall be of multiple sets and be provided with enough spare parts for the Xiangxaing purpose of maintenance and update. City Electromechanical machines of the treatment system The Risk and Operatio Environmen sh all be of at least two sets, one for operation and one Operato Protection n Period tal for spare purpose; r Protection (3) Equipment of good quality shall be selected. Every Bureau machine, electric appliance, instrument and so on installed on the treatment facilities shall be of good quality and low failure rate, meet design requirement, and be suitable for long-term operation and fit for maintenance and repairing; (4) Within the operation period, operators shall strictly carry out job function according to the related regulations of treatment facilities, and take frequent patrol inspection and in-time maintenance and repairing to the equipment, so as to reduce equipment failure rate;

247

(5) The earthing protection of electric equipment shall be conducted according to related regulations, an auto trip circuit is provided, the operation of major equipment is digitally monitored via a computer which can alarm in time and record event location, event properties and time of occurrence so as to facilitate people organization and in-time repairing; (6) Two-way power provision is adopted to guarantee the normal operation of power facilities and lines; (7) it shall be guarantee at the best that grid and sand depositing pool operate well to reduce the concentration of SS and COD in the water to some degree; (8) Pollution causes are found out from the water catchment system. Related companies shall take emergency measures to control the discharge quantity of substances poisonous to microorganism; (9) In the case that external force majeure factors happen to cause the discharge of wastewater before treatment, part or all of water discharge companies shall be required to stop discharging wastewater in to the pipeline so as to secure water security; (10) During the settlement of accidents incurred, warning marks shall be hung beside the waters close to the outlet so as to notify parties concerned to take preventive measures; (11) Before the operation of the WWTP, its operation and management personnel shall take security and safety education first and safety operation procedures

248

and management systems are established and strictly implemented after the operation. Frequent inspection is required; (12) The design of building shall take into consideration of such sanitation requirements as water discharge, heating and ventilation, and lighting. The places for permanent work shall be provided with air conditional. And the enclosed operation places with bad ventilation shall use mechanical ventilation; (13) Such labor protection appliances as life jackets, lifebuoys, safety belts and safety helmets shall be provide within the Plant. And proper protection facilities shall be provided to the operators working or inspecting in the wells or tunnels so as to avoid poisoning and at least two operators shall be on the spot at the same time; (14) The edges of the paths connected to the pool shall be provided with rails and lightings so as to guarantee the safety of people working beside the pool; (15) The safety protection of all electric appliances shall meet the safety regulations of electric a ppliances and the earthing protection of high voltage equipment shall be well done; (16) The dangerous parts of machines, such as driving belts, gears and grinding wheels, shall be provided with guarding devices; (17) Dangerous areas within the Plant shall be alarmed by hanging a warning board at the noticeable

249

position, platforms higher than 1.2m shall be provided with protection rails and those places which may cause the enrichment of poisonous harmful gas shall be provided with venting facilities; (18) During each period, according the actual necessity and convenience of use, production sanitation rooms (such as rest rooms, washing rooms and undressing rooms) shall be provided; besides the strengthening of ventilation and the provision of shelter, rest rooms shall also be built for work in construction sections with bad environment and open field. Concentration bathrooms are constructed in the Plant; and (19) Worker who directly deal with wastewater, sludge and domestic waste shall do regular health examination and take regular injection of related vaccines.

250

251